Committee Reports

109th Congress (2005-2006)

Senate Report 109-061

Senate Report 109-061 1 of 1

This Report: To Accompany S.728     Printer Friendly: HTML  |  PDF




{link: 'http://www.congress.gov:80/cgi-bin/cpquery?',title: 'THOMAS - Committee Report - Senate Report 109-061' }

WATER RESOURCES DEVELOPMENT ACT OF 2005

20-686

2005
109TH CONGRESS 1ST SESSION
SENATE
Report

109-61

Calendar No. 93

WATER RESOURCES

DEVELOPMENT ACT OF 2005

REPORT

of the

COMMITTEE ON

ENVIRONMENT AND PUBLIC WORKS

UNITED STATES SENATE

to accompany

S. 728

together with

ADDITIONAL VIEWS

Congress.#13

APRIL 26, 2005- Ordered to be printed

?
COMMITTEE ON ENVIRONMENT AND PUBLIC WORKS
one hundred ninth congress
JAMES M. INHOFE, Oklahoma, Chairman
JOHN W. WARNER, Virginia
CHRISTOPHER S. BOND, Missouri
GEORGE V. VOINOVICH, Ohio
LINCOLN CHAFEE, Rhode Island
LISA MURKOWSKI, Alaska
JOHN THUNE, South Dakota
JIM DEMINT, South Carolina
JOHNNY ISAKSON, Georgia
DAVID VITTER, Louisiana
JAMES M. JEFFORDS, Vermont
MAX BAUCUS, Montana
JOSEPH I. LIEBERMAN, Connecticut
BARBARA BOXER, California
THOMAS R. CARPER, Delaware
HILLARY RODHAM CLINTON, New York
FRANK R. LAUTENBERG, New Jersey
BARACK OBAMA, Illinois
ANDREW WHEELER MAJORITY STAFF DIRECTOR
KEN CONNOLLY, MINORITY STAFF DIRECTOR (ii)

C O N T E N T S Page
General statement 1
Water Resources Development Act of 2005 2
Section-by-section analysis 2
Sec. 1. Short title; table of contents.
2
Sec. 2. Definition of Secretary.
3
TITLE I--WATER RESOURCES PROJECTS Sec. 1001. Project authorizations.
3
Sec. 1002. Enhanced navigation capacity improvements and ecosystem restoration plan for the Upper Mississippi River and Illinois Waterway System.
19
Sec. 1003. Louisiana coastal area ecosystem restoration, Louisiana.
23
Sec. 1004. Small projects for flood damage reduction.
26
Sec. 1005. Small projects for navigation.
26
Sec. 1006. Small projects for aquatic ecosystem restoration.
26
TITLE II--GENERAL PROVISIONS
Subtitle A--Provisions Sec. 2001. Credit for in-kind contributions.
26
Sec. 2002. Interagency and international support authority.
27
Sec. 2003. Training funds.
28
Sec. 2004. Recreational areas and project sites.
28
Sec. 2005. Fiscal transparency report.
29
Sec. 2006. Planning.
30
Sec. 2007. Independent reviews.
32
Sec. 2008. Mitigation for fish and wildlife losses.
34
Sec. 2009. State technical assistance.
35
Sec. 2010. Access to water resource data.
35
Sec. 2011. Construction of flood control projects by non-Federal interests.
35
Sec. 2012. Regional sediment management.
36
Sec. 2013. National shoreline erosion control development program.
37
Sec. 2014. Shore protection projects.
38
Sec. 2015. Cost sharing for monitoring.
38
Sec. 2016. Ecosystem restoration benefits.
38
Sec. 2017. Funding to expedite the evaluation and processing of permits.
39
Sec. 2018. Electronic submission of permit applications.
39
Sec. 2019. Improvement of water management at Corps of Engineers reservoirs.
39
Sec. 2020. Corps of Engineers hydropower operation and maintenance funding.
40
Sec. 2021. Federal hopper dredges.
40
Sec. 2022. Obstruction to navigation.
40
Subtitle B--Continuing authorities projects Sec. 2031. Navigation enhancements for waterbourne transportation.
40
Sec. 2032. Protection and restoration due to emergencies at shores and streambanks.
41
Sec. 2033. Restoration of the environment for protection of aquatic and riparian ecosystems program.
41
Sec. 2034. Environmental modification of projects for improvement and restoration of ecosystems program.
41
Sec. 2035. Projects to enhance estuaries and coastal habitats.
41
Sec. 2036. Remediation of abandoned mine sites.
41
Sec. 2037. Small projects for the rehabilitation or removal of dams.
41
Sec. 2038. Remote, maritime-dependent communities.
41
Sec. 2039. Agreements for water resource projects.
42
Sec. 2040. Program names.
43
TITLE III--PROJECT-RELATED PROVISIONS Sec. 3001. St. Herman and St. Paul Harbors, Kodiak, Alaska.
43
Sec. 3002. Sitka, Alaska.
43
Sec. 3003. Black Warrior-Tombigbee Rivers, Alabama.
43
Sec. 3004. Augusta and Clarendon, Arkansas.
43
Sec. 3005. St. Francis Basin, Arkansas and Missouri.
44
Sec. 3006. St. Francis Basin land transfer, Arkansas and Missouri.
44
Sec. 3007. Red-Ouachita River Basin levees, Arkansas and Louisiana.
44
Sec. 3008. McClellan-Kerr Arkansas River navigation system, Arkansas and Oklahoma.
44
Sec. 3009. Cache Creek Basin, California.
44
Sec. 3010. Hamilton Airfield, California.
45
Sec. 3011. LA-3 dredged material ocean disposal site designation, California.
45
Sec. 3012. Larkspur Ferry Channel, California.
45
Sec. 3013. Llagas Creek, California.
45
Sec. 3014. Los Angeles Harbor, California.
45
Sec. 3015. Magpie Creek, California.
45
Sec. 3016. Pine Flat Dam fish and wildlife habitat, California.
46
Sec. 3017. Redwood City navigation project, California.
46
Sec. 3018. Sacramento and American Rivers flood control, California.
46
Sec. 3019. Conditional declaration of nonnavigability, Port of San Francisco, California.
46
Sec. 3020. Salton Sea restoration, California.
46
Sec. 3021. Upper Guadalupe River, California.
47
Sec. 3022. Yuba River Basin project, California.
47
Sec. 3023. Charles Hervey Townshend Breakwater, New Haven Harbor, Connecticut.
47
Sec. 3024. Anchorage area, New London Harbor, Connecticut.
47
Sec. 3025. Norwalk Harbor, Connecticut.
47
Sec. 3026. St. George's Bridge, Delaware.
47
Sec. 3027. Christina River, Wilmington, Delaware.
47
Sec. 3028. Additional program authority, comprehensive Everglades restoration, Florida.
48
Sec. 3029. Critical restoration projects, Everglades and south Florida ecosystem restoration, Florida.
48
Sec. 3030. Jacksonville Harbor, Florida.
48
Sec. 3031. Lake Okeechobee and Hillsboro Aquifer pilot projects, comprehensive Everglades restoration, Florida.
48
Sec. 3032. Lido Key, Sarasota County, Florida.
49
Sec. 3033. Tampa Harbor, Cut B, Tampa, Florida.
49
Sec. 3034. Allatoona Lake, Georgia.
49
Sec. 3035. Dworshak Reservoir improvements, Idaho.
49
Sec. 3036. Little Wood River, Gooding, Idaho.
49
Sec. 3037. Port of Lewiston, Idaho.
50
Sec. 3038. Cache River Levee, Illinois.
50
Sec. 3039. Chicago, Illinois.
50
Sec. 3040. Chicago River, Illinois.
50
Sec. 3041. Missouri and Illinois flood protection projects reconstruction pilot program.
50
Sec. 3042. Spunky Bottom, Illinois.
51
Sec. 3043. Strawn Cemetery, John Redmond Lake, Kansas.
51
Sec. 3044. Harry S. Truman Reservoir, Milford, Kansas.
51
Sec. 3045. Ohio River, Kentucky, Illinois, Indiana, Ohio, Pennsylvania, and West Virginia.
51
Sec. 3046. Public access, Atchafalaya Basin Floodway System, Louisiana.
51
Sec. 3047. Calcasieu River and Pass, Louisiana.
52
Sec. 3048. Larose to Golden Meadow, Louisiana.
52
Sec. 3049. East Baton Rouge Parish, Louisiana.
52
Sec. 3050. Red River (J. Bennett Johnston) Waterway, Louisiana.
52
Sec. 3051. Camp Ellis, Saco, Maine.
52
Sec. 3052. Union River, Maine.
52
Sec. 3053. Chesapeake Bay environmental restoration and protection program, Maryland, Pennsylvania, and Virginia.
53
Sec. 3054. Cumberland, Maryland.
53
Sec. 3055. Fall River Harbor, Massachusetts and Rhode Island.
53
Sec. 3056. St. Clair River and Lake St. Clair, Michigan.
53
Sec. 3057. Duluth Harbor, Minnesota.
54
Sec. 3058. Land exchange, Pike County, Missouri.
54
Sec. 3059. Union Lake, Missouri.
54
Sec. 3060. Fort Peck Fish Hatchery, Montana.
54
Sec. 3061. Yellowstone River and tributaries, Montana and North Dakota.
54
Sec. 3062. Lower Truckee River, Mccarran Ranch, Nevada.
55
Sec. 3063. Middle Rio Grande restoration, New Mexico.
55
Sec. 3064. Long Island Sound oyster restoration, New York and Connecticut.
55
Sec. 3065. Orchard Beach, Bronx, New York.
55
Sec. 3066. New York Harbor, New York, New York.
55
Sec. 3067. Onondaga Lake, New York.
56
Sec. 3068. Missouri River restoration, North Dakota.
56
Sec. 3069. Lower Girard Lake Dam, Girard, Ohio.
56
Sec. 3070. Toussaint River navigation project, Carroll Township, Ohio.
56
Sec. 3071. Arcadia Lake, Oklahoma.
56
Sec. 3072. Oklahoma Lake demonstration, Oklahoma.
56
Sec. 3073. Waurika Lake, Oklahoma.
57
Sec. 3074. Lookout Point, Dexter Lake project, Lowell, Oregon.
57
Sec. 3075. Upper Willamette River Watershed ecosystem restoration.
57
Sec. 3076. Tioga Township, Pennsylvania.
57
Sec. 3077. Upper Susquehanna River Basin, Pennsylvania and New York.
57
Sec. 3078. Cooper River Bridge demolition, Charleston, South Carolina.
57
Sec. 3079. South Carolina Department of Commerce development proposal at Richard B. Russell Lake, South Carolina.
58
Sec. 3080. Missouri River restoration, South Dakota.
58
Sec. 3081. Missouri and Middle Mississippi Rivers enhancement project.
58
Sec. 3082. Anderson Creek, Jackson and Madison Counties, Tennessee.
58
Sec. 3083. Harris Fork Creek, Tennessee and Kentucky.
58
Sec. 3084. Nonconnah Weir, Memphis, Tennessee.
59
Sec. 3085. Old Hickory Lock and Dam, Cumberland River, Tennessee.
59
Sec. 3086. Sandy Creek, Jackson County, Tennessee.
59
Sec. 3087. Cedar Bayou, Texas.
59
Sec. 3088. Freeport Harbor, Texas.
59
Sec. 3089. Harris County, Texas.
59
Sec. 3090. Dam remediation, Vermont.
60
Sec. 3091. Lake Champlain eurasian milfoil, water chestnut, and other nonnative plant control, Vermont.
60
Sec. 3092. Upper Connecticut River Basin wetland restoration, Vermont and New Hampshire.
60
Sec. 3093. Upper Connecticut River Basin ecosystem restoration, Vermont and New Hampshire.
60
Sec. 3094. Lake Champlain Watershed, Vermont and New York.
61
Sec. 3095. Chesapeake Bay oyster restoration, Virginia and Maryland.
61
Sec. 3096. Tangier Island Seawall, Virginia.
61
Sec. 3097. Erosion control, Puget Island, Wahkiakum County, Washington.
61
Sec. 3098. Lower granite pool, Washington.
61
Sec. 3099. Mcnary Lock and Dam, Mcnary National Wildlife Refuge, Washington and Idaho.
62
Sec. 3100. Snake River project, Washington and Idaho.
62
Sec. 3101. Marmet Lock, Kanawha River, West Virginia.
62
Sec. 3102. Lower Mud River, Milton, West Virginia.
62
Sec. 3103. Green Bay Harbor Project, Green Bay, Wisconsin.
62
Sec. 3104. Underwood Creek diversion facility project, Milwaukee County, Wisconsin.
63
Sec. 3105. Mississippi River headwaters reservoirs.
63
Sec. 3106. Lower Mississippi River Museum and Riverfront Interpretive Site.
63
Sec. 3107. Pilot program, Middle Mississippi River.
63
Sec. 3108. Upper Mississippi River system environmental management program.
63
Sec. 3109. Great Lakes fishery and ecosystem restoration program.
63
Sec. 3110. Great Lakes remedial action plans and sediment remediation.
64
Sec. 3111. Great Lakes tributary models.
64
TITLE IV--STUDIES Sec. 4001. Eurasian milfoil.
64
Sec. 4002. National port study.
64
Sec. 4003. McClellan-Kerr Arkansas River Navigation Channel.
65
Sec. 4004. Selenium study, Colorado.
65
Sec. 4005. Nicholas Canyon, Los Angeles, California.
65
Sec. 4006. Oceanside, California, shoreline special study.
65
Sec. 4007. Comprehensive flood protection project, St. Helena, California.
65
Sec. 4008. San Francisco Bay, Sacramento-San Joaquin Delta, Sherman Island, California.
65
Sec. 4009. South San Francisco Bay shoreline study, California.
65
Sec. 4010. San Pablo Bay Watershed restoration, California.
66
Sec. 4011. Bubbly Creek, South Fork of South Branch, Chicago, Illinois.
66
Sec. 4012. Grand and Tiger Passes and Baptiste Collette Bayou, Louisiana.
66
Sec. 4013. Lake Erie at Luna Pier, Michigan.
66
Sec. 4014. Middle Bass Island State Park, Middle Bass Island, Ohio.
66
Sec. 4015. Jasper County port facility study, South Carolina.
66
Sec. 4016. Lake Champlain Canal study, Vermont and New York.
66
TITLE V--MISCELLANEOUS PROVISIONS Sec. 5001. Lakes program.
67
Sec. 5002. Estuary restoration.
67
Sec. 5003. Delmarva conservation corridor, Delaware and Maryland.
69
Sec. 5004. Susquehanna, Delaware, and Potomac River Basins, Delaware, Maryland, Pennsylvania, and Virginia.
69
Sec. 5005. Chicago Sanitary and Ship Canal Dispersal Barriers project, Illinois.
69
Sec. 5006. Rio Grande environmental management program, New Mexico.
70
Sec. 5007. Cheyenne River Sioux Tribe, Lower Brule Sioux Tribe, and Terrestrial Wildlife Habitat Restoration, South Dakota.
71
Sec. 5008. Connecticut River dams, Vermont.
71
TITLE VI--PROJECT DEAUTHORIZATIONS Sec. 6001. Little Cove Creek, Glencoe, Alabama.
71
Sec. 6002. Goleta and vicinity, California.
71
Sec. 6003. Bridgeport Harbor, Connecticut.
71
Sec. 6004. Bridgeport, Connecticut.
71
Sec. 6005. Hartford, Connecticut.
72
Sec. 6006. New Haven, Connecticut.
72
Sec. 6007. Inland waterway from Delaware River to Chesapeake Bay, Part II, installation of fender protection for bridges, Delaware and Maryland.
72
Sec. 6008. Central and southern Florida, Everglades National Park, Florida.
72
Sec. 6009. Shingle Creek Basin, Florida.
72
Sec. 6010. Brevoort, Indiana.
72
Sec. 6011. Middle Wabash, Greenfield Bayou, Indiana.
72
Sec. 6012. Lake George, Hobart, Indiana.
72
Sec. 6013. Green Bay Levee and Drainage District No. 2, Iowa.
72
Sec. 6014. Muscatine Harbor, Iowa.
73
Sec. 6015. Big South Fork National River and Recreational Area, Kentucky and Tennessee.
73
Sec. 6016. Eagle Creek Lake, Kentucky.
73
Sec. 6017. Hazard, Kentucky.
73
Sec. 6018. West Kentucky tributaries, Kentucky.
73
Sec. 6019. Bayou Cocodrie and tributaries, Louisiana.
73
Sec. 6020. Bayou Lafourche and Lafourche Jump, Louisiana.
73
Sec. 6021. Eastern Rapides and South-Central Avoyelles Parishes, Louisiana.
73
Sec. 6022. Fort Livingston, Grand Terre Island, Louisiana.
73
Sec. 6023. Gulf Intercoastal Waterway, Lake Borgne and Chef Menteur, Louisiana.
74
Sec. 6024. Red River Waterway, Shreveport, Louisiana to Daingerfield, Texas.
74
Sec. 6025. Casco Bay, Portland, Maine.
74
Sec. 6026. Northeast Harbor, Maine.
74
Sec. 6027. Penobscot River, Bangor, Maine.
74
Sec. 6028. Saint John River Basin, Maine.
74
Sec. 6029. Tenants Harbor, Maine.
74
Sec. 6030. Grand Haven Harbor, Michigan.
74
Sec. 6031. Greenville Harbor, Mississippi.
74
Sec. 6032. Platte River flood and related streambank erosion control, Nebraska.
74
Sec. 6033. Epping, New Hampshire.
75
Sec. 6034. Manchester, New Hampshire.
75
Sec. 6035. New York Harbor and adjacent channels, Claremont Terminal, Jersey City, New Jersey.
75
Sec. 6036. Eisenhower and Snell Locks, New York.
75
Sec. 6037. Olcott Harbor, Lake Ontario, New York.
75
Sec. 6038. Outer Harbor, Buffalo, New York.
75
Sec. 6039. Sugar Creek Basin, North Carolina and South Carolina.
75
Sec. 6040. Cleveland Harbor 1958 Act, Ohio.
75
Sec. 6041. Cleveland Harbor 1960 Act, Ohio.
75
Sec. 6042. Cleveland Harbor, uncompleted portion of Cut #4, Ohio.
76
Sec. 6043. Columbia River, Seafarers Memorial, Hammond, Oregon.
76
Sec. 6044. Chartiers Creek, Cannonsburg (Houston Reach Unit 2b), Pennsylvania.
76
Sec. 6045. Schuylkill River, Pennsylvania.
76
Sec. 6046. Tioga-Hammond Lakes, Pennsylvania.
76
Sec. 6047. Tamaqua, Pennsylvania.
76
Sec. 6048. Narragansett Town Beach, Narragansett, Rhode Island.
76
Sec. 6049. Quonset Point-Davisville, Rhode Island.
76
Sec. 6050. Arroyo Colorado, Texas.
76
Sec. 6051. Cypress Creek-Structural, Texas.
76
Sec. 6052. East Fork Channel Improvement, Increment 2, east fork of the Trinity River, Texas.
77
Sec. 6053. Falfurrias, Texas.
77
Sec. 6054. Pecan Bayou Lake, Texas.
77
Sec. 6055. Lake of the Pines, Texas.
77
Sec. 6056. Tennessee Colony Lake, Texas.
77
Sec. 6057. City Waterway, Tacoma, Washington.
77
Sec. 6058. Kanawha River, Charleston, West Virginia.
77
Hearings 77
Legislative history 78
Rollcall votes 78
Mandates assessment 78
Evaluation of regulatory impact 78
Cost of legislation 79
Additional views of Senators Jeffords, Baucus, Lieberman, Boxer, Clinton, Carper, and Lautenberg 80
Additional views of Senators Jeffords, Lieberman, Boxer, Clinton, Carper, Lautenberg, and Chafee 84
Changes in existing law 90

20-686

Calendar No. 93

109TH CONGRESS

Report

SENATE

1st Session

109-61

--WATER RESOURCES DEVELOPMENT ACT OF 2005

April 26, 2005- Ordered to be printed

Mr. INHOFE, from the Committee on Environment and Public Works, submitted the following

REPORT

[to accompany S. 728]

together with

--ADDITIONAL VIEWS

The Committee on Environment and Public Works, to which was referred the bill (S. 728) to provide for the conservation and development of water and related resources, to authorize the Secretary of the Army to construct various projects for improvements to rivers and harbors of the United States, and for other purposes, and having considered the same, reports favorably thereon, and recommends that the bill, as amended, be reported and pass.

GENERAL STATEMENT

In 1986, a House-Senate Conference Committee produced a Conference Report (H. Rpt. 99-1013), which was passed by the House and Senate and signed into law on November 17, 1986, that was the largest and most comprehensive authorization of the Army Corps' Civil Works Program since the Senate Public Works Committee was created in 1947. The Water Resources Development Act of 1986 marked the end of a 16-year deadlock between the Congress and executive branch regarding authorization of the civil works program. In addition to authorizing numerous projects, the 1986 Act resolved longstanding disputes relating to cost sharing, user fees, and environmental requirements.

Some of the major reforms included in the Water Resources Development Act of 1986 and subsequent legislation are listed below:

Cost-sharing formulas were established for harbor dredging (section 101), flood control (section 103), shoreline protection (section 103), stream bank erosion control (section 603), and other projects. Project Cooperation Agreements were required for all such projects. Projects for mitigation of fish and wildlife resources were allowed to be carried out at up to 100 percent Federal expense under section 906 and modification of Army Corps of Engineers projects in the interest of environmental quality were authorized to be carried out at 75 percent Federal expense under section 1135. The Water Resources Development Act of 1996 extended harbor cost sharing formulas to dredged material disposal facilities, increased the non-Federal cost share for flood control, and established cost sharing for environmental protection and restoration.

The Harbor Maintenance Trust Fund, capitalized by a new Harbor Maintenance Fee, was established to pay 40 percent of the Federal cost of maintaining authorized deep draft navigation channels (sections 210, 1402, and 1403), and was subsequently increased to provide for 100 percent of the cost under the 1990 Water Resources Development Act.

These policy changes applied to all projects contained in the Water Resources Development Acts of 1988 (Public Law 100-676); 1990 (Public Law 101-640); 1992 (Public Law 102-580); 1996 (Public Law 104-303); 1999 (Public Law 106-53); and 2000 (Public Law 106-541); and will continue to apply to all projects contained in the Water Resources Development Act of 2005.

In reporting the Water Resources Development Act of 2005, the committee is adhering to the policies established in the Water Resources Development Act of 1986 (P.L. 99-662) and continued in the civil works program of the Army Corps of Engineers. This bill includes authorization for 37 new projects for navigation, flood and coastal storm damage reduction, ecosystem restoration and environmental remediation, and water storage and water quality. This bill limits contingent authorization of water resources projects to those projects that will have final reports of the Chief of Engineers in the same calendar year as the Water Resources Development Act under consideration.

WATER RESOURCES DEVELOPMENT ACT OF 2005

The Water Resources Development Act of 2005, reported by the Committee on Environment and Public Works, resulting from consideration of S. 728, introduced on April 6, 2005, by Senator Bond, for himself, Senators Inhofe, Vitter, Warner, Voinovich, Isakson, Thune, Murkowski, Obama, Landrieu, Grassley, Harkin, Talent, Cornyn, Cochran, Domenici, and Coleman, incorporates some of the provisions as outlined below.

SECTION-BY-SECTION ANALYSIS

Section 1. Short title; table of contents.

This section designates the title of the bill as `The Water Resources Development Act of 2005' and lists the table of contents.

Sec. 2. Definition of Secretary.

This section defines the term `Secretary' for the purposes of the Act as the Secretary of the Army.

TITLE I--WATER RESOURCES PROJECTS

Sec. 1001. Project authorizations.

This section provides authority for the Secretary to carry out 35 projects for water resources development, conservation, and other purposes substantially in accordance with the plans recommended in the reports referenced in the bill language. Descriptions of the projects are as follows:

(a) Projects with Chief's Report.

Subsection (a) of section 1001 authorizes 27 projects to be carried out by the Secretary substantially in accordance with the plan and subject to the conditions recommended in a final report of the Chief of Engineers.

(1) Akutan Harbor, Akutan, Alaska.

Location. Akutan, Aleutians East Borough, Alaska.

Purpose. Navigation.

Problem. There are currently no protected moorage facilities for both large commercial fishing vessels and the local resident fleet.

Recommended Plan. The recommended plan consists of two rubblemound breakwaters totaling 700 feet and dredging the entrance channel and the inner harbor area to create a 12-acre mooring basin.

Project Costs. Total Cost $12,200,000. Federal cost $9,800,000; non-Federal cost $2,400,000.

Benefit/Cost Ratio. 1.8 to 1.

(2) Haines Small Boat Harbor, Haines, Alaska.

Location. Haines, Alaska.

Purpose. Navigation.

Problem. The existing harbor is inadequate in terms of size and design to accommodate the needs of the existing demands of resident and transient users.

Recommended Plan. The recommended plan provides additional protection to the existing 2.25-hectare mooring and maneuvering basin and adds a new adjacent 6.60-hectare basin with an additional entrance channel.

Project Costs. Total Cost $12,200,000. Federal cost $9,700,000; non-Federal cost $2,500,000.

Benefit/Cost Ratio. 1.2 to 1.

(3) Rillito River (El Rio Antiguo), Pima County, Arizona.

Location. Rillito River from Craycroft Rd. to Campbell Ave. on the northern edge of the city of Tucson, Arizona.

Purpose. Ecosystem Restoration, recreation and incidental flood damage reduction.

Problem. 90 percent of riparian areas have been lost due to impacts from urbanization. Riparian areas in the Southwest represent only 1 percent of the landscape, yet the survival of 75 to 90 percent of wildlife in the West is dependent on riparian areas. The riparian areas of this reach of the Rillito have become severely degraded.

Recommended Plan. The plan consists of restoration of approximately 391 acres of riparian habitat, including 99 acres of Cottonwood/willow community, 116 acres of Mesquite Bosque, 62 acres of riparian strand (desert wash), and 114 acres of seasonal cienega. The project also will provide 8 water harvesting retention basins at tributary confluences, terracing of approximately 4600 feet of soil cement banks, irrigation, as well as a passive recreation plan consisting of 7.5 miles of multi-use trails, a pedestrian bridge, parking lots, comfort stations and interpretive signs.

Project Costs. Total cost is $67,457,000. Federal cost $43,421,000; non-Federal cost $24,036,000.

Benefit/Cost Ratio. The cost of the plan is justified by the restoration of valuable habitat.

(4) Tanque Verde Creek Project, Pima County, Arizona.

Location. Pima County, Arizona.

Purpose. Flood Control and Habitat Preservation.

Problem. The project addresses erosion along an approximately two-mile reach of Tanque Verde Creek immediately upstream of Rillito River at its confluence with Pantano Wash, east of Tucson, Arizona. This segment of Tanque Verde Creek (a tributary of the Rillito River) has an average annual rate of bank erosion of 13 feet. About 9,500 linear feet, located along four separate channel segments have previously been stabilized with soil cement to prevent streambank erosion. Annual erosion damage caused by floodflows is estimated as $714,100.

Recommended Plan. The recommended plan includes: (1) completing bank erosion control on the southern bank with the construction of two segments of which one is approximately 4,220 linear feet and the other 2,830 linear feet, (2) north bank erosion control (1,550 linear feet) protecting vulnerable public infrastructure and 5,000 feet of modified bank protection along the mitigation preserve area, and (3) the establishment of a 48-acre riparian habitat area for mitigation.

Project Costs. Total cost $4,978,000. Federal cost $3,236,000; non-Federal cost $1,742,000.

Benefit/Cost Ratio. 2.1 to 1.

(5) Salt River (Va Shlyay Akimel), Maricopa County, Arizona.

Location. Salt River between Granite Reef Dam and Price Freeway Bridge within the jurisdiction of the Salt River Pima-Maricopa Indian Community and the city of Mesa.

Purpose. Ecosystem Restoration.

Problem. The primary problem is the severe degradation and loss of riparian habitat along the Salt River since the early 20th century. The Salt River once flowed perennially and supported substantial growth of cottonwoods, willows, and mesquites. The river channel carried abundant water that supported early irrigation projects. Increasing appropriation of surface and groundwater to support expansion of agriculture and growing urban populations resulted in the transformation of the Salt River to a dry river that flows only ephemerally in response to storm runoff. As a result of this change, stands of native riparian habitat are rare in the study area, as they are throughout Maricopa County. The riparian areas of this reach of the Salt River have become severely degraded.

Recommended Plan. The cost of the plan is justified by the restoration of valuable habitat.

Project Costs. Total cost is $138,968,000. Federal cost $90,129,000; non-Federal cost $48,839,000.

Benefit/Cost Ratio. B/C ratio is not computed for restoration projects; however, the cost of the recommended environmental restoration features would be justified by the restoration of about 1006 average annual functional capacity units and by achieving ecosystem function increases in the most cost effective manner.

(6) Hamilton City, California.

Location. Hamilton City, Glenn County, California.

Purpose. Flood Damage Reduction and Ecosystem Restoration.

Problem. The Hamilton City community has long been at risk of flooding from the Sacramento River. Portions of Hamilton City and the surrounding area were flooded in 1974, and extensive flood fighting was necessary in 1983, 1986, 1995, 1997, and 1998 to avoid failure of the existing private levee. Residents of the town were evacuated six times in the past 20 years: 1983, 1986, twice in 1995, 1997, and 1998. The existing levee does not meet U.S. Army Corps of Engineers or any other levee construction standards and could fail at river levels well below the top of the levee. In addition to the existing flood risk, native habitat and natural functions of the Sacramento River have been altered by construction of the private levee and conversion of the floodplain to agricultural and rural development.

Recommended Plan. The plan, as described in the Chief's report signed December 22, 2004, consists of construction of a levee, which would be set back from the Sacramento River, and for the restoration of lands waterside of the setback levee. The recommended multi-purpose plan focuses on reconnecting the Sacramento River with a portion of its historic floodplain by removing the existing levee. This would restore hydrologic functions of the floodplain while providing flood damage reduction to the community and area landside of the setback levee. The project area encompasses about 1,480 acres with a 6.8-mile setback levee that would begin about 2 miles north of the community. Implementation of this plan would reduce potential flood damages and restore ecosystem functions and values in the area by restoring fish and wildlife habitats. The setback levee would provide 3 distinct levels of flood protection associated with three different average levee heights. The recommended plan includes removal of existing orchards in the project area, and planting of native vegetation to restore native habitat types that have become degraded along much of the Sacramento River.

Project Costs. Total cost is $50,600,000. Federal cost $33,000,000; non-Federal cost $17,600,000.

Benefit/Cost Ratio. The cost of the plan is justified by the restoration of valuable habitat.

(7) Imperial Beach, California.

Location. Imperial Beach, San Diego County, California.

Purpose. Shore Protection.

Problem. There is a lack of adequate protection from winter coastal storms for the Silver Shoreline, Imperial Beach, California. The shoreline is eroding at a rate of 6 feet per year. Many private and commercial properties along the shoreline are susceptible to wave attack, inundation, and failure due to erosion during coastal storm events.

Recommended Plan. This section modifies the project for beach erosion, San Diego County California, authorized by section 101 of the River and Harbor Act of 1958 (72 Stat. 300) to authorize the Secretary to carry out a shore protection project in accordance with the Report of the Chief of Engineers dated December 30, 2003. The additional project consists of an initial beach fill of approximately 1.6 million cubic yards of sand. The placement will be 7,100 feet long and 105 feet wide along the developed shorefront. Periodic nourishment of approximately 1 million cubic yards of sand will occur on average every 10 years over a 50-year period of Federal participation for a total of four additional nourishments.

Project Costs. Total Cost $11,862,000. Federal cost $7,592,000; non-Federal cost $4,270,000. Estimated total costs of $38,004,00 for periodic nourishment over a period of 50 years, with an estimated Federal cost of $19,002,000 and an estimated non-Federal cost of $19,002,000.

Benefit/Cost Ratio. 1.7 to 1.

(8) Matilija Dam, Ventura County, California.

Location. Ventura River, Ventura County, California.

Purpose. Ecosystem Restoration.

Problem. Matilija Dam was constructed in 1948 as a water supply facility. The resulting reservoir has filled with sediment and provides very little water storage; approximately 500 acre-feet, 7 percent of capacity, and decreasing. The Matilija Dam is an impediment for fish passage, no longer provides adequate water supply, and negatively affects downstream and coastal sediment transport. Arundo Donax, a non-native invasive plant, is prevalent throughout the river system reducing the quality of habitat for a number of endangered, listed and other species.

Recommended Plan. The recommended plan includes dam removal to restore fish passage and sediment transport processes to the river and beach. It also includes levees and floodwalls, bridge modification, radial gates, a detention basin, land acquisition, sediment slurry lines and sediment placement, channel excavation upstream of current dam site, recreation features and removal of invasive plant species.

Project Costs. Total cost $130,335,000. Federal cost $78,973,000; non-Federal cost $51,362,000.

Benefit/Cost Ratio. The cost of the recommended plan is justified by the restoration of valuable habitat.

(9) Middle Creek, Lake County, California.

Location. Middle Creek, Lake County, California.

Purpose. Flood Damage Reduction and Ecosystem Restoration.

Problem. Considerable ecosystem degradation has taken place in the area. Historically, the area was part of Clear Lake and consisted of tule marsh and open water. These wetlands were converted to agricultural fields during the last century. This has caused loss of natural habitat, loss of ecosystem function, and degraded water quality. The area is subject to damages to structures and agricultural lands from overflows from Rodman Slough. Although surrounded by levees, the area remains at risk from flooding from both Clear Lake and Rodman Slough because of levee settlement.

Recommended Plan. The plan is to reconnect the flood plain of Middle Creek to the historic Robinson Lake wetland area by breaching the existing levee system to create inlets that direct flows into the area and providing flood damage reduction by relocating residents from the flood plain. Implementation of this plan would result in 765 acres of wetlands, 230 acres of riparian, 405 acres of open water, and 250 acres of upland habitat. As part of the authorization of this project and upon request of the governing body of the Robinson Rancheria of Pomo Indians, the Secretary of the Interior shall, notwithstanding any other provision of law, accept the transfer from the tribe to the Secretary of the tribe's interest in three parcels of land located adjacent to Clear Lake in Lake County, California, and hold such lands in trust for the benefit of the tribe. Such lands shall be deemed restored lands for the tribe.

Project Costs. Total cost $41,793,000. Federal Cost $27,256,000; non-Federal Cost $14,537,000.

Benefit/Cost Ratio. The cost of the plan is justified by the restoration of valuable habitat.

(10) Napa River Salt Marsh, California.

Location. Napa, Sonoma, and Solano Counties, California.

Purpose. Ecosystem Restoration.

Problem. The San Francisco Bay Region is an extensive, complex and diverse estuary that has lost approximately 90 percent of its original tidal wetlands due to development over the past 150 years. The degradation of fish and wildlife resources associated with the loss of the Bay's historic wetlands has resulted in several species being listed as threatened or endangered. The project site, historically dominated by tidal salt marsh, was diked and converted to hayfields approximately 150 years ago. In the early 1950's, the diked areas were converted to solar salt evaporation ponds. This project will restore a portion of diked baylands to tidal action to support endangered and special status species recovery, improve water quality, and restore greater ecological balance to the San Francisco Bay.

Recommended Plan. The recommended plan will use a system of water control structures and levee breaches to reduce the salinity of 11 former salt production ponds by using a combination of water sources, including a recycled water pipeline, seasonal rainfall and adjacent sloughs that will flow through the ponds and then be discharged to the Napa River and an adjacent slough. The recommended plan then relies on natural sediment processes and colonization by marsh vegetation to restore nearly 9,500 acres of tidal ponds and managed ponds. Because the recycled water pipeline can provide non-saline water at all times during the year, it will enable pond desalinization to continue during the `dry season'. Once the ponds are desalinated, the pipeline will continue to provide water to maintain the salinity levels in the managed ponds. Upon desalinization, the pipeline will be transferred from the Federal Government to the Sonoma County Water Agency at the fully depreciated pipeline value, less the non-Federal cost-share contribution and less the estimated value of the water that will continue to be provided for pond salinity maintenance purposes.

Project Costs. Total cost $100,500,000. Federal cost $64,000,000; non-Federal cost $36,500,000.

Benefit/Cost Ratio. The cost of the recommended plan is justified by the restoration of valuable habitat.

(11) South Platte River, Denver, Colorado.

Location. Denver County Reach, South Platte River, Denver, Colorado.

Purpose. Environmental Restoration.

Problem. The City and County of Denver has accomplished much toward restoring the environmental assets of Denver's South Platte River corridor. Only the Zuni to Sun Valley reach, which includes the Zuni Power Plant and the Sun Valley housing development, remains in a severely degraded condition.

Recommended Plan. The recommended plan consists of removal of a low head Fabridam; construction of a 250 cubic-feet-per-second, low-flow channel; stripping vegetation; modification of overall channel banks; construction of a series of pool/riffle structures and diversion jetties; relocation of existing trails; relocation of utilities; and complete revegetation of the project area with native species. To allow continued operation of the existing Zuni Power Plant, construction of an infiltration gallery and purchase of water rights as necessary are included as just compensation for removal of the Fabridam.

Project Costs. Total cost $18,824,000. Federal cost $12,236,000; non-Federal cost $6,588,000.

Benefit/Cost Ratio. The cost of the recommended plan is justified by the restoration of valuable habitat.

(12) Indian River Lagoon, South Florida.

Location. Martin, St Lucie and Okeechobee Counties, Florida.

Purpose. Flood Damage Reduction and Ecosystem Restoration.

Problem. The southern Indian River Lagoon estuary system has been degraded by large and frequently occurring discharges of freshwater, and by an excessive accumulation of muck in estuary and lagoon bottoms. Together these stressors have reduced water clarity and exceeded the salinity tolerances of submerged vegetation and benthic animals.

Recommended Plan. The recommended plan consists of 12,600 acres of new reservoirs for surface water storage, 8,700 acres of storm-water treatment areas for water quality improvement, 7,900,000 cubic yards of muck removal, 92,000 acres of natural water storage areas and 3,100 acres of floodplain wetlands. This section also deauthorizes the C-44 storage reservoir identified in the Comprehensive Review Study authorized for construction in section 601 of the Water Resources Development Act of 2000(114 Stat. 2680), the Martin County irrigation, flood control and backflow projects authorized by section 203 of the Flood Control Act of 1968 (82 Stat. 740) and the East Coast Backpumping, St. Lucie-Martin County, Spillway Structure S-311, authorized by section 203 of the Flood Control Act of 1968 (82 Stat. 740).

Project Costs. Total Cost $1,210,608,000. Federal cost $605,304,000; non-Federal cost $605,304,000.

Benefit/Cost Ratio. The cost of the recommended plan is justified by the restoration of valuable habitat.

(13) East St. Louis and Vicinity, Illinois.

Location. East St. Louis and Vicinity, Illinois.

Purpose. Ecosystem Restoration.

Problem. The study area consisted of approximately 166 square miles (about 105,000 acres). The area has historically experienced the loss or serious degradation of the floodplain ecosystems and widespread interior flooding. Many aquatic resources of national and regional significance are found in the study area. Urban growth in the study area has led to the increasing scarcity of aquatic habitat.

Recommended Plan. The recommended plan is an extensive restoration of the ecosystem in the vicinity of East St. Louis, Illinois, on the Mississippi River. The recommended plan will restore approximately 1,700 acres of bottomland forest habitat, 1,100 acres of prairie wetland habitat, 840 acres of marsh and shrub swamp habitat, 460 acres of lake habitat, and 380 acres of riparian forest. In addition, the recommended plan also includes restoration of 10.4 miles of floodplain stream, installation of 650 wood duck boxes and 870 prairie bird perches, improvement of 20 acres of lacustrine over wintering and shoreline habitat, construction of 130 tributary sediment detention basins and riffle and pool complexes in 178 miles of streams, 15.5 miles of earthen embankments, and associated water control features (i.e., culverts, flap gates, and new channels). All project features are located within the State of Illinois. Because the recommended plan would not have any significant adverse effects, no mitigation measures (beyond management practices and avoidance) or compensation measures are required.

Project Cost. Total cost $191,158,000. Federal cost $123,807,000; non-Federal cost $67,351,000.

Benefit/Cost Ratio. The cost of the recommended plan is justified by the restoration of valuable habitat.

(14) Peoria Riverfront, Illinois.

Location. Illinois River, Tazewell and Peoria Counties, Illinois.

Purpose. Ecosystem Restoration.

Problem. Peoria Lake, the largest bottomland lake in the Illinois River valley, reflects changes similar to other lakes. Since 1903, the volume of Peoria Lake has decreased by approximately 61 percent. This sedimentation has reduced many of the deeper, off-channel parts of the lake from an estimated maximum of 8 feet to 1-2 feet in recent years. These changes have transformed Peoria Lake into a narrow navigation channel with bordering shallow water. The loss of aquatic habitat due to sedimentation is viewed as the greatest threat to the Illinois River. The loss of lake depth and volume has severely impacted off-channel overwintering, spawning, and nursery habitats for fish. Shallow water areas are subject to wave action that resuspends sediment, further limiting fish, aquatic vegetation, macroinvertebrate, and mussel production.

Recommended Plan. The selected aquatic restoration plan in Lower Peoria Lake includes off-channel dredging with island creation. It would result in the greatest restoration of depth diversity of any of the plans proposed. Overall, lake habitat diversity would increase through the addition of shoreline and terrestrial habitats associated with the islands and aquatic structures. The dredged area would provide critical backwater habitat and flowing side channel habitat for fish and other aquatic species. The islands would provide resting, nesting, and feeding areas for waterfowl and shorebirds. In addition, the islands would reduce wind-and wake-generated waves in the study area, helping to improve water quality by lowering turbidity levels.

Project Cost. Total cost $16,000,000. Federal cost $10,400,000; non-Federal cost $5,600,000.

Benefit/Cost Ratio. The cost of the recommended plan is justified by the restoration of valuable habitat.

(15) Bayou Sorrel Lock, Louisiana.

Location. Located in the Gulf Intracoastal Waterway, about half way up the Morgan City to Port Allen Alternate Route near Bayou Sorrel, Iberville Parish, Louisiana.

Purpose. Navigation Project necessary to accommodate the Flood Damage Reduction functionality of the FC, MR&T project.

Problem. Bayou Sorrel Lock is structurally sound; however, the lock must be replaced for flood control purposes and is congested due to increasing traffic and its restrictive dimensions. The improvements allocated to navigation need to be authorized subject to applicable requirements of section 102 of WRDA 1986, as amended. The modification of Bayou Sorrel Lock to safely pass the project flood in the Atchafalaya Basin Floodway is a feature of the authorized MR&T project, and as such, no additional implementing authority is required.

Recommended Plan. The selected plan is a new 75-ft wide by 1,200-ft long replacement lock.

Project Costs. Total cost $9,000,000. Federal cost $4,500,000; non-Federal cost (from the Inland Waterways Trust Fund) $4,500,000.

Benefit/Cost Ratio. 1 to 1.

(16) Morganza to the Gulf of Mexico.

Location. Houma City, Terrebonne and Lafourche Parishes, Louisiana.

Purpose. Hurricane and Storm Damage Reduction.

Problem. The area is significantly affected by tides emanating from the Gulf of Mexico. Deterioration of coastal marshes, as a result of saltwater intrusion, land subsidence, and the lack of interchanges from the Mississippi River and Tributaries (MR&T) systems has increased storm surge inundation.

Recommended Plan. The recommended hurricane protection plan consists of approximately 72-miles of earthen levee with 12 water control structures to allow ebb and flow through the levee, 12 floodgate structures (proposed for the navigable waterways), and a lock complex in the Houma Navigation Canal. The structural features are integrated into the levee alignment to provide flood protection, drainage, environmental benefit, and navigational passage.

Project Costs. Total cost $788,000,000. Federal cost $512,200,000; non-Federal cost $275,800,000.

Benefit/Cost Ratio. 1.7 to 1.

(17) Smith Island, Maryland.

Location. Smith Island, Chesapeake Bay, Maryland.

Purpose. Environmental Restoration.

Problem. Valuable wetland and submerged aquatic vegetation (SAV) habitat is being destroyed and degraded by erosion. As the landmasses that make up Smith Island erode, there is increased wave and current action into shallow-water areas that were previously protected, quiescent, and suitable for SAV growth. The eroded material also adds turbidity and nutrients to the water column that further inhibit SAV colonization and growth. Additionally, the landmasses themselves are extremely high quality emergent wetlands. These wetlands are even more valuable than most since they are part of a remote island with little human disruption. In its entirety, Smith Island has lost over 3,300 acres of wetlands in the last 150 years, and, in the identified project areas alone, it lost almost 2,400 acres of SAV between 1992 and 1998.

Recommended Plan. The recommended plan consists of constructing over 2 miles of off-shore segmented breakwaters to provide protection to over 2100 acres of wetlands and SAV habitats, and reduction of sediment to the Chesapeake Bay.

Project Costs. Total cost $14,500,000. Federal cost $9,425,000; non-Federal cost $5,075,000.

Benefit/Cost Ratio. The cost of the recommended plan is justified by the restoration of valuable habitat.

(18) Swope Park Industrial Area, Missouri.

Location. Blue River at the Swope Park Industrial Area, Kansas City, Missouri.

Purpose. Flood Damage Reduction.

Problem. The Blue River flooded in 1961, 1977, 1984, and 1990. The most severe floods occurred in 1961 and 1990. The May 1990 flood caused an estimated $1,000,000 in damages. If left without protection in the current condition, the Swope Park Industrial Area will be subjected to continuing damaging floods. Eventually, the area will fall into decline as a viable industrial park and source of employment.

Recommended Plan. The plan consists of construction of reinforced concrete floodwall and compacted earthen levee; construction of an interior drainage system consisting of reinforced concrete pipe and an interior storm water retention pond; construction of a rolling-gate closure at the existing 75th Street entrance to the industrial park; construction of a small park and trailhead; planting of hardwood trees along the Blue River Parkway; and excavation for a small wetland riverward of the levee at a location just upstream of the Swope Park Industrial Area.

Project Costs. Total cost $15,683,000. Federal cost $10,194,000; non-Federal cost $5,489,000.

Benefit/Cost Ratio. 1.5 to 1.

(19) New Jersey Shore protection, Manasquan Inlet to Barnegat Inlet, New Jersey.

Location. Atlantic Coast of New Jersey, Island Beach, Ocean County, New Jersey.

Purpose. Hurricane and Storm Damage Reduction.

Problem. Severe storms in recent years have caused a reduction in the overall beach height and width along the study area. The narrowing and lowering of the beaches and dunes along the study area have reduced the storm protection that would have otherwise been available. As a result, public and private property is subject to damage from erosion, wave attack and tidal inundation. Some storms have caused extensive damage and even loss of life, and when evacuation was considered necessary, families have suffered hardships and inconvenience.

Recommended Plan. The recommended plan consists of berm and dune restoration using sand obtained from offshore borrow sources. Periodic nourishment is expected to occur at 4-year intervals subsequent to completion of initial construction.

Project Costs. Total cost $64,872,000. Federal cost $42,168,000; non-Federal cost $22,704,000. Estimated total costs of $107,990,000 for periodic nourishment over a period of 50 years, with an estimated Federal cost of $53,995,000 and an estimated non-Federal cost of $53,995,000.

Benefit/Cost Ratio. 2.1 to 1.

(20) South River, New Jersey.

Location. South River, Boroughs of South River and Sayreville, New Jersey.

Purpose. Hurricane and Storm Damage Reduction and Ecosystem Restoration.

Problem. The main problem affecting the area is flooding caused by periodic hurricanes and other storms. Damages are primarily due to storm surges and associated basin runoff, which subject these areas to significant flooding. Significant degradation of wetlands and the surrounding ecosystem has occurred due to urbanization resulting in tidal flow restrictions and increased storm surge inputs of excess water and sediments.

Recommended Plan. The recommended plan consists of a storm surge barrier, two combined levees/floodwalls, and interior drainage facilities including pump stations and outlets. In addition, the project will provide for the restoration of the structure and function of 380 acres of degraded ecosystems, including wetlands and forest habitats.

Project Costs. Total cost $112,623,000. Federal cost $73,205,000; non-Federal cost $39,418,000.

Benefit/Cost Ratio. 2.2 to 1.

(21) Southwest Valley, Albuquerque, New Mexico.

Location. Southwest Valley, Albuquerque, Bernalillo County, New Mexico.

Purpose. Flood Damage Reduction.

Problem. Portions of the Southwest Valley are subject to flooding from a variety of sources. The runoff from the West Mesa is largely controlled by a series of dams, detention basins, and diversion channels constructed by AMAFCA, Bernalillo County, and the city of Albuquerque. Most of these facilities release controlled discharges directly or indirectly into Middle Rio Grande Conservancy District (MRGCD) agricultural drainage facilities. Flood damages occur when large floods overwhelm the capacity of these facilities, or the capacity of the MRGCD drains or canals is exceeded.

Recommended Plan. The plan, as described in the Chief's report signed November 29, 2004, involves reduction of flood damages by modifying existing features of the Middle Rio Grande Conservancy District's surface drain facilities. The recommended plan includes utilizing existing easements, widening existing drains, and providing a gravity outfall to the Rio Grande with the opportunity for wetland enhancement. Approximately 7.5 miles of existing 30-to 40-foot-wide drains would be enlarged to a width of 68 feet to store and convey flood flows on the Isleta, Armijo, and Los Padillas drains. New access roads and trails would be installed on each side of these drains. Existing road crossings would be rehabilitated and/or enlarged to facilitate the proposed improvements and additions to the drainage system. A 25-acre detention pond would be constructed in an existing agricultural field situated east of the Isleta Drain to detain a portion of flood flow during large storm events. Two flood flow channels totaling approximately 1.5 miles would be constructed to connect the Isleta drain to the Los Padillas drain and then to the Rio Grande levee. New access roads 15 feet wide would be placed on each side of these drains. Floodgates would be built at the Rio Grande levee. An engineered outfall would continue from the levee for approximately 700 feet through the floodplain to the Rio Grande.

Project Costs. Total cost is $19,494,000. Federal cost $12,671,000; non-Federal cost $6,823,000.

Benefit/Cost Ratio. The flood damage reduction project provides a benefit-to-cost ratio of 1.4.

(22) Corpus Christi Ship Channel, Corpus Christi, Texas.

Location. Corpus Christi Ship Channel, Corpus Christi, Texas.

Purpose. Navigation and Ecosystem Restoration.

Problem. The depth and width of the existing Federal navigation channel system has become restrictive due to the increasing size of vessels in operation in the world fleet. Beam width restrictions also cause delays for larger ships wishing to enter Corpus Christi's port facilities.

Recommended Plan. The project consists of deepening the navigation channel from Viola Turning Basin to the end of the jetties in the Gulf of Mexico (approximately 34 miles) to--52 feet mean low tide (MLT); deepening of the remainder of the channel into the Gulf of Mexico (approximately 2 miles) to--54 feet MLT; and widening of the Upper Bay and Lower Bay reaches (approximately 20 miles) to 530 feet. Deepening would be performed in all channel reaches, including the Entrance Channel, Upper and Lower Bay reaches, and the Inner Harbor. Construction of 200-foot wide, 12-foot deep MLT barge shelves on both sides of the CCSC (approximately 10 miles). Construction of an extension to the La Quinta Channel to--39 feet MLT. The channel would be extended approximately 1.4 miles beyond its current limit. The channel would measure 400 feet wide, and a second turning basin with a 1,200-foot radius would be constructed. The existing limits of the La Quinta Channel would remain at their existing 45-foot depth. Construction of two ecosystem restoration features, including construction of rock breakwaters and geo-tubes to protect 1,200 acres of high quality marsh and 40 acres of seagrass. Both components are adjacent to the CCSC in the Lower Bay reach of the channel.

Project Costs. Total cost $172,940,000. Federal cost $80,086,000; non-Federal cost $92,854,000.

Benefit/Cost Ratio. 2.6 to 1.

(23) Gulf Intracoastal Waterway, Brazos River to Port O'Connor, Texas.

Location. Gulf Intracoastal Waterway through Matagorda Bay, Texas.

Purpose. Inland Navigation.

Problem. The Gulf Intracoastal Waterway (GIWW) through Matagorda Bay is experiencing strong cross currents from the interplay with the natural bay opening at Pass Cavallo and the deep-draft Matagorda Ship Channel and its jettied entrance channel resulting in significant vessel delays, property damages, and high waterway maintenance costs for the existing Matagorda Bay reach of the GIWW.

Recommended Plan. The project consists of rerouting the existing GIWW from mile markers 460 to 472 approximately 6,000 feet north of and parallel to the existing channel. The channel will have a depth of 12 feet and a bottom width of 125 feet, which is the same as the existing channel. The project will make beneficial use of dredged material to provide for the construction of approximately 135 acres of marsh at Palacios Point and 160 acres of marsh near Port O'Connor, and to nourish beaches at Sundown Island, a National Audubon Society site, and the beach at Port O'Connor.

Project Costs. Total cost $15,960,000. Federal cost $7,980,000; non-Federal cost (from the Inland Waterways Trust Fund) $7,890,000.

Benefit/Cost Ratio. 2.1 to 1.

(24) Gulf Intracoastal Waterway, High Island to Brazos River, Texas.

Location. The project is located along the Gulf Intracoastal Waterway (GIWW) from mile 318 to 400, between High Island and the Brazos River in Texas.

Purpose. Inland Navigation.

Problem. The Navigation Users have experienced problems along the GIWW at Rollover Pass, Sievers Cove, the Texas City Wye, and Greens Lake due to channel width and alignment restrictions, lack of mooring facilities, high maintenance costs due to frequent dredging requirements and limitation on placement areas for dredged material, and strong tidal current affects.

Recommended Plan. The plan consists of widening and realigning reaches of the existing GIWW channel to allow maneuvering room to alleviate the navigation restrictions.

Project Costs. Total cost $13,104,000. Federal cost $6,552,000; non-Federal cost (from the Inland Waterways Trust Fund) $6,552,000.

Benefit/Cost Ratio. 2.4 to 1.

(25) Riverside Oxbow, Fort Worth, Texas.

Location. Riverside Oxbow Trinity River, Fort Worth, Texas.

Purpose. Ecosystem Restoration.

Problem. The Riverside Oxbow and surrounding area has experienced both direct and indirect environmental degradation as a result of the construction and implementation of Benbrook Lake, Eagle Mountain Lake, Lake Worth, the Fort Worth Floodway project, and subsequent flood control projects and development activities.

Recommended Plan. The recommended plan consists of restoration of 512.2 acres of floodplain lands, approximately 2 miles of Oxbow river channel, 56.5 acres of wetlands, and 112 acres of uplands. It also provides 25,700 feet of mixed surface linear recreation trails.

Project Costs. Total cost $25,200,000. Federal cost $10,400,000; non-Federal cost $14,800,000.

Benefit/Cost Ratio. The cost of the recommended plan is justified by the restoration of valuable habitat.

(26) Deep Creek, Chesapeake, Virginia.

Location. Chesapeake, Virginia.

Purpose. Navigation (Bridge Replacement).

Problem. The bridge, constructed in 1934, is a federally owned and operated facility and assists in navigation. The bridge passes over the Dismal Swamp Canal where U.S. Route 17 crosses it. The bridge is a two-lane low level swing bridge with several intersecting side streets, none of which meet today's highway/bridge standards. The bridge is considered obsolete.

Recommended Plan. Low-level, 5-lane, split leaf, pit bascule bridge, with separate 2-lane and 3-lane leafs. The new bridge will relieve heavy traffic congestion, correct poor alignments with connecting roads, and insure the required safety features are brought up to standard. Further, the city of Chesapeake will assume ownership of the bridge.

Project Costs. Total cost $35,573,000. Federal cost $35,573,000; non-Federal cost $0.

Benefit/Cost Ratio. 8.3 to 1.

(27) Chehalis River, Centralia, Washington.

Location. Chehalis River valley at the cities of Centralia and Chehalis in Lewis County, Washington.

Purpose. Flood Damage Reduction.

Problem. The river valley has a broad meandering channel and a mile-wide floodplain. The average annual rainfall is about 42 inches. Major floods occur during the October to March period from heavy rainfall augmented by snowmelt runoff. The cities of Centralia and Chehalis have been subject to repeated flooding for many years. This flooding has caused extensive damage to private and public property and periodic closure of critical transportation routes resulting in significant economic losses.

Recommended Plan. The plan consists of construction of a levee system along the Chehalis River from approximately river mile (RM) 75 to RM 64 and along most of the lower 2 miles of both 46 Dillenbaugh Creek and Salzer Creek; construction of a levee along the lower approximately 2 miles of Skookumchuck River to the confluence with Coffee Creek; modification to the existing Skookumchuck Dam to add a short gated outlet tunnel to create flood control storage; and raising in elevation approximately eight structures that would incur induced damages from increased inundation as a result of the project. Unavoidable environmental impacts will include wetland and riparian habitat degradation and destruction resulting in the loss of approximately 105 habitat units.

Mitigation for these losses will be accomplished through a combination of wetland creation, revegetation of riparian habitat, and reconnection of an isolated oxbow with the mainstem Chehalis River.

Project Costs. Total cost $109,850,000. Federal cost $66,425,000; non-Federal cost $43,425,000.

Benefit/Cost Ratio. 1.3 to 1.

(b) Projects Subject to Final Report.

Subsection (b) of section 1001 authorizes 8 projects to be carried out by the Secretary substantially in accordance with the plan and subject to the conditions recommended in a final report of the Chief of Engineers if a favorable report of the Chief is completed not later than December 31, 2005.

(1)Miami Harbor, Miami, Florida.

Location. Miami Harbor, Miami-Dade County, Florida.

Purpose. Navigation.

Problem. Entrance channel and inner harbor widths and depths are not adequate for safe, cost-efficient vessel transit.

Recommended Plan. Component 1C: Widen seaward portion of Cut-1 from 500 to 800 feet and deepen Cut-1 and Cut-2 from a project depth of 44 to 52 feet. Component 2A: Add turn widener at the southern intersection of Cut-3 with Fisherman's Channel and deepen to a project depth of 50 feet. Component 3B: Increase the Fisher Island Turning Basin from 1200 to 1500 feet, truncate the 28 northeast section of the turning basin, deepen from a project depth of 42 feet to 50 feet. Component 4: Realign the western end of the existing 36-foot main channel about 250 feet to the south - no dredging require for Component 4. Component 5A: Expand the Sponsor's berthing area by 60 feet and widen the southern edge of Fisherman's Channel (Lummus Island Cut) about 40 feet for a 100-foot increase in total width, reduce the Lummus Island (Middle) Turning Basin to a 1500-foot diameter from the currently authorized 1600-foot diameter, and deepen from a project depth of 42 feet to 50 feet. Mitigation including restoration of seagrass beds and construction of artificial reefs.

Project Costs. Total cost $121,126,000. Federal cost $64,843,000; non-Federal cost $56,283,000.

Benefit/Cost Ratio. 1.5 to 1.

(2) Picayune Strand Ecosystem Restoration, Collier County, Florida.

Location. Collier County, Florida.

Purpose. Flood Damage Reduction and Ecosystem Restoration.

Problem. Canals and roads cause excessive drainage and the reduction of many wetland communities and associated plants and wildlife of over 59,000 acres of Picayune Strand. The drainage also creates large discharges of freshwater to some downstream estuaries and greatly reduces discharges to other nearby estuaries, stressing a total of nearly 50,000 acres of estuary habitat.

Recommended Plan. The recommended plan consists of plugging the main canals, degrading roads, filling ditches, and constructing spreader channels and pump stations to restore the flows of water across the landscape and reduce damaging high and low discharges of freshwater to the estuaries.

Project Costs. Total cost $349,422,000. Federal cost $174,711,000; non-Federal cost $174,711,000.

Benefit/Cost Ratio. The cost of the recommended plan is justified by the restoration of valuable habitat.

(3) Des Moines and Raccoon Rivers, Des Moines Iowa.

Location. Des Moines and Raccoon Rivers, Des Moines, Polk County, Iowa.

Purpose. Flood Damage Reduction.

Problem. During the Great Flood of 1993, Polk County suffered more than $152 million in flood damages, mostly in the Des Moines metropolitan area. Major portions of the city of Des Moines' downtown and several large neighborhoods were flooded and the city was without water service for over a week. More than 3,000 properties were inundated.

Recommended Plan. The recommended plan includes reconstructing 13,300 feet of levees, improving 19 closure structures, and constructing a recreation trail on a segment of the Birdland Park levee.

Project Costs. Total cost $10,000,000. Federal cost $6,500,000; non-Federal cost $3,500,000.

Benefit/Cost Ratio. 2.5 to 1.

(4) Port of Iberia, Louisiana.

Location. Iberia and Vermilion Parishes, Louisiana.

Purpose. Navigation.

Problem. The primary problem is the depth restriction of--12 feet of the existing access channels, Freshwater Bayou, Gulf Intracoastal Waterway and Commercial Canal, to the Port of Iberia. The predominant economic engines located in the study area are large offshore rig fabricators and offshore petroleum services firms. The primary purpose of this deepening project is to allow for deeper draft vessels that are needed to meet the burgeoning demands of the deepwater offshore petroleum industry. At present the relative shallow depth does not allow for the size vessels needed to transport the fabricated structures used in the exploration and production in the deep waters in the Gulf of Mexico.

Recommended Plan. The study area consists of the Port of Iberia, Commercial Canal, GIWW (Commercial Canal to Freshwater Bayou), and Freshwater Bayou out to the--20 foot contour in the Gulf of Mexico. The recommended and locally preferred plan consists of deepening and widening this access channel by dredging the Commercial Canal, the GIWW and Freshwater Bayou to a uniform size channel of 150 feet wide by 20 feet deep, that will better accommodate the industry of the area and the port. The placement of dredged material will depend on the section of channel.

Project Costs. Total cost: $194,000,000. Federal Cost $123,000,000; non-Federal Cost $71,000,000.

Benefit/Cost Ratio. 1.03 to 1.

(5) Jamaica Bay, Marine Park and Plumb Beach, Queens and Brooklyn, New York.

Location. Jamaica Bay, New York.

Purpose. Ecosystem Restoration.

Problem. Over the past century, the Bay's fragile ecosystem has been degraded through human encroachment and increased urbanization.

Recommended Plan. The recommended plan includes restoration measures at nine sites, including measures to regrade shorelines, revegetate grasslands, create and/or restore additional estuarine, wetland, and upland habitats, and improve circulation and flushing in the bay.

Project Costs. Total cost $180,000,000. Federal cost $117,000,000; non-Federal cost $63,000,000.

Benefit/Cost Ratio. The cost of the recommended plan is justified by the restoration of valuable habitat.

(6) Raritan Bay and Sandy Hook Bay, Union Beach, New Jersey.

Location. Union Beach, New Jersey.

Purpose. Hurricane and Storm Damage Reduction.

Problem. The identified problem is coastal storm inundation along the Raritan and Sandy Hook Bays, Chingarora Creek, Flat Creek, and East Creek, which results in inundation of approximately 1,000 structures from a 100-yr storm event. The problem is caused by a combination of rainfall and coastal storm surges, erosion, and wave attack, combined with restrictions to channel flow in the tidal creeks.

Recommended Plan. The plan consists of a combination of levees, floodwalls, 2 storm gates, 3 pump stations, 2 terminal groins, beach and dune, periodic renourishment, interior drainage structures and mitigation.

Project Costs. Total cost $105,544,000. Federal cost $68,603,600; non-Federal cost $36,940,400. Estimated total cost of $2,315,000 for periodic nourishment over the 50-year life of the project, with an estimated Federal cost of $1,157,500 and an estimated non-Federal cost of $1,157,500.

Benefit/Cost Ratio. 1.8 to 1.

(7) Montauk Point, New York.

Location. Montauk Point, New York.

Purpose. Hurricane and Storm Damage Reduction.

Problem. The Montauk Point study area, including the historic lighthouse, is located on a bluff at the eastern end of the southern fork of Long Island, approximately 125 miles east of New York City. The area surrounding the lighthouse is operated as a State park. The Montauk Point Lighthouse was commissioned by President Washington and completed in 1796. It is included in the National Register of Historic Places (NRHP). Continued shoreline erosion threatens the loss of the lighthouse complex and surrounding State park property.

Recommended Plan. The recommended plan consists of an 840-foot long revetment with a crest width of 40 feet at an elevation of +25 feet NGVD and 2 vertical and 1 horizontal side slopes.

Project Costs. Total cost $12,000,000. Federal cost $7,800,000; non-Federal cost $4,200,000.

Benefit/Cost Ratio. 1.3 to 1.

(8) Hocking River Basin, Monday Creek, Ohio.

Location. Hocking River, Monday Creek, OH.

Purpose. Ecosystem Restoration.

Problem. The Monday Creek Basin ecosystem and environment is, and continues to be, significantly impacted by abandoned mines resulting in acid mine drainage contaminating water system. The resultant is a near sterile aquatic ecosystem.

Recommended Plan. The sponsor of the project is the Ohio Department of Natural Resources (ODNR). However, part of the project is located on the Federal lands of the Wayne National Forest, Ohio and managed by the US Forest Service. In designing and constructing the project described, ODNR and the Secretary will work, in cooperation with the Secretary of Agriculture, to construct the project features on land located in the Wayne National Forest.

The Federal (COE) share of the project will be 65 percent. However, it is anticipated that the Federal share of the costs of the features of the project located in the Wayne National Forest, would be 100 percent. The Corps will be responsible for implementation costs, while the Forest Service would provide the lands, easements and rights of way necessary for the project at no cost to the Department of the Army. The operation, maintenance, repair, rehabilitation, and replacement of the project under subsection would be a non-Federal (ODNR) responsibility. The operation, maintenance, repair, rehabilitation, and replacement of the project features, located in the Wayne National Forest, will be a U.S. Forest Service responsibility.

Project Costs. Total cost $20,000,000. Federal cost $13,000,000; non-Federal cost $7,000,000.

Benefit/Cost Ratio. Not applicable. Justification based on National Ecosystem Restoration Benefits (NER).

Sec. 1002. Enhanced navigation capacity improvements and ecosystem restoration plan for the Upper Mississippi River and Illinois Waterway System.

This section authorizes navigation improvements and ecosystem restoration for the Upper Mississippi River and Illinois Waterway System. These improvements and ecosystem restoration for the Upper Mississippi River and Illinois Waterway System is in general conformance with the preferred integrated plan contained in the document entitled `Integrated Feasibility Report and Programmatic Environmental Impact Statement for the UMR-IWW System Navigation Feasibility System' and dated September 24, 2004. The Upper Mississippi River and Illinois Waterway System consists of the projects for navigation and ecosystem restoration authorized by Congress for the segment of the Mississippi River from the confluence with the Ohio River, River Mile 0.0, to Upper St. Anthony Falls Lock in Minneapolis-St. Paul, Minnesota, River Mile 854.0 and the Illinois Waterway from its confluence with the Mississippi River at Grafton, Illinois, River Mile 0.0, to T.J. O'Brien Lock in Chicago, Illinois, River Mile 327.0.

In section 1103(a) (2) of the Water Resources Development Act of 1986 (100 Stat. 4225), Congress recognized the Upper Mississippi River System as `a nationally significant ecosystem and a nationally significant commercial navigation system' and declared that the system `shall be administered and regulated in recognition of its several Purposes'.

The inland waterway transportation system moves 16 percent of the freight in the United States for 2 percent of the cost, including more than 100,000,000 tons on the Upper Mississippi River System. The Upper Mississippi River and Illinois Waterway is a major thoroughfare for goods in the United States. The river provides transportation for 60 percent of the corn exports of the United States and 45 percent of the soybean exports of the United States. It carries approximately 100,000,000 tons of products. The current 600-foot lock system was designed for steamboats, at a time when only 4,000,000 tons moved on the Mississippi River. The Waterway supports 400,000 full-and part-time jobs in the United States, generating over $4,000,000,000 in income and $12,000,000,000 to $15,000,000,000 in economic activity. The Upper Mississippi River System also provides important economic benefits from recreational and tourist uses, resulting in the basin's receiving more visitors annually than most National Parks, with the ecosystems and wildlife being the main attractions.

The current capacity of the Upper Mississippi River System is declining by 10 percent annually and the 600-foot locks at Locks and Dam Nos. 20, 21, 22, 24, and 25 on the Upper Mississippi River and LaGrange and Peoria on the Illinois Waterway are operating at 80 percent utilization. The unplanned closures of a 70-year old infrastructure reduce the potential for sustained growth.

United States farm and trade policies work to open world markets and promote United States exports. Keeping the cost of transportation lower through competition between transportation modes is the United States farmer's competitive advantage in capturing future global growth in agricultural exports. Foreign competitors have worked over the last 10 years to improve foreign transportation infrastructure to compete more effectively with United States production. The movement of 100,000,000 tons on the river system in 4,400 15-barge tows out of harms way would require an equivalent of 4,000,000 trucks or 1,000,000 rail cars moving directly through our communities. The Department of Transportation projects that freight congestion on the roads and rails in the United States will double in the next 25 years.

The Department of Agriculture projects that corn exports will grow 44 percent over the next decade, with a 1.3 increase in growth exported through the Gulf of Mexico. Econometric models are useful analytic tools to provide valuable information, but are unable to account for every market trend, development, and public policy impact. The transportation savings generated by the navigation improvements to the Mississippi River Waterway are expected to provide higher income to farmers and rural communities and to generate Federal and State taxes to support community activities, quality of life, and national benefits. The Army Corps of Engineers has been studying the needs for national investments on the Upper Mississippi River System for the last 15 years and has completed its feasibility report dated September 24, 2004. The construction of new 1,200-foot locks and lock extensions will provide more than 48,000,000 man-hours of employment over 10 to 15 years. Based on the current construction schedule of new locks and dams on the inland system, lock modernization will need to take place over 30 years, starting immediately.

The Upper Mississippi and Illinois Rivers ecosystem consists of hundreds of thousands of acres of bottomland forests, islands, backwaters, side channels, and wetlands, including 284,688 acres of National Wildlife Refuge land that provides habitat and recreational opportunities. It is home to 270 species of birds, 57 species of mammals, 45 species of amphibians and reptiles, 113 species of fish, and nearly 50 species of mussels. More than 40 percent of migratory waterfowl and shorebirds in North America depend on the river for food, shelter, and habitat during migration. Development since the 1930's has altered and reduced the biological diversity of the large flood plain river systems of the Upper Mississippi and Illinois Rivers. The annual operation of the Upper Mississippi River Basin needs to take into consideration opportunities for ecosystem restoration, and Congress recognizes the need for significant Federal investment in the restoration of the Upper Mississippi and Illinois River ecosystems.

The navigation improvements authorized for construction by the Secretary of the Army includes small scale and nonstructural measures and new locks.

The small scale and nonstructural measures consists of the construction of mooring facilities at Locks 12, 14, 18, 20, 22, 24, and La Grange Lock, switch boats at Locks 20 through 25 and the development and testing of an appointment scheduling system. The costs of these measures are $117,500,000 in funds from the general fund of the Treasury, to be matched in an equal amount from the Inland Waterways Trust Fund that is paid by private users.

New 1,200-foot locks are authorized for construction at Locks 20, 21, 22, 24, and 25 on the Upper Mississippi River and at LaGrange Lock and Peoria Lock on the Illinois Waterway. The cost of the new locks is $789,500,000 in funds from the general fund of the Treasury, with an equal matching amount provided from the Inland Waterways Trust Fund that is paid by private users.

The authorized plan for navigation improvements includes mitigation for the new locks and small scale and nonstructural measures at a cost of $108,000,000 in funds from the general fund of the Treasury, with an equal matching amount provided from the Inland Waterways Trust Fund which is paid by private users.

This section also authorizes ecosystem restoration on the Upper Mississippi River and Illinois Waterway System. First, to ensure the environmental sustainability of the existing Upper Mississippi River and Illinois Waterway System, the Secretary shall, consistent with requirements to avoid any adverse effects on navigation, modify the operation of the Upper Mississippi River and Illinois Waterway System to address the cumulative environmental impacts of operation of the system and improve the ecological integrity of the Upper Mississippi River and Illinois River. Second, the Secretary shall, consistent with requirements to avoid any adverse effects on navigation, carry out ecosystem restoration projects to attain and maintain the sustainability of the ecosystem of the Upper Mississippi River and Illinois River in accordance with the general framework outlined in the Integrated Feasibility Report and Programmatic Environmental Impact Statement for the UMR-IWW System Navigation Feasibility System dated September 24, 2004. This section lists specific types of ecosystem restoration projects that may be conducted under this authority.

The Federal share of the cost of carrying out an ecosystem restoration project under this section shall be 100 percent if the project is located below the ordinary high water mark or in a connected backwater; modifies the operation or structures for navigation; or is located on federally owned land. The Federal share of ecosystem restoration projects not meeting these criteria shall be 65 percent. Nongovernmental organizations shall be eligible to contribute the non-Federal cost-sharing requirements applicable to ecosystem restoration projects. The Secretary of the Army may acquire land or an interest in land for an ecosystem restoration project from a willing owner through conveyance of fee title to the land; or a flood plain conservation easement.

Ecosystem restoration projects shall be carried out at a total construction cost of $1,580,000,000 of which not more than $226,000,000 shall be available for construction of fish passages and not more than $43,000,000 shall be available for dam point control. Of the amounts made available under for construction not more than $35,000,000 for each fiscal year shall be available for land acquisition.

Before initiating the construction of any individual ecosystem restoration project, the Secretary of the Army shall: (i) establish ecosystem restoration goals and identify specific performance measures designed to demonstrate ecosystem restoration; (ii) establish the without-project condition or baseline for each performance indicator; and (iii) for each separable element of the ecosystem restoration identify specific target goals for each performance indicator. Performance measures should comprise specific measurable environmental outcomes, such as changes in water quality, hydrology, or the well-being of indicator species the population and distribution of which are representative of the abundance and diversity of ecosystem-dependent aquatic and terrestrial species. Restoration design shall include a monitoring plan for the performance measures including a timeline to achieve the identified target goals and a timeline for the demonstration of project completion.

Not later than June 30, 2008 and every 5 years thereafter, the Secretary of the Army shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives an implementation report that includes baselines, benchmarks, goals, and priorities for ecosystem restoration projects and measures the progress in meeting the goals.

The Secretary shall appoint and convene an advisory panel to provide independent guidance in the development of each implementation report. The panelists shall include 1 representative of each of the State resource agencies or a designee of the Governor of the State from each of the States of Illinois, Iowa, Minnesota, Missouri, and Wisconsin; 1 representative of the Department of Agriculture; 1 representative of the Department of Transportation; 1 representative of the United States Geological Survey; 1 representative of the United States Fish and Wildlife Service; 1 representative of the Environmental Protection Agency; 1 representative of affected landowners; 2 representatives of conservation and environmental advocacy groups; and 2 representatives of agriculture and industry advocacy groups. The Secretary of the Army and the Secretary of Interior shall serve as co-chairpersons of the advisory panel. The Advisory Panel shall not be considered an advisory committee under the Federal Advisory Committee Act (5 U.S.C. App.)

The Secretary, in consultation with the Advisory Panel, shall develop a system to rank proposed projects. The ranking system shall give greater weight to projects that restore natural river processes including floodplain restoration and water level management including dam point control. If the Secretary determines that projects for navigation improvement and ecosystem restoration are not moving toward completion at a comparable rate, annual funding for the projects will be adjusted to ensure that projects move toward completion at a comparable rate in the future.

Sec. 1003. Louisiana coastal area ecosystem restoration, Louisiana.

This section authorizes a program for ecosystem restoration in the Louisiana Coastal Area (LCA). The LCA contains one of the largest expanses of coastal wetlands in the contiguous United States and accounts for 90 percent of the total coastal marsh loss in the Nation. Coastal Louisiana has lost more than 1.2 million acres (1,875 sq. mi.) since 1930, and it is estimated to continue to lose land at a rate of approximately 14 square miles per year over the next 50 years.

Louisiana's coastal wetlands and barrier island system enhances protection of an internationally significant commercial-industrial complex from the destructive forces of storm driven waves and tides. The system, taken as a whole with migratory birds, fish and other species, places the coastal wetlands of Louisiana among the nation's most productive and important natural assets. Louisiana's coastal area is home to more than two million people, representing 46 percent of Louisiana's population. The State provides more than 20 percent of the seafood consumed in the United States. An estimated 20 percent of our nation's energy is dependent upon the coastal area of Louisiana. In 2001, offshore oil and gas production off the coast of Louisiana provided approximately $5.1 billion to the Federal Government, making it one of the largest revenue sources to the U.S. Treasury. Without implementation of a comprehensive restoration program, these resources, including the extensive energy infrastructure network, are at risk.

In response to the degradation of the coastal area, the State of Louisiana, in cooperation with the Corps and other Federal agencies, developed a comprehensive plan for the restoration of coastal Louisiana. The plan, which served as the Corps reconnaissance report for the LCA, is known as the Coast 2050 plan. As a result of this plan, the Louisiana Coastal Area Ecosystem Restoration program report (report of the Chief of Engineers dated January 31, 2005) has identified an initial phase of near-term work. The framework established in this bill advances the initial component.

Subsection (a) authorizes the Louisiana Coastal Area program substantially in accordance with the report of the Chief of Engineers dated January 31, 2005. The report identifies five major categories as follows.

1) Five Near-Term Critical Ecosystem Restoration Features--subsection (f) includes additional language on one of these five projects (the Mississippi River Gulf Outlet).

2) Ten Additional Near-Term Restoration Features--subsection (j) directs the Secretary to submit a feasibility report on these features by July 1, 2006. The traditional committee process would allow for authorization of implementation of these features upon submission to Congress of the report of the Chief of Engineers.

3) Science and Technology Program--subsection (g) provides additional direction on implementation of this component of the program, including authority to use the expertise of estuary assessment groups and consortia with significant experience directly related to the Louisiana Coastal Area ecosystem. Various agencies and experts have conducted investigations into the coastal Louisiana ecosystem over the past four decades. Utilization of the materials and researchers may prove to be an efficient use of funds.

4) Beneficial Use of Dredged Material--the Corps spends millions of dollars annually to dredge navigation channels in the program area. This program component is designed to ensure the efficient use of tax dollars by coordinating dredging for navigation purposes with the restoration goals of the program.

5) Demonstration Program--Standard practice for demonstration projects involves local entities at or near the site of the project to be the non-Federal partner. Therefore, each demonstration project under this program should occur within the State of Louisiana.

Subsection (b) establishes the priorities of the program.

Subsection (c) provides for the financial participation of non-governmental entities for credit toward the non-Federal share.

Subsection (d) requires the submission of a comprehensive plan with updates every 5 years. This plan shall include a description of the following: 1) the framework of a long-term program to protect, conserve and restore the wetlands, estuaries (including the Barataria-Terrebonne estuary), barrier islands, shorelines and related lands and features; 2) the means by which new technology or improved techniques can be integrated into the LCA program; and 3) the role of other Federal agencies and programs in implementing the LCA program.

Subsection (e) establishes a Task Force comprised of eight members of the President's cabinet and three representatives of the State. Federal participation in the Task Force shall be at the level of assistant secretary or equivalent. In the case of agencies where the participation of more than one assistant secretary (or equivalent) may be appropriate, two or more assistant secretaries (or equivalent) may participate in the Task Force meeting, but the agency will have only one vote for matters considered before the Task Force.

The Task Force is directed to make recommendations to the Secretary regarding the policies, strategies, plans, programs, projects, activities and financial participation (including identifying funds from current agency missions and budgets and coordination of individual agency budget requests) for addressing conservation, protection, restoration and maintenance of the coastal Louisiana ecosystem.

The Task Force is also authorized to establish working groups. This program could cause potential conflicts pertaining to maritime and surface transportation, oil and gas activities, recreational and commercial fishing impacts. The working groups in each of these areas established by the Task Force will provide an opportunity to identify and address potential conflicts between the implementation of this program and activities in the coastal area and the OCS. The Governor's Advisory Commission on Coastal Restoration and Conservation may be one such appropriate working group. The Task Force and any working groups are exempt from the Federal Advisory Committee Act.

Subsection (f) requires the Secretary to submit to Congress a plan for the modification of the Mississippi River Gulf Outlet to address wetland losses attributable to the Outlet, channel bank erosion, hurricane storm surges, saltwater intrusion, navigation interests and environmental restoration. The Secretary may be able to implement modifications upon completion of this plan under existing operation and maintenance authorities.

Subsection (g) establishes a Science and Technology program with three purposes--1) to identify any uncertainty relating to the physical, chemical, geological, biological and cultural baseline conditions in coastal Louisiana; 2) to improve the knowledge of these baseline conditions; and 3) to identify and develop technologies, models and methods to carry out the LCA program.

Subsection (h) authorizes the Secretary to determine that the environmental benefits provided by the program outweigh the disadvantage of an activity, and no further economic justification is required if the Secretary determines that the activity is cost-effective. However, this is not applicable to separable elements intended to produce benefits that are predominantly unrelated to the conservation, restoration, or maintenance of the natural system.

Subsection (i) requires the Secretary, in consultation with the non-Federal sponsor, to enter into a contract with the National Academy of Sciences for a study to evaluate the impact on ecosystem degradation in south Louisiana of activities authorized by the Secretary. Examples of such activities include the Mississippi River and Tributaries project and the construction of the Mississippi River Gulf Outlet. Upon completion of this study, the Secretary is directed to review the findings as well as the potential reduction in emergency expenditures as a result of ecosystem restoration in the LCA in order to identify financing alternatives for the LCA program.

In an effort to expedite implementation of the features identified in Table 3 of the Chief's report, subsection (j) requires the Secretary to prepare and submit a report by July 01, 2006.

Subsection (k) authorizes the Secretary to review existing water resources projects in the program area to determine if the projects are consistent with the goals of the LCA program and if modifications to the projects could result in additional contributions to achieving the goals of the LCA program. The Secretary is authorized to implement such modifications after providing opportunity for public notice and comment and submitting a report to the Senate Environment and Public Works Committee and the House Transportation and Infrastructure Committee. The bill authorizes $10 million to implement this subsection.

Sec. 1004. Small projects for flood damage reduction.

This section directs the Secretary to perform the following project under the Small Projects for Flood Damage Reduction continuing authority program:

(1) Cache River Basin, Grubbs, Arkansas

Sec. 1005. Small projects for navigation.

This section directs the Secretary to perform the following projects under the Small Projects for Navigation continuing authority program:

(1) Little Rock Port, Arkansas

(2) Au Sable River, Michigan

(3) Outer Channel and Inner Harbor, Menominee Harbor, Michigan and Wisconsin

(4) Middle Bass Island State Park, Middle Bass Island, Ohio

(5) Outer Channel and Inner Harbor, Menominee, Wisconsin

Sec. 1006. Small projects for aquatic ecosystem restoration.

This section directs the Secretary to perform the following projects under the Small Projects for Aquatic Ecosystem Restoration continuing authority program:

(1) San Diego River, California

(2)Suison Marsh, San Pablo Bay, California

(3) Blackstone River, Rhode Island

TITLE II--GENERAL PROVISIONS

SUBTITLE A--PROVISIONS

Sec. 2001. Credit for in-kind contributions.

This section provides general authority for the Secretary to provide credit for in-kind services made by the non-Federal sponsor toward the non-Federal share of the cost of a project. This authority applies to all authorized projects, including projects implemented under general continuing authority. In-kind services include: 1) the costs of planning (including data collection), design, management, mitigation, construction, and construction services; and 2) the value of materials or services provided before the execution of an agreement for the project, including efforts on constructed elements incorporated into the project and materials and services provided after an agreement is executed.

In all cases, credit is subject to a determination by the Secretary that the property or service provided is integral to the project. Credit may be provided as long as it does not exceed the non-Federal share of the cost of the project, it does not alter any other requirement that the non-Federal interest provide land, easements or rights-of-way, or an area for disposal of dredged material for the project, or it does not exceed the actual and reasonable costs of the materials, services, or other items provided by the non-Federal sponsor.

This section was incorporated in the Water Resources Development Act of 2005 to ensure that a consistent crediting policy is applied throughout the Army Corps of Engineers for all projects undertaken. The committee recognizes that many non-Federal sponsors have significant capability to carry out elements of projects and studies, as described in the testimony offered by Mr. Gregory A. Zlotnik, Director of the Santa Clara Valley Water District in California, on March 31, 2004, at a hearing before the U.S. Senate Committee on Environment and Public Works, Subcommittee on Transportation and Infrastructure regarding the Water Resources Development Act of 2004, which this credit policy is designed to encourage.

It is the intent of the committee to allow credit for in-kind contributions for all on-going, but not completed, projects in accordance with this section. Ongoing projects that this crediting policy applies to include, but are not limited to:

(1) White River Basin Comprehensive Study, Arkansas and Missouri

(2) San Francisco Bay to Port of Stockton Channel Deepening Project, California

(3) Pinole Creek, California

(4) Walnut Creek Channel Aquatic Restoration, California

(5) Garyson's Creek/Murderer's Creek, California

(6) Wildcat Creek, Phase I, California

(7) Wildcat Creek, Phase II, California

(8) South Platte River Urban Watershed, Colorado

(9) Port of Miami, Florida

(10) Port of Tampa, Florida

(11) Ft. Pierce Shoreline Protection Study, Florida

(12) Gasparilla and Estero Islands Shore Protection Project, Florida

(13) Broward County and Hillsboro Inlet Shore Protection Project, Florida

(14) South Branch of the Wild Rice River, Minnesota

(15) Pemiscot County Harbor, Missouri

(16) Monarch Chesterfield, Missouri

(17) Sand Creek Watershed, Nebraska

(18) Watershed Management and Development, Nevada

(19) Great Lakes Fishery and Ecosystem Restoration Program

(20) John Glenn Great Lakes Basin Program

(21) Alsop/Brownwood Wetlands Restoration Project, Oregon

(22) San Antonio Channel, Texas

Sec. 2002. Interagency and international support authority.

This section modifies the existing authority to provide support for other Federal agencies and international organizations. Under current law, the Secretary is authorized to receive funds to support Federal agencies or international organizations (after consultation with the Department of State) to address problems of national significance to the United States. This section allows the Secretary to also provide support to foreign governments and it adds contracting as one of the activities the Army Corps of Engineers may undertake under this authority. It authorizes $1,000,000 for this purpose for fiscal year 2005.

By changing the consultation requirement to the Department of State, the Secretary is able to streamline the consultation process to more quickly and effectively work directly with the offices within the State Department that oversee the particular support requests.

Sec. 2003. Training funds.

This section authorizes the Secretary to allow non-Federal interests, including the private sector, to enroll in training classes or courses offered by the Army Corps of Engineers and to recoup expenses incurred by the Corps in providing training for those participants. It also authorizes the Secretary to retain the funds paid by private sector individuals who enroll in these courses. Funds retained by the Secretary must be credited to an appropriation or account used to pay for training costs and shall be available without further appropriations for use by the Secretary for training purposes. Amounts received in excess of costs of training are required to be credited to the U.S. Treasury. Under the current system, the more successful the Army Corps of Engineers is in training the private sector, the greater the financial burden on the agency. Currently, any reimbursements collected by the Army Corps of Engineers for training provided to private sector individuals are sent to the U.S. Treasury as miscellaneous receipts.

Sec. 2004. Recreational areas and project sites.

This section amends section 4 of the Flood Control Act of 1944 (16 U.S.C. 460d) to establish a user funded recreation fee program to cover the operation and maintenance associated with recreational infrastructure at Corps facilities.

This section allows the Corps to retain 100 percent of the recreation fees it collects. In addition, it allows the fees collected to remain available until expended and expands the activities for which fees may be used to include planning. Eighty percent of the fees collected are to be made available for expenditure by the Corps District in which they were collected.

Fees are to be based on fees charged at comparable recreationsites for admission or use and established at such a level so as to maximize the long term recreational benefits of each project.

The Secretary is authorized to use contracts, including reasonable commissions, with public or private entities to provide visitor services for the recreation area or site, including taking reservations and providing information. The Secretary is also authorized to accept volunteer services to collect fees. The Secretary is required to charge and collect rents for leases of project land. This section applies chapter 69, title 31, U.S.C. (payments in lieu of taxes) to land leased to non-Federal entities. Finally, any recreation fees collected under this section are deemed in lieu of fees charged under any other provision of law.

The committee expects the Secretary to attempt to recover from users the costs of operating and maintaining recreation areas or recreation infrastructure on project land. This section ensures that the majority of the fees stay at the site to reinvest into visitor facilities and services. For this reason, 80 percent of the fees are to be used to benefit the visitors at the site of collection. While 20 percent of the fees are available to the Secretary to utilize agency wide, the committee strongly recommends that the Secretary utilize those funds to establish and expand recreational opportunities at additional Corps facilities which may be underutilized in terms of recreational opportunities.

The committee recognizes that recreation fees are sometimes spent in ways that may not be apparent, but would be noticed by visitors if the investment did not occur. Recreation fees may be spent on such services as maintaining and upgrading toilet facilities, trails, and parking lots, for example. The committee encourages the Secretary to communicate with the public on how recreation fees are spent to enhance the visitor experience.

The committee recognizes that certain recreation activities require additional attention by agency staff or involve costs. These extra costs should be borne by those visitors participating in these activities and not by the general public or by the rest of the visiting public.

While this section removes the prohibition on collecting admission fees, it does not require that the Secretary establish admission fees. Fees should be established in order to cover the costs for operations and maintenance of recreational facilities or to maximize the recreational experience of visitors. The committee recommends the Secretary not charge fees for locations that do not offer any services.

As demand for public recreation grows in scope and form, the committee expects the permanent recreation fee program to help meet these needs. The committee recognizes that sites that attract thousands of visitors each day and tens of thousands of visitors each year, must invest in sanitation facilities, parking, campgrounds, shelters, boat ramps, and other infrastructure that helps ensure access, safety, and resource protection so the very feature that attracts the visitor remains available for the future.

Sec. 2005. Fiscal transparency report.

This section directs the Secretary to prepare and submit to Congress on the third Tuesday of January, beginning in 2006, and each year thereafter, a report on the expenditures for the preceding fiscal year and estimated expenditures for the current fiscal year for:

(1) Construction;

(2) Operation and Maintenance of inland and intracoastal waterways;

(3) General Investigations, reconnaissance, and feasibility studies;

(4) Interagency and International Support Activities;

(5) Recreation Fees and Lease Payments;

(6) Hydropower and Water Supply Fees;

(7) Inland Waterway Trust Fund and Harbor Maintenance Trust Fund;

(8) Other revenues, fees and payments;

(9) Permit Application and notification processing information; and

(10) Project backlog.

This section provides details on what is required to be reported for each item. This information will allow Congress to evaluate funding priorities to support the projects and programs of the Army Corps of Engineers.

Sec. 2006. Planning.

First, this section requires the Secretary to assess each water resource project's and project increment's cost-effectiveness and compliance with local, State, and national laws, regulations, and public policies. While the committee expects that all Army Corps of Engineers projects will be fully compliant with local, State and national laws, regulations, and public policy, it is aware of instances where a project may come into conflict with particular laws, regulations, or public policies. This section ensures that such conflicts, including the degree and severity, will be identified and assessed by the Army Corps of Engineers and documented in the feasibility report.

Second, the Secretary is required to establish a plan and schedule to periodically update and revise the agency's planning guidelines, regulations, and circulars of the Army Corps of Engineers to improve the analysis of water resources projects, including the integration of new and existing analytical techniques that properly reflect the probability of project benefits and costs. This section provides specifics on what must be included in a cost-benefit analysis. All feasibility studies must include an analysis of the benefits and costs, both quantified and unquantified.

All cost benefit analyses must:

1) identify areas of risk and uncertainty in the analysis;

2) clearly describe the degree of reliability of the estimated benefits and costs of the effectiveness of alternative plans, including an assessment of the credibility of the project construction schedule as it affects the estimated benefits and costs. Construction delays can impact the realization of expected benefits and costs, and therefore should be included in the cost benefit analysis;

3) identify local, regional, and national economic costs and benefits. The committee heard testimony (such as that offered by Mr. Gregory A. Zlotnik, Director of the Santa Clara Valley Water District in California, on March 31, 2004) that local and regional benefits are routinely disregarded when the Army Corps of Engineers chooses between alternative plans. Because local communities are cost-sharing significant portions of project study, design, construction, coupled with the fact that some local and regional input may result in the formation of better project alternatives, the committee believes that the exclusion of local and regional benefits should cease;

4) identify environmental costs and benefits, including the costs and benefits of protecting or degrading natural systems. The committee believes that it is important to identify and measure not just costs of degrading natural systems, but also benefits of protecting natural systems;

5) identify social costs and benefits, including a risk analysis regarding potential loss of life that may result from flooding and storm damage. The committee believes that avoiding loss of life, while not economically quantifiable, should be included in the analysis; and

6) identify cultural and historical costs and benefits.

This section provides for the following planning process improvements:

1) completion of feasibility reports within 2 years with an extension of up to 4 years for a controversial project, if the Secretary approves;

2) adoption of risk analysis procedures for project cost estimation;

3) recommendations to Congress for potential amendments to section 902 of WRDA 1986;

4) a requirement to provide a systematic framework to manage, certify and modernize methods, models and procedures used in water resources planning;

5) developing systems for planning technology transfer within the Corps and sustaining the state-of-art skills and knowledge of Corps planners; and

6) establishment of benchmarks for the discrete elements of planning studies to improve timeliness and effectiveness.

This section also provides guidance for the formulation of flood damage and hurricane and storm damage reduction projects, ecosystem restoration projects and projects that have both of these purposes.

The committee supports the efforts of the Chief of Engineers to strengthen the planning competency within the Corps and therefore provides authority to establish centers of expertise to provide specialized planning expertise for studies and to provide internal peer review support for external peer review panels.

The committee supports the concept that planning studies of the Corps should follow principles of integrated water management. If non-Federal study sponsors request and provide the cost-share, studies should incorporate and evaluate project alternatives without regard for whether such alternatives are within budgetary priorities for implementation. As these reports are primarily to provide Congress with the information and assurances necessary to justify congressional authorization, the Corps should not predetermine the outcome or eliminate viable alternatives for any reasons beyond the statutory requirements for feasibility studies.

This section also gives full responsibility to the Chief of Engineers for the technical aspects of project development by directing that the Chief of Engineers shall not be subject to direction as to the contents, findings or recommendation of reports and shall be solely responsible for the reports and any related recommendations, including any evaluation and recommendation for changes in law or policy that may be appropriate and representative of the best technical solutions to water resource needs and problems.

Finally this section provides for timely review and submission of reports to Congress. The completion of the Chief of Engineers reports shall not be delayed while consideration is being given to potential changes in policy or priority for project consideration and, after completion, shall be submitted to the Committee on Environment and Public Works of the Senate and to the Committee on Transportation and Infrastructure of the House of Representatives. The Secretary shall, within 90 days after the date of completion of a report of the Chief of Engineers that recommends to Congress a water resource project, review the report and provide any recommendation regarding the project to Congress. Within 90 days of enactment of this Act, the Secretary shall complete review of, and provide recommendation to Congress for any report recommending to Congress a water resource project that the Chief of Engineers completed before the date of enactment of this Act.

Sec. 2007. Independent reviews.

The committee has considered proposals for improvements to the Corps planning process and to assure confidence in the recommendations that are founded on this process. In considering these proposals, we examined testimony of witnesses before this committee and the House Transportation and Infrastructure Committee, reviewed the application of scientific review within the programs of other Federal and non-Federal agencies and talked with non-Federal project sponsors and organizations that represent them.

The committee believes the application of independent peer review to the project studies of the Corps of Engineers can add value when appropriately structured and implemented. Among the considerations we found important are the following:

Congress has provided policy guidance to ensure the quality of information disseminated by the Federal Government in the `Information Quality Act' (Section 515 of the Treasury and General Government Appropriations Act for Fiscal Year 2001 (Public Law 106-554; HR. 5658)). To establish the role of peer review in pursuing the objectives of the Information Quality Act, the Office of Management and Budget has published guidance to Federal agencies in Office of Management and Budget, Revised Information Quality Bulletin for Peer Review, dated December 15, 2004. The committee believes the Corps of Engineers is required to implement peer review and has direction from the Executive Office of the President to do so. The committee also believes that one standard for peer review at the agency is appropriate.

The committee notes that Corps of Engineers project studies are unique within the Federal Government. The Corps conducts project studies on the ground and in partnership with non-Federal interests who typically have a need for immediate solutions. Corps studies are not pure research and development projects but are conducted under guidance designed to implement the principles of engineering, ecology and economics. As the practice of economics, ecology and engineering improves, the guidance for conducting Corps studies should be adjusted and improved. But study guidance always remains a set of conventions that apply science in a cost effective, predictable and replicable way to determine solutions to real problems and eligibility for Corps participation. The Corps should always ask peer reviewers if the guidance providing for application of science has been adhered to as well as commenting on the overall science used in a project study. By making such a distinction, the Corps can get even greater value from peer review by discovering where the systematic improvement in guidance or methods is needed. We expect a Corps feasibility study will emphasize the timely and cost-effective solution of a community's specific water resources problems using established methods, models and procedures. Improvements or advances in methods, models and procedures should be achieved through research and development and other initiatives outside the scope of the individual project studies.

The committee believes that the Corps of Engineers must work to reduce, not increase, sponsor burdens in terms of time and cost of project development and if possible, find ways to reduce the time and cost of studies.

The committee has also sought to recognize the distinction between the engineering, scientific or technical aspects of a study and those that are purely a government function. The committee believes that the economics, science and engineering in Corps project studies can benefit from independent peer review. However the committee also recognizes that a large component of a Corps project study is the time and talent expended on government functions such as weighing competing values and policies in making decisions related to formulating a recommended water resources project, formulating alternatives, involving the stakeholders, developing community consensus for a project and assessing risk and deciding how much study, data collection or analysis are needed to make a recommendation. The committee recognizes that the distinction between the technical aspects of project studies and the government functions have close relationships that will often blur sharp distinctions. However, the two aspects of project studies, scientific/technical vs. policy/balancing values, require different kinds of review and evaluation. The committee believes independent peer review applies only to the engineering, scientific and technical work products that form the basis for the recommendations.

The committee does not excessively legislate the procedures and processes of peer review. Within the Department of the Army, the Chief of Engineers is the official responsible for the quality and adequacy of the engineering, scientific and technical work products that form the basis for his recommendations on implementation of water resources projects. Therefore, the Chief of Engineers is accountable for developing procedures for the application of peer review. This legislation charges the Chief of Engineers with developing guidance for the use of peer review, including external peer review, within the Corps and directs him to complete and publish such guidance within 1 year. This section also includes principles to govern the Chief of Engineers in the formulation of this guidance. A major objective in this guidance is to ensure that the Chief of Engineers concentrates peer review activities on those elements of information where such review will return the greatest benefit, that peer review activities be built into the district engineer's study and completed before the district engineer completes his report. In all cases, peer review must be completed before the Chief of Engineers signs his report. We also strongly encourage the Chief of Engineers to undertake peer review of all major scientific and engineering methods, models, procedures and data that will be applied in multiple planning studies. Application of peer review to basic planning methods and models will avoid duplicative review in project studies. An important principle of the legislation is that the costs for undertaking all peer reviews shall be at full Federal expense to ensure that this Federal function not be shifted onto non-Federal sponsors.

Sec. 2008. Mitigation for fish and wildlife losses.

This section amends section 906 of the Water Resources Development Act of 1986. Subsection (a) amends 906(a) to require completion of mitigation no later than the last day of the first fiscal year beginning after completion of the project or separable element where such mitigation is not technically practicable to complete by the last day of construction. It also amends section 906(b) by authorizing the use of consolidated mitigation where other forms of mitigation are not practicable or are less environmentally desirable, including mitigation banks and conservation banks. This subsection also relieves the Secretary and non-Federal interest from responsibility for monitoring or demonstrating mitigation success.

This section also amends 906(d) to identify elements to be included in a specific mitigation plan required under section 906. The plan shall include a description of the physical action to be undertaken; justification for mitigation that is undertaken outside the watershed; a description of the quality and types of lands and interest in land to be used for mitigation and as the basis for a determination that lands and interest will be available at the time required; the type, quantity, and characteristics of the habitat being restored; and a plan for monitoring mitigation success, including cost and duration of monitoring and to the extent practicable, the entities responsible for the monitoring. In the case where it is not practicable to identify the entity responsible for monitoring at the time of the final report of the Chief of Engineers or other final decision document, then the entity shall be identified in the partnership agreement entered into with the non-Federal interest.

This subsection also requires submission of a status report describing the construction of projects that require mitigation under section 906. This report shall be submitted to the Committee on Environment and Public Works in the Senate and the Committee on Transportation and Infrastructure of the House of Representatives concurrently with the President's submission of the Civil Works appropriations request to Congress. Projects to be included in the status report are: all projects under construction as of the date of the report; all projects for which the President requests funding for the next fiscal year; and all projects that have completed construction but have not completed mitigation.

Sec. 2009. State technical assistance.

This section amends section 22 of the Water Resources Development Act of 1974. It authorizes the Secretary, upon request of a governmental agency or non-Federal interests, to provide technical assistance at Federal expense. This assistance may include hydrologic, economic and environmental data and analyses and may not exceed $10,000,000 a year. Of the amount authorized, $2,000,000 may be used for cooperative agreements with nonprofit entities to provide assistance to rural and small communities. This authority will allow the Army Corps of Engineers to participate with State and local governments in watershed planning. The committee does not intend the receipt of funds by non-profit organizations and State agencies under other Federal programs to preclude technical assistance under this section.

In addition, this section eliminates the $500,000 State limitations under section 22 and directs the Secretary to submit, as part of the President's annual budget request, a list of the individual activities proposed for funding under this program.

The committee believes this section will better support State, tribal, and local government for integrated water resources management.

Sec. 2010. Access to water resources data.

Subsection (a) directs the Secretary to carry out a program to provide public access to water resources and related water quality data.

Subsection (b) requires that the program include access to data generated in water resources project development and regulation under section 404 of the Federal Water Pollution Control Act and employ geographic information system technology and linkages to water resources models and analytical techniques.

Subsection (c) requires the Secretary to develop partnerships with States, tribal, and local governments and other Federal agencies in carrying out this program.

Subsection (d) authorizes $5,000,000 to carry out the section.

The committee is aware that the Army Corps of Engineers collects significant amounts of water resources and related data in the development of water resources projects and the regulation of wetlands. This data, including models and analytical techniques developed and maintained by Army Corps of Engineers laboratories, are valuable to States, tribal, and local governments and the general public, yet, in this age of modern information technology, are not accessible. The committee believes the program established by this section will improve water management and save money at all levels of government.

Sec. 2011. Construction of flood control projects by non-Federal interests.

Subsection (a) establishes that for projects being formed under the authority granted by section 211 of the Water Resources Development Act of 1996 (33 U.S.C. 701b), the budget priority of those projects shall be proportionate to the percentage of project completion or if the project is complete, shall have the same priority as a project with a contractor onsite.

Subsection (b) adds the following projects to the list of demonstration projects established in section 211(f) of the Water Resources Development Act of 1996 (33 U.S.C. 701b-13):

Thornton Reservoir, Cook County, Illinois--This section amends section 221(f) of the Water Resources Development Act of 1996 to include an element of the project for flood control, Chicagoland Underflow Plan, Illinois.

St. Paul Downtown Airport (Holman Field) St. Paul, Minnesota--This section amends section 211(f) of the Water Resources Development Act of 1996 to include the project for flood damage reduction, St. Paul Airport, St. Paul, Minnesota.

Buffalo Bayou, Texas--This section amends section 211(f) of the Water Resources Development Act of 1996 to include the Buffalo Bayou, Texas project. The Buffalo Bayou Texas project was authorized by the River and Harbors Act of 20 June 1938, and modified by the 1939 and 1954 Flood Control Acts.

Halls Bayou, Texas--This section amends section 211(f) of the Water Resources Development Act of 1996 to include the Halls Bayou project, and subject to approval by the Secretary as provided by this section, the non-Federal interests may design and construct an alternative to the authorized project. The Halls Bayou project was authorized by section 101(a)(21) of the Water Resources Development Act of 1990, Buffalo Bayou and Tributaries, Texas, Report of the Chief of Engineers dated February 12, 1990.

Sec. 2012. Regional sediment management.

This section amends section 204 of the Water Resources Development Act of 1992 (33 U.S.C. 2326) to authorize the Corps of Engineers to engage in the regional planning and implementation of water resources and environmental restoration projects. The committee recognizes the need for Regional Sediment Management Plans to address in a programmatic fashion those water resource and environmental restoration needs in which there is, under current law, a Federal interest. The ongoing regional planning and management of these projects will improve the Corps' civil works program, conserve sediment, and decrease the long-term costs of projects.

Subsection (a) authorizes the Secretary, in connection with the construction, operation, or maintenance of a Federal water resource project, to carry out projects for the protection, restoration, and creation of aquatic and ecologically related habitats, and the transport and placement of dredged material.

Subsection (b) requires that projects carried out under subsection (a) are justified in terms of their environmental, economic, and social costs.

Subsection (c) outlines the determination of planning and construction costs for projects carried out under subsection (a). Studies conducted under this section are to be at full Federal cost to assure that no governmental entity within a region can, by its refusal to pay its share of the cost, impede the other non-Federal interests from partnering with the Federal Government to prepare a plan. The non-Federal share of the construction cost of any project with a willing and fiscally committed non-Federal partner will be based on the type of Federal water resource project (i.e., navigation, shore protection, environmental restoration, etc.) to which the regional sediment management plan is related. Total Federal costs associated with the construction of a project may not exceed $5,000,000 without congressional approval.

Subsection (d) authorizes the Secretary, with the consent of the non-Federal interest, to select a placement of sediment that is not the least-cost option if the Secretary determines that the incremental costs of the placement are reasonable in relation to the derived environmental benefits. The Federal share of the incremental costs would be determined in accordance with subsection (c).

Subsection (e) authorizes the Secretary, acting through the Chief of Engineers, to work with State, regional and local governments to develop plans for the regional management of sand that may or may not result in Federal water resource projects. In some cases, for example, the Federal Government may be able to assist other levels of government in the development of regional sediment management plans that the non-Federal entity chooses to implement without Federal construction assistance.

Subsection (f) establishes priority areas for the development of plans identified in subsection (e).

Subsection (g) authorizes $30,000,000 annually for section 204 and reserves up to $5,000,000 of this amount for the development of plans as provided in subsection (e).

Subsection (b) repeals section 145 of the Water Resources Development Act of 1976 (33 U.S.C. 426j), but does not affect the authority to complete any on-going project under that section.

Sec. 2013. National shoreline erosion control development program.

This section amends section 3 of the Act of August 13, 1946 (33 U.S.C. 426g) by permanently reauthorizing the National Shoreline Erosion Control Development and Demonstration program. This innovative program to test new technology to combat shoreline erosion is due to expire on September 30, 2005. This section expands this program in the hope that it can continue to develop and test technologies that will reduce the periodic renourishment costs of beach nourishment projects.

This section places the shoreline demonstration program under the authority for small shoreline projects. Both are intended to provide expedited means to deal with erosion problems along limited areas of shoreline. Although the bill places authority for both programs within the same section of law, it does not change current management of either program.

This section makes several amendments to the current erosion control demonstration program. In order to assure effective congressional oversight of this program, an annual reporting procedure is established. This section emphasizes that the technology or methods to be tested under this program shall be chosen with the goal of improving the performance of beach nourishment projects (i.e., lessen the frequency of required periodic renourishments), therefore lowering project costs. It also emphasizes the use of natural designs, including the use of native and naturalized vegetation, to minimize permanent structural alterations of shorelines.

In addition, this section authorizes the Secretary, acting through the Chief of Engineers and at the request of a non-Federal sponsor, to incorporate a demonstration project as a feature of an existing, authorized Federal shore protection project. The section authorizes the Federal Government to enter into cost share agreements for the construction of the demonstration project. Current law makes the construction cost solely a Federal responsibility. The committee believes that this will save significant time and cost involved with studying and modifying the original authorization to incorporate the new technology or methods.

The section also improves existing authority for this program by permitting the Federal Government to cost share the removal of a project that has failed to the extent that it endangers property, infrastructure or lives. Current law places this fiscal responsibility solely on the non-Federal sponsor of the project.

Sec. 2014. Shore protection projects.

Subsection (a) states that it is the policy of the United States to promote shore protection projects, including beach restoration and periodic beach renourishment for a period of 50 years. Subsection (b) states that preference shall be given to areas where Federal funds have been invested and areas where Federal navigation projects or activities have caused the need for prevention or mitigation to shores and beaches.

This section emphasizes the committee's support for the protection, restoration and enhancement of sand beaches through financial support of periodic beach nourishment for a period of 50 years. The committee recognizes that periodic beach nourishment is an effective measure to prevent or mitigate damage to shore from storms and hurricanes. Preference shall be given to areas in which there has been a Federal investment of funds. The committee emphasizes that through previous Water Resources Development Acts, Congress has established the length and Federal cost share for period beach nourishment and renourishment.

Moreover, the written agreement entered by the Secretary and non-Federal sponsor with respect to such projects is legally binding in compliance with the Water Resources Planning Act (42 U.S.C. 1962(a)-1962(a)(4)(e)).

Sec. 2015. Cost sharing for monitoring.

This section authorizes the Secretary to cost share in the monitoring of ecosystem restoration projects identical to the cost sharing for construction, including projects designed and constructed under a continuing authority program for a maximum of 10 years and not to exceed 5 percent of the construction cost of the original project. After 10 years, the costs of monitoring shall be 100 percent non-Federal.

Sec. 2016. Ecosystem restoration benefits.

This section directs the Secretary to use ecosystem restoration benefits as part of developing a recommended plan for the following projects:

(1) Grayson's Creek, California

(2) Seven Oaks, California

(3) Oxford, California

(4) Walnut Creek, California

(5) Wildcat Phase II, California

Sec. 2017. Funding to expedite the evaluation and processing of permits.

This section amends section 214(a) of the Water Resources Development Act of 2000 (33 U.S.C. 2201 note; 114 Stat. 2594) to eliminate the expiration of the program.

Sec. 2018. Electronic submission of permit applications.

This section directs the Secretary to establish procedures to allow the electronic submission of permit applications for permits under the jurisdiction of the Department of the Army.

Sec. 2019. Improvement of water management at Corps of Engineers reservoirs.

This section authorizes the Secretary to carry out measures in cooperation and coordination with States, tribal governments, and local governments to more effectively and efficiently meet the water resource needs in watersheds containing reservoirs operated and maintained by the Army Corps of Engineers. It requires that water supply revenue collected in connection with reservoir operation for navigation, flood control, or multi-purpose projects, be credited to the revolving fund established under section 101 of the Civil Functions Appropriations Act, 1954 (33 U.S.C. 701b-10). Eighty percent of those revenues shall be available within the Corps District in which they were generated for the purpose of defraying costs of planning, operation, maintenance, replacements, and upgrades of, and emergency expenditures for, all facilities of Army Corps of Engineers projects within that District. Twenty percent of those revenues shall be available on an agency-wide basis for the same purposes.

Water supply storage fees at reservoirs should reflect the opportunity cost to the project for providing that water. For the permanent first costs of water storage, such fees shall be the lesser of the estimated cost of purposes foregone (benefits foregone), replacement costs, or the updated cost of storage. The committee recognizes that this is a departure from the current agency developed policy. In all cases the Corps should calculate the joint use costs for the annual operation and maintenance of each reservoir based on the allocated benefits of water storage. In the case of a water supply that is reallocated from another project purpose to municipal or industrial water supply, the joint use costs for the reservoir shall be adjusted to reflect the reallocation of project purposes. In addition, in the case of a reallocation that adversely affects hydropower generation, the Secretary shall defer to the Administrator of the respective Power Marketing Administration to calculate the impact of such a reallocation on the rates for hydroelectric power.

Water supply and management issues are becoming increasingly important as the demand on existing supplies continues to grow. The Army Corps of Engineers currently manages 383 major dams and reservoirs, providing significant benefits to many regions of the Nation. However, some of these reservoirs use operating plans that may no longer reflect the best comparative net economic and environmental returns for the Nation. The intent of this program is to ensure existing Army Corps of Engineers reservoirs contribute to enhance economic and ecosystem values in a cost efficient and environmentally sustainable way as water demands continue to increase.

Sec. 2020. Corps of Engineers hydropower operation and maintenance funding.

This section provides for the direct funding by the Southeastern, Southwestern and Western Power Administrations of Corps of Engineers operations and maintenance activities attributable to hydropower generation. In the case of the Southwestern Power Administration and under a specified condition for the Southeastern Power Administration, amounts credited to the Corps of Engineers may be used for capital and non-recurring costs. In addition, the section provides for consultation and resolution of costs appropriate for direct funding between the Secretary and the respective power marketing administrators.

Sec. 2021. Federal hopper dredges.

This section lifts the annual operational restrictions on these Federal dredges to maximize the available dredging capacity to maintain channel dimensions of West Coast Federal navigation projects. The committee is aware that the current restrictions on the Federal hopper dredges, YAQUINA and ESSAYONS, do not maximize the use of these important Federal resources.

In addition the committee is aware of the fixed and operating costs of the Federal hopper dredge McFarland, as well as the current capability of the private industry hopper dredge fleet. The committee has determined that the current daily operating costs of the McFarland compared to similar-sized industry hopper dredges is excessive. This section directs the Secretary to retire the hopper dredge McFarland within 1 year of enactment of this Act.

Sec. 2022. Obstruction to navigation.

This section amends section 10 of the Rivers and Harbors Act of 1899 by providing that nothing in the section shall be construed as to provide for the regulation of activities or structures on private property unless the Secretary, in consultation with the Secretary of the department in which the Coast Guard is operating, determines that such activity would pose a threat to the safe transit of maritime traffic. Nothing in this section affects the definition of navigable waters under section 404 of the Clean Water Act.

SUBTITLE B--CONTINUING AUTHORITIES PROGRAMS

Sec. 2031. Navigation enhancements for waterbourne transportation.

This section increases the per project limit from $4,000,000 to $7,000,000 for the Navigation Enhancements for Waterbourne Transportation (NEWT) continuing authority program created under section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577), as amended.

Sec. 2032. Protection and restoration due to emergencies at shore and streambanks.

This section increases the annual program limit from $15,000,000 to $20,000,000 and the per project limit from $1,000,000 to $1,500,000 for the Protection and Restoration due to Emergencies at Shores and Streambanks (PRESS) continuing authority program created under section 14 of the Flood Control Act of 1946 (33 U.S.C. 701r).

Sec. 2033. Restoration of the environment for protection of aquatic and riparian ecosystems program.

This section increases the annual program limit from $25,000,000 to $75,000,000 for the Restoration of the Environment for Protection of Aquatic and Riparian Ecosystem (REPARE) continuing authority program created under section 206 of the Water Resources Development Act of 1996 (33 U.S.C. 2330).

Sec. 2034. Environmental modification of projects for improvement and restoration of ecosystems program.

This section increases the annual program limit from $25,000,000 to $50,000,000 for the Environmental Modification of Projects for Improvement and Restoration of Ecosystems (EMPIRE) continuing authority program created under section 1135 of the Water Resources Development Act of 1986 (33 U.S.C. 2309a).

Sec. 2035. Projects to enhance estuaries and coastal habitats.

This section creates a new continuing authority program, Projects to Enhance Estuaries and Coastal Habitats, for improvement of the quality of the environment by performing estuary habitat restoration, with an annual program limit of $25,000,000 and a per project cost limit of $5,000,000.

Sec. 2036. Remediation of abandoned mine sites.

This section expands the existing Remediation of Abandoned Mine Sites (RAMS) program into a continuing authority program, with an annual program limit of $45,000,000, by amending section 560 of the Water Resources Development Act of 1999 (33 U.S.C. 2336; 113 Stat. 354-355) to authorize the Secretary to perform construction activities associated with remediation of abandoned mines, to cost share program features with non-profit organizations with the consent of the affected local government, to adjust the cost share requirement, and defines the operation and maintenance costs as 100 percent non-Federal.

Sec. 2037. Small projects for the rehabilitation or removal of dams.

This section creates a new continuing authority program, Small Projects for the Rehabilitation or Removal of Dams, for improvement of the quality of the environment, with an annual program limit of $25,000,000 and a per project cost limit of $5,000,000.

Sec. 2038. Remote, maritime-dependent communities.

This provision gives the Secretary of the Army authority to develop criteria for the justification of Federal participation in remote harbors without the need to demonstrate that the project is justified solely by National Economic Development benefits. The remote or subsistence harbor projects would be cost shared in accordance with section 101 of the Water Resources Development Act of 1986, as amended, in the same way other harbor projects are cost shared, but would not be required to be economically justified solely on the basis of National Economic Development benefits. The provision recognizes that there are communities within the United States and its Territories that are totally dependent on water transportation for their subsistence. In addition to their geographic isolation, in many cases these communities are in economically disadvantaged areas. Conventional procedures currently used to estimate National Economic Development benefits do not capture water transportation economic dependency and subsistence issues. This provision is responsive to the particular needs of isolated economically disadvantaged regions that depend on water transportation for their subsistence and is responsive to the need to expand the economy and promote growth in areas of poverty and economic need.

Sec. 2039. Agreements for water resource projects.

Subsection (a) amends section 221 of the Flood Control Act of 1970, to rename project cooperation agreements as partnership agreements, allow district engineers to enter into partnership agreements, and allow partnership agreements to provide for liquidated damages. This subsection also requires that, if the Secretary determines that a project needs to be continued for the purposes of public health and safety, the non-Federal interest shall pay the increased project costs, up to an amount equal to 20 percent of the original estimated project costs and in accordance with the statutorily determined cost share and the Secretary shall pay all increased costs remaining.

Subsection (b) amends 912(b) of the Water Resources Development Act of 1986 to eliminate civil penalties in partnership agreements and allow the use of liquidated damages.

Subsection (c) clarifies that these changes apply only to partnership agreements entered into after the date of enactment, unless the non-Federal interest requests applicability from the district engineer and construction has not been initiated.

Subsection (d) clarifies that cooperation agreements or project cooperation agreements shall be partnerships agreements or project partnership agreements, respectively and vice versa.

The Water Resources Development Act of 1986 significantly increased the roles and responsibilities of project sponsors. As a result of the Water Resources Development Act of 1986, project cooperation agreements (PCAs) required under section 221 of the Flood Control Act of 1970 and section 912 of the Water Resources Development Act of 1986 assumed significant importance in defining non-Federal responsibilities for providing items of local cooperation.

In testimony before the committee, non-Federal project partners, including Mr. Gregory A. Zlotnik, Director of the Santa Clara Valley Water District in California, expressed frustration in the multiple layers of review and approval imposed upon the execution of PCAs within the Department of the Army, which produced needless delays and inefficiencies. The committee expects these changes will address the concerns of non-Federal interests, improve efficiency by streamlining the process for approving partnership agreements, and foster a culture of true partnerships that will improve projects and their implementation.

Sec. 2040. Program names.

Subsection (a) changes the program name for the continuing authority program created under section 3 of the Act of 1946 (33 U.S.C. 426g).

Subsection (b) changes the name for the continuing authority program created under section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s).

TITLE III--PROJECT RELATED PROVISIONS

Sec. 3001. St. Herman and St. Paul Harbors, Kodiak, Alaska.

This section authorizes the Secretary to carry out, on an emergency basis, the necessary removal of rubble, sediment, and rock impeding the entrance to the St. Herman and St. Paul Harbors, Kodiak, Alaska, at a Federal cost of $2,000,000.

Sec. 3002. Sitka, Alaska.

This section directs the Secretary to take such action as is necessary to correct design deficiencies in the Thompson Harbor element of the project for navigation, Southeast Alaska Harbors of Refuge, Alaska, authorized by section 101 of the Water Resources Development Act of 1992 (106) Stat. 4801) Thompson Harbor at Sitka, Alaska, at a Federal cost $6,300,000.

Sec. 3003. Black Warrior-Tombigbee Rivers, Alabama.

This section authorizes the Secretary to construct a new project management office for the Black Warrior-Tombigbee Rivers and Alabama River projects to be located in the vicinity of Tuscaloosa, Alabama. To accomplish this section, the Secretary shall acquire necessary real estate interests, prepare required environmental documentation, design and construct office, warehouse, shop and dock facilities, and necessary ancillary buildings for the new project management office. The Secretary shall sell, convey, or otherwise transfer to the city of Tuscaloosa, Alabama, at fair market value, the land and structures with the existing project management office, if the city agrees to assume full responsibility and costs associated with the demolition of the existing project management office. There is authorized to carry out this section $32,000,000.

Sec. 3004. Augusta and Clarendon, Arkansas.

This section modifies the project for flood control, the Augusta to Clarendon Levee, Lower White River, Arkansas project, authorized by the Flood Control Act of 1941 (P.L. 77-228) and modified by the Flood Control Act of 1946 (P.L. 79-525), to authorize the Secretary to carry out rehabilitation of authorized and completed levees on the White River between Augusta and Clarendon, Arkansas, at a total estimated cost of $8,000,000, with an estimated Federal cost of $5,200,000 and an estimated non-Federal cost of $2,800,000.

Sec. 3005. St. Francis Basin, Arkansas and Missouri.

This section modifies the St. Francis Basin, Arkansas and Missouri project, authorized by the Act of June 15, 1936 (49 Stat. 1508, chapter 548), as amended, to authorize the Secretary to undertake channel stabilization and sediment removal measures as an integral part of original project and not to be considered a separable element. These measures would be provided at current project cost sharing, which is 100 percent Federal.

Sec. 3006. St. Francis Basin land transfer, Arkansas and Missouri.

This section modifies the St. Francis Basin, Arkansas and Missouri project, authorized by the Act of June 15, 1936 (49 Stat. 1508, chapter 548), as amended, to authorize the Secretary to transfer acquired project mitigation lands in Arkansas directly to the State of Arkansas or its appropriate designee, provided that certain local requirements are met. Currently, transfer of the land is only authorized for the U.S. Fish and Wildlife Service.

Sec. 3007. Red-Ouachita River Basin levees, Arkansas and Louisiana.

This section authorizes the Secretary to design, construct, operate and maintain bank stabilization measures, at full Federal expense, along the Ouachita and Black Rivers, Arkansas and Louisiana, between mile 0 on the Black River, Louisiana, to mile 460 on the Ouachita River, Arkansas at the outlet of Remmel Dam.

Sec. 3008. McClellan-Kerr Arkansas River navigation system, Arkansas and Oklahoma.

Subsection (a) directs the Secretary to continue construction of the 12-foot channel project as authorized by section 136 of P.L. 108-137.

Subsection (b) authorizes the Secretary to determine the need for and construct modifications in the structures and operations of the Arkansas River in the area of Tulsa County, Oklahoma, specifically including the construction of low water dams and islands to provide nesting and foraging habitat for the interior least tern, in accordance with the study entitled, `Arkansas River Corridor Master Plan Planning Assistance to States.' Such habitat will provide for mitigation for any incidental taking relating to the McClellan-Kerr Navigation System. The non-Federal share of the cost of a project under this subsection shall be 35 percent. There is authorized to be appropriated to carry out this subsection $12,000,000.

Sec. 3009. Cache Creek Basin, California.

This section amends section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4112), and directs the Secretary to mitigate the hydraulic impacts of the new south levee of the Cache Creek Settling Basin on the city of Woodland's storm drainage system capacity, including all appurtenant features, erosion control measures, and environmental mitigation features. This project would be a separable element of the original project.

Sec. 3010. Hamilton Airfield, California.

This section authorizes the project for ecosystem restoration, Hamilton Army Airfield, California, substantially in accordance with the plan, and subject to the conditions, recommended in the final report of the Chief of Engineers. The project is modified to included the diked bayland parcel `Bel Marin Keys Unit V.' The total Cost is $205,226,000, with a Federal cost of $153,840,000 and a non-Federal cost of $51,386,000.

Sec. 3011. LA-3 dredged material ocean disposal site designation, California.

This section amends section 102(c)(4) of the Marine Protection, Research, and Sanctuary Act of 1972 (33 U.S.C. 1412(c)(4)) to extend the LA-3 Dredged Material Ocean Disposal Site interim designation from January 1, 2003 to January 1, 2007. The extension is needed to allow for maintenance dredging activities to proceed within Newport Harbor as the formal site designation process continues to completion.

Sec. 3012. Larkspur Ferry Channel, California.

This section authorizes the Secretary to prepare a limited reevaluation report to determine whether maintenance of the project is feasible. If the Secretary determines that maintenance of the project is feasible, the Secretary shall maintain the channel.

Sec. 3013. Llagas Creek, California.

This section authorizes the Secretary to complete the project for flood damage reduction, authorized by section 501(a) of the Water Resources Development Act of 1999 (113 Stat. 333), in accordance with the requirements of local cooperation agreements as specified in section 5 of the Watershed Protection and Flood Prevention Act (16 USC 1005) at a total cost of $95,000,000 with a Federal cost of $55,000,000 and a non-Federal cost of $40,000,000.

Sec. 3014. Los Angeles Harbor, California.

This section authorizes the Secretary to construct the main channel deepening project for Los Angeles Harbor, California. The provision amends the project authorization provided by section 101(b)(5) of the Water Resources Development Act of 2000 (114 Stat. 2577), to increase the total project cost for the project to $222,000,000 with an estimated Federal cost of $72,000,000 and an estimated non-Federal cost of $150,000,000.

Sec. 3015. Magpie Creek, California.

This section authorizes the Secretary to apply cost-sharing requirements applicable to non-structural flood control under section 103(b) of the Water Resources Development Act of 1986 (100 Stat. 4085) for the portion of the project consisting of land acquisition to preserve and enhance existing floodwater storage. The crediting allowed under this provision shall not exceed the non-Federal share of the cost of the project. The Secretary is directed to utilize the in-kind contribution authorization in section 1001 of this Act to provide a credit to the local sponsors for the value of their in-kind contributions made on authorized activities in the project's scope of work if the Secretary determines the work is integral to the project.

Sec. 3016. Pine Flat Dam fish and wildlife habitat, California.

This section authorizes the Secretary to participate with appropriate State and local agencies in the implementation of a cooperative program to improve and manage fisheries and aquatic habitat conditions in the Pine Flat Reservoir and in the 14-mile reach of Kings River immediately below the dam in accordance with Kings River Fisheries Management Program Framework. There is a total cost of $20,000,000, a Federal cost $13,000,000 and a non-Federal cost of $7,000,000.

Sec. 3017. Redwood City navigation project, California.

This section authorizes the Secretary to dredge the Redwood City Navigation Channel on an annual basis, to maintain the authorized depth of--30 feet mean lower low water.

Sec. 3018. Sacramento and American Rivers flood control, California.

This section authorizes the Secretary to apply remaining funds eligible for reimbursement on the Natomas Federal Plan as a credit toward the non-Federal share of cost for future work on any flood damage reduction project authorized before the date of enactment of this Act that is to be paid for by the Sacramento Area Flood Control Agency.

Sec. 3019. Conditional declaration of nonnavigability, Port of San Francisco, California.

This section authorizes the Secretary to declare portions of the San Francisco, California, waterfront not to be navigable water of the United States for the purpose of section 9 of the Act of March 3, 1899 (33 U.S.C. 401) and the General Bridge Act of 1946 (33 U.S.C. 525 et seq.). This determination is based on proposed projects which are to be carried out by non-Federal entities, consisting of bulkheads, fill, or otherwise occupied by permanent structures, that will impact the accessibility of the waterfront. If, after 20 years from the date of the enactment of this Act, any of the portions of the project declared to be non-navigable have not been impacted or if work has not begun within 5 years after the date of issuance of a permit, the declaration of nonnavigability shall cease to be effective.

Sec. 3020. Salton Sea restoration, California.

This section authorizes a special study of pilot projects identified in the preferred restoration concept plan approved by the Salton Sea Authority to determine if the pilot projects are economically justifiable, technically sound, environmentally acceptable and meeting the objectives of the Salton Sea Reclamation Act (Public Law 105-372). If the Secretary makes a positive determination, the Secretary may enter into an agreement with the Salton Sea Authority, and in consultation with the Salton Sea Science Office, to carry out pilot projects for improvement of the environment in the Salton Sea. There is a total cost $26,000,000, a Federal cost of $16,900,000 of which not more than $5,000,000 may be used for any one pilot project and a non-Federal cost $9,100,000.

Sec. 3021. Upper Guadalupe River, California.

This section authorizes the Secretary to carry out the project for flood damage reduction and recreation, Upper Guadalupe River, California, authorized by section 101(a)(9) of the Water Resources Development Act of 1999 (113 Stat. 275), as modified, generally in accordance with Upper Guadalupe River Flood Damage Reduction Project, San Jose, California, Limited Reevaluation Report, dated July, 2004, at a total cost of $212,100,000, with an estimated Federal cost of $113,300,000 and an estimated non-Federal cost of $98,800,000.

Sec. 3022. Yuba River Basin project, California.

This section modifies the project for flood damage reduction authorized by section 101(a)(10) of the Water Resources Development Act of 1999 (113 Stat. 275) by increasing the authorized project cost from $26,600,000 to $107,000,000 with a Federal cost of $70,000,000 and a non-Federal cost of $37,700,000. The Secretary is directed to utilize the in-kind contribution authorization in section 1001 of this Act to provide a credit to the local sponsors for the value of their in-kind contributions made on authorized activities related to the levees in the project's scope of work, if the Secretary determines the work is integral to the project.

Sec. 3023. Charles Hervey Townshend Breakwater, New Haven Harbor, Connecticut.

This section designates the western breakwater in New Haven Harbor as the `Charles Hervey Townshend Breakwater'.

Sec. 3024. Anchorage area, New London Harbor, Connecticut.

This section modifies the project for navigation, New London Harbor, Connecticut, authorized by the Act of June 13, 1902 (32 Stat. 333), to redesignate a portion of the 23-foot deep waterfront channel as an anchorage area.

Sec. 3025. Norwalk Harbor, Connecticut.

This section deauthorizes two small areas and authorizes the Secretary to realign a portion of the 10-foot channel at the northern section of the project for navigation, Norwalk Harbor, Connecticut, authorized by the River and Harbor Act of 1919 (40 Stat. 1276).

Sec. 3026. St. George's Bridge, Delaware.

This section amends section 102(g) of the Water Resources Development Act of 1990 (104 Stat. 4612) to direct the Secretary to assume ownership of the State Route 1 replacement bridge and continue to operate and maintain the existing St. Georges Bridge unless otherwise directed by Congress.

Sec. 3027. Christina River, Wilmington, Delaware.

This section directs the Secretary to remove the shipwrecked vessel known as the `State of Pennsylvania,' and any debris associated with that vessel from the Christina River at Wilmington, Delaware, which is substantially outside of current Federal navigation channels maintained by either the Corps of Engineers or the Coast Guard. The ship wreck poses a danger to recreational traffic during high tide, when it is not visible to boaters in the area.

Further, the section specifically exempts the Secretary from any provisions of law that would require recovering funds from the owner of the vessel or any other vessel. Finally the section authorizes the appropriation of $425,000 to carry out the removal of the shipwreck, to remain available until expended.

Sec. 3028. Additional program authority, comprehensive Everglades restoration, Florida.

This section applies section 902 of WRDA 1986 to the cost limits on the Federal share, total cost, and aggregate cost of projects pursued under CERP's programmatic authority of WRDA 2000 section 601(c).

Sec. 3029. Critical restoration projects, Everglades and south Florida ecosystem restoration, Florida.

This section increases the Federal appropriation limit for this program from $75,000,000 to $95,000,000 and remove language ending the period of appropriation, which was set at fiscal year 1999 in WRDA 1996 and at fiscal year 2003 in WRDA 1999. It would also increase the limit on Federal expenditures for a single project from $25,000,000 to $30,000,000 only in the case of the Seminole Water Conservation Plan, which is one of the projects for which a Project Cooperation Agreement has been executed. Cost estimates for the projects have increased over time due to inflation, unexpected site conditions, design modifications necessary to meet the project goals, and construction bids higher than those originally estimated.

Sec. 3030. Jacksonville Harbor, Florida.

This section authorizes the Secretary to modify the project for navigation, Jacksonville Harbor, Florida, authorized by section 101(a)(17) of the Water Resources Development Act of 1999 (113 Stat. 276) to extend the navigation features in accordance with the Report of the Chief of Engineers dated July 22, 2003, at an additional total cost of $14,658,000, with an estimated Federal cost of $9,636,000 and an estimated non-Federal cost of $5,022,000.

Sec. 3031. Lake Okeechobee and Hillsboro Aquifer pilot projects, comprehensive Everglades restoration, Florida.

This section amends section 601(b)(2)(B) of WRDA 2000, to include the pilot projects for aquifer storage and recovery, Lake Okeechobee and Hillsboro Aquifer, Florida, under the cost sharing and other provisions of the WRDA 2000. These pilot projects shall be treated as being integral components of the Comprehensive Everglades Restoration Plan, and carried out in accordance with the Plan, except that costs of operation and maintenance of these projects shall remain 100 percent non-Federal.

Sec. 3032. Lido Key, Sarasota County, Florida.

This section authorizes the Secretary to modify the project for hurricane and storm damage reduction in Lido Key, Sarasota County, Florida, authorized by section 354(2) of the Water Resources Development Act of 1999 (113 Stat. 276). The modified project provides for initial construction and periodic nourishment of an 80-foot-wide beach berm at elevation +5 feet National Geodetic Vertical Datum over 1.56 miles of shoreline, in accordance with the Report of the Chief of Engineers dated December 22, 2004. The authorized total cost is $14,809,000 with a Federal cost of $9,088,000 and a non-Federal cost of $5,721,000. Estimated total costs of $63,606,000 for periodic nourishment over a period of 50 years with an estimated Federal cost of $31,803,000 and an estimated non-Federal cost of $31,803,000.

Sec. 3033. Tampa Harbor, Cut B, Tampa, Florida.

This section authorizes the Secretary to modify the project for navigation, Tampa Harbor, Florida, authorized by section 101 of the River and Harbor Act of 1970 (84 Stat. 1818) to construct passing lanes in an area approximately 3.5 miles long and centered on Tampa Bay Cut B, if the Secretary determines that the improvements are necessary for navigation safety.

Sec. 3034. Allatoona Lake, Georgia.

This section repeals the authority provided in section 325 of the Water Resources Development Act of 1992 (106 Stat. 4849), and authorizes the Secretary to exchange land at Allatoona Lake, Georgia, by adding an alternative method whereby the Government could sell land above 863 feet in elevation and with the proceeds from the sales, without further appropriations, acquire additional lands, from willing sellers, to protect the water quality and overall environment of Allatoona Lake. The lands available to be sold are in accordance with the Real Estate Design Memorandum prepared by the Mobile district engineer dated April 5, 1996, and approved October 8, 1996.

Sec. 3035. Dworshak Reservoir improvements, Idaho.

This section authorizes the Secretary to construct recreational facilities as well as improve existing Army Corps of Engineers and outgranted improvements to recreation facilities on the existing Dworshak Reservoir to allow for operation at the lower pool elevations that are being experienced to assist in salmon species recovery efforts. The estimated total project cost is $5,300,000, with a Federal cost of $3,900,000 and a non-Federal cost of $1,400,000.

Sec. 3036. Little Wood River, Gooding, Idaho.

This section modifies Public Law 75-5, the Energy Conservation Work Program (16 U.S.C. 585 et seq.), to direct the rehabilitation of the Gooding Idaho Channel Project for the purpose of flood control and ecosystem restoration, if the Secretary determines the rehabilitation and ecosystem restoration to be feasible. The section authorizes and directs the Secretary to plan, design and construct the project at a total cost of $9,000,000, provides that the non-Federal share of the cost of the project can be provided as in-kind contributions, services, supplies and material, and provides that non-Federal funds may come from other Federal programs if permitted under that Federal program. This provision directs the Secretary to consider the ability to pay provisions from the Water Resources Development Act of 1986 (33 U.S.C. 2213(m)) when computing the non-Federal cost share.

Sec. 3037. Port of Lewiston, Idaho.

The section extinguishes reversionary interests and use restrictions related to industrial use purposes, the restriction that no activity shall be permitted that will compete with services and facilities offered by public marinas, and the restriction on human habitation or other building structure in which the elevation is above the standard project flood elevation. The use of fill material to raise low areas above the standard project flood elevation is authorized, except in any low area constituting wetland for which a permit under section 404 of the Federal Water Pollution Control Act (33 U.S.C. 1344) is required. This section also specifies the deeds involved and includes a savings clause regarding other remaining rights and interests of the Army Corps of Engineers for authorized project purposes.

Sec. 3038. Cache River Levee, Illinois.

This section directs the Secretary to add ecosystem restoration as a project purpose to the Cache River Levee, Illinois, authorized under the Flood Control Act of June 28, 1938 (52 Stat. 1215, Chapter 795).

Sec. 3039. Chicago, Illinois.

This section modifies the existing authorization by clarifying that the study includes Lake Michigan as well as the Chicago River.

Sec. 3040. Chicago River, Illinois.

This section reduces the width of the authorized navigation channel from between 100 and 120 to no wider than 66 feet from 100 feet downstream of the Halsted Street Bridge to 100 feet upstream of the Division Street Bridge, Chicago, Illinois to ensure consistency in Army Corps of Engineers records to actual bridge size.

Sec. 3041. Missouri and Illinois flood protection projects reconstruction pilot program.

This section directs the Secretary to reconstruct existing flood control projects in Missouri and Illinois as needed for proper functioning as originally authorized, so long as the deficiencies identified are not due to lack of proper operation and maintenance by the non-Federal interest. Costs shall be shared in the same percentages as the original projects. Operation, maintenance, repair, and rehabilitation of reconstructed projects are a non-Federal responsibility. A total of $50,000,000 is authorized for this effort. The following critical projects are to receive priority:

(1) Clear Creek Drainage and Levee District, Illinois.

(2) Fort Chartres and Ivy Landing Drainage District, Illinois.

(3) Wood River Drainage and Levee District, Illinois.

(4) city of St. Louis, Missouri.

(5) Missouri River Levee Drainage District, Missouri.

Sec. 3042. Spunky Bottom, Illinois.

This section directs the Secretary to add ecosystem restoration as a project purpose to the flood control project between Beardstown, Illinois and the mouth of the Illinois River, authorized by section 5 of the Flood Control Act of June 22, 1936 (49 Stat. 1583, Chapter 688). In addition, it directs that the flood control project shall remain eligible for emergency repair assistance under the Flood Control Act of August 18, 1941 (Public Law 77-228), as amended (33 U.S.C. 701n) without consideration of economic justification. It also authorizes $7,500,000 in Federal funding ($500,000 of which will be available for post-construction monitoring and adaptive management for a period of 5 years following completion of construction) for the project modifications carried out under section 1135 of WRDA 1986 for the Spunky Bottoms, Illinois project.

Sec. 3043. Strawn Cemetery, John Redmond Lake, Kansas.

This section authorizes the transfer of approximately 3 acres of Federal lands at John Redmond Lake directly to Pleasant Township. The conveyance would be at fair market value of undeveloped land. All costs associated with the conveyance shall be non-Federal.

Sec. 3044. Harry S. Truman Reservoir, Milford, Kansas.

This section directs the Secretary to sell 7.4 acres of land at Harry S. Truman Reservoir for a fire station.

Sec. 3045. Ohio River, Kentucky, Illinois, Indiana, Ohio, Pennsylvania, and West Virginia.

This section modifies the project for ecosystem restoration, Ohio River, Kentucky, Illinois, Indiana, Ohio, Pennsylvania, and West Virginia, authorized by section 101(16) of the Water Resources Development Act of 2000 (114 Stat. 2578), to authorize the Secretary to cost share projects with non-profit organizations with the consent of the affected local government, prepare an implementation plan and initiate a pilot restoration program in the Lower Scioto Basin, Ohio.

Sec. 3046. Public access, Atchafalaya, Basin Floodway System, Louisiana.

This section allows the Secretary to acquire an additional 20,000 acres of land from willing sellers as is consistent with the Public Access feature. This section also addresses an inconsistency in previous Acts pertaining to a fiscal cap placed on Federal first cost expenditures. In section 906(f) of the Water Resources Development Act of 1986, Congress increased the scope of the public access feature of the project to a cost of $66,000,000 without raising the $32,000,000 cap on expenditures associated with this expanded scope. This section removes the $32,000,000 cap for the acquisition of additional lands retroactive to the Water Resources Development Act of 1986 when the project scope was expanded.

Sec. 3047. Calcasieu River and Pass, Louisiana.

This section modifies the project for the Calcasieu River and Pass, Louisiana, authorized by section 101 of the River and Harbor Act of 1960 (74 Stat. 481) to authorize the Secretary to provide $3,000,000 for each fiscal year, in a total amount of $15,000,000, for such rock bank protection of the Calcasieu River from mile 5 to mile 16, as the Chief of Engineers determines to be advisable to reduce maintenance dredging needs and facilitate protection of valuable disposal areas for the Calcasieu River and Pass, Louisiana.

Sec. 3048. Larose to Golden Meadow, Louisiana.

This section requires the Secretary to make a determination as to the advisability of converting the floodgate in Golden Meadow into a navigation lock when considering feasibility, environmental and economic conditions. If the Secretary either makes a favorable determination or fails to make a determination within 180 days of the date of enactment of this act, the conversion is authorized.

Sec. 3049. East Baton Rouge Parish. Louisiana.

This section modifies the project for flood damage reduction and recreation, East Baton Rouge Parish, Louisiana, authorized by section 101(a)(21) of the Water Resources Development Act of 1999 (113 Stat. 277), as amended by section 116 of the Consolidated Appropriations Resolution, 2003 (117 Stat. 140), to authorize the Secretary to carry out the project substantially in accordance with the Report of the Chief of Engineers dated December 23, 1996, and the subsequent Post Authorization Change Report dated December 2004. The estimated cost is $178,000,000.

Sec. 3050. Red River (J. Bennett Johnston) Waterway, Louisiana.

This section will allow the Secretary to purchase and reforest lands, which have been cleared or converted to agricultural uses for mitigation purposes. Current law restricts land purchases to bottomland hardwood lands. There are no additional willing sellers of bottomland hardwood lands available. This change will increase the amount of land available to meet the projects' mitigation requirements. There is authorized to carry out this section $33,000,000.

Sec. 3051. Camp Ellis, Saco, Maine.

This section authorizes the Secretary to continue the project initiated under section 111 of the River and Harbor Act of 1968 (33 U.S.C. 426i), up to a maximum of $20,000,000 to mitigate erosion on Camp Ellis Beach.

Sec. 3052. Union River, Maine.

This section modifies the project for navigation, Union River, Maine, authorized by the Act of 1896 (29 Stat. 215, Chapter 314), by redesignating the upper 6-foot turning basin as an anchorage area.

Sec. 3053. Chesapeake Bay environmental restoration and protection program, Maryland, Pennsylvania, and Virginia.

This section amends section 510(i) of the Water Resources Development Act of 1996 (110 Stat. 3761) to increase the total program funding limit from $10,000,000 to $30,000,000.

Sec. 3054. Cumberland, Maryland.

This section amends section 580(a) of the Water Resources Development Act of 1999 (113 Stat. 375) to increase the total authorized cost of the project from $15,000,000 to $25,750,000 with a Federal cost of $16,738,000 and a non-Federal cost of $9,012,000.

Sec. 3055. Fall River Harbor, Massachusetts and Rhode Island.

First, this section extends the authorization for the project for navigation, Fall River Harbor, Massachusetts and Rhode Island authorized by section 101 of the River and Harbor Act of 1968(82 Stat. 731) and amends the authorization to restrict the project depth of the existing navigation project riverward of the Charles M. Braga, Jr. Memorial Bridge, Fall River and Somerset, Massachusetts, to not more than 35 feet in depth. Second, this section also directs the Secretary to conduct a study to determine the feasibility of deepening the portion of the navigation channel of the navigation project for Fall River Harbor, Massachusetts and Rhode Island, seaward of the Charles M. Braga, Jr. Memorial Bridge, Fall River and Somerset, Massachusetts. If funds are not obligated for construction (including planning and design) of the Fall River Harbor project within 5 years of the enactment of this act, the original project will no longer be authorized.

Sec. 3056. St. Clair River and Lake St. Clair, Michigan.

This section provides the statutory authority for the Secretary to establish and lead a partnership of Federal agencies, including the Environmental Protection Agency (EPA), and the State of Michigan and political subdivisions of the State and other involved parties in the management of the St. Clair River and Lake St. Clair Watersheds, in accordance with the St. Clair River and Lake St. Clair Comprehensive Management Plan. The focus of this partnership would be to develop and implement projects consistent with the management plan.

In 2001, the U.S. Army Corps of Engineers initiated development of the management plan, emphasizing broad coordination with other public agencies and local stakeholders. The management plan recommends that successful, locally driven programs continue, and that larger efforts be coordinated by an intergovernmental steering group. This provision supports both efforts, allowing grants and other financial assistance as well as providing for direct participation in project development and implementation.

The section directs the Secretary, working in consultation with the partnership, to develop a St. Clair River and Lake St. Clair strategic implementation plan in accordance with the St. Clair River and Lake St. Clair Management Plan; and to supplement the management plan and the strategic implementation plan, as needed.

Appropriations to support this provision are capped at $10,000,000 per fiscal year. The non-Federal share for the cost of technical assistance, planning, design, construction, and evaluation of a project, and the development of supplementary information, is 25 percent of the total cost of the project or development. All operation and maintenance costs associated with projects implemented under this provision are to be 100 percent non-Federal responsibilities.

Sec. 3057. Duluth Harbor, Minnesota.

This section authorizes the Secretary to include public access and recreational facilities as part of the federally cost-shared facilities for the project, authorized by section 107(b) of the River and Harbor Act of 1960 (33 U.S.C. 577(b)). These facilities include, but are not limited to, parking facilities, pedestrian walkways, and boating and fishing access facilities. This section also increases the allowable Federal share to $9,000,000 from $6,000,000 to accommodate the increased project scope.

Sec. 3058. Land exchange, Pike County, Missouri.

This section directs a land exchange of 42 acres between S.S.S., Inc. and the Army Corps of Engineers within 2 years. The Federal land includes 2 parcels of Army Corps of Engineers land located on Buffalo Island in Pike County, Missouri. The S.S.S., Inc. land is situated in Pike County, Missouri, upstream and northwest, about 200 feet from Drake Island (also known as Grimes Island).

Sec. 3059. Union Lake, Missouri.

This section directs the Secretary to offer to convey to the State of Missouri two tracts of land totaling approximately 205.5 acres that were originally purchased for the Union Lake Project, which was deauthorized in the Water Resources Development Act of 1986 (33 U.S.C. 579a(a)).

Sec. 3060. Fort Peck Fish Hatchery, Montana.

This section amends section 325 of the Water Resources Development Act of 2000 (144 Stat. 2607) to increase the amount authorized for appropriation to carry out the design and construction of a fish hatchery and associated facilities at Fort Peck Lake from $20,000,000 to $25,000,000.

Sec. 3061. Yellowstone River and tributaries, Montana and North Dakota.

This section authorizes the Secretary to carry out restoration projects in the watershed of the Yellowstone River and tributaries in Montana, Wyoming, and North Dakota. The restoration projects would be implemented in partnership with non-Federal sponsors, including non-profit entities with the support of the local government. Projects would provide for a wide range of measures in the main channel and flood plain to accomplish restoration, creation, and preservation of fish and wildlife habitat. Incorporation of multi-purpose features into these projects is authorized. This section authorizes Federal expenditure up to $30,000,000 and establishes a per project Federal limit of $5,000,000.

Sec. 3062. Lower Truckee River, McCarran Ranch, Nevada.

This section authorizes the Secretary to construct a project modification for environmental restoration on the Truckee River at McCarran Ranch, Nevada, with the Federal share of the cost in excess of the statutory $5,000,000 limit established under section 1135 of the Water Resources Development Act of 1986 (33 U.S.C. 2309a). The total project cost is $7,500,000, with an estimated Federal cost of $5,775,000 and an estimated non-Federal cost of $1,725,000.

Sec. 3063. Middle Rio Grande restoration, New Mexico.

This section authorizes the Secretary to implement a program of conducting an inventory of existing ecosystem resources; developing a comprehensive implementation plan for the restoration and protection of the ecosystem resources; conducting detailed planning and design and implementing site specific projects to restore and protect aquatic, wetland, floodplain, and riparian areas; and appropriate recreation features in conjunction with site specific restoration projects; and monitoring of individual project performance for the Middle Rio Grande and the adjacent Bosque, a riparian forest unique to the area. The Secretary shall consult with and consider the activities being carried out by the Middle Rio Grande Endangered Species Act Collaborative Program and the Bosque Improvement Group of the Middle Rio Grande Bosque Initiative. The cost of projects carried out under this authority will be cost-shared at a non-Federal share of 35 percent and shall include provision of necessary land, easements, relocations, and disposal sites. The non-Federal sponsor may, with the consent of the affected government, be a nonprofit entity. The program is authorized for an annual appropriation of $25,000,000.

Sec. 3064. Long Island Sound oyster restoration, New York and Connecticut.

This section authorizes the Secretary to plan, design, and construct projects to increase aquatic habitats within Long Island Sound, New York and Connecticut, and adjacent waters, including the construction and restoration of oyster beds and related shellfish habitat. There is a total cost of $25,000,000 a Federal cost $18,750,000, and a non-Federal cost $6,250,000.

Sec. 3065. Orchard Beach, Bronx, New York.

This section amends section 554 of the Water Resources Development Act of 1996 (110 Stat. 3781) to increase the maximum total Federal cost of the project from $5,200,000 to $18,200,000.

Sec. 3066. New York Harbor, New York, New York.

This section amends section 217 of the Water Resources Development Act of 1996 (33 U.S.C. 2326a) which authorized the Secretary to enter into cost-sharing agreements with one or more non-Federal public interests for the acquisition, design, construction, management, or operation of a dredged material processing, treatment, decontamination, or disposal facility. This includes any facility used to demonstrate potential beneficial uses of dredged material. When appropriate, the Secretary may combine portions of separate Federal projects if the facility is used to manage dredged material from multiple Federal projects in the same geographic area. The New York and New Jersey Harbor Deepening Project, New York and New Jersey, is the most likely candidate navigation project to use the facility; however, the cost-sharing agreement may include the management of sediments from the maintenance dredging of Federal navigation projects that do not have partnership agreements.

Sec. 3067. Onondaga Lake, New York.

This section amends the project for ecosystem restoration, Onondaga Lake, New York, authorized by section 573 of the Water Resources Development Act of 1999 (113 Stat. 372), to increase the authorized project cost from $10,000,000 to $30,000,000 and to authorize the Secretary to cost share projects with non-profit organizations with the consent of the affected local government.

Sec. 3068. Missouri River restoration, North Dakota.

This section amends section 707(a) of the Water Resources Development Act of 2000 (114 Stat. 2699) to extend the authorization for appropriations through 2010.

Sec. 3069. Lower Girard Lake Dam, Girard, Ohio.

The section amends section 507(1) of the Water Resources Development Act of 1996 (110 Stat. 3758) by increasing the authorization from $2,500,000 to $5,500,000 for repair and rehabilitation of the Lower Girard Lake Dam, which may include lowering the crest of the Dam by not more than 12.5 feet).

Sec. 3070. Toussaint River navigation project, Carroll Township, Ohio.

This section authorizes full Federal funding for increased operation and maintenance activities that are carried out in accordance with section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577) and relate directly to the presence of unexploded ordnance.

Sec. 3071. Arcadia Lake, Oklahoma.

This section directs the Secretary to eliminate the requirement to pay accrued interest costs for the storage following the end of the 10-year interest free period beginning on November 30, 1996 to September 1999; the date the storage was placed into the active status.

Sec. 3072. Oklahoma Lake demonstration, Oklahoma.

This section extinguishes each reversionary interest and use restriction related to recreation and public parks on the land conveyed by the Secretary to the State of Oklahoma pursuant to the Act entitled `An Act to authorize the sale of certain lands to the State of Oklahoma' (67 Stat. 62, chapter 118). Any deed of release, amended deed, or other appropriate instrument of release needed to extinguish each reversionary interest and use restriction, shall be filed and executed as soon as practicable after the date of enactment of this act.

Sec. 3073. Waurika Lake, Oklahoma.

This section directs the Secretary to use the costs for construction of the water conveyance facilities for the projects as defined in June 1986. Any costs identified by the Army Corps of Engineers after June 1986 are considered a Federal cost.

Sec. 3074. Lookout Point, Dexter Lake project, Lowell, Oregon.

This section directs the Secretary to offer to convey to the community of Lowell, Oregon one tract of land totaling approximately 0.98 acres located in Lane County, Oregon for use as a fire station. The conveyance shall not take place until the Unites State Forest Service, that currently operates structures on the property, completes and certifies that the necessary environmental remediation has be performed and transferred the structures to the Corps of Engineers.

Sec. 3075. Upper Willamette River Watershed ecosystem restoration.

This section authorizes the Secretary to conduct studies and ecosystem restoration projects for the Upper Willamette Watershed, which includes the planning, design, and construction of ecosystem restoration projects. Habitat has been altered or destroyed for a wide variety of plants and animals, including fish species, such as bull trout and Willamette spring Chinook salmon and winter steelhead, listed as threatened under the Endangered Species Act. There is a total cost $15,000,000, a Federal cost $9,750,000, and a non-Federal cost $5,250,000.

Sec. 3076. Tioga Township, Pennsylvania.

This section directs the Secretary to convey by quitclaim deed approximately 8 acres of the Tioga-Hammond Lakes Flood Control Project property to the Tioga Township for use as administrative offices and a road maintenance complex.

Sec. 3077. Upper Susquehanna River Basin, Pennsylvania and New York.

This section amends the project for ecosystem restoration, Upper Susquehanna River Basin, Pennsylvania and New York, authorized by section 567 of the Water Resources Development Act of 1996 (110 Stat. 3787), to expand the definition of potential non-Federal sponsors; to authorize the Secretary to provide assistance for implementing wetland restoration projects and soil conservation measures; and defines an implementation strategy for carrying out the goals of the program.

Sec. 3078. Cooper River Bridge demolition, Charleston, South Carolina.

This section authorizes the Secretary to carry out planning, design, and construction for the demolition and removal of the Grace and Pearman Bridges over the Cooper River, South Carolina and to use the remnants from that demolition and removal to develop an aquatic reef off the shore of South Carolina. There is authorized $39,000,000 to be appropriated to carry out this section.

Sec. 3079. South Carolina Department of Commerce development proposal at Richard B. Russell Lake, South Carolina.

This section directs the Secretary to convey to the State of South Carolina a portion of those lands described in Army Lease No. DACW21-1-92-500 (Abbeville, Hester Marina and Manor Recreation Areas) currently under lease to the South Carolina Department of Commerce (SCDOC) for 99 years for cost-shared recreation development pursuant to P.L. 89-72 (approximately 650 acres). This section includes provisions for the Army to retain ownership of land that would have been acquired for operational purposes in accordance with existing policy and such other land as is determined to be required for project purposes. The section eliminates the applicability of section 2696 of title 10, U.S.C. to this conveyance and allows the Secretary to require additional terms and conditions as appropriate to protect the interests of the United States. The State is responsible for all costs associated with this conveyance, is required to pay fair market value for land conveyed, and is permitted to perform environmental or real estate actions associated with the conveyance in lieu of payment. This section retains the applicability of the Shoreline Management Policy of the Army Corps of Engineers and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et. seq.), including public review under that Act, and other Federal statutes.

Sec. 3080. Missouri River restoration, South Dakota.

This section amends section 707(a) of the Water Resources Development Act of 2000 (114 Stat. 2699) to extend the authorization for appropriations through 2010.

Sec. 3081. Missouri and Middle Mississippi Rivers enhancement project.

This section amends section 514 of the Water Resources Development Act of 1999 (113 Stat. 343; 117 Stat. 142) to extend the authorization of appropriations through fiscal year 2015. For any project undertaken under this section, a non-Federal interest may include a nonprofit entity with the consent of the affected local government.

Sec. 3082. Anderson Creek, Jackson and Madison Counties, Tennessee.

This section authorizes the Secretary to carry out a project for flood damage reduction at Anderson Creek, Tennessee, under section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s) if the Secretary determines that the project is technically sound, environmentally acceptable, and economically justified. Anderson Creek is not to be considered an authorized channel of the West Tennessee Tributaries Project, nor is the flood damage reduction project to be considered a part of the West Tennessee Tributaries Project.

Sec. 3083. Harris Fork Creek, Tennessee and Kentucky.

This section extends the authorization to be carried out by the Secretary for a period of 7 years beginning on the date of enactment of this Act for the project for flood control, Harris Fork Creek, Tennessee and Kentucky, authorized by section 102 of the Water Resources Development Act of 1976 (33 U.S.C. 701c note; 90 Stat. 2920).

Sec. 3084. Nonconnah Weir, Memphis, Tennessee.

This section modifies the project for flood control, Nonconnah Creek, Tennessee and Mississippi, authorized by section 401 of the Water Resources Development Act of 1986 (100 Stat. 4124) and modified by section 334 of the Water Resources Development Act of 2000 (114 Stat. 2611), to authorize the Secretary to reconstruct, at full Federal expense, the weir originally constructed in the vicinity of the mouth of Nonconnah Creek and to make repairs and maintain the weir in the future so that the weir functions properly. The estimated cost of reconstruction of the weir is $2,500,000.

Sec. 3085. Old Hickory Lock and Dam, Cumberland River, Tennessee.

This section extinguishes the reversionary interests and use restrictions relating to recreation and camping purposes with respect to land conveyed by the Secretary to the Tennessee Society of Crippled Children and Adults, Incorporated (commonly known as `Easter Seals Tennessee') at Old Hickory Lock and Dam, Cumberland River, Tennessee, under section 211 of the Flood Control Act of 1965 (79 Stat. 1087). The Army Corps of Engineers retains remaining rights or interest of the Army Corps of Engineers with respect to an authorized purpose of any project.

Sec. 3086. Sandy Creek, Jackson County, Tennessee.

This section authorizes the Secretary to carry out a project for flood damage reduction at Sandy Creek, Tennessee, under section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s) if the Secretary determines that the project is technically sound, environmentally acceptable, and economically justified. Sandy Creek is not to be considered an authorized channel of the West Tennessee Tributaries Project, nor is the flood damage reduction project to be considered a part of the West Tennessee Tributaries Project.

Sec. 3087. Cedar Bayou, Texas.

This section modifies the project, authorized by section 349(a)(2) of the Water Resources Development Act of 2000 (114 Stat. 2632), to authorize construction of a navigation channel that is 10 feet by 100 feet instead of 112 feet by 125 feet.

Sec. 3088. Freeport Harbor, Texas.

This section clarifies that all costs associated as a result of the discovery of the sunken vessel Comstock of the Corps of Engineers are a Federal responsibility and directs the Corps not to seek these costs or any costs associated with a delay from the local sponsor.

Sec. 3089. Harris County, Texas.

This section modifies section 575(b) of WRDA 1996 to not consider flood control works constructed by non-Federal interests within the drainage area in the determination of conditions existing prior to construction of the Upper White Oak Bayou, Texas project authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4125).

Sec. 3090. Dam remediation, Vermont.

This section amends section 543 of the Water Resources Development Act of 2000 (42 Stat. 2671) to add ecosystem restoration, protection, and preservation as a purpose of the dam remediation authority and identifies nine additional dams to be evaluated under the program.

Sec. 3091. Lake Champlain eurasian milfoil, water chestnut, and other nonnative plant control, Vermont.

This section directs the Secretary to revise the existing General Design Memorandum prepared under the project authorized by section 104 of the River and Harbor Act of 1958 (33 U.S.C. 610) to permit the use of chemical means of control, when appropriate, of Eurasian milfoil, water chestnuts, and other nonnative plants in the Lake Champlain basin, Vermont.

Sec. 3092. Upper Connecticut River Basin wetland restoration, Vermont and New Hampshire.

This section authorizes the Secretary, in consultation with Federal, State, local or non-profit agencies, to conduct a study and develop a strategy for the use of wetland restoration, soil and water conservation practices, and non-structural measures in the Upper Connecticut River basin to reduce flood damage, improve water quality, and create wildlife habitat. It further directs the Secretary to participate in the implementation of the strategy in cooperation with local landowners and local government officials. The river basin provides important habitat for Atlantic salmon, dwarf mussels, beaver, otter, mink, bear, and moose. It is a flyway for migratory bird species. Portions of the Connecticut River, such as the Conte Refuge Special Focus Area, are known for its biological diversity and an unusual concentration of species that are disappearing from other places. It is the best dwarf wedge mussel population in the basin and it provides summer forage for migratory bald eagles. In addition, the Connecticut River Rapids Macrosite includes some of the river's last floodplain forests. There is authorized a total cost of $5,000,000, a Federal cost of $3,250,000 and a non-Federal cost of $1,750,000.

Sec. 3093. Upper Connecticut River Basin ecosystem restoration, Vermont and New Hampshire.

This section directs the Secretary, in consultation with Federal, State, local or non-profit agencies, to conduct a study and develop a strategy for ecosystem restoration of the Upper Connecticut River ecosystem. It further directs the Secretary to participate in the implementation of critical restoration projects in the Upper Connecticut River Basin consistent with the developed strategy. The river basin provides important habitat for Atlantic salmon, dwarf mussels, beaver, otter, mink, bear, and moose. It is a flyway for migratory bird species. Portions of the Connecticut River, such as the Conte Refuge Special Focus Area, are known for its biological diversity and an unusual concentration of species that are disappearing from other places. It is the best dwarf wedge mussel population in the basin and it provides summer forage for migratory bald eagles. In addition, the Connecticut River Rapids Macrosite includes some of the river's last floodplain forests. There is authorized a total cost of $20,000,000, a Federal cost of $13,000,000, and a non-Federal cost $7,000,000.

Sec. 3094. Lake Champlain Watershed, Vermont and New York.

This section amends section 542 of the Water Resources Development Act of 2000 (42 Stat. 2671) to identify additional activities that may be considered critical restoration projects, including geographic mapping using existing technical capacity to produce a high-resolution, multi-spectral satellite, imagery-based land use and cover data sets; and river corridor assessments, protection, management, and restoration for purposes of ecosystem restoration. This section increases the authorized project costs from $20,000,000 to $32,000,000.

Sec. 3095. Chesapeake Bay oyster restoration, Virginia and Maryland.

This section amends section 704(b) of the Water Resources Development Act of 1968 (33 U.S.C. 22263(b)) to increase the authorized appropriation limit for the program from $20,000,000 to $50,000,000. The provision also modifies the allowable activities to be conducted in the Chesapeake Bay and expands the purposes for which restoration activities may be undertaken and defines successful restoration activities.

Sec. 3096. Tangier Island Seawall, Virginia.

This section amends section 577(a) of the Water Resources Development Act of 1196 (110 Stat. 3789) to increase the total project cost from $1,200,000 to $3,000,000 with a Federal cost of $2,400,000 and a non-Federal cost of $600,000.

Sec. 3097. Erosion control, Puget Island, Wahkiakum County, Washington.

This section modifies section 204 of the Flood Control Act of 1950 (64 Stat. 178) for a one-time placement of dredge material from the Columbia River channel onto the shoreline of Puget Island, Washington, for temporary protection from erosion of economic and environmental resources. This section authorizes appropriations of $1,000,000 at full Federal expense and instructs the Secretary to perform appropriate agency coordination and ensure environmental compliance.

Sec. 3098. Lower granite pool, Washington.

This section extinguishes reversionary interests and use restrictions related to industrial use purposes, the restriction that no activity shall be permitted that will compete with services and facilities offered by public marinas, and the restriction on human habitation or other building structure in which the elevation is above the standard project flood elevation. The use of fill material to raise low areas above the standard project flood elevation is authorized, except in any low area constituting wetland for which a permit under section 404 of the Federal Water Pollution Control Act (33 U.S.C. 1344) is required. This section also specifies the deeds involved and includes a savings clause regarding other remaining rights and interests of the Army Corps of Engineers for authorized project purposes.

Sec. 3099. McNary Lock and Dam, McNary National Wildlife Refuge, Washington and Idaho.

This section directs the transfer of administrative jurisdiction over the land acquired for the McNary Lock and Dam Project and managed by the Fish and Wildlife Service under Cooperative Agreement Number DACW68-4-00-13 from the Army Corps of Engineers to the US Fish and Wildlife Service. The land shall continue to be managed as part of the McNary National Wildlife Refuge. This section includes specific provisions regarding retention of habitat unit credits at the Cummins property. It requires the Fish and Wildlife Service to obtain priority approval of the Washington State Department of Fish and Wildlife for any change to the previously approved site development plan for the Cummins property, and it requires that the Fish and Wildlife Service continue operation of the Madame Dorian Recreation Area for public use and boater access.

Sec. 3100. Snake River project, Washington and Idaho.

This section is a project modification for the Snake River Project, Oregon and Washington, authorized by section 101 of the Water Resources Development Act of 1976 (90 Stat. 2921), to amend the Fish and Wildlife Compensation Plan for the Lower Snake River, Washington, and Idaho. This subsection authorizes the Secretary to conduct studies and implement aquatic and riparian ecosystem restoration and improvements specifically for fisheries and wildlife.

Sec. 3101. Marmet Lock, Kanawha River, West Virginia.

This section increases the authorized project costs from $229,581,000 to $358,000,000 due to an increase in construction costs for the project authorized by section 101(a) of the Water Resources Development Act of 1996 (110 Stat. 3666).

Sec. 3102. Lower Mud River, Milton, West Virginia.

This section authorizes the modification of the project for flood damage reduction, Lower Mud River, Milton, West Virginia, substantially in accordance with the plans, and subject to the conditions, recommended in a final report of the Chief of Engineers at an estimated total cost of $45,500,000, with an estimated Federal cost of $34,125,000 and an estimated non-Federal cost of $11,375,000.

Sec. 3103. Green Bay Harbor Project, Green Bay, Wisconsin.

This section modifies the existing limits of the authorized navigation channel of the Green Bay Harbor Project, beginning at Station 190+00 to Station 378+00 to a width of 75 feet and a depth of 6 feet. This modification will allow the local entities to complete the cleanup of hazardous wastes currently within the waterway.

Sec. 3104. Underwood Creek diversion facility project, Milwaukee County, Wisconsin.

This section directs the Secretary to carry out planning, engineering, and design of an adaptive ecosystem restoration, flood damage reduction, and erosion protection project at the Milwaukee County Grounds, Wauwatosa, Wisconsin. The Secretary must determine that the project is a cost-effective means of providing ecosystem restoration, flood damage reduction, and erosion protection, and is environmentally acceptable and technically feasible and will improve the economic conditions of the affected area.

Sec. 3105. Mississippi River headwaters reservoirs.

This section allows the Secretary to operate headwaters reservoirs below the minimum or above the maximum water levels established by this section in accordance with manual developed by the Secretary after consultation with the Governor of Minnesota and affected tribal governments. In addition, this section requires the Secretary to submit a notice of intent to Congress 14 days prior to operating the headwaters reservoir below the minimum or above the maximum water level limits. This notice does not have to be provided in cases where the operation is necessary to prevent the loss of life, to ensure the safety of a dam, or in anticipation of a flood control operation.

Sec. 3106. Lower Mississippi River Museum and Riverfront Interpretive Site.

This section amends section 103(c)(2) of the Water Resources Development Act of 1992 (106 Stat. 4811) to allow the purchase of property that is not limited to being held by the Resolution Trust Corporation.

Sec. 3107. Pilot program, Middle Mississippi River.

This section authorizes the Secretary to carry out a pilot program over at least a 10-year period within the current project for navigation, Mississippi River between the Ohio and Missouri Rivers (Regulating Works), Missouri River and Illinois to restore and protect fish and wildlife habitat in the middle Mississippi River. Activities under this program may include those necessary to improve navigation through the project for navigation, Mississippi River, while restoring and protecting fish and wildlife habitat in the middle Mississippi River system. This section authorizes specific activities under this program. Cost sharing shall continue to be in accordance with the River and Harbor Acts of 1910, 1927, and 1930.

Sec. 3108. Upper Mississippi River system environmental management program.

This section modifies the existing authorization to allow that for any project undertaken under this section, a non-Federal interest may include a nonprofit entity with the consent of the affected local government.

Sec. 3109. Great Lakes fishery and ecosystem restoration program.

This section amends the Great Lakes Fishery and Ecosystem Restoration Program in section 506(c) of the Water Resources Development Act of 2000 by directing the Corps to carry out a reconnaissance study before planning, design, or construction, to identify methods of restoring fisheries, ecosystems and beneficial uses of the Great Lakes. The Secretary shall then make a determination as to whether the planning should proceed. Any reconnaissance study carried out under this section shall be at full Federal expense.

Sec. 3110. Great Lakes remedial action plans and sediment remediation.

This section amends section 401(c) of the Water Resources Development Act of 1900 by extending the authorization of the program from 2006 to 2011.

Sec. 3111. Great Lakes tributary models.

This section amends section 506(g)(2) of the Water Resources Development Act of 1996 by extending the authorization of the program from 2006 to 2011.

TITLE IV--STUDIES

Sec. 4001. Eurasian milfoil.

This section directs the Secretary to carry out a study, at full Federal expense, to develop national protocols for the use of the Euhrychiopsis lecontei weevil for biological control of Eurasian milfoil in the lakes of Vermont and other northern tier States.

Sec. 4002. National port study.

This section authorizes the Secretary to conduct a study of the ability of coastal and deepwater port infrastructure to meet existing and future marine transportation demands. The committee is concerned that the rapid growth in maritime trade has placed great pressure upon our existing port infrastructure. Vessel sizes are increasing, and rapidly increasing volumes of containers and cargo are creating significant congestion to all modes of transportation serving the coastal and deepwater ports. The committee has determined that there is a need to understand the ability of coastal and deepwater port infrastructure to meet current and projected demands. Therefore, the committee requests the Secretary to perform this study in consultation with the Secretary of Transportation. The study needs to consider the availability of alternate transportation destinations and modes, the impact of larger vessels on port capacity, and practicable, cost-effective congestion management alternatives. Particular consideration should be given to the benefits and proximity of proposed and existing port, harbor, waterway and other transportation infrastructure. This section requires the Secretary to submit a report that describes the results of the study to the Senate Committee on Environment and Public Works and the Committee on Transportation and Infrastructure of the House of Representatives not later than 180 days after the date of enactment of this Act. The timing is important for consideration with other pertinent studies of vital infrastructure needs.

Sec. 4003. McClellan-Kerr Arkansas River Navigation Channel.

The committee is aware of scientific and technical concerns with the identification and differentiation of sturgeon species and the effects that this may have on navigation projects operated by the Corps of Engineers. The Secretary, in conjunction with the Oklahoma State University, is directed to convene a panel of experts with acknowledged expertise in wildlife biology and genetics to review the available scientific information regarding the genetic variation of various sturgeon species and possible hybrids.

Sec. 4004. Selenium study, Colorado.

This section authorizes the Secretary, in consultation with State resource agencies, to conduct regional and watershed wide studies to address selenium concentrations within the State of Colorado. The authorized limit for this section is $5,000,000.

Sec. 4005. Nicholas Canyon, Los Angeles, California.

This section authorizes the Secretary to conduct a study to determine the feasibility of bank stabilization and shore protection for Nicholas Canyon, Los Angeles, California, under the small project authority of section 3 of the Act of August 13, 1946 (33 U.S.C. 426g).

Sec. 4006. Oceanside, California, shoreline special study.

This section amends section 414 of the Water Resources Development Act of 2000 (114 Stat. 2636) to increase by 12-months an extension for completing the Oceanside, California Shoreline Special Study by striking `32 months' and inserting `44 months'.

Sec. 4007. Comprehensive flood protection project, St. Helena, California.

This section authorizes the Secretary to review the project for flood control and environmental restoration at St. Helena, California, generally in accordance with the Enhanced Minimum Plan A, as described in the Final Environmental Impact Report prepared by the city of St. Helena, California and certified by the city to be in compliance with the California Environmental Quality Act. Cost sharing for the project shall in accordance with section 103 of the Water Resources Development Act of 1986 (33 U.S.C. 2213).

Sec. 4008. San Francisco Bay, Sacramento-San Joaquin Delta, Sherman Island, California.

This section authorizes the Secretary to conduct a study to determine the feasibility of using a portion of Sherman Island, California, as a dredged material rehandling facility.

Sec. 4009. South San Francisco Bay shoreline study, California.

This section authorizes the Secretary in carrying out the feasibility phase of the South San Francisco Bay shoreline study to use planning and design documents prepared by the California State Coastal Conservancy, the Santa Clara Valley Water District, and other local interests, in cooperation with the Army Corps of Engineers (who shall provide technical assistance to the local interests), as the basis for recommendations to Congress for authorization of a project to provide for flood protection of the South San Francisco Bay shoreline and restoration of the South San Francisco Bay salt ponds.

Sec. 4010. San Pablo Bay Watershed restoration, California.

This section directs the Secretary to submit to Congress a report describing the results of the San Pablo Bay watershed study not later than March 31, 2008.

Sec. 4011. Bubbly Creek, South Fork of South Branch, Chicago, Illinois.

This section authorizes the Secretary to conduct a study to determine the feasibility of a project for ecosystem restoration and other related activities.

Sec. 4012. Grand and Tiger Passes and Baptiste Collette Bayou, Louisiana.

This section authorizes the Secretary to conduct a study to determine the feasibility of modifying the existing project for enlargement of the navigation channel.

Sec. 4013. Lake Erie At Luna Pier, Michigan.

This section authorizes the Secretary to conduct a study to determine the feasibility of carrying out storm damage reduction, beach erosion protection and other related measures along the shores of Lake Erie at Luna Pier, Michigan. The study shall include consideration of replacement, repair or modification of existing local and Federal storm damage reduction and beach erosion protection measures.

Sec. 4014. Middle Bass Island State Park, Middle Bass Island, Ohio.

This section authorizes the Secretary to conduct a study to determine the feasibility of providing a safe harbor and beach at Middle Bass Island State Park for the navigation, storm damage reduction, recreation and other related purposes.

Sec. 4015. Jasper County port facility study, South Carolina.

This section authorizes the Secretary to conduct a study to determine the feasibility of providing improvements to the Savannah River, Jasper County, South Carolina, for navigation and other purposes related necessary to support locating a container cargo and other port facilities near the entrance to the Savannah Harbor Entrance Channel. The Secretary shall take into consideration landside infrastructure, dredged material disposal sites, and the results of consultation with the Governors of the States of Georgia and South Carolina.

Sec. 4016. Lake Champlain Canal study, Vermont and New York.

This section directs the Secretary to conduct a study, at full Federal expense, to determine the feasibility of a dispersal barrier for control of invasive species at the Lake Champlain Canal, Vermont and New York, and, if such project is found to be feasible, directs the Secretary to construct, maintain, and operate such dispersal barrier as necessary.

TITLE V--MISCELLANEOUS PROVISIONS

Sec. 5001. Lakes program.

This section amends section 602(a) of the Water Resources Development Act of 1986 (100 Stat. 4148; 110 Stat. 3758; 113 Stat. 295) to include additional sites in Illinois, North Carolina, North Dakota, and Vermont to the Lakes Program.

Sec. 5002. Estuary restoration.

Subsection (a) amends section 102 of the Estuary Restoration Act (ERA) of 2000 (the Act) (33 U.S.C. 2901) to expand the purposes of the restoration program by including the implementation of a coordinated Federal approach to estuary habitat restoration activities, including the use of common monitoring standards and a common system for tracking restoration acreage; adding implementation to the strategy; and adding cooperative agreements to the Federal assistance purpose.

Subsection (b) amends section 103(6)(A) of the Act (33 U.S.C. 2902(6)(A)) by adding regional to the estuary habitat restoration plan.

Subsection (c) amends section 104 of the Act (33 U.S.C. 2903) to allow monitoring costs to be included in the total cost of the estuary restoration project and allows the Secretary, on recommendation of the Estuary Council, to delegate the implementation of projects costing less than $1,000,000 to the Secretary of the Interior; the Under Secretary for Oceans and Atmosphere of the Department of Commerce; the Administrator of the Environmental Protection Agency; or the Secretary of Agriculture. Funding for these small projects may be funded from the responsible department or appropriations of the agency authorized by section 109(a)(1).

Subsection (d) amends section 105(b) of the Act (33 U.S.C. 2903(b)) to direct the Council to cooperate in the implementation of the strategy, recommend standards for monitoring restoration projects and contribution of project information to the data base, and use agency authorities to carry out the Act.

Subsection (e) amends section 107(d) of the Act (33 U.S.C. 2906(d) to give the Secretary general data compilation, coordination, and analysis responsibilities to support the strategy.

Subsection (f) amends section 108(a) of the Act (33 U.S.C. 2908(a)) by requiring the report every sixth, eighth, and tenth fiscal year after November 7, 2000.

Subsection (g) amends section 109(a) of the Act (33 U.S.C. 2908(a)) to establish project funding for fiscal years 2006 through 2010 as follows: $25,000,000 for the Secretary; $2,500,000 for the Secretary of the Interior; $2,500,000 for the Under Secretary for Oceans and Atmosphere of the Department of Commerce; $2,500,000 for the Administrator of the Environmental Protection Agency; and $2,500,000 for the Secretary of Agriculture. In addition, this subsection extends the monitoring authorization to 2010.

Subsection (h) amends section 110 of the Act (33 U.S.C. 2909) to allow nongovernmental organizations to enter into cooperative agreements or contracts.

The Estuary Restoration Act of 2000 (P.L. 106-457; 33 U.S.C. 2901-2909) was enacted to promote the restoration of estuary habitat through the development of a national estuary habitat restoration strategy, creating and maintaining effective estuary restoration partnerships among public agencies and private sectors. In passing the Estuary Restoration Act, Congress recognized the importance of this national, strategic plan and multi-level partnerships for effectively addressing the problems plaguing our nation's estuaries. By setting a goal to restore one million acres of estuary habitat by 2010, the Act encourages coordination among all levels of government, along with engaging the unique strengths of the public, non-profit, and private sectors. In 2002, the Estuary Council, consisting of members from several Federal agencies including the Army Corps of Engineers and the Department of Commerce, completed the national estuary strategy to ensure a comprehensive and integrated approach for implementing the Estuary Restoration Program.

Section 5002 amends sections 102, 103(6)(A), 104, 105(b), 107(d), 108(a), 109(a), and 110 of the Estuary Restoration Act (ERA) to clarify the coordinated Federal approach and cooperative nature of the law; to include monitoring costs as part of the total costs of an estuary restoration project; to provide new authorities to the Secretary for the delegation of small estuary projects; to extend funding authority for the Secretary; and to provide new authority for the U.S. Fish and Wildlife Service, Department of Commerce, Environmental Protection Agency, and Department of Agriculture to develop and implement estuary projects.

The ERA itself is not clear regarding the mechanism by which funding is granted under the law and the Conference Report for P.L. 106-457 increases the uncertainty by stating that the Secretary should not give grants, but rather should use an expedited version of the funding process used under past Water Resources Development Acts. Section 110(b) of the ERA clearly stipulates that cooperative agreements are appropriate vehicles, but the presence of multiple options has led to confusion. This section amends section 104 to clarify that the Secretary may carry out estuary habitat restoration projects and provide technical assistance through the award of contracts and cooperative agreements. Ongoing uncertainty also exists regarding the inclusion of monitoring costs within the non-Federal cost share. Some are interpreting the law to read that the required monitoring is part of the `operations and maintenance', which may not be included in the sponsor's portion of the cost share agreement. The Council has released monitoring guidelines that stipulate restoration projects should be monitored for at least 5 years, an amount of time that may significantly increase the burden on the project sponsor, particularly if these costs are not included as part of the total cost of a project. Section 104(d) is amended to clarify that monitoring costs may be included in the total costs of an estuary project.

To date, the ERA has received $3,500,000 in annual appropriations for estuary projects. Authorized at $275,000,000 through fiscal year 2005, the ERA has faced a number of hurdles since its enactment in November 2000, including the Army Corps of Engineers' no new starts policy and the tight fiscal situation. The law has no sunset provision, but appropriations are defined only through fiscal year 2005. Section 109(a) of the ERA is amended to authorize $25,000,000 annually through fiscal year 2010 for the Secretary; $1,500,000 annually for the Department of Commerce estuary monitoring activities; and to grant new funding authority of $2,500,000 annually to the U.S. Fish and Wildlife Service, Department of Commerce, Environmental Protection Agency, and Department of Agriculture, respectively, for estuary projects. This new funding authority, combined with language encouraging the Secretary to delegate implementation of small projects with a Federal share of less than $1,000,000, is essential to maximize the partnership model of the Act and encourage other Federal partners to become engaged in project implementation.

Sec. 5003. Delmarva conservation corridor, Delaware and Maryland.

This section authorizes the Secretary to provide technical assistance to the Secretary of Agriculture for use in carrying out the Conservation Corridor Demonstration Program established under subtitle G of title II of the Farm Security and Rural Investment Act of 2002 (16 U.S.C. 3801; 116 Stat. 275). The Delmarva Conservation Corridor (DCC) is an attempt to integrate and connect restoration efforts throughout the Delmarva Peninsula. The DCC is a multi-faceted effort, designed to preserve farmland and rural character, as well as restore natural ecosystem through the creation of a hub and corridor system.

Sec. 5004. Susquehanna, Delaware, and Potomac River Basins, Delaware, Maryland, Pennsylvania, and Virginia.

This section designates that the Division Engineer, North Atlantic Division, U.S. Army Corps of Engineers, shall serve as the ex-officio United States member under the Susquehanna River Basin Compact, the Delaware River Basin Compact, and the Potomac River Basin Compact without additional compensation, and with the authority to designate an alternate member(s) in accordance with the terms of the applicable compact. The section directs the Secretary to allocate funds to the Susquehanna River Basin Commission, the Delaware River Basin Commission, and the Interstate Commission on the Potomac River Basin, to fulfill the equitable funding requirements of the applicable compacts. The section directs the Secretary to enter into an agreement with the Susquehanna River Basin Commission, the Delaware River Basin Commission and the Interstate Commission on the Potomac River Basin, to provide temporary water supply and conservation storage, during drought emergencies.

Sec. 5005. Chicago Sanitary and Ship Canal Dispersal Barriers project, Illinois.

The Chicago Ship and Sanitary Canal forms a unique, man-made link between the Great Lakes and the Mississippi River. The Canal also provides non-indigenous aquatic nuisance species access between the two water basins. As the non-indigenous aquatic nuisance species move toward the Great Lakes from the Mississippi River and vice versa, they prey on native species and compete for food, living space and spawning areas. There is a current demonstration barrier authorized by the Non-Indigenous Aquatic Nuisance Prevention and Control Act of 1990 (amended through 1996) which is nearing the end of its useful life.

Subsection (a) directs the Secretary to upgrade and make permanent the existing dispersal barrier at full Federal expense.

Subsection (b) directs the Secretary to construct the dispersal barrier currently being implemented using section 1135 of the Water Resources Development Act of 1986 (33 U.S.C. 2309a) at full Federal expense.

Subsection (c) directs the Secretary to operate and maintain the dispersal barriers described in subsections (a) and (b) at full Federal expense.

Subsection (d) directs the Secretary to credit to each State the proportion funds that the State contributed to the dispersal barriers and allows the States to apply that credit toward the State's interest in other existing or future Corps projects.

Sec. 5006. Rio Grande environmental management program, New Mexico.

This section authorizes the Secretary to implement a program for planning, design, construction and evaluation of planning and implementation of measures for ecosystem restoration for the Rio Chama and the Rio Grande, including all tributaries of the Rivers, from the border between the States of Colorado and New Mexico downstream to the border between the States of New Mexico and Texas. The section also provides for long-term monitoring, computerized data inventory and analyses, and applied research and adaptive management programs for the resources associated with the Rio Grande River basin and its tributaries. The Secretary must ensure coordinated planning and implementation of the program by consulting with the State of New Mexico and other entities and by entering into an interagency agreement with the Secretary of Interior that provides for the transfer of funds to Interior Department agencies for their participation in program planning, design, implementation and monitoring. The Secretary, in consultation with the Secretary of Interior and the State of New Mexico, will be required to submit a report every 6 years that evaluates and describes the accomplishments of the program, and identifies and needed adjustments to program authorization. This program will not preempt any State water law. This program will comply with the Rio Grande Compact and any applicable court decrees or State and Federal laws affecting water or water rights in the Rio Grande system. The cost of projects carried out under this authority will be cost-shared at a non-Federal share of 35 percent, which may be provided through cash contribution or in-kind services, and shall include provision of necessary land, easements, relocations, and disposal sites. The non-Federal sponsor, may, with the consent of the affected government, be a nonprofit entity. The program is authorized for an annual appropriation of $25,000,000.

Sec. 5007. Cheyenne River Sioux Tribe, Lower Brule Sioux Tribe, and Terrestrial Wildlife Habitat Restoration, South Dakota.

This section amends section 602(a)(4) of the Water Resources Development Act of 1999 (113 Stat. 386) to direct the Secretary of the Treasury to make funds available to the State of South Dakota from the State of South Dakota Terrestrial Wildlife Habitat Restoration Trust Fund. The prior authorization directed the Secretary of the Army to make such funds available to the State and the Secretary of the Treasury to make funds available to the Cheyenne River Sioux Tribe and the Lower Brule Sioux Tribe. This section also amends the investment strategy directed in sections 603 and 604 of the Water Resources Development Act of 1999 for the State of South Dakota Terrestrial Wildlife Habitat Restoration Trust Fund and the Cheyenne River Sioux Tribe and Lower Brule Sioux Terrestrial Wildlife Habitat Restoration Trust Fund. This section directs the investment of funds in Treasury obligations with differing maturities to ensure high returns while allowing for the logical availability of funds.

Sec. 5008. Connecticut River dams, Vermont.

This section authorizes the Secretary to evaluate, design and construct structural modifications, at full Federal expense, for the purposes of improving the environment, to the following Army Corps of Engineers operated dams in Vermont: Townshend Lake, Ball Mountain Lake, North Springfield Lake, North Hartland Lake, and Union Village Lake. There is authorized to carry out this section $30,000,000.

TITLE VI--PROJECT DEAUTHORIZATIONS

Sec. 6001. Little Cove Creek, Glencoe, Alabama.

This section deauthorizes the project for flood damage reduction, Little Cove Creek, Glencoe, Alabama, authorized in the Supplemental Appropriations Act, 1985 (99 Stat. 312).

Sec. 6002. Goleta and vicinity, California.

This section deauthorizes the project for flood control, Goleta and vicinity, California, authorized by section 201 of the Flood Control Act of 1970 (84 Stat. 1826).

Sec. 6003. Bridgeport Harbor, Connecticut.

This section deauthorizes the Yellow Mill River portion of the project for navigation, Bridgeport Harbor, Connecticut, authorized by the Act of July 3, 1930 (46 Stat. 919), that consists of an 18-foot channel, 150 to 200 feet wide, extending about a mile upstream from the 35-foot entrance channel.

Sec. 6004. Bridgeport, Connecticut.

This section deauthorizes the project for environmental infrastructure, Bridgeport, Connecticut, authorized by section 219(f)(26) of the Water Resources Development Act of 1992 (106 Stat. 4835; 73, 113 Stat. 336).

Sec. 6005. Hartford, Connecticut.

This section deauthorizes the project for environmental infrastructure, Hartford, Connecticut, authorized by section 219(f)(27) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336).

Sec. 6006. New Haven, Connecticut.

This section deauthorizes the project for environmental infrastructure, New Haven, Connecticut, authorized by section 219(f)(28) of the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336).

Sec. 6007. Inland waterway from Delaware River to Chesapeake Bay, Part II, installation of fender protection for bridges, Delaware and Maryland.

This section deauthorizes the project for construction of bridge fenders for the Summit and St. Georges Bridges over the Chesapeake and Delaware Canal, Delaware and Maryland, authorized by the River and Harbor Act of 1954 (68 Stat. 1249).

Sec. 6008. Central and southern Florida, Everglades National Park, Florida.

This section deauthorizes the project to improve water supply, Everglades National Park, Florida, authorized by section 203 of the Flood Control Act of 1954 (68 Stat. 1257) and the Flood Control Act of 1968 (82 Stat. 740).

Sec. 6009. Shingle Creek Basin, Florida.

This section deauthorizes the project for flood control, Shingle Creek Basin, Florida, authorized by section 203 of the Flood Control Act of 1962 (76 Stat. 1182).

Sec. 6010. Brevoort, Indiana.

This section deauthorizes the project for flood control, Brevoort, Indiana, authorized by section 5 of the Flood Control Act of June 22, 1936 (49 Stat. 1587).

Sec. 6011. Middle Wabash, Greenfield Bayou, Indiana.

This section deauthorizes the project for flood control, Middle Wabash, Greenfield Bayou, Indiana, authorized by section 10 of the Flood Control Act of 1946 (60 Stat. 649).

Sec. 6012. Lake George, Hobart, Indiana.

This section deauthorizes the project for flood damage reduction, Lake George, Hobart, Indiana, authorized by section 602 of the Water Resources Development Act of 1986 (100 Stat. 4148).

Sec. 6013. Green Bay Levee and Drainage District No. 2, Iowa.

This section deauthorizes the project for flood damage reduction, Green Bay Levee and Drainage District No. 2, Iowa, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4115), deauthorized in fiscal year 1991, and reauthorized by section 115(a)(1) of the Water Resources Development Act of 1992 (106 Stat. 4821).

Sec. 6014. Muscatine Harbor, Iowa.

This section deauthorizes the project for navigation at Muscatine Harbor on the Mississippi River at Muscatine, Iowa, authorized by section 101 of the River and Harbor Act of 1950 (64 Stat. 166).

Sec. 6015. Big South Fork National River and Recreational Area, Kentucky and Tennessee.

This section deauthorizes the uninitiated portions of the project for recreation facilities, Big South Fork National River and Recreational Area, Kentucky and Tennessee, authorized by section 108 of the Water Resources Development Act of 1974 (88 Stat. 43).

Sec. 6016. Eagle Creek Lake, Kentucky.

This section deauthorizes the project for flood control and water supply, Eagle Creek Lake, Kentucky, authorized by section 203 the Flood Control Act 1962 (76 Stat. 1188).

Sec. 6017. Hazard, Kentucky.

This section deauthorizes the project for flood damage reduction, Hazard, Kentucky, authorized by section 3 of the Water Resources Development Act (WRDA) of 1988 (102 Stat. 4014) and section 108 of the Water Resources Development Act of 1990 (104 Stat. 4621).

Sec. 6018. West Kentucky tributaries, Kentucky.

This section deauthorizes the project for flood control, West Kentucky Tributaries, Kentucky, authorized by section 204 of the Flood Control Act of 1965 (79 Stat. 1081), section 201 of the Flood Control Act of 1970 (84 Stat. 1825), and section 401(b) of the Water Resources Development Act of 1986 (100 Stat. 4129).

Sec. 6019. Bayou Cocodrie and tributaries, Louisiana.

This section deauthorizes the project for flood damage reduction, Bayou Cocodrie and Tributaries, Louisiana, authorized by section 3 of the Flood Control Act of 1941 (55 Stat. 644) and section 1(a) of the Water Resources Development of 1974 (88 Stat. 12).

Sec. 6020. Bayou LaFourche and LaFourche Jump, Louisiana.

This section deauthorizes the project for navigation improvement for Bayou LaFourche and LaFourche Jump, Louisiana, authorized by the Act of August 30, 1935 (49 Stat. 1033, chapter 831) and the River and Harbor Act of 1960 (74 Stat. 481).

Sec. 6021. Eastern Rapides and South-Central Avoyelles Parishes, Louisiana.

This section deauthorizes the project for flood control, Eastern Rapides and South-Central Avoyelles Parishes, Louisiana, authorized by section 201 of the Flood Control Act of 1970 (84 Stat. 1825).

Sec. 6022. Fort Livingston, Grand Terre Island, Louisiana.

This section deauthorizes the project for erosion protection and recreation, Fort Livingston, Grande Terre Island, Louisiana, authorized by the Flood Control Act of 1946 (33 U.S.C. 426e et seq.).

Sec. 6023. Gulf Intracoastal Waterway, Lake Borgne and Chef Menteur, Louisiana.

This section deauthorizes the project for the construction of bulkheads and jetties at Lake Borgne and Chef Menteur, Louisiana, as part of the Gulf Intracoastal Waterway, authorized by the first section of the River and Harbor Act of 1946 (60 Stat. 635).

Sec. 6024. Red River Waterway, Shreveport, Louisiana To Daingerfield, Texas.

This section deauthorizes the Red River Waterway, Shreveport, Louisiana to Dangerfield, Texas, authorized by section 101 of the River and Harbor Act of 1968 (82 Stat. 731).

Sec. 6025. Casco Bay, Portland, Maine.

This section deauthorizes the project for environmental infrastructure, Casco Bay, Portland, Maine, authorized by section 307 of the Water Resources Development Act of 1992 (106 Stat. 4841).

Sec. 6026. Northeast Harbor, Maine.

This section deauthorizes the project for navigation, Northeast Harbor, Maine, authorized by section 2 of the Act of March 2, 1945 (59 Stat. 12, Chapter 19).

Sec. 6027. Penobscot River, Bangor, Maine.

This section deauthorizes the project for environmental infrastructure, Penobscot River, Bangor, Maine, authorized by section 307 of the Water Resources Development Act of 1992 (106 Stat. 4841).

Sec. 6028. Saint John River Basin, Maine.

This section deauthorizes the program for research and demonstration of cropland irrigation and soil conservation techniques, Saint John River Basin, Maine, authorized section 1108 of the Water Resources Development Act of 1986 (106 Stat. 4230).

Sec. 6029. Tenants Harbor, Maine.

This section deauthorizes the project for navigation, Tenants Harbor, Maine, authorized by the first section of the Act of March 2, 1919 (40 Stat. 1275, Chapter 95).

Sec. 6030. Grand Haven Harbor, Michigan.

This section deauthorizes modifications to the project for navigation, Grand Haven Harbor, Michigan, authorized by section 202(a) of the Water Resources Development Act of 1986 (100 Stat. 4093).

Sec. 6031. Greenville Harbor, Mississippi.

This section deauthorizes the project for navigation, Greenville Harbor, Mississippi, authorized by section 601(a) of the Water Resources Development Act of 1986 (100 Stat. 4142).

Sec. 6032. Platte River flood and related streambank erosion control, Nebraska.

This section deauthorizes the project for flood damage reduction, Platte River Flood and Related Streambank Erosion Control, Nebraska, authorized by section 603 of the Water Resources Development Act of 1986 (100 Stat. 4149).

Sec. 6033. Epping, New Hampshire.

This section deauthorizes the project for environmental infrastructure, Epping, New Hampshire, authorized by section 219(c)(6) of the Water Resources Development Act of 1992 (106 Stat. 4835). No funds have been allocated to date and the project is eligible for deauthorization.

Sec. 6034. Manchester, New Hampshire.

This section deauthorizes the project for environmental infrastructure, Manchester, New Hampshire, authorized by section 219(c)(7) of the Water Resources Development Act of 1992 (106 Stat. 4836).

Sec. 6035. New York Harbor and adjacent channels, Claremont Terminal, Jersey City, New Jersey.

This section deauthorizes the project for navigation, New York Harbor and adjacent channels, Claremont Terminal, Jersey City, New Jersey, authorized by section 202(b) of the Water Resources Development Act of 1986 (100 Stat. 4098).

Sec. 6036. Eisenhower and Snell Locks, New York.

This section deauthorizes the project for navigation rehabilitation, Eisenhower and Snell Locks, New York, authorized by section 1163 of the Water Resources Development Act of 1986 (100 Stat. 4258).

Sec. 6037. Olcott Harbor, Lake Ontario, New York.

This section deauthorizes the project for navigation, Olcott Harbor, New York, authorized by section 601(a) of the Water Resources Development Act of 1986 (100 Stat. 4143).

Sec. 6038. Outer Harbor, Buffalo, New York.

This section deauthorizes the project for navigation, Outer Harbor, Buffalo, New York, authorized by section 110 of the Water Resources Development Act of 1992 (106 Stat. 4817).

Sec. 6039. Sugar Creek Basin, North Carolina and South Carolina.

This section deauthorizes the project for flood damage reduction, Sugar Creek Basin, North Carolina and South Carolina, authorized by section 401(a) of Water Resources Development Act of 1986 (100 Stat. 4121).

Sec. 6040. Cleveland Harbor 1958 Act, Ohio.

This section deauthorizes the project for navigation, Cleveland Harbor, Ohio, project modifications, authorized by section 101 of the River and Harbor Act of 1960 (74 Stat. 482).

Sec. 6041. Cleveland Harbor 1960 Act, Ohio.

This section deauthorizes the project for navigation, Cleveland Harbor, Ohio, authorized by section 101 of the River and Harbor Act of 1960 (74 Stat. 482).

Sec. 6042. Cleveland Harbor, uncompleted portion of Cut #4, Ohio.

This section deauthorizes the project for navigation, Cleveland Harbor, Ohio, authorized by the first section of the Act of July 24, 1946 (60 Stat. 636, chapter 595).

Sec. 6043. Columbia River, Seafarers Memorial, Hammond, Oregon.

This section deauthorizes the proposed Seafarers Memorial at Hammond, Oregon, authorized by Title I of the Fiscal Year 1991 Energy and Water Development Act (104 Stat. 2078).

Sec. 6044. Chartiers Creek, Cannonsburg (Houston Reach Unit 2b), Pennsylvania.

This section deauthorizes the project for flood control, Chartiers Creek, Cannonsburg (Houston Reach Unit 2B), Pennsylvania, authorized by section 204 of the Flood Control Act of 1965 (79 Stat. 1081).

Sec. 6045. Schuylkill River, Pennsylvania.

This section deauthorizes the 40-foot project for navigation, Schuylkill River (Mouth to Penrose Avenue), Pennsylvania, authorized by section 344 of the Water Resources Development Act of 1996 (110 Stat. 3722).

Sec. 6046. Tioga-Hammond Lakes, Pennsylvania.

This section deauthorizes the project for flood control and recreation, Tioga Hammond Lakes, Mill Creek Recreation, Pennsylvania, authorized by section 203 of the Flood Control Act of 1958 (72 Stat. 313).

Sec. 6047. Tamaqua, Pennsylvania.

This section deauthorizes the project for flood control, Tamaqua, Pennsylvania, authorized by section 1(a) of the Water Resources Development Act of 1974 (88 Stat. 14).

Sec. 6048. Narragansett Town Beach, Narragansett, Rhode Island.

This section deauthorizes the project for navigation, Narragansett Town Beach, Rhode Island, authorized by section 361 of the Water Resources Development Act of 1992 (106 Stat. 4861).

Sec. 6049. Quonset Point-Davisville, Rhode Island.

This section deauthorizes the project for navigation, Davisville, Quonset Point, Rhode Island, authorized by section 571 of the Water Resources Development Act of 1996 (110 Stat. 3788).

Sec. 6050. Arroyo Colorado, Texas.

This section deauthorizes project for flood damage reduction, Arroyo Colorado, Texas, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4125).

Sec. 6051. Cypress Creek-Structural, Texas.

This section deauthorizes the project for flood damage reduction, Cypress Creek Structural, Texas, authorized by section 3(a)(13) of the Water Resources Development Act of 1988 (102 Stat. 4014).

Sec. 6052. East Fork Channel Improvement, Increment 2, east fork of the Trinity River, Texas.

This section deauthorizes the Increment II of the project for flood damage reduction, East Fork Channel Improvement, East Fork of the Trinity River, Texas, authorized by section 203 of the Flood Control Act of 1962 (76 Stat. 1185).

Sec. 6053. Falfurrias, Texas.

This section deauthorizes the project for flood damage reduction, Falfurrias, Texas, authorized by the section 3(a)(14) of the Water Resources Development Act of 1988 (102 Stat. 4014).

Sec. 6054. Pecan Bayou Lake, Texas.

This section deauthorizes the project for flood control, Pecan Bayou Lake, Texas, authorized by section 203 of the Flood Control Act of 1968 (82 Stat. 742).

Sec. 6055. Lake of the Pines, Texas.

This section deauthorizes the project for navigation, Lake of the Pines, Texas for the portion of the Red River below Fulton, Arkansas, authorized by the Act of July 13, 1892 (27 Stat. 88, chapter 158), as amended by the Act of July 24, 1946 (60 Stat. 635, chapter 595), the Act of May 17, 1950 (64 Stat. 163, chapter 188), and the River and Harbor Act of 1968 (82 Stat. 731).

Sec. 6056. Tennessee Colony Lake, Texas.

This section deauthorizes the project for navigation, Tennessee Colony Lake, Trinity River, Texas, authorized by section 204 of the River and Harbor Act of 1965 (79 Stat. 1091).

Sec. 6057. City Waterway, Tacoma, Washington.

This section deauthorizes the unused portion of The City Waterway, Tacoma, Washington, consisting of the last 1,000 linear feet of the inner portion of the Waterway beginning at Station 70+00 and ending at Station 80+00, authorized by the Rivers and Harbors Act of 1902 (32 Stat. 347).

Sec. 6058. Kanawha River, Charleston, West Virginia.

This section deauthorizes the project for bank erosion, Kanawha River, Charleston, West Virginia, authorized by section 603(f)(13) of the Water Resources Development Act of 1986 (100 Stat. 4153).

HEARINGS

On March 31, 2004, the Subcommittee on Transportation and Infrastructure held a hearing to receive testimony on the role of the U.S. Army Corps of Engineers in meeting the nation's water resource needs in the 21st century. The committee received testimony from the Honorable John Paul Woodley, Assistant Secretary of the Army (Civil Works); Lieutenant General Robert B. Flowers, Chief of Engineers, U.S. Army Corps of Engineers; The Honorable John T. Myers, on behalf of the National Waterways Conference; Mr. Derrick Crandall, President, American Recreation Coalition; Mr. Steve Levy, County Executive, Suffolk County, New York; Mr. Michael Leone, Chairman, American Association of Port Authorities; Dr. William G. Howland, Basin Program Manager, Lake Champlain Basin Program, Vermont; Mr. Michael Cameron, Desert Rivers Program Director, The Nature Conservancy of Nevada; Mr. Dominic Izzo, American Society of Civil Engineers; Mr. Gregory A. Zlotnick, Director, Santa Clara Valley Water District, California; Mr. Ray Poupore, Executive Director, National Heavy & Highway Alliance; Mr. Scott Faber, Environmental Defense; and testimony was submitted for the record by Mr. George C. Grugett, Executive Vice President, Mississippi Valley Flood Association, Tennessee.

LEGISLATIVE HISTORY

On April 6, 2005, Senator Bond, for himself, Senators Inhofe, Vitter, Warner, Voinovich, Isakson, Thune, Murkowski, Obama, Landrieu, Grassley, Harkin, Talent, Cornyn, Cochran, Domenici, and Coleman, introduced the Water Resources Development Act of 2005 (S. 728). The Committee on Environment and Public Works met to consider S. 728 on April 13, 2005, and reported the amended bill by voice vote.

ROLLCALL VOTES

On April 13, 2005, the Committee on Environment and Public Works met to consider S. 728, the Water Resources Development Act of 2005. A Managers amendment, offered by Senators Inhofe and Bond, as modified by a second degree amendment offered by Senator Jeffords and a second degree amendment offered by Senator Inhofe, was agreed to by voice vote. An amendment offered by Senator Vitter, related to obstructions to navigable water covered under section 10 of the Rivers and Harbors Act of 1899, was agreed to by a vote of 12 ayes to 6 nays. Voting in favor were Senators Baucus, Bond, Carper, DeMint, Isakson, Jeffords, Murkowski, Thune, Vitter, Voinovich, Warner and Inhofe. Voting against were Senators Boxer, Chafee, Clinton, Lautenberg, Lieberman and Obama. An amendment offered by Senator Jeffords, related to the planning and independent peer review requirements, was disagreed to by voice vote. A modified amendment offered by Senator Voinovich, related to the Great Lakes Fishery and Ecosystem Restoration Program, was agreed to by voice vote. Final passage of S. 728 was agreed to by voice vote.

MANDATES ASSESSMENT

In compliance with the Unfunded Mandates Reform Act of 1995 (Public Law 104-4), the committee finds that this bill would impose no Federal intergovernmental unfunded mandates on State, local, or tribal governments. All of its governmental directives are imposed on Federal agencies. The bill does not directly impose any private sector mandates.

EVALUATION OF REGULATORY IMPACT

Section 11(b) of rule XXVI of the Standing Rules of the Senate require publication in the report the committee's estimate of the regulatory impact made by the bill as reported. No regulatory impact is expected by the passage of the bill. The bill will not affect the personal privacy of individuals.

COST OF LEGISLATION

Section 403 of the Congressional Budget and Impoundment Act requires each report to contain a statement of the cost of a reported bill prepared by the Congressional Budget Office. Senate Rule XXVI paragraph 11(a)(3) allows the report to include a statement of the reasons why compliance is impracticable. The committee has requested this statement from the Congressional Budget Office and will publish it in the Congressional Record when it becomes available.

ADDITIONAL VIEWS OF SENATORS JEFFORDS, BAUCUS, LIEBERMAN, BOXER, CLINTON, CARPER, AND LAUTENBERG

GENERAL STATEMENT

During the last 5 years, concern has been raised about the U.S. Army Corps of Engineers' internal evaluation and review procedures of their projects. Project economics, as well as mitigation practices have been questioned. In light of these concerns, there have been calls for changes that would force the Corps of Engineers to be more accountable for its actions. Such changes include independent peer review of recommended projects, review of the construction backlog, as well as an improved deauthorization process, and revision of project evaluation procedures (Principles and Guidelines) to ensure that economic and environmental features are evaluated appropriately.

BACKGROUND

In 1999, the National Academy of Sciences issued a report entitled New Directions in Water Resources Planning. The report called for greater emphasis on ecological and social goals in project planning at the Corps of Engineers and for the elimination of bias against non-structural solutions.

In 2000, the Washington Post published a five-part series that revealed efforts by the Corps of Engineers to exaggerate project benefits and underestimate environmental costs. Also in 2000, the Inspector General of the Army's Upper Mississippi Illinois-Water Navigation Study found evidence that results of that study were manipulated to support longer locks and there was an institutional bias in favor of large, structural projects.

Section 216 of the Water Resources Development Act of 2000 directed the Secretary of the Army to contract with the National Academy of Sciences (NAS) to study and make recommendations relating to the independent peer review of feasibility reports for water resources projects. The July 25, 2002, report by the Panel on Peer Review made several recommendations. Among them are:

complex planning studies should be subjected to independent review by objective, expert panels;

reviewers should not be selected by or employed by the Corps of Engineers;

reviews should be overseen by an organization independent of the Corps of Engineers;

review results should be presented to the Chief of Engineers before a final decision on a planning study is made;

the Chief of Engineers should either agree with a point and explain how it will be incorporated into the planning study or project, or the point should be rebutted with an explanation of why the Corps is choosing to reject it;

reviews should be conducted to identify, explain, and comment upon assumptions that underly economic, engineering, and environmental analyses, as well as evaluate the soundness of models and planning methods; and

reviewers should be given the flexibility to bring important issues to the attention of decisionmakers and evaluate whether the interpretations of analysis and the conclusions based on analysis are reasonable.

In 2001, the NAS Inland Waterway System Planning report called for the Corps of Engineers to use a model that recognizes the importance of alternative grain destinations and modes, to use real data, and to give greater consideration to non-structural alternatives, such as scheduling.

In 2002, the General Accounting Office(GAO) looked into the Oregon Inlet Jetty Project and found that the Corps of Engineers overestimated the number of vessels that would use an expanded inlet that was being proposed. In another GAO report that same year, it was found that the Corps of Engineers overstated the benefits of the $311 million Delaware River Deepening Project by more than 300 percent. Also in 2002, following review by outside engineers, the Corps of Engineers conceded that the $90 million Chesapeake and Delaware Canal deepening project was not economically justified. The 2002 GAO, Assessment of Fish and Wildlife Mitigation report concluded that the Corps of Engineers fails to mitigate for nearly 70 percent of the projects for which mitigation is required, and found that the Corps of Engineers frequently fails to mitigate in a timely fashion.

In 2004, the NAS did a series of four reports on U. S. Army Corps of Engineers Water Resources Planning: A New Opportunity for Service. The reports call for reforms in the Corps of Engineers' planning process, including expanded focus on ecological restoration and updated planning tools. Also in 2004, the NAS conducted a Review of the Restructured Upper Mississippi-Illinois Water Navigation Study and found that the Corps of Engineers still employs models that exaggerate likely barge traffic and ignore non-structural alternatives that could immediately reduce waterway congestion. Finally, a Congressional Research Service report on Agriculture as Source of Barge Demand states that the Corps of Engineers exaggerates likely barge traffic and ignores rising demand for corn at ethanol plants and increased rail shipments to Canada, Mexico and West Coast ports.

In response to some of the reports cited above, legislation has been introduced in the Senate in the 106th, 107th, 108th and 109th Congresses to reform the Corps of Engineers. ( S. 2309, `Corps of Engineers Civil Works Independent Investigation and Review Act', by Senator Daschle, on March 28, 2000; S. 3036, `Corps of Engineers River Stewardship Independent Investigations and Review Act', by Senators Daschle and Johnson, on October 3, 2002; S. 1997, `Corps of Engineers Modernization and Improvement Act of 2002', by Senators Smith, Feingold and McCain, on March 3, 2002; S. 2188, `Corps of Engineers Modernization and Improvement Act of 2004', by Senators Feingold, McCain and Daschle, on March 10, 2004; and S. 753, `Corps of Engineers Modernization and Improvement Act of 2005', by Senators Feingold and McCain on April 11, 2005.

June 18, 2002, the Committee on Environment and Public Works held a hearing on water resources development issues and heard from several witnesses on the need for reform of the Corps of Engineers.

During development of S. 2773, the Water Resources Development Act of 2004, the committee considered many of the recommendations from the aforementioned reports and reviewed the testimony presented to the committee on reforming the Corps of Engineers. After extensive negotiations and compromise, the committee agreed to provisions that would improve the Corps of Engineers planning, review and mitigation programs and included them in sections 1008, 1009, 1010, and 1111 of S. 2773, and favorably reported the bill. S. 2773 was never considered by the full Senate before the 108th Congress adjourned.

At the start of the 109th Congress, the committee began to develop a Water Resources Development Act for 2005. However, the language proposed by the majority on planning, independent peer review and mitigation was significantly different from what had been agreed to and passed the committee in the previous Congress. The minority were told that these provisions were non-negotiable.

DISCUSSION

On April 13, 2005, the committee met to consider S. 728, the Water Resources Development Act of 2005. Senator Jeffords offered an amendment on planning and independent peer review which was identical to sections 1008,1009 and 1010 of S. 2773 from the previous committee passed bill. The amendment would have required the Secretary to assess a project's compliance with Federal, State and local regulations; required the Secretary, in consultation with the Water Resource Planning Council, to revise the agency's planning guidelines; provided specifics on what must be included in a cost-benefit analysis; required the Secretary to generally complete feasibility studies within 2 years, but not longer than 3 years; required the Secretary to establish a Water Resources Planning Council to identify and review the methods, models and processes of the Corps, as well as identifying new or additional methods or processes which would streamline and enhance the agency's planning process; and established an independent peer review process within the office of the Inspector General of the Army; directing the Inspector General to convene an independent peer review panel prior to the submission of a project study or report required to be submitted to Congress for authorization and describing the panel membership and duties. In addition, the amendment directed the Secretary to provide the panel with sufficient information to conduct the independent peer review and written or oral comments received from the public on the project study or report, described the contents for a panel report, established the requirements for the Secretary's response to a panel report, required that independent peer review reports be completed not later than 180 days after the date on which the panel received the draft project study or report, and clarified that the Secretary is not required to conduct an independent peer review of an existing water resources project.

The amendment failed on a voice vote.

We believe that the provisions in sections 2006, 2007, and 2008 of S. 728 do not provide the necessary direction and authority to provide for meaningful reform of the Corps of Engineers. The planning provision rejects the recommendations of the NAS studies to change the Principles and Guidelines which promote large-scale structural solutions over non-structural approaches, which in many cases are less harmful to the environment. The provision also states the Chief of Engineers shall not be subject to direction in the completion of reports. This grants the Chief of Engineers extreme, subjective discretion in reviewing and approving reports.

The independent review provisions do not require that independent reviews be performed by reviewers independent of the Corps of Engineers, gives the Chief of Engineers complete discretion as to what projects are reviewed, and limits what aspects of a project can be reviewed. This is not independent peer review.

The mitigation provision will not improve the Corps of Engineers project mitigation. No minimum standard is established, success criteria are not proposed and there is no publicly accessible tracking system authorized.

We believe that meaningful reform of the Corps of Engineers in necessary in order to protect the nation's water resources and the environment and to prevent wasteful spending on uneconomic water resources projects. We believe these reforms must be contained in any Water Resources Development Act considered by the Senate.

ADDITIONAL VIEWS OF SENATORS JEFFORDS, LIEBERMAN, BOXER, CLINTON, CARPER, LAUTENBERG, AND CHAFEE

GENERAL STATEMENT

Section 2022 of the Water Resources Development Act of 2005 (WRDA) amends the Rivers and Harbors Act of 1899 to limit the authority of the Army Corps of Engineers to regulate any activities or structures on private property under section 10 of the Rivers and Harbors Act of 1899 other than `those that the Secretary, in consultation with the Secretary of the department in which the Coast Guard is operating, determines that such activity would pose a threat to the safe transit of maritime traffic.' This section was presented to the committee as an amendment that sought to prevent the Corps of Engineers from claiming jurisdiction and requiring permits for activities and structures (house, cars, etc.) on private property behind levees in Louisiana that are impacted by flood waters. The amendment summary presented to the committee emphasizes that the amendment limits section 10 applicability to obstructions to `maritime navigation--not on private lands where mariners are unable to transit.'

During the Business Meeting of the Committee on Environment and Public Works, held on April 13, 2005, we expressed concern that the actual text of the amendment could have unintended consequences as it is extremely broad language modifying a century-old statute and asked that Senator Vitter (R-LA) withdraw his amendment and work with concerned members to resolve concerns before floor consideration of the WRDA bill. Senator Vitter chose to proceed with a vote on his amendment which was adopted, but agreed to work with interested members to resolve concerns with the amendment language. We look forward to that discussion.

Since committee action on the WRDA bill on April 13, we have completed a more thorough analysis of the nationwide impacts of section 2022. In summary, this section seeks to exempt a timber company from a permit requirement in Louisiana and purports to prevent the Corps from expanding the scope of the definition of navigable waters to include private property impacted by floods. However, as drafted, the amendment takes drastic action to strip the Corps of regulatory authority it has held since 1968 and reduces the Corps' ability to protect navigation and the environment.

BACKGROUND

Section 10 of the Rivers and Harbors Act of 1899, 33 U.S.C. 403, prohibits the unauthorized obstruction or alteration of any navigable water of the United States unless a permit has been issued by the Army Corps of Engineers. This authority covers construction, excavation, or deposition of materials in, over, or under any navigable water of the United States, or any work, which would affect the course, location, condition, or capacity of those waters. Activities requiring section 10 permits include structures (e.g., piers, wharfs, breakwaters, bulkheads, jetties, weirs, transmission lines) and work such as dredging or disposal of dredged material, or excavation, filling, or other modifications to the navigable waters of the United States.

Geographic Jurisdiction of Section 10

The geographic jurisdiction of the Rivers and Harbors Act includes all navigable waters of the United States which are defined (33 CFR Part 329) as, `those waters that are subject to the ebb and flow of the tide and/or are presently used, or have been used in the past, or may be susceptible to use to transport interstate or foreign commerce.' This jurisdiction extends seaward to include all ocean waters within a zone three nautical miles from the coastline.

In tidal waters, the shoreward limit of navigable waters extends to the line of the shore reached by the plane mean (average) high water.

In bays and estuaries, jurisdiction extends to the entire surface and bed of all water bodies subject to tidal action.

In rivers and lakes, jurisdiction extends laterally over the entire water surface and bed of a navigable water body, including all land and waters below the ordinary high mark even though such waters may be extremely shallow or obstructed by shoals or vegetation.

The definition of navigable waters for the purposes of section 10 is different than the definition of navigable waters for the Clean Water Act. However, both are similar in that they are not limited to locations where boats travel. A more thorough discussion of the fact that this section does not affect the definition of navigable waters for the Clean Water Act follows in the discussion section below.

Privately owned lands underlying a water body, or the lands through which it runs, can be deemed navigable waters within the jurisdiction of section 10. Privately constructed and operated canals not used to transport interstate commerce, nor used by the public, are not considered to be navigable waters of the United States. However, a private water body, even though not itself navigable, may affect the navigable capacity of nearby waters as to nevertheless be subject to certain regulatory authorities. (33 CFR 329.8(a)(3))

Application of Section 10: Public Interest Review

Until 1968, the Rivers and Harbors Act of 1899 was administered to protect only navigation and the navigable capacity of this nation's waters. In 1968, the policy for review of permit applications with respect to sections 9 and 10 of the Rivers and Harbors Act was revised to include additional factors besides navigation:`. . . All factors which may be relevant to the proposal must be considered including the cumulative effects thereof: among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people . . .' (33 CFR 320.4.) This new type of review was identified as a `public interest review' that requires the Corps to consider the practicability of alternatives to the project and deny a permit application where a practicable alternative exists that would have a less adverse impact on the aquatic environment.

DISCUSSION

Section 2022 Intent.

This section was presented as a solution to two perceived local issues. First, a timber harvesting company in Louisiana is interested in having the ability to harvest cypress trees growing below the ordinary high water mark in Louisiana without obtaining a section 10 permit. Second, based on the amendment summary provided, the experience of the timber company raised concern among some that the Corps would seek to extend its jurisdiction under section 10 to private property inundated by a flooding event.

Timber Permit

The timber company is interested in harvesting cypress trees growing below the ordinary high water mark. In order to reach these trees, they will need to construct a road. Section 10 prohibits the construction of such structures in navigable waters without a permit. Therefore, under normal circumstances the timber company would apply to the Corps for a permit. Should the permit be granted, cypress trees that currently protect the coast of Louisiana from erosion would be harvested. The Corps indicates that it would likely grant a permit with some conditions designed to mitigate the environmental impact of the construction of the road. The timber company in question has not applied for a permit and is instead seeking an exemption from the requirements of section 10.

Regulation of private lands inundated by floods

It appears that based on this series of events, some became concerned that what they characterize as a recent interpretation of section 10 authority, could lead the Corps to seek to apply section 10 permit requirements to private property inundated by a flooding event. The Corps refutes this suggestion by stating that:

First, the timber company situation described above does not represent a recent interpretation of section 10; and

Second, as described above, section 10 jurisdiction is based on the definition of navigable waters, which extends in general to those locations below the ordinary high water mark or mean high water.

First, since the late 1960's, following a rulemaking, the Corps of Engineers has regulated activities occurring within the entire lateral extent of navigable waters--up to the mean high water mark and the ordinary high water mark. These regulations were affirmed in Federal court (See e.g. United States v. Alaska, 503 U.S. 569 at 582 (1992.) Thus, the decision to require a section 10 permit for activities located below the ordinary high water mark does not represent a recent interpretation of section 10.

Second, ordinary high water mark and mean high water do not include unusually high waters or unusually high river flood stages.

There is extensive Federal case law supporting the fact that flood stages or peak flows are not used when determining the ordinary high water mark. (See Oklahoma v. Texas 260 U.S. 606, 43 S.Ct. 3221, 67 L. Ed. 428 (1923); United States v. Chicago, Milwaukee, St. Paul & Pacific Railroad Company, et al., 312 U.S. 592, 596, 61 S.Ct. 722, 85 L.Ed. 1064 (1941) (the ordinary high water mark (OHWM) is determined`. . . without reference to the extraordinary freshets of the winter or spring, or the extreme droughts of the summer and autumn'); United States v. Claridge 279 F. Supp. 87, 91 (D.C. Ariz. 1967) aff'd 416 F. 2d 933 (9th Cir. 1969) cert. denied 397 US. 961, 90 S. Ct. 944, 25 L.Ed.2d 251 (1970); Goose Creek Hunting Club, Inc. v. United States, 518 F. 2d 579 (Ct. Cl. 1975).

Mean high water shoreline is a line on the shore reached by the plane of the mean daily high tides. Corps regulations (33 CFR 329.12(a)(2)) establish one method for establishing the precise mean high water shoreline by taking an average of the tides over a period of 18.6 years. Practically speaking, the mean high water shoreline is located by observing physical markings such as lines of vegetation and debris or changes in vegetation.

Therefore, it is clear that based both on Federal case law and existing regulation, a flooding event would not generate a change in the ordinary high water mark or the mean high water shoreline. The situation anticipated by this section--Corps regulation of private lands under section 10 following inundation after a flooding event--would not occur.

Section 2022 Effect.

In summary, this section eliminates the ability of the Army Corps of Engineers to regulate any activities or structures on private property under section 10 of the Rivers and Harbors Act of 1899 other than `those that the Secretary, in consultation with the Secretary of the department in which the Coast Guard is operating, determines that such activity would pose a threat to the safe transit of maritime traffic.'

In doing so, this section strips the Corps of regulatory authority it has held since 1968 to protect the public interest (including national security, environment, homeland security, etc.) when granting permits for the construction, excavation, or deposition or materials in, over, or under any navigable water of the United States, or any work, which would affect the course, location, condition, or capacity of those waters.

Eliminates Protection of Public Interest

Under the conditions of this section, the Corps would only be allowed to consider the safe transit of maritime traffic rather than the entire public interest when issuing permits for activities such as construction of piers, wharfs, breakwaters, bulkheads, jetties, weirs, transmission lines, and work such as dredging or disposal of dredged material, or excavation, filling, or other modifications to navigable waters. This eliminates huge numbers of activities from regulation that would normally be covered by section 10 because of impacts to the environment, national security, homeland security, the speed rather than the safe transit of maritime traffic, or any other element of the public interest. For example, in coastal Louisiana, the Corps would be unable to issue a section 10 permit for construction or activities that would increase the speed of the erosion of Louisiana's coastline.

Negatively Affects Navigation

In addition, this section could negatively impact navigation itself. First, it limits the Corps' authority to regulate those activities that affect safe transit with no consideration for speed. Second, it imposes a new burden on the Corps to consult with the Coast Guard before requiring a section 10 permit. Third, it limits Corps authority to maritime, or sea-going, navigation, eliminating the Corps' ability to require section 10 permits for structures or activities on inland waterways. Therefore, the Corps would not be able to prevent the construction on privately owned beds of structures that would impact safe transit on an inland waterway. Finally, this section interferes with the Federal Government's long-standing right of navigational servitude by excluding privately owned elements of navigable waters from its scope, potentially interfering with navigation and generating extensive litigation as ownership of the beds of water bodies is determined.

Limits Federal Regulation on Navigable Waters Under Section 10

This section does not explicitly modify the definitions of navigable waters for section 10 or for the Clean Water Act. In addition, legislative history shows that there is no congressional intent for this section to modify the definition of navigable waters for the purposes of the Clean Water Act. During committee consideration of this section, there was extensive dialog between Senators Bond, Jeffords, Boxer, Carper, Chafee, and Vitter regarding any potential impact of this section on the definition of navigable waters for the purposes of the Clean Water Act. Senators Bond and Vitter stated that there is no impact of this language on section 404 of the Clean Water Act. These statements were supported by majority staff.

Limits Environmental Protections

By so severely restricting the scope of the activities that would require a section 10 permit, this section limits the number of activities that would be subject to the National Environmental Policy Act (NEPA), the Endangered Species Act (ESA), the Clean Water Act (CWA), and other statutes whose applicability is triggered by the section 10 permit process. In addition, in cases where the CWA section 404 does not apply for whatever reason, this section eliminates the potential application of section 10 to provide wetlands protection. This contradicts the intent of the amendment as described by Senator Vitter at the Business Meeting where he indicated that should the amendment have any negative effects on wetlands, he would withdraw it from consideration.

CONCLUSION

Therefore, as currently drafted, this section has extensive unintended consequences. Although it is clear that there is no effect of the amendment on the definition of navigable waters under the Clean Water Act, there are impacts on the Corps' regulatory authority as described above. We look forward to the opportunity to work with its sponsor prior to floor consideration of this bill to resolve these issues.

CHANGES IN EXISTING LAW

In compliance with section 12 of rule XXVI of the Standing Rules of the Senate, changes in existing law made by the bill as reported are shown as follows: Existing law proposed to be omitted is enclosed in [Struck out->][ black brackets ][<-Struck out] , new matter is printed in italic, existing law in which no change is proposed is shown in roman:

* * * * * * *

-

[33 U.S.C. 622; 25 STAT. 423]

ACT OF AUGUST 11, 1888

* * * * * * *

SEC. 3. CONTRACTS, ETC., WITH PRIVATE INDUSTRY FOR IMPLEMENTATION OF PROJECTS FOR IMPROVEMENTS AND DREDGING; REDUCTION OF FEDERALLY OWNED FLEET.

* * * * * * *

* * * * * * *

* * * * * * *

-

[33 U.S.C. 403]

ACT OF MARCH 3, 1899

* * * * * * *

SEC. 10. OBSTRUCTION OF NAVIGABLE WATERS GENERALLY; WHARVES; PIERS, ETC.; EXCAVATIONS AND FILLING IN

* * * * * * *

-

[55 STAT. 642, CHAPTER 377]

ACT OF AUGUST 18, 1941

* * * * * * *

LOWER MISSISSIPPI RIVER

* * * * * * *

* * * * * * *

-

[CF. 16 U.S.C. 460D]

FLOOD CONTROL ACT OF 1944

* * * * * * *

-

[33 U.S.C. 701R--JUL. 24, 1946]

FLOOD CONTROL ACT OF 1946

* * * * * * *

* * * * * * *

-

[CF. 33 U.S.C. 426G, AUGUST 13, 1946]

AN ACT AUTHORIZING FEDERAL PARTICIPATION IN THE COST OF PROTECTING THE SHORES OF PUBLICLY OWNED PROPERTY

[Struck out->][ SEC. 3. AUTHORIZATION OF SMALL PROJECTS NOT SPECIFICALLY AUTHORIZED; EXPENDITURES; LOCAL COOPERATION; WORK TO BE COMPLETE; EXCEPTIONS ][<-Struck out]

SEC. 3. STORM AND HURRICANE RESTORATION AND IMPACT MINIMIZATION PROGRAM.

* * * * * * *

[Struck out->][ SEC. 5. FEDERAL AID IN PROTECTION OF SHORES ][<-Struck out]

* * * * * * *

-

[33 U.S.C. 701S]

FLOOD CONTROL ACT OF 1948

* * * * * * *

SEC. 205. PROJECTS TO ENHANCE REDUCTION OF FLOODING AND OBTAIN RISK MINIMIZATION.

* * * * * * *

-

[64 STAT. 170--MAY 17, 1950]

FLOOD CONTROL ACT OF 1950

* * * * * * *

SEC. 204. * * *

* * * * * * *

RED-OUACHITA RIVER BASIN

* * * * * * *

-

[33 U.S.C. 577; PUBLIC LAW 86-645--JUL. 14, 1960]

RIVER AND HARBOR ACT OF 1960

SEC. 101. * * *

* * * * * * *

SEC. 107. NAVIGATION ENHANCEMENTS FOR WATERBOURNE TRANSPORTATION.

* * * * * * *

-

[CF. 16 U.S.C. 460L-6A(I)(3)]

LAND AND WATER CONSERVATION FUND ACT OF 1965

SEC. 460l-6a. ADMISSION AND SPECIAL RECREATION USE FEES

* * * * * * *

* * * * * * *

-

[CF. 16 U.S.C. 460D-3]

FLOOD CONTROL ACT OF 1968

SEC. 460d-3. RECREATIONAL USER FEES

* * * * * * *

-

[PUBLIC LAW 91-611--DEC. 31, 1970]

[CF. 42 U.S.C. 1962D-5B]

FLOOD CONTROL ACT OF 1970

* * * * * * *

[Struck out->][ SEC. 221. ][<-Struck out]

SEC. 221. WRITTEN AGREEMENT REQUIREMENT FOR WATER RESOURCES PROJECTS.

* * * * * * *

-

[PUBLIC LAW 92-532--OCT. 23, 1972]

[CF. 33 U.S.C. 1412(C)(4)]

MARINE PROTECTION, RESEARCH, AND SANCTUARIES ACT OF 1972

* * * * * * *

SEC. 1412. Dumping permit program

* * * * * * *

* * * * * * *

* * * * * * *

-

[PUBLIC LAW 93-251--MAR. 7, 1974]

WATER RESOURCES DEVELOPMENT ACT OF 1974

* * * * * * *

SEC. 22. PLANNING ASSISTANCE TO STATES.

* * * * * * *

* * * * * * *

-

[CF. 33 U.S.C. 426J]

WATER RESOURCES DEVELOPMENT ACT OF 1976

[Struck out->][ SEC. 426j. PLACEMENT ON STATE BEACHES OF SAND DREDGED IN CONSTRUCTING AND MAINTAINING NAVIGATION INLETS AND CHANNELS ADJACENT TO SUCH BEACHES ][<-Struck out]

* * * * * * *

-

[PUBLIC LAW 99-662--NOV. 17, 1986]

WATER RESOURCES DEVELOPMENT ACT OF 1986

SECTION 1. SHORT TITLE AND TABLE OF CONTENTS.

* * * * * * *

SEC. 602. LAKES PROGRAM.

* * * * * * *

SEC. 704. STUDY OF CORPS CAPABILITY TO CONSERVE FISH AND WILDLIFE.

* * * * * * *

* * * * * * *

SEC. 904. MATTERS TO BE ADDRESSED IN PLANNING.

SEC. 905. FEASIBILITY REPORTS.

* * * * * * *

* * * * * * *

SEC. 906. FISH AND WILDLIFE MITIGATION.

* * * * * * *

* * * * * * *

SEC. 912. SECTION 221 AGREEMENTS.

* * * * * * *

* * * * * * *

[Struck out->][ SEC. 1135. PROJECT MODIFICATIONS FOR IMPROVEMENT OF ENVIRONMENT. ][<-Struck out]

SEC. 1135. ENVIRONMENTAL MODIFICATION OF PROJECTS FOR IMPROVEMENT AND RESTORATION OF ECOSYSTEMS PROGRAM.

* * * * * * *

* * * * * * *

-

[PUBLIC LAW 100-676--NOV. 17, 1988]

WATER RESOURCES DEVELOPMENT ACT OF 1988

SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

* * * * * * *

SEC. 21. MISSISSIPPI RIVER HEADWATERS RESERVOIRS.

* * * * * * *

-

[PUBLIC LAW 101-640--NOV. 28, 1990]

WATER RESOURCES DEVELOPMENT ACT OF 1990

SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

* * * * * * *

SEC. 102. PROJECT MODIFICATIONS.

* * * * * * *

SEC. 401. GREAT LAKES REMEDIAL ACTION PLANS AND SEDIMENT REMEDIATION.

* * * * * * *

* * * * * * *

-

[PUBLIC LAW 102-580--OCT. 31, 1992]

WATER RESOURCES DEVELOPMENT ACT OF 1992

SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

* * * * * * *

SEC. 103. VISITOR CENTERS

* * * * * * *

* * * * * * *

SEC. 204. BENEFICIAL USES OF DREDGED MATERIAL.

* * * * * * *

[Struck out->][ SEC. 325. LAND EXCHANGE, ALLATOONA LAKE, GEORGIA. ][<-Struck out]

* * * * * * *

-

[PUBLIC LAW 104-303--OCT. 12, 1996]

WATER RESOURCES DEVELOPMENT ACT OF 1996

SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

* * * * * * *

SECTION 101. PROJECT AUTHORIZATIONS.

* * * * * * *

* * * * * * *

[Struck out->][ SEC. 206. AQUATIC ECOSYSTEM RESTORATION. ][<-Struck out]

SEC. 206. RESTORATION OF THE ENVIRONMENT FOR PROTECTION OF AQUATIC AND RIPARIAN ECOSYSTEMS PROGRAM.

* * * * * * *

* * * * * * *

SEC. 211. CONSTRUCTION OF FLOOD CONTROL PROJECTS BY NON-FEDERAL INTERESTS.

* * * * * * *

* * * * * * *

* * * * * * *

* * * * * * *

SEC. 217. DREDGED MATERIAL DISPOSAL FACILITY PARTNERSHIPS.

* * * * * * *

SEC. 234. INTERAGENCY AND INTERNATIONAL SUPPORT AUTHORITY.

* * * * * * *

SEC. 507. DESIGN AND CONSTRUCTION ASSISTANCE.

* * * * * * *

SEC. 510. CHESAPEAKE BAY ENVIRONMENTAL RESTORATION AND PROTECTION PROGRAM.

* * * * * * *

* * * * * * *

SEC. 516. SEDIMENT MANAGEMENT.

* * * * * * *

* * * * * * *

SEC. 528. EVERGLADES AND SOUTH FLORIDA ECOSYSTEM RESTORATION.

* * * * * * *

* * * * * * *

* * * * * * *

* * * * * * *

SEC. 554. ORCHARD BEACH, BRONX, NEW YORK.

* * * * * * *

[Struck out->][ SEC. 563. HOPPER DREDGE MCFARLAND. ][<-Struck out]

SEC. 563. HOPPER DREDGE MCFARLAND.

* * * * * * *

SEC. 567. UPPER SUSQUEHANNA RIVER BASIN, PENNSYLVANIA AND NEW YORK.

* * * * * * *

* * * * * * *

SEC. 575. HARRIS COUNTY, TEXAS.

* * * * * * *

SEC. 577. TANGIER ISLAND, VIRGINIA.

* * * * * * *

-

[PUBLIC LAW 106-53--AUG. 17, 1999]

WATER RESOURCES DEVELOPMENT ACT OF 1999

SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

* * * * * * *

SEC. 212. FLOOD MITIGATION AND RIVERINE RESTORATION PROGRAM.

* * * * * * *

* * * * * * *

* * * * * * *

[Struck out->][ SEC. 225. RECREATION USER FEES. ][<-Struck out]

* * * * * * *

SEC. 514. MISSOURI AND MIDDLE MISSISSIPPI RIVERS ENHANCEMENT PROJECT.

* * * * * * *

* * * * * * *

SEC. 560. ABANDONED AND INACTIVE NONCOAL MINE RESTORATION.

* * * * * * *

SEC. 573. ONONDAGA LAKE, NEW YORK.

* * * * * * *

* * * * * * *

SEC. 580. CUMBERLAND, MARYLAND, FLOOD PROJECT MITIGATION.

* * * * * * *

SEC. 602. TERRESTRIAL WILDLIFE HABITAT RESTORATION.

* * * * * * *

* * * * * * *

SEC. 603. SOUTH DAKOTA TERRESTRIAL WILDLIFE HABITAT RESTORATION TRUST FUND.

* * * * * * *

* * * * * * *

* * * * * * *

* * * * * * *

SEC. 604. CHEYENNE RIVER SIOUX TRIBE AND LOWER BRULE SIOUX TRIBE TERRESTRIAL WILDLIFE HABITAT RESTORATION TRUST FUNDS.

* * * * * * *

* * * * * * *

-

[33 U.S.C. 2901--NOV 7, 2000]

ESTUARY RESTORATION ACT OF 2000

SEC. 101. * * *

* * * * * * *

SEC. 102. Purposes.

* * * * * * *

SEC. 103. DEFINITIONS.

* * * * * * *

* * * * * * *

SEC. 104. ESTUARY HABITAT RESTORATION PROGRAM.

* * * * * * *

* * * * * * *

* * * * * * *

(aa) to measure the effectiveness of the restoration project; and

(bb) to allow adaptive management to ensure project success.

* * * * * * *

* * * * * * *

SEC. 105. ESTABLISHMENT OF ESTUARY HABITAT RESTORATION COUNCIL.

* * * * * * *

SEC. 107. MONITORING OF ESTUARY HABITAT RESTORATION PROJECTS.

* * * * * * *

* * * * * * *

SEC. 108. REPORTING.

* * * * * * *

SEC. 109. FUNDING.

* * * * * * *

SEC. 110. GENERAL PROVISIONS.

* * * * * * *

-

[PUBLIC LAW 106-541--DEC. 11, 2000]

WATER RESOURCES DEVELOPMENT ACT OF 2000

SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

* * * * * * *

SEC. 101. PROJECT AUTHORIZATIONS.

* * * * * * *

* * * * * * *

* * * * * * *

* * * * * * *

SEC. 214. FUNDING TO PROCESS PERMITS.

* * * * * * *

SEC. 321. DULUTH HARBOR, MINNESOTA.

* * * * * * *

SEC. 325. FORT PECK FISH HATCHERY, MONTANA.

* * * * * * *

* * * * * * *

SEC. 349. Project Reauthorizations.

* * * * * * *

* * * * * * *

SEC. 414. OCEANSIDE, CALIFORNIA.

* * * * * * *

SEC. 425. CHICAGO, ILLINOIS.

* * * * * * *

SEC. 506. GREAT LAKES FISHERY AND ECOSYSTEM RESTORATION.

* * * * * * *

* * * * * * *

* * * * * * *

SEC. 542. LAKE CHAMPLAIN WATERSHED, VERMONT AND NEW YORK.

* * * * * * *

* * * * * * *

SEC. 543. VERMONT DAMS REMEDIATION.

* * * * * * *

SEC. 601. COMPREHENSIVE EVERGLADES RESTORATION PLAN.

* * * * * * *

* * * * * * *

* * * * * * *

* * * * * * *

* * * * * * *

* * * * * * *

* * * * * * *

* * * * * * *

SEC. 707. AUTHORIZATION OF APPROPRIATIONS.

* * * * * * *

SEC. 904. MISSOURI RIVER TRUST.

* * * * * * *

* * * * * * *

SEC. 907. AUTHORIZATION OF APPROPRIATIONS.

* * * * * * *

This Report:     Printer Friendly: HTML  |  PDF
1 of 1