42-224

2008
110TH CONGRESS 2D SESSION
SENATE
REPORT

110-335

Calendar No. 732

NATIONAL DEFENSE AUTHORIZATION

ACT FOR FISCAL YEAR 2009

R E P O R T

[to accompany s. 3001]

on

AUTHORIZING APPROPRIATIONS FOR FISCAL YEAR 2009 FOR MILITARY ACTIVITIES OF THE DEPARTMENT OF DEFENSE, FOR MILITARY CONSTRUCTION, AND FOR DEFENSE ACTIVITIES OF THE DEPARTMENT OF ENERGY, TO PRESCRIBE PERSONNEL STRENGTHS FOR SUCH FISCAL YEAR, AND FOR OTHER PURPOSES

COMMITTEE ON ARMED SERVICES

UNITED STATES SENATE

congress.#13

MAY 12, 2008- Ordered to be printed

NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2009

42-224

2008
110TH CONGRESS 2D SESSION
SENATE
REPORT

110-335

Calendar No. 732

NATIONAL DEFENSE AUTHORIZATION

ACT FOR FISCAL YEAR 2009

R E P O R T

[to accompany s. 3001]

on

AUTHORIZING APPROPRIATIONS FOR FISCAL YEAR 2009 FOR MILITARY ACTIVITIES OF THE DEPARTMENT OF DEFENSE, FOR MILITARY CONSTRUCTION, AND FOR DEFENSE ACTIVITIES OF THE DEPARTMENT OF ENERGY, TO PRESCRIBE PERSONNEL STRENGTHS FOR SUCH FISCAL YEAR, AND FOR OTHER PURPOSES

COMMITTEE ON ARMED SERVICES

UNITED STATES SENATE

congress.#13

MAY 12, 2008- Ordered to be printed

?
COMMITTEE ON ARMED SERVICES
(110th Congress, 2d Session)
CARL LEVIN, Michigan, Chairman
EDWARD M. KENNEDY, Massachusetts
ROBERT C. BYRD, West Virginia
JOSEPH I. LIEBERMAN, Connecticut
JACK REED, Rhode Island
DANIEL K. AKAKA, Hawaii
BILL NELSON, Florida
E. BENJAMIN NELSON, Nebraska
EVAN BAYH, Indiana
HILLARY RODHAM CLINTON, New York
MARK L. PRYOR, Arkansas
JIM WEBB, Virginia
CLAIRE MCCASKILL, Missouri
JOHN MCCAIN, Arizona
JOHN WARNER, Virginia
JAMES M. INHOFE, Oklahoma
JEFF SESSIONS, Alabama
SUSAN M. COLLINS, Maine
SAXBY CHAMBLISS, Georgia
LINDSEY O. GRAHAM, South Carolina
ELIZABETH DOLE, North Carolina
JOHN CORNYN, Texas
JOHN THUNE, South Dakota
MEL MARTINEZ, Florida
ROGER F. WICKER, Mississippi
RICHARD D. DEBOBES, STAFF DIRECTOR
MICHAEL V. KOSTIW, REPUBLICAN STAFF DIRECTOR (ii)

C O N T E N T S

Page
Purpose of the Bill 1
Committee overview
2
Explanation of funding summary
3
Division A--Department of Defense Authorizations 15
Title I--Procurement 15
Subtitle A--Authorization of Appropriations
15
Explanation of tables
15
Subtitle B--Army Programs
17
Stryker Mobile Gun System (sec. 111)
42
Procurement of small arms (sec. 112)
42
Budget Items--Army
43
Chief of Staff of the Army's unfunded priorities list
43
Armed Reconnaissance Helicopter
44
Forward-looking infrared radar systems
44
Grenades Army
44
Radford Ammunition Plant upgrades
45
Bomb line modernization
45
Area Common User System Modernization
45
Army Global Command and Control System
45
Information Technology Upgrades
46
Fido explosives detector
46
Land Warrior
46
Combat Arms Training System
46
Immersive Group Simulation Virtual Training System
47
Joint Fires and Effects Trainer System
47
Laser collective combat advanced training system
47
Urban training center instrumentation
47
Operator driving simulators
47
Joint Improvised Explosive Device Defeat Fund
48
Subtitle C--Navy Programs
48
Authority for advanced procurement and construction of components for the Virginia-class submarine program (sec. 131)
74
Refueling and complex overhaul of the USS Theodore Roosevelt (sec. 132)
74
Budget Items
74
E-2D Advanced Hawkeye
74
H-53 modifications
75
P-3 modifications
75
Common ECM equipment
75
Weapons industrial facilities
76
Grenades Marine Corps
76
Virginia-class submarine advance procurement
76
Littoral combat ship
76
LPD-17 amphibious transport dock
78
LHA(R) advance procurement
79
DDG-51 Arleigh Burke-class destroyer modernization program
79
Submarine training device modifications
80
Man overboard indicators
81
Logistics vehicle system replacement
81
Combat casualty care equipment upgrade program
81
Subtitle D--Air Force Programs
82
F-22A fighter aircraft (Sec. 151)
99
Budget Items--Air Force
99
Advanced procurement for the F136 engine
99
C-17A engine spares
100
Tactical intelligence support
100
Airborne Imaging
101
Wide-Area Airborne Surveillance
102
National-Tactical SIGINT Initiatives
103
B-52 bomber
104
Large aircraft infrared countermeasures system
104
C-130 Avionics Modernization Program
104
Advanced targeting pod
105
Budget request realignments
105
Improved stores ejection cartridge
106
Joint Air-to-Surface Standoff Missile
106
Advanced Extremely High Frequency satellite
106
Intelligence communication equipment
107
Combat training ranges
107
Air Operations Centers
108
Subtitle E--Joint and Multiservice Matters
108
Annual long-term plan for the procurement of aircraft for the Navy and the Air Force (sec. 171)
108
Budget Items--Defense-wide
109
Terminal High Altitude Area Defense
118
Standard Missile-3 interceptors
119
Intelligence, surveillance, reconnaissance mission equipment package
120
Special operations forces combat assault rifle
120
Special operations visual augmentation systems hand-held imager/long-range
120
M53 Joint Chemical Biological Protective Mask
121
Joint Chemical Agent Detector
121
Joint Biological Standoff Detection System
121
Items of Special Interest
121
Aegis modernization open architecture
121
F/A-18 Hornet and Navy tactical aviation inventory shortfall
123
Light utility helicopter
124
Material handling equipment study
125
Mine Resistant Ambush Protected Vehicles
125
Mission packages
126
Operational support aircraft for U.S. Africa Command
126
Shadow unmanned aerial vehicle
127
Ship maintenance and material condition
127

Warfighter Information Network-Tactical

Title II--Research, Development, Test, and Evaluation

Explanation of tables

Subtitle A--Authorization of Appropriations

Subtitle B--Program Requirements, Restrictions, and Limitations

Requirement for plan on overhead nonimaging infrared systems (sec. 211)

Advanced battery manufacturing and technology roadmap (sec. 212)

Availability of funds for defense laboratories for research and development of technologies for military missions (sec. 213)

Assured funding for certain information security and information assurance programs of the Department of Defense (sec. 214)

Requirements for certain airborne intelligence collection systems (sec. 215)

Subtitle C--Missile Defense Programs

Review of the ballistic missile defense policy and strategy of the United States (sec. 231)

Limitation on availability of funds for procurement, construction, and deployment of missile defenses in Europe (sec. 232)

Airborne Laser system (sec. 233)

Annual Director of Operational Test and Evaluation characterization of operational effectiveness, suitability, and survivability of the Ballistic Missile Defense System (sec. 234)

Independent assessment of boost-phase missile defense programs (sec. 235)

Study on space-based interceptor element of ballistic missile defense system (sec. 236)

Subtitle D--Other Matters

Modification of systems subject to survivability testing by the Director of Operational Test and Evaluation (sec. 251)

Biennial reports on joint and service concept development and experimentation (sec. 252)

Repeal of annual reporting requirement relating to the Technology Transition Initiative (sec. 253)

Executive agent for printed circuit board technology (sec. 254)

Report on Department of Defense response to findings and recommendations of the Defense Science Board Task Force on Directed Energy Weapons (sec. 255)

Assessment of standards for mission critical semiconductors procured by the Department of Defense (sec. 256)

Budget Items

Army

Army basic research programs

Network science and technology research center

Army materials research

Advanced Army energy and power technologies

Army aviation technologies

Sniper detection systems

Army vehicle reliability technologies

Unmanned ground vehicle weaponization

Standoff explosives detection technologies

Soldier positioning technologies

Military engineering technologies

Combat feeding technologies

Army medical research

Biosensor controller systems

Army medical advanced technology development

Army aviation advanced technology development

Army combat vehicle technologies

Diverse threat sensor development

Army training technologies

Deactivation of military explosives

Army missile and rocket technologies

Situational awareness technologies

Unique item ID data management research

Advanced electronics integration

Advanced environmental controls

Advanced fuel cell research

Radiation hardening initiative

High-altitude integration testbed

Air and missile defense architecture analysis

Stryker active protection system

Vibration management enhancement research

Next-generation combat helmet development

High Mobility Multi-purpose Wheeled Vehicle modernization research

Non-Line of Sight-Launch System anti-tamper research

Future Combat System

Urban training development

Extended range sniper rifle research

Army test and target development

Javelin modernization

Global Combat Support System, the Logistics Modernization Program and Product Lifecycle Management Plus

Army manufacturing technologies

Navy

Navy basic research

Manufacturing engineering training

Navy power projection research

Navy force protection research

Situational awareness processing technologies

Acoustic research and test capabilities

Navy electronics research

Advanced technologies for power projection

Force protection advanced technology

High-integrity Global Positioning System

Ground sensor networks

Shipboard system component development

Advanced submarine system development

Facilities improvements

Optical interconnect

Land attack technology

Directed energy

Next-generation cruiser

Improved towed array handler

Submarine electronic chart updates

Next-generation Phalanx

NULKA anti-ship missile decoy system

Combat wound tissue transplantation technologies

F-35 Joint Strike Fighter competitive propulsion system

Navy test and evaluation support

Advanced LINAC facility

Navy support of the reliable replacement warhead

Warfighter enhanced decision making

Aviation improvements

Broad Area Maritime Surveillance Unmanned Aircraft System

Digital manufacturing technologies

National Shipbuilding Research Program--Advanced Shipbuilding Enterprise

Air Force

Air Force basic research programs

Air Force materials research

Optical components for air vehicles

Air Force training technology

Air Force aerospace propulsion technology

Aerospace sensor technologies

Air Force seismic research

Cyber attack mitigation technologies

Reconfigurable securing computing

Propulsion technologies

Thin film amorphous solar arrays

Integrated targeting devices

Optical interconnect for battlefield communications

High energy laser weapon systems

Global Positioning System III operational control segment

Space situational awareness

Transformational Communications satellite

Operationally Responsive Space

B-2 radar modernization program

Space-based space surveillance block 10

Space-based Infrared Satellite system

Third Generation Infrared Surveillance satellite system

F135 engine

Combat Search and Rescue Replacement Aircraft

High speed test track

B-52 bomber

Air Operations Centers

Joint surveillance target attack radar system research and development

Weather service research and development

C-17 research, development, test, and evaluation

Expeditionary Combat Support System

Defense Enterprise Accounting and Management System

Defense-wide

Defense Experimental Program to Stimulate Competitive Research

In-vitro models for biodefense vaccines

Superstructural particle evaluation

Next-generation over-the-horizon radar

Chemical agent fate response planning tool

Chemical and biological applied research

Chemical and biological infrared detector

Multivalent Marburg and Ebola vaccine

DARPA technology transition

Three-dimensional integrated circuit technologies

Blast mitigation and protection

Comprehensive National Incident Management System

Special operations technologies

Blast trauma research

Blackswift

Engineered biological detectors

Improved chemical, biological, and radiological filters

Raman chemical identification system

Command and control gap filler joint capabilities technology demonstration

High performance manufacturing technologies

Defense Logistics Agency technology programs

Superlattice nanotechnology

Special warfare domain awareness technologies

Weapon of mass destruction exercises

Arrow missile defense program

Short-range ballistic missile defense

Terminal High Altitude Area Defense

Ground-based Midcourse Defense

Airborne Laser

Real-time non-specific viral agent detector

Ballistic missile defense sensors

Kinetic Energy Interceptor

Ballistic missile defense reductions

Aegis Ballistic Missile Defense (BMD)

Space Tracking and Surveillance System

Multiple Kill Vehicles

Space test-bed

Missile Defense Agency funding reduction

Corrosion control technologies

Conflict modeling technologies

Prompt global strike

Net-enabled command and control

Central Test and Evaluation Investment Program

Anti-tamper technologies

Force transformation directorate

Software assurance education and research

Status of Operational Readiness and Training Systems

Industrial Base Innovation Fund

Items of Special Interest

Aegis Ballistic Missile Defense funding

Agency relocation

Executive helicopter program (VH-71A)

Expeditionary Fighting Vehicle

Global Positioning System

Improved commercial imagery integration

Title III--Operation and Maintenance

Subtitle A--Authorization of Appropriations

Explanation of tables

Subtitle B--Environmental Provisions

Expansion of cooperative agreement authority for management of natural resources to include off-installation mitigation (sec. 311)

Reimbursement of Environmental Protection Agency for certain costs in connection with Moses Lake Wellfield Superfund Site, Moses Lake, Washington (sec. 312)

Comprehensive program for the eradication of the brown tree snake population from military facilities in Guam (sec. 313)

Subtitle C--Workplace and Depot issues

Authority to consider depot-level maintenance and repair using contractor furnished equipment or leased facilities as core logistics (sec. 321)

Minimum capital investment for certain depots (sec. 322)

Subtitle D--Reports

Additional information under annual submissions of information regarding information technology capital assets (sec. 331)

Subtitle E--Other Matters

Mitigation of power outage risks for Department of Defense facilities and activities (sec. 341)

Increased authority to accept financial and other incentives related to energy savings and new authority related to energy systems (sec. 342)

Recovery of improperly disposed of Department of Defense property (sec. 343)

Budget Items

Army

Computing services

Unmanned aircraft systems concept development

Shipping containers

Life cycle logistics contracting

Facilities sustainment, restoration, and modernization

Second destination transportation

Ammunition inspections and warehousing

Navy

Unobligated Operation and Maintenance balances

Overstatements of civilian personnel pay requirements

Naval aircraft depot maintenance

Damage control management

MK 45 gun depot overhaul

Marine Corps

Marine Corps shelters

Mobile corrosion protection Marine Corps

Air Force

B-52 flying hours

F-15 depot maintenance

B-52 depot maintenance

B-2 depot maintenance

Engine trailer life extension program

Land mobile radios

National Security Space Institute

Advanced ultrasonic inspection of aging aircraft structures

Defense-wide

Expanded prisoner of war/missing in action research in North Korea

Defense Security Cooperation Agency

Status of Operational Readiness and Training System

Defense Readiness Reporting System

Readiness and Environmental Protection Initiative

STARBASE Academies

Army Reserve

Mobile corrosion protection Army Reserve

Army Reserve military technician cost avoidance

Army National Guard

Aircraft humidity protection

Expandable Light Air Mobility Shelters

Extended Cold Weather Clothing System

Rapid Data Management System

Mobile corrosion protection Army National Guard

Weapons Skills Trainer

Emergency satellite communications

Air National Guard

Controlled humidity protection

Crypto-linguist and intelligence officer initiative

Items of Special Interest

Assessment of plans for contracting support in combatant command operational plans

Combatant Commander Initiative Fund

Commercial satellite communications

Defense Information Systems Agency working capital fund management

Funding for military morale, welfare, and recreation programs

Long-range facilities and construction planning at Army ammunition plants and arsenals

Standards for deployable shelters

Title IV--Military Personnel Authorizations

Subtitle A--Active Forces

End strengths for active forces (sec. 401)

Subtitle B--Reserve Forces

End strengths for Selected Reserve (sec. 411)

End strengths for Reserves on active duty in support of the Reserves (sec. 412)

End strengths for military technicians (dual status) (sec. 413)

Fiscal year 2009 limitation on number of non-dual status technicians (sec. 414)

Maximum number of Reserve personnel authorized to be on active duty for operational support (sec. 415)

Increased end strengths for Reserves on active duty in support of the Army National Guard and Army Reserve and military technicians (dual status) of the Army National Guard (sec. 416)

Modification of authorized strengths for Marine Corps Reserve officers on active duty in the grades of major and lieutenant colonel to meet new force structure requirements (sec. 417)

Subtitle C--Authorizations of Appropriations

Military personnel (sec. 421)

Budget Items

Military personnel funding changes

Military personnel unobligated balances

Title V--Military Personnel Policy

Subtitle A--Officer Personnel Policy

Modification of distribution requirements for commissioned officers on active duty in general and flag officer grades (sec. 501)

Modification of limitations on authorized strengths of general and flag officers on active duty (sec. 502)

Clarification of joint duty requirements for promotion to general or flag grades (sec. 503)

Modification of authorities on length of joint duty assignments (sec. 504)

Technical and conforming amendments relating to modification of joint specialty requirements (sec. 505)

Eligibility of reserve officers to serve on boards of inquiry for separation of regular officers for substandard performance and other reasons (sec. 506)

Modification of authority on Staff Judge Advocate to the Commandant of the Marine Corps (sec. 507)

Increase in number of permanent professors at the United States Air Force Academy (sec. 508)

Service creditable toward retirement for thirty years or more of service of regular warrant officers other than regular Army warrant officers (sec. 509)

Modification of requirements for qualification for issuance of posthumous commissions and warrants (sec. 510)

Subtitle B--Enlisted Personnel Policy

Increase in maximum period of reenlistment of regular members of the armed forces (sec. 521)

Subtitle C--Reserve Component Management

Modification of limitations on authorized strengths of reserve general and flag officers in active status (sec. 531)

Extension to other reserve components of Army authority for deferral of mandatory separation of military technicians (dual status) until age 60 (sec. 532)

Increase in mandatory retirement age for certain Reserve officers to age 62 (sec. 533)

Authority for vacancy promotion of National Guard and Reserve officers ordered to active duty in support of a contingency operation (sec. 534)

Authority for retention of reserve component chaplains and medical officers until age 68 (sec. 535)

Modification of authorities on dual duty status of National Guard officers (sec. 536)

Modification of matching fund requirements under National Guard Youth Challenge Program (sec. 537)

Report on collection of information on civilian skills of members of the reserve components of the armed forces (sec. 538)

Subtitle D--Education and Training

Authority to prescribe the authorized strength of the United States Naval Academy (sec. 551)

Tuition for attendance of certain individuals at the United States Air Force Institute of Technology (sec. 552)

Increase in stipend for baccalaureate students in nursing or other health professions under Health Professions Stipend Program (sec. 553)

Clarification of discharge or release triggering delimiting period for use of educational assistance benefit for reserve component members supporting contingency operations and other operations (sec. 554)

Payment by the service academies of certain expenses associated with participation in activities fostering international cooperation (sec. 555)

Subtitle E--Defense Dependents' Education Matters

Continuation of authority to assist local educational agencies that benefit dependents of members of the armed forces and Department of Defense civilian employees (sec. 561)

Impact aid for children with severe disabilities (sec. 562)

Transition of military dependent students among local educational agencies (sec. 563)

Subtitle F--Military Family Readiness

Authority for education and training for military spouses pursuing portable careers (sec. 571)

Subtitle G--Other Matters

Department of Defense policy on the prevention of suicides by members of the armed forces (sec. 581)

Relief for losses incurred as a result of certain injustices or errors of the Department of Defense (sec. 582)

Paternity leave for members of the armed forces (sec. 583)

Enhancement of authorities on participation of members of the armed forces in international sports competitions (sec. 584)

Pilot programs on career flexibility to enhance retention of members of the armed forces (sec. 585)

Prohibition on interference in independent legal advice by the Legal Counsel to the Chairman of the Joint Chiefs of Staff (sec. 586)

Items of Special Interest

Enhancing family support for the National Guard and reserve

Financial literacy

Legislative fellows from the Department of Defense

Premium conversion and flexible spending account options for service members

Report on implementation of Yellow Ribbon Reintegration Program

Secretary of Defense review of deferment from deployment policy following birth of a child

Title VI--Compensation and Other Personnel Benefits

Subtitle A--Pay and Allowances

Fiscal year 2009 increase in military basic pay (sec. 601)

Subtitle B--Bonuses and Special and Incentive Pays

Extension of certain bonus and special pay authorities for Reserve forces (sec. 611)

Extension of certain bonus and special pay authorities for health care professionals (sec. 612)

Extension of special pay and bonus authorities for nuclear officers (sec. 613)

Extension of authorities relating to payment of other bonuses and special pays (sec. 614)

Extension of authorities relating to payment of referral bonuses (sec. 615)

Permanent extension of prohibition on charges for meals received at military treatment facilities by members receiving continuous care (sec. 616)

Accession and retention bonuses for the recruitment and retention of psychologists for the armed forces (sec. 617)

Authority for extension of maximum length of service agreements for special pay for nuclear-qualified officers extending period of active service (sec. 618)

Incentive pay for members of precommissioning programs pursuing foreign language proficiency (sec. 619)

Subtitle C--Travel and Transportation Allowances

Shipment of family pets during evacuation of personnel (sec. 631)

Special weight allowance for transportation of professional books and equipment for spouses (sec. 632)

Travel and transportation allowances for members of the reserve components of the armed forces on leave for suspension of training (sec. 633)

Subtitle D--Retired Pay and Survivor Benefits

Presentation of burial flag to the surviving spouse and children of members of the armed forces who die in service (sec. 641)

Subtitle E--Other Matters

Separation pay, transitional health care, and transitional commissary and exchange benefits for members of the armed forces separated under surviving son or daughter policy (sec. 651)

Items of Special Interest

Aviation career incentive pay

Travel allowances for family of service members with serious psychiatric conditions

Title VII--Health Care Provisions

Subtitle A--TRICARE Program

Calculation of monthly premiums for coverage under TRICARE Reserve Select after 2008 (sec. 701)

Subtitle B--Other Health Care Authorities

Enhancement of medical and dental readiness of members of the armed forces (sec. 711)

Additional authority for studies and demonstration projects relating to delivery of health and medical care (sec. 712)

Travel for anesthesia services for childbirth for dependents of members assigned to very remote locations outside the continental United States (sec. 713)

Subtitle C--Other Health Care Matters

Repeal of prohibition on conversion of military medical and dental positions to civilian medical and dental positions (sec. 721)

Items of Special Interest

Chiropractic care for members of the armed forces

Comptroller General study on medical personnel requirements, shortfalls, and actions needed to resolve medical personnel shortages

Mental health and traumatic brain injury

Modification of security clearance questionnaire to reduce stigma for seeking mental health care

Organ and tissue donor program

Title VIII--Acquisition Policy, Acquisition Management, and Related Matters

Subtitle A--Provisions Relating to Major Defense Acquisition Programs

Inclusion of major subprograms to major defense acquisition programs under acquisition reporting requirements (sec. 801)

Inclusion of certain major information technology investments in acquisition oversight authorities for Major Automated Information System programs (sec. 802)

Configuration steering boards for cost control under major defense acquisition programs (sec. 803)

Subtitle B--Acquisition Policy and Management

Internal controls for procurements on behalf of the Department of Defense by certain non-defense agencies (sec. 811)

Contingency contracting corps (sec. 812)

Expedited review and validation of urgent requirements documents (sec. 813)

Incorporation of energy efficiency requirements into key performance parameters for fuel consuming systems (sec. 814)

Subtitle C--Amendments Relating to General Contracting Authorities, Procedures, and Limitations

Multiyear procurement authority for the Department of Defense for the purchase of alternative and synthetic fuels (sec. 821)

Modification and extension of pilot program for transition to follow-on contracts under authority to carry out certain prototype projects (sec. 822)

Exclusion of certain factors in consideration of cost advantages of offers for certain Department of Defense contracts (sec. 823)

Subtitle D--Department of Defense Contractor Matters

Database for Department of Defense contracting officers and suspension and debarment officials (sec. 831)

Ethics safeguards for employees under certain contracts for the performance of acquisition functions closely associated with inherently governmental functions (sec. 832)

Information for Department of Defense contractor employees on their whistleblower rights (sec. 833)

Subtitle E--Matters Relating to Iraq and Afghanistan

Performance by private security contractors of inherently governmental functions in an area of combat operations (sec. 841)

Additional contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel in Iraq and Afghanistan (sec. 842)

Clarification and modification of authorities relating to the Commission on Wartime Contracting in Iraq and Afghanistan (sec. 843)

Comprehensive audit of spare parts purchases and depot overhaul and maintenance of equipment for operations in Iraq and Afghanistan (sec. 844)

Subtitle F--Other Matters

Expedited hiring authority for the defense acquisition workforce (sec. 851)

Specification of Secretary of Defense as `Secretary concerned' for purposes of licensing of intellectual property for the defense agencies and defense field activities (sec. 852)

Repeal of requirements relating to the military system essential item breakout list (sec. 853)

Items of Special Interest

Contracting officer representatives

Database and after-action reports for multiyear contracts

Past performance information

Title IX--Department of Defense Organization and Management

Subtitle A--Department of Defense Management

Modification of status of Assistant to the Secretary of Defense for Nuclear and Chemical and Biological Defense Programs (sec. 901)

Participation of Deputy Chief Management Officer of the Department of Defense on Defense Business System Management Committee (sec. 902)

Repeal of obsolete limitations on management headquarters personnel (sec. 903)

General Counsel to the Inspector General of the Department of Defense (sec. 904)

Assignment of forces to the United States Northern Command with primary mission of management of the consequences of an incident in the United States homeland involving a chemical, biological, radiological, or nuclear device, or high-yield explosives (sec. 905)

Business transformation initiatives for the military departments (sec. 906)

Subtitle B--Space Matters

Space posture review (sec. 911)

Subtitle C--Defense Intelligence Matters

Requirement for officers of the armed forces on active duty in certain intelligence positions (sec. 921)

Transfer of management of Intelligence Systems Support Office (sec. 922)

Program on advanced sensor applications (sec. 923)

Title X--General Provisions

Subtitle A--Financial Matters

General transfer authority (sec. 1001)

Incorporation into Act of tables in the report of the Committee on Armed Services of the Senate (sec. 1002)

United States contribution to NATO common-funded budgets in fiscal year 2009 (sec. 1003)

Subtitle B--Naval Vessels and Shipyards

Government rights in designs of Department of Defense vessels, boats, craft, and components developed using public funds (sec. 1011)

Reimbursement of expenses for certain Navy mess operations (sec. 1012)

Subtitle C--Counter-Drug Activities

Extension of authority for joint task forces to provide support to law enforcement agencies conducting counter-terrorism activities (sec. 1021)

Two-year extension of authority for use of funds for unified counterdrug and counterterrorism campaign in Colombia (sec. 1022)

Subtitle D--Miscellaneous Authorities and Limitations

Procurement by State and local governments of equipment for homeland security and emergency response activities through the Department of Defense (sec. 1031)

Enhancement of the capacity of the United States Government to conduct complex operations (sec. 1032)

Crediting of admiralty claim receipts for damage to property funded from a Department of Defense working capital fund (sec. 1033)

Minimum annual purchase requirements for airlift services from carriers participating in the Civil Reserve Air Fleet (sec. 1034)

Termination date of base contract for the Navy-Marine Corps Intranet (sec. 1035)

Prohibition on interrogation of detainees by contractor personnel (sec. 1036)

Notification of Committees on Armed Services with respect to certain nonproliferation and proliferation activities (sec. 1037)

Sense of Congress on nuclear weapons management (sec. 1038)

Sense of Congress on Joint Department of Defense-Federal Aviation Administration Executive Committee on Conflict and Dispute Resolution (sec. 1039)

Sense of Congress on sale of new outsize cargo, strategic lift aircraft for civilian use (sec. 1040)

Subtitle E--Reports

Repeal of requirement to submit certain annual reports to Congress regarding allied contributions to the common defense (sec. 1051)

Report on detention operations in Iraq (sec. 1052)

Strategic plan to enhance the role of the National Guard and Reserves in the national defense (sec. 1053)

Review of nonnuclear prompt global strike concept demonstrations (sec. 1054)

Review of bandwidth capacity requirements of the Department of Defense and the intelligence community (sec. 1055)

Subtitle F--Wounded Warrior Matters

Modification of utilization of veterans' presumption of sound condition in establishing eligibility of members of the armed forces for retirement for disability (sec. 1061)

Inclusion of service members in inpatient status in wounded warrior policies and protections (sec. 1062)

Clarification of certain information sharing between the Department of Defense and Department of Veterans Affairs for wounded warrior purposes (sec. 1063)

Additional responsibilities for the wounded warrior resource center (sec. 1064)

Responsibility for the center of excellence in the prevention, diagnosis, mitigation, treatment, and rehabilitation of traumatic brain injury to conduct pilot programs on treatment approaches for traumatic brain injury (sec. 1065)

Center of excellence in the mitigation, treatment, and rehabilitation of traumatic extremity injuries and amputations (sec. 1066)

Three-year extension of Senior Oversight Committee with respect to wounded warrior matters (sec. 1067)

Subtitle G--Other Matters

Military salute for the flag during the national anthem by members of the armed forces not in uniform and by veterans (sec. 1081)

Modification of deadlines for standards required for entry to military installations in the United States (sec. 1082)

Items of Special Interest

Compliance with Rule XLIV of the Standing Rules of the Senate

Fully interoperable electronic health information for the Department of Defense and Department of Veterans Affairs

Interagency coordination and participation in post-conflict stability and reconstruction operations

National cyber security initiative

Nuclear security

Nutrition and dietary care for seriously ill and injured service members

Recovery care coordinators and medical care case managers for seriously wounded and ill service members

Refugee crisis in Iraq

United States Africa Command

Title XI--Civilian Personnel Matters

Department of Defense strategic human capital plans (sec. 1101)

Conditional increase in authorized number of Defense Intelligence Senior Executive Service personnel (sec. 1102)

Enhancement of authorities relating to additional positions under the National Security Personnel System (sec. 1103)

Expedited hiring authority for health care professionals of the Department of Defense (sec. 1104)

Election of insurance coverage by federal civilian employees deployed in support of a contingency operation (sec. 1105)

Permanent extension of Department of Defense voluntary reduction in force authority (sec. 1106)

Four-year extension of authority to make lump sum severance payments with respect to Department of Defense employees (sec. 1107)

Authority to waive limitations on pay for federal civilian employees working overseas under areas of United States Central Command (sec. 1108)

Technical amendment relating to definition of professional accounting position for purposes of certification and credentialing standards (sec. 1109)

Title XII--Matters Relating to Foreign Nations

Subtitle A--Assistance and Training

Increase in amount available for costs of education and training of foreign military forces under Regional Defense Combating Terrorism Fellowship Program (sec. 1201)

Authority for distribution to certain foreign personnel of education and training materials and information technology to enhance military interoperability with the armed forces (sec. 1202)

Extension and expansion of authority for support of special operations to combat terrorism (sec. 1203)

Modification and extension of authorities relating to program to build the capacity of foreign military forces (sec. 1204)

Extension of authority and increased funding for security and stabilization assistance (sec. 1205)

Four-year extension of temporary authority to use acquisition and cross-servicing agreements to lend military equipment for personnel protection and survivability (sec. 1206)

Authority for use of funds for non-conventional assisted recovery capabilities (sec. 1207)

Subtitle B--Department of Defense Participation in Bilateral, Multilateral, and Regional Cooperation Programs

Availability across fiscal years of funds for military-to-military contacts and comparable activities (sec. 1211)

Enhancement of authorities relating to Department of Defense regional centers for security studies (sec. 1212)

Payment of personnel expenses for multilateral cooperation programs (sec. 1213)

Participation of the Department of Defense in multinational military centers of excellence (sec. 1214)

Subtitle C--Other Authorities and Limitations

Waiver of certain sanctions against North Korea (sec. 1221)

Subtitle D--Reports

Extension and modification of updates on report on claims relating to the bombing of the Labelle Discotheque (sec. 1231)

Report on utilization of certain global partnership authorities (sec. 1232)

Title XIII--Cooperative Threat Reduction With States of the Former Soviet Union

Specification of Cooperative Threat Reduction programs and funds (sec. 1301)

Funding allocations (sec. 1302)

Title XIV--Other Authorizations

Summary and explanation of tables

Subtitle A--Military Programs

Working capital funds (sec. 1401)

National Defense Sealift Fund (sec. 1402)

Defense Health Program (sec. 1403)

Chemical agents and munitions destruction, defense (sec. 1404)

Drug interdiction and counter-drug activities, defense-wide (sec. 1405)

Defense Inspector General (sec. 1406)

Reduction in certain authorizations due to savings from lower inflation (sec. 1407)

Subtitle B--Armed Forces Retirement Home

Authorization of appropriations for Armed Forces Retirement Home (sec. 1421)

Subtitle C--Other Matters

Responsibilities for chemical demilitarization Citizens' Advisory Commissions in Colorado and Kentucky (sec. 1431)

Modification of definition of `Department of Defense Sealift Vessel' for purposes of the National Defense Sealift Fund (sec. 1432)

Budget Items

LHA(R) advance procurement and research and development

Traumatic brain injury and post traumatic stress disorder initiative

Department of Defense Inspector General

Item of Special Interest

Completion of destruction of chemical weapons stockpile

Title XV--Authorization of Additional Appropriations for Operations in Afghanistan

Overview

Explanation of Tables

Purpose (sec. 1501)

Army procurement (sec. 1502)

Navy and Marine Corps procurement (sec. 1503)

Air Force procurement (sec. 1504)

Joint Improvised Explosive Device Defeat Fund (sec. 1505)

Defense-wide activities procurement (sec. 1506)

Research, development, test, and evaluation (sec. 1507)

Operation and maintenance (sec. 1508)

Military personnel (sec. 1509)

Working capital funds (sec. 1510)

Other Department of Defense programs (sec. 1511)

Afghanistan Security Forces Fund (sec. 1512)

Treatment as additional authorizations (sec. 1513)

Special transfer authority (sec. 1514)

Limitation on use of funds (sec. 1515)

Requirement for separate display of budget for Afghanistan (sec. 1516)

Title XVI--Authorization of Additional Appropriations for Operations in Iraq

Overview

Explanation of Tables

Purpose (sec. 1601)

Army procurement (sec. 1602)

Navy and Marine Corps procurement (sec. 1603)

Air Force procurement (sec. 1604)

Joint Improvised Explosive Device Defeat Fund (sec. 1605)

Defense-wide activities procurement (sec. 1606)

Research, development, test, and evaluation (sec. 1607)

Operation and maintenance (sec. 1608)

Military personnel (sec. 1609)

Working capital funds (sec. 1610)

Defense Health Program (sec. 1611)

Iraq Freedom Fund (sec. 1612)

Iraq Security Forces Fund (sec. 1613)

Treatment as additional authorizations (sec. 1614)

Limitation on use of funds (sec. 1615)

Contributions by the Government of Iraq to large-scale infrastructure projects, combined operations, and other activities in Iraq (sec. 1616)

Division B--Military Construction Authorizations

Summary and explanation of funding tables

Short title (sec. 2001)

Expiration of authorizations and amounts required to be specified by law (sec. 2002)

Effective date (sec. 2003)

Title XXI--Army

Summary

Authorized Army construction and land acquisition projects (sec. 2101)

Family housing (sec. 2102)

Improvements to military family housing units (sec. 2103)

Authorization of appropriations, Army (sec. 2104)

Extension of authorizations of certain fiscal year 2005 projects (sec. 2105)

Extension of authorization of certain fiscal year 2006 project (sec. 2106)

Title XXII--Navy

Summary

Authorized Navy construction and land acquisition projects (sec. 2201)

Family housing (sec. 2202)

Improvements to military family housing units (sec. 2203)

Authorization of appropriations, Navy (sec. 2204)

Modification of authority to carry out certain fiscal year 2005 project inside the United States (sec. 2205)

Modification of authority to carry out certain fiscal year 2007 projects inside the United States (sec. 2206)

Title XXIII--Air Force

Summary

Authorized Air Force construction and land acquisition projects (sec. 2301)

Family housing (sec. 2302)

Improvements to military family housing units (sec. 2303)

Authorization of appropriations, Air Force (sec. 2304)

Extension of authorizations of certain fiscal year 2006 projects (sec. 2305)

Extension of authorizations of certain fiscal year 2005 projects (sec. 2306)

Budget Item

Planning and design, Air Force

Title XXIV--Defense Agencies

Summary

Subtitle A--Defense Agency Authorizations

Authorized defense agencies construction and land acquisition projects (sec. 2401)

Energy conservation projects (sec. 2402)

Authorization of appropriations, defense agencies (sec. 2403)

Modification of authority to carry out certain fiscal year 2007 project (sec. 2404)

Extension of authorization of certain fiscal year 2006 project (sec. 2405)

Subtitle B--Chemical Demilitarization Authorizations

Authorized chemical demilitarization program construction and land acquisition projects (sec. 2411)

Authorization of appropriations, chemical demilitarization construction, defense-wide (sec. 2412)

Modification of authority to carry out certain fiscal year 1997 project (sec. 2413)

Modification of authority to carry out certain fiscal year 2000 project (sec. 2414)

Title XXV--North Atlantic Treaty Organization Security Investment Program

Summary

Authorized NATO construction and land acquisition projects (sec. 2501)

Authorization of appropriations, NATO (sec. 2502)

Title XXVI--Guard and Reserve Forces Facilities

Summary

Authorized Army National Guard construction and land acquisition projects (sec. 2601)

Authorized Army Reserve construction and land acquisition projects (sec. 2602)

Authorized Navy Reserve and Marine Corps Reserve construction and land acquisition projects (sec. 2603)

Authorized Air National Guard construction and land acquisition projects (sec. 2604)

Authorized Air Force Reserve construction and land acquisition projects (sec. 2605)

Authorization of appropriations, Guard and Reserve (sec. 2606)

Extension of authorizations of certain fiscal year 2006 projects (sec. 2607)

Extension of authorizations of certain fiscal year 2005 project (sec. 2608)

Modification of authority to carry out certain fiscal year 2008 project (sec. 2609)

Budget Items

Planning and design, Army National Guard

Planning and design, Air National Guard

Planning and design, Air Force Reserve

Title XXVII--Base Closure and Realignment Activities

Summary and explanation of tables

Authorization of appropriations for base closure and realignment activities funded through Department of Defense base closure account 1990 (sec. 2701)

Authorized base closure and realignment activities funded through Department of Defense base closure account 2005 (sec. 2702)

Authorization of appropriations for base closure and realignment activities funded through Department of Defense base closure account 2005 (sec. 2703)

Modification of annual base closure and realignment reporting requirements (sec. 2704)

Technical corrections regarding authorized cost and scope of work variations for military construction and military family housing projects related to base closures and realignments (sec. 2705)

Title XXVIII--Military Construction General Provisions

Subtitle A--Military Construction Program and Military Family Housing Changes

Increase in threshold for unspecified minor military construction projects (sec. 2801)

Authority to use operation and maintenance funds for construction projects outside the United States (sec. 2802)

Improved oversight and accountability for military housing privatization initiative projects (sec. 2803)

Leasing of military family housing to Secretary of Defense (sec. 2804)

Cost-benefit analysis of dissolution of Patrick Family Housing LLC (sec. 2805)

Subtitle B--Real Property and Facilities Administration

Participation in conservation banking programs (sec. 2811)

Clarification of congressional reporting requirements for certain real property transactions (sec. 2812)

Modification of land management restrictions applicable to Utah national defense lands (sec. 2813)

Subtitle C--Land Conveyances

Transfer of proceeds from property conveyance, Marine Corps Logistics Base, Albany, Georgia (sec. 2821)

Subtitle D--Energy Security

Expansion of authority of the military departments to develop energy on military lands (sec. 2831)

Subtitle E--Other Matters

Report on application of force protection and anti-terrorism standards to gates and entry points on military installations (sec. 2841)

Items of Special Interest

Defense Access Roads criteria

Military construction reprogrammings

Title XXIX--War-Related Military Construction Authorizations

Summary

Subtitle A--Fiscal Year 2008 Projects

Authorized Army construction and land acquisition projects (sec. 2901)

Authorized Navy construction and land acquisition projects (sec. 2902)

Authorized Air Force construction and land acquisition projects (sec. 2903)

Termination of authority to carry out fiscal year 2008 Army projects (sec. 2904)

Subtitle B--Fiscal Year 2009 Projects

Authorized Army construction and land acquisition projects (sec. 2911)

Authorized Navy construction and land acquisition projects (sec. 2912)

Limitation on availability of funds for certain purposes relating to Iraq (sec. 2913)

Division C--Department of Energy National Security Authorizations and Other Authorizations

Title XXXI--Department of Energy National Security Programs

Overview

Subtitle A--National Security Programs Authorizations

National Nuclear Security Administration (sec. 3101)

Weapons activities

Directed stockpile work

Campaigns

Readiness in the technical base

Secure transportation asset

Nuclear weapons incident response

Safeguards and security

Facilities and infrastructure

Environmental projects and operations and transformation disposition

Stockpile surveillance testing

Construction projects

Defense Nuclear Nonproliferation programs

Nonproliferation and verification research and development

Nonproliferation and international security

International nuclear materials and cooperation

Fissile materials disposition

Naval reactors

Office of the Administrator

Defense environmental cleanup (sec. 3102)

Other defense activities (sec. 3103)

Defense nuclear waste disposal (sec. 3104)

Subtitle B--Program Authorizations, Restrictions, and Limitations

Modifications of functions of Administrator for Nuclear Security to include elimination of surplus fissile materials usable for nuclear weapons (sec. 3111)

Report on compliance with Design Basis Threat issued by the Department of Energy in 2005 (sec. 3112)

Modification of submittal of reports on inadvertent releases of restricted data (sec. 3113)

Nonproliferation scholarship and fellowship program (sec. 3114)

Review of and reports on Global Initiatives for Proliferation Prevention program (sec. 3115)

Title XXXII--Defense Nuclear Facilities Safety Board

Authorization (sec. 3201)

Legislative Requirements

Departmental Recommendations

Committee Action

Congressional Budget Office Cost Estimate

Regulatory Impact

Changes in Existing Law

110TH CONGRESS

Report

SENATE

2d Session

110-335
AUTHORIZING APPROPRIATIONS FOR FISCAL YEAR 2009 FOR MILITARY ACTIVITIES OF THE DEPARTMENT OF DEFENSE, FOR MILITARY CONSTRUCTION, AND FOR DEFENSE ACTIVITIES OF THE DEPARTMENT OF ENERGY, TO PRESCRIBE PERSONNEL STRENGTHS FOR SUCH FISCAL YEAR, AND FOR OTHER PURPOSES

May 12, 2008- Ordered to be printed

Mr. LEVIN, from the Committee on Armed Services, submitted the following

R E P O R T

[To accompany S. 3001]

The Committee on Armed Services reports favorably an original bill to authorize appropriations for the fiscal year 2009 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe personnel strengths for such fiscal year, and for other purposes, and recommends that the bill do pass.

PURPOSE OF THE BILL

This bill would:

Committee overview

The United States armed forces have been involved in armed conflict for more than 6 years--6 1/2 years in Afghanistan and 5 years in Iraq. Whether fighting in Afghanistan or Iraq, delivering humanitarian assistance to the victims of natural disasters in Asia or Africa, training foreign national forces to combat terrorism in their own countries, or assisting State and federal agencies responding to emergencies here at home, the men and women of our armed forces, both active and reserve, are serving honorably and courageously to promote and defend our Nation's interests. They do so often at great personal risk and significant sacrifice to themselves and their families.

After more than 6 years of war, our military, particularly our ground forces, are severely stressed. The Vice Chief of Staff of the Army, General Richard A. Cody, in testimony before the Readiness and Management Subcommittee of the Committee on Armed Services on April 1, 2008 stated, `Our readiness, quite frankly, is being consumed as fast as we can build it' and `I've never seen our lack of strategic depth be at where it is today.'

Moreover, the requirement for large numbers of forces in Iraq, coupled with an insufficient contribution from North Atlantic Treaty Organization (NATO) member nations, has left Afghanistan with a shortage of combatants and trainers. As the Chairman of the Joint Chiefs of Staff Admiral Michael Mullen noted on April 15, 2008, `So until we come down in numbers of brigades in Iraq, the brigade-size requirements in Afghanistan just aren't going to be met. That link is very direct.'

To date in this Second Session of the 110th Congress, the Committee on Armed Services has conducted 30 hearings and numerous briefings on the President's budget request for fiscal year 2009 and related defense matters. In order to provide a framework for the consideration of these matters, the committee identified seven priorities to guide its work on the National Defense Authorization Act for Fiscal Year 2009. These priorities are:

1. Provide fair compensation and first rate health care, and improve the quality of life of the men and women in the armed forces (active duty, National Guard and reserves) and their families.

2. Provide our servicemen and women with the resources, training, technology, equipment (especially force protection) and authorities they need to succeed in combat and stability operations in Iraq and Afghanistan.

3. Seek to reduce our Nation's strategic risk by taking action aimed at restoring, as soon as possible, the readiness of the military services to conduct the full range of their assigned missions.

4. Improve the efficiency of Department of Defense programs and activities, and apply the savings toward high-priority programs.

5. Improve the ability of the armed forces to counter nontraditional threats, including terrorism and the proliferation of weapons of mass destruction.

6. Promote the transformation of the armed forces to deal with the threats of the 21st century.

7. Ensure aggressive and thorough oversight of the Department's programs and activities to ensure proper stewardship of taxpayer dollars and compliance with relevant laws and regulations.

Explanation of funding summary

The administration's budget request for the national defense function of the federal budget for fiscal year 2009 was $542.5 billion for the so-called `base' budget, which excludes the costs of operations in Iraq and Afghanistan. This amount includes scorekeeping adjustments by the Congressional Budget Office. The President has also requested an additional $70.0 billion in emergency defense funding for operations in Iraq and Afghanistan. The combined total requested by the President for the national defense budget function was $612.5 billion.

The following table summarizes both the direct authorizations and the equivalent budget authority levels for fiscal year 2009 defense programs. The columns relating to the authorization request do not include funding for items that are not within the jurisdiction of this committee or that do not require an annual authorization. The table also includes the authorization for spending from the trust fund of the Armed Forces Retirement Home, which is outside the national defense budget function.

Funding for all programs in the national defense function is reflected in the columns related to the budget authority request and the total budget authority implication of the authorizations in this bill. The committee recommends funding for national defense programs totaling $612.5 billion in budget authority, which is consistent with the President's budget request and with the funding levels for national defense in the Concurrent Resolution on the Budget for Fiscal Year 2009 (S. Con. Res. 70) adopted by the Senate on March 13, 2008.

In order to clearly identify the cost of war, funding for operations in Afghanistan is contained in title XV of this Act, and funding for operations in Iraq is contained in title XVI of this Act. Titles XV and XVI authorize funding for personnel, operation and maintenance, procurement, health care, working capital funds, and other costs normally funded in division A of this Act. Titles XV and XVI authorize $69.5 billion for operations in Afghanistan and Iraq.

Title XXIX of this act authorizes an additional $500.0 million for war-related military construction, in particular, for additional warrior transition units to care for injured military personnel, whether such illness or injury resulted from operations in Iraq or Afghanistan or from other operations.

In total, this bill authorizes $70.0 billion in war-related funding, the same amount requested by the President and approved by the Senate in the Concurrent Resolution on the Budget for Fiscal Year 2009.

In accordance with views and estimates of this committee to the Senate Committee on the Budget for fiscal year 2009, the committee bill does not designate any of the funding authorized by this Act as emergency spending. The committee continues to believe that the expected costs of longstanding operations such as those in Iraq and Afghanistan should be included in the budget request and should not be treated as emergencies.

The committee also continues to believe the financial cost of war should be as transparent as possible. In an effort to promote and enhance such transparency, the committee bill allocates funding to operations in Afghanistan and Iraq separately.

The committee notes that on February 8, 2008, Secretary of Defense Robert Gates stated that, `I worry that for many Europeans the missions in Iraq and Afghanistan are confused . . . I think that they combine the two . . . Many of them, I think, have a problem with our involvement in Iraq and project that to Afghanistan, and do not understand the very different--for them--the very different kind of threat.' The committee shares this concern, and has included a provision that would require future budget or supplemental requests to allocate funds separately for operations in Afghanistan.

The $70.0 billion requested by the President for these operations in the budget contains no supporting detail at the service, account, or line-item level, nor does it allocate such funding between operations in Iraq and Afghanistan. Furthermore, this $70.0 billion is a `placeholder' that does not purport to represent the full cost of these operations during fiscal year 2009. While the committee understands that projecting costs of ongoing operations where force levels are changing cannot be an exact science, the committee does believe that by omitting any supporting details and by not including a realistic estimate of the full year cost of these operations, the budget request failed to fully comply with the requirements of section 1008 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364).

The committee anticipates a future supplemental request for additional funds for operations in Iraq and Afghanistan and will consider such a request when it becomes available.

Insert graphic folio 32 here SR335.001

Insert graphic folio 33 here SR335.002

Insert graphic folio 34 here SR335.003

Insert graphic folio 35 here SR335.004

Insert graphic folio 36 here SR335.005

Insert graphic folio 37 here SR335.006

Insert graphic folio 38 here SR335.007

Insert graphic folio 39 here SR335.008

Insert graphic folio 40 here SR335.009

DIVISION A--DEPARTMENT OF DEFENSE AUTHORIZATIONS

TITLE I--PROCUREMENT

SUBTITLE A--AUTHORIZATION OF APPROPRIATIONS

Explanation of tables

The following tables provide the program-level detailed guidance for the funding authorized in title I of this Act. The tables also display the funding requested by the administration in the fiscal year 2009 budget request for procurement programs, and indicate those programs for which the committee either increased or decreased the requested amounts.

These tables are incorporated by reference into this Act as provided in section 1002 of this Act. The Department of Defense may not exceed the authorized amounts (as set forth in the tables or, if unchanged from the administration request, as set forth in budget justification documents of the Department of Defense) without a reprogramming action in accordance with established procedures. Unless noted in this report, funding changes to the budget request are made without prejudice.

Insert graphic folio 42 SR335.010

SUBTITLE B--ARMY PROGRAMS

Insert graphic folio 44 SR335.011

Insert graphic folio 45 SR335.012

Insert graphic folio 46 SR335.013

Insert graphic folio 47 SR335.014

Insert graphic folio 48 SR335.015

Insert graphic folio 49 SR335.016

Insert graphic folio 50 SR335.017

Insert graphic folio 51 SR335.018

Insert graphic folio 52 SR335.019

Insert graphic folio 53 SR335.020

Insert graphic folio 54 SR335.021

Insert graphic folio 55 SR335.022

Insert graphic folio 56 SR335.023

Insert graphic folio 57 SR335.024

Insert graphic folio 58 SR335.025

Insert graphic folio 59 SR335.026

Insert graphic folio 60 SR335.027

Insert graphic folio 61 SR335.028

Insert graphic folio 62 SR335.029

Insert graphic folio 63 SR335.030

Insert graphic folio 64 SR335.031

Insert graphic folio 65 SR335.032

Insert graphic folio 66 SR335.033

Insert graphic folio 67 SR335.034

Stryker Mobile Gun System (sec. 111)

The committee recommends a provision that would require the Secretary of Defense, through the Director of Operational Test and Evaluation (DOT&E), to ensure that the Stryker Mobile Gun System (MGS) is subject to testing to confirm the efficacy of any actions taken to mitigate operational effectiveness, suitability, and survivability deficiencies identified in Initial Operational Test and Evaluation and Live Fire Test and Evaluation. The provision would also require the Secretary of the Army to provide quarterly updates to the congressional defense committees on the status of the corrective measures and expand section 117(a) of the National Defense Authorization Act (NDAA) for Fiscal Year 2008 (Public Law 110-181) to future fiscal years.

In January 2007, the Army decided to deploy the Stryker MGS with the Stryker Brigade Combat Team (SBCT) that was deploying to Iraq. This was done despite the DOT&E's concern that planned operational and live fire ballistic test and evaluation were not complete and were not yet adequate to support a final assessment of MGS crew and system survivability, operational effectiveness, and operational suitability.

In response to the Army's decision, Public Law 110-181 included a provision prohibiting the obligation or expenditure of funds for the procurement of the Stryker MGS until 30 days after the Secretary of the Army certifies to Congress that the Stryker MGS is operationally effective, suitable, and survivable for its anticipated deployment missions or until the Secretary of Defense waives the limitation on MGS funding by determining that further procurement of the Stryker MGS is in the national security interest of the United States.

In February 2008, DOT&E provided a report to Congress on the results of the operational and live fire ballistic test and evaluation events. The report confirmed the January 2007 concerns of DOT&E's early fielding report and concluded that the Stryker MGS continues to have problems associated with its survivability, operational effectiveness, and operational suitability. More specifically, the February 2008 report cited mission equipment package failures, `fightability' shortfalls, and, even more troubling, unique survivability shortfalls that place MGS crews at greater risk than crews in other Stryker variants.

The committee remains troubled by the Army's decision to deploy low-rate initial production models to Iraq, and believes that no more Stryker MGS's should be deployed until the Army takes the actions necessary to make the Stryker MGS operationally effective, suitable, and survivable. For this reason, the provision recommended by the committee would extend the limitation in section 117(a) on the procurement of additional Stryker MGS units until appropriate action is taken.

Procurement of small arms (sec. 112)

The committee recommends a provision that would require the Secretary of the Army to submit, within 90 days of enactment of this act, a report on the small arms Capabilities Based Assessment conducted by the Army's Training and Doctrine Command. This assessment is overdue. The Army had indicated to the committee that it would complete the small arms Capabilities Based Assessment by August 2007 and failed to do so. Accordingly, the committee recommends withholding authority to obligate more than 75 percent of the aggregate amount authorized to be appropriated for fiscal year 2009 and available for the Guardrail Common Sensor until the report has been delivered.

In the event that the Capabilities Based Assessment identifies gaps in current small arms capability that require a new individual weapon, the committee recommends that the acquisition of such weapons should result from a full and open competition. The committee further recommends that the Secretary of Defense submit a report on the feasibility and advisability of conducting a full and open competition for carbine-type rifles.

BUDGET ITEMS--ARMY

Chief of Staff of the Army's unfunded priorities list

The Chief of Staff of the Army's unfunded priorities list for fiscal year 2009 addresses Army National Guard equipment shortfalls required to accomplish its dual responsibilities--to the States for crisis response and homeland security and to the nation for the defense of the United States and its interests. The items requested such as communications equipment, vehicles, driver vision enhancement equipment, night vision goggles, and water purification equipment will significantly enhance the Guard's ability to respond to contingencies at home.

The committee welcomes this clear and substantial commitment on the part of the Army to restore and improve the homeland defense capabilities and readiness of the National Guard. Accordingly, the committee recommends a total increase in Army procurement of $391.2 million for dual-purpose equipment in support of National Guard readiness.

The specific account increases are as follows--the committee recommends an increase of $369.5 million in Other Procurement, Army, which includes: $28.8 million for additional night vision devices; $15.0 million for super high frequency terminals; $4.0 million for tactical satellite equipment upgrades; $5.9 million for life cycle software support; $5.9 million for additional automatic identification systems; $5.9 million for additional transportation coordinator's automated information for movement system equipment; $5.9 million for combat service support communications equipment; $1.2 million for additional water purification systems; $22.8 million for commercial off-the-shelf tactical radio equipment; $52.5 million for additional driver vision enhancement systems; $5.4 million for additional field feeding systems; $43.1 million for additional heavy equipment transporter systems; $300,000 for additional logistics automation systems; $1.4 million for medical communication and combat casualty care equipment; $4.3 million for additional combat medical support equipment; $16.5 million for additional defense advanced Global Positioning System receivers; $2.4 million for additional spares; $1.0 million for additional graders; $3.0 million for additional skid steer loaders; $1.0 million for additional scrapers; $1.0 million for additional water distributors; $1.0 million for additional engineer mission module water distributors; $2.0 million for additional loaders; $2.0 million for additional tractors; $1.0 million for additional cranes; $8.0 million for additional high mobility engineer excavators; $1.0 million for construction equipment; $80.7 million for additional palletized loading systems; and $44.6 million for additional tactical electric generators.

The committee also recommends an increase of $19.6 million in Aircraft Procurement, Army, which includes: $11.3 million for additional avionics navigation equipment; $249,000 for avionics support equipment; $2.4 million for aircrew integrated systems; $5.5 million for air traffic control equipment; $116,000 for additional avionics and airborne instrumentation equipment; and $2,000 for high frequency radio equipment.

In addition, the committee recommends an increase of $2.2 million in weapons and tracked combat vehicles for additional small arms.

Each of the committee's recommended increases is reflected in title I of the Army procurement tables.

Armed Reconnaissance Helicopter

The budget request included $358.8 million in Aircraft Procurement, Army (APA) for the Armed Reconnaissance Helicopter (ARH). The committee appreciates the operational necessity of replacing the aging OH-58D Kiowa Warrior and replacing combat losses from the force structure. The committee has in the past supported the Army's efforts to get the ARH program on track. However, the committee believes that the Army is pursuing an overly ambitious ARH development and fielding program, given performance problems by the contractor. Decisions regarding the acquisition approach and schedule for the ARH program have been delayed by at least half a year, with no change in the procurement program. The committee also notes that the Defense Acquisition Board will meet in July 2008 to consider another restructuring of this program. Such an ambitious program exposes the Army to significant cost, performance, and schedule risk, and may not result in fielding this capability to the warfighter any sooner.

Therefore, the committee recommends a decrease of $75.0 million in APA for procurement of ARH.

Forward-looking infrared radar systems

The budget request included $10.9 million in Aircraft Procurement, Army for utility helicopter modifications. This funding will procure and field a number of safety modifications for the UH-60 Blackhawk helicopter. The committee recommends an increase of $3.0 million for the procurement of additional forward-looking infrared radar systems for the UH-60 Blackhawk helicopters.

Grenades Army

The budget request included $71.6 million in Procurement of Ammunition, Army (PAA) for grenades. The committee recommends an increase of $7.0 million in PAA for the procurement of additional grenades.

Radford Ammunition Plant upgrades

The budget request included $187.4 million in Procurement of Ammunition, Army (PAA) for the provision of industrial facilities. The committee is encouraged by the Army's commitment to its ammunition plants and supports plans to accelerate repair or modernization of these facilities to improve efficiency, safety, and reduce environmental risk. The committee is particularly concerned about modernization at Radford Army Ammunition Plant. Radford is the sole North American provider for many of the propellants and explosives used in munitions. The committee recommends an increase of $20.0 million in PAA for production, safety, and environmental upgrades at Radford Army Ammunition Plant.

Bomb line modernization

The budget request included $187.4 million in Procurement of Ammunition, Army (PAA) for the provision of industrial facilities, but provided no funds for bomb line modernization at the McAlester Army Ammunition Plant, Oklahoma. The committee recommends an increase of $1.0 million in PAA for bomb line modernization.

Area Common User System Modernization

The budget request included $85.3 million in Other Procurement, Army for the Warfighter Information Network--Tactical (WIN-T) Area Common User System Modernization (ACUS-Mod) program. This program is intended to provide ongoing and planned modifications, upgrades, and recapitalization of the Mobile Subscriber Equipment (MSE) and Tri-Service Tactical (TRI-TAC) communications systems.

According to the Army, there are currently 19 units with MSE and TRI-TAC equipment and each of these units is currently developing a disposition and turn-in plan for their equipment. However, some limited equipment purchases are required to support the single shelter switch, battlefield video teleconference, secure tactical fax, and tropo-scatter radio systems currently deployed in Iraq and Afghanistan.

Given the rapidly declining number of units using the equipment provided by the ACUS-Mod program, the committee recommends a decrease of $42.0 million, leaving more than 50 percent of the funding for the limited equipment purchases needed to support deployed equipment.

Army Global Command and Control System

The budget request included $33.5 million in Other Procurement, Army for the Army Global Command and Control System (GCCS) program. The committee recommends a reduction of $4.7 million. Given constrained resources and the current fielding schedule for GCCS--Army, the committee believes procurement of Net-Enabled Command Capability equipment is not required at this time. Additional concerns about the GCCS--Army program are discussed in title II of this Act.

Information Technology Upgrades

The budget request included $231.3 million in Other Procurement, Army for the Installation Information Infrastructure Modernization program (I3MP). The committee notes that high bandwidth connectivity provides military users with enhanced capabilities for data, voice, and video communications. These capabilities enable military organizations to better support deployed forces and other Department of Defense activities. The committee recommends an additional $3.0 million for hardware enhancements to the Defense Information System Network, especially to increase network geographic diversity and alternative data pathways.

Fido explosives detector

The budget request included $46.8 million in Other Procurement, Army (OPA) for ground standoff mine detection systems, but provided no funds for the Fido explosives detector. The Fido explosives detector is deployed and in use by units in Iraq to counter improvised explosive devices and land mines. The committee recommends an increase of $6.0 million in OPA for additional Fido explosives detectors.

Land Warrior

The budget request did not include any funds in Other Procurement, Army (OPA) for the Land Warrior system. The committee remains concerned that the Army has terminated this program despite significant investment, its promising test results, and its performance in combat.

Last year the Department of Defense Director of Operational Test and Evaluation (DOT&E) assessed Land Warrior during tests with the 4th Battalion, 9th Infantry, a Stryker unit preparing to deploy to Iraq. The Director, in a carefully worded report to this committee, determined that the system was `on track' to be operationally effective and suitable, even though it had not completed its Initial Operational Test. DOT&E also indicated that the system's test items could deploy to Iraq with the 4th Battalion, 9th Infantry, the Army approved the plan, and the battalion is using the system effectively today.

In testimony to the committee this year, the Army indicated that it will move forward with the program based on the test results and the feedback from the soldiers of the 4th Battalion, 9th Infantry. Additionally, the Army included in its fiscal year 2008 supplemental appropriation request sufficient funding to outfit a brigade combat team with Land Warrior equipment.

The committee is encouraged by the Army's action and recommends accelerating the procurement of the system to include enough equipment to outfit a second brigade combat team preparing to deploy to Iraq or Afghanistan. Accordingly, the committee recommends an increase of $102.0 million in OPA for additional Land Warrior systems.

Combat Arms Training System

The budget request included $218.6 million in Other Procurement, Army (OPA) for non-system training devices. The Army is upgrading the Combined Arms Training System (CATS). Funds authorized would be used to upgrade 1,900 fielded systems and procure additional simulated weapons. The committee recommends an increase of $6.0 million in OPA for CATS.

Immersive Group Simulation Virtual Training System

The budget request included $218.6 million in Other Procurement, Army (OPA) for non-system training devices, but provided no funding for the Immersive Group Simulation Virtual Training System (IGS-VTS). The IGS-VTS is a fully immersive, interactive virtual reality platform that supports soldier vehicle training. The committee recommends an increase of $6.0 million in OPA for the IGS-VTS.

Joint Fires and Effects Trainer System

The budget request included $3.1 million in Other Procurement, Army (OPA) for the Call for Fire Trainer (CFFT), but included no funds for the Joint Fires and Effects Trainer System (JFETS) project. JFETS is a next-generation, virtual reality call for fire training simulation. The committee recommends an increase of $5.0 million in OPA for JFETS.

Laser collective combat advanced training system

The budget request included $218.6 million in Procurement of Ammunition, Air Force (PAAF) for non-system training devices, but included no funds for the laser collective combat advanced training system. This is a comprehensive laser-based marksmanship training system and is currently in use by units for urban operations, reflexive fire training, close-quarters marksmanship, and movement to contact drills. The committee recommends an increase of $8.0 million in OPA for the laser collective combat advanced training system.

Urban training center instrumentation

The budget request included $218.6 million in Other Procurement, Army (OPA) for non-system training devices. The committee notes that the Army's readiness and rotation training strategies call for units to accomplish more of their mission training and rehearsals at their local training areas and facilities. The Army is using several technologies to increase the flexibility and value of local training ranges and facilities including the Deployable Range Package, the Homestation Instrumentation System, and the Integrated Military Operations in Urbanized Terrain Training System. The committee recommends an increase of $2.9 million in OPA for the instrumentation of a regional urban operations training center.

Operator driving simulators

The budget request included $218.6 million in Other Procurement, Army (OPA) for non-system training devices. Additional driving simulators would allow deploying soldiers to maximize their training time while providing a realistic experience without risk to personnel or equipment. The committee recommends an increase of $5.0 million in OPA for operator driving simulators.

Joint Improvised Explosive Device Defeat Fund

The budget request included a total of $496.3 million for the Joint Improvised Explosive Device Defeat Fund (JIEDDF), of which $306.3 million was for the Joint Improvised Explosive Device Defeat Organization (JIEDDO) attack the network line of operation, $88.3 million was for the JIEDDO train the force line of operation, and $101.7 million was for the JIEDDO staff and infrastructure line of operation.

The committee recommends a transfer of $496.3 million in the JIEDDF to titles XV and XVI of this Act. The committee remains supportive of JIEDDO, but believes that JIEDDO's expenses are war-related and should be accounted for in the appropriate war-related accounts in titles XV and XVI of this Act.

Improvised Explosive Devices (IED) are the weapon of choice for terrorist organizations throughout the world because they provide high profile, lethal attacks that attract attention, provide propaganda, and expose vulnerabilities.

The committee understands the Department of Defense is currently reviewing the JIEDDO mandate to determine how best to leverage JIEDDO's capability to counter a future unknown threat, recognizing that the enemy's current weapon of choice is the IED and that this threat will evolve. The committee welcomes this initiative by the Department and expects that the Department will be able to develop a more clear path forward for JIEDDO in the fiscal year 2010 budget submission.

JIEDDO has been able to stand up quickly an organization capable of responding to the various IED threats that U.S. forces face in Iraq and Afghanistan, but the committee is concerned that JIEDDO's expanding budget, manpower, and associated responsibilities have surpassed the Department's ability to adequately oversee the activities of JIEDDO in a manner that ensures no duplication of effort and the most effective delivery of equipment and capabilities to the warfighter.

The Government Accountability Office and the Defense Science Board have raised similar concerns. If JIEDDO is to continue to implement material solutions across all Department components, the Department must reevaluate JIEDDO's authorities and determine whether JIEDDO should be a permanent organization and where it should be subordinated.

SUBTITLE C--NAVY PROGRAMS

Insert graphic folio 79 SR335.035

Insert graphic folio 80 SR335.036

Insert graphic folio 81 SR335.037

Insert graphic folio 82 SR335.038

Insert graphic folio 83 SR335.039

Insert graphic folio 84 SR335.040

Insert graphic folio 85 SR335.041

Insert graphic folio 86 SR335.042

Insert graphic folio 87 SR335.043

Insert graphic folio 88 SR335.044

Insert graphic folio 89 SR335.045

Insert graphic folio 90 SR335.046

Insert graphic folio 91 SR335.047

Insert graphic folio 92 SR335.048

Insert graphic folio 93 SR335.049

Insert graphic folio 94 SR335.050

Insert graphic folio 95 SR335.051

Insert graphic folio 96 SR335.052

Insert graphic folio 97 SR335.053

Insert graphic folio 98 SR335.054

Insert graphic folio 99 SR335.055

Insert graphic folio 100 SR335.056

Insert graphic folio 101 SR335.057

Insert graphic folio 102 SR335.058

Insert graphic folio 103 SR335.059

Authority for advanced procurement and construction of components for the Virginia-class submarine program (sec. 131)

The committee recommends a provision that would modify the multiyear authority provided in section 121 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181). The provision would modify section 121 to permit the Secretary of the Navy to enter into one or more contracts on the Virginia-class submarine program, for which authorization to enter a multiyear procurement contract was granted under section 121, that could include advance construction activities if he determines that such action would yield greater cost savings or construction efficiencies.

The Navy believes that having such an option available could help achieve greater cost savings and production efficiencies as the program increases throughput to a rate of two boats per year in fiscal year 2011.

Refueling and complex overhaul of the USS Theodore Roosevelt (sec. 132)

The committee recommends a provision that would provide a one-time exemption to the normal full funding policy to allow for contracting of a 3-year incrementally-funded aircraft carrier refueling complex overhaul (RCOH) from the Shipbuilding and Conversion, Navy (SCN) account. This language would provide the Navy with the authority to commence the refueling overhaul in fiscal year 2009. The Navy informs the committee that this would help level the workload at the shipyard and avoid an overhead increase of approximately $50.0 million across the future-years defense program. The Department of Defense has requested that this be a one-time authorization, not one to be extended into future years.

BUDGET ITEMS

E-2D Advanced Hawkeye

The budget request included $496.4 million in Aircraft Procurement, Navy (APN) for three E-2D Advanced Hawkeye aircraft. The E-2D aircraft will provide improved airborne early warning and surveillance capability to support carrier strike groups in naval, joint, and coalition operations. In fiscal year 2008, the administration requested--and the Congress authorized and appropriated--funding for three research and development E-2D aircraft. The committee notes that the E-2D program has experienced several delays in aircraft production over the past year due to development difficulties with the advanced radar. Those delays threaten to postpone the Milestone C decision for low rate initial production, currently scheduled for the end of the second quarter of fiscal year 2009, which would reduce the need for production effort funded by the fiscal year 2009 budget. Accordingly, the committee recommends the Navy decrease their planned procurement of low rate initial production of E-2D aircraft in fiscal year 2009 by one aircraft.

The committee recommends a reduction of $165.5 million in APN for the E-2D Advanced Hawkeye aircraft.

H-53 modifications

The budget request included $56.4 million in Aircraft Procurement, Navy (APN) for modifications of H-53 helicopters, of which $2.9 million is for the Integrated Mechanical Diagnostics Health and Usage Management System (IMDS). Since 2001, the Marines have been equipping the fleet of H-53 helicopters with the IMDS. The systems flying have already provided a significant improvement in aircraft readiness rates and ability to maintain the aircraft to support high tempo operations, while simultaneously improving the accuracy of the fleet health and material status reporting. The replacement for the current CH-53, the CH-53K, is years away from achieving initial operational capability, so buying additional IMDS kits would still make a significant contribution to the readiness of the fleet.

Therefore, the committee recommends an increase of $8.0 million for the procurement of additional IMDS systems.

P-3 modifications

The budget request included $152.7 million in Aircraft Procurement, Navy (APN) for continuation of the Special Structural Inspection-Kits (SSI-K) program, which replaces fatigue-limited airframe structural components to enable the airframe to fully reach its designed service life.

Analysis that was conducted as part of the ongoing fatigue life management program determined that an area of the P-3 wing surface not included in the SSI-K program, designated as Zone 5, has much worse predicted fatigue than previously estimated. These results caused the Navy to ground 39 of 130 mission aircraft in December 2007, and to initiate long-term mitigation efforts to correct the critical deficiencies.

Due to the emergent nature of this P-3 sustainment issue, the budget request does not include funding for Zone 5 kit material and installation. The Chief of Naval Operations has identified the correction of this critical operational and safety of flight issue as the Navy's top unfunded priority. The committee recommends an increase of $160.0 million in APN to fund P-3 wing crack repair kits.

Common ECM equipment

The budget request included $66.4 million in Aircraft Procurement, Navy (APN), common electronic countermeasures (ECM) equipment, but included no funds to procure upgrades for the AN/AAR-47 missile warning system to incorporate hostile fire indications capability. This system improvement would provide aircrews with warning of anti-aircraft artillery, rocket-propelled grenade, or small arms fire. This capability would undoubtedly assist Navy and Marine Corps aircrews in avoiding or exiting dangerous environments. The committee believes that the Department of the Navy should be fielding this capability as a priority for aircraft potentially exposed to such situations.

The committee recommends an increase of $10.0 million in APN to begin fielding the hostile fire indications capability for the AN/AAR-47 missile warning system.

Weapons industrial facilities

The budget request included $3.3 million for various activities at government-owned, contractor-operated weapons industrial facilities. The committee recommends an increase of $30.0 million to accelerate the facilities restoration program at the Allegany Ballistics Laboratory.

Grenades Marine Corps

The budget request included $39.0 million in Procurement of Ammunition, Navy and Marine Corps (PANMC) for grenades. The committee recommends an increase of $9.0 million in PANMC for the procurement of additional grenades.

Virginia-class submarine advance procurement

The budget request included approximately $1.3 billion for advance procurement for the Virginia-class submarine program, including $596.8 million for economic order quantity (EOQ) procurement of long lead material in conjunction with the current multiyear procurement program.

Congress approved the Navy's request to enter into a multiyear procurement contract in the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181), and added $588.0 million to help accelerate increasing the attack submarine program to a rate of two boats per year. At that time, the Navy planned to increase production to a rate of two boats per year in fiscal year 2012.

This year, as a part of the fiscal year 2009 request, the Navy plans to accelerate that production increase to fiscal year 2011. The Navy has also identified that additional EOQ funding in fiscal year 2009 and additional authority to conduct advance construction activities would help achieve greater cost savings and production efficiencies, and reduce the span time for construction as the program increases throughput to a rate of two boats per year in fiscal year 2011.

Therefore, the committee recommends an increase for EOQ funding of $79.0 million. The committee also recommends a provision (described elsewhere) that would give the Navy authority to contract for advance construction activities for which authorization to enter a multiyear procurement contract was granted under section 121 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181).

Littoral combat ship

The budget request included $920.0 million in Shipbuilding and Conversion, Navy (SCN) for the construction of two Littoral Combat Ships (LCS). The Navy intends this to be a relatively smaller, more affordable vessel that carries modular payloads. The Navy concept is that on one day, an LCS might be configured to operate as an anti-submarine vessel. However, as mission needs change, it could rapidly change the whole mission payload within a day or so, and operate in an anti-surface warfare or mine warfare mode.

Each of the two prime contractor teams had contracts to build two ships. The prime contractors have teamed with smaller shipyards in both cases in order to keep LCS costs lower than would be possible in one of the major yards that normally build Navy ships.

The first ship (LCS-1) was scheduled to deliver in late 2006. The Navy is now estimating that the first ship will deliver sometime in late 2008. The LCS-1 contractor team had barely started on their second ship (LCS-3) when the program ran into major cost problems earlier last year. The Navy then issued a stop work order on LCS-3 in order to reduce expenditures and limit further cost exposure on the program while it separately re-evaluated program cost estimates.

The Navy entered into negotiations with the LCS-1 team to sign up to a fixed price contract on the two ships or face outright cancellation on the second ship. The Navy terminated the contract for LCS-3 for the convenience of the government. As a result of that termination, the government will take delivery of some sizeable inventory of equipment and material for the cancelled LCS-3.

The second contractor team had a contract to build two LCS vessels of another design (LCS-2 and LCS-4). The Navy awarded this contract almost a year later, so LCS-2 was roughly 1 year behind the LCS-1. The Navy went ahead with activities leading to the start of construction on LCS-4, despite internal warnings that the second contractor would face similar cost and schedule problems as those faced by the first contractor. Late last year, the same poor performance and fixed priced negotiation scenario also played out on the LCS-2 and LCS-4. This led the Navy to also cancel the LCS-4, again with the result that the government will take delivery of some sizeable inventory of equipment and material for the cancelled LCS-4.

Section 125 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) places a cost ceiling on LCS contracts of $460.0 million per ship, a dollar value provided by the Navy. Congress also authorized and appropriated one LCS in fiscal year 2008.

The Navy has not awarded the one LCS approved in the fiscal year 2008 budget. The Navy's acquisition strategy, which has been extremely fluid, is to award this ship, plus the two ships from the fiscal year 2009 program later this calendar year. The Navy's intent is that the award be a limited competition, with each yard assured of being awarded at least one ship.

The total funding provided in fiscal year 2007 and prior budgets for the six previously authorized Littoral Combat Ships totals $1,639.0 million. The Navy has determined that $1,162.0 million of these funds is required for construction, test, trials, outfitting, and post-delivery of LCS-1 and LCS-2. The remaining $477.0 million funding is allocated against the terminated ships, LCS-3 and LCS-4, including material purchased for those ships prior to termination. Within the remaining funding allocated against the terminated ships, sufficient funding should also be available for LCS class design to ensure that the follow-on ships commence production with `clean,' producible drawings and planning products. Presuming the Navy maintains stable design requirements, the availability of clean drawings and planning products should ensure healthy learning curve performance in production. This learning curve performance, in conjunction with material purchased in prior years (from the terminated ships), should more than offset the effects of one year's escalation for ships purchased in 2009.

The fiscal year 2008 budget has resources sufficient to award one LCS within the cost cap to either shipyard, when taking into account the inventory of equipment and material available from that shipyard's cancelled ship. The Navy would provide this equipment and material to the shipyard that wins the fiscal year 2008 ship as government furnished material (GFM). The value of this GFM would count against the cost cap.

Under their plan, the Navy would also award at least one of the two ships in the fiscal year 2009 budget to the other shipyard. The Navy would likewise provide the GFM from that shipyard's cancelled ship to offset the cost of that one ship. Similarly, the value of this GFM would count against the cost cap on this ship as well.

The fiscal year 2009 budget request, however, would fund both ships to the full cost cap and not take the value of this GFM for the second cancelled ship into account. This means that the budget request of $920.0 million includes more funding than can be placed on contract without violating the cost cap, unless the Navy were to withhold the GFM for the second shipyard.

The committee believes that the Navy should apply the GFM to both contractors' vessels as soon as a second ship is purchased from either yard. Therefore, the committee recommends a reduction of $123.0 million to take that GFM into account. This will leave sufficient funds in the Navy's hands to award two ships in fiscal year 2009, with both ships fully funded to the congressional cost cap of $460.0 million.

LPD-17 amphibious transport dock

The budget request for fiscal year 2009 included $103.2 million to provide for LPD-17 program close out costs, but included no funding for the tenth ship of the USS San Antonio (LPD-17) class amphibious ship program, LPD-26.

The Navy's 2008 report to Congress on the long-range plan for construction of naval vessels calls for assuming additional risk in the expeditionary warfare force, by reducing expeditionary force size, including reducing the LPD-17 class from a total of 12 to nine ships. The Navy would instead extend the service of some existing vessels as an interim measure, with no real long-term plan to solve the problem.

The committee is concerned that this plan does not provide the total number of amphibious ships needed to support the Department of the Navy's two Marine Expeditionary Brigade lift requirements for forcible entry operations. In testimony before Congress in fiscal years 2005, 2006, 2007, and 2008, Marine Corps leadership stated that a class of no less than 10 LPD-17 ships was required to meet Marine Corps forcible entry requirements, with acceptable risk. The Chief of Naval Operations and the Commandant of the Marine Corps have both identified procurement of LPD-26 in 2009 as a top unfunded priority for both services.

The committee is aware that construction for LPD-26 would have commenced in fiscal year 2009 under the previous schedule. However, with delays in other shipbuilding programs within the contractor's facilities, and with the fact that the contractor has recently had to subcontract significant work on earlier LPD-17s with other vendors, it should be possible to procure LPD-26 in fiscal year 2010 without incurring significant cost growth or jeopardizing industrial base stability.

Therefore, the committee recommends: (1) an increase of $170.0 million for advance procurement; and (2) a transfer of the $103.2 million from program close out costs to advance procurement. In total, including funding provided in fiscal year 2008, the committee recommends $323.2 million for advance procurement for LPD-26.

LHA(R) advance procurement

The fiscal year 2009 budget request for the National Defense Sealift Fund (NDSF) included $348.3 million for advance procurement for the first Maritime Prepositioning Force (Future) (MPF(F)), based on the design of amphibious assault replacement ships. These vessels are designated as the MPF(F) LHA(R).

The committee does not agree with funding development and procurement for amphibious assault ships within the NDSF and has included a provision (described elsewhere) that would clarify what programs will be included in the NDSF.

The Navy and the contractor have recently informed the committee that there will be significant schedule delays and cost increases for the LHD-8 amphibious assault ship. These problems, and the continuing struggles to regain and retain staffing and achieve productivity levels experienced before the Hurricane Katrina disaster, do not bode well for making expected progress on the LHA-6 amphibious assault ship, the next large amphibious ship to be built by the contractor. LHA-6 is intended to be the basis for the design of the MPF(F) LHA(R).

Based on all these factors, the committee does not believe that the Navy can or should apply all of the requested advance procurement funds in the MPF(F) LHA(R) in fiscal year 2009. Therefore, the committee recommends a decrease of $170.0 million for MPF(F) LHA (R) advance procurement.

DDG-51 Arleigh Burke-class destroyer modernization program

The budget request included $165.5 million in Other Procurement, Navy (OPN) for the DDG-51 modernization program. This program upgrades the 62 ships of the DDG-51 class with key technologies to provide improved warfighting capability while reducing operating and support cost. This is planned to be a 20-year modernization program that will cost roughly $10.0 billion.

The Secretary of the Navy's fiscal year 2008 report to Congress on the long-range plan for construction of naval vessels identified the requirement to extend the service life of the DDG-51 class to 40 years in order to meet surface combatant force structure requirements. However, additional planning and funding to accomplish this extended service life is not included in the budget request.

The committee views the Navy's plan to operate the DDG-51 class for a full 40 years to be very high risk, based on recent history of 20-25 year service life for surface combatants. Additional fiscal year 2009 DDG-51 modernization procurement funding would support critical planning, engineering, and procurement activities for service life extension alterations. The committee recommends an increase of $25.0 million in OPN for the DDG-51 modernization program.

The 2008 Navy report to Congress on DDG modernization indicated that the Navy staff had reviewed a concept that would achieve favorable results for each of the program attributes outlined in the report. The Navy report identified using the multi-ship, multi-option (MSMO) contracts as the preferred approach for conducting the DDG modernization. The MSMO contracts are contracts for maintenance efforts on Navy ships that are conducted in the ships' homeport area.

It is not apparent to the committee that the Navy seriously evaluated conducting the modernization program at the shipyards where the DDG-51s were built, or a so-called `building yard' approach. Further, upon reviewing the Navy's basis for determining that MSMO contracts would be more suitable for executing the DDG modernization program, the committee cannot find that the Navy has established measures of effectiveness and appropriate cost control mechanisms to maximize the benefits promised by MSMO contract maintenance strategies.

The magnitude of this investment, coupled with the critical need for this modernization effort, warrants a more thorough assessment of the considerations leading to the Navy's selection of an acquisition strategy.

Accordingly, the committee directs the Secretary of the Navy to submit a DDG-51 modernization acquisition strategy report to the congressional defense committees with the fiscal year 2010 budget request. The report should include a plan to execute a pilot project that would accomplish the full scope of DDG-51 hull, mechanical and electrical, and combat system maintenance and modernization in a single availability executed at one of the building yards. Such plan shall include a detailed quantitative and qualitative assessment of each of the acquisition strategy and availability execution considerations addressed by the Navy's 2008 report on DDG modernization. The report shall also provide a quantitative and qualitative comparison of this building yard plan with the Navy's plan to execute DDG modernization within a MSMO contract framework. The report shall include a plan for strengthening the Navy's MSMO contract strategy by:

Submarine training device modifications

The budget request included $33.6 million to procure submarine training device modifications, but included no funding for fielding any system that would provide commanders and sailors with instant, continuous, and long-term feedback regarding performance. The committee is aware that industry has developed standardized metrics systems that could be used to assess readiness and training proficiency. Such technology would be interfaced with simulators and instrumented ranges to automatically measure individual and crew performance as thousands of tactical events are performed during a single day of training. Having such systems would provide rapid, objective feedback to sailors regarding the accuracy and consistency of their tactical assessments and provide frequent and objective assessments to force commanders, so that they can spot trends and underperformers before an incident occurs.

Therefore, the committee recommends an increase of $3.8 million to expand the use of performance measurement systems by completing definition of metrics and algorithms and installing hardware and software in training sites.

Man overboard indicators

The budget request included $43.2 million in Other Procurement, Navy (OPN) for command support equipment, but no funding to procure man overboard indicators (MOBI).

The Navy has tested a one-per-person MOBI transmitter. Additionally, at least two expeditionary strike groups recommended the Navy procure MOBI transmitters for each embarked sailor, marine, and airman. The committee understands that a large majority of ship commanding officers having MOBI systems installed have requested additional MOBI transmitters in order to protect all embarked personnel. In addition, the U.S. Navy Safety Center has recommended that each embarked sailor and marine be afforded MOBI protection.

Therefore, the committee recommends an increase of $4.9 million for the procurement of additional MOBI systems.

Logistics vehicle system replacement

The budget request included $324.6 million in Procurement, Marine Corps for the Logistics Vehicle System Replacement (LVSR). The LVSR will provide the Marine Corps with a replacement vehicle system for the current fleet of LVS's, which are approaching the end of their service life.

The committee supports the LVSR program, but is concerned the Marine Corps' current plan for procurement is too aggressive given the number of engineer change proposals and other manufacturing issues that have been discovered during the low-rate initial production process. Further, the committee is concerned that the Marine Corps inadequately pursued unit cost reductions from the manufacturer given the 3-year window during which the Marine Corps intends to procure these systems. Therefore, the committee recommends a decrease of $25.0 million in funding for fiscal year 2009.

Combat casualty care equipment upgrade program

The budget request included $6.6 million in Procurement, Marine Corps, for Field Medical Equipment, but no funds for the combat casualty care equipment upgrade program (CCCEUP), now completing its fifth year of operation. The CCCEUP provides lightweight, compact, field medical equipment for the Marine Corps and Navy corpsmen delivering combat casualty care. This equipment and the medical care it supports are designed specifically to reduce preventable combat deaths and speed recovery of the wounded.

The committee recommends an increase of $7.9 million for the CCCEUP program.

SUBTITLE D--AIR FORCE PROGRAMS

Insert offset folio 117 here SR335.060

Insert offset folio 118 here SR335.061

Insert offset folio 119 here SR335.062

Insert offset folio 120 here SR335.063

Insert offset folio 121 here SR335.064

Insert offset folio 122 here SR335.065

Insert offset folio 123 here SR335.066

Insert offset folio 124 here SR335.067

Insert offset folio 125 here SR335.068

Insert offset folio 126 here SR335.069

Insert offset folio 127 here SR335.070

Insert offset folio 128 here SR335.071

Insert offset folio 129 here SR335.072

Insert offset folio 130 here SR335.073

Insert offset folio 131 here SR335.074

Insert offset folio 132 here SR335.075

F-22A fighter aircraft (Sec. 151)

As described elsewhere in this report, the budget request included $497.0 million for structural repairs to the F-15 that were added to the aircraft maintenance budget in case they would be needed to correct problems that might have emerged after investigations and inspections following a mishap in November 2007. Since that time, the Air Force has determined that these additional funds are not necessary for completing the repairs required to: (1) correct F-15 structural problems; and (2) return them to flying status.

The committee recommends a provision that would provide $497.0 million Aircraft Procurement, Air Force (APAF) for either (1) advance procurement for F-22A aircraft in fiscal year 2010; or (2) winding down the production line for F-22A aircraft. The next President of the United States would have to decide which alternative would be in the best interests of the Nation and submit a certification of that decision to the congressional defense committees before any of these funds could be spent.

The budget request included $3,054.2 million in APAF for building 20 F-22A aircraft. The budget request did not include funding for either: (1) advance procurement to continue F-22A production after fiscal year 2009; or (2) funding to support government liability for costs of closing the production line.

The 20 F-22A aircraft in the fiscal year 2009 budget would complete the currently approved program to buy 183 F-22A aircraft. The committee heard conflicting testimony from Department of Defense officials about whether 183 F-22A aircraft are sufficient to meet the needs of the Department. The budget request reflects the view that 183 aircraft are enough to meet warfighting requirements. The Air Force maintains that it needs to have 381 F-22A aircraft to meet warfighting requirements, provide support to homeland defense missions, and have sufficient aircraft to provide squadrons for 10 Air Expeditionary Forces (AEFs) and, thereby, support a peacetime rotation base for the AEFs.

The committee also heard testimony from the Secretary of Defense, with which the Secretary of the Air Force concurred, that he would prefer to leave the question of continuing F-22A production after fiscal year 2009 in a neutral position for the next administration.

Therefore, the committee recommends an increase of $497.0 million, for either: (1) advance procurement to continue F-22A production after fiscal year 2009; or (2) funding to support government liability for costs of closing the production line, as decided by the next President.

BUDGET ITEMS--AIR FORCE

Advanced procurement for the F136 engine

The budget request included $136.9 million in Aircraft Procurement, Air Force (APAF) for advanced procurement for the F-35 Joint Strike Fighter (JSF) program. In section 213 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181), Congress explicitly directed the Department of Defense to (1) develop a competitive propulsion system for the JSF aircraft; and (2) continue competition for the propulsion system throughout the production phase of the JSF program.

In order to follow through on that direction and begin competition with the F-135 engine in 2012, the Department of Defense must begin funding for long lead items for the F-136 production line in 2009.

Therefore, the committee recommends in increase of $35.0 million in APAF for long lead items for the F-136 engine.

C-17A engine spares

The budget request included $367.6 million in Aircraft Procurement, Air Force, for the C-17A aircraft, including $114.6 million for engine spares. The funding stream for engine spares over the past 3 years has shown little consistency, going from a level of $76.0 million in fiscal year 2007 to zero in fiscal year 2008, and $114.6 million this year.

The committee is aware that the operating forces have lodged few complaints over the availability of spares, nor have mission capability or effectiveness rates suffered in recent years. The committee believes that funding to the fiscal year 2007 level should be more than adequate, at least until the Air Force can provide adequate supporting documentation of the need for additional spares.

Therefore, the committee recommends a reduction of $40.0 million for C-17 engine spares.

Tactical intelligence support

The Joint Special Operations Command (JSOC) forces operating in Iraq and Afghanistan, in cooperation with the intelligence community, have developed sophisticated capabilities to identify, find, track, and kill or capture high-value individuals. Whereas traditional force-on-force military campaigns require techniques to find and attack large mechanized formations, irregular warfare requires these new `man-hunting' capabilities.

Army and Marine Corps ground forces have requirements similar to JSOC's in their counter-insurgency operations. Over time, some of the systems as well as tactics, techniques, and procedures developed by and for JSOC have begun to migrate from JSOC to Army and Marine Corps ground forces. This process includes specialized support from national intelligence agencies. Also, the Army and Marine Corps themselves have acquired innovative capabilities to conduct effective counter-insurgency operations.

For example, the services have deployed `human terrain teams' to enhance their understanding of the local social and cultural environment. Biometric signature and forensic data collection capabilities and effective reach-back to national-level databases and processing are more widespread and well-received by tactical elements. More national human intelligence (HUMINT) and signals intelligence (SIGINT) databases are for the first time being pushed forward to support tactical unit operations with greater speed and frequency. Meanwhile, these capabilities are linked with airborne and ground-based intelligence capabilities that further enable the detection, identification, location, and tracking of high-value targets.

The committee believes there is an urgent requirement to enhance and increase access to this man-hunting capability to all Army and Marine Corps ground forces in harm's way. Consequently, the committee recommends a series of actions to initiate, accelerate, or eliminate bottlenecks that impede fielding of special-purpose equipment and capabilities, much of them classified. Specific recommendations are outlined below, but full explanations are provided only in the classified annex to this report.

AIRBORNE IMAGING

Requirements for airborne full-motion video (FMV) platforms are escalating rapidly as a result of demonstrated operational successes. The Department of Defense (DOD) appears to have responded belatedly and without appropriate focus to this requirement. The committee believes that DOD has focused almost exclusively on trying to accelerate fielding of the Predator, Army Warrior, Reaper, and Shadow unmanned aerial systems (UAS). Despite a sustained Air Force effort to surge the Predator system, however, UAS likely will be unable to meet operational requirements in the near term, for reasons discussed below.

The committee believes that manned aircraft could be acquired and modified rapidly from the commercial sector, which would allow DOD to meet operational requirements until the UAS programs can catch up to demand. At that point, commercial contracts could be terminated, or the manned aircraft systems could be transferred to Iraqi security forces. The committee believes that DOD could have chosen to pursue this approach as an expedient through war-related supplemental funding.

The committee notes that the Commander of Special Operations Command (SOCOM) has requested that Congress provide funds for approximately five 24-hour orbits of primarily manned aircraft in the fiscal year 2008 supplemental. This request, while commendable, would satisfy one-quarter to one-third of the immediate requirement. The committee is concerned that DOD has not explained why it is not seeking more of what SOCOM has requested. The committee encourages the Secretary of Defense to address this issue in the next war-related supplemental funding request.

The major medium- and long-endurance UAS programs cannot be adequately accelerated in part because of shortages of operators and looming training limitations, as noted in the Conference Report on the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181). The Department is now addressing the operator shortage by requesting funds for more training capacity, examining whether rated pilots are required to control these UAS, and investigating whether the Air Force needs to establish a career field for UAS pilots. The other major training-related problem is the lack of capabilities and procedures to operate UAS in the National Airspace (NAS).

The committee is deeply concerned that DOD is unprepared to meet Federal Aviation Administration (FAA) requirements to operate in the NAS. The committee appreciates that DOD UAS programs are growing larger and faster than anyone anticipated, and are being used in unexpected locations and missions. However, the major programs have been in the acquisition system for 15 years, and many observers, including congressional committees, warned DOD repeatedly of the risk of deferring resolution of this challenge.

The Air Force is operating Global Hawk UAS from Beale Air Force Base under Temporary Flight Restrictions. Developmental test and acceptance flights for the Army Sky Warrior and the Reaper cannot be conducted at night at El Mirage Flight Operations Facility in California. The Army is fielding Shadow UAS systems to many Guard and reserve units across the United States that do not have access to restricted airspace for training.

These problems require prompt and vigorous action. The committee recommends that DOD and the FAA create a joint committee between the DOD and the Federal Aviation Administration at the level of the Under Secretary of Defense for Acquisition, Technology, and Logistics (USD/AT&L) and the Associate Administrator for Aviation safety. Such a committee could serve as the focal point for dispute resolution and policy development. The committee directs the Deputy Secretary of Defense to seek an agreement with the Administrator of the FAA to create an executive committee to implement the memorandum of agreement signed in September 2007 for Operation of Unmanned Aircraft Systems in the National Airspace System.

The committee also recommends funding to accelerate the highest priority UAS airspace integration needs. The committee recommends $31.0 million in Aircraft Procurement, Air Force (APAF), RQ-4 Global Hawk (Line 20) and $31.0 million in APAF MQ-1 Predator (Line 22) for two ground-based radars for Beale Air Force Base, and El Mirage Flight Operations facility, respectively, to provide enhanced ground-based collision-avoidance capabilities to mitigate restrictions on terminal flight operations. The committee also recommends $10.0 million in Research, Development, Test, and Evaluation (RDT&E), Air Force, PE 35219F, to accelerate development of critical sense-and-avoid capabilities for Global Hawk and the Predator/Sky Warrior UAS. Finally, the committee recommends $15.0 million in RDT&E, Defense-wide, PE 64400D8Z, to begin the development for the major UAS programs of modeling and simulation tools, and standards, that will provide the foundation for gaining routine UAS access to the national and international airspace.

WIDE-AREA AIRBORNE SURVEILLANCE

One objection to buying many more airborne FMV platforms is that they are an inefficient means of surveillance. FMV cameras have a narrow field-of-view, requiring one platform for every specific target or mission. In areas where the target density permits, it would be more efficient to use camera systems that can cover large areas. The Army Constant Hawk and Marine Corps Angel Fire systems are current examples of wide-area collection systems. The DOD leadership requested funds for the Air Force to acquire a combined, enhanced system, currently called Wide-Area Airborne Surveillance (WAAS), to image a larger area than Constant Hawk or Angel Fire, enable night operations, real-time support to ground forces, provide a forensic capability, and support many simultaneous targeting and surveillance missions. It could cue and hand off targets to FMV platforms for prosecution.

The committee strongly supports this initiative for many reasons, including its potential to reduce the requirement for UAS with FMV and to make the latter more effective. However, the WAAS system likely will not be available in useful numbers for 2 years or more, and therefore cannot serve as a near-term solution for U.S. Central Command's airborne FMV deficiency.

The Air Force intends to field the WAAS system on the Reaper, or MQ-9, UAS. The committee understands that it may require less time and cost to field the WAAS system on the Sky Warrior, or Predator-1C. The committee is also aware that there are several proposals under consideration to field WAAS capabilities on other platforms, such as the Shadow UAS. The committee directs the Deputy Secretary of Defense to examine these issues and provide an assessment and recommendation to the committee by June 15, 2008 to help inform decisions in conference on the National Defense Authorization Act for Fiscal Year 2009.

NATIONAL-TACTICAL SIGINT INITIATIVES

The National Security Agency (NSA), with Special Operations Command and the Army, has developed special capabilities against modern signals encountered in Iraq and elsewhere. These capabilities are now engineered for fielding as tactical systems, on ground vehicles, and on airborne platforms. NSA and the Army are fielding the Triton III system on Mine Resistant Ambush Protected (MRAP) vehicles to support maneuver forces. A program called Final e-Curfew provides more advanced area-collection capabilities against the same target set from fixed locations. These systems work in conjunction with databases pushed forward to tactical echelons.

These systems should be fielded rapidly. The committee recommends authorization of $25.0 million above the request in Other Procurement, Army, line 74, to accelerate Triton III procurement and installation on the MRAP vehicles. The committee understands that the Army's needs for Triton III procurement exceed the amount recommended for authorization. The committee urges the Army and Office of the Secretary of Defense to include the balance of the requirement in the next war-related supplemental spending request. The committee also recommends an authorization of $25.0 million in PE 35885G, NSA's Tactical Cryptologic Activities, for development and acquisition of Final e-Curfew systems for the Army and Marine Corps units in Iraq.

Special SIGINT capabilities are also more widely available for manned and unmanned aircraft deployment. The Air Force is planning to field these capabilities as an adjunct to the Airborne Signals Intelligence Program (ASIP)-2C configuration on the Reaper and Predator, and the Army is planning to build similar capabilities, under the Tactical SIGINT Program, for the Sky Warrior/MQ-1C UAS. The committee is concerned that the Army and the Air Force are developing very similar systems to meet similar requirements and concepts of operation. At the same time, the committee is concerned that neither service is planning to incorporate certain fundamental collection capabilities, as described in the classified annex to this report. The committee understands that these advanced capabilities will cost more and will consume a larger portion of the payload of such potential platforms as the Reaper, Predator, and Sky Warrior, but believes that these tradeoffs must be seriously considered. The committee is also concerned that the Air Force's preferred platform choice is the Reaper even though it will be more difficult to collect against the targets of interest from that platform's higher altitude.

Accordingly, the committee directs that the Deputy Secretary of Defense, in consultation with the Under Secretary of Defense for Intelligence, the USD/AT&L, the Joint Staff, and the Director of NSA, to review requirements and determine whether the Army and Air Force should pursue a single, joint airborne UAS SIGINT program, and whether this development should include the advanced collection capability described in the classified annex to this report. The committee requests that the Deputy Secretary report to the committee by June 15, 2008 to help inform decisions in conference on the National Defense Authorization Act for Fiscal Year 2009.

B-52 bomber

The budget request included $41.7 million in Aircraft Procurement, Air Force line 26 for the B-52 bomber, of which $32.4 million is for combat network communications technology (CONECT) and $7.3 million is for advanced weapons integration (AWI). No funds were included for the selective availability anti-spoofing module (SAASM). The committee recommends an additional $18.1 million for the SAASM, $22.8 million for CONECT, and $16.7 million for AWI, for a total of $57.6 million. The Air Force failed to include adequate funding in the budget request to meet the requirements of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) to maintain 76 B-52 bombers in a common configuration and included this funding on the Air Force unfunded priorities list.

Large aircraft infrared countermeasures system

The budget request included $59.5 million in Aircraft Procurement, Air Force for procurement of aircraft installation kits for the large aircraft infrared countermeasures (LAIRCM) system for various C-130 aircraft. The LAIRCM system provides protection against man-portable air defense systems (MANPADS) which are widely available and have been used by adversaries in Operations Enduring Freedom and Iraqi Freedom against both military and commercial aircraft. Additional funding for LAIRCM, including funding for nonrecurring engineering and kit production for Special Operations Command (SOCOM), is included on the Chief of Staff of the Air Force's unfunded priorities list.

The committee recommends an increase of $15.0 million to accelerate LAIRCM upgrades for C-130 aircraft, in general, and an increase of $2.2 million to accelerate LAIRCM upgrades for SOCOM AC-130 and MC-130 aircraft.

C-130 Avionics Modernization Program

The budget request included $422.8 million in Aircraft Procurement, Air Force (APAF) for the C-130 Modifications Program, including $149.1 million for the C-130 Avionics Modernization Program (AMP). The C-130 AMP effort suffered a Nunn-McCurdy breach in February 2007, which caused the Department of Defense to significantly restructure and recertify the program in June 2007. While the committee remains supportive of the program, we have concerns over the unexplained growth in overhead on the program.

The committee recommends a reduction of $25.0 million in APAF for the C-130 AMP Modification Program.

Advanced targeting pod

The budget request included $521.4 million in Aircraft Procurement, Air Force (APAF, line 78) for miscellaneous production charges, including $49.9 million for the procurement of advanced targeting pods (ATPs), also known as precision attack systems. Advanced targeting pods provide targeting capability for use with precision guided munitions on fighter, bomber, and attack aircraft. The ATP is currently in use by both the active and reserve components of the Air Force. The Air Force Chief of Staff included $170.0 million for buying new ATPs and upgrading existing ATPs in his unfunded priorities list.

The Air Force and the contractor team for the Litening ATP program have devised a spiral enhancement kit for existing Litening ATPs that will provide:

The committee recommends an increase of $27.9 million for the procurement of spiral upgrade kits for Litening ATPs.

Budget request realignments

The Air Force requested that Congress make several realignments in their budget to correct various errors in their submission of the Aircraft Procurement, Air Force (APAF) documentation. The table below reflects these adjustments:

[insert at the end of budget items for APAF]

CHANGES TO CORRECT SUBMISSION ERRORS
(In millions)
----------------------------------------------------------------------------------------------
Item                                                                 Account Line item Amount 
----------------------------------------------------------------------------------------------
C-130J                                                                  APAF        49 -$25.0 
C-130J                                                                  APAF         6 +$25.0 
JPATS                                                                   APAF        12  -$5.5 
JPATS                                                                   APAF        39  -$0.4 
JPATS                                                                   APAF        75  -$8.8 
JPATS                                                                   APAF        63 +$14.7 
(Adjustment to APAF line 63 already reflected in the budget request)                          
C-17                                                                    APAF         5  -$8.8 
C-17                                                                    APAF        34  +$8.8 
C-21                                                                    APAF        35 -$10.2 
T-1                                                                     APAF        40 +$10.2 
C-21                                                                    APAF        70 -$19.0 
T-1                                                                     APAF        75 +$19.0 
KC-X                                                                    APAF        10 -$61.7 
KC-X                                                                    RDAF        83 +$61.7 
----------------------------------------------------------------------------------------------

Improved stores ejection cartridge

The budget request included $150.8 million in Procurement of Ammunition, Air Force (PAAF) for cartridges, but provided no funds for improved stores ejection cartridges. Funds provided will update the ejection cartridge currently used on numerous aircraft platforms by all branches of the military for various payload ejection applications, including, but not limited to, the F-15, F-16, A-10, and B-52 aircraft. The committee recommends an increase of $1.0 million in PAAF for improved stores ejection cartridges.

Joint Air-to-Surface Standoff Missile

The budget request included $240.3 million in Missile Procurement, Air Force (MPAF) for the Joint Air-to-Surface Stand off Missile (JASSM). The JASSM program announced a Nunn-McCurdy breach in February 2007. Following a review of the program, the Under Secretary of Defense for Acquisition, Technology, and Logistics (USD (AT&L)) declined to certify the program, delaying the decision until at least May 2008. As part of the effort leading to recertification, the Air Force has been conducting JASSM flight tests, but those tests have drawn concern from the Office of the Director of Test and Evaluation (DOT&E). According to DOT&E, flight tests have not occurred in a predicted way, leading to serious questions about configuration control.

The committee continues to recognize that JASSM was designed to meet a needed capability. The Air Force anticipates that it will be able to ramp up production once the USD (AT&L) recertifies the missile under Nunn-McCurdy rules. The Air Force plan is to increase production from 115 missiles in fiscal year 2008 to 260 missiles in 2009. However, given the questions and concerns over this program, the committee believes that such an increase in quantities is unwarranted at this time.

Therefore, the committee recommends a reduction of $80.0 million in MPAF for JASSM.

Advanced Extremely High Frequency satellite

The budget request included $16.5 million in Missile Procurement, Air Force for advanced procurement and launch support for the third Advanced Extremely High Frequency (AEHF) satellite but no funds for the fourth AEHF satellite. The committee recommends an additional $100.0 million for advanced procurement, parts obsolescence, test equipment, and spares for the fourth AEHF.

In fiscal year 2008 $125.0 million was appropriated for advanced procurement for the fourth AEHF satellite, with direction to fully fund the fourth AEHF in the fiscal year 2009 budget request. The Milstar satellites, the predecessors to AEHF, have lasted longer than expected and the Air Force has determined that it can wait until the 2010 budget request to include full funding for the fourth AEHF satellite. As a result, the technical, schedule, and cost risks associated with further extending the production break between the third and fourth AEHF satellites will further increase the cost of the fourth AEHF satellite.

The committee notes that the Air Force is currently studying whether a fifth AEHF satellite might be needed. This study will not be completed until June 2008.

Intelligence communication equipment

The budget request included $15.4 million in Other Procurement, Air Force (OPAF), for intelligence communication equipment, including $6.9 million for the `Chief of Staff Innovation Program.' In fiscal year 2008, this program is called `Eagle Vision.' Eagle Vision is a family of systems that provide commercial imagery data to operational commanders for mission planning, rehearsal, visualization, and intelligence support purposes. Eagle Vision is composed of a data acquisition segment (DAS) and a data integration segment (DIS). Funds requested for fiscal year 2009 are to support procurement of imagery ingestion capability upgrades as well as Eagle Vision DAS and DIS upgrades. These upgrades will provide improved processing capability, additional satellite capabilities, and baseline upgrades.

Commercially available synthetic aperture radar (SAR) data at 1 meter resolution could significantly improve surveillance and search and rescue operations, since this data is unclassified, and is releasable to State and local responders or, with proper authorization, releasable to foreign governments. The data intensive SAR image will require an upgrade to the Eagle Vision communications and image archive and processing system not included in the budget request. The committee is aware that such an upgrade to the Eagle Vision system is available. Such systems deployed with Air National Guard will allow the Eagle Vision systems to respond to military contingencies and maritime surveillance, and search and rescue operations, or to natural or man-made disasters.

The committee recommends an increase of $3.5 million to begin fielding the SAR upgrades for the Eagle Vision system.

Combat training ranges

The budget request included $55.3 million in Other Procurement, Air Force (OPAF) for making improvements at combat training ranges. These improvements are aimed at increasing the capability to support realistic air-to-air, air-to-ground, ground-to-air, and electronic warfare training, along with the ability to record and playback events for aircrew debriefing and analysis.

The unmanned threat emitter (UMTE) modernization program will provide affordable and realistic threats, with sufficient threat density, typical of today's adversarial combat environment. This UMTE effort will upgrade performance capabilities and extend the service life of existing UMTE range assets by providing fully reactive, programmable, high-fidelity threat simulators, electronic attack receivers, automatic video tracking, and mobility to support time-critical targeting exercises. The committee understands that the Air Force's current threat emitters are inadequate to train F/A-22s, Joint Strike Fighters.

Therefore, the committee recommends an increase of $10.7 million in OPAF for UMTE.

Air Operations Centers

The budget request included $35.1 million in Other Procurement, Air Force (OPAF) line 33 for Air Operations Centers (AOCs), including $29.0 million for fielding additional AOCs, increment 10.1. The committee recommends a reduction of $29.0 million in OPAF for the fielding of AOCs.

The Air Force plans to build between 12 to 30 AOCs in the coming years, with five main regional sites, and many more `tailored' sites. The justification for the total number of sites is not clear. The recent addition of a requirement for an AOC for the newly created U.S. Africa Command (AFRICOM) is a case in point. For the foreseeable future, AFRICOM will be headquartered in Germany. U.S. European Command already has a fully operational AOC for Europe, which is only partially used. Moreover, the proliferation of AOCs has created manning shortages in the AOCs across all regions. While the committee recognizes the value of the AOC that is currently fully manned and operated in the U.S. Central Command area of operations, little justification has been made as to why each numbered air force requires its own command facility, especially as reach-back command and control continues to rapidly evolve.

Finally, increment 10.1 of the AOCs was not developed as a service oriented architecture, even though that is the future approach for command and control within the Department of Defense. The committee recommends the Air Force take a pause in fielding increment 10.1 and fundamentally rethink its AOC fielding and operating strategy.

SUBTITLE E--JOINT AND MULTISERVICE MATTERS

Annual long-term plan for the procurement of aircraft for the Navy and the Air Force (sec. 171)

The committee recommends a provision that would require the Secretary of Defense to submit an annual long-term plan for procurement of aircraft for the Departments of the Navy and Air Force. The provision would require that the plan project procurement, inventories, retirements, and losses for the following 30-year period.

Aircraft that would be covered by the plan would include fighter aircraft, attack aircraft, bomber aircraft, strategic lift aircraft, intratheater lift aircraft, intelligence, surveillance and reconnaissance aircraft, tanker aircraft, and any other major support aircraft designated by the Secretary.

The committee received testimony over the past 2 years about shortfalls of fighter/attack aircraft within the Navy and Marine Corps projected for the middle of the next decade, and, this year, received testimony about shortfalls of fighter aircraft within the Air Force projected for the year 2024.

The committee believes that the Department of Defense and Congress need long-term projections so that the two organizations can focus attention on potential shortfalls, gaps, or mismatches well before the full range of options are foreclosed. This annual report should help in that effort.

BUDGET ITEMS--DEFENSE-WIDE

Insert offset folio 148 here SR335.076

Insert offset folio 149 here SR335.077

Insert offset folio 150 here SR335.078

Insert offset folio 151 here SR335.079

Insert offset folio 152 here SR335.080

Insert offset folio 153 here SR335.081

Insert offset folio 154 here SR335.082

Insert offset folio 155 here SR335.083

Terminal High Altitude Area Defense

The budget request included no funds for procurement of long lead items for Fire Units 3 and 4 of the Terminal High Altitude Area Defense (THAAD) system. The committee recommends an increase of $140.0 million in a new defense-wide procurement funding line for procurement of long lead items for the interceptors and ground equipment for THAAD Fire Units 3 and 4. Of this additional amount, $65.0 million would be transferred from research and development (R&D) funds requested in PE 63881C for THAAD.

Section 223(b) of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) required the Department of Defense to request any long lead procurement funding for THAAD Fire Units 3 and 4, and for Standard Missile-3 interceptors, in the fiscal year 2009 budget request using procurement funds, rather than R&D funds. In addition, section 223(c) of that act prohibits the use of fiscal year 2009 R&D funds for procurement of long lead items for THAAD Fire Units 3 and 4.

THAAD is a high priority near-term missile defense system intended to provide our regional combatant commanders with the capability they need today to protect our forward-deployed forces, allies, and other friendly countries against many hundreds of existing short- and medium-range ballistic missiles. The budget request for THAAD included a planned 1-year delay in the delivery of Fire Units 3 and 4, and an 18-month production gap in THAAD interceptors. After congressional objections were raised to this planned delay, the Missile Defense Agency (MDA) decided it would reallocate $65.0 million of fiscal year 2009 funding for the THAAD system for long lead procurement of interceptors for Fire Unit 3. However, contrary to the law, MDA plans to use R&D funds to procure long lead items for Fire Unit 3.

The committee disagrees with MDA's plan to use R&D funds for procurement of long lead items for Fire Unit 3, because it would be contrary to the law and contrary to the intent of Congress in requiring the use of procurement funds for such activity. Therefore, the committee recommends establishing a new defense-wide procurement funding line for MDA missile defense procurement activities. The committee expects MDA and the Department of Defense to comply with the requirements of section 223 of the National Defense Authorization Act for Fiscal Year 2008 in executing any long lead procurement funding for THAAD Fire Units 3 and 4.

The committee notes that the Joint Capabilities Mix (JCM) study, conducted by the Joint Staff, concluded that the United States needs about twice as many THAAD and Standard Missile-3 interceptors as the number currently planned, to meet just the minimum operational requirements of regional combatant commanders to defend our forward-deployed forces, allies, and other friendly nations against short- and medium-range ballistic missiles that exist today. To meet even these minimum operational requirements, MDA would have to increase substantially its plans and budgets for THAAD procurement. The committee expects MDA to adjust its plans accordingly.

The committee is concerned that MDA has not planned or budgeted any funds in fiscal year 2009 for procuring a THAAD radar. This would create a gap in THAAD radar production and cause a schedule disconnect between fire unit delivery and radar delivery. Therefore, the committee also recommends an increase of $40.0 million in the new missile defense procurement funding line for long lead procurement of the THAAD radar for Fire Unit 3, to avoid a production gap and a schedule disconnect. The committee urges MDA to synchronize the THAAD fire unit and radar production and delivery schedules.

Standard Missile-3 interceptors

The budget request included no procurement funds for long lead procurement of Standard Missile-3 (SM-3) interceptors for the Aegis Ballistic Missile Defense (BMD) system. Contrary to the law, the budget request included $57.0 million in research and development (R&D) funds in PE 63892C for long lead procurement of SM-3 Block IA missiles. The committee recommends transferring the requested $57.0 million in R&D funds to a new defense-wide procurement funding line for procurement of long lead items for SM-3 interceptors, consistent with the law. The committee also recommends an increase of $20.0 million in the new Procurement, Defense-wide line for long lead procurement of an additional 15 SM-3 interceptor missiles.

Section 223(b) of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) required the Department of Defense to request any long lead procurement funding for SM-3 interceptors, and THAAD Fire Units 3 and 4, in the fiscal year 2009 budget request using procurement funds, rather than R&D funds. In addition, section 223(c) of that act prohibits the use of fiscal year 2009 R&D funds for procurement of long lead items for SM-3 interceptors and THAAD Fire Units 3 and 4.

The committee is deeply disappointed that the Department of Defense chose not to comply with the requirements of section 223 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181), and directs the Director of the Missile Defense Agency and the Under Secretary of Defense (Comptroller) to jointly provide a report to the congressional defense committees by no later than October 1, 2008, providing a detailed explanation of the reasons the Department chose not to comply with the law, and an explanation of the Department's plans to comply with the law.

The committee notes that the Joint Capabilities Mix (JCM) study, conducted by the Joint Staff, concluded that U.S. combatant commanders need about twice as many SM-3 and THAAD interceptors as currently planned to meet just their minimum operational requirements for defending against the many hundreds of existing short- and medium-range ballistic missiles. The committee is deeply disappointed that the Missile Defense Agency (MDA) has not planned or budgeted to acquire more than a fraction of the SM-3 interceptors needed to meet the warfighters' minimum operational needs, and that it does not plan to fund additional procurement beyond fiscal year 2010. The committee believes that achieving at least the JCM levels of upper tier interceptors in a timely manner should be the highest priority for MDA, and expects the Agency to modify its plans and budgets to meet our combatant commanders' current operational needs. In section 223 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364), Congress specified the Aegis BMD system and its SM-3 interceptor as a high priority near-term program for the Department to focus on. As the JCM study makes clear, the Department has failed to do so.

To address these concerns, the committee recommends an increase of $20.0 million in the new defense-wide procurement funding line for long lead procurement of an additional 15 SM-3 missiles to start to address the need to meet the requirements identified in the JCM analysis. As described elsewhere in this report, the committee also recommends increases of $80.0 million for increasing the production rate of the SM-3 missile, reducing schedule risk for the SM-3 Block IB missile, and for improving the capability of the Aegis BMD system to conduct engagements using offboard sensors, known as `engage on remote,' and to engage missiles in the ascent phase of midcourse flight.

Intelligence, surveillance, reconnaissance mission equipment package

The budget request included $54.1 million for Special Operations Forces (SOF) Intelligence, but no funding for a classified intelligence, surveillance, reconnaissance mission equipment package to modify existing classified air assets. This equipment is critical to enabling operators to fix, find, and target terrorists. It is also the Commander of the U.S. Special Operations Command's fifth highest priority item for funding, in the event that additional funds are available for the Special Operations Command.

The committee recommends an increase of $13.3 million in Procurement, Defense-wide, SOF Intelligence Systems, for a special operations forces intelligence, surveillance, reconnaissance mission equipment package to modify existing classified air assets.

Special operations forces combat assault rifle

The budget request included $2.7 million in Procurement, Defense-wide for the special operations forces (SOF) Combat Assault Rifle program, which provides the SOF operator a highly reliable, accurate, and sustainable family of weapons, to include the MK17 sniper support rifle, suppressors, the operator tool kit, and spare weapons systems to support the MK16 and MK17. However, the Commander, Special Operations Command identified a $4.4 million shortfall in funding for the MK17 sniper support rifle.

The committee recommends an increase of $4.4 million in Procurement, Defense-wide, small arms and weapons, for the Special Operations Command.

Special operations visual augmentation systems hand-held imager/long-range

The budget request included $30.2 million in Procurement, Defense-wide for the special operations forces (SOF) visual augmentation, lasers and sensor systems. However, no funding was included for the special operations visual augmentation systems hand-held imager/long-range. These relatively new, hand-held imagers are thermal imagers that significantly improve the ability of special operators to track targets under conditions where existing technology does not allow them to do so. The Commander of the U.S. Special Operations Command has identified a $15.4 million shortfall in funding for these hand-held imagers.

The committee recommends an increase of $5.0 million in Procurement, Defense-wide, SOF visual augmentation, lasers and sensor systems, for the Special Operations Command.

M53 Joint Chemical Biological Protective Mask

The budget request did not include funding in the Defense-wide, Procurement, special operations forces operational enhancements account for the M53 Joint Chemical Biological Protective Mask (JCBPM). The committee recommends an increase of $5.0 million for M53 JCBPM in this account.

United States Special Operations Command (SOCOM) has a validated requirement for 14,601 JCBPMs, but only 58 percent of that requirement was procured with available funding from the Joint Program Executive Officer-Chemical and Biological Defense. Additional funding for this program would allow the purchase of the remaining 42 percent of the JCBPMs that is required by SOCOM.

Joint Chemical Agent Detector

The budget request included $200.0 million in Procurement, Defense-wide (PDW) for chemical and biological contamination avoidance, including $38.1 million for procurement of the Joint Chemical Agent Detector (JCAD). The committee recommends an increase of $10.0 million in PDW for procurement of additional JCAD units. The JCAD is an automatic, lightweight chemical agent detector, identifier, and warning unit that is significantly more effective, smaller, and less expensive than other fielded chemical agent detectors. It is replacing older, less effective systems, including the M8 Chemical Agent Alarm system that contains a radioactive source. It is important to equip U.S. forces with this greatly improved JCAD system for operational and force protection purposes.

Joint Biological Standoff Detection System

The budget request included $199.6 million in Procurement, Defense-wide (PDW) for chemical and biological defense contamination avoidance, but included no funds for the Joint Biological Standoff Detection System (JBSDS). Standoff detection of biological warfare agents is the highest priority technology objective in the chemical and biological defense program, and also one of the most challenging. The JBSDS is the first U.S. standoff early warning biological detection system. It has completed initial operational testing, and is capable of detecting and warning of biological threats at distances of several kilometers, before exposure occurs. It is thus a good choice for force protection at high threat overseas military facilities. The committee recommends an increase of $8.0 million in PDW to continue low-rate initial procurement of additional JBSDS units, pending a final decision on full-rate production.

ITEMS OF SPECIAL INTEREST

Aegis modernization open architecture

The Navy has been on a path to transition surface ship systems to an open business model, commonly referred to as Open Architecture (OA), for approximately 6 years. The goal of employing OA systems is to bring to bear competition and innovation to achieve improved performance and affordability through use of modular designs, allowing public access to design specifications, reusing software code, mandating common interface standards, and achieving seamless interoperability between system hardware and software applications.

The committee concurs with the Navy's determination that OA is both a business imperative and a critical enabler for modernizing the Surface Navy. However, the Navy's overall progress in transitioning to OA is falling short of expectations in the extent to which the Navy is opening up the Aegis combat system for the DDG-51 modernization program. The Senate Report accompanying S. 1547 (S. Rept. 110 77) directed the Navy to outline its plan and progress with implementing OA. The Navy's OA report provides valuable insight regarding the strategy for implementing OA. However, the Navy has not outlined a program plan that ensures alignment between system development schedules, development contracts, Navy budget, program management structure, and the Aegis modernization program.

The committee's concerns with delays to OA implementation are compounded by the revelation this year of significant shortfalls to Aegis combat systems engineering funding through the future-years defense program.

The committee understands that the Navy intends to continue with a sole source contract to develop improvements in the Aegis combat system for a 5-year period commencing in fiscal year 2009. This decision is driven by schedule pressures. The Navy has assessed that the Aegis combat system is insufficiently `open' to enable competition for Aegis modernization development efforts in the time remaining before the first ship installation, scheduled in 2012. The decision also reflects the challenges associated with performing the tasks necessary to open this complex combat system for competition under prior sole source development contracts.

The committee is concerned that, absent a rigorous program plan that provides for steady, incremental progress at opening the Aegis combat system, in lock-step with contracts governing the system development, the Navy will continue to fall short of the progress required to achieve the objectives for OA.

Therefore, the committee directs that no greater than 50 percent of the amounts authorized for fiscal year 2009 for the surface combatant combat system engineering program (PE 64307N) may be obligated under a sole source contract, until 30 days after submission by the Secretary of the Navy of a detailed program plan for implementing OA for the Aegis combat system. The program plan shall be included in subsequent quarterly reports to the congressional defense committees on Naval Open Architecture, and shall include methodology and scheduling for incrementally opening the Aegis combat system. The plan must provide for measuring discrete progress toward achieving a full open system commensurate with introduction of the 2012 Aegis baseline (formerly referred to as `COTS Refresh 3').

It is the committee's intent that, following consultation with the Navy regarding the details of this plan, the Navy will: (1) establish future benchmarks to govern the transition from sole source to competitive development during the period 2010 to 2013; and (2) transfer the lessons learned from this initiative to remaining surface ship combat system development programs.

F/A-18 Hornet and Navy tactical aviation inventory shortfall

The committee is concerned that the Navy is facing a sizeable gap in aircraft inventory as older F/A-18A-D Hornets retire before the aircraft carrier variant (F-35C) of the Joint Strike Fighter (JSF) is available. Compounding this problem is the higher-than-predicted use of Hornets in ongoing operations and the challenges of meeting Marine Corps/Navy tactical aircraft integration obligations. The committee similarly raised this issue in the committee report accompanying S. 1547 (S. Rept. 110-77) of the National Defense Authorization Act for Fiscal Year 2008.

This year, the committee again received testimony from the Navy of a projected shortfall in Navy tactical aviation. The Navy has indicated that, under current assumptions, it will experience a shortfall of 69 tactical aircraft in the year 2017, a number that swells to 125 when requirements of the United States Marine Corps are included. The committee believes that the Navy's projection of this shortfall may be, however, based on a series of questionable assumptions.

Regardless, the acknowledgement that the Navy will be short, at minimum, the equivalent of a full carrier air wing and an additional half of a carrier air wing of aircraft is troubling to the committee. Navy aircraft carriers are among the nation's most important power projection platforms. With shortfalls as large as the Navy is projecting, we could be faced with drastically reducing the number of aircraft available on short notice to the combatant commanders, either because we have deployed under-strength air wings, or because we did not deploy the carrier at all because of these aircraft shortages.

The committee understands that the Navy is preparing a comprehensive tactical aviation plan to be delivered to the committee late summer, 2008. The committee eagerly awaits the results of that plan. Last year the committee directed the Congressional Budget Office to report on the strike fighter gap, with that report due this fall. Finally, as discussed elsewhere in this report, the committee has asked for a Department of Defense 30-year aviation plan, the first of which is to be delivered with the defense budget next February. These three plans should serve to inform the continuing debate over the looming strike fighter shortfall.

The committee notes the Navy has testified about its confidence in the F/A-18E/F Super Hornet and its commitment to a long-term mix of Super Hornet aircraft and the future F-35C variant. Navy plans indicate that F/A-18-E/F Super Hornets will remain in the fleet until at least 2040. While the Navy has programmed the purchase of 89 F/A-18E/F in its future-years defense program (FYDP) (40 in fiscal year 2010, 27 in fiscal year 2011, and 22 in fiscal year 2012), it has not positioned itself to potentially increase its purchase of F/A-18 E/Fs in order to address the projected carrier aircraft shortfall. In the near term, the Navy has no satisfactory alternative to the F/A-18E/F for filling the gap.

Therefore, the committee believes that a multiyear procurement (MYP) of additional F/A-18E/F aircraft may be helpful in closing whatever gap in capability is borne out by the plans described above. Needless to say, the committee expects that any MYP contract the Navy enters into, including one for this program, will fully comply with the requirements of section 2306b of title 10, United States Code, as amended by section 811 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181). That section lays out a framework that allows the services to decide on which major weapons it seeks to buy under a multiyear contract, deliberatively and timely.

Subject to the outcome of the plans described above, the Navy should explore all available options in determining how to address the anticipated tactical aircraft shortfall, although options to resolve the Navy tactical aircraft shortfall must be viewed realistically. Projections of the shortfall are already predicated on extending the maximum number of F/A-18A-D fleet aircraft to what virtually all observers have acknowledged is the extreme limit, a level of 10,000 total flight hours. Further, the shortfall assumes achieving an initial operational capability for the F-35C in 2015.

The committee is particularly concerned that a failure to establish the conditions for an MYP on the F/A-18E/F by fiscal year 2010, should the Navy ultimately decide to purchase additional F/A-18E/F aircraft to address the tactical aircraft shortfall, could lead to the loss of `substantial savings' to the government. If the Navy were to proceed with annual purchases of F/A-18E/F aircraft to close the tactical aircraft shortfall but not position itself to do so with an MYP, the taxpayer may be deprived of `substantial savings,' within the meaning of section 2306b of title 10, United States Code, as amended. The committee understands that the two previous MYP contracts that the Navy executed on this program obtained that level of savings--a savings that exceed 10 percent of the total costs of carrying out the program through annual contracts. The first MYP resulted in an estimated savings of $700.0 million. The second MYP resulted in an estimated savings of $1.1 billion. This suggests that the Navy could achieve significant savings on a third MYP.

The committee remains supportive of the 5th generation F-35, Joint Strike Fighter. This provision should in no way be misconstrued as a lack of support for the F-35. In fact, the Department of Defense's current FYDP funding and quantities for the F-35C program should not be affected if the Navy decides to pursue an F/A-18E/F multiyear contract unless changes to the F-35C program are being made for purposes other than to facilitate purchases of F/A-18E/F aircraft.

Light utility helicopter

The committee understands that the Army's Light Utility Helicopter (LUH) is a commercial off the shelf procurement program that will begin fielding to the National Guard in June 2008. The committee notes that the Army's current procurement plan buys fewer aircraft per fiscal year in 2009, 2010, and 2011. The committee believes that the LUH program may benefit from an accelerated procurement strategy. The committee, therefore, directs the Secretary of the Army to reevaluate the acquisition strategy for the LUH to determine if an accelerated procurement plan could realize significant economic order quantity unit cost savings, allow the Army to retire aging and more expensive H-1 and H-58 model helicopters, and free up UH-60 Blackhawks for the global war on terror and medium helicopter operations. The Secretary shall provide the congressional defense committees with the results of this reevaluation not later than September 30, 2008.

Material handling equipment study

The committee understands that the U.S. Transportation Command (TRANSCOM) has previously identified significant shortfalls in Air Force material handling equipment (MHE) capable of deploying and operating in austere expeditionary environments. In response, Congress increased funding for the Halvorsen Air Cargo Loader for a number of years.

The committee is concerned that ongoing attrition of older MHE units, increased Army combat end strength potentially requiring increased through put, and procurement of additional strategic and theater lift aircraft including the JCA and KC-X tanker with increased cargo capacity may serve to further exacerbate the operational requirements versus availability of MHE.

Therefore, the committee directs the Secretary of the Air Force, in consultation with the Secretary of the Army, to conduct a comprehensive analysis of current and future MHE requirements across the Air Force, Army, and National Guard, and report to Congress on the findings of the study with the budget request for fiscal year 2010.

Mine Resistant Ambush Protected Vehicles

The National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) included over $17.2 billion for the procurement of more than 15,000 Mine Resistant Ambush Protected (MRAP) vehicles. At the beginning of April 2008, according to the MRAP Joint Program Office, over 3,500 MRAP vehicles had been delivered to the U.S. Central Command area of responsibility--3,368 to Iraq and 154 to Afghanistan. The committee commends the Department of Defense and industry for working together to deliver rapidly to theater this urgently needed piece of equipment.

The committee notes that in the coming months and years, the Department will need to develop a plan to incorporate these vehicles into the tactical wheeled vehicle fleets of the military services and develop a sustainment plan for the eventual transition of these vehicles from contractor logistic support to government support. Further, the Department must begin to account for the full cost of maintaining the different manufacturer variants and to develop as many efficiencies as possible.

The Government Accountability Office has noted that developmental testing of the MRAP continues and that significant engineering change proposals are necessary to address a variety of issues. The committee intends to monitor closely how the Department works to incorporate these changes in the coming months, and the committee expects that the Department will place a high priority on any force protection and warfighter safety items that may be discovered in the ongoing developmental testing.

The committee also encourages the Department to continue to pursue aggressively force protection technologies that will ensure that our military forces remain the best equipped in the world. The committee continues to monitor a number of ongoing research efforts, including active protection systems, reactive armor, and other add-on armor kits for the existing legacy fleet.

Mission packages

The Navy has embarked on a program to develop modular counter-mine, anti-surface, and anti-submarine warfare systems, referred to as mission packages, to be deployed on the Littoral Combat Ship (LCS). The Navy envisions fielding 60 mission packages, which Navy commanders could interchange across the 55-ship LCS class as operational requirements dictate. This total system capability of the LCS program has been identified by the Chief of Naval Operations as a top priority for operations in the littorals. The committee similarly views the capability provided by a family of LCS mission packages as a key component of the maritime strategy. The committee is, therefore, concerned by the delays to mission package initial operational capability, deployment, and full operational capability caused by delays to the LCS construction program.

The Navy has designed the LCS mission packages with modularity and with open architecture. Having done this, the Navy should be able to deploy this capability on other ship classes. Such an expanded concept of operations would provide opportunities to employ mission packages more rapidly, and against threats and in operational scenarios perhaps not envisioned today.

Therefore, the committee directs the Secretary of the Navy to evaluate alternatives for employing LCS mission packages on other ship classes of the battle force, and to provide a report on his findings to the congressional defense committees with submission of the 2010 budget request. The report shall outline the feasibility, cost, and impacts associated with integrating mine countermeasures and anti-submarine mission packages on other surface combatant and amphibious force ship classes, and provide an assessment of the operational utility afforded by being able to deploy mission packages across the broader battle force.

Operational support aircraft for U.S. Africa Command

The committee is concerned that the Commander of U.S. Africa Command (AFRICOM) lacks the necessary air support to execute effectively his mission in a continent comprised of 53 countries, spanning a geographic area larger than the United States, China, and Western Europe combined.

The Air Force has requested a C-37B and a C-40 aircraft for AFRICOM on its unfunded priorities list. The committee considers AFRICOM's operational airlift capability a high priority. The committee requests that the Air Force support the AFRICOM Combatant Commander's requirement with existing assets and, in the future, include these items in its regular budget request.

Shadow unmanned aerial vehicle

The budget request included $316.6 million in Other Procurement, Army for tactical unmanned aerial vehicles (UAV). The Army originally submitted a budget request $194.5 million higher in this PE than what was approved for submission to Congress. Included in this amount was $162.4 million for improvements to the Shadow vehicle. The Office of the Under Secretary of Defense for Intelligence (USDI) cut this amount due to a misunderstanding that the funds were intended to procure many more Shadow units, well beyond the approved procurement objective. The funds were in fact intended to field a heavy fuel engine, a tactical common data link, a laser designator, better cold-weather performance, and improved launch and recovery capabilities for the Shadow UAV.

The committee believes that these proposed improvements are needed not only for better combat performance; all but the laser designator are also important for gaining routine access to national airspace for training and support to domestic emergencies. The committee recommends that the USDI reconsider his position and identify resources for reprogramming to initiate these improvements in fiscal year 2009.

Ship maintenance and material condition

The Navy has determined that a battle force of no less than 313 ships, operating within the framework of the Fleet Response Plan (FRP), is necessary to meet the requirements of the National Security Strategy. The FRP provides the framework for managing training, maintenance, and material readiness to ensure the Navy's ability to command the seas in major combat operations. Successful execution of the FRP relies upon individual unit readiness, which, in turn, relies upon the most fundamental ability to self-assess and maintain material condition. This is particularly critical as today's 280-ship Navy falls well short of the Chief of Naval Operations' requirement for 313 ships.

Chapter 633 of title 10, United States Code, establishes the requirement for a Board of Officers, commonly referred to as the Board of Inspection and Survey, or INSURV, to examine naval vessels. The committee is concerned that recent INSURV reports have found that certain front line ships of the Navy are unfit for combat operations. When forward-deployed mine countermeasure ships were unable to get underway in 2006, the Navy attacked the material issues to restore these ships to high readiness. However, subsequent reports of serious degradation to amphibious ships, and more recently, the determination that two Aegis combatants are `unfit for combat operations,' raises concern that there are systemic issues associated with organic level maintenance and self-assessment that jeopardize the Navy's ability to meet its objectives under the FRP.

The committee directs the Secretary of the Navy to submit a report to the congressional defense committees with the fiscal year 2010 budget which addresses ship material condition and readiness. The report shall include underway material inspection findings and trends of the INSURV board during 2003-2008, with an analysis of the cause for any downward trends and the actions underway to improve upon these trends. Further, the report shall specifically address the factors surrounding any ships found to be seriously degraded or unfit for combat operations. The report shall also address the Navy's findings with regard to unit level ability to self-assess and maintain material condition readiness.

In view of the current emphasis by the Navy to reduce shipboard manning, the report shall include the Navy's plan for maintaining material readiness for the Littoral Combat Ship (LCS), which the Navy currently intends to deploy for extended durations. To support these extended deployments, the Navy intends to utilize rotating crews, consisting of substantially less than 50 percent of current combatant crew manning levels. The LCS plan shall include a description of maintenance requirements, performing organizations, budget requirements, and any consideration by the Navy to outsource LCS maintenance.

Warfighter Information Network-Tactical

The committee continues to follow closely the test and evaluation activities associated with the Warfighter Information Network-Tactical (WIN-T) program. Following a fiscal year 2007 Nunn-McCurdy unit cost breach, WIN-T is currently being restructured, and will be fielded in four increments. The first increment absorbs the former Joint Network Node-Network (JNN-N) program and provides the Army an initial battlefield networking capability down to the Army's battalion level. Follow-on increments will provide the Army with greater data capacity and more agile on-the-move capabilities. Increment 3 is intended to provide the Army with full interoperability with the Future Combat System (FCS).

The committee continues to recognize the importance of this program to the Army's overall modernization efforts. However, the committee shares the concerns raised by the Director of Operational Test and Evaluation (DOT&E) regarding the risk involved in pursuing an Initial Operational Test and Evaluation (IOT&E) without proper documentation and test resourcing. Now that the Army has completed its WIN-T Overarching Acquisition Strategy Report with accompanying Increment 1 Annex, the committee believes the Army must complete its WIN-T Increment 1 Test and Evaluation Master Plan and IOT&E test plan with certification by DOT&E. Further, the committee believes it is critical that the Army test systems that are procured under the WIN-T Increment 1 contract, not equipment procured under the JNN-N contract. Additionally, the committee emphasizes that, for both WIN-T Increment 1 and 2 operational testing, the Army must use field representative units engaged in a full spectrum operations scenario.

Further, the committee directs the Secretary of the Army, in coordination with the Under Secretary of Defense for Acquisitions, Technology, and Logistics and the DOT&E, to report, no later than 90 days after enactment of this Act, on the Army's: (1) initial operational test plan, as approved by the DOT&E for WIN-T Increment 1 as well as Test and Evaluation Master Plans for WIN-T Increments 1,2, and 3; (2) current plans to develop a baseline for WIN-T Increment 3; (3) timeline and details for a memorandum of agreement on requirements stability between FCS and WIN-T program offices; and (4) plans for completing an independent life cycle cost estimate for WIN-T Increment 3.

TITLE II--RESEARCH, DEVELOPMENT, TEST, AND EVALUATION

Explanation of tables

The following tables provide the program-level detailed guidance for the funding authorized in title II of this Act. The tables also display the funding requested by the administration in the fiscal year 2009 budget request for research and development programs, and indicate those programs for which the committee either increased or decreased the requested amounts.

These tables are incorporated by reference into this Act as provided in section 1002 of this Act. The Department of Defense may not exceed the authorized amounts (as set forth in the tables or, if unchanged from the administration request, as set forth in budget justification documents of the Department of Defense) without a reprogramming action in accordance with established procedures. Unless noted in this report, funding changes to the budget request are made without prejudice.

Insert offset folio 173 here SR335.084

SUBTITLE A--AUTHORIZATION OF APPROPRIATIONS

SUBTITLE B--PROGRAM REQUIREMENTS, RESTRICTIONS, AND LIMITATIONS

Requirement for plan on overhead nonimaging infrared systems (sec. 211)

The committee recommends a provision that would direct the Secretary of the Air Force to develop a comprehensive plan to conduct and support research, development, and demonstration of technologies that could evolve into the next generation of overhead nonimaging systems. The plan would also include an explanation of how such systems would be tested, including any flight or on-orbit testing as well as how and when the technologies would transition to an acquisition program. In addition, the provision would prohibit appropriation of more than 50 percent of the funds authorized to be appropriated for the third generation infrared surveillance program until the plan is submitted to the congressional defense committees.

Advanced battery manufacturing and technology roadmap (sec. 212)

The committee recommends a provision that would require the Secretary of Defense to develop a detailed roadmap for the development of advanced battery technologies, and a domestic manufacturing base and assured supply chain to meet current and future military requirements. The committee notes that the Defense Science Board Task Force on DOD Energy Strategy has highlighted the importance of advanced battery technologies in meeting military vehicle power and portable power requirements. The committee also notes that the Department of Defense (DOD) expends significant resources on the procurement of legacy batteries, and makes some investments in next-generation battery technologies.

The committee believes that advanced battery technologies can play a key role in improving system performance and reducing operating and system life cycle costs. However, the committee is concerned about the Department's ability to access reliable, trusted sources of advanced battery technologies, especially given the diminishing domestic manufacturing base for these systems. The committee believes that the roadmap required by this section will serve to better coordinate service and agency efforts in battery technologies and directly tie investments to specific capability gaps, technological opportunities, and military requirements. The committee directs that the roadmap be developed in cooperation with each of the military departments, the defense and automotive industries, academia, and the Department of Energy, to ensure that future investments, programs, and plans are well coordinated and that technological and manufacturing capabilities serve dual-use purposes where applicable and advantageous to the Department.

Availability of funds for defense laboratories for research and development of technologies for military missions (sec. 213)

The committee recommends a provision that would authorize the Secretary of Defense to establish mechanisms through which laboratory directors would be able to set aside up to 3 percent of funding available to their laboratories to support defense missions. The funds would be available for the purposes of investing in innovative in-house research projects, promoting transition of laboratory-developed technologies into operational systems, or for science and engineering workforce enhancement activities. The committee believes that the funds to be used under the authority of this provision should be a portion of those that are currently directly appropriated funds; are funds derived from work for other Department of Defense organizations, other federal agencies, and non-federal organizations; or from other sources of laboratory revenue.

The committee notes that the Department of Energy laboratories have had a similar authority, known as the Laboratory Directed Research and Development program. This authority is generally viewed as a necessary tool to support innovative research at those laboratories and retain and recruit the finest scientific talent, which helps ensure that the laboratories remain world class research institutions. Over the years, a number of independent groups, including the Defense Science Board, National Research Council, and Naval Research Advisory Committee have recommended similar authority for Department of Defense laboratories. The committee feels that this authority, if properly used, can help revitalize the defense laboratories and enable them to better support departmental missions and remain technically on par with their private sector, international, and other federal peers.

Assured funding for certain information security and information assurance programs of the Department of Defense (sec. 214)

The National Security Agency (NSA) and the Assistant Secretary of Defense for Network and Information Integration (ASD/NII) have attempted for a number of years to persuade the Office of Management and Budget to establish a budget line item for information assurance anticipatory development within the Department of Defense (DOD). While these efforts have not been successful, the committee believes that the arguments in favor of such a program are compelling.

The information technology (IT) industry is the most vibrant and rapidly evolving industry in the world. The Department attempts to acquire or make use of these commercial IT advances to achieve efficiencies and improved operational effectiveness. However, DOD cannot effectively adopt this technology if it cannot be used securely, yet the Department has no appropriate mechanism for keeping pace with the march of technology development.

There is, for example, an outstanding requirement for a very high speed Internet Protocol encryption capability, but NSA has almost no resources with which to respond. The executive branch recently had to launch a satellite that lacked encryption for a key wideband downlink. The Advanced Extremely High Frequency Satellite program was delayed because of a belated encryption subsystem development effort. These types of requirements can be anticipated and, with modest funding, security solutions can be developed to match acquisition schedules.

The committee recommends a provision that would impose a permanent 1 percent tax on the Department's information systems security program, other information assurance programs, and the non-National Intelligence Program-funded cyber security initiative to finance this new program.

The committee directs that the program be executed by NSA's Information Assurance Directorate unless otherwise specified by the ASD/NII. The ASD/NII shall review and approve expenditures under this program. The committee urges the administration to vitiate the need for this statute-based funding mechanism by submitting its own budget request for this activity.

Requirements for certain airborne intelligence collection systems (sec. 215)

The committee recommends a provision that would require that, by October 1, 2012, all intelligence collection aircraft that provide data to, or receive tasking from, the joint Distributed Common Ground/Surface System (DCGS) be connected to, and able to fully operate with, the Network Centric Collaborative Targeting (NCCT) network. The provision would provide for waivers on a case-by-case basis. The committee stresses that the RIVET JOINT RC-135 signals intelligence system is considered to be connected to the DCGS system via its satellite-based reachback capability, and therefore would be subject to the requirements of this provision.

The committee believes that NCCT is an important intelligence and targeting capability that has not received adequate resources or management attention. Intelligence budget requests are generally based on inputs from the program managers of the collection platforms and few of them see that allocating scarce resources to connect to the NCCT network is a high priority because doing so benefits consumers in general. The operational utility of universal NCCT participation for commanders is not reflected in the programming process. The committee urges the Office of the Secretary of Defense to impose a joint perspective to NCCT.

SUBTITLE C--MISSILE DEFENSE PROGRAMS

Review of the ballistic missile defense policy and strategy of the United States (sec. 231)

The committee recommends a provision that would require the Secretary of Defense to conduct a review of the ballistic missile defense policy and strategy of the United States, and to report the results of the review to Congress not later than January 31, 2010. The provision specifies a number of elements to be considered in the review.

The committee believes it is essential for the next administration to conduct a full review of missile defense policy, strategy, and related matters at the outset of its tenure. The previous missile defense policy review was conducted before the United States had deployed any missile defense systems other than the Patriot system. In order to expedite the deployment of an initial set of missile defense capabilities, the Missile Defense Agency was created and given extraordinary acquisition flexibility and authority, and high levels of concurrency were adopted.

Now that the initial missile defense capabilities have been deployed or are under production, the circumstances warrant a new overarching review to guide the next phase of U.S. missile defense programs and activities.

Limitation on availability of funds for procurement, construction, and deployment of missile defenses in Europe (sec. 232)

The committee recommends a provision that would limit the availability of fiscal year 2009 funds authorized to be appropriated in this Act from being obligated or expended for procurement, site activation, construction, preparation of equipment for, or deployment of major components of a long-range missile defense system in a European country until two conditions have been met: (1) the government of the country in which such major components of such missile defense system (including interceptors and associated radars) are proposed to be deployed has given final approval (including parliamentary ratification) to any missile defense agreements negotiated between such government and the United States Government concerning the proposed deployment of such components in such country; and (2) 45 days have elapsed following the receipt by Congress of the report required by section 226(c) of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181).

The provision would also limit the availability of fiscal year 2009 funds for the acquisition (other than initial long lead procurement) or deployment of operational interceptor missiles for the proposed long-range missile defense system in Europe until the Secretary of Defense certifies to Congress, after receiving the views of the Director of Operational Test and Evaluation, that the proposed interceptor to be deployed as part of such a missile defense system has demonstrated, through successful, operationally realistic flight testing, that it has a high probability of accomplishing its mission in an operationally effective manner.

The provision also makes clear that it would not limit continuing obligations and expenditures of funds for missile defense, including for research and development and for other activities not otherwise limited by the provision, including site surveys, studies, analysis, and planning and design for the proposed missile defense deployment in Europe.

The committee notes that the provision would adopt the same standard that was enacted in section 226 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) with respect to the availability of funds for the proposed deployment of a long-range missile defense system in Europe. The provision would make clear that if a European host nation provides final approval of a negotiated deployment agreement with the United States, it would be able to proceed without waiting for the final approval of another European nation on any missile defense agreements negotiated with the United States.

The provision would also clarify that initial long-lead procurement of parts for the planned 2-stage interceptors could be acquired. The committee notes that the initial long lead items planned for procurement are 100 percent common with both the 2-stage and 3-stage Ground-Based Interceptors (GBIs). Therefore, they could be used for purposes other than being deployed on operational 2-stage GBIs if necessary, including for flight test and ground test interceptors for either 3-stage or 2-stage GBIs. As described elsewhere in this report, the committee recommends authorizing initial funding for these long lead parts, with the understanding that if there are problems with the 2-stage GBI development program, these long lead parts would be used for other purposes, rather than being wasted or deployed before the 2-stage GBI is certified as ready.

The United States is continuing its negotiations with Poland and the Czech Republic on agreements concerning the proposed deployment of 10 GBI missiles in Poland and a midcourse X-band radar in the Czech Republic. Although the negotiations with the Czech Republic appear to be nearly complete, the negotiations with Poland could still take months to complete, and are conditioned on whether the United States meets Poland's requests for security enhancements. If the negotiations are concluded successfully, it will take additional time for the Polish and Czech parliaments to consider ratification of the agreements. Consequently, it remains unclear whether or when any agreements would be finally approved, a necessary condition before beginning any proposed construction or deployment.

The committee notes that the proposed 2-stage interceptor intended for deployment in Poland is still being developed, and is not scheduled to have its first booster flight test until the fourth quarter of fiscal year 2009. Given that a number of Ground-based Midcourse Defense (GMD) flight tests have been delayed substantially, it is possible that the 2-stage GBI tests will also be delayed.

In an October 2007 report, the Director of Operational Test and Evaluation (DOT&E) noted the `significant differences' between the proposed GMD deployment with a 2-stage interceptor in Europe and the existing GMD system deployed in the United States with a 3-stage GBI. According to the report, `European defense using GMD assets is a completely new mission area for GMD.' The report provided DOT&E's initial testing concept for the proposed European deployment, which would include three flight tests, two of which would be intercept tests. The Missile Defense Agency (MDA) was originally planning to conduct only two flight tests prior to deploying the system, one of which would be an intercept test. This planned flight test program would not meet the DOT&E minimum test plan concept. It is difficult to envision the certification required of the Secretary of Defense under these circumstances. However, MDA has recently agreed to conduct three flight tests, in accordance with the DOT&E test concept. The committee views this as a positive development.

The committee notes that, in their Bucharest summit declaration in April, Ministers of the North Atlantic Treaty Organization (NATO) recognized the substantial contribution of the planned deployment to the protection of NATO allies against long-range missiles, and said they were exploring ways to link the planned capability with NATO missile defense efforts. They also said they would develop options for a comprehensive NATO missile defense architecture to provide coverage of the portions of NATO Europe that would not be covered by the planned U.S. deployment, in order to inform any future political decision by NATO on whether and how to provide defensive coverage for the portion of its territory that would not be protected against ballistic missiles, including from the hundreds of Iranian ballistic missiles that exist today.

Airborne Laser system (sec. 233)

The committee recommends a provision that would require the Director of Operational Test and Evaluation (DOT&E) to review and evaluate the testing conducted on the first Airborne Laser (ABL) aircraft and to report to the Secretary of Defense and to Congress, not later than January 15, 2010, his assessment of the operational effectiveness, suitability, and survivability of the ABL system. The provision would also limit the availability of funds for procurement of a second ABL aircraft until the Secretary of Defense, after receiving the assessment of DOT&E, certifies that the ABL system has demonstrated, through successful testing and operational and cost analysis, a high probability of being operationally effective, suitable, survivable, and affordable.

The committee observes that Missile Defense Agency officials indicated in a briefing to staff that the authority to proceed with the second ABL aircraft has been granted on the condition that the planned 2009 first shoot-down demonstration test is successful, and that the budget request included $15.8 million to begin studies and analysis on a second ABL aircraft. The committee believes that a decision on whether to proceed with a possible second ABL aircraft should only be made after much more information is available about the likelihood that the system could eventually provide an operationally effective, suitable, survivable, and affordable missile defense capability.

As the committee noted last year, the ABL program has many unanswered questions about operational effectiveness, suitability, survivability, and affordability. The committee believes these questions need to be answered before making a commitment to procure a second ABL aircraft.

Annual Director of Operational Test and Evaluation characterization of operational effectiveness, suitability, and survivability of the Ballistic Missile Defense System (sec. 234)

The committee recommends a provision that would require the annual report by the Director of Operational Test and Evaluation (DOT&E) on the testing of the Ballistic Missile Defense System (BMDS) to include a characterization of the operational effectiveness, suitability, and survivability of the BMDS and its elements that have been fielded or tested before the end of the previous fiscal year.

Section 232(h) of the National Defense Authorization Act for Fiscal Year 2002 (Public Law 107-107) requires DOT&E to provide an annual report to Congress assessing the adequacy and sufficiency of the test program of the Missile Defense Agency (MDA) during the previous fiscal year. Section 234(b)(2) of the National Defense Authorization Act for Fiscal Year 2006 (Public Law 109-163) requires DOT&E to submit a report to Congress providing his characterization of the operational effectiveness, suitability, and survivability of the BMDS at the conclusion of testing of each 2-year block of the BMDS. However, MDA eliminated the previous 2-year block structure and replaced it with functional blocks that respond to specific threats. These new blocks have no timelines associated with them, thus changing the schedule assumptions of section 234(b)(2). This provision would retain the requirement for DOT&E to report to Congress on the characterization of the BMDS, consistent with the new MDA block structure.

The committee notes that the DOT&E annual missile defense testing report for 2007 included the DOT&E characterization of the operational effectiveness, suitability, and survivability of the Block 2006 BMD system and its elements, in fulfillment of the requirements of section 234(b)(2) of the National Defense Authorization Act for Fiscal Year 2006. In testimony before the committee, Dr. Charles McQueary, the DOT&E, stated that he plans to include this characterization information in future annual DOT&E reports on missile defense testing.

Independent assessment of boost-phase missile defense programs (sec. 235)

The committee recommends a provision that would require the Secretary of Defense to enter into a contract with the National Academy of Sciences to conduct an independent assessment of the boost-phase missile defense programs of the United States to consider the extent to which boost-phase missile defense is feasible, practical, and affordable, and whether any of the existing boost-phase missile defense technology programs of the Department of Defense (particularly the Airborne Laser and the Kinetic Energy Interceptor) have a high probability of performing a boost-phase missile defense mission in an operationally effective, suitable, survivable, and affordable manner. Upon completion of its assessment, the National Academy would submit a report on the results of its assessment to the Secretary of Defense and the congressional defense committees, along with any recommendations the Academy considers appropriate.

The committee notes that the Department of Defense will have spent over $5.1 billion since 1996 on the Airborne Laser (ABL) technology demonstration program to conduct the first proof of principle missile shoot-down demonstration test in 2009, and an additional $2.8 billion in the 4-year period starting in fiscal year 2010. The Congressional Budget Office provided an initial estimate that a fleet of seven ABL aircraft could cost as much as $36.0 billion to develop, acquire, and operate. Additionally, the Department plans to spend more than $3.6 billion over the 7-year period starting in fiscal year 2007 on technology development for the Kinetic Energy Interceptor (KEI) as a possible boost-phase intercept system. Despite these significant past and planned expenditures, there is no assurance that either of these systems will work in an operationally effective, practical, or affordable manner.

As the committee noted last year, the ABL program has a host of significant unanswered questions related to whether it could work in an operationally effective, suitable, survivable, and affordable manner. For example, the ABL concept is to destroy a missile body--not the warhead--while it is boosting. By the time this intercept would take place, the missile could have achieved sufficient velocity to travel well outside the border of the nation that launched it. Thus, the warhead could continue to fly to an unintended location, including possibly an allied country where U.S. forces are deployed, and cause significant damage. Also, for the aircraft to have any possibility of conducting intercepts, it would have to be flying at exactly the right place and the right time, out of range of air defenses, but within range of a boosting missile. Given these constraints, there appear to be practical limits to the ability of an ABL system to operate against most nations that possess ballistic missiles.

In its March 2007 report, `Defense Acquisitions: Missile Defense Acquisition Strategy Generates Results but Delivers Less at a Higher Cost,' the Government Accountability Office recommended an independent evaluation of ABL and KEI `to inform decisions on the future of the two programs.' The statement of managers to accompany the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) expressed the view that an independent review should be conducted of the ABL and KEI programs.

The committee believes it would be important to have an independent, technically competent review of the feasibility, practicality, and affordability of boost-phase missile defense programs to help inform future decisions on missile defense investments.

Study on space-based interceptor element of ballistic missile defense system (sec. 236)

The committee recommends a provision that would direct the Secretary of Defense to enter into a contract with one or more independent entities to conduct a review of the feasibility and advisability of developing a space-based interceptor element to the ballistic missile defense system. The provision would require that the contract be entered into after consultation with the Chairman and Ranking members of the Committees on Armed Services of the Senate and the House of Representatives, and no later than 75 days after the date this Act is enacted. The committee expects the Secretary of Defense to undertake a thorough consultation with the Committees on Armed Services in advance of selecting the independent entity or entities to conduct the study.

The independent entities could be federally funded research and development centers, including the Department of Energy National Laboratories, recognized scientific and technical organizations such as the National Academy of Sciences, the American Association for the Advancement of Science, the American Physical Society, or drawn from academia such as JASON.

The provision would direct the report be provided simultaneously to the Committees on Armed Services and to the Secretary of Defense and would permit the Secretary a period of 60 days to submit comments or recommendations with respect to the report to the committees. The report and any comments would be submitted in an unclassified form but may include a classified annex.

The provision would authorize $5.0 million from funds available to the Missile Defense Agency for the study.

SUBTITLE D--OTHER MATTERS

Modification of systems subject to survivability testing by the Director of Operational Test and Evaluation (sec. 251)

The committee recommends a provision that would ensure that the Director of Operational Test and Evaluation (DOT&E) can perform adequate and necessary oversight over the live fire, survivability, and lethality testing of critical defense systems. The committee has been concerned about the oversight of testing, and the lack of standardized testing for systems fielded to personnel in Iraq and Afghanistan, including personnel protective equipment such as body armor and helmets. The committee attempted to enhance testing and DOT&E oversight authority over testing of these types of systems through statutory changes in section 231 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364). Section 231 intended to authorize the DOT&E to perform necessary oversight activities over force protection and non-lethal weapon systems.

The committee feels that the ability of the DOT&E to perform his intended role to ensure that fielded systems are survivable is hindered by lack of statutory authority and limited cooperation by the military services. The committee notes that the DOT&E has worked effectively in partnership with the services in performing testing oversight duties on important rapid development and fielding initiatives like the Mine Resistant Ambush Protected (MRAP) vehicle, which have contributed to improving the survivability and performance of the systems without unnecessary delay in development or fielding of vital combat systems.

The committee directs the secretaries of the military departments to ensure that programs designated for survivability oversight by the DOT&E under this authority cooperate fully with testing oversight officials such that all equipment fielded to deployed personnel is safe, survivable, and of the highest performance possible.

Biennial reports on joint and service concept development and experimentation (sec. 252)

The committee recommends a provision that would modify the existing reporting requirement on joint warfighting experimentation activities. The provision would reduce the reporting requirement from annual to biennial and change the report's focus to better reflect the current state of concept development and experimentation activities in the Department of Defense, and better highlight current and future activities that will enable robust joint warfighting capabilities.

The committee commends United States Joint Forces Command (JFCOM) for its extensive efforts in concept development and experimentation. To date, JFCOM activities have explored a number of emerging operational concepts, capabilities, and technologies, including addressing future homeland defense, interagency cooperation, urban operations, and multinational operations scenarios. However, it is not clear that JFCOM is placing a high enough priority on experimentation with future concepts and technologies that could be operationally employed in a time frame of greater than 10 years. The committee is also concerned that the efforts of JFCOM in this regard have not had sufficient and wide ranging impacts across the organizational and force structures, doctrine, and materiel development activities of the Department of Defense. The committee also notes that the services continue to pursue their own warfighting experimentation and concept development activities, though often in a manner poorly coordinated with joint efforts. Therefore, the provision's reporting requirements include focused reporting on `futures' experimentation, an assessment of the return on investments in concept development and experimentation activities in terms of specific outcomes and impacts within the Department of Defense, and descriptions of the concept development and experimentation activities of the military departments.

Further, the committee notes that the JFCOM Commander's activities in joint training, provision of joint forces, and position as the North Atlantic Treaty Organization (NATO) Supreme Allied Commander for Transformation may also serve to motivate recommended changes in the Department's organizational and force structure, doctrine, and materiel development efforts, which should also be incorporated into the recommendations included in the report.

Finally, the committee directs the secretaries of the military departments to support the development of this report through coordination, appropriate resources, and supplying required information in a timely manner.

Repeal of annual reporting requirement relating to the Technology Transition Initiative (sec. 253)

The committee recommends a provision that would eliminate the recurring reporting requirement on the Technology Transition Initiative (TTI). The committee originally proposed this initiative in the National Defense Authorization Act for Fiscal Year 2002 (Public Law 107-107) in order to accelerate the transition of technologies from science and technology programs into operational use. The initiative was codified in section 242 of the Bob Stump National Defense Authorization Act for Fiscal Year 2003 (Public Law 107-314).

The committee notes that the TTI is currently successfully transitioning roughly 70 percent of its funded projects into operational use. This committee believes that this success is a result of the initiative's flexible funding, cost sharing requirements, and joint and service participation in the selection and funding of projects. The committee notes that the statute and processes of the TTI have contributed to enhancing the links between technology developers, requirements generators, and operators, and have successfully enhanced transition efficiency and speed. The committee notes that there are now a number of parallel initiatives and programs seeking to accelerate technology transition in the Department of Defense, including, but not limited to, the Quick Reaction Fund, the Joint Improvised Explosive Device Defeat Fund, the work of the Joint Rapid Acquisition Cell, many Defense Advanced Research Projects Agency efforts, and the Army Agile Integration and Demonstration program.

The committee notes that some of these programs may be duplicative and others may not be adequately coordinated with partner services, agencies, and operational users, but rather are flexible funds used solely in the discretion of a single organization. The committee notes that the desire for complete flexibility in the use of appropriated funds is a necessary but insufficient condition for enhancing technology transition, and can lead to problems in ensuring adequate oversight and in coordination between elements of the Department. The committee recommends that the Secretary of Defense, working through the Technology Transition Council, continue to review these programs and their relative merits and authorities and recommend any necessary consolidation, expansion, or changes in statutory authorities, or other changes in regulations or execution that would increase their efficiency and effectiveness.

Executive agent for printed circuit board technology (sec. 254)

The committee recommends a provision that would follow the recommendations of the National Research Council and a report of the Deputy Under Secretary of Defense for Logistics and Materiel Readiness and would require the establishment of an executive agent to oversee Department of Defense (DOD) activities related to printed circuit board technologies. The committee notes that the National Research Council's Board on Manufacturing and Engineering Design studied the issue of DOD access to legacy and future generations of printed circuit board technologies to support defense and other missions. The resulting 2005 report made a series of recommendations designed to ensure DOD access to printed circuit board technology and enable the development of new capabilities needed to support emerging requirements.

In March 2008, a Principal Response Team convened by the Navy and Defense Logistics Agency, and consisting of membership from the Office of the Secretary of Defense, the National Security Agency, the military services, and the Departments of State and Energy, reported to Congress that `DOD concurs with comments on all NRC recommendations,' and identified current and potential actions to address each one.

The committee notes that printed circuit board technologies are critical components of numerous defense systems, and cost the Department roughly $500.0 million annually. There are strong and growing concerns related to the development of next-generation capabilities, to preserving assured access to trusted sources of technology due to a diminishing domestic manufacturing base, and even to the trustworthiness of existing supplies of printed circuit board technology being used for military systems. The committee notes that DOD efforts to address these issues have been underfunded and disjointed in the past. The establishment of an executive agent can raise the profile of risk issues related to printed circuit board technological, as well as production and acquisition issues, and help ensure that these concerns are better addressed in future budgets, plans, and programs. The committee further notes that the March 2008 DOD report recommended a series of possible actions for the executive agent to undertake to address a variety of issues. The committee directs the executive agent to carefully analyze and evaluate these recommendations and act on them as appropriate.

Report on Department of Defense response to findings and recommendations of the Defense Science Board Task Force on Directed Energy Weapons (sec. 255)

The committee recommends a provision that would require the Secretary of Defense to develop specific responses to the findings and recommendations of the December 2007 Defense Science Board (DSB) Task Force on Directed Energy Weapons. The DSB found that directed energy offers promise as a `transformational game changer,' but that `years of investment have not resulted in any current operational high-energy laser capability.' The DSB made a series of recommendations broadly aimed at accelerating the operational use of directed energy weapons, including: better defining concepts of operations for directed energy weapons; better understanding the relative benefits and disadvantages of directed energy systems versus traditional, kinetic systems; and better focusing research and development and science and technology investments on high priority potential operational solutions and on resolving specific high priority technical issues.

The committee directs the Secretary of Defense to coordinate a formal response to the DSB findings and recommendations in concert with appropriate technology development, requirements generation, and operational communities. The committee also directs that the required analysis address the important issue of assuring that the Department of Defense has sufficient testing expertise and infrastructure to adequately perform all necessary developmental and operational tests on directed energy systems.

Assessment of standards for mission critical semiconductors procured by the Department of Defense (sec. 256)

The committee recommends a provision that would require the Secretary of Defense to perform an assessment of existing and emerging technical methods for verifying the trustworthiness of semiconductors procured for use in critical defense applications.

The committee notes that the manufacture of semiconductors has continued to migrate to off-shore foundries, particularly to foundries in China. Since the defense semiconductor market comprises only 1 percent of the overall global semiconductor market, the Department of Defense's (DOD) ability to procure high end semiconductor technologies is largely dependent on commercial interests, practices, and markets.

The committee notes that the Department is currently depending primarily on a single source for high end semiconductors for defense and intelligence applications through the DOD Trusted Foundry program, which was established in 2004. The February 2005 report by the Defense Science Board Task Force on High Performance Microchip supply stated that the Trusted Foundry Program is an interim source of high performance integrated circuits (ICs) and was appropriate for addressing the immediate needs for trusted sources of IC supply. Since that time, the trend of migration of semiconductor manufacturing overseas has continued, making it more urgent to augment the Trusted Foundry by developing a more comprehensive approach for the procurement of trusted parts.

The committee notes that one issue that needs to be addressed by the Department through the required assessment is providing defense programs assurance of dependable, continuous, long-term access to trusted, mission critical semiconductors from both foreign and domestic sources for its potentially vulnerable defense systems. DOD needs for integrated circuits include high end semiconductors, custom Application Specific Integrated Circuits (ASICs), and Field Programmable Gate Arrays (FPGAs). The committee notes that the assurance of trust includes verifying that the semiconductor has not been tampered with or modified in any way, and performs only the functions expected and required. This also requires assurance that the design process, fabrication, packaging, final assembly, and test of semiconductors are also free from tampering.

The recommended provision would require that the Department inventory and possibly implement the best methods currently available for assuring trust. The committee recommends that the Department put in place an overall policy and direction, as well as a plan for the procurement of semiconductors that assures continuous access and trust to support military requirements. The committee believes the Department also needs to monitor and implement new techniques and approaches as they become available through technological advances.

Finally, the committee directs the Under Secretary of Defense for Acquisition, Technology, and Logistics to keep the congressional defense committees informed of the actions taken pursuant to this provision.

BUDGET ITEMS

ARMY

Insert offset folio 192 here SR335.085

Insert offset folio 193 here SR335.086

Insert offset folio 194 here SR335.087

Insert offset folio 195 here SR335.088

Insert offset folio 196 here SR335.089

Insert offset folio 197 here SR335.090

Insert offset folio 198 here SR335.091

Insert offset folio 199 here SR335.092

Insert offset folio 200 here SR335.093

Insert offset folio 201 here SR335.094

Insert offset folio 202 here SR335.095

Insert offset folio 203 here SR335.096

Insert offset folio 204 here SR335.097

Insert offset folio 205 here SR335.098

Insert offset folio 206 here SR335.099

Army basic research programs

The budget request included $177.0 million in PE 61102A for Army defense research sciences. The committee commends the Army for increasing investments in basic research by over $75.0 million relative to the fiscal year 2008 budget request. The committee notes that the previous Director of Defense Research and Engineering has called for increases in fundamental research of $300.0 to $500.0 million per year to support focused efforts in discovery and innovation on crucial problems for national security. Consistent with that effort, the committee recommends a series of increases to support mission-informed basic research.

The committee recommends an increase in PE 61102A of: $3.0 million for research on advanced energy storage technologies; $1.5 million for research on drug resistant bacterial infections; $1.5 million for research on understanding and forecasting natural environments to support global military operations; and $1.5 million for modeling and simulation studies of organic semiconductor materials and devices.

The budget request also included $77.0 million in PE 61103A for university research initiatives. The committee recommends a number of increases in PE 61103A to support Army mission areas, including: $2.0 million for research on the low temperature performance of military vehicles; $2.0 million for research on nanomaterials for lightweight composite systems; $1.2 million for research on training and simulation to support urban terrain operating capabilities; $2.5 million for nanoscale biosensor research; and $1.5 million for development of nanocomposite technologies for wireless energy applications.

Network science and technology research center

The budget request included $10.0 million in PE 61104A for the establishment of a network science and technology research center. The committee commends the Army for its continued commitment to investments in basic research, especially in the face of severe budget constraints due to the current operations and reset of the force. The committee also commends the Army for its new investments in network science and believes that these investments can lead to significant enhancements in operational capabilities.

The committee notes with concern that the current Army plan calls for the majority of funding for this effort to go to the establishment of a single research center. The committee believes that this approach ironically fails to take advantage of many of the benefits of networked, distributed research efforts. The committee believes that these include the ability to have a multitude of geographically diverse, interdisciplinary researchers working collaboratively on military network research issues, using shared or existing resources to reduce overall cost, and exploiting advances in computing, collaboration, and other information technologies to make research and technology development efficient and seamless.

The committee is also concerned that the Army's pre-selection of a site for the center has created a situation in which very few worthy academic institutions can legitimately compete to manage the center, thereby severely limiting the Army's ability to access the highest quality network science research across the nation. The committee also notes that the Army's management strategy for current university affiliated research centers faces some major problems. These include the fact that the centers and their relatively large basic research funding levels limit the Army's ability to reach out to a broad spectrum of universities to fund innovative research that would supplement investments in the focused centers, as well as a lack of planning for the process of terminating the centers, so that the Army's research programs can remain responsive to military needs and scientific opportunity.

Finally, the committee notes that the National Research Council's 2007 report entitled `Strategy for an Army Center for Network Science, Technology, and Experimentation' concluded that, `based on Army needs, the NSTEC [Network Science, Technology, and Experimentation Center] should be a hybrid operation consisting of two or three centralized facilities having interconnectivity to a variety of distributed supporting elements.' The current Army proposed plan and budget is not consistent with this recommended hybrid approach.

Therefore, the committee directs that the network science and technology research center be established as a virtual center, with the majority of funding going to a networked group of investigators selected on the basis of technical merit of proposed research. The committee directs that only up to $2.0 million of the $10.0 million authorized in PE 61104A for the establishment of a network science and technology research center shall be available for the purpose of infrastructure and facilities development at the proposed U.S. Army Aberdeen Proving Ground, Maryland location. The remaining funds are to be used for other program purposes, primarily the funding of competitive projects to a diverse group of single investigators and research teams who will participate in the virtual network science center. The committee directs the Secretary of the Army to report to the congressional defense committees on the status of the virtual center, the use of authorized funding, and the methods of selection of industry and academic participants in the virtual center, no later than December 31, 2008.

Army materials research

The budget request included $27.0 million in PE 62105A for applied research on materials technology. The committee notes that the Army's Vehicle Armor Technology Objective seeks to provide comprehensive solutions to threats that will be faced by the Future Combat Systems ground vehicles. In support of that objective, the committee recommends increases of: $2.0 million for research on lightweight composites for combat and tactical vehicle applications and $1.7 million for development of materials processing technologies to support production of lightweight armor systems.

To help reduce life cycle costs of Army ground and aviation assets, the committee recommends an increase of $2.0 million in PE 62105A for development of cold spray coating technologies for repair applications.

The committee notes that one of the major threats currently facing deployed forces is improvised explosive devices (IED). To support efforts to better technically characterize these threats, the committee recommends an additional $475,000 in PE 62105A for development of simulations of IED blast effects.

Finally, in the May 2007 report to Congress on the Defense Nanotechnology Research and Development program, the Director of Defense Research and Engineering indicated that sustained support was necessary to continue development of novel nanotechnology-based systems and devices, and that increased support was needed to further nanomanufacturing efforts. Consistent with that report, the committee recommends an additional $2.0 million for the development of advanced magnetic nanosensor technologies, and an additional $1.5 million for the development of advanced nanomanufacturing capabilities for multifunctional sensors.

Advanced Army energy and power technologies

The Defense Science Board (DSB) Task Force on Energy Security highlighted the critical security, cost, and performance issues that currently face and will increasingly handicap the Department of Defense (DOD) due to its overreliance on costly, sometimes unreliable sources of energy. The DSB study noted that increased investments in research on energy and power technologies were warranted in order to address this issue, stating, `. . . technologies with the potential to make incremental improvements often are not significant enough to attract much funding and are disadvantaged in their competition for deployment into programs.' To support Army efforts to address emerging energy and power requirements and enable new operational capabilities, the committee makes a series of increases for energy and power research activities.

The National Research Council's 2004 report entitled `Meeting the Energy Needs of Future Warriors' noted a number of technical challenges for battery and fuel cell development and commented that `the challenge is to make them smaller, lighter, cheaper, more reliable, and more energy-dense without sacrificing safety.' To support the achievement of this technological goal, the committee recommends increases of: $2.0 million in PE 62120A for development of hydrogen battery technologies; $2.0 million in PE 62705A for soldier portable fuel cell technologies; and $2.0 million in PE 63734A for direct methanol fuel cell development.

The DSB noted that there are a number of executive order and statutory mandates that are driving the Department to improve the energy efficiency of its facilities and to utilize alternative fuels in its non-tactical alternative fueled vehicles. In order to support the development of technologies that could help DOD meet those goals, the committee recommends a number of funding increases for investments in advanced energy power and technologies for vehicle applications. The committee recommends increases for advanced technology development on combat vehicles of: $6.0 million in PE 63005A for the development of military hybrid engines; $3.0 million for advanced lithium battery technologies; $5.0 million to support development of next-generation non-tactical fuel cell vehicle technologies; $2.0 million for the development of nickel metal hydride batteries for military vehicles; $10.0 million for an advanced military vehicle battery development and testing initiative; $3.0 million for the development of hydraulic hybrid vehicle systems; $4.0 million for development of hybrid blast resistant vehicles; $3.5 million for the demonstration of hydraulic hybrid retrofit technologies for legacy Army vehicles; $1.0 million for the development of solid hydrogen storage technologies; $2.0 million for development of integrated power management and control technologies; $3.5 million for the development of logistics fuel processors; $5.0 million for development of electric drive technologies for tactical wheeled vehicles; and $12.0 million for Army power and energy research infrastructure and equipment.

The DSB task force also called for DOD to address critical infrastructure security issues that result from energy use. To help address these infrastructure issues, the committee recommends an additional $1.0 million in PE 63734A for the development of fuel cell systems to provide power for continuity of operations missions.

The Future Combat Systems (FCS) program has identified power and energy technologies, especially batteries, and continuing work to leverage commercial technology development, as a top science and technology priority. The committee also recognizes the value of dual-use research and technology research and development in the area of energy and power systems for vehicles. To support these efforts the committee is recommending a series of increases in applied research on dual-use energy and power vehicle systems. The committee recommends increases of: $1.5 million in PE 62601A for research on next-generation vehicle design and biofuel technologies; $2.0 million for the development of hybrid electric vehicle battery technologies for FCS; $4.0 million for development and testing of fuel cells for medium and heavy duty vehicles; and $2.0 million for advanced lightweight electric drive technologies. Additionally, the committee recommends an increase of $2.0 million in PE 62601A for research on novel military fuels.

Army aviation technologies

The budget request included $17.0 million in PE 62211A for applied research for aviation technology. The committee notes that the United States Central Command has identified the development of standoff and persistent observation of the improvised explosive device `kill chain' by advanced sensors using unmanned air systems as a high science and technology priority. To support the development and maturation of that capability the committee recommends an increase in PE 62211A of $2.5 million for research on slowed rotor technologies for unmanned air systems.

Sniper detection systems

The budget request included $17.0 million in PE 62308A for advanced concepts and simulation. The committee notes the continued threats that snipers and mortars pose to deployed forces, especially in urban settings. Therefore, the committee recommends an increase of $3.0 million for the development of wearable sniper detection systems to aid in localizing sniper fire and mortar launches.

Army vehicle reliability technologies

The budget request included $55.2 million in PE 62601A for applied research for combat vehicle and automotive technologies. The committee notes that reducing the life cycle costs of weapon systems is an important thrust area for the Department of Defense, especially through enhancements in system reliability in harsh operating environments and at high operating tempos. To support the development of highly reliable systems, the committee recommends increases in PE 62601A of $4.5 million for the development of computer simulation tools for vehicle design and optimization, and $2.0 million for modeling of ground vehicle reliability and condition-based maintenance.

Unmanned ground vehicle weaponization

The budget request included $30.6 million in PE 62624A for weapons and munitions technology. The committee has been supportive of the development of unmanned ground systems to reduce casualties and to enable new operational concepts and capabilities. The committee notes that the Near Autonomous Unmanned Systems Army Technology Objective is developing robotic technologies for future unmanned systems, and working to transition technologies to programs such as Future Combat Systems. To support these efforts, the committee recommends an increase of $3.5 million to develop remotely controlled unmanned systems with lethal and non-lethal capabilities.

Standoff explosives detection technologies

The budget request included $21.8 million in PE 62712A for applied research on countermine systems. The committee notes that the standoff detection of explosives is a capability that is of critical concern to the Department of Defense as it seeks to combat the use of improvised explosive devices in Iraq and Afghanistan. Therefore, the committee recommends an additional $3.0 million in PE 62712A for the development of standoff explosives detection technologies.

Soldier positioning technologies

The budget request included $24.0 million in PE 62782A for command, control, and communications technologies. The committee notes that the 2003 National Research Council study entitled `Science and Technology for Army Homeland Security' found that `the current system for gaining situational awareness in an urban environment is inadequate,' and recommended the development of robust technologies to address this capability gap. To support this recommendation, the committee recommends an increase of $2.0 million in PE 62782A for research on portable positioning and timing devices for use in urban terrains.

Military engineering technologies

The budget request included $52.1 million in PE 62784A for military engineering technologies. The committee notes that the Battle Space Terrain Reasoning and Awareness--Battle Command Army Technology Objective seeks to provide actionable information relating to terrain, atmospheric, and weather impacts on deployed assets. To support this objective, the committee recommends an increase of $2.5 million for geosciences and atmospheric research.

The committee notes that the Modular Protective Systems for Future Force Assets Army Technology Objective seeks to develop systems that enhance the protection and survivability of personnel and systems from conventional and asymmetric threats. To support these efforts, the committee recommends an increase of $1.5 million in PE 62784A for research on low-cost, high-performance nanocomposite panels for enhanced blast and ballistic protection, and an increase of $1.5 million in PE 62786A for development of ballistic materials for force protection applications.

The committee notes that deployments in Iraq, Afghanistan, and other regions of the world are putting on forward operating bases infrastructure at unprecedented risk. Strategic, tactical, and resource constraints sometimes restrict the nature and scope of construction for these bases, yet the bases must be hardened for long-term use and asymmetric terrorist and insurgent attack.

The committee is aware of a number of efforts at service laboratories, small businesses, and universities developing new force protection technologies that can counter current and emerging threats to bases. Given the long-term need for enhanced and rapidly deployable force protection at bases in volatile operating zones, the committee directs the Secretary of Defense to develop a report outlining a plan for addressing deployable force protection infrastructure technology. The report should address current and emerging capability gaps, specific research and development goals to be accomplished to address those gaps, funding needs to address the gaps and accelerate infrastructure force protection technology deployment, and the value of creating research centers to partner with service laboratories on promising research and technology areas. The report should be delivered to the committee not later than 6 months after the date of enactment of this bill.

Combat feeding technologies

The budget request included $21.9 million in PE 62786A for applied research for warfighter technologies. The committee notes that reduction in logistics costs is a goal of the Department of Defense and is being pursued through a number of efforts, including the use of alternative energy technologies. To support these efforts, the committee recommends an additional $1.5 million for the development of energy efficient, high performance mobile kitchen units.

Army medical research

The budget request included $75.4 million in PE 62787A for applied research on medical technologies. The committee notes that Army medical research and technology protects and treats personnel to sustain combat strength, reduce casualties, and save lives. The committee recommends a number of funding increases in PE 62787A to support these efforts and to help respond to a variety of medical care issues resulting from current operations or to leverage emerging research and technology.

The Army has a stated technology objective to develop fluid resuscitation to reduce injury and loss of life on the battlefield. In support of this, the committee recommends an increase of $2.0 million to support clinical research on dried blood technologies.

To help military surgeons find new limb-sparing techniques to save injured extremities, avoid amputations, and preserve and restore the function of injured extremities, the committee recommends an increase of $5.0 million to continue peer-reviewed research efforts on extremity war injuries. To support the treatment of blast injuries, the committee recommends increases of: $3.5 million for traumatic brain injury research; $2.5 million for bio-engineering research to enhance soldier survivability; $2.5 million for post traumatic stress disorder research; $5.0 million for modeling of blast wave effects; and $1.0 million for research on injury biomechanics.

The committee notes that Army infectious disease efforts focus on medical countermeasures against naturally occurring diseases of military importance. To support those research efforts the committee recommends an increase of $2.0 million for research on treatments for dengue fever.

Finally, the committee notes that next-generation technologies will develop medical technologies and enable human performance improvements that could radically transform military operations. To support next-generation research efforts in military medical technologies the committee recommends increases of: $2.0 million for genetics research to enhance soldier survival in extreme environments; $2.0 million for research on nanomaterials to improve biological processes such as targeted drug delivery; and $8.0 million to initiate a military photomedicine program that would fund single investigators and research centers to develop optics and photonics based technologies to perform combat casualty care missions.

Biosensor controller systems

The budget request included $46.8 million in PE 63001A for development of advanced technologies for warfighters. The January 2008 report to Congress entitled `Efforts and Programs of the Department of Defense Relating to the Prevention, Mitigation, and Treatment of Blast Injuries' identified the development of diagnostics for traumatic brain injury as a blast injury research knowledge gap. To support addressing that gap, the committee recommends an increase of $3.5 million in PE 63001A for the development of biosensor systems to evaluate treatment response in this and other disorders, as well as to potentially serve to enhance operator-machine interface technologies.

Army medical advanced technology development

The budget request included $59.0 million in PE 63002A for medical advanced technology development. The committee continues to recognize the critical need to advance military medical technologies to address battlefield injuries. The committee has taken a number of steps to advance these efforts, including the establishment of a Department of Defense (DOD) initiative to prevent, mitigate, and treat blast injuries in section 256 of the National Defense Authorization Act for Fiscal Year 2006 (Public Law 109-163). To support these and similar efforts, as well as to support a number of Army technology objectives in medical technologies, the committee recommends a number of increases in medical research investments.

The committee notes that improvised explosive devices have created a new set of challenges for medical personnel in dealing with soft tissue and bone damage. The committee recommends an increase of $5.5 million for research on the treatment of combat wounds. To help address the treatment of blast injuries, in coordination with the Blast Mitigation Initiative, the committee recommends an increase of $2.0 million for the development of technologies to efficiently detect and assess mild traumatic brain injuries, and an increase of $3.0 million for remote vital signs monitoring systems.

The committee recognizes the continuing need to develop advanced lower limb prostheses for battlefield amputees. The committee recommends an additional $2.5 million for the development of advanced lower limb prosthesis technologies.

The committee notes that the Battlefield Treatment of Fractures and Soft Tissue Trauma Care Defense Technology Objective includes a specific challenge to improve tissue viability technologies. In support of this goal, the committee recommends an increase of $5.0 million for research on novel regenerative medical research to treat battlefield injuries. In addition, to support advances in military capabilities to treat combat injuries, the committee recommends increases of: $2.0 million for the development of tracheal intubation technologies for use on the battlefield; $2.0 million for research on bioelectric interactions to support wound healing capabilities; and $5.0 million to develop advanced combat wound dressings.

The committee notes that the use of information technologies can serve to make military medical operations more successful and efficient, and can potentially lead to considerable cost savings through the use of commercial technologies. To promote the use of advanced information systems and technologies in DOD medical operations, the committee recommends an increase of $4.0 million to support modernization of joint medical logistics efforts and an increase of $2.0 million for the development of online medical training programs for military personnel.

Finally, the committee recommends an increase of $13.0 million to support the continuing Gulf War Veterans' Illnesses Research Program. The committee directs the Secretary of the Army to utilize the authorized funding for this program to undertake research on Gulf War illnesses. The committee directs that activities under the program should include studies of treatments for the complex of symptoms commonly referred to as Gulf War Illness, and identification of objective markers for Gulf War Illness. The committee recommends that no studies based on psychiatric illness and psychological stress as the central cause of Gulf War Illness be funded under the program. The committee directs that the program be conducted using competitive selection and peer review for the identification of research with the highest technical merit and military value. Further, the committee directs that this program be coordinated with similar activities in the Department of Veterans Affairs and the National Institutes of Health.

Army aviation advanced technology development

The budget request included $57.3 million in PE 63003A for advanced technology development on aviation systems. The committee continues to be supportive of efforts to use unmanned systems on the battlefield. To support the development of new capabilities for unmanned systems, the committee recommends an increase of $2.0 million for the development of unmanned systems for the precision delivery of supplies to friendly forces.

The committee notes that the Army's Network-Enabled Command and Control Technology Objective seeks to develop systems that provide network-centric capabilities to the future force. In support of the objective, the committee recommends an increase of $3.5 million in PE 63003A for technologies to enable rapid tactical integration and fielding of interoperable aviation systems.

Finally, in support of the Army's Rotorcraft Survivability Technology Objective the committee recommends an increase of $1.5 million in PE 63003A for the development of lightweight armor systems to reduce helicopter vulnerabilities to battlefield threats, and an increase of $2.0 million in PE 63270A for development of laser systems for aircraft missile defense.

Army combat vehicle technologies

The budget request included $108.0 million in PE 63005A for advanced technology development on combat vehicles. The committee notes with concern that this is nearly 20 percent lower than the fiscal year 2008 budget request for this account, despite the fact that: current Army operations are heavily dependent on tactical vehicles; the Department of Defense is seeking to make ground vehicles more survivable against a growing number of battlefield threats, including explosively formed penetrators, rocket propelled grenades (RPGs), and improvised explosive devices (IEDs); the Army's primary transformation effort is the Future Combat Systems (FCS) program involving a large number of new vehicle technologies; and the Department is also seeking to develop and field novel energy and power vehicle technologies to reduce costs and improve performance.

The Vehicle Armor Technology Army Technology Objective seeks to provide comprehensive solutions for FCS ground vehicles to address a variety of threats, including mines, RPGs, IEDs, and other threats. Consistent with that objective, the committee recommends a number of funding increases to enhance vehicle survivability. The committee recommends increases of: $2.0 million for the development of composite armored cabs; $2.5 million for development of hostile fire detection systems; and $4.0 million for development of windshield armor systems.

The Prognostics and Diagnostics for Operational Readiness and Condition Based Maintenance Army Technology Objective has a goal to improve near-term and FCS commodity readiness and maintainability through improvements in the capability to detect and predict equipment health status and performance. In coordination with this objective and as part of efforts to improve the readiness of Army forces, the committee recommends increases of: $5.0 million to support development of advanced thermal and oil management systems to reduce vehicle life cycle costs; $4.2 million for the development of test facilities to evaluate advanced combat vehicle power train designs; $4.0 million to enhance Army capabilities for the rapid integration of new technologies onto military vehicles; $3.5 million for development of advanced vehicle prognostics systems; and $2.0 million to support ground vehicle fastening and joining research.

Finally, the committee notes that the Army's future force technology thrust in unmanned systems seeks to enhance the effectiveness of unmanned systems through improved perception, cooperative behaviors, and increased autonomy. In support of those efforts, the committee recommends an increase of $12.0 million to continue the unmanned ground vehicle initiative.

Diverse threat sensor development

The budget request included $108.0 million in PE 63005A for combat vehicle and automotive technology programs. The committee notes that the Army has a need to develop systems that coordinate unattended, airborne, man-portable, and vehicle-mounted sensor inputs to identify and characterize threats in complex terrain, including urban environments. The committee recommends an increase of $1.0 million in PE 63005A for development of systems that better combine sensor data to provide enhanced threat warning capabilities.

Army training technologies

The budget request included $18.9 million in PE 63015A for next-generation training and simulation systems. The committee notes that the Army's Institute of Creative Technologies is working on the development of a variety of simulations to support the training requirements of the Army. The Army's advanced simulation technology technology thrust area seeks to provide increasingly realistic training and mission rehearsal environments to support military missions. In order to support development of advanced combat training simulators, the committee recommends increases in PE 63015A of $3.5 million for the development of joint fires training systems, and $2.0 million for modeling architectures to support battle command simulation and training.

Deactivation of military explosives

The budget request included $10.6 million in PE 63103A for explosives demilitarization technology. To support continuing efforts to develop environmentally sound methods of disposing munitions, the committee recommends an increase of $500,000 to support research on the safe deactivation of military explosives.

Army missile and rocket technologies

The budget request included $64.0 million in PE 63313A for advanced missile and rocket technologies. The committee notes the continuing need for development of advanced high speed, precision strike weaponry. The committee recommends an increase of $1.0 million to support studies of long range hypersonic interceptor technology, in coordination with the efforts of the Joint Technology Office for Hypersonics, previously established by the committee.

Situational awareness technologies

The budget request included $39.9 million in PE 63710A for advanced night vision technologies. The Army's intelligence, surveillance, and reconnaissance future force technology thrust area seeks to develop persistent and integrated situational awareness capabilities to provide actionable intelligence to support military operations. To support these efforts, the committee recommends an increase of $3.5 million for research on short range electro-optical sensor systems to support Future Combat Systems.

Unique item ID data management research

The budget request included $600,000 in PE 63024A for the ongoing development of the Army's unique item identification (UID) research. The committee recommends an increase of $2.0 million for the continued research and development of an enterprise-wide software application to support Army programs that are required to comply with unique item mandates. UID research is permitting the Army to better manage its logistic activities, including accurate, non-intrusive item identification and data collection and enhanced unit-pack level visibility.

Advanced electronics integration

The budget request included $14.0 million in PE 63305A for Army missile defense systems integration, but no funds for advanced electronics integration. The committee recommends an increase of $4.0 million in PE 63305A for advanced electronics integration to advance state-of-the-art weapon system electronics, with the goal of reducing the size, weight, and cost of electronic components, while reducing hazardous materials used in such advanced electronics. This effort supports Army needs for research, prototyping, testing, and production technologies that have the potential to produce more efficient, higher performance, less hazardous and lower cost electronics.

Advanced environmental controls

The budget request included $14.0 million in PE 63305A for Army missile defense systems integration, but no funds for advanced environmental control systems. The committee recommends an increase of $5.0 million in PE 63305A for the development of thermal management control systems that can support sensors and electronic systems which operate in the harsh environmental conditions required by missile defense systems. The committee notes that advanced environmental controls have applicability to a variety of military systems that operate in harsh environments.

Advanced fuel cell research

The budget request included $14.0 million in PE 63305A for Army missile defense systems integration, but no funds for advanced fuel cell research. The committee recommends an increase of $3.5 million in PE 63305A for the development of advanced fuel cell technology for applications in Army space and missile defense systems. The committee notes that lightweight, reliable, and cost-effective power sources are important components of complex weapon systems such as space and missile defense systems. Advanced fuel cells would have applicability to a wide variety of military systems.

Radiation hardening initiative

The budget request included $14.0 million in PE 63305A for Army missile defense systems integration, but no funds for radiation hardening integration. The subcommittee recommends an increase of $3.0 million in PE 63305A for a radiation hardening initiative to improve understanding of radiation transport and effects, modeling and simulation tools, and radiation-hardened design approaches. This activity should be coordinated with the Joint Radiation Hardened Electronics Oversight Council.

High-altitude integration testbed

The budget request included $20.0 million in PE 63308A for Army missile defense systems integration (space), but no funds for continued development of the high-altitude integration testbed. The committee recommends an increase of $3.0 million in PE 63308A for the Army's high-altitude integration testbed to integrate and test payloads for high altitude airships and unmanned aerial vehicles for long-loiter missions. Such systems could provide enhanced information to military forces.

Air and missile defense architecture analysis

The budget request included $116.4 million in PE 63327A for air and missile defense engineering, but included no funds for development of an integrated air and missile defense (IAMD) architecture analysis program. The committee recommends an increase of $5.0 million in PE 63327A for continued development of an IAMD architecture analysis program to improve the integration and coordination of air and missile defense capabilities into a coherent system of systems to defend against aircraft, cruise missiles, and ballistic missiles. The Army has been selected as the lead service for joint IAMD. This effort would support the Army's lead role, and its development of an IAMD Battle Command System.

Stryker active protection system

The budget request included $108.0 million in PE 63653A for Advanced Tank Armament System (ATAS), but provided no funds for development of a Stryker active protection system. The committee recommends an increase of $4.5 million in PE 63653A for the Stryker active protection system.

Vibration management enhancement research

The budget request included $71.6 million in PE 64201A to develop hardware and software improvements for the Army's aviation system. The committee recommends an increase of $3.0 million to continue research and development of advanced diagnostic tools to measure vibration in the aircraft and develop possible mitigation measures. This research utilizes an embedded condition-based maintenance system developed to detect mechanical faults in transmissions, gearboxes, main and tail rotors, and the entire power train.

Next-generation combat helmet development

The budget request included $42.4 million in PE 64601A for infantry support weapons, but no funds were provided for next-generation combat helmet development. Funds provided would support the development of a next-generation combat helmet that is safer and significantly lighter. The committee recommends an increase of $3.0 million in PE 64601A for combat helmet development.

High Mobility Multi-purpose Wheeled Vehicle modernization research

The budget request included no funding in PE 64642A for advanced technology development for the Army's legacy light tactical wheeled vehicles, including technology enhancements and modernization activities for the High Mobility Multi-purpose Wheeled Vehicle (HMMWV) in the areas of survivability, mobility, and energy and power.

The committee recommends an increase of $5.0 million in PE 64642A for the HMMWV program manager to continue efforts to develop, test, and integrate advanced technologies into the HMMWV. Previous technology integration activities have included improved cooling systems, seats and seat belt enhancements, gunner restraints, vehicle intercom systems, and fire suppression systems.

Non-Line of Sight-Launch System anti-tamper research

The budget request included $200.1 million in Research and Development, Army for the Non-Line of Sight-Launch System (NLOS-LS). The committee recommends an increase of $2.0 million in PE 64646A to continue funding anti-tamper research. Anti-tamper protection of weapon systems is a growing concern in U.S. national security planning. In September 2007, the Defense Science Board issued a report entitled `Mission Impact of Foreign Influence on Department of Defense Software' that found that given the military's increasing dependence on software-based programs, `current systems designs, assurance methodologies, acquisition procedures, and knowledge of adversarial capabilities and intentions are inadequate to the magnitude of the threat.' In January 2008, the Government Accountability Office reported that military program managers lack clear guidance on what information they need to protect and are challenged in selecting anti-tamper solutions because they do not have the tools needed to determine how much protection is required. This additional funding will complete ongoing NLOS-LS anti-tamper development activities, including significant test and validation by Red Teams and government agencies.

Future Combat System

The budget request included $3.6 billion for the Future Combat System (FCS) program, the Army's comprehensive force modernization program. The committee remains committed to the modernization of the Army and is hopeful that the FCS program will provide, as promised, an appropriate and affordable combination of advanced technologies to support operational concepts that will ensure future success across the spectrum of conflict. The ambitiousness, complexity, and risk associated with FCS have resulted in many challenges over the years that the Army must continue to overcome.

Therefore, the committee agrees that this program merits careful, even special oversight. Recognizing this, Congress directed in section 211 of the National Defense Authorization Act for Fiscal Year 2006 (Public Law 109-163) that the Government Accountability Office (GAO) submit an annual report on the program's progress. Moreover, in section 214 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364), Congress directed the Secretary of Defense to conduct a milestone review following FCS's preliminary design review, now scheduled for April 2009. Consequently, fiscal year 2009, as the GAO notes in its March 2008 annual report, is a critical year for this program.

The GAO's March 2008 annual review of the FCS program noted that it will be difficult for the Army to demonstrate firm requirements and technical maturity in time for its preliminary design and Secretary of Defense reviews next year. Consistent with other GAO reports, the committee believes that instability in funding could make that challenge more difficult. The committee remains convinced that FCS merits support and stable funding, and therefore recommends full funding for FCS as requested by the Army.

Urban training development

The budget request included $35.4 million in PE 64715A for engineering development of non-system training devices. The committee recognizes the importance of training concepts and systems for joint military operations in urban terrain and culture to increase unit effectiveness at reduced operating costs. The committee recommends an increase of $6.0 million in PE 64715A for development of systems for joint military operations in urban terrain and cultural training.

Extended range sniper rifle research

The budget request included $52.1 million in PE 64802A for weapons and munitions--system demonstration and development. This program element funds multiple efforts for engineering development of weapons and munitions systems. The committee recommends an increase of $3.0 million for extended range sniper rifle research.

Army test and target development

The budget request included $13.5 million in PE 64258A for target simulator development. The committee continues to support Department of Defense (DOD) investments in targets and test and evaluation infrastructure and capabilities, which serve to enhance force readiness, improve systems capabilities, and reduce life cycle costs. The committee recommends an increase of $3.0 million in PE 64258A to support development of advanced fixed-wing aerial targets to support warfighters facing current and future air defense threats.

The budget request included $74.6 million in PE 65602A for technical test instrumentation and targets. The committee recommends an increase of $3.0 million for enhancements in laser and modeling systems to support testing of chemical and biological defense systems.

The budget request included $2.8 million in PE 65605A for the DOD High Energy Laser Test Facility (HELSTF). The committee is concerned that this level of support will not preserve all of the critical laser test functions that DOD requires, including the Missile Defense Agency. Further, the lack of funding will force a `mothballing' of test facilities and lead to a loss of technical expertise and huge startup costs when the facility is needed for potential use by the range of advanced high power laser systems under development. The committee also notes that the required analyses and reports on high energy laser testing from the fiscal year 2008 authorization reports have yet to be delivered. Therefore, the committee recommends an additional $15.0 million in PE 65605A to support the operations of HELSTF.

Javelin modernization

The budget request included $1.5 million in PE 23802A for other missile product improvement programs, but provided no funds for the modernization of the Javelin anti-armor missile. Funds provided would initiate a Javelin modernization program that would increase the missile's effective range to beyond line-of-sight. The committee recommends an increase of $10.0 million in PE 23802A for Javelin modernization development.

Global Combat Support System, the Logistics Modernization Program and Product Lifecycle Management Plus

The budget request included $104.9 million in PE 33141A for the Global Combat Support System (GCSS), $82.0 million in Operation and Maintenance, Army (OMA), for the Logistics Modernization Program (LMP), and $42.4 million in PE 33141A for Product Lifecycle Management Plus (PLM+).

In July 2007, the Government Accountability Office (GAO) reported that the Army would be investing approximately $5.0 billion over the next several years to develop and implement their Enterprise Resource Programs (ERP). The GAO noted that this significant investment was being made without the benefit of a comprehensive business enterprise architecture, concept of operations, and effective portfolio management. For example, the three logistics systems, GCSS, LMP, and PLM+, utilize separate financial systems and different versions of SAP software, making future consolidation extremely complex. In addition, as the Army itself reports, prior to 2006 the Army's functional approach to governance led to development of completely disparate ERPs. In a November 21, 2007 Acquisition Decision Memorandum (ADM) the Under Secretary of Defense for Acquisition, John Young, seemingly validates the GAO conclusions, stating that additional work was necessary in synchronizing the separate components of the Army's enterprise resource planning strategy. While the committee expects the three logistics ERP efforts--GCSS, LMP, and PLM+--to continue development and fielding, synergies should be explored and realized. On March 14, 2008 Secretary Young signed ADMs for two Army ERPs, General Fund Enterprise Business System (GFEBS) and GCSS, mandating one such efficiency by directing the integration on the previously separate financial subset of GCSS with GFEBS. Further efficiencies should be explored across the Army's logistics ERPs.

The committee recommends decreases of $30.0 million in PE 33141A for GCSS, $20.0 million for LMP from OMA, and $10.0 million in PE 33141A for PLM+. While the committee has historically been supportive of the Department of Defense's business systems modernization efforts, it is concerned by the Army's functionally `stovepiped' approach to its ERP systems.

Army manufacturing technologies

The budget request included $69.1 million in PE 78045A for development of manufacturing technologies. The committee continues to support increasing funding for manufacturing research and technology to support the preservation of the defense industrial base and reduce costs of weapons systems. To enhance Army manufacturing research efforts, the committee recommends increases in PE 78045A of: $2.5 million for advanced nanotechnology manufacturing research; $3.5 million for castings research to improve performance and lower the cost of weapons systems; $3.0 million for research to improve machine tool accuracy and performance; and $2.0 million for manufacturing process improvements to reduce costs of body armor plates.

NAVY

Insert offset folio 229 here SR335.100

Insert offset folio 230 here SR335.101

Insert offset folio 231 here SR335.102

Insert offset folio 232 here SR335.103

Insert offset folio 233 here SR335.104

Insert offset folio 234 here SR335.105

Insert offset folio 235 here SR335.106

Insert offset folio 236 here SR335.107

Insert offset folio 237 here SR335.108

Insert offset folio 238 here SR335.109

Insert offset folio 239 here SR335.110

Insert offset folio 240 here SR335.111

Insert offset folio 241 here SR335.112

Navy basic research

The budget request included $103.7 million in PE 61103N for university research initiatives. The committee notes that the 2007 Marine Corps Science and Technology (S&T) Strategic Plan lists the development of advanced robotic systems for ground combat in order to `take humans out of direct involvement in hazardous and exceptionally arduous missions' as a technology objective. In support of achieving that objective, the committee recommends an increase of $1.5 million for research on automated robotic technologies for landmine detection.

The 2007 Naval S&T Strategic Plan identifies a specific technology objective of adapting defense systems to the environment, especially with respect to space environmental effects. To help address this concern, the committee recommends an increase of $1.0 million in PE 61103N for research on novel radiation hardened microelectronics.

The budget request included $407.3 million in PE 61153N for defense research sciences programs. The committee recommends an increase of $1.5 million in PE 61153N for research on quantum computing and quantum mechanics that can support efforts to enhance Navy sensor and communications systems. The 2004 National Research Council study entitled `Advanced Energetic Materials' characterized the U.S. effort on research and development of energetic materials as `suboptimal,' but stated that the materials are `a key component of the nation's defense strategies.' To help address this identified gap, the committee recommends an increase of $1.5 million in PE 61153N for basic research on energetic materials.

To support efforts to enhance math and science education nationally and develop the next generation of clearable scientists and engineers to work on national security issues, the committee recommends an additional $1.5 million in PE 61153N for science and technology educational outreach efforts.

Manufacturing engineering training

The budget request included $407.3 million in PE 61153N for defense research sciences. The committee notes that National Science and Technology Council's March 2008 report entitled `Manufacturing the Future: Federal Priorities for Manufacturing R&D' highlighted the role that federal investments could play in enhancing the domestic manufacturing base through improvements in workforce training and education. The report cited a 2005 National Association of Manufacturers skills gap survey of more than 800 manufacturing businesses, which found that 81 percent were experiencing `severe' (13 percent) or `moderate' (68 percent) shortages of skilled workers overall, and 90 percent reported shortages of skilled production employees. These shortages lead to deficiencies in the defense industrial base and therefore weaken the Department of Defense production and supply chain. To help address this issue, the committee recommends an increase of $2.0 million in PE 61153N for manufacturing engineering educational outreach programs.

Navy power projection research

The budget request included $79.9 million in PE 62114N for applied research on power projection technologies. The committee notes that the 2007 Defense Science Board Task Force on Directed Energy Weapons noted that science and technology (S&T) funding for laser weapons should be focused on concentrated development of free electron lasers for ship defense. In support of that recommendation, the committee recommends an increase of $3.5 million for high power free electron laser development. To support the Naval S&T Strategic Plan objective of developing energy storage technologies, the committee recommends an increase of $2.5 million in PE 62114N for the development of fuel cells for unmanned aerial vehicle applications. Finally, the committee recommends an increase of $1.5 million for research on advanced electron sources for use in next-generation radar systems.

Navy force protection research

The budget request included $131.3 million in PE 62123N for applied research on force protection technologies. The 2007 Naval S&T [science and technology] Strategic Plan identifies the development of advanced materials in platform construction to support the production of more survivable platforms as a key technology objective. In support of that objective, the committee recommends an increase of $3.0 million for composite materials research for high speed craft, and an increase of $2.0 million for research to reduce the structural weight and improve signature characteristics of special operations combatant craft through the use of lightweight composite materials.

The Naval S&T Strategic Plan also has a technology objective of enhancing homeland and port defense monitoring. In support of this effort, the committee recommends an additional $3.5 million in PE 62123N for development of deployable, under hull inspection technologies. Consistent with the Navy's High Energy and Pulse Power Technology Objective, which seeks to develop energy storage power system architectures and pulsed power control systems, the committee recommends an additional $3.0 million to develop energy delivery technologies for advanced naval weapons systems.

In support of Office of Naval Research efforts to improve towed sonar array reliability and enhance situational awareness, the committee recommends an additional $2.5 million for modeling and simulation efforts on towed sonar array system reliability. In support of Navy objectives to reduce the cost of high-resolution infrared focal plane arrays for missile seekers and other applications, and in conjunction with ongoing related Army and Missile Defense Agency efforts, the committee recommends an increase of $3.0 million for infrared materials research.

Finally, consistent with Navy efforts to identify new coating technologies for military equipment, the committee recommends an increase of $3.5 million in PE 62123N for development of novel surface coatings to improve performance and reliability of defense systems.

Situational awareness processing technologies

The budget request included $36.5 million in PE 62131M for applied research on Marine Corps landing force technologies. The committee notes that one of the Marine Corps' science and technology objectives is the development of `improved situational awareness for warfighters at all echelons.' Consistent with that objective, the committee recommends an additional $4.5 million for applied research on the distribution of tactical information to individual warfighters.

Acoustic research and test capabilities

The budget request included $93.9 million in PE 62236N for applied research on warfighter sustainment technologies. The committee notes that the 2007 Strategic Plan for DOD (Department of Defense) T&E (Test and Evaluation) Resources stated that `improved acoustic and radio frequency (RF) signature measurement capability is necessary to adequately conduct T&E on new hull forms.' In support of the development of that capability, the committee recommends an increase of $1.5 million in PE 62236N for upgrades to Navy acoustic research and test equipment.

Navy electronics research

The budget request included $54.8 million in PE 62271N for radio frequency systems applied research. The committee notes that next-generation Navy radars, communications, and electronic warfare systems will all depend on advanced high power microelectronics. The Navy's Power and Energy Science and Technology Focus Area includes the specific objective of developing new materials to increase the efficiency and power density of Navy systems. To complement these efforts, the committee recommends an increase of $1.5 million for research on advanced semiconductor radio frequency power technologies.

Advanced technologies for power projection

The budget request included $60.4 million in PE 63114N for advanced technologies for power projection. The committee notes that the capability to support detection, tracking, and identification of mobile targets, including to support maritime interdiction and land attack of high value targets, is a high priority based on several fleet and combatant commands assessments of current operational capability gaps. The Defense Advanced Research Projects Agency and Office of Naval Research science and technology programs are currently supporting these science and technology development efforts with planned transitions in fiscal year 2012. To accelerate the development and reduce the risk of these efforts, the committee recommends an additional $3.5 million in PE 63114N for development of mobile target tracking and identification technologies.

The committee notes that the Naval Expeditionary Command recommendations to the Office of Naval Research for high priority capability gaps to be addressed with science and technology investments included `fires detections and engagement systems for incoming direct and indirect fires.' To support efforts to address that gap, the committee recommends an increase of $2.5 million in PE 63114N for the development of watercraft active protection systems.

Force protection advanced technology

The budget request included $55.1 million in PE 63123N for force protection advanced technology. This program addresses applied research associated with providing force protection capability for all naval platforms.

The budget request included no funding for continuing the development of wide band gap semiconductor substrate materials. These materials offer capability for higher power and higher frequency operation in high temperature environments across a broad spectrum of applications. The committee recommends an increase of $2.0 million for the continued development of wide band gap semiconductor substrate material.

The budget request included no funding for any initiative to leverage rapidly developing ongoing advances in hydrogen-powered fuel cell vehicle technology to enable revolutionary changes in the Department of the Navy non-tactical vehicle fleet. Fuel cells powered by hydrogen could totally change the present dependence on petroleum as the logistics fuel and could offer the ability to run systems silently and with significantly reduced thermal signatures for missions requiring low probability of detection. In previous years, the Department of the Navy conducted several short-term demonstrations of hydrogen fuel cell powered vehicles. The committee recommends an increase of $5.0 million for an expanded demonstration of fuel cell vehicles, to include an extended vehicle range refueling capability enhancement to include testing that could establish the basis for a potential full qualification of a hydrogen-powered fuel cell vehicle for fleet operations.

The budget request included no funding for development of a lithium battery technology that could replace one of the three generators normally in operation or reserve aboard all large Navy ships. If lithium battery technology could be scaled up to a capacity of roughly 2.5 megawatts, such a battery would replace one of the three ship service generators normally in operation or in reserve aboard all surface combatants. Such a battery system could provide a lower cost, higher quality source of electrical power that would replace redundant back-up power sources dedicated to subsystems throughout the ship. The battery would also eliminate the possibility of a ship experiencing a catastrophic loss of power (`going dark') due to a cascading failure of generators and an inability to restart the main engines following a loss of main power. The committee recommends an increase of $9.0 million to enable the development of such lithium battery technology.

The budget request included no funding for development of a combined mishap reduction system. The committee is aware that the private sector has developed web-based information management systems that enable managers at all levels in an organization to prevent avoidable accidents among their personnel. These systems identify high-risk practices, procedures, conditions, and attitudes before accidents occur and provide paths to mitigate them. The Department of Defense has long collected data about the causes of accidents after they occur. Using this information alone, however, has proven insufficient for reducing accident rates below recent historical levels. The committee recommends an increase of $2.0 million to enable the development of a combined mishap reduction system.

The budget request included no funding for an integrated vehicle health monitoring program. Such a program could determine the value of adopting commercial automotive standards as a baseline for a set of open standards as part of an open system vehicle electronics architecture. This program could also achieve reductions in the demand for space, weight, power, and cooling, as well as reduce the time and cost needed to develop new vehicle applications. The committee recommends an increase of $3.5 million to enable the development of a prototype of an integrated health monitoring system for proof-of-concept evaluation and demonstration.

The committee recommends a total authorization of $76.6 million in PE 63123N for force protection advanced technology.

High-integrity Global Positioning System

The budget request included $104.6 million for common picture advanced technology in PE 63235N, Research, Development, Test, and Evaluation, Navy, including $61.2 million for high-integrity Global Positioning System (GPS). The committee recommends no funds for high-integrity GPS.

Ground sensor networks

The budget request included $100.8 million in PE 63640M for Marine Corps advanced technology demonstrations. The committee notes that small arms fire accounts for a large number of coalition casualties in Iraq and Afghanistan, and that a number of services and defense agencies are pursuing technological solutions to meet urgent needs of deployed forces. To support these efforts, the committee recommends an increase of $2.0 million for the development of ground sensor networks that can detect and locate hostile fire.

Shipboard system component development

The budget request included $4.0 million in PE 63513N for shipboard system component development, but included no funding for high temperature superconductor alternating current (HTS-AC) synchronous marine propulsion motor development or for developing a permanent magnet hybrid propulsion system for the DDG-51 Aegis destroyer.

The Navy has been developing and testing a 36.5 megawatt prototype HTS-AC synchronous propulsion motor. Funds are required to complete preliminary design and risk reduction of the tactical motor in order to initiate detailed design and fabrication of the motor in 2010. HTS propulsion motors could support current and future Navy needs, either as an upgrade to the DDG-1000, or for the CG(X) next-generation cruiser. Successful development of the HTS motor will allow much greater flexibility in regards to space and weight considerations on Navy warships. The committee recommends an increase of $5.5 million to continue development and testing of the HTS-AC synchronous marine propulsion motor.

The budget request included no funding for continued development and testing of the permanent magnet motor (PMM). Congress has provided funding for several fiscal years to mature the PMM technology for main propulsion motor applications. The team developing this system has developed a plan to design and build a smaller PMM that would support a hybrid electric drive system for DDG-51 Aegis destroyers. The contractor claims that such a system installed on a DDG-51 would pay back the investment in approximately 3 years, based only on fuel savings of approximately 13,000 barrels of fuel per ship per year. The committee recommends an increase of $7.6 million to design and build a hybrid electric drive system based on PMM technology.

The committee recommends a total authorization of $17.1 million in PE 63513N for shipboard system component development.

Advanced submarine system development

The budget request included $141.7 million in PE 63561N for advanced submarine systems development. The design and development efforts in these programs are to evaluate a broad range of system and technology alternatives to directly support and enhance the mission capability of current submarines and future submarine concepts.

The budget request included no funding to begin studies that would lead to developing a replacement for the Ohio class strategic missile submarine program which was designed in the 1970s. The Navy has begun studies under a program called the Undersea Launch Missile Study (ULMS). The efforts within ULMS will involve exploring new technologies, conceptual design of ship configurations, supporting ship systems, consideration of strategic payloads, and development of other payloads.

However, there appears to be insufficient work to maintain the skill set among submarine designers until the Navy would otherwise start designing a replacement for the Ohio class. A previous report by the RAND Corporation evaluating the submarine design industrial base concluded that it would be less expensive to sustain some number of workers in excess of those needed to meet the residual design demands during such a gap. One means of achieving this goal would be to begin the more extensive design activities earlier than the Navy would otherwise start them to support a specific date to start building the next class. The committee believes that the Navy should continue that effort in fiscal year 2009 and recommends an increase of $15.0 million for that purpose.

Facilities improvements

The budget request included $4.1 million in PE 63725N, but included no funding for a program to develop a hydrokinetic power generator. This technology uses the phenomenon of vortex-induced vibrations to extract useful kinetic energy from ocean and other water currents. Researchers claim that it is highly scalable and could produce energy over a wide range of current speeds, starting as low as 1 knot. This energy extraction technology is non-obtrusive, environmentally compatible, and modular. Such generating systems could be very useful for supporting various Navy power needs, including coastal naval bases, instrumentation stations, battery recharging, off-shore stations, and ships not under way.

The committee recommends an increase of $2.0 million to support development and testing of this power generation approach.

Optical interconnect

The budget request included $2.8 million in PE 63739N for Navy logistics productivity initiatives, but included no funding to develop low cost, high quality fiber optic interconnect technology for military aerospace application. The Department of Defense continues to demand increasing data processing, communication, and system control capabilities. The next-generation data and communication management systems needed for weapons systems will depend upon tightly integrated optical fiber solutions, also known as optical interconnect. This solution optimizes space utilization while achieving high bandwidth, decreased weight, immunity to electromagnetic interference, resistance to corrosion, and improved safety and security. The Navy has requirements for next-generation optical interconnect technology for several aircraft platform systems, and anticipates that this technology could be applied to Navy vessels as well. The committee recommends an increase of $4.0 million to develop this important technology.

Land attack technology

The budget request included $40.0 million in PE 63795N for land attack technology, including $38.8 million for the naval surface fire support development activity. Most of the funding within this activity would have been applied to development of the extended range guided munition (ERGM).

Based on continuing development problems, and capped by recent test failures, the Navy decided to terminate the ERGM program after submitting the fiscal year 2009 budget request.

The committee strongly supports making improvements in naval surface fire support capability. However, the Navy cannot usefully spend all of the funds requested in this program until it decides on a path forward.

Therefore, the committee recommends a decrease of $30.0 million in land attack technology. The remaining funds should be sufficient to support Navy efforts to mature other technologies and develop a new plan for meeting surface fire support requirements.

Directed energy

The budget request included $108.6 million PE 62114N and PE 63114N for directed energy and continued development of an electromagnetic rail gun. No funding was requested in PE 63925N, directed energy and electric weapons systems. Neither was there any funding included for a laser weapons system (LAWS), which is a top research and development priority on the Chief of Naval Operations' unfunded priorities list, or for the Guillotine program. LAWS is under development as a rapid prototype to serve as an adjunct laser weapon for the Navy's Close-In Weapon System (CIWS) to counter rockets, artillery, mortar, and unmanned aerial vehicles for ship and expeditionary base defense. Additional funding would accelerate development by 2 years. Guillotine would provide commanders with a non-lethal capability to disrupt threats and terrorist operations.

The committee agrees with the Navy's objectives, outlined in Joint Vision 2020, to develop directed energy weapons that provide unique capability against emerging asymmetric threats. The committee recommends an increase of $10.7 million in PE 63925N in support of LAWS and Guillotine development and related directed energy and laser weapon systems research and development, including high power free electron and high brightness electron laser technology.

Next-generation cruiser

The budget request included $172.1 million in PE 64300N and $140.4 million in PE 64501N for development efforts in support of a next-generation cruiser, CG(X). CG(X) is planned to be the replacement for the CG-47 class cruiser, with primary missions including air and missile defense. The Navy's long-range shipbuilding plan proposes to procure the first ship of the CG(X) program in 2011.

The John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364) required that the Navy include nuclear power in its Analysis of Alternatives (AoA) for the CG(X) propulsion system.

Section 1012 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) further requires that CG(X) be nuclear powered, unless the Secretary of Defense submits a notification that inclusion of an integrated nuclear power system is not in the national interest. The statement of managers accompanying that act directed the Secretary of the Navy to submit a report with the budget request for fiscal year 2009 providing information regarding CG(X) design, cost, schedule, industrial base considerations, and risk assessment; that would reflect the results of the CG(X) AoA and provide evidence that the Navy is on schedule for procuring the first ship of the class in 2011.

The Secretary of the Navy has delayed submission of the CG(X) report because the CG(X) AoA, which was scheduled to be complete by third quarter fiscal year 2007, remains under review by the Navy. Fundamental considerations regarding the cruiser's requirements, characteristics, technology readiness levels, and affordability continue to be studied, making it likely that milestone A, which was targeted for September 2007, will slip into 2009. By all measures, there is no reasonable path for the next-generation cruiser to meet the current schedule for milestone B and award of a ship construction contract in 2011.

Pending completion of the AoA, determination of radar requirements, ship characteristics, propulsion system, and an executable program schedule, and in view of the delay to program major milestones, the activities planned for fiscal years 2008 and 2009 cannot be executed per the schedule reflected in the fiscal year 2009 budget request. Therefore, the committee recommends a decrease of $87.2 million in PE 64300N and a decrease of $33.6 million in PE 64501N. These recommended decreases would maintain the cruiser development activities at the same level as was funded in fiscal year 2008.

Improved towed array handler

The budget request included $143.5 million in PE 64503N for SSN-688 and Trident submarine modernization, but included no funding for developing or testing improved handling gear for submarine towed arrays. One continuing problem area involves the mechanisms for deployment of the towed array from the submarine's hull. The current system attempts to `push' the flexible array out of the submarine using multiple rollers which often results in damage to array elements and deployment failure. A new system that `pulls' the array out could reduce the number of rollers which are the source of array damage and allow for other improvements and increased reliability.

The committee recommends an increase of $4.1 million to complete further development of the new handling system and testing of a prototype to demonstrate improved thin-line towed array system reliability from better array handlers.

Submarine electronic chart updates

The budget request included $143.5 million in PE 64558N, but included no funding for a program to update electronic charts for submarines.

Navy instructions mandate the use of electronic chart display products across the Navy. This requirement was conceived in stand-alone, display workstation applications, which no longer represent the state-of-the-practice of net-ready, web-service environments. The committee is aware that the Navy conducted a Small Business Innovative Research effort that focused on the demonstration of net-ready, web-service updates of electronic charts for submarines. Funding is needed to:

The committee recommends an increase of $5.3 million to support these activities.

Next-generation Phalanx

The budget request included $36.2 million in PE 64756N for ship self-defense (hard kill), but included no funding for next-generation Phalanx. The Phalanx weapon system is the Navy's principal close-in weapon system for ship self-defense, and has proven to be extremely adaptive for performance against emerging air and surface target sets. The continually evolving nature of the threat, unique challenges posed by operations in the littorals, increased emphasis on single ship probability of raid annihilation, and fact of life technology obsolescence require continued development effort to sustain the superior performance of this critical ship self-defense system. The committee recommends an increase of $10.7 million in PE 64756N for the continued development of the next-generation Phalanx.

NULKA anti-ship missile decoy system

The budget request included $57.6 million for ship self-defense soft-kill systems development in PE 64757N, including $3.0 million for various development activities related to the NULKA anti-ship missile decoy system.

The Navy has identified a series of development activities associated with the NULKA system that are required to understand and deal with emerging threats:

The committee recommends an increase of $9.0 million for the NULKA development program to continue these efforts.

Combat wound tissue transplantation technologies

The budget request included $7.8 million in PE 64771N for medical development. The committee notes the continuing and growing need for combat casualty care technologies including tissue and organ replacement and transplantation. The committee recommends an increase of $2.5 million in PE 64771N for composite tissue transplantation research.

F-35 Joint Strike Fighter competitive propulsion system

The budget request included $1,532.7 million in PE 64800N and $1,524.0 million in PE 64800F for the F-35 Joint Strike Fighter (JSF) program. In section 213 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181), Congress explicitly directed the Department of Defense to (1) develop a competitive propulsion system for the JSF aircraft; and (2) continue competition for the propulsion system throughout the production phase of the JSF program.

The committee is disappointed that the administration chose to ignore the law by failing to fund the competitive propulsion system. Accordingly, the committee recommends an increase of $215.0 million in PE 64800N and $215.0 million in PE 64800F for development of the F-35 JSF competitive propulsion system.

Navy test and evaluation support

The budget request included $356.3 million in PE 65864N for test and evaluation support. The committee commends the Navy for the growth in this line, and urges the Navy to continue to sustain and modernize test capabilities to support current and emerging service and joint requirements. However, the committee is concerned that test and evaluation accounts are often used to deposit discretionary funds that are then transferred for use for other purposes.

The committee recommends a reduction of $10.0 million in PE 65864N for the activities described in budget presentations as `PBD P19--COTF Balancing.' The committee was later informed that the Office of the Secretary of Defense transferred the funds to the Navy without sufficient explanation, so the amount was placed into a test and evaluation account for the purposes of the budget request until clarification was received. The committee has not received any clarification for the purpose of the funds and feels that this is insufficient justification for the request.

Advanced LINAC facility

The budget request included $80.1 million in PE 11221N, Research, Development, Test, and Evaluation, Navy (RDTEN), but included no funding for the Crane linear accelerator facility (LINAC). The committee recommends an increase of $4.0 million for the LINAC to simulate the high radiation environment in space. The committee directs the Navy to develop and use these additional funds in conjunction with the Joint Radiation Hardened Electronics Oversight Council.

Navy support of the reliable replacement warhead

The budget request included $23.3 million in PE 11221N Research, Development, Test, and Evaluation, Navy (RDTEN) for support to the reliable replacement warhead (RRW). The committee recommends no funds for Navy support to phase 3 RRW activities and a reduction of $23.3 million. This effort anticipated that the National Nuclear Security Administration would be moving to the phase 3 of the RRW study process in 2009. No funds were provided for RRW phase 2A in fiscal year 2008, as a result funding for phase 3 is premature.

Warfighter enhanced decision making

The budget request included $26.7 million in PE 24163N for fleet communications, but included no funding for a warfighter enhanced decision making and mobile networking applications initiative (WEDM).

Two years ago, Congress directed the Navy to establish a laboratory to address information technology (IT) challenges facing local and regional commands. The laboratory's focus on emerging technologies offers a unique opportunity to develop and test a joint operational proof-of-concept WEDM. This initiative would be aimed at fielding leading edge applications that could shorten the operational `kill chain' and enhance information flow to the warfighter. WEDM would also provide an opportunity for the academic community to work with the Department of Defense to develop and rapidly deploy training curricula for emerging technologies.

The committee recommends an increase of $3.0 million to establish the WEDM pilot program to provide modeling and simulation, lab testing, live testing, and training on equipment prior to shore site acquisition to ensure that the C4I systems programmed for installation on Navy ships are compatible with shore facilities and are of appropriate capacity to support fleet deployments worldwide.

Aviation improvements

The budget request included $122.9 million in PE 25633N for aviation improvements, but no funds to develop next-generation automated test systems (ATS) instrumentation for aircraft avionics or to develop rapid repair structural adhesives for aircraft applications.

Current ATS are large and numerous. The Navy finds it difficult to keep the commercial hardware used in test equipment modernized on a schedule similar to advanced and evolving aircraft avionics. The Navy specifically, and the Department of Defense broadly, require technology that is easily upgradeable and flexible to conduct complex tests on a variety of fielded systems. Therefore, the committee recommends an increase of $3.0 million to develop new technology for ATS to reduce the size and increase the versatility of test equipment through software upgrades.

The Navy has been pursuing efforts to develop structural adhesives that cure in the presence of ultraviolet light, reducing required maintenance equipment while retaining required strength. This would permit rapid repair of structures, such as damaged military aircraft and radomes. Present technology only supports either room temperature curing for several days or high pressure and temperature cycles in autoclaves. Developing adhesives that cure rapidly, store at room temperature, last on the shelf for a year, and are environmentally safe would have great benefits to Navy logistics. Therefore, the committee recommends an increase of $1.0 million to develop structural adhesives that exhibit these properties.

The committee recommends a total authorization of $126.9 million in PE 25633N for aviation improvements.

Broad Area Maritime Surveillance Unmanned Aircraft System

The budget request included $480.1 million in PE 35205N for the Broad Area Maritime Surveillance Unmanned Aircraft System (BAMS UAS). The BAMS UAS program development contract, which the Navy had expected to award in October 2007, was delayed until late April 2008. As a result, development activities originally planned for fiscal year 2008 will inevitably move to fiscal year 2009. For example, an updated BAMS UAS program schedule indicates that system engineering activities such as the system functional review have slipped to fiscal year 2009.

Therefore, the committee recommends a reduction of $48.2 million in PE 35205N for BAMS UAS to reflect this delay.

Digital manufacturing technologies

The budget request included $56.7 million in PE 78011N for Navy manufacturing technology programs. The committee notes that the Director of Defense Research and Engineering and the Defense Science Board have both identified significant shortfalls in manufacturing research and development funding in the Department of Defense. To help address these shortfalls and strengthen the defense industrial base, the committee recommends an increase of $1.7 million in PE 78011N for the development of advanced direct digital manufacturing technologies to support the rapid prototyping of defense materiel.

National Shipbuilding Research Program--Advanced Shipbuilding Enterprise

The budget request included no funding in PE 78730N for maritime technology. The National Shipbuilding Research Program--Advanced Shipbuilding Enterprise (NSRP-ASE) is a collaborative effort between the Navy and industry which has yielded significant productivity improvements for Navy ship construction and repair. Under this program the Navy provides funding that is matched and exceeded by industry investment. Using this approach, the Navy has achieved a high return on investment by providing near-term savings and avoiding significant future costs. The committee believes that continuation of the NSRP-ASE effort is a vital element of the overarching objective of improving the affordability of naval warship construction and maintaining a healthy, innovative shipbuilding industrial base.

The committee recommends an increase of $15.0 million in PE 78730N for the NSRP-ASE.

AIR FORCE

Insert graphic folio 260 here SR335.113

Insert graphic folio 261 here SR335.114

Insert graphic folio 262 here SR335.115

Insert graphic folio 263 here SR335.116

Insert graphic folio 264 here SR335.117

Insert graphic folio 265 here SR335.118

Insert graphic folio 266 here SR335.119

Insert graphic folio 267 here SR335.120

Insert graphic folio 268 here SR335.121

Insert graphic folio 269 here SR335.122

Insert graphic folio 270 here SR335.123

Insert graphic folio 271 here SR335.124

Insert graphic folio 272 here SR335.125

Insert graphic folio 273 here SR335.126

Air Force basic research programs

The budget request included $125.9 million in PE 61103F for university research initiatives. The committee commends the Air Force for increasing its investments in basic research in the fiscal year 2009 budget request. This is consistent with the National Research Council's 2005 report entitled `Assessment of Department of Defense Basic Research,' which recommended that `the Department of Defense should redress the imbalance between its current basic research allocation, which has declined critically over the past decade, and its need to better support the expanded areas of technology, the need for increased unfettered basic research, and the support of new researchers.'

Consistent with the need to fund more basic research efforts in areas of technological interest to the Air Force, the committee recommends increases in PE 61103F of: $2.0 million for research on advanced hypersonic technology designs; $2.0 million for information security research; $1.6 million for research on reducing military decision making cycle times; and $2.5 million for research on diamond substrates for microelectronics.

Air Force materials research

The budget request included $117.1 million in PE 62102F for applied research on materials. The committee notes that the National Research Council's 2005 report on `High Performance Structural Fibers for Advanced Polymer Matrix Composites' highlighted the need for the Department of Defense to reduce costs and improve its understanding of the manufacture and properties of advanced carbon fibers. Consistent with those recommendations, the committee recommends an increase of $2.5 million in PE 62102F for research on advanced carbon fiber materials for Air Force applications. The committee notes that the Naval Studies Board's 2007 report on `Conventional Prompt Global Strike (CPGS) Capability' noted that `the boost glide and high-speed cruise missile concepts as CPGS options require advanced technologies, especially in the areas of thermal protection and management . . .' The committee recommends an increase of $2.5 million for the development of thermal protection systems for global strike hypersonic vehicles.

The Director of Defense Research and Engineering's 2007 Strategic Plan identified advanced materials as an enabling technology for a number of desired military capabilities, including protection against improvised explosive devices and air dominance. The committee recommends an increase of $2.0 million in PE 62102F for development of fire and blast resistant materials for force protection missions.

Finally, the committee notes that the Air Force Research Laboratory strategy has a strategic goal to `accurately diagnose the current state and predict the future state of aerospace systems' by 2015. To support that effort, the committee recommends an increase of $1.5 million for development of health monitoring sensors of aerospace components.

The budget request included $41.9 million in PE 63112F for advanced materials technology development for weapons systems. The committee recommends an increase of $5.0 million to develop and transition metals and process technologies for fielded and future Air Force systems.

Optical components for air vehicles

The budget request included $122.9 million in PE 62201F for applied research on aerospace vehicle technologies. The committee notes that the National Research Council's 2006 study on `Future Air Force Needs for Survivability' noted the need to reduce electronic emission signatures on aircraft. The committee recommends an additional $1.5 million in PE 62201F for research on optical components to replace electrical components for use in onboard aircraft communications systems.

Air Force training technology

The budget request included $82.1 million in PE 62202F for applied research on human effectiveness. The committee notes that in a 2007 memorandum to the Secretary of Defense, the Director of Defense Research and Engineering highlighted the need to significantly increase investments in research on adaptive, interactive full immersion training. To enhance Air Force and joint training capabilities, the committee recommends increases in PE 62202F of $2.0 million for advanced satellite operator training systems development and $2.5 million for development of immersive tools for enhancing theater air-to-ground command and control coordination modeling and simulation.

Air Force aerospace propulsion technology

The budget request included $218.0 million in PE 62203F for applied research on aerospace propulsion. The 2006 National Research Council report entitled `A Review of United States Air Force and Department of Defense Aerospace Propulsion Needs' concluded that Air Force investments in propulsion science and technology need `. . . to be increased if technical gaps are to be filled.' The report focused on a variety of space, tactical air, and engine technology gaps that need to be addressed.

To enhance Air Force propulsion technology efforts, the committee recommends an increase in 62203F of $2.0 million for development of high temperature, corrosion resistant bearings for advanced propulsion systems.

The committee continues to support Department of Defense efforts to develop technologies to support time-critical strike missions. The committee recommends an increase of $5.0 million in PE 62203F for robust scramjet research activities leading to flight tests and demonstration of an alternate engine to support the Air Force X-51 testbed program.

Aerospace sensor technologies

The budget request included $109.0 million in PE 62204F for applied research on aerospace sensors. The committee notes that the Air Force Research Laboratory (AFRL) science and technology (S&T) strategy highlights the need for development of `novel data mining and advanced relevance assessment technologies' to support establishment of `universal situational awareness.' To help address this need, the committee recommends an increase of $1.5 million for research on enhancing information quality to support persistent surveillance missions.

The AFRL S&T strategy has set a strategic goal of demonstrating `layered and flexible sensing architecture that respond to the Commander's intent' by identifying and precisely locating high value difficult targets by 2015. To support the development of this architecture, the committee recommends an increase of $3.0 million in PE 62204F for development of wideband system components to support electronic intelligence systems.

Air Force seismic research

The budget request included $117.5 million in PE 62601F Research, Development, Test, and Evaluation, Air Force for space technologies including $6.8 for seismic technologies to support national requirements for monitoring nuclear explosions. The committee recommends an increase of $13.0 million to improve operational seismic capability.

Cyber attack mitigation technologies

The budget request included $109.5 million in PE 62702F for applied research on command, control, and communications technologies. The September 2007 Defense Science Board study entitled `Mission Impact of Foreign Influence on DOD Software' highlighted the need for `programs to advance the state-of-the-art in vulnerability detection and mitigation in software and hardware.' In support of this finding, the committee recommends an increase of $2.5 million for the development of systems to detect and defeat malicious software on military networks and information systems.

Reconfigurable securing computing

The budget request included $56.9 million in PE 63203F for development of advanced aerospace sensors. The Air Force and Department of Defense have set cybersecurity as a high technology priority. To support these efforts at the tactical level and reduce the costs for the development of security systems, the committee recommends an increase of $2.0 million to develop reconfigurable secure computing technologies for advanced sensor systems.

Propulsion technologies

The budget request included $170.9 million in PE 63216F for aerospace and propulsion and power technology development. The Defense Science Board Task Force on DOD Energy Strategy recommended investing `in energy efficient and alternative energy technologies to a level commensurate with their operational and financial value.' The committee believes that the development of alternative sources of fuel for Air Force missions could result in huge cost savings for the Department of Defense, and therefore recommends an increase of $3.0 million in PE 63216F for research on assured aerospace fuels to assess alternative fuels from sources such as coal, biomass, and shale, while minimizing environmental impact.

The committee continues to support development of hypersonic technologies to enable high speed, precision strike capabilities. The committee recommends an additional $6.0 million in PE 63216F for development of supersonic and hypersonic cruise missile engine technologies, as part of the Versatile Affordable Advanced Turbine Engine (VAATE) High Speed Turbine Engine Demonstrator (HiSTED) program.

Thin film amorphous solar arrays

The budget request included $81.0 million in PE 63401F for advanced spacecraft technology. The committee recommends an increase of $2.0 million for thin film amorphous solar arrays for space systems. Fiscal year 2009 will be the last year of this successful research and development program of advanced solar arrays for space systems using thin film amorphous substrate. These solar arrays are 10 times cheaper, three to five times lighter, and significantly more efficient than current solar arrays. After the successful demonstration flight on the Tac-Sat2 satellite, the committee believes that the Air Force should work with industry to explore future opportunities to transition these solar arrays to future Tac-Sat satellites or other satellite programs of record. Fiscal year 2009 funds would be used to finish the analysis of the experimental and demonstration data and complete the project.

Integrated targeting devices

The budget request included $11.8 million in PE 63601F for development of conventional weapons technology. The Air Force Research Laboratory science and technology strategy states that `an important aspect of universal situational awareness is the advancement of sensor technologies.' In order to support the development of enhanced sensor technologies to support improving precision strike capabilities, the committee recommends an increase of $3.0 million for lightweight, targeting device development to integrate multiple sensor types.

Optical interconnect for battlefield communications

The budget request included $30.1 million in PE 63789F for advanced development of command, control, communications, and intelligence technologies. The Director of Defense Research and Engineering's 2007 strategic plan highlights networks and communications, including technologies to address airborne networks, as an enabling technology that should receive the highest level of corporate attention and coordination. To support these efforts the committee recommends an additional $2.0 million for development of optical interconnects to support data communications onboard unmanned aircraft systems and satellites.

High energy laser weapon systems

The budget request included $4.0 million in PE 63924F for the high energy laser advanced technology program managed by the high energy laser joint technology office. The committee notes that the Defense Science Board Task Force on Directed Energy Weapons recommended that `the Director of Defense Research and Engineering should give high priority to science and technology activities addressing high power solid state laser development and accompanying beam quality and beam control development.' To support this effort, the committee recommends an increase of $5.0 million in PE 63924F for optimization of solid state laser technologies and acceleration of the transition of operational systems to warfighters.

Global Positioning System III operational control segment

The budget request included $734.7 million in Research, Development, Test, and Evaluation, Air Force (RDTEAF) for the Global Positioning System III (GPS III) in three separate budget lines: $420.3 million for the GPS III space segment; $3.0 million for the GPS III operational control segment; and $304.4 million for the backwards compatibility for the operational control segment. Previously all three GPS activities were in a single GPS III program element. While the committee recognizes some value in separating the ground and space segments, the committee believes that separating the ground segment into two different budget lines needlessly removes program management flexibility.

The committee recommends combining RDTEAF line 37 with line 36 into a single budget line and program element, PE 63423F, for the GPS III operational control segment.

If the continued separation of the space and operational control segments introduces additional cost or management difficulty into the GPS III program, the committee would support recombining both segments into a single program element.

Space situational awareness

The budget request included $76.8 million in PE 63438F for space control technology. The committee recommends an increase of $5.0 million to utilize Missile Defense Agency X-band and UHF-band sensors for additional space object tracking to improve space situational awareness.

Transformational Communications satellite

The budget request included $843.0 million in Research, Development, Test, and Evaluation, Air Force (RDTEAF) for the Transformational Communications satellite (TSAT). This amount is $384.8 million less than was projected for TSAT just last year. The committee recommends an increase of $350.0 million for TSAT.

The Air Force and the Department of Defense (DOD) reduced the TSAT program by $3.6 billion over the future-years defense program (FYDP), delaying the first launch of TSAT until fiscal year 2018 or beyond, a delay of 4 years. The committee is very disappointed in the decision to delay TSAT. For the last several years the Air Force and the DOD executive agent for space have asserted that TSAT is one of its highest priorities for the Department and the core of the protected satellite communications architecture.

TSAT would provide protected, high data rate, wideband communications with many times the capability of the Advanced Extremely High Frequency (AEHF) and the Wideband Global System (WGS) that it will replace. The significantly enhanced capabilities provided by TSAT are required to support a broad range of modernization programs, including the Army Future Combat System and the many existing and future unmanned aerial vehicle (UAV) programs. In addition, TSAT will provide a networking capability based on Internet protocols that will substantially increase the number of users and the way information is shared.

The TSAT program started with an overly aggressive schedule, significant technical risks, and significant cost uncertainty, but with substantial management attention the technical and other risks are being addressed. The key technologies for TSAT are all at a technical readiness level 6 and the independent program assessment found that TSAT is ready to move to the preliminary design phase.

Nevertheless, the Department has initiated a review to revalidate the TSAT program requirements as part of a military satellite communications investment strategy study. The committee is concerned that some of the options being discussed as part of the study will, if adopted, further delay delivery of the TSAT capabilities to the broad user community, waste money in the long run, and generate a significant communications gap in the future. Many of the options under consideration will so reduce the capability of TSAT that the committee questions why such a substantially downgraded TSAT is worth the effort, time, and expense. TSAT as originally envisioned would dramatically increase data throughput and, through the introduction of an Internet protocol approach, fundamentally change the way in which satellite communications are utilized.

The committee recognizes the critical need for the full scope TSAT, but will not support TSAT under the circumstances as currently presented to the committee by the Air Force and DOD. At this juncture the committee would support funding for TSAT only if the Air Force and DOD return TSAT to a meaningful technology and schedule path. This is a difficult decision given the superb management of the program by the TSAT program office.

Once again the committee questions the senior level Air Force commitment to being a space force.

Operationally Responsive Space

The budget request included $110.0 million in PE 64857F for Operationally Responsive Space (ORS). The committee recommends an increase of $10.0 million for increased work on approaches to standardized bus designs with common interfaces, additional satellite launches to support both technology demonstrations and operational concepts, and additional launch capabilities including a resource study to look at block buys for launch vehicles.

The committee commends the work of the ORS office since it was formally established last year, and appreciates the effort required to establish a multi-service, multi-agency, functioning program office. To support the multi-service, multi-agency nature of the office the committee supports the concept of rotational directors and deputy directors.

The committee urges the ORS office to continue to maintain a balanced program including launch, bus development, sensor development, and developing fully integrated satellites. In addition, the launch of the Tac-Sat2 satellite demonstrated that many issues remain to be resolved in the development of operational concepts for the Transformational Communications Satellite (TSAT).

B-2 radar modernization program

The budget request included $351.4 million in PE64240F for the B-2 bomber, including $83.1 million for radar modernization. The committee recommends a transfer of $18.5 million from PE6420F to Aircraft Procurement, Air Force line 24 to facilitate the management of the radar modernization program.

Space-based space surveillance block 10

The budget request included $210.5 million for space situational awareness systems in PE 64425F including $210.5 million for space-based space surveillance block 10 (SBSS 10). SBSS 10 is a spacecraft to improve deep space situational awareness by finding, fixing, and tracking space objects that is scheduled to launch in early 2009. The committee recommends an additional $10.0 million for SBSS 10 to allow for timely development of training materials, technical orders, and a simulation environment to train Air Force SBSS 10 operators, thereby reducing the time between launch and transition to Air Force operations.

Space-based Infrared Satellite system

The budget request included $529.8 million in PE 64441F for the Space-based Infrared Satellite system (SBIRS). The committee recommends an increase of $30.0 million for SBIRS operations and training.

The SBIRS program is suffering from the same problem that is becoming increasingly apparent in several space systems--a disconnect between the ground and space segments. Because of the technical, cost, and schedule issues that have surrounded the SBIRS space segment, the Air Force has had to divert funds slated for ground related activities to the space segment for at least the last 3 years. As a result, the ground activities associated with SBIRS have been underfunded. The committee notes that for both fiscal years 2008 and 2009 funding for the ground segment has appeared on the Chief of the Air Force's unfunded priorities list.

Now that the first HEO sensor is on orbit, with excellent initial performance, and the second HEO sensor is close behind, the lack of ground funding is a growing problem. The unfunded requirement in fiscal year 2009 is $71.2 million and includes funding for such basic items as the wideband data transmission requirements needed for the payload on-orbit test station to exploit and utilize the capabilities of the new HEO sensors, and crew training. Also included on the unfunded list is completing the hardware and software to allow the mission control station and the backup station to control, track, task, and process the data from both the legacy and the SBIRS systems. Moreover, on the current schedule the backup station will be certified for full operations before the main mission station.

The committee also notes that the Air Force has now decided not to include the Space and Atmospheric Burst Reporting System (SABRS), part of the U.S. nuclear detonation system, as part of the payload on the SBIRS-GEO 3 satellite. The committee directs the Air Force to either reinstate the SABRS on the SBIRS-GEO 3 satellite or find an equally capable alternative host and report its decision to the congressional defense committee no later than August 30, 2008.

Third Generation Infrared Surveillance satellite system

The budget request included $149.1 million in PE 64443F for the Third Generation Infrared Surveillance (3GIRS) satellite system. The committee recommends a reduction of $30.0 million.

3GIRS is a technology development program to develop the next generation of infrared early warning satellite. The committee supports further development and on orbit testing of new technologies to support the follow-on to the Space Based Infrared Satellite system (SBIRS). The last SBIRS GEO satellite will probably launch in fiscal year 2016 depending on the final decision as to the full size of the SBIRS GEO constellation. In its budget justification material for 3GIRS, the Air Force plans to freeze the technology for the follow-on to SBIRS and make a decision to proceed to build an operational satellite at the end of fiscal 2010 even though the first launch of the follow-on would not be until 2019. The committee is concerned that the Air Force plan would prematurely lock in a technology without completing needed sensor development and without fully understanding the performance of the two approaches currently funded. The committee notes that there is a third unfunded option as well. As a result, the committee urges the Air Force to complete development of the focal plane arrays and to consider short-term on orbit demonstrations of both approaches. The committee encourages utilizing the Operationally Response Space Office to explore opportunities to conduct on orbit experiments.

F135 engine

The budget request included $1,524.0 million in PE 64800F for the F-35 Joint Strike Fighter (JSF) program. Over the past 2 years, Congress has added $820.0 million to continue funding of the F136 engine, a competitive propulsion source, to ensure there is fair and full competition for the propulsion system of the JSF.

The Department of Defense froze the technology baseline of the F135 engine several years ago when the JSF and the engine began system development and demonstration (SDD). To ensure that both engines incorporate the best configuration and most recent technology available, the Department should invest in and direct a program for the F135 and F136 engine programs that would drive technology insertion and provide potential customers with the best performing, most efficient engines possible. For example, the committee believes that the potential application of new composite materials in the F135 engine program could result in life cycle cost savings. Because no funds were set aside for the F136 engine in the administration's budget request, elsewhere in this report the committee has recommended an increase of $430.0 million for the development of the F-136 engine.

In order to maintain a level playing field, the committee recommends an increase of $35.0 million in PE 64800F for F135 engine technology development.

Combat Search and Rescue Replacement Aircraft

The budget request included $305.1 million in PE 65277F for development of the Combat Search and Rescue Replacement Aircraft (CSAR-X) and $15.0 million in Aircraft Procurement, Air Force (APAF) for advanced procurement for CSAR-X. The Air Force anticipated awarding the development contract for the CSAR-X in the spring of 2008, but the award has been delayed until the first quarter of fiscal year 2009 due to successful protests by losing offerors, development of additional data about the program, as well as the offerors' schedules.

On April 11, 2008, the Air Force released Amendment 6 to the Request for Proposal for the CSAR-X. Amendment 6 modifies the development funding required in fiscal year 2009, lowering the amount, according to the Air Force, to $265.1 million. These delays and the new program profile associated with Amendment 6 also remove the need for programming any advance procurement funds in fiscal year 2009.

Therefore, the committee recommends a reduction of $40.0 million in PE 65277F for CSAR-X and a reduction of $15.0 million in APAF for CSAR-X advance procurement.

High speed test track

The budget request included $61.8 million in PE 64759F for major test and evaluation investments. The committee continues to be concerned about the Air Force's downsizing of its test and evaluation infrastructure and workforce. The committee believes that a shortsighted reduction in Air Force testing capabilities will inevitably increase technical risk, life cycle costs, and potentially reduce operational performance of future Air Force acquisition programs. The committee recommends an increase of $4.0 million to support development of high speed test track technology for use on testing of critical missile, propulsion, and sensor subsystems.

B-52 bomber

The budget request included $38.7 million in PE 11113F for B-52 squadrons, including $35.2 million for combat network communications technology (CONECT). The committee recommends an additional $9.5 million for CONECT. The Air Force failed to include adequate funding in the budget request to meet the requirements of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) to maintain 76 B-52 bombers in a common configuration and included this funding on the Air Force unfunded priorities list.

Air Operations Centers

The budget request included $118.8 million in PE 27410F for Air Operations Centers, including $40.4 million for integration and development of Air Operation Centers (AOCs), increment 10.2. The Air Force has not finished fielding increment 10.1 of the AOCs, yet has launched into development of increment 10.2. Increment 10.2 will rely, in part, on the Defense Information Systems Agency's Net-enabled Command and Control (NECC). However, both the Director of Defense Research and Engineering's technology readiness assessment and the Director of Operational Test and Evaluation's ongoing oversight of the NECC program have raised concerns regarding technical risk, aggressive and optimistic scheduling, and unclear testing and deployment strategies.

Until technical risk, testing, and program schedule issues are addressed in a coordinated and joint fashion for both NECC and AOCs, the committee believes that continuing development of AOCs, increment 10.2 would be premature. Therefore, the committee recommends a reduction of $40.4 million in PE 27410F for the development of AOCs, increment 10.2.

Joint surveillance target attack radar system research and development

The budget request included $97.6 million in PE 27581F for research and development projects for the E-8 joint surveillance target attack radar system (JSTARS).

The E-10 aircraft was supposed to be a test bed for the multi-platform radar technology insertion program (MP-RTIP). The Air Force intends to field this MP-RTIP sensor suite on a number of air vehicles, including the Global Hawk unmanned aerial vehicle (UAV).

Last year, the Air Force decided to cancel the E-10 program. However, the Air Force realized that canceling testing and development of the large MP-RTIP would leave a void in its capability to defend the U.S. homeland as well as U.S. and coalition forces against cruise missile attacks. The JSTARS (E-8) was the original platform designated for MP-RTIP. That makes the current JSTAR aircraft a prime candidate as the Air Force investigates a path forward. The Air Force could transfer the radar back to JSTARS with minimal risk. Installation of MP-RTIP could provide nearly the same capability as the E-10 while saving scarce defense dollars.

The committee believes that the Air Force should pursue another path, whether that would be the E-8 JSTARS or some other platform, and field the better capability than can be achieved with the Global Hawk. Therefore, the committee recommends an increase of $98.0 million in PE 27581F for maturing the MP-RTIP sensor suite.

Weather service research and development

The budget request included $47.3 million in PE 35111F for research and development projects for the Air Force weather weapon system (AFWWS), but included no funding to develop software toolkits for operations risk management (STORM) upgrades for the system.

AFWWS and its warfighter application are charged with providing regional and tactical weather observations and forecasts to Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR) systems used by commanders, planners, and operators throughout the world. The Air Force needs to upgrade AFWWS to provide commanders and mission planners with a better appreciation of the uncertainty of weather forecasts and observations. Such an upgrade should enable them to better determine the risk of ongoing and planned operations. The AFWWS is currently capable of calculating the needed uncertainty but is unable to provide computer-to-computer transfer of such information.

Therefore, the committee recommends an increase of $6.0 million to upgrade the AFWWS and integrate all vital information (terrain, weather, risk assessment) into one visual display.

C-17 research, development, test, and evaluation

The budget request included $236.0 million in PE 41130F for C-17 research, development, test, and evaluation (RDT&E), including $150.8 million for performance improvement development and testing. The funding for performance improvement development and testing represents a 50 percent increase over the fiscal year 2008 amount.

The committee believes that the Air Force should continue to seek improvements in existing weapons systems, and therefore is not recommending elimination of all funding. However, given the superb performance and operation of the C-17 fleet over the past several years, the committee sees no justification for increased RDT&E funding for C-17s at this time.

Therefore, the committee recommends a reduction of $48.0 million in PE 41130F for C-17 performance improvement development and testing.

Expeditionary Combat Support System

The budget request included $189.7 million in PE 78610F for the Expeditionary Combat Support System (ECSS). The committee is encouraged by the recent progress ECSS has made towards achieving Milestone B certification in the fall of this year. Also encouraging is the Air Force strategy briefed to the committee for better coordination and integration of ECSS with another information technology initiative, the Defense Enterprise Accounting and Management System (DEAMS). However, significant concerns remain. Current plans show that over the next 3 years the Air Force has underfunded the ECSS by over $500.0 million. Additionally, the committee has learned that the program office is significantly understaffed. While the committee has been given assurances that the funding concerns will be reconciled in future years, the current schedule of concurrently developing and fielding Release 1 and Release 2 appears high risk. Until the Air Force fully funds the ECCS and provides sufficient manning, the current schedule appears overly optimistic. Therefore, the committee recommends a decrease of $50.0 million in PE 78610F for ECSS, Release 2.

Defense Enterprise Accounting and Management System

The budget request included $27.3 million in PE 91538F for the research, development, test, and evaluation activities related to the Defense Enterprise Accounting and Management System (DEAMS). The committee has historically been supportive of the Department of Defense's business systems modernization efforts, but is concerned by the Air Force's functionally `stovepiped' approach to its Enterprise Resource Planning (ERP) financial systems. Current Air Force strategy designates DEAMS as the Air Force financial system of record for working capital fund accounting, requiring the Expeditionary Combat Support System (ECSS) financial transaction to be provided to DEAMS. Current strategy increases the number of interfaces between DEAMS and ECSS, increases long-term costs, and greatly complicates the Air Force movement to a fully integrated information technology environment.

The committee notes that the Air Force has recognized the weaknesses of the current `stovepiped' strategy and, under a proposed new strategy, plans to migrate working capital fund financials to ECSS. Supported by the Office of the Secretary of Defense's Business Transformation Agency, this proposal will provide the foundation for the Air Force's evolution to a single enterprise resource program. Under the new strategy, the committee believes that the development funding requested for DEAMS is excess to need.

Therefore, the committee recommends a reduction of $15.0 million for DEAMS. The committee directs that the Air Force preserve funding for testing activities related to DEAMS when allocating the reduction.

DEFENSE-WIDE

Insert graphic folio 290 SR335.127

Insert graphic folio 291 SR335.128

Insert graphic folio 292 SR335.129

Insert graphic folio 293 SR335.130

Insert graphic folio 294 SR335.131

Insert graphic folio 295 SR335.132

Insert graphic folio 296 SR335.133

Insert graphic folio 297 SR335.134

Insert graphic folio 298 SR335.135

Insert graphic folio 299 SR335.136

Insert graphic folio 300 SR335.137

Insert graphic folio 301 SR335.138

Insert graphic folio 302 SR335.139

Insert graphic folio 303 SR335.140

Insert graphic folio 304 SR335.141

Insert graphic folio 305 SR335.142

Insert graphic folio 306 SR335.143

Defense Experimental Program to Stimulate Competitive Research

The budget request included $2.8 million in PE 61114D8Z for the Defense Experimental Program to Stimulate Competitive Research (DEPSCoR). The committee notes that this program was funded at $16.9 million in fiscal year 2008 and, according to military service program managers, has funded meritorious basic research programs that have contributed to defense capabilities. The program is currently undergoing a congressionally directed independent assessment that will serve to improve the management and execution of the program. The committee recommends an additional $8.0 million for the DEPSCoR program.

In-vitro models for biodefense vaccines

The budget request included $53.2 million in PE 61384BP for chemical and biological defense basic research, but no funds for development of lung models to improve vaccines. The committee recommends an increase of $1.0 million in PE 61384BP for development of an in-vitro lung model to support biodefense vaccines against aerosolized pathogens. The committee notes that there is insufficient understanding of the interaction between human lung immune cells and aerosolized biological agents. In order to design effective vaccines against such threats, it would be important to improve this understanding.

Superstructural particle evaluation

The budget request included $53.2 million in PE 61384BP for chemical and biological defense basic research. This basic research improves the understanding of the scientific processes for protection against chemical and biological agents. The committee recommends an increase of $3.0 million in PE 61384BP to continue efforts in superstructural particle evaluation and characterization with targeted reaction analysis. This program shows potential as an enabling technology for other efforts in the chemical and biological defense area.

Next-generation over-the-horizon radar

The budget request included $31.3 million for the Lincoln Laboratory Research Program in PE 62234D8Z, but no funds for next-generation over-the-horizon radar development (OTHR). The budget request did include $1.0 million in PE 63648D8Z to begin a Joint Capability Technology Demonstration (JCTD) of a next-generation OTHR. The Department of Homeland Security (DHS) is expected to contribute funds to this JCTD in fiscal year 2009 as well.

The Joint Requirements Oversight Council has validated a Joint Capabilities Document for homeland air and cruise missile defense of North America, which documents significant surveillance gaps in the approaches to the United States. The OTHR JCTD is intended to address these vulnerabilities. U.S. Northern Command and North American Aerospace Defense Command (NORTHCOM/NORAD), the sponsors of the JCTD, submitted a high-priority requirement to augment funding for the OTHR JCTD to conduct technology risk reduction activities.

This JCTD will capitalize on the large investment of the Australian Ministry of Defense in OTHR technology. The risk-reduction initiative would procure a copy of a brass board next-generation radar design developed by Australia. This brass board would be used to develop and test technology to enhance performance.

The committee believes that this project merits support and applauds the joint efforts of the Department of Defense and DHS to find innovative solutions for securing U.S. airspace. The committee recommends an increase of $2.8 million in PE 62234D8Z, and $1.9 million in Other Procurement, Air Force, line 24, General Information Technology, for OTHR JCTD risk reduction.

Chemical agent fate response planning tool

The budget request included $203.7 million in PE 62384BP for chemical and biological defense applied research, but included no funds to develop analytic tools to plan appropriate responses to chemical exposures. The committee recommends an increase of $2.0 million in PE 62384BP to develop an appropriate response planning tool that uses the chemical agent fate database and supports consequence management and operations effects assessments. Such a response planning tool would fulfill a requirement of the Joint Operational Effects Federation.

The committee notes that the chemical agent fate program is a joint service program that focuses on the acquisition and use of chemical warfare agent persistence data to improve the ability of U.S. forces to protect themselves and their equipment while operating in a chemically contaminated environment. It also has applications to domestic consequence management planning and response.

Chemical and biological applied research

The budget request included $203.7 million in PE 62384BP for chemical and biological defense applied research. The committee recommends an increase of $5.0 million in PE 62384BP to develop advanced processes for the production of molecular therapeutics against botulism, with the goal of advancing to Phase I clinical studies. The committee notes that there is no vaccine approved and licensed by the Food and Drug Administration against the botulism toxin, and therapeutic approaches may hold significant potential.

The committee also recommends an increase of $4.0 million in PE 62384BP for rapid response countermeasures for chemical and biological threats. This effort is intended to provide a low-cost sensor that can be widely distributed and networked to provide early warning capabilities. This effort would address issues related to sensitivity, selectivity, miniaturization, manufacturability, and low-cost production. The committee notes that progress in these areas would permit a significant improvement in chemical and biological sensors.

Chemical and biological infrared detector

The budget request included $203.7 million in PE 62384BP for chemical and biological defense applied research, but included no funds to develop miniaturized infrared detection technology. The committee recommends an increase of $3.0 million in PE 62384BP to continue development and miniaturization of an advanced infrared detection system for chemical and biological agents. The objective is to demonstrate a functional prototype that operates at high speed and sensitivity with minimal false alarm rates. This technology may provide an end product with significantly lower logistical burden than other technologies.

Multivalent Marburg and Ebola vaccine

The budget request included $203.7 million in PE 62384BP for chemical and biological defense applied research, but included no funds to advance Marburg/Ebola vaccine candidates into clinical trials. The committee recommends an increase of $4.5 million in PE 62384BP to help move candidate vaccines against Marburg and Ebola viruses into Phase I clinical trials, including clinical lot production for human injection, human safety trials, and human dose escalation studies. The Department of Defense is currently evaluating five different vaccine technologies for Marburg and Ebola, and this additional funding would permit progress toward selecting the most promising candidate for advanced development.

DARPA technology transition

The budget request included $371.5 million in PE 62702E, $107.9 million in PE 63286E, and $287.0 million in PE 63287E for Defense Advanced Research Projects Agency (DARPA) science and technology projects. The committee recommends reductions of $4.5 million in PE 62702E for laser guided bullet research; $3.0 million in PE 63286E for the A160 program; and $10.0 million in PE 63287E for the Integrated Sensor is Structure program. The committee is concerned that these programs do not have clearly delineated transition paths in place, or programmed funding in place, so that they will be adopted by any service program of record or science and technology activity.

The committee commends DARPA's efforts to invest in high risk, high payoff technologies, but believes that scarce science and technology resources should be used in a manner well coordinated between the science and technology executives of the military services and DARPA.

Three-dimensional integrated circuit technologies

The budget request included $211.5 million in PE 62716E for applied research in electronics technology. To support efforts to miniaturize defense technologies, the committee recommends an additional $2.5 million for research on three-dimensional integrated circuits for use in sensors and other defense applications.

Blast mitigation and protection

The budget request included $211.1 million in PE 62718BR for technologies to defeat weapons of mass destruction. The committee recommends an increase of $2.0 million in PE 62718BR for blast mitigation and protection analysis and software development to improve the Vulnerability Assessment and Protection Option analytic tool used by the Defense Threat Reduction Agency to predict the effects of explosive blasts on buildings, and to design protection and mitigation options for military facilities. Given the threat of terrorists using high explosives, this analytic capability is an important component of force protection assessment and planning.

Comprehensive National Incident Management System

The budget request included $211.1 million in PE 62718BR for technologies to defeat weapons of mass destruction (WMD). The committee recommends an increase of $4.0 million in PE 62718BR for the Comprehensive National Incident Management System being developed by the Defense Threat Reduction Agency to improve national capabilities to analyze potential catastrophic events such as pandemic influenza and terrorist attacks using WMD. This technology has the potential to significantly improve the ability of the Department of Defense and U.S. Northern Command to analyze, model, and plan for such catastrophic events, including the ability to provide support to civil authorities for consequence management of such events.

Special operations technologies

The budget request included $23.1 million in PE 116401BB for special operations technology development. The committee notes that the United States Special Operations Command (SOCOM) has highlighted `tagging, tracking, and locating' as a key technology challenge. To support development of tracking technologies, the committee recommends an additional $2.0 million in PE 1160401BB for the development of multi-sensor data fusion systems to enhance detection and discrimination of targets hidden in foliage.

The budget request included $2.5 million in PE 1160407BB for special operations forces medical technology development. The committee recommends an increase of $1.5 million for the development of portable devices to diagnose traumatic brain injuries.

Blast trauma research

The budget request included $80.0 million in PE 63122D8Z for technology support for combating terrorism. To help address issues of traumatic brain injuries suffered by military personnel, the committee recommends an increase of $2.0 million for development of threshold blast-induced traumatic brain injury data that will provide safe weapons operations guidelines, safe standoff distances for the use of explosions in combat training and operations, and inform engineering design considerations of force protection equipment. The committee directs that this work be performed in coordination with the activities of the Department of Defense Blast Injury Research Program Coordinating Office.

Blackswift

The budget request included $70.0 million in PE 63287E and $50.0 million in PE 35206F for the Blackswift Test Bed. The Blackswift program seeks to develop `an extended duration hypersonic test bed which will allow for the study of tactics for a hypersonic airplane.' The committee recommends a reduction of $40.0 million from PE 63287E for the Blackswift program. The committee directs the Defense Advanced Research Projects Agency (DARPA), Director of Defense Research and Engineering (DDRE), the Air Force, the Prompt Global Strike Office, and the newly established Joint Technology Office for Hypersonics to review the program to ensure that it is focused on addressing the highest priority hypersonics technological gaps in order to operationally field hypersonic capabilities in the future. The committee recommends that the remaining $30.0 million requested for Blackswift in PE 63287E be used to continue the program.

The committee notes that the 2006 National Research Council report, `Future Air Force Needs for Survivability', states:

Hypersonic missiles with ranges comparable to those of current missiles could increase targeting timeliness and flexibility and thus increase operational utility in the 2018 time frame. It is not clear, however, whether a hypersonic cruise aircraft (other than a missile) designed for long-range flight and recovery offers unique capability and operational utility. Furthermore, it is unlikely that such an air-breathing hypersonic platform, other than a missile, will be available in the near term.

The committee notes that although it is widely agreed that the best opportunity for near-term transition of hypersonics technology will be in cruise missile or conventional strike systems, especially to support time critical and prompt global strike missions, sufficient resources for research, development, or testing of the systems has never been focused, coordinated, or sustained within the Department of Defense. Examples of these programs include the DARPA Falcon Hypersonic Technology Vehicle (HTV-2), the Air Force's X-51 program and the now terminated HyFly and Revolutionary Approach to Time Critical Long-Range Strike Project (RATTLRS) programs. The committee feels that these programs have all suffered from a lack of investment in addressing fundamental technical issues and insufficient resources for required flight test and demonstration activities.

The committee further notes that many fundamental research and technology challenges related to hypersonics flight were identified by both the DDRE National Aerospace Initiative and the 2004 National Research Council's `Evaluation of the National Aerospace Initiative,' including air-breathing propulsion and flight test, materials, thermal protection systems, structures, integrated vehicle design and multidisciplinary optimization, and integrated ground testing and numerical simulation/analysis remain insufficiently funded. In addition, there is still no set of approved requirements for any hypersonic missile or aircraft.

Finally, the committee notes that the Blackswift program has been projected to cost at least $800.0 million, with DARPA and the Air Force sharing the cost according to a recent memorandum of understanding. Given the severe constraints on the Air Force budget, especially in science and technology and test and evaluation, the committee is not convinced that the Air Force will be able to provide the resources necessary to keep this ambitious program on schedule or on budget, especially since it is not tied to any specific requirement. The committee notes that one of the drivers of the technical program is the need to have the aircraft perform typical aircraft maneuvers, such as an aileron roll, although it is not clear why that will necessarily enhance the program's probability of transition into formal acquisition. The committee also directs that the Air Force and DARPA work to ensure that the flight test program is consistent with the projected goals of the program.

Further, the Air Force (AF) budget request included $50.0 million in PE 35206F to `provide a temporary repository for AF funds supporting DARPA Blackswift unmanned, hypersonic ISR [intelligence, surveillance, and reconnaissance] and strike vehicle.' The committee recommends a reduction of $10.0 million for this effort. The committee directs that the remaining funding be invested in addressing the highest priority technological challenges to meet Air Force needs in hypersonics technology.

Engineered biological detectors

The budget request included $337.9 million in PE 63384BP for chemical and biological defense advanced technology development, but included no funds to develop engineered biological warfare agent detectors. The committee recommends an increase of $2.7 million in PE 63384BP for development of a prototype biological sensor for assessment and testing as a spiral upgrade of current generation systems. Effective detection of biological warfare agents is the key to contamination avoidance and force protection in a biologically contaminated area.

Improved chemical, biological, and radiological filters

The budget request included $337.9 million in PE 63384BP for chemical and biological defense advanced technology development, but included no funds for developing improved chemical, biological, and radiological (CBR) filtration capabilities. The committee recommends an increase of $2.0 million in PE 63384BP for design, engineering, and prototyping of CBR filters. Improved filters would fill a requirement for enhanced collective protection capability against a wide spectrum of threat agents. Such filters would be multi-use and multi-platform configurable, for use in buildings, ships, and shelters.

Raman chemical identification system

The budget request included $337.9 million in PE 63384BP for chemical and biological defense advanced technology development, but included no funds to develop a miniaturized Raman chemical agent identification system. The committee recommends an increase of $2.5 million in PE 63384BP for development of a hand-held chemical agent identification system that is smaller and more reliable than existing systems, in order to improve the ability of U.S. forces to rapidly identify unknown chemical agents and substances for force protection purposes.

Command and control gap filler joint capabilities technology demonstration

The budget request included $206.3 million in PE 63648D8Z, Research, Development, Test, and Evaluation, Defense-wide, for Joint Capability Technology Demonstrations (JCTD). While $4.0 million of these funds will be allocated for the command and control for North American surveillance gap filler JCTD, U.S. Northern Command (NORTHCOM) testified that the JCTD is underfunded by $22.8 million. This JCTD is the number one unfunded priority for NORTHCOM.

As identified in the National Strategy for Aviation Security, the National Strategy for Maritime Security, and the Joint Requirements Oversight Council-validated Homeland Air and Cruise Missile Defense of North America Joint Capabilities Document, there are significant airspace surveillance deficiencies and gaps--7 years after September 11, 2001.

The gap filler JCTD will remedy many of these deficiencies by integrating feeds from all the disparate surveillance systems operated by government departments and agencies, including classified systems, and sustain development of new technology for extending air surveillance based on the utilization of ambient radio waves from such sources as television and radio station broadcasts.

The committee recommends an authorization of $26.8 million for this gap filler JCTD, $22.8 million above the requested amount.

High performance manufacturing technologies

The budget request included $12.0 million in PE 63680D8Z for the manufacturing science and technology program. The committee recommends an increase of $10.0 million for efforts on the development of high performance manufacturing technologies as authorized by title II, subtitle D of the National Defense Authorization Act for Fiscal Year 2006 (Public Law 109-163). The committee directs that the funding be used for development of test beds and prototypes of advanced manufacturing technologies, diffusion of advanced manufacturing processes throughout the industrial base, and the development of technology roadmaps to ensure that the Department of Defense can access required manufacturing and technology capabilities in critical defense technologies.

Defense Logistics Agency technology programs

The budget request included $19.4 million in PE 63712S for generic logistics research and development and technology demonstrations. Following the recommendation of the Defense Science Board Task Force on DOD Energy Strategy, the committee recommends a series of investments designed to address defense energy requirements using lower cost, reliable, alternative fuel sources. The committee recommends an increase of $4.0 million for research on advanced biofuels to support military operations, $10.0 million to continue efforts to develop advanced vehicle fuel cell technologies and demonstrate the use of hydrogen technologies for defense operations, and $3.0 million for the development of deployable microgrid systems that can utilize a variety of energy sources to produce installation and vehicle power.

The committee notes that the National Research Council Committee on Manufacturing Trends in Printed Circuit Technology recommended that the Department of Defense `should ensure access to new printed circuit board (PrCB) technology by expanding its role in fostering new PrCB design and manufacturing technology.' DOD recently concurred with the recommendations of that report, but has yet to make any significant changes in investment level in this area. In support of that recommendation, the committee recommends an increase of $2.0 million for the development of emerging critical interconnect and printed circuit board technology.

Superlattice nanotechnology

The budget request included no funding in PE 63720S for microelectronics technology development and support. The committee notes that the 2007 report on the Defense Nanotechnology Research and Development Program states a goal `to utilize breakthroughs in nanotechnology to provide revolutionary devices and systems to advance warfighter capabilities and battle systems capabilities.' Consistent with that goal, the committee recommends an increase of $3.0 million in PE 63720S for research on superlattice nanotechnology to develop high power, high temperature devices for defense applications.

Special warfare domain awareness technologies

The budget request included $113.9 million in PE 63826D8Z for quick reaction special projects. The committee notes that the 2007 Naval Science and Technology (S&T) Strategic Plan's asymmetric and irregular warfare focus area has a specific objective of enhancing riverine surveillance capabilities through development of `common and persistent' maritime pictures. To support this objective, the committee recommends an increase of $2.0 million in PE 63826D8Z for development of augmented reality systems to support special warfare situational awareness needs.

Weapon of mass destruction exercises

The budget request included $114.9 million in PE 63828D8Z for joint experimentation programs. The committee notes that the United States Joint Forces Command's joint experimentation program funds concept development and experimentation efforts and leads the development, exploration, and assessment of new joint concepts, organizational structures, and emerging technologies. A focus of committee attention this year has been the threat of domestic use of weapons of mass destruction (WMD) by terrorist groups, and the capabilities of the Department of Defense to participate in actions to detect and defeat or mitigate the effects of such an event. Therefore, the committee recommends an increase of $1.5 million in PE 63828D8Z to support experimentation activities related to the potential use of WMD against critical domestic infrastructure, and directs that such activities involve the participation of other appropriate Federal, local and State entities so as to better inform planning and coordination efforts.

Arrow missile defense program

The budget request included approximately $1.0 billion for terminal defense programs in PE 63881C, of which $74.3 million is for the U.S.-Israeli cooperative program of development and procurement for the Israeli Arrow missile defense system. The Arrow Weapon System provides Israel defense against regional ballistic missiles, including against Iran's Shahab-3 missile. Israel is interested in an upper-tier follow-on to its Arrow system in order to provide more capable protection against missiles with possible weapons of mass destruction warheads.

There are several options under consideration for an upper-tier follow-on to the Arrow system. One would be to develop a new Israeli Arrow-3 interceptor, which would also require the development of a new long-range radar for the system to be effective. Other options include the possibility of using existing U.S. missile defense technologies, such as the Terminal High Altitude Area Defense (THAAD) system or a land-based version of the Standard Missile-3 interceptor, which is used by the Aegis Ballistic Missile Defense (BMD) system, to provide highly effective upper-tier defense for Israel. The committee believes that developing a new Israeli interceptor missile and long-range radar would be very expensive and would duplicate existing U.S. capabilities. Therefore, the committee encourages the full consideration of U.S. systems as potentially the most effective and cost-effective approach to providing an upper-tier missile defense capability for Israel.

The committee recommends an increase of $30.0 million in PE 63881C for the Missile Defense Agency to fully evaluate the potential of existing U.S. missile defense systems and technologies--particularly a land-based version of the Standard Missile-3 interceptor used in conjunction with a THAAD radar--to provide an operationally effective, timely, and cost-effective upper-tier missile defense capability for Israel. Such an option would be fully interoperable with deployed U.S. missile defense systems, which could reinforce and support the Israeli upper-tier system.

Short-range ballistic missile defense

The budget request included approximately $1.0 billion for terminal defense programs in PE 63881C, of which $44.9 million is for cooperative U.S.-Israeli development of a short-range ballistic missile defense system called the David's Sling Weapon System. This system is being developed in response to short-range missile and rocket attacks against Israel from Lebanon. The United States is sharing the development of the system in order to ensure that it is compatible with U.S. missile defense systems, and to provide an option for the U.S. military to procure the system in the future if needed. The committee recommends an increase of $28.0 million in PE 63881C to accelerate the development of the David's Sling Weapon System in order to permit timely fielding of the system.

Terminal High Altitude Area Defense

The budget request included approximately $1.0 billion for terminal defense programs in PE 63881C, of which $864.9 million is for the Terminal High Altitude Area Defense (THAAD) program. The committee recommends a transfer of $65.0 million from the budget request, and an increase of $75.0 million, to a new defense-wide procurement line for long lead procurement of interceptors and ground equipment for THAAD Fire Units 3 and 4. This would permit awarding the long lead contract for both Fire Units 3 and 4 together, and would lead to a more efficient and economical production plan. It would also permit a production rate of three interceptors per month, which would reduce the cost of each interceptor while delivering the capability sooner than the current plan.

The committee is deeply disappointed that the budget request for the THAAD system would delay the delivery of interceptors for Fire Units 3 and 4 by a year and cause a production gap of 18 months. This delay would be wholly inconsistent with the need to provide our regional combatant commanders with the near-term effective defenses they need to defend our forward-deployed military forces, allies, and friends against the many hundreds of short- and medium-range ballistic missiles that exist today. As specified in section 223 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364), the THAAD system is a high priority near-term system, and the committee believes that delaying its production for budget reasons is unacceptable.

The committee notes that after the budget was submitted and congressional objections were raised to the planned delay, the Missile Defense Agency (MDA) acknowledged that the delay would be unacceptable and indicated that it plans to change the allocation of fiscal year 2009 funding within the funds requested for THAAD, and to use an inflation adjustment, to provide $65.0 million for long lead procurement of interceptors for Fire Unit 3, to avoid the delay and the production gap. The committee believes MDA should not have planned for the delay and the production gap in the first place.

A number of new requirements were placed on the THAAD program by the Army, including requirements to meet new insensitive munitions standards, and to use a 5-ton truck instead of a High-Mobility Multipurpose Wheeled Vehicle (HMMWV) for the fire control vehicle. Given the extraordinary acquisition authority and flexibility granted to the MDA, the committee is disappointed that MDA did not budget the funds from lower priority programs outside of THAAD to meet these new requirements while keeping the THAAD production schedule on track.

Furthermore, the committee is disappointed that MDA is only planning and budgeting to procure four THAAD Fire Units and 96 THAAD interceptors. As the Commander of the Joint Force Component Command for Integrated Missile Defense told the committee in April 2007, the Joint Capabilities Mix study, conducted by the Joint Staff in association with the combatant commands and the military departments, concluded that the United States needs about twice as many THAAD and Standard Missile-3 interceptors as the number currently planned, just to meet the minimum inventory needs of the combatant commanders to provide protection against existing short- and medium-range missile threats. That minimum number does not include the normally required spare, reserve, and reload missiles.

The committee observes that the United Arab Emirates has expressed an interest in purchasing three THAAD fire units and 144 THAAD interceptors for defense of its territory, which is about the size of Maine. Their purchase would be 50 percent larger than the number of interceptors currently planned by MDA for all U.S. forces, and would include twice as many interceptors per fire unit as MDA is currently planning for U.S. forces.

The committee believes that MDA's current plan for THAAD acquisition is wholly inadequate and needs to be changed to meet the current needs of our combatant commanders. The committee believes that MDA should focus on meeting at least these minimum inventory upper-tier requirements as its highest acquisition priority, and directs MDA to report to the congressional defense committees by no later than December 1, 2008 on its plans to meet the inventory requirements identified in the Joint Capabilities Mix study.

Additionally, the committee notes that section 223(b) of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) required the Department of Defense to request any long lead procurement for THAAD Fire Units 3 and 4 in the fiscal year 2009 budget request using procurement funds, rather than research and development (R&D) funds. In addition, section 223(c) of that act prohibits the use of fiscal year 2009 R&D funds for procurement of long lead items for Fire Units 3 and 4. Therefore, the committee recommends that all $140.0 million in long lead procurement funds for THAAD Fire Units 3 and 4 be provided in a new defense-wide procurement line, as described elsewhere in this report and displayed in the funding tables in this report.

Finally, the committee is concerned that MDA has not planned or budgeted any funds in fiscal year 2009 for procuring a THAAD radar. This would create a gap in THAAD radar production and cause a schedule disconnect between fire unit delivery and radar delivery. Therefore, the committee also recommends an increase of $40.0 million in the new missile defense procurement funding line for long lead procurement of the THAAD radar for Fire Unit 3, to avoid a production gap and a schedule disconnect. The committee urges MDA to synchronize the THAAD fire unit and radar production and delivery schedules.

Ground-based Midcourse Defense

The budget request included $2.1 billion in PE 63882C for the ballistic missile defense midcourse element, which is the source of funds for the Ground-based Midcourse Defense (GMD) system deployed in Alaska and California, and for the proposed deployment of the GMD system in Europe.

The budget request included $19.2 million for long lead procurement of operational 2-stage Ground-Based Interceptors (GBIs) intended for European deployment, `pending successfully meeting the criteria described in Section 226 of the FY08 National Defense Authorization Report [sic].' Section 226 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) prohibits the use of fiscal year 2008 funds to acquire or deploy the planned operational European 2-stage GBIs until the Secretary of Defense, after receiving the views of the Director of Operational Test and Evaluation (DOT&E), certifies that the system has a high probability of working in an operationally effective manner. The committee recommends a similar provision for fiscal year 2009, as described elsewhere in this report.

The committee notes that the proposed 2-stage interceptor intended for deployment in Poland is still being designed and developed, and is not scheduled to have its first booster flight test until the fourth quarter of fiscal year 2009, and the first planned intercept test in the second quarter of fiscal year 2010. Given that a number of GMD flight tests have been delayed substantially, it is possible that these 2-stage GBI tests will also be delayed.

In an October 2007 report, DOT&E noted the `significant differences' between the proposed GMD deployment with a 2-stage interceptor in Europe and the existing GMD system deployed in the United States with a 3-stage GBI. According to the report, `European defense using GMD assets is a completely new mission area for GMD.' The report provided DOT&E's initial testing concept for the proposed European deployment, which would include three flight tests, two of which would be intercept tests. The Missile Defense Agency (MDA) originally planned to conduct only two flight tests prior to deploying the system, one of which would be an intercept test. This planned flight test program would not meet the DOT&E minimum test plan concept. It is difficult to envision the certification required of the Secretary of Defense under these circumstances. However, MDA has recently agreed to conduct three flight tests, in accordance with the DOT&E test concept. The committee views this as a positive development.

The committee notes that the long lead items planned for procurement with the $19.2 million are 100 percent common with both the 2-stage and 3-stage GBIs. Therefore, they could be used for purposes other than being deployed on operational 2-stage GBIs if necessary, including for flight test and ground test interceptors for either 3-stage or 2-stage GBIs. Consequently, the committee recommends authorizing the requested $19.2 million, with the understanding that if there are problems with the 2-stage GBI development program, these long lead assets would be used for other purposes, rather than being wasted or deployed before the 2-stage GBI is certified as ready.

The committee notes that MDA has changed its GMD test plans to accelerate the testing of the 2-stage GBI intended for European deployment. As part of this change, MDA merged the objectives of two previously planned tests (FTG-06 and FTG-07) into one test (FTG-06), so that the next test could be the first Booster Verification Test (BVT-01) of the 2-stage GBI. Consequently, the target originally planned and budgeted for FTG-07 is no longer needed for that test, since that test's objectives are being merged into FTG-06. The committee directs MDA to inform Congress of any significant changes in its test and target plans on a timely basis.

The committee notes that the political process toward negotiation and ratification of agreements with Poland and the Czech Republic on the proposed deployment of a missile defense system on their territory will take additional time to resolve itself, possibly through fiscal year 2008. This additional time may delay the ability of MDA to obligate or expend fiscal year 2008 funds into fiscal year 2009, which would presumably delay its ability to obligate and expend fiscal year 2009 funds. The committee is concerned that MDA will have difficulty executing funds requested for fiscal year 2009 for the proposed European deployment.

For example, Congress appropriated $28.0 million in fiscal year 2008 for site activation activities, but those funds cannot be obligated or expended until the governments of Poland and the Czech Republic give final approval to the proposed deployments on their respective territories. This raises concerns that the funds requested in fiscal year 2009 for site activation will be premature or unexecutable. The committee directs MDA to keep the congressional defense committees informed regularly of the plans and schedule for executing funds for the proposed European deployment, and of any delays in the planned execution of funds.

Airborne Laser

The budget request included $421.2 million in PE 63883C for the Airborne Laser (ABL) technology demonstration program. The committee notes that the budget request for ABL included $15.8 million for planning and analysis related to a possible second ABL aircraft. Since the first planned proof of principle shoot-down demonstration test is not scheduled until the fourth quarter of fiscal year 2009, and since even a successful test will not provide answers to the many questions about whether the ABL technology could be made into an effective, suitable, survivable, and affordable weapon system, the committee believes it is inappropriate to provide any funds in fiscal year 2009 related to a potential second ABL aircraft.

Any decision on whether to proceed with a possible second ABL aircraft should only be made after much more information is available about the likelihood that the system could eventually provide a militarily useful, operationally effective, and affordable missile defense capability, when balanced against other missile defense programs, capabilities, and needs, and also balanced against other Department of Defense priorities and needs. As described elsewhere in this report, the committee recommends a provision that would limit the availability of funds for procurement of a second ABL aircraft until the Secretary of Defense certifies that it has a high probability of accomplishing its mission in an operationally effective, suitable, survivable, and affordable manner.

The Government Accountability Office has noted that the ABL program has a history of significant cost increases and schedule delays. When the program was originally proposed in 1996 it was estimated that the technology demonstration program would cost $1.0 billion and be completed in 2001. However, after numerous cost and schedule delays, it is now estimated that the technology demonstration program will cost more than $5.1 billion and be completed in 2010, a 500 percent cost growth and 9-year delay. In 2007, because of integration issues and technical challenges, the program increased its costs by $253.0 million and added a year to the program schedule.

As the committee noted last year, the ABL program remains a far-term, high risk technology development and demonstration program. If the technology could be made to work in a militarily useful and operationally effective manner, it would not produce an operational capability before 2018. The committee believes there are higher priorities for missile defense funds, particularly the near-term capabilities currently needed by our combatant commanders to defend our forward-deployed forces, allies, and other friendly nations against many existing short- and medium-range ballistic missiles.

Therefore, the committee recommends a reduction in PE 63883C of $15.8 million, the funds requested for work related to a second ABL aircraft, and a reduction of $30.0 million for work not related to maintaining the schedule for the planned proof of principle shoot-down demonstration test in 2009.

Real-time non-specific viral agent detector

The budget request included $51.3 million in PE 63884BP for chemical and biological defense advanced component development and prototypes, but included no funds for development of a mobile non-specific viral agent detector. The committee recommends an increase of $4.0 million in PE 63884BP for development of a mobile real-time non-specific viral agent detector that would improve current detection capabilities. The committee notes that this effort could provide a significant upgrade to the Joint Biological Agent Identification and Diagnostic System (JBAIDS). This technology, which would add the capability to detect infectious diseases, would be useful both for forward-deployed forces and for potential domestic consequence management missions.

Ballistic missile defense sensors

The budget request included $1.1 billion in PE 63884C for radars and other sensors for the Ballistic Missile Defense System (BMDS), including sensors for different missile defense elements.

The committee notes that there is no funding requested in fiscal year 2009 to begin production of the THAAD radar for Fire Unit 3, designated AN/TPY #8, and is concerned that this would result in a production gap and a schedule disconnect with Fire Unit 3. The committee recommends an increase of $40.0 million in a new defense-wide missile defense procurement funding line for long lead procurement of AN/TPY #8 for THAAD Fire Unit 3, as described elsewhere in this report.

The committee is concerned that the consolidation of all sensor work in one program element may have the unintended consequence of reducing focus on and responsiveness to the needs of the individual elements for the timely production of sensors for the element weapon systems, such as THAAD radars to accompany THAAD fire units. The committee expects the Missile Defense Agency (MDA) to ensure that funding and production of radars for THAAD will be synchronized with the production schedules for their associated fire units.

The committee notes that the budget request included $26.5 million for the site activation and deployment of a forward-based X-band radar, designated AN/TPY-2 #3, to an undecided location, and $18.0 million for overseas site security for this radar. Since the MDA has not decided where to deploy such a radar, has not begun negotiations with any foreign nation for such a deployment, and there is no agreement with any foreign nation to deploy such a radar on its soil, the committee believes this funding is premature. Therefore, the committee recommends a reduction of $26.5 million in PE 63884C for costs related to site activation and deployment of AN/TPY-2 #3 radar to an undecided foreign location, and a reduction of $18.0 million for overseas site security of AN/TPY-2 #3.

The budget request included $20.3 million to operationalize the External Sensors Lab boost-phase capabilities. Since there are no boost-phase missile defense systems within a decade of deployment, the committee believes this funding is premature. The committee recommends a reduction of $20.3 million in PE 63884C.

The committee is aware of a proposal to enhance the BMDS sensor system by deploying additional shipboard radars to increase the coverage and availability of mobile radar networks, while potentially producing significant cost savings. This mobile sensor enhancement concept is worth evaluating to determine if it would provide a significant improvement to the capability of an integrated BMDS. The committee recommends an increase of $5.0 million in PE 63884C for the MDA and the Navy to evaluate this concept and determine whether it merits further development.

Kinetic Energy Interceptor

The budget request included $386.8 million in PE 63886C for the Kinetic Energy Interceptor (KEI) program. This is $172.8 million more than requested in the fiscal year 2008 budget request for KEI, $46.7 million more than appropriated, and a very large sum of funds for a program at such an early stage of development. The committee notes that the KEI program was originally conceived as a boost-phase risk reduction alternative to the Airborne Laser (ABL) program because of the high risks associated with the ABL technology development effort.

However, the KEI program is no longer considered primarily a boost-phase program; it is being managed as a technology development program for a mid-course follow-on to the Ground-based Interceptors (GBIs) being deployed as part of the Ground-based Midcourse Defense (GMD) program. The GBIs are scheduled to be deployed through 2013, and will have many years of useful operational life following deployment, so there is no urgent need to develop a follow-on now to a system that will not complete its deployment for another 5 years.

The fiscal year 2008 budget request for KEI focused on developing the technology for a high-performance silo-based interceptor, rather than as a mobile system, with a flight test in 2008. That flight test has now been delayed until 2009 because of technology problems with the development program.

The budget request for KEI represents another significant change in direction and a significant increase in program funding at a time when the program has lost focus and direction, and when the long-range midcourse defense capability is being addressed by the GMD system with its GBI interceptors. The committee is concerned that this level of funding is more than can be effectively executed during fiscal year 2009. The committee believes there are higher priority needs in the missile defense program, such as near-term defenses against existing short- and medium-range missiles, and that the KEI program can and should take more time to develop technologies that may be useful in the decades to come when the GBIs reach the end of their useful operational life, if there is not another capability that is more suitable. Therefore, the committee recommends a reduction of $45.0 million to PE 63886C for the Kinetic Energy Interceptor development program.

Ballistic missile defense reductions

The budget request included $432.3 million in PE 63890C for the Ballistic Missile Defense (BMD) Systems Core program; and $288.3 million in PE 63891C for Missile Defense Agency (MDA) Special Programs. The committee recommends a decrease of $30.0 million in PE 63890C for BMD Systems Core; and a decrease of $100.0 million in PE 63891C for MDA Special Programs to partially offset the additional funding needed for the Aegis Ballistic Missile Defense (BMD) program and its Standard Missile-3 (SM-3) interceptor, the Terminal High Altitude Area Defense (THAAD) program, and other high priority near-term missile defense programs described elsewhere in this report. The committee notes that the proposed funding reductions are for projects that are of lower priority than the near-term capabilities provided by the Aegis BMD, SM-3, and THAAD programs, which meet the needs of combatant commanders to defend our forward-deployed forces, allies, and other friendly nations against the existing threat of many hundreds of short- and medium-range ballistic missiles. The Joint Capabilities Mix study concluded that we need about twice as many THAAD and SM-3 interceptors as currently planned just to meet the minimum operational requirements of our regional combatant commanders.

Aegis Ballistic Missile Defense (BMD)

The budget request included $1.2 billion in PE 63892C for the Aegis Ballistic Missile Defense (BMD) program, including $57.0 million for long lead procurement of Standard Missile-3 (SM-3) Block IA interceptor missiles. The committee notes that the Aegis BMD system with its SM-3 interceptor is the only midcourse defense system currently being deployed to provide defense against short- and medium-range ballistic missile threats to our forward-deployed forces, allies, and other friendly nations. The Aegis BMD system has had an impressive record of successful tests against short- and medium-range targets, including a multi-mission test against a ballistic missile and an air-breathing threat, and a multiple target intercept against two ballistic missile targets.

The SM-3 missile is being developed to have increasing capability with each successive version, from Block IA, to Block IB, to the Block IIA version being developed jointly with Japan. The Aegis BMD system and its SM-3 interceptor have the potential to provide a significant measure of defensive capability in various regions of the world, and to increase its capability to conduct intercepts based on radar tracks from offboard sensors, known as `engage on remote,' and to engage missiles early in their midcourse flight, including in the ascent phase.

The committee notes that the Joint Capabilities Mix (JCM) study, conducted by the Joint Staff, concluded that U.S. combatant commanders need about twice as many SM-3 and THAAD interceptors as currently planned to meet just their minimum operational requirements for defending against the many hundreds of existing short- and medium-range ballistic missiles. The committee is deeply disappointed that the Missile Defense Agency (MDA) has not planned or budgeted to acquire more than a fraction of the SM-3 interceptors needed to meet the warfighters' minimum operational needs. The committee believes that achieving at least the JCM levels of upper tier interceptors in a timely manner should be the highest priority for MDA, and expects the Agency to modify its plans and budgets to meet our combatant commanders' current operational needs. In section 223 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364), Congress specified the Aegis BMD system and its SM-3 interceptor as a high priority near-term program for the Department of Defense to focus on. As the JCM study makes clear, the Department has failed to do so.

Section 223(b) of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) requires that any long lead or advance procurement for SM-3 Block IA missiles in the fiscal year 2009 budget be requested in procurement funds, rather than in research and development (R&D) funds. Section 223(c) of that act prohibits the use of fiscal year 2009 R&D funds for procurement of long lead items for SM-3 Block IA missiles. The Department chose not to comply with the law, and requested R&D funds for procuring long lead items for the SM-3 missiles. This is not acceptable. The committee notes that the Department is obliged to comply with the law, and expects the Department to do so.

To be consistent with the law, and to correct the Department's failure to comply with the law, the committee recommends that all long lead funds for SM-3 missiles be authorized and appropriated in a new defense-wide procurement line described elsewhere in this report. Accordingly, the committee recommends a transfer of $57.0 million from PE 63892C to the new procurement line for long lead procurement of SM-3 Block IA missiles. The committee also recommends an increase of $20.0 million in that new procurement line for the procurement of long lead items for an additional 15 SM-3 interceptors, to begin the process of increasing the inventory of SM-3 missiles toward the JCM levels. The committee notes that MDA does not plan any procurement of SM-3 Block IB missiles after fiscal year 2010, which is inconsistent with the JCM study conclusions concerning the need for about twice as many SM-3 and THAAD missiles as are currently planned. The committee expects MDA to modify its plans and budgets for the fiscal year 2010 budget submission to address the inventory levels indicated by the JCM study.

To address these numerous concerns, the committee recommends an increase of $80.0 million in PE 63892C for the following projects: $20.0 million for facilitizing an increase in SM-3 production capacity to four missiles per month; $20.0 million to reduce schedule risk for the Block IB missile; and $40.0 million for accelerated development of enhanced Aegis BMD capability for `engage on remote' and ascent-phase engagement.

Space Tracking and Surveillance System

The budget request included $242.4 million in PE 63893C for the Space Tracking and Surveillance System (STSS). The committee notes that the Missile Defense Agency (MDA) has again changed the approach to the STSS program for fiscal year 2009, but the program is out of phase with the schedule of related events.

The committee notes that the launch of the two STSS demonstration prototype satellites has been delayed until November 2008. MDA plans to gather on-orbit data from these demonstration satellites through 2010. These data will be necessary to determine further changes in design of the objective follow-on STSS satellites. The committee is concerned that MDA plans to issue a Request for Proposals for the objective follow-on satellites in August of 2008, several months before the demonstration satellites are launched, and well before actual orbital data are available to help determine the final design parameters of the follow-on satellites.

Furthermore, the committee notes that MDA and the Air Force are just beginning to obtain actual on-orbit data from the initial Space-based Infrared System (SBIRS) satellites, and the results appear both promising and important for understanding what our current capabilities are and what our future requirements will be for the STSS system. Before MDA finalizes its design for the follow-on STSS satellites, the committee believes it should work closely with the Air Force to fully evaluate the data available from the SBIRS system, and evaluate the data provided by the two STSS demonstration satellites. Only then will MDA be in a position to determine the final design for the STSS system. The STSS program schedule is ahead of need, and ahead of the data it will need to determine the final requirements and design for the objective STSS satellites.

Consequently, the committee recommends a decrease of $50.0 million in PE 63893C, to allow more time to evaluate on-orbit data from SBIRS and from the two STSS demonstration satellites before proceeding with the final design of the objective STSS satellites.

The committee also urges MDA to coordinate with the Air Force to use the SBIRS ground stations for STSS residual operational capability and for the STSS objective system.

Multiple Kill Vehicles

The budget request included $354.5 million in PE 63894C for the Multiple Kill Vehicle (MKV) program. This is nearly a three-fold increase from the fiscal year 2007 funding level, and an increase of nearly $125.0 million from the fiscal year 2008 funding level, which represents large budget growth in the MKV program.

The committee notes that the MKV program is at an early development stage, with the preliminary design review not expected until the third quarter of fiscal year 2010 and the first substantive knowledge point not expected until mid-2011. The committee is concerned that the program cannot effectively execute the large amount of funding requested for a program at such an early stage of development. Therefore, the committee recommends a decrease of $50.0 million in PE 63894C.

The committee believes that, although the MKV program is pursuing a laudable technical goal, there are higher priorities for current missile defense funds, including providing our regional combatant commanders with near-term capabilities to defend our forward-deployed forces, allies, and other friendly nations against the many hundreds of short- and medium-range ballistic missiles that exist today.

The committee also notes that the Missile Defense Agency (MDA) plans to fund two contractor teams with competing technology approaches, but does not plan to have a competitive selection of the best technology in the future. Although MDA is pursuing development of MKV technologies for long-range midcourse defense interceptors and for the Standard Missile-3 Block II interceptor, keeping two contractor teams for the indefinite future is both expensive and possibly unnecessary. The committee urges MDA to consider a competitive selection process to determine which of the two contractor teams has the best technology, and to select that team as the only team to fund in the future.

The committee is also concerned that the consolidation of all kinetic kill vehicle technology development in one office may have the unintended effect of removing continued focus on developing or improving existing and planned unitary kinetic kill vehicles, such as the unitary kill vehicle planned for the Standard Missile-3 Block IIA missile being developed jointly by the United States and Japan.

As the Director of Operational Test and Evaluation has reported, there are still no validated or accredited models and simulations available to provide confidence in the performance of the Exoatmospheric Kill Vehicle deployed on the Ground-Based Interceptors of the Ground-based Midcourse Defense system. It is essential to fully demonstrate and improve the capability of this system, which will likely be deployed for at least 20 years.

The committee urges MDA to consider whether it needs to take mitigating actions to ensure that the unitary kill vehicle programs have sufficient focus and resources, particularly in the event that the MKV efforts do not yield effective or affordable results.

Space test-bed

The budget request included $29.7 million in PE 63895C for Ballistic Missile Defense System space programs, of which $10.0 million is for a `space test-bed.' The committee recommends a decrease of $10.0 million in PE 63895C, the entire amount requested for the space test-bed.

As the committee noted last year, the proposed space test-bed is intended to be the initial step toward deploying space-based interceptors. There is no need or justification to deploy space-based interceptors, and therefore no justification to create the proposed space test-bed. The committee notes that Congress denied all funding requested for the proposed space test-bed in fiscal year 2008.

There are, however, numerous real missile threats in existence today for which near-term missile defense capabilities are needed. The Joint Capabilities Mix study has concluded that there is a need for about twice as many Standard Missile-3 and Terminal High Altitude Area Defense interceptors just to meet the minimum operational requirements of the regional combatant commanders against the hundreds and hundreds of short- and medium-range ballistic missiles that currently can target our forward-deployed forces, allies, and other friendly nations. As Congress made clear in section 223 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364), the committee believes it is a high priority to fund these near-term effective systems that meet current combatant commander needs against existing threats.

Missile Defense Agency funding reduction

The budget request included $9.3 billion for the Missile Defense Agency (MDA) in research, development, test, and evaluation funds. The committee recommends an undistributed reduction of $268.7 million in MDA funding.

Corrosion control technologies

The budget request included $5.1 million in PE 64016D8Z for the Department of Defense Corrosion Program. The committee notes that corrosion damage to Department of Defense (DOD) assets has been estimated to lead to a $20.0 billion annual cost to the Department. The committee supports the research efforts of the DOD Corrosion Program, which seeks to develop and demonstrate new technologies to mitigate the effects of corrosion. To support these efforts the committee recommends an additional $3.0 million for research on the use of polymer materials and coatings to enhance corrosion prevention and mitigation. The committee also recommends an increase of $3.5 million to develop comprehensive technical, maintenance, and training systems to reduce asset life cycle costs related to corrosion damage.

Conflict modeling technologies

The budget request included $6.0 million in PE 64670D8Z for human, social, and cultural behavioral research and engineering. The committee supports enhancing Department of Defense capabilities to model and anticipate future conflicts and better understand political-social systems and their interactions. The committee recommends an increase of $2.5 million in PE 64670D8Z to continue conflict modeling, planning, and outcomes experimentation activities.

Prompt global strike

The budget request included $117.6 million in PE 64165D8Z for prompt global strike. The committee recommends an increase of $30.0 million in PE 64165D8Z and $45.0 million for the advanced hypersonic boost glide vehicle.

The budget request for prompt global strike included $40.0 million for the alternative re-entry system/warhead engineering and delivery vehicle options/development, which would support work on various aspects of a biconic re-entry vehicle for use as a possible prompt global strike option. The committee believes that work on the biconic vehicle is premature and therefore recommends that no funds be made available for the manufacture of the biconic vehicle. Work on technologies to support prompt global strike systems generally, such as command destruct, fuze development, and similar generally applicable technologies, however, should continue. The committee notes that the Defense Advanced Research Projects Agency (DARPA) hypersonic glide vehicle HTV-2 is scheduled for testing in fiscal year 2009, and that if these tests are successful, there would be no need for the biconic vehicle.

The committee recommends that of the funds that were included in the budget request for the biconic vehicle, approximately $15.0 million shall be available for the advanced hypersonic boost glide vehicle in addition to the $30.0 million for a total of $45.0 million. The committee notes that funding for the advanced hypersonic boost glide vehicle was previously included in PE63305A. The committee believes that all prompt global strike activities, with the exception of the DARPA funded work on HTV-2, which will terminate at the end of fiscal year 2009, should be consolidated in one budget account.

Net-enabled command and control

The budget request included $147.3 million in PE 33158K for the Joint Command and Control Program for Net-enabled command and control, as well as $8.0 million in Procurement, Defense-wide (PDW) Line 21 and $35.7 million in Operation and Maintenance, Defense-wide (OMDW) Line 120 for the same program. This is out of a total investment of $227.4 million for the program and nearly $675.0 million between fiscal years 2007 and 2010 to develop and begin to field the program. The committee recommends decreases of $90.0 million in PE 33158K, $25.0 million from OMDW, and $7.9 million from PDW.

The committee notes that both the Director of Defense Research and Engineering's (DDRE) technology readiness assessment and the Director of Operational Test and Evaluation's ongoing oversight of the Network enabled command and control (NECC) program have raised issues regarding technical risk, aggressive and overly optimistic scheduling, and unclear testing and deployment strategies. The DDRE assessment noted a lack of definition of the program as to requirements or agreement on program definition with stakeholders. The committee understands that these and other NECC program issues could lead to a delay in the Milestone B decision approval for the program.

In addition, the committee notes that the services are currently developing information systems under the Global Command and Control System Family of Systems (GCCS-FOS), which are planned for eventual integration into a single NECC architecture. The committee is not aware of any service that has a well articulated and coordinated transition strategy and deployment and integration schedule for this complex system of systems. Finally, the committee notes that GCCS-FOS technologies have not yet been fully fielded, nor will users and testers have significant operational experience with the newest versions of the GCCS-FOS for a number of years. Since NECC is designed to be the follow-on program for the GCCS-FOS, the committee recommends a reduction in its funding growth until technical risk, testing, and program schedule issues are addressed in a coordinated and joint fashion amongst all stakeholders, and a set of operational lessons learned and capability gaps from GCCS-FOS deployments is developed and analyzed.

Central Test and Evaluation Investment Program

The budget request included $133.9 million in PE 64940D8Z for the Central Test and Evaluation (T&E) Investment Program managed by the Test Resource Management Center, originally established by the committee in section 231 of the Bob Stump National Defense Authorization Act for Fiscal Year 2003 (Public Law 107-314). The 2007 Strategic Plan for DOD T&E Resources noted that `outdated threat missile fly-out models reduced the effectiveness of both active and passive countermeasures testing.' To help address this shortfall, the committee recommends an additional $5.0 million for development of surface-to-air missile hardware simulators. The strategic plan also commented that `the expanded computing capability being deployed in the upcoming C4ISR [command, control, communications, computers, intelligence, surveillance, and reconnaissance] systems will need to be replicated at the (test) ranges by upgrading existing or acquisition of new hardware and software systems.' Consistent with addressing that need, the committee recommends an increase of $3.5 million for development of range network enterprise systems to support distributed testing.

Anti-tamper technologies

The budget request included $2.2 million in PE 65790D8Z for Small Business Innovation Research program activities. The committee notes that the 2007 Defense Science Board study, `Mission Impact of Foreign Influence on DOD [Department of Defense] Software,' found that `software deployed across the DOD continues to contain numerous vulnerabilities and weak information security design characteristics.' To address these weaknesses the committee recommends an increase of $3.0 million for the development of anti-tamper software systems.

Force transformation directorate

The budget request included $20.7 million in PE 65799D8Z for the force transformation directorate. The committee recommends a reduction of $15.0 million from this account, and directs that the remaining requested funds be used to transition programs to other activities within the Department of Defense. The committee notes that the disestablishment of the Office of Force Transformation (OFT) has diminished the role that this program plays in driving transformative defense technologies and operational concepts. The committee acknowledges that OFT has made significant contributions to the development of active protection systems and operationally responsive space capabilities, but feels that the Department of Defense needs to reconsider the totality of programs that all seemed to be aimed at a common, laudable purpose of driving force transformation.

The committee believes that the efforts of the Defense Advanced Research Projects Agency, United States Joint Forces Command, and the Joint Capability Technology Demonstration program, among others, can be coordinated to serve the role that was intended for the research and development programs of OFT at its inception. The committee notes that all these efforts are under the oversight or direct control of the Director of Defense Research and Engineering (DDRE), and so directs the DDRE to strongly consider merging force transformation program activities with these other efforts.

Software assurance education and research

The budget request included $394.1 million in PE 33140G for the Information Systems Security Program, but no funds for the development and integration of secure software design practices in curricula of higher education institutions that teach computer science and software engineering.

The committee recommends an increase of $1.0 million for this purpose at one of the institutions designated as a National Center of Academic Excellence in Information Assurance Education by the National Security Agency.

Status of Operational Readiness and Training Systems

The budget request included $36.4 million in PE 33150K for the Global Command and Control System (GCCS). The committee notes that this program includes funding to continue the development, testing, and fielding of the legacy Status of Operational Readiness and Training Systems (SORTS) that is currently being replaced by the Department of Defense's objective system, the Defense Readiness Reporting System. The committee recommends a decrease of $2.0 million in PE 33150K for SORTS.

Industrial Base Innovation Fund

The budget request included $20.5 million in PE 78011S for industrial preparedness programs. The committee notes that the 2006 Defense Science Board Task Force on the Manufacturing Technology Program called for increased investment in manufacturing research and technology over a 5-year period to a level of `one percent of the RDT&E budget,' to align the Department of Defense with the level of manufacturing technology investments in the early 1980s. The committee notes that for the fiscal year 2009 budget request this would be $796.0 million. The actual Manufacturing Technology (Mantech) budget request is only $198.0 million.

The committee further notes that the Director of Defense Research and Engineering called for an increase in funding for `manufacturing science technology' in the range of $50.0 to $70.0 million per year. The committee notes that the fiscal year 2009 Mantech budget request is only an increase of $4.6 million over the fiscal year 2008 budget request and a decrease of $80.4 million relative to fiscal year 2008 appropriated levels.

The committee notes that investing in innovation in the defense industrial base can only serve to help address many of the issues facing the Department of Defense. For example, the committee believes that the development of innovative manufacturing capabilities can lead to lower cost, more efficient production of defense systems, potentially lead to spin-off commercial technologies that can support national manufacturing and industrial base needs, and address critical manufacturing assured supply chain issues that limit the Department's capability to acquire critical defense equipment and technologies, such as body armor, production of advanced aerospace materials, and electronic components.

Therefore, the committee recommends an increase of $30.0 million in PE 78011S to continue the Industrial Base Innovation Fund. The committee directs that the funds be executed jointly with the Deputy Under Secretary of Defense for Industrial Policy, to ensure that critical shortfalls in the defense industrial base are addressed. The committee directs that the highest priority on investments be made in areas that support accelerating the surge production of items likely to be required in near-term military operations and in areas to preserve or expand diminishing critical defense industrial base.

ITEMS OF SPECIAL INTEREST

Aegis Ballistic Missile Defense funding

The committee notes that the Aegis Ballistic Missile Defense (BMD) system was used in February for a one-time mission to intercept and destroy a decaying U.S. satellite before it re-entered the earth's atmosphere. This mission, which cost more than $90.0 million, used considerable Aegis BMD assets and funding. The committee is concerned that the Aegis BMD program will not be fully reimbursed for its expenses in preparing for, testing for, and conducting the mission, as well as for restoring the system's components to their normal missile defense configuration, and replacing the Standard Missile-3 interceptor used for the mission. If the Aegis BMD program is not reimbursed for these expenses, it would not be able to perform some $90.0 million worth of planned and budgeted activities that have been approved by Congress. This would not be acceptable.

The committee directs the Missile Defense Agency (MDA) and the Department of Defense to ensure that the Aegis BMD program is fully reimbursed for all expenses related to the one-time satellite intercept mission, so that all previously planned, funded, and approved Aegis BMD work will proceed without delay. The committee directs MDA to report to the congressional defense committees by no later than October 1, 2008 on the status of the full reimbursement of the Aegis BMD program.

Agency relocation

The budget request included $28.0 million in PE 65897E for Defense Advanced Research Projects Agency (DARPA) relocation costs, and another $45.0 million is programmed for this purpose in fiscal year 2010. The committee believes that the request and budget plan have not yet been adequately justified and directs the Secretary of Defense to develop a report on the plan for DARPA's relocation, as described below. The committee notes that current plans for the relocation call for the Department of Defense (DOD) to lease a new facility for DARPA and to provide funding for the building's outfitting to meet mandated force protection requirements.

The plans also call for the Department to provide funding for other DARPA requirements, including facilities to handle classified information, specialized heating, ventilation, and air conditioning (HVAC) equipment, and specialized information technology requirements. The committee is unclear as to whether the Department will be responsible for restoring the building's specialized modifications at the end of DARPA's new lease to the satisfaction of the building owner and what that cost will be to the government.

The committee is unclear as to the rationale and cost implications for selecting a commercial lease requiring extensive upgrades over government facilities, which government facilities were evaluated as alternatives to leasing, what cost-benefit analyses were performed, and what criteria were used to finally select an option. The committee understands that the DARPA leasing plan has been approved through the General Services Administration and by the relevant congressional committees of jurisdiction. Nonetheless, the committee notes that upon expiration of its current lease in 2010, DARPA could potentially be relocated onto other existing government property, which may more cost-effectively meet force protection, classified facility, and information technology requirements and therefore save valuable resources.

The committee notes that research agencies like DARPA need to be able to attract the finest technical talent to perform their critical mission for DOD. The committee notes that DARPA has had some difficulty attracting appropriate talent, despite special personnel flexibilities available to the organization, and has plans to use commercial executive search firms to enhance recruiting efforts. The committee understands that an agency's location plays a role in its ability to attract talent, and further notes that some organizations with similar hiring challenges, like the Office of Naval Research and Air Force Office of Scientific Research are located in commercially developed areas, while others, such as the Naval Research Laboratory, the Defense Threat Reduction Agency, the National Security Agency, and the Army's Night Vision Laboratory are not.

The committee directs the Secretary of Defense to provide a report to the congressional defense committees detailing the justification for the agency relocation plans and requested funding, no later than September 1, 2008. The report shall include a cost-benefit analysis comparing the leasing of commercial property and upgrading those facilities to meet DARPA requirements to alternative options; describe which government properties, buildings, and facilities were evaluated as alternatives to commercial leasing; detail the costs that will be incurred to the government to restore the building to the lessor's requirements at the end of the lease; describe the criteria that were finally used to select an option; and include certifications that to perform its mission efficiently, DARPA must maintain a headquarters in the Washington, DC region, that no commercial or government facilities currently exist within that region to meet DARPA's unique requirements, and that the selected plan for relocation represents the best value for the Department.

Executive helicopter program (VH-71A)

The budget request included $1,047.8 million in PE 64273N for continued development of the executive helicopter, VH-71A. The VH-71A program is intended to provide the replacement helicopter for transportation of the President and Vice President of the United States, heads of state, and other dignitaries. The administration established challenging performance requirements and an aggressive fielding schedule for the program, reflecting an elevated level of urgency to field this new capability for post-9/11 operations. In an effort to manage programmatic risk and meet the stressing demands for this new capability, the program adopted an incremental fielding strategy for the 23 aircraft to be placed in service. The first portion of the program, called Increment One, would deliver five aircraft, with four of these aircraft used to provide an initial limited capability to fulfill immediate presidential transport requirements. The second portion of the program, called Increment Two, would deliver 19 aircraft to complete all of the presidential support requirements.

The committee is aware that the VH-71A program has encountered significant challenges associated with modifying the selected commercial aircraft to meet the cost and schedule requirements for Increment One. As a result, the Navy plans for only limited employment for Increment One aircraft due to expectations that service life of these helicopters will be limited.

The Navy has found that Increment Two, which was originally planned for concurrent development with Increment One, is beyond the reach of the cost, technical, and schedule baseline established for the program. Faced with this realization, the Department of Defense has restructured the program with a focus on validating requirements, establishing realistic cost and schedule estimates, eliminating concurrency, and developing a new baseline for future budget requirements.

Recognizing that the fiscal year 2008 budget would have been inadequate to support concurrent efforts on both Increment One and Increment Two, the Department issued a `stop work' order on Increment Two. Although the program continues to refine an independent cost assessment in support of future budget decisions, initial estimates point toward a cost overrun of at least 70 percent. This level is well in excess of the percentages that would trigger a breach of the Nunn-McCurdy limits for major acquisition programs.

While it is evident that the VH-71A program will require a Nunn-McCurdy certification in order to proceed with Increment Two, the Department has apparently chosen to wait until submission of the annual Selected Acquisition Report to initiate the certification process. This delay appears to be based on a technical interpretation that, since the government has stopped all work on Increment Two and has neither finalized cost assessments nor revised the program's baseline to reflect the cost growth, it is premature to declare that thresholds have been breached. Under this scenario, the Navy would potentially receive fiscal year 2009 funding and be in a position to sign a contract modification for Increment Two prior to declaring a Nunn-McCurdy breach. Subsequent to signing such a contract, they would then declare a Nunn-McCurdy breach and, thereby, trigger the certification process that this provision of law requires.

The committee realizes that the administration has spent significant time conducting senior level analysis and review of this critical program's requirements, cost, and schedule, in conjunction with the ongoing restructure and deliberations on the fiscal year 2010 budget. However, the committee is concerned that program cost and schedule may be further impacted by potential delays associated with meeting the requirements for Nunn-McCurdy certification, and encourages the Department to initiate proceedings in accordance with section 2433 of title 10, United States Code. The committee notes that the Secretary of the Air Force did not wait until either the Air Force had signed a contract or had received additional funds before declaring a Nunn-McCurdy breach on the C-5 reliability enhancement and re-engining program.

Because of all these concerns, the committee directs the Secretary of the Navy to submit a VH-71A report to the congressional defense committees outlining VH-71A program:

(1) performance requirements;

(2) revised cost estimates;

(3) causes for cost growth;

(4) detailed breakout of cost growth related to under-estimated requirements; and

(5) actions being implemented to reduce and control development and production costs.

Additionally, the committee directs the Secretary to identify alternatives for extending the service life of Increment One aircraft and increasing their utility in the effort to provide greater return on this investment.

The committee directs that, of the amounts authorized for fiscal year 2009 for VH-71A Executive Helicopter Development (PE 64273N), the Secretary may obligate no funding for Increment Two efforts until: (1) the Defense Department completes VH-71A unit cost reporting requirements as prescribed by section 2433 of title 10, United States Code; and (2) the Secretary of the Navy submits the VH-71A report described above to the congressional defense committees.

Expeditionary Fighting Vehicle

Military threats to amphibious operations have forced the Navy and Marine Corps to develop a concept of operations, referred to as Operational Maneuver from the Sea, for launching an amphibious assault from over the horizon. The Navy and Marine Corps are fielding the full capability required to launch amphibious assaults from 25 miles at sea--with one critical exception: the Expeditionary Fighting Vehicle (EFV). Designed to rapidly transport marines ashore and maneuver to inland objectives, the EFV is the missing component of the Marine Corps' amphibious assault triad, which also includes the Landing Craft Air Cushion and the MV-22 Osprey.

Under current plans, the EFV will not achieve Initial Operational Capability (IOC) until 2015 and Full Operational Capability (FOC) until 2025--about 35 years after the EFV program entered development. Without the EFV, amphibious assault operations would require the Navy to bring amphibious ships and escorts close to shore to disembark the aged Advanced Amphibious Vehicles, exposing the ships and the marines to anti-access threats. The committee is very concerned that the EFV program plan places the Marine Corps' primary mission capability--amphibious operations--at risk for an unacceptably long duration.

The committee understands that the EFV program has experienced serious developmental delays and cost growth, which have added years to the schedule. The program is emerging from a critical Nunn-McCurdy cost breach, and the restructured program has added 4 years of further development prior to a full-rate production decision. The program's cost challenges, however, are compounded by the protracted production schedule planned for the vehicle. The Marine Corps projects that its budget will permit a production rate limited to 55 vehicles per year once full-rate production begins in 2016. This low rate of production will delay full fielding while discarding potential cost benefits afforded by more economic rates of procurement.

The committee believes that greater priority must be given to achieving EFV Full Operational Capability within the Department of Defense's equation for balancing requirements with developmental risk and budget constraints. Accordingly, the committee directs the Secretary of the Navy to evaluate cost and risk for alternatives that would improve upon current EFV Initial Operational Capability projections, and accelerate Full Operational Capability to meet the 2020 threat baseline. The Secretary shall report the results of this evaluation to the congressional defense committees with submission of the fiscal year 2010 budget request. The report shall include an assessment of total program cost, annual budget requirements, and technical risk for the accelerated program, and compare these results with the program of record. Additionally, the report shall provide an assessment of the operational impact and risk to amphibious assault capabilities associated with delaying FOC to 2025.

Global Positioning System

The committee is concerned that the space, ground control, and user equipment segments of the Global Positioning Satellite system (GPS) program are not well synchronized. The committee notes that the ground control needed to utilize the M-code on the GPS IIR satellites will not be fully available until after the last of the GPS IIR satellites is launched and the user equipment will not be fully fielded until after the first of the M-code GPS IIR satellites reaches the end of its useful life. The first M-code GPS IIR satellite was launched in September 2005. The M-code is a special code to allow military users to continue using GPS signals in an area of operation while jamming other signals.

Looking ahead to the GPS III satellites, the committee notes that the possibility for a similar disconnect among space, ground control, and user equipment is significant. The Air Force reduced anticipated funding in the early years and the GPS schedule is compressed with very little margin. Moreover, the contract award is late, with the space segment originally scheduled for award in 2007. The committee is concerned that adequate management attention be paid to the GPS program to minimize additional risks to the program.

Improved commercial imagery integration

The committee notes that the government is investing substantial funds in the commercial imagery industry to meet important operational requirements of the combatant commands and the intelligence community. However, the tasking, processing, exploitation, and dissemination (TPED) systems for commercial imagery and imagery collected by government-owned assets are not integrated, which causes commercial imagery resources to be under-utilized and other inefficiencies. The government needs to be able to task commercial imagery collection against specific areas without revealing that fact to the world, to be able to share commercial imagery within the national security community freely, and to routinely and automatically task commercial satellites when they are the logical choice to satisfy a requirement. These needs will become critical if the administration and Congress decide to shift a larger proportion of imagery collection requirements to the commercial sector.

Accordingly, the committee directs that, as feasible within available funding, the National Geospatial Intelligence Agency and the National Reconnaissance Office complete the tasking prototype effort, including an integrated constellation optimization tool; integrate commercial imagery data streams into the existing national dissemination network; and begin systems engineering and development to enable SECRET-level operations within the commercial-data provider facilities and networks.

TITLE III--OPERATION AND MAINTENANCE

SUBTITLE A--AUTHORIZATION OF APPROPRIATIONS

Explanation of tables

The following tables provide the program-level detailed guidance for the funding authorized in title III of this Act. The tables also display the funding requested by the administration in the fiscal year 2009 budget request for operation and maintenance programs, and indicate those programs for which the committee either increased or decreased the requested amounts.

These tables are incorporated by reference into this Act as provided in section 1002 of this Act. The Department of Defense may not exceed the authorized amounts (as set forth in the tables or, if unchanged from the administration request, as set forth in budget justification documents of the Department of Defense) without a reprogramming action in accordance with established procedures. Unless noted in this report, funding changes to the budget request are made without prejudice.

Insert offset folio 347 here SR335.144

Insert offset folio 348 here SR335.145

Insert offset folio 349 here SR335.146

Insert offset folio 350 here SR335.147

Insert offset folio 351 here SR335.148

Insert offset folio 352 here SR335.149

Insert offset folio 353 here SR335.150

Insert offset folio 354 here SR335.151

Insert offset folio 355 here SR335.152

Insert offset folio 356 here SR335.153

Insert offset folio 357 here SR335.154

Insert offset folio 358 here SR335.155

Insert offset folio 359 here SR335.156

Insert offset folio 360 here SR335.157

Insert offset folio 361 here SR335.158

Insert offset folio 362 here SR335.159

Insert offset folio 363 here SR335.160

Insert offset folio 364 here SR335.161

Insert offset folio 365 here SR335.162

Insert offset folio 366 here SR335.163

Insert offset folio 367 here SR335.164

Insert offset folio 368 here SR335.165

Insert offset folio 369 here SR335.166

Insert offset folio 370 here SR335.167

Insert offset folio 371 here SR335.168

Insert offset folio 372 here SR335.169

Insert offset folio 373 here SR335.170

Insert offset folio 374 here SR335.171

Insert offset folio 375 here SR335.172

Insert offset folio 376 here SR335.173

Insert offset folio 377 here SR335.174

SUBTITLE B--ENVIRONMENTAL PROVISIONS

Expansion of cooperative agreement authority for management of natural resources to include off-installation mitigation (sec. 311)

The committee recommends a provision that would authorize the secretaries of the military departments to enter cooperative agreements for the management of natural resources outside of Department of Defense installations, if the cooperative agreements benefit the Department by relieving or eliminating current or anticipated restrictions on military activities.

Reimbursement of Environmental Protection Agency for certain costs in connection with Moses Lake Wellfield Superfund Site, Moses Lake, Washington (sec. 312)

The committee recommends a provision that would authorize the Secretary of Defense to reimburse the Environmental Protection Agency for certain costs incurred in connection with Moses Lake Wellfield Superfund Site, Moses Lake, Washington.

Comprehensive program for the eradication of the brown tree snake population from military facilities in Guam (sec. 313)

The committee recommends a provision that would direct the Department of Defense to establish a comprehensive program to control and, to the extent practicable, eradicate the brown tree snake (Boiga irregularis) population from military facilities in Guam and prevent their spread to other areas.

The committee is concerned about the ecological and economic risks posed by the inadvertent introduction of the brown tree snake from Guam to other areas in the Pacific region and the United States. Force stationing changes in the Pacific planned by the Department over the next several years will significantly increase the number of department facilities and activities on Guam, resulting in an equally significant increase in military traffic to and from the island. The Department has the responsibility to control and, to the maximum extent practicable, ensure that its facilities and activities do not contribute to the spread of the brown tree snake to other areas.

SUBTITLE C--WORKPLACE AND DEPOT ISSUES

Authority to consider depot-level maintenance and repair using contractor furnished equipment or leased facilities as core logistics (sec. 321)

The committee recommends a provision that would authorize the military departments to count workload performed by Government employees using contractor furnished equipment, or in facilities leased to the Government, as sustaining a core logistics capability under section 2464 of title 10, United States Code, if that work is being performed pursuant to a public-private partnership as defined by section 2474 of title 10, United States Code.

Section 2474 encourages private sector investment at Centers of Industrial and Technical Excellence. This private sector investment may include facilities or equipment. This proposed change would authorize partnered workloads performed by Government employees using contractor-furnished equipment or leased facilities to be counted as core.

Minimum capital investment for certain depots (sec. 322)

The committee recommends a provision that would amend section 332 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364) to require the Department of Defense to report the separate levels of capital investment for Navy and Marine Corps depots. The committee also recommends the addition of the following Army arsenals to the list of covered depots:

Watervliet Arsenal, New York

Rock Island Arsenal, Illinois

Pine Bluff Arsenal, Arkansas

SUBTITLE D--REPORTS

Additional information under annual submissions of information regarding information technology capital assets (sec. 331)

The committee recommends a provision that would synchronize the information the Department of Defense provides to both Congress and the Office of Management and Budget (OMB) regarding major Department of Defense information technology (IT) investments. The committee believes that the change recommended in this provision will make the IT budget justification documents more usable to Congress and the public, and increase the transparency of the Department's IT programs.

SUBTITLE E--OTHER MATTERS

Mitigation of power outage risks for Department of Defense facilities and activities (sec. 341)

The February 2008 report of the Defense Science Board Task Force on DOD Energy Strategy found that, `critical national security and homeland defense missions are at an unacceptably high risk of extended outage from failure of the [commercial electricity] grid and other crucial national infrastructure.' The task force recommended that the Department of Defense take several actions to assess and reduce risk to critical missions at fixed installations and activities from the loss of commercial power.

The Department is in the process of evaluating the task force report and is developing a comprehensive energy strategy. However, the committee is concerned that, despite numerous vulnerability studies, the extent of technical and operational risks to specific critical missions are not adequately assessed, or plans for their mitigation programmed. This incomplete assessment coupled with the trend over the last several years to place more defense installations onto the commercial power grid suggests that Department infrastructure energy plans may not be synchronized with an up-to-date technical and operational risk evaluation.

Accordingly, the committee recommends a provision that would direct the Secretary of Defense to conduct a comprehensive technical and operational risk assessment for mission critical Department installations, facilities, and activities; to develop integrated prioritized plans to eliminate or mitigate risks; and to establish goals to mitigate or eliminate the greatest and most urgent risks. The committee further recommends that the Secretary provide the defense committees an annual report on the Department's integrated prioritized plans and progress on efforts to mitigate or eliminate risks to mission critical installations, facilities, and activities.

Increased authority to accept financial and other incentives related to energy savings and new authority related to energy systems (sec. 342)

The committee recommends a provision that would increase the authority of the Secretary of Defense to accept financial and other incentives related to energy savings and energy systems. The provision would authorize the acceptance of such incentives in connection with the construction of an energy system using solar energy or other renewable forms of energy.

Recovery of improperly disposed of Department of Defense property (sec. 343)

The committee recommends a provision that would prohibit the sale or other disposition of military or Department of Defense (DOD) property except in accordance with statutes and regulations governing such property. If property is disposed of in violation of this prohibition, the person holding the property would have no right or title to, or interest in, the property, and the property would be subject to seizure by appropriate law enforcement officials. Under the provision, the appropriate federal district court would have jurisdiction to determine whether property was improperly disposed of and is subject to seizure.

The DOD has informed the committee that the absence of a comprehensive statute has complicated law enforcement efforts to recover military and DOD property that has been misappropriated or that was the subject of unauthorized disposition by members of the armed forces, DOD civilians, contractors, and others. For example, the DOD reports that ceramic plate inserts for body armor, night vision goggles, and munitions list items that were reported as lost or misplaced by Navy personnel have later been found for sale on the Internet. Recently published reports indicate that military equipment offered for sale on the Internet also includes infrared patches used to identify U.S. troops on the battlefield, as well as spare parts for Chinook helicopters and F-14 fighters. In one case, there was even an attempt to sell a Navy airplane over the Internet.

The provision recommended by the committee would address this problem by establishing a comprehensive statutory approach to the improper disposal of military and DOD property and facilitating the recovery of such property regardless of to whom it was furnished and who was responsible for its improper disposal.

BUDGET ITEMS

ARMY

Computing services

The committee recommends a total reduction of $200.0 million from service and defense-wide operation and maintenance accounts that support the procurement and delivery of computing services. The reductions include a $50.0 million decrease each from Army, Navy, Air Force, and defense-wide accounts. The committee does not intend for these reductions to be assessed against Defense Information Systems Agency (DISA) computing services activities. The committee directs the services to aggressively explore increased opportunities to utilize DISA computing services and eliminate redundant, wasteful service-specific computing services activities.

The committee notes that consolidation of computing services activities, such as reductions in numbers of computing centers, data storage systems, and electronic file servers, has saved the Department of Defense an estimated $200.0 million or more annually since 1990, according to DISA. Further, a June 2007 independent assessment of DISA's computing services noted that they `. . . provided world-class computing services that enable the DOD community to better execute their missions,' and compared DISA's services favorably to general government, federal, and workload peers. The assessment also recommended continuing assessment of organizational staffing, structure, and realignment, as well as continued maturation of data center processes. Finally, the committee notes that uncoordinated, Department-wide deployment of servers, mainframes, data warehouses, web sites, and other computing services has resulted in inefficiencies, underutilization of computing infrastructure, and interoperability difficulties.

The committee recommends that the Assistant Secretary of Defense for Networks and Information Integration initiate independent, comparative benchmarking studies of computing services across the Department of Defense to inform and accelerate the consolidation of the provision of computing services to increase efficiency, improve services, and reduce costs.

Unmanned aircraft systems concept development

The budget request included $1.0 billion in Operation and Maintenance, Army (OMA) for aviation assets, but provided no funds for unmanned aircraft systems (UAS) concept development. The committee supports the efforts of the Army's Aviation Warfighting Center at Fort Rucker, Alabama to develop current and future UAS concepts that will meet joint and Army operational objectives. The committee expects that the Army's UAS concept development will be consistent with the Department of Defense's roles and missions review, as required by section 941 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181). This increase is not intended to prejudice or influence that report. The committee recommends an increase of $3.0 million in OMA for UAS concept development.

Shipping containers

The budget request included $204.5 million in Operation and Maintenance, Army (OMA) for strategic mobility, but provided no funds for shipping containers. The committee recommends an increase of $2.0 million in OMA for the purchase of shipping containers.

Life cycle logistics contracting

The budget request included $7.3 billion in Operation and Maintenance, Army (OMA) for base operations support. These funds include the cost of providing logistics support to Army forces operating around the world. The committee is aware of the Army's challenges in contracting for base operation services, including shelter, utilities, food, water, and sanitization, to meet the logistics needs of forward deployed forces. The committee recommends an increase of $21.6 million in OMA for the Army Contracting Agency to improve its life cycle acquisition planning, solicitation, and negotiation activities.

Facilities sustainment, restoration, and modernization

The budget request included $2.1 billion for facilities sustainment, restoration, and modernization for the Army. The committee recommends an increase of $7.8 million for restoration or modernization of barracks.

Second destination transportation

The budget request included $552.6 million in Operation and Maintenance, Army (OMA) for service-wide and second destination transportation. These funds support the cost of line haul, over-ocean, and inland transportation for worldwide movement of Army supplies and equipment to and from depots, between commands, and to overseas commands by civilian and military air and surface modes. Additional funds allow the Army to redistribute more equipment and supplies to correct unit shortages and increase readiness. The committee recommends an increase of $50.0 million in OMA for second destination transportation.

Ammunition inspections and warehousing

The budget request included $450.3 million in Operation and Maintenance, Army (OMA) for ammunition management. These funds support the management of operations within the life cycle of conventional ammunition, including procurement administration, storage, distribution, maintenance, and demilitarization. Additional funds allow the Army to reduce backlogs in ammunition inspections and re-warehousing efforts. The committee recommends an increase of $25.0 million in OMA for ammunition management.

NAVY

Unobligated Operation and Maintenance balances

The committee notes that the challenges associated with operations in Iraq and Afghanistan create a difficult fiscal management situation, especially for the Army and Marine Corps. However, the Department of Defense continues to under-execute its Operation and Maintenance (O&M) appropriations for the active and reserve components. According to the Government Accountability Office (GAO), the Department of Defense had $247.3 million in average yearly unobligated balances for fiscal years 2003 through 2007. The military departments had $1.1 billion in average yearly unobligated balances for fiscal years 2003 through 2007.

The committee recalls that 3 years ago the Department began to reduce the O&M portion of its annual funding request and future-years defense program before submission to Congress based, in part, on the GAO analysis of unobligated balances. The Department also underfunds important maintenance and activities in its annual request in anticipation of supplemental appropriations. Whether made available in annual or supplemental appropriations, the Department and services must ensure that taxpayer dollars are appropriately managed to provide the best possible readiness for the force and avoid the expiration of obligating authority. Therefore, the committee recommends a decrease of $212.4 million to the Department's O&M accounts, as follows: Operation and Maintenance, Navy, $70.0 million; Operation and Maintenance, Air Force, $72.0 million; and Operation and Maintenance, Defense-wide, $70.4 million.

Overstatements of civilian personnel pay requirements

Analysis performed by the Government Accountability Office based on the services' civilian personnel end strength data as of February 2008, projects that the Department of Defense civilian personnel costs are overstated for fiscal year 2009 by $565.3 million. Therefore, the committee recommends a decrease of $65.8 million in Operation and Maintenance, Navy, and a decrease of $131.7 million in Operation and Maintenance, Air Force for overstatement of civilian personnel pay.

Naval aircraft depot maintenance

The budget request included $34.9 billion for Operation and Maintenance, Navy but only $1.1 billion for aircraft depot maintenance. The Navy identified a shortage of resources for aircraft depot maintenance for fiscal year 2009. The committee recommends an increase of $63.0 million in Operation and Maintenance, Navy for aircraft depot maintenance.

Damage control management

The budget request included $3.5 billion in Operation and Maintenance, Navy (OMN) for mission and other ship operations, but provided no funds for the development and installation of an improved damage control inventory management and stowage system for amphibious ships. The committee recommends an increase of $3.0 million in OMN for development of a damage control management system for amphibious ships.

MK 45 gun depot overhaul

The budget request included $478.1 million in Operation and Maintenance, Navy (OMN) for weapons maintenance, but provided no funds for MK 45 5' gun depot overhauls. The committee recommends an increase of $9.0 million in OMN for MK 45 depot overhauls.

MARINE CORPS

Marine Corps shelters

The budget request included $759.8 million in Operation and Maintenance, Marine Corps (OMMC) for operational forces, but provided no funds for the Family of Shelters and Tents (FST). The committee recommends an increase of $2.5 million in OMMC for FST.

Mobile corrosion protection Marine Corps

The budget request included $502.4 million in Operation and Maintenance, Marine Corps (OMMC) for field logistics activities. The committee recommends an increase of $7.6 million in OMMC for mobile corrosion protection and abatement.

AIR FORCE

B-52 flying hours

The budget request included $2.8 billion in Operation and Maintenance, Air Force (OMAF) for flying hours. The committee recommends an increase of $47.9 million in OMAF for B-52 squadron flying hours. The Air Force failed to include adequate funding in the budget request to meet the requirements of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) to maintain 76 B-52 bombers in a common configuration and included this funding on the Air Force unfunded priorities list.

F-15 depot maintenance

The budget request included $35.9 billion for Operation and Maintenance, Air Force of which $2.7 billion is for aircraft depot maintenance. The Air Force depot maintenance request includes $497.0 million for F-15 repairs related to a structural problem identified in an aircraft mishap in November 2007. After inspections of the F-15 fleet the number of aircraft requiring major repair was not as anticipated, therefore funds requested for fiscal year 2009 exceed the requirement. The committee recommends a reduction of $497.0 million in Operation and Maintenance, Air Force for F-15 depot maintenance.

B-52 depot maintenance

The budget request included $2.7 billion in Operation and Maintenance Air Force (OMAF) for depot maintenance. The committee recommends an increase of $48.0 million in OMAF for B-52 aircraft depot maintenance. The Air Force failed to include adequate funding in the budget request to meet the requirements of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) to maintain 76 B-52 bombers in a common configuration and included this funding on the Air Force unfunded priorities list.

B-2 depot maintenance

The budget request included $35.9 billion for Operation and Maintenance, Air Force (OMAF) of which $2.7 billion is for aircraft depot maintenance. The committee notes that B-2 Bomber scheduled workload for fiscal year 2009 will be less due to the loss of an aircraft in a flight mishap on Guam in February 2008. The committee recommends a reduction of $2.0 million in OMAF.

Engine trailer life extension program

The budget request included $2.7 billion in Operation and Maintenance, Air Force (OMAF) for depot maintenance, but provided no funds for engine trailer life extension. The committee recommends an increase of $3.0 million in OMAF to begin the re-manufacturing and refurbishing of Air Force engine trailers.

Land mobile radios

The budget request included $2.4 billion in Operation and Maintenance, Air Force (OMAF) for air operations base support, but provided no funds for land mobile radios. Upgrades to the radio system used at Nellis Test and Training Range are necessary to comply with required federal communication standards. The committee recommends an increase of $2.1 million in OMAF for land mobile radios.

National Security Space Institute

The budget request included $19.5 million in Operation and Maintenance, Air Force (OMAF) for the National Security Space Institute (NSSI). The committee recommends an increase of $2.8 million for the NSSI. The NSSI, which is operated by the Air Force, is the space education and professional development center for the Department of Defense. The additional funding will allow the NSSI to continue to reinstate one advanced course, sustain one advanced course, and establish distance learning programs. This program is on the Chief of Staff of the Air Force's unfunded priorities list.

Advanced ultrasonic inspection of aging aircraft structures

The budget request included $917.7 million in Operation and Maintenance, Air Force (OMAF) for logistics operations, but included no funds for advanced ultrasonic inspection of aging aircraft. Ultrasonic inspection of the Air Force's aging fleet would provide a non-destructive means to determine the structural condition of aircraft, saving time and money. The committee recommends an increase of $1.0 million in OMAF for advanced ultrasonic inspection techniques.

DEFENSE-WIDE

Expanded prisoner of war/missing in action research in North Korea

The budget request did not include funding to cover the costs associated with resumption of recovery operations in North Korea for the remains of prisoners of war/missing in action (POW/MIA) personnel. The committee recommends an increase of $13.7 million for Operation and Maintenance, Defense-wide.

The Under Secretary of Defense for Policy recently reported to Congress on the organization, management, and budgeting of the Joint POW/MIA Accounting Command (JPAC). In that report, he stated that `JPAC is funded to meet its current mission, excluding operations in North Korea, if those should be resumed at some point.'

The committee notes that cooperation with North Korea to recover the remains of U.S. POW/MIAs was suspended by the United States in 2005. The committee views this program as an important humanitarian effort that should proceed. Since time is a factor for the families of the POW/MIAs, the committee urges the Department of Defense to begin talks with the North Korean military regarding how to resume recovery operations at the earliest possible time.

Defense Security Cooperation Agency

The budget request included $880.0 million in Operation and Maintenance, Defense-wide (OMDW) for the Defense Security Cooperation Agency. Of this amount, $500.0 million was requested for the Global Train and Equip program to build the security capacity of foreign forces to meet urgent or emerging threats. Section 1206 of the National Defense Authorization Act for Fiscal Year 2006 (Public Law 109-163), as amended by section 1206 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364), authorizes the Global Train and Equip program at a level of $300.0 million through September 30, 2008. The Global Train and Equip program is reauthorized under this Act through fiscal year 2011 at a level of $400.0 million in each fiscal year. Therefore, the committee recommends a decrease of $100.0 million to OMDW for the Global Train and Equip program.

Status of Operational Readiness and Training System

The budget request included $89.2 million in Operation and Maintenance, Defense-wide (OMDW) for the Global Command and Control System (GCCS). The committee is aware that this program includes funds to continue to support fielding and upgrades of the legacy Status of Operational Readiness and Training Systems (SORTS) that is currently being replaced by the Department of Defense's objective system, the Defense Readiness and Reporting System. The committee recommends a decrease of $20.0 million in OMDW for SORTS.

Defense Readiness Reporting System

The budget request included $4.9 million in Operation and Maintenance, Defense-wide for the Defense Readiness Reporting System (DRRS). The committee recommends an increase of $16.2 million for the acceleration of the development and deployment of DRRS.

The committee is aware of the challenges associated with the accurate, reliable, and timely measurement and reporting of the readiness of military forces. The current readiness reporting system, Global Status of Resources and Training System (GSORTS), is inadequate to meet the demands of the force rotation strategy that supports operations in Iraq, Afghanistan, and around the world. The Department of Defense (DOD), Joint Staff, and U.S. Joint Forces Command lack the visibility of deployed and non-deployed forces' capabilities and readiness required to manage global military commitments.

In June 2002, DOD issued a directive establishing the DRRS, a capabilities-based, adaptive, near-term readiness reporting system. The directive requires all components to align their readiness reporting processes with DRRS. Since then, we understand DOD and the services have taken a number of steps but that DRRS is not yet fully operational and aligned with the services' reporting processes. As a result, DOD's most recent quarterly readiness report to Congress contains both DRRS and GSORTS data.

The committee supports the Department's development of DRRS as an important management modernization and replacement for GSORTS. However, the committee is concerned that the Department has yet to successfully plan, organize, resource, and execute tests and full deployment for DRRS's within the Global Command and Control System. Accordingly, the committee directs the Secretary of Defense to provide the congressional defense committees a report not later than March 1, 2009 on its plan to accelerate the full deployment of DRRS and retire GSORTS. The committee also directs that the Government Accountability Office evaluate the DRRS program, DOD's plan, and identify factors affecting DOD's ability to fully develop and implement DRRS and retire GSORTS.

Readiness and Environmental Protection Initiative

The budget request included $39.8 million in Operation and Maintenance, Defense-wide (OMDW) for the Readiness and Environmental Protection Initiative (REPI). The committee is encouraged that this is $10.0 million more than requested in fiscal year 2008.

The committee believes that the military departments should continue to pursue voluntary agreements with other public and private entities as authorized under section 2684a of title 10, United States Code, to prevent the development or use of property that would be incompatible with the mission of an installation, and preserve habitat that is compatible with environmental requirements that might otherwise result in current or anticipated environmental restrictions on military bases.

The committee recommends an increase of $20.0 million in OMDW for the REPI and directs that the military departments give priority to projects that benefit critical mission training sites that have the greatest potential to prevent or reduce encroachment through the creation of a compatible use buffer zone.

STARBASE Academies

The budget request included $108.0 million in Operation and Maintenance, Defense-wide (OMDW) for Civil Military Programs, but did not provide sufficient funds to sustain the operations of the 60 existing STARBASE Academies. The committee recommends an increase of $5.2 million in OMDW for STARBASE.

ARMY RESERVE

Mobile corrosion protection Army Reserve

The budget request included $87.5 million in Operation and Maintenance, Army Reserve (OMAR) for land forces systems readiness. The committee recommends an increase of $4.8 million in OMAR for mobile corrosion protection and abatement.

Army Reserve military technician cost avoidance

The budget request included $2.6 billion in Operation and Maintenance, Army Reserve (OMAR). Operation and maintenance accounts ordinarily fund military technician pay and benefits as civilian pay. When mobilized and serving on active duty, however, this compensation is paid by military personnel appropriations. Based on an analysis of the services' actual military technician mobilization data, the Government Accountability Office (GAO) projects that the Army Reserve could realize $14.9 million in cost avoidance in fiscal year 2009. The committee recommends a decrease of $4.5 million in OMAR for military technician cost avoidance.

ARMY NATIONAL GUARD

Aircraft humidity protection

The budget request included $905.8 million in Operation and Maintenance, Army National Guard (OMARNG) for maneuver units, but provided no funds for aircraft humidity protection. The Government Accountability Office (GAO) has found that the readiness and safety of military equipment can be severely degraded by corrosion. The most cost-effective means of combating corrosion is prevention. The committee recommends an increase of $5.0 million in OMARNG for aircraft controlled humidity protection.

Expandable Light Air Mobility Shelters

The budget request included $905.8 million in Operation and Maintenance, Army National Guard (OMARNG) for maneuver units but provided no funds for Expandable Light Air Mobility Shelters (ELAMS). The committee recommends an increase of $6.5 million in OMARNG for the procurement of ELAMS.

Extended Cold Weather Clothing System

The budget request included $316.3 million in Operation and Maintenance, Army National Guard (OMARNG) for force readiness operations support, but included no funds for the Extended Cold Weather Clothing System (ECWCS). The committee recommends an increase of $1.0 million in OMARNG for ECWCS.

Rapid Data Management System

The budget request included $316.3 million in Operation and Maintenance, Army National Guard (OMARNG) for force readiness operations support, but provided no funds for the Rapid Data Management System (RDMS). RDMS is an integrated data collection and management system that allows first responders to gather data during field operations. It was successfully tested and used by the Marine Corps during Exercise COBRA GOLD 2007, and is currently used by the American Red Cross. The committee recommends an increase of $9.5 million in OMARNG for RDMS.

Mobile corrosion protection Army National Guard

The budget request included $120.2 million in Operation and Maintenance, Army National Guard (OMARNG) for land forces systems readiness activities. The committee recommends an increase of $4.8 million in OMARNG for mobile corrosion protection and abatement.

Weapons Skills Trainer

The budget request included $316.3 million in Operation and Maintenance, Army National Guard (OMARNG) for force readiness operations support, but included no funds for the Weapons Skills Trainer (WST). The committee notes the high mobilization rates of members of the National Guard. Individual and unit weapons training are enhanced by the availability of a multilevel weapons simulator such as the WST. The committee recommends an increase of $3.5 million in OMARNG for the Weapons Skills Trainer.

Emergency satellite communications

The budget request included $120.2 million in Operation and Maintenance, Army National Guard (OMARNG) for land forces systems readiness. The committee recommends an increase of $4.0 million in OMARNG for additional authorized Joint Incident Scene Communication Capability packages required for disaster response.

AIR NATIONAL GUARD

Controlled humidity protection

The budget request included $3.6 billion in Operation and Maintenance, Air National Guard (OMANG) for air operations, but provided no funds for controlled humidity protection. The Government Accountability Office (GAO) has found that the readiness and safety of military equipment can be severely degraded by corrosion. The Department of Defense spends billions of dollars annually to address corrosion damage that could be avoided with increased prevention and mitigation technology such as controlled humidity protection. The committee recommends an increase of $3.6 million in OMANG for controlled humidity protection.

Crypto-linguist and intelligence officer initiative

The budget request did not include sufficient funding for airborne crypto-linguists to conduct training and related activities. The committee recommends an increase of $750,000 for Operation and Maintenance, Air National Guard for airborne crypto-linguists.

ITEMS OF SPECIAL INTEREST

Assessment of plans for contracting support in combatant command operational plans

The committee notes the inadequacy of initial planning and execution related to contracting support for contingency operations in Iraq and Afghanistan. Assumptions with respect to the scope and duration of post-conflict stability operations made by the Department of Defense left military planners with little justification to provide for more robust reconstruction and civil-military logistics and the contracting support necessary for efficient and effective execution.

The committee believes that contingency plans must have comprehensive, detailed, and realistic contracting support plans that meet the operational requirements of the force before, during, and after combat operations. The Department appears to be applying the lessons of Operations Iraqi Freedom and Enduring Freedom and notes the recent publication of Chairman, Joint Chief of Staff Manual 3133.03C (CJCSM 3133.03C) providing planning guidance that requires combatant commanders to include contracting support plans in their contingency operations plans.

The committee directs that the Government Accountability Office (GAO) conduct an assessment of the implementation of the directives contained in CJCSM 3133.03C. In conducting this assessment the GAO shall also evaluate the contracting support plans for those combatant command operations plans as reported in the Quarterly Readiness Report to Congress (QRRC) as required by section 482 of title 10, United States Code. The GAO should base its assessment of contracting support plans on the requirements of CJCSM 3133.03C but shall also include an evaluation of each plan's assumptions, comprehensiveness, feasibility, adequacy of executable detail, resources required and available, contracting related operational risk at each phase of the plan, and any other aspect of contracting support planning useful to this review. The GAO shall provide this assessment to the congressional defense committees not later than September 30, 2009.

Combatant Commander Initiative Fund

The budget request included $75.0 million in Operation and Maintenance, Defense-wide (OMDW), for the Combatant Commander Initiative Fund (CCIF). The committee notes that this fund is intended to make small amounts of monies available promptly to combatant commanders to enable them to meet unexpected contingencies and take advantage of opportunities that arise but that are not amenable to the time-consuming reprogramming process. The statement of managers accompanying the National Defense Authorization Act for Fiscal Years 1990 and 1991 (Public Law 101-189) directs that these funds `may only be used for activities for which funding is not available in a timely fashion under existing authorizations and appropriations.' The committee urges the Department of Defense to preserve the flexibility of this fund, consistent with the intent of Congress, by refraining from programming these funds at the beginning of the fiscal year.

Funding for the CCIF reflects an increase of $50.0 million over the fiscal year 2008 level for this fund. The committee believes that priority in the use of this $50.0 million in additional funding should be given to enabling geographic combatant commanders to respond to unanticipated emergencies in their respective areas of responsibility by providing urgent humanitarian relief and reconstruction assistance, particularly in foreign countries where U.S. armed forces are engaged in a contingency operation. The authority to use the CCIF to provide urgent and unanticipated humanitarian relief and reconstruction assistance is under the authority added to section 166a(b)(6) of title 10, United States Code, by section 902 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364).

The committee notes that the statement of managers accompanying Public Law 109-364 urged the Department to develop guidance for the use of the additional authority provided by section 902 of that act to ensure that the authority could be used quickly and without bureaucratic delay under urgent circumstances. That statement of managers also urged that such guidance include procedures for coordinating with the relevant Department of State country team as a precondition for providing assistance under this authority. The committee is unaware of the Department having developed such guidance and again urges the Department to do so, consistent with the statement of managers' recommendations.

The committee also notes that the additional authority provided under section 902 is not intended for use in Afghanistan or Iraq so long as Commanders' Emergency Response Program (CERP) authority is available for use in those countries.

The committee directs the Chairman of the Joint Chiefs of Staff, after consultation with the combatant commanders, to submit a report to the Committees on Armed Services of the Senate and House of Representatives by October 31, 2009, providing a detailed description of the activities funded by the CCIF during fiscal year 2009, and an assessment of the benefits derived from those activities.

Commercial satellite communications

The committee notes that approximately 80 percent of the Department of Defense satellite communications capacity is currently provided by commercially operated satellites. These services are purchased on an as-needed basis, predominately with funds made available through supplemental appropriations acts or other short-term funding. While the percentages have varied, the Department of Defense estimates that as much as 50 percent of satellite communications capabilities in the long-term could be provided using commercially operated satellites. The committee urges the Secretary of Defense to review the Defense Department commercial satellite communications requirements and determine the most efficient and reliable way to acquire commercial satellite communications capabilities. This review should include the most appropriate funding approach for sustained and surge requirements and opportunities to involve the commercial satellite industry in planning to ensure the capability will be available when and where it is needed.

Defense Information Systems Agency working capital fund management

The committee notes that section 321 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) gave the Defense Information Systems Agency (DISA) greater flexibility to utilize working capital funds (WCF) in small modernization projects for its systems. Congress noted that the rate of technological advances in information systems represents a major challenge to DISA as it attempts to keep pace with commercial technology and provide better service to its defense customers. The authority provided was intended to help address those challenges, by enabling DISA to use flexible WCF funds to make investments that would replace outdated, unsupported software and hardware systems, and other equipment to maintain network performance and functionality.

The committee notes that there are no mechanisms currently available within the DISA WCF to raise capital in order to make the investments permitted under the authority granted last year. Further, unlike other WCF activities, DISA utilizes funding from direct appropriations for technology refreshment and modernization purposes. The committee notes that dependence on the direct authorization and appropriation of funds for systems operated and maintained using WCFs is inconsistent with the WCF concept itself. The committee further notes that requiring DISA to build technology refreshment into the Defense Information Systems Network (DISN) customer rate structure, similar to the mechanisms other working capital funds use, could increase usage costs for the DISA customer base.

The committee recognizes the contradiction between the new authority and current DISA WCF practices and operations. Therefore, the committee directs the Director of DISA to report to the congressional defense committees no later than April 1, 2009 on planned mechanisms to continue to invest in timely, flexible, technology refreshment and modernization on its systems; an analysis of the current DISN rate structure and customer billing mechanisms and their adequacy for providing sufficient funding for technology refreshment needs; and any suggested changes to WCF authorities or DISN rate structures and mechanisms that may be necessary to provide warfighters with the most current, highest performance information systems possible.

Funding for military morale, welfare, and recreation programs

The availability of appropriated funds for military morale, welfare, and recreation (MWR) programs is a continuing concern to the committee. As the committee learned from hearing testimony given this year, many military family organizations share this concern. Programs funded through MWR programs, such as child care and youth programs, libraries, and fitness centers, have always been an important and critical benefit for our military families. Now, in light of the multiple and lengthy deployments many military families have been facing over the past few years, the programs provided through these funds are more important than ever. These types of programs and benefits are also vital retention tools. While funds for MWR have increased slightly over the past few years, the committee believes that each of the military departments should consider increasing the amount of funds that support MWR programs, in order to ensure the best quality of life possible for our military families.

Long-range facilities and construction planning at Army ammunition plants and arsenals

The committee notes the absence of long-range planning for the recapitalization and modernization of Army ammunition plants and arsenals nationwide. In many cases, these ammunition plants and arsenals, operating in facilities that have not been upgraded in decades, serve as the sole producer of critical components that are absolutely essential to the mission of the Department of the Army. The committee further notes that other Department of Defense industrial operations such as depots have developed comprehensive long-range modernization plans that benefit from a mandatory level of recapitalization funding each year required by Congress. These long-range plans are essential to ensure that Department of the Army industrial operations can meet current and future mission requirements with effective, efficient systems and equipment that are safe, secure, and comply with environmental regulations.

The committee directs the Secretary of the Army develop a comprehensive long-range plan for each ammunition plant and arsenal. Long-range plans should establish a detailed investment strategy and priorities to: correct unsafe, hazardous, or environmentally harmful working conditions; upgrade deteriorated facilities to an adequate condition; modernize equipment and manufacturing processes to industry standards; and incorporate investments in new technology that will improve efficiencies in production. Furthermore, the committee directs the Secretary to submit a report to the defense committees no later than 180 days after bill enactment and annually thereafter with the budget request for a period of 5 years detailing the following:

(1) the investment master plan for each ammunition plant and arsenal;

(2) the status of the implementation of such plans to date at each plant and arsenal; and,

(3) the amount contained in the budget request that is proposed to be applied to the investment strategy for each ammunition plant or arsenal.

Standards for deployable shelters

The committee recognizes the need for maximum interoperability among the services and with civilian organizations for certain types of equipment that support both contingency military operations and homeland defense missions. Deployable expeditionary facilities, such as shelters and tents used for housing, medical care, and other combat service support functions should meet minimum safety standards and be fully interoperable for joint operations, peacekeeping efforts, refugee support, and homeland defense missions. In certain cases the military services have developed standards, such as the U.S. Air Force Operational Requirements Document (ORD) CAF 316-92-II/IIIB, to ensure that shelters and tents meet consistent, interoperable safety and security standards. The committee is concerned that all the military services may not have a consistent standard to guide acquisition of these critical equipment items.

Therefore, the committee directs the Secretary of Defense to submit a report to the congressional defense committees, not later than May 1, 2009, assessing whether the Department of Defense criteria, requirements, and acquisition policies for the acquisition of deployable shelters acquired for troop housing, medical care, and other combat service support functions meet adequate structural, environmental, and security standards, and that, to the maximum extent practicable, such standards will facilitate optimal interoperability between the military and civil support functions.

TITLE IV--MILITARY PERSONNEL AUTHORIZATIONS

SUBTITLE A--ACTIVE FORCES

End strengths for active forces (sec. 401)

The committee recommends a provision that would authorize active-duty end strengths for fiscal year 2009, as shown below:


-----------------------------------------------------------------
                    Fiscal year                                  
             2008 authorization 2009 request 2009 recommendation 
-----------------------------------------------------------------
Army                    525,400      532,400             532,400 
Navy                    329,098      325,300             325,300 
Marine Corps            189,000      194,000             194,000 
Air Force               329,563      316,600             316,771 
-----------------------------------------------------------------

The National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181) authorized active-duty end strength for the Army at 525,400 and for the Marine Corps at 189,000. Additional authority was provided in section 403 of that act to increase active-duty end strength for fiscal years 2009 and 2010 by up to 22,000 for the Army and 13,000 for the Marine Corps above the fiscal year 2008 authorized levels of 525,400 and 189,000, respectively.

The committee supports the Army and Marine Corps efforts to increase their active-duty end strength and commends the Army for its efforts to achieve an active-duty end strength of 547,400 by 2010 rather than 2012 as originally planned. The wars in Iraq and Afghanistan have severely stressed the nation's ground forces. In the past year, the Army extended troop rotations to 15 months, with only 12 months dwell time between deployments. With the ongoing commitments in Iraq and Afghanistan, the growth in the Army and Marine Corps is clearly necessary to assist in alleviating the burden of multiple lengthy deployments. The committee recommends an active-duty end strength for fiscal year 2009 for the Army and Marine Corps of 532,400 and 194,000, respectively.

The committee recommends an additional 171 active-duty personnel for the Air Force above the budget request to support the operation and maintenance of 76 B-52 aircraft.

SUBTITLE B--RESERVE FORCES

End strengths for Selected Reserve (sec. 411)

The committee recommends a provision that would authorize Selected Reserve end strengths for fiscal year 2009, as shown below:


-------------------------------------------------------------------------------------------------
                                                    Fiscal year                                  
                                             2008 authorization 2009 request 2009 recommendation 
-------------------------------------------------------------------------------------------------
The Army National Guard of the United States            351,300      352,600             352,600 
The Army Reserve                                        205,000      205,000             205,000 
The Navy Reserve                                         67,800       66,700              66,700 
The Marine Corps Reserve                                 39,600       39,600              39,600 
The Air National Guard of the United States             106,700      106,700             106,756 
The Air Force Reserve                                    67,500       67,400              67,400 
The Coast Guard Reserve                                  10,000       10,000              10,000 
-------------------------------------------------------------------------------------------------

The authorizations contained in this section include an increase of 56 personnel for the Air National Guard. The committee believes these additional personnel should be used to enhance essential training and readiness missions.

End strengths for Reserves on active duty in support of the Reserves (sec. 412)

The committee recommends a provision that would authorize full-time support end strengths for fiscal year 2009, as shown below:


-------------------------------------------------------------------------------------------------
                                                    Fiscal year                                  
                                             2008 authorization 2009 request 2009 recommendation 
-------------------------------------------------------------------------------------------------
The Army National Guard of the United States             29,204       29,950              29,950 
The Army Reserve                                         15,870       16,170              16,170 
The Navy Reserve                                         11,579       11,099              11,099 
The Marine Corps Reserve                                  2,261        2,261               2,261 
The Air National Guard of the United States              13,936       14,337              14,360 
The Air Force Reserve                                     2,721        2,733               2,733 
-------------------------------------------------------------------------------------------------

The committee recommends increases of 746 in the Army National Guard, 300 in the Army Reserve, 401 in the Air National Guard, and 35 in the Air Force Reserve over levels approved for fiscal year 2008. The committee supports increases in full-time support manning consistent with requested levels to increase readiness in the reserve components. The authorizations contained in this section include an increase of 23 personnel for the Air National Guard. The committee believes these additional personnel should be used to enhance essential training and readiness missions.

The committee also recommends a decrease from the fiscal year 2008 level of 480 in the Navy Reserve, consistent with reductions in both active Navy and Navy Reserve end strength. The committee recommends an end strength for the Marine Corps Reserve equal to the fiscal year 2008 level, consistent with the budget request.

End strengths for military technicians (dual status) (sec. 413)

The committee recommends a provision that would authorize end strengths for military technicians (dual status) for fiscal year 2009, as shown below:


-------------------------------------------------------------------------------------------------
                                                    Fiscal year                                  
                                             2008 authorization 2009 request 2009 recommendation 
-------------------------------------------------------------------------------------------------
The Army Reserve                                          8,249        8,395               8,395 
The Army National Guard of the United States             26,502       27,210              27,210 
The Air Force Reserve                                     9,909       10,003              10,003 
The Air National Guard of the United States              22,553       22,452              22,459 
-------------------------------------------------------------------------------------------------

The authorizations contained in this section include an increase of 7 personnel for the Air National Guard. The committee believes these additional personnel should be used to enhance essential training and readiness missions.

Fiscal year 2009 limitation on number of non-dual status technicians (sec. 414)

The committee recommends a provision that would establish limits on the number of non-dual status technicians who may be employed in the Department of Defense as of September 30, 2009, as shown below:


-------------------------------------------------------------------------------------------------
                                                    Fiscal year                                  
                                             2008 authorization 2009 request 2009 recommendation 
-------------------------------------------------------------------------------------------------
The Army National Guard of the United States              1,600        1,600               1,600 
The Army Reserve                                            595          595                 595 
The Air National Guard of the United States                 350          350                 350 
The Air Force Reserve                                        90           90                  90 
-------------------------------------------------------------------------------------------------

Maximum number of Reserve personnel authorized to be on active duty for operational support (sec. 415)

The committee recommends a provision that would establish limits on the number of reserve personnel authorized to be on active duty for operational support under section 115(b) of title 10, United States Code, as of September 30, 2009, as shown below:


-------------------------------------------------------------------------------------------------
                                                    Fiscal year                                  
                                             2008 authorization 2009 request 2009 recommendation 
-------------------------------------------------------------------------------------------------
The Army National Guard of the United States             17,000       17,000              17,000 
The Army Reserve                                         13,000       13,000              13,000 
The Navy Reserve                                          6,200        6,200               6,200 
The Marine Corps Reserve                                  3,000        3,000               3,000 
The Air National Guard of the United States              16,000       16,000              16,000 
The Air Force Reserve                                    14,000       14,000              14,000 
-------------------------------------------------------------------------------------------------

Increased end strengths for Reserves on active duty in support of the Army National Guard and Army Reserve and military technicians (dual status) of the Army National Guard (sec. 416)

The committee recommends a provision that would authorize additional Active Guard and Reserve (AGR) end strength for the Army National Guard and Army Reserve, and additional end strength for Army National Guard military technicians (dual status). The provision would also require that this additional end strength be funded out of funds appropriated for fiscal year 2009 by titles XV or XVI of this Act.

The committee notes that full-time support for Army reserve component soldiers and units, including AGR personnel and military technicians, is critical to the readiness of the reserve components. The Department of the Army has continued to increase the number of personnel assigned to provide full-time support to its reserve components and seeks a fiscal year 2013 end state of 32,060 AGR personnel in the National Guard, 16,261 AGR personnel in the Army Reserve, 28,380 military technicians (dual status) in the National Guard, and 8,395 military technicians (dual status) in the Army Reserve. This provision would authorize the Department to accelerate attainment of these levels by the end of fiscal year 2009. The committee expects the Department to update a 1999 manpower study that evaluates the number of AGR and military technician personnel required to achieve adequate full-time support to its reserve components in light of the increased operational use of the reserve components since that study's completion, and to include discussion of this requirement in its evaluation of the recommendations of the Commission on the National Guard and Reserves.

Modification of authorized strengths for Marine Corps Reserve officers on active duty in the grades of major and lieutenant colonel to meet new force structure requirements (sec. 417)

The committee recommends a provision that would amend section 12011 of title 10, United States Code, to increase the limit on the number of Marine Corps majors and lieutenant colonels authorized to serve on full-time reserve component duty at the end of any fiscal year.

SUBTITLE C--AUTHORIZATIONS OF APPROPRIATIONS

Military personnel (sec. 421)

The committee recommends a provision that would limit the amounts authorized to be appropriated for military personnel accounts of the Department of Defense for fiscal year 2009.

BUDGET ITEMS

Military personnel funding changes

The amount authorized to be appropriated for military personnel programs in section 421 of this Act includes the following changes from the budget request: (1) an increase of $316.0 million to increase the pay raise for military personnel by an additional 0.5 percentage point; (2) an increase of $12.5 million for increased active-duty Air Force end strength levels; (3) an increase of $3.3 million to reflect increased Air National Guard end strength levels; and (4) a reduction of $1.1 billion to reflect anticipated unobligated balances, which is described in more detail elsewhere in this report.

Military personnel unobligated balances

The Department of Defense has consistently underexecuted its military personnel funding since fiscal year 1995 for active and reserve members. The Government Accountability Office estimates the average potential unexpended balances for fiscal year 2009, based on the most recent data from recent years, to be $1.1 billion. The committee recommends a decrease of $1.1 billion to the military personnel accounts to reflect these anticipated unobligated balances.

TITLE V--MILITARY PERSONNEL POLICY

SUBTITLE A--OFFICER PERSONNEL POLICY

Modification of distribution requirements for commissioned officers on active duty in general and flag officer grades (sec. 501)

The committee recommends a provision that would amend section 525 of title 10, United States Code, to increase from 16.3 percent to 16.4 percent the percentage of general and flag officers in a military service that may be appointed above the grade of major general or rear admiral, and to exclude from this limitation those reserve general or flag officers on active duty under a call or order to active duty specifying a period of active duty of not longer than 3 years.

Modification of limitations on authorized strengths of general and flag officers on active duty (sec. 502)

The committee recommends a provision that would amend section 526 of title 10, United States Code, to authorize the Secretary of Defense to designate up to 324 general and flag officer positions as joint duty assignments that would be excluded from the limitation on the number of general and flag officers in each service and would specify the minimum number of officers required to serve in these positions for each service. The provision would realign the number of general and flag officers authorized to serve on active duty in the Army from 302 to 222 officers; in the Navy from 216 to 159 officers; in the Air Force from 279 to 206 officers; and in the Marine Corps from 80 to 59 officers. The provision would also repeal section 721 of title 10, United States Code, which limits the number of general and flag officers authorized to serve in positions outside their own service.

The provision would also establish goals for the number of general officers and flag officers in the Department of Defense (DOD) and the military services who serve in acquisition positions and who have significant contracting experience. The October 31, 2007, report of the Commission on Army Acquisition and Program Management in Expeditionary Operations (the `Gansler Commission') attributed contracting failures in Iraq and Afghanistan, in significant part, to the Army's lack of general officers in the contracting field. The report states:

The Army's difficulty in adjusting to the singular problems of Kuwait, Iraq and Afghanistan is in large part due to the fact that there are no Generals assigned to contracting responsibilities. This is a decade-old blight: the cutbacks began in 1991, and no general officers have held an Army contracting position since 1998. In a military environment (especially in an expeditionary environment), the number and level of the Generals associated with a discipline reflects its importance. A General is held accountable for his or her leadership. Today, the Secretary of the Army cannot replace a General and obtain a new start for Army contracting--the Army has no Generals doing contracting.

The findings of the Gansler Commission are symptomatic of a broader decline in the number of acquisition and contracting positions across the Department of Defense. In fiscal year 2000, 104 general officers--roughly 12 percent of all general officers in DOD--served in acquisition positions. By fiscal year 2007, DOD had only 73 general officers serving in such positions--despite the fact that DOD's acquisition spending had almost doubled in the interim.

Without increasing the number of general officers serving in these positions, DOD is unlikely to reverse the ongoing decline in its acquisition workforce and revitalize its acquisition and contracting practices. The committee urges the Secretary of Defense, the secretaries of the military departments, and the chiefs of staff to significantly increase the number of general officers serving in acquisition and contracting positions in the near future.

Clarification of joint duty requirements for promotion to general or flag grades (sec. 503)

The committee recommends a provision that would amend section 619a of title 10, United States Code, to provide that with certain exceptions, an officer must be designated as a joint qualified officer, rather than a joint specialty officer, in accordance with section 661 of title 10, United States Code, before being eligible for promotion to general or flag officer.

Modification of authorities on length of joint duty assignments (sec. 504)

The committee recommends a provision that would amend section 664 of title 10, United States Code, to align prescribed joint duty assignment lengths with the joint qualification system implemented pursuant to section 516 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109-364), to take into account multiple joint experiences in satisfying joint duty assignment requirements.

Technical and conforming amendments relating to modification of joint specialty requirements (sec. 505)

The committee recommends a provision that would make technical and conforming amendments to sections 663, 665, and 667 of title 10, United States Code, to replace references to joint specialty officers with officers designated as joint qualified officers.

Eligibility of reserve officers to serve on boards of inquiry for separation of regular officers for substandard performance and other reasons (sec. 506)

The committee recommends a provision that would amend section 1187 of title 10, United States Code, to authorize reserve officers to serve as members of boards of inquiry convened to consider whether regular officers should be retained on active duty. This implements a recommendation of the Commission on the National Guard and Reserves regarding elimination of policies which unnecessarily distinguish reserve component personnel from their active-duty counterparts and thereby impede full integration.

Modification of authority on Staff Judge Advocate to the Commandant of the Marine Corps (sec. 507)

The committee recommends a provision that would amend sections 5046 and 525 of title 10, United States Code, to require that an officer, while serving as the Staff Judge Advocate to the Commandant of the Marine Corps, shall serve in the grade of major general. The provision would also exclude an officer serving in this grade and position from the limitation on the authorized number of officers serving in grades above brigadier general in the Marine Corps.

Increase in number of permanent professors at the United States Air Force Academy (sec. 508)

The committee recommends a provision that would amend section 9331 of title 10, United States Code, to increase from 21 to 25 the number of permanent professors at the Air Force Academy.

Service creditable toward retirement for thirty years or more of service of regular warrant officers other than regular Army warrant officers (sec. 509)

The committee recommends a provision that would amend section 1305 of title 10, United States Code, to authorize the retirement of a regular warrant officer of the Navy, Marine Corps, and Coast Guard 60 days after the date on which the officer completes 30 years of active service.

Modification of requirements for qualification for issuance of posthumous commissions and warrants (sec. 510)

The committee recommends a provision that would amend sections 1521 and 1522 of title 10, United States Code, to replace the condition for a posthumous commission or warrant that the death be in the line of duty with a requirement for a certification by the secretary concerned that, at the time of death, the member was qualified for appointment to the next higher grade.

SUBTITLE B--ENLISTED PERSONNEL POLICY

Increase in maximum period of reenlistment of regular members of the armed forces (sec. 521)

The committee recommends a provision that would amend section 505(d) of title 10, United States Code, and section 308(a) of title 37, United States Code, to increase from 6 to 8 years the maximum period of reenlistment of regular members of the armed forces.

SUBTITLE C--RESERVE COMPONENT MANAGEMENT

Modification of limitations on authorized strengths of reserve general and flag officers in active status (sec. 531)

The committee recommends a provision that would amend section 12004 of title 10, United States Code, to exclude from the limitations on the numbers of reserve general and flag officers in an active status those reserve general and flag officers serving in joint duty assignments. The number of reserve general and flag officers excluded could not exceed 20 percent of the number of authorized flag and general officers authorized for the service concerned.

Extension to other reserve components of Army authority for deferral of mandatory separation of military technicians (dual status) until age 60 (sec. 532)

The committee recommends a provision that would amend section 10216(f) of title 10, United States Code, to require the Secretary of the Air Force to implement personnel policies that would allow a military technician (dual status) who continues to meet the requirements for dual status to continue to serve until the technician reaches age 60 and attains eligibility for an unreduced annuity. Currently, this requirement applies only to the Secretary of the Army.

Increase in mandatory retirement age for certain Reserve officers to age 62 (sec. 533)

The committee recommends a provision that would amend sections 12647 and 14702 of title 10, United States Code, to increase the mandatory retirement age from age 60 to age 62 for commissioned officers assigned to the Selective Service System or as property and fiscal officers; Army National Guard officers assigned to a headquarters or headquarters detachment of a State; and reserve officers of the Army or Air Force who are required to maintain membership in a Selected Reserve unit or organization as a condition of continued employment as a National Guard or reserve technician.

Authority for vacancy promotion of National Guard and Reserve officers ordered to active duty in support of a contingency operation (sec. 534)

The committee recommends a provision that would amend section 14317 of title 10, United States Code, to authorize the promotion of reserve component officers who are recommended for promotion to fill a position vacancy under section 14315 of title 10, United States Code, and who are ordered to active duty in support of a contingency operation.

Authority for retention of reserve component chaplains and medical officers until age 68 (sec. 535)

The committee recommends a provision that would amend section 14703(b) of title 10, United States Code, and section 324(a) of title 32, United States Code, to authorize reserve component chaplains and medical officers to be retained in an active status until the date on which the officer becomes 68 years of age.

Modification of authorities on dual duty status of National Guard officers (sec. 536)

The committee recommends a provision that would amend section 325 of title 32, United States Code, to authorize all National Guard officers, not just those in command of National Guard units, to retain their state status while serving on active duty when authorized by the President and with the consent of the Governor or the commanding general of the District of Columbia National Guard as applicable. The provision would also allow the consent or authorization to be given in advance for the purpose of establishing the succession of command of a unit.

Modification of matching fund requirements under National Guard Youth Challenge Program (sec. 537)

The committee recommends a provision that would amend section 509(d) of title 32, United States Code, to clarify that the limitation on assistance provided by the Department of Defense to a State National Guard Youth Challenge Program may not be construed as a limitation on the amount of assistance that may be provided by other sources.

Report on collection of information on civilian skills of members of the reserve components of the armed forces (sec. 538)

The committee recommends a provision that would require the Secretary of Defense to submit a report by March 1, 2009, on the feasibility, uses, and cost effectiveness of collecting information about skills, qualifications, and professional certifications possessed by members of the reserve components.

The Commission on the National Guard and Reserves recommended that the Department of Defense develop a standardized system for developing and maintaining a `civilian skills database' that is consistent with standardized database formats, such as that used by the North Atlantic Treaty Organization, to allow worldwide interoperability. The committee believes that collection of this information should be considered for inclusion in the Reserve Components Common Personnel Data System pursuant to Department of Defense Instruction 7730.54, dated March 31, 2008.

SUBTITLE D--EDUCATION AND TRAINING

Authority to prescribe the authorized strength of the United States Naval Academy (sec. 551)

The committee recommends a provision that would amend section 6954 of title 10, United States Code, to provide that the authorized strength of the Brigade of Midshipmen at the United States Naval Academy is 4,400 midshipmen or such lower number as may be prescribed by the Secretary of the Navy.

Tuition for attendance of certain individuals at the United States Air Force Institute of Technology (sec. 552)

The committee recommends a provision that would amend section 9314(c) of title 10, United States Code, to require the United States Air Force Institute of Technology to charge tuition for instruction of civilians from the military departments, other components of the Department of Defense, and other federal agencies, and to use these funds to defray the costs of such instruction.

Increase in stipend for baccalaureate students in nursing or other health professions under Health Professions Stipend Program (sec. 553)

The committee recommends a provision that would amend section 16201 of title 10, United States Code, to equate the authority for the stipend paid to baccalaureate students in nursing or other health professions under the Health Professions Stipend Program for health care professionals in reserve components to the amount of the stipend paid to participants in the Armed Forces Health Professions Scholarship Program under section 2121(d) of title 10, United States Code.

Clarification of discharge or release triggering delimiting period for use of educational assistance benefit for reserv