Union Calendar No. 122
109th CONGRESS 1st Session |
[Report No. 109–215, Part I]
To ensure jobs for our future with secure and reliable energy.
Mr. Barton of Texas (for himself, Mr. Hall, Mr. Upton, Mr. Stearns, Mrs. Cubin, Mr. Shimkus, Mr. Pickering, Mr. Blunt, Mr. Buyer, Mr. Radanovich, Mr. Pitts, Mr. Terry, and Mr. Rogers of Michigan) introduced the following bill; which was referred to the Committee on Energy and Commerce, and in addition to the Committees on Science, Resources, Education and the Workforce, Transportation and Infrastructure, Financial Services, and Agriculture, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned
Additional sponsors: Mr. Otter and Mr. Burgess
Reported from the Committee on Energy and Commerce with an amendment
[Strike out all after the enacting clause and insert the part printed in italic]
Committees on Science, Resources, Education and the Workforce, Transportation and Infrastructure, Financial Services, and Agriculture discharged; committed to the Committee of the Whole House on the State of the Union and ordered to be printed
[For text of introduced bill, see copy of bill as introduced on April 14, 2005]
To ensure jobs for our future with secure and reliable energy.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled, (b) Table of contents.—The table of contents for the bill is as follows: (a) In general.—Part 3 of title V of the National Energy Conservation Policy Act (42 U.S.C. 8251 et seq.) is amended by adding at the end the following: “SEC. 552. Energy and water savings measures in congressional buildings. “(a) In general.—The Architect of the Capitol— “(1) shall develop, update, and implement a cost-effective energy conservation and management plan (referred to in this section as the ‘plan’) for all facilities administered by Congress (referred to in this section as ‘congressional buildings’) to meet the energy performance requirements for Federal buildings established under section 543(a)(1); and “(b) Plan requirements.—The plan shall include— “(1) a description of the life cycle cost analysis used to determine the cost-effectiveness of proposed energy efficiency projects; “(2) a schedule of energy surveys to ensure complete surveys of all congressional buildings every 5 years to determine the cost and payback period of energy and water conservation measures; “(3) a strategy for installation of life cycle cost-effective energy and water conservation measures; (b) Table of contents amendment.—The table of contents of the National Energy Conservation Policy Act is amended by adding at the end of the items relating to part 3 of title V the following new item: (c) Repeal.—Section 310 of the Legislative Branch Appropriations Act, 1999 (2 U.S.C. 1815), is repealed. (d) Energy infrastructure.—The Architect of the Capitol, building on the Master Plan Study completed in July 2000, shall commission a study to evaluate the energy infrastructure of the Capital Complex to determine how the infrastructure could be augmented to become more energy efficient, using unconventional and renewable energy resources, in a way that would enable the Complex to have reliable utility service in the event of power fluctuations, shortages, or outages. (a) Energy reduction goals.— (1) AMENDMENT.—Section 543(a)(1) of the National Energy Conservation Policy Act (42 U.S.C. 8253(a)(1)) is amended by striking “its Federal buildings so that” and all that follows through the end and inserting the Federal buildings of the agency (including each industrial or laboratory facility) so that the energy consumption per gross square foot of the Federal buildings of the agency in fiscal years 2006 through 2015 is reduced, as compared with the energy consumption per gross square foot of the Federal buildings of the agency in fiscal year 2003, by the percentage specified in the following table: (2) REPORTING BASELINE.—The energy reduction goals and baseline established in paragraph (1) of section 543(a) of the National Energy Conservation Policy Act (42 U.S.C. 8253(a)(1)), as amended by this subsection, supersede all previous goals and baselines under such paragraph, and related reporting requirements. (b) Review and revision of energy performance requirement.—Section 543(a) of the National Energy Conservation Policy Act (42 U.S.C. 8253(a)) is further amended by adding at the end the following: (c) Exclusions.—Section 543(c)(1) of the National Energy Conservation Policy Act (42 U.S.C. 8253(c)(1)) is amended by striking “An agency may exclude” and all that follows through the end and inserting(A) An agency may exclude, from the energy performance requirement for a fiscal year established under subsection (a) and the energy management requirement established under subsection (b), any Federal building or collection of Federal buildings, if the head of the agency finds that— “(iii) the agency has achieved compliance with the energy efficiency requirements of this Act, the Energy Policy Act of 1992, Executive orders, and other Federal law; and “(iv) the agency has implemented all practicable, life cycle cost-effective projects with respect to the Federal building or collection of Federal buildings to be excluded. (d) Review by Secretary.—Section 543(c)(2) of the National Energy Conservation Policy Act (42 U.S.C. 8253(c)(2)) is amended— (e) Criteria.—Section 543(c) of the National Energy Conservation Policy Act (42 U.S.C. 8253(c)) is further amended by adding at the end the following: (f) Retention of energy and water savings.—Section 546 of the National Energy Conservation Policy Act (42 U.S.C. 8256) is amended by adding at the end the following new subsection: “(e) Retention of energy and water savings.—An agency may retain any funds appropriated to that agency for energy expenditures, water expenditures, or wastewater treatment expenditures, at buildings subject to the requirements of section 543(a) and (b), that are not made because of energy savings or water savings. Except as otherwise provided by law, such funds may be used only for energy efficiency, water conservation, or unconventional and renewable energy resources projects.”. (g) Reports.—Section 548(b) of the National Energy Conservation Policy Act (42 U.S.C. 8258(b)) is amended— (h) Conforming amendment.—Section 550(d) of the National Energy Conservation Policy Act (42 U.S.C. 8258b(d)) is amended in the second sentence by striking “the 20 percent reduction goal established under section 543(a) of the National Energy Conservation Policy Act (42 U.S.C. 8253(a)).” and inserting “each of the energy reduction goals established under section 543(a).”. Section 543 of the National Energy Conservation Policy Act (42 U.S.C. 8253) is further amended by adding at the end the following: “(e) Metering of energy use.— “(1) DEADLINE.—By October 1, 2012, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered or submetered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Such data shall be incorporated into existing Federal energy tracking systems and made available to Federal facility energy managers. “(2) GUIDELINES.— “(A) IN GENERAL.—Not later than 180 days after the date of enactment of this subsection, the Secretary, in consultation with the Department of Defense, the General Services Administration, representatives from the metering industry, utility industry, energy services industry, energy efficiency industry, energy efficiency advocacy organizations, national laboratories, universities, and Federal facility energy managers, shall establish guidelines for agencies to carry out paragraph (1). “(B) REQUIREMENTS FOR GUIDELINES.—The guidelines shall— “(i) take into consideration— “(I) the cost of metering and submetering and the reduced cost of operation and maintenance expected to result from metering and submetering; “(ii) include recommendations concerning the amount of funds and the number of trained personnel necessary to gather and use the metering information to track and reduce energy use; “(iii) establish priorities for types and locations of buildings to be metered and submetered based on cost-effectiveness and a schedule of 1 or more dates, not later than 1 year after the date of issuance of the guidelines, on which the requirements specified in paragraph (1) shall take effect; and “(3) PLAN.—Not later than 6 months after the date guidelines are established under paragraph (2), in a report submitted by the agency under section 548(a), each agency shall submit to the Secretary a plan describing how the agency will implement the requirements of paragraph (1), including (A) how the agency will designate personnel primarily responsible for achieving the requirements and (B) demonstration by the agency, complete with documentation, of any finding that advanced meters or advanced metering devices, as defined in paragraph (1), are not practicable.”. (a) Requirements.—Part 3 of title V of the National Energy Conservation Policy Act (42 U.S.C. 8251 et seq.), as amended by section 101, is amended by adding at the end the following: “SEC. 553. Federal procurement of energy efficient products. “(a) Definitions.—In this section: “(1) AGENCY.—The term ‘agency’ has the meaning given that term in section 7902(a) of title 5, United States Code. “(2) ENERGY STAR PRODUCT.—The term ‘Energy Star product’ means a product that is rated for energy efficiency under an Energy Star program. “(b) Procurement of energy efficient products.— “(1) REQUIREMENT.—To meet the requirements of an agency for an energy consuming product, the head of the agency shall, except as provided in paragraph (2), procure— “(2) EXCEPTIONS.—The head of an agency is not required to procure an Energy Star product or FEMP designated product under paragraph (1) if the head of the agency finds in writing that— “(3) PROCUREMENT PLANNING.—The head of an agency shall incorporate into the specifications for all procurements involving energy consuming products and systems, including guide specifications, project specifications, and construction, renovation, and services contracts that include provision of energy consuming products and systems, and into the factors for the evaluation of offers received for the procurement, criteria for energy efficiency that are consistent with the criteria used for rating Energy Star products and for rating FEMP designated products. “(c) Listing of energy efficient products in Federal catalogs.—Energy Star products and FEMP designated products shall be clearly identified and prominently displayed in any inventory or listing of products by the General Services Administration or the Defense Logistics Agency. The General Services Administration or the Defense Logistics Agency shall supply only Energy Star products or FEMP designated products for all product categories covered by the Energy Star program or the Federal Energy Management Program, except in cases where the agency ordering a product specifies in writing that no Energy Star product or FEMP designated product is available to meet the buyer’s functional requirements, or that no Energy Star product or FEMP designated product is cost-effective for the intended application over the life of the product, taking energy cost savings into account. “(d) Specific products.— (1) In the case of electric motors of 1 to 500 horsepower, agencies shall select only premium efficient motors that meet a standard designated by the Secretary. The Secretary shall designate such a standard not later than 120 days after the date of the enactment of this section, after considering the recommendations of associated electric motor manufacturers and energy efficiency groups. “(2) All Federal agencies are encouraged to take actions to maximize the efficiency of air conditioning and refrigeration equipment, including appropriate cleaning and maintenance, including the use of any system treatment or additive that will reduce the electricity consumed by air conditioning and refrigeration equipment. Any such treatment or additive must be— “(A) determined by the Secretary to be effective in increasing the efficiency of air conditioning and refrigeration equipment without having an adverse impact on air conditioning performance (including cooling capacity) or equipment useful life; “(B) determined by the Administrator of the Environmental Protection Agency to be environmentally safe; and “(C) shown to increase seasonal energy efficiency ratio (SEER) or energy efficiency ratio (EER) when tested by the National Institute of Standards and Technology according to Department of Energy test procedures without causing any adverse impact on the system, system components, the refrigerant or lubricant, or other materials in the system. (a) Limitations.— (1) IN GENERAL.—Section 801(a)(2) of the National Energy Conservation Policy Act (42 U.S.C. 8287(a)(2)) is amended by adding at the end the following subparagraph: “(E) All Federal agencies combined may not, after the date of enactment of the Energy Policy Act of 2005, enter into more than a total of 100 contracts under this title. Payments made by the Federal Government under all contracts permitted by this subparagraph combined shall not exceed a total of $500,000,000. Each Federal agency shall appoint a coordinator for Energy Savings Performance Contracts with the responsibility to monitor the number of such contracts for that Federal agency and the investment value of each contract. The coordinators for each Federal agency shall meet monthly to ensure that the limits specified in this subparagraph on the number of contracts and the payments made for the contracts are not exceeded.”. (2) DEFINITION.—Section 804(1) of the National Energy Conservation Policy Act (42 U.S.C. 8287c(1)) is amended to read as follows: (3) VALIDITY OF CONTRACTS.—The amendments made by this subsection shall not affect the validity of contracts entered into under title VIII of the National Energy Conservation Policy Act (42 U.S.C. 8287 et seq.) before the date of enactment of this Act, or of contracts described in subsection (h). (b) Permanent extension.—Effective October 1, 2006, section 801(c) of the National Energy Conservation Policy Act (42 U.S.C. 8287(c)) is repealed. (c) Review.—Not later than 180 days after the date of the enactment of this Act, the Secretary of Energy shall complete a review of the Energy Savings Performance Contract program to identify statutory, regulatory, and administrative obstacles that prevent Federal agencies from fully utilizing the program. In addition, this review shall identify all areas for increasing program flexibility and effectiveness, including audit and measurement verification requirements, accounting for energy use in determining savings, contracting requirements, including the identification of additional qualified contractors, and energy efficiency services covered. The Secretary shall report these findings to Congress and shall implement identified administrative and regulatory changes to increase program flexibility and effectiveness to the extent that such changes are consistent with statutory authority. (d) Extension of authority.—Any energy savings performance contract entered into under section 801 of the National Energy Conservation Policy Act (42 U.S.C. 8287) after October 1, 2006, and before the date of enactment of this Act, shall be deemed to have been entered into pursuant to such section 801 as amended by subsection (a) of this section. (a) Voluntary agreements.—The Secretary of Energy is authorized to enter into voluntary agreements with 1 or more persons in industrial sectors that consume significant amounts of primary energy per unit of physical output to reduce the energy intensity of their production activities by a significant amount relative to improvements in each sector in recent years. (a) Establishment.—The Secretary of Energy, in consultation with the Administrator of General Services, shall establish an Advanced Building Efficiency Testbed program for the development, testing, and demonstration of advanced engineering systems, components, and materials to enable innovations in building technologies. The program shall evaluate efficiency concepts for government and industry buildings, and demonstrate the ability of next generation buildings to support individual and organizational productivity and health (including by improving indoor air quality) as well as flexibility and technological change to improve environmental sustainability. Such program shall complement and not duplicate existing national programs. (b) Participants.—The program established under subsection (a) shall be led by a university with the ability to combine the expertise from numerous academic fields including, at a minimum, intelligent workplaces and advanced building systems and engineering, electrical and computer engineering, computer science, architecture, urban design, and environmental and mechanical engineering. Such university shall partner with other universities and entities who have established programs and the capability of advancing innovative building efficiency technologies. (c) Authorization of appropriations.—There are authorized to be appropriated to the Secretary of Energy to carry out this section $6,000,000 for each of the fiscal years 2006 through 2008, to remain available until expended. For any fiscal year in which funds are expended under this section, the Secretary shall provide 1⁄3 of the total amount to the lead university described in subsection (b), and provide the remaining 2⁄3 to the other participants referred to in subsection (b) on an equal basis. Section 305(a) of the Energy Conservation and Production Act (42 U.S.C. 6834(a)) is amended— (1) in paragraph (2)(A), by striking “CABO Model Energy Code, 1992” and inserting “the 2003 International Energy Conservation Code”; and (2) by adding at the end the following: “(3) Revised Federal building energy efficiency performance standards.— “(A) IN GENERAL.—Not later than 1 year after the date of enactment of this paragraph, the Secretary of Energy shall establish, by rule, revised Federal building energy efficiency performance standards that require that— “(i) if life-cycle cost-effective, for new Federal buildings— “(B) ADDITIONAL REVISIONS.—Not later than 1 year after the date of approval of each subsequent revision of the ASHRAE Standard or the International Energy Conservation Code, as appropriate, the Secretary of Energy shall determine, based on the cost-effectiveness of the requirements under the amendments, whether the revised standards established under this paragraph should be updated to reflect the amendments. “(C) STATEMENT ON COMPLIANCE OF NEW BUILDINGS.—In the budget request of the Federal agency for each fiscal year and each report submitted by the Federal agency under section 548(a) of the National Energy Conservation Policy Act (42 U.S.C. 8258(a)), the head of each Federal agency shall include— (a) Repeal.—Section 3(a) of the Uniform Time Act of 1966 (15 U.S.C. 260a(a)) is amended— (a) Authorization of appropriations.—Section 2602(b) of the Low-Income Home Energy Assistance Act of 1981 (42 U.S.C. 8621(b)) is amended by striking “and $2,000,000,000 for each of fiscal years 2002 through 2004” and inserting “and $5,100,000,000 for each of fiscal years 2005 through 2007”. (b) Renewable fuels.—The Low-Income Home Energy Assistance Act of 1981 (42 U.S.C. 8621 et seq.) is amended by adding at the end the following new section: (c) Report to Congress.—The Secretary of Energy shall report to Congress on the use of renewable fuels in providing assistance under the Low-Income Home Energy Assistance Act of 1981 (42 U.S.C. 8621 et seq.). (a) Authorization of appropriations.—Section 422 of the Energy Conservation and Production Act (42 U.S.C. 6872) is amended by striking “for fiscal years 1999 through 2003 such sums as may be necessary” and inserting “$500,000,000 for fiscal year 2006, $600,000,000 for fiscal year 2007, and $700,000,000 for fiscal year 2008”. (b) Eligibility.—Section 412(7) of the Energy Conservation and Production Act (42 U.S.C. 6862(7)) is amended by striking “125 percent” both places it appears and inserting “150 percent”. (a) State energy conservation plans.—Section 362 of the Energy Policy and Conservation Act (42 U.S.C. 6322) is amended by inserting at the end the following new subsection: “(g) The Secretary shall, at least once every 3 years, invite the Governor of each State to review and, if necessary, revise the energy conservation plan of such State submitted under subsection (b) or (e). Such reviews should consider the energy conservation plans of other States within the region, and identify opportunities and actions carried out in pursuit of common energy conservation goals.”. (b) State energy efficiency goals.—Section 364 of the Energy Policy and Conservation Act (42 U.S.C. 6324) is amended to read as follows: “State energy efficiency goals “Sec. 364. Each State energy conservation plan with respect to which assistance is made available under this part on or after the date of enactment of the Energy Policy Act of 2005 shall contain a goal, consisting of an improvement of 25 percent or more in the efficiency of use of energy in the State concerned in calendar year 2012 as compared to calendar year 1990, and may contain interim goals.”. (c) Authorization of appropriations.—Section 365(f) of the Energy Policy and Conservation Act (42 U.S.C. 6325(f)) is amended by striking “for fiscal years 1999 through 2003 such sums as may be necessary” and inserting “$100,000,000 for each of the fiscal years 2006 and 2007 and $125,000,000 for fiscal year 2008”. (a) Definitions.—In this section: (1) ELIGIBLE STATE.—The term “eligible State” means a State that meets the requirements of subsection (b). (2) ENERGY STAR PROGRAM.—The term “Energy Star program” means the program established by section 324A of the Energy Policy and Conservation Act. (3) RESIDENTIAL ENERGY STAR PRODUCT.—The term “residential Energy Star product” means a product for a residence that is rated for energy efficiency under the Energy Star program. (5) STATE ENERGY OFFICE.—The term “State energy office” means the State agency responsible for developing State energy conservation plans under section 362 of the Energy Policy and Conservation Act (42 U.S.C. 6322). (b) Eligible States.—A State shall be eligible to receive an allocation under subsection (c) if the State— (1) establishes (or has established) a State energy efficient appliance rebate program to provide rebates to residential consumers for the purchase of residential Energy Star products to replace used appliances of the same type; (c) Amount of allocations.— (1) IN GENERAL.—Subject to paragraph (2), for each fiscal year, the Secretary shall allocate to the State energy office of each eligible State to carry out subsection (d) an amount equal to the product obtained by multiplying the amount made available under subsection (f) for the fiscal year by the ratio that the population of the State in the most recent calendar year for which data are available bears to the total population of all eligible States in that calendar year. (d) Use of allocated funds.—The allocation to a State energy office under subsection (c) may be used to pay up to 50 percent of the cost of establishing and carrying out a State program. (e) Issuance of rebates.—Rebates may be provided to residential consumers that meet the requirements of the State program. The amount of a rebate shall be determined by the State energy office, taking into consideration— (2) the amount of any Federal or State tax incentive available for the purchase of the residential Energy Star product; and (3) the difference between the cost of the residential Energy Star product and the cost of an appliance that is not a residential Energy Star product, but is of the same type as, and is the nearest capacity, performance, and other relevant characteristics (as determined by the State energy office) to, the residential Energy Star product. (a) Grants.—The Secretary of Energy may make grants to the State agency responsible for developing State energy conservation plans under section 362 of the Energy Policy and Conservation Act (42 U.S.C. 6322), or, if no such agency exists, a State agency designated by the Governor of the State, to assist units of local government in the State in improving the energy efficiency of public buildings and facilities— (1) through construction of new energy efficient public buildings that use at least 30 percent less energy than a comparable public building constructed in compliance with standards prescribed in the most recent version of the International Energy Conservation Code, or a similar State code intended to achieve substantially equivalent efficiency levels; or (a) Grants.—The Secretary of Energy is authorized to make grants to units of local government, private, non-profit community development organizations, and Indian tribe economic development entities to improve energy efficiency; identify and develop alternative, renewable, and distributed energy supplies; and increase energy conservation in low income rural and urban communities. (b) Purpose of grants.—The Secretary may make grants on a competitive basis for— (3) studies and other activities that improve energy efficiency in low income rural and urban communities; (c) Definition.—For purposes of this section, the term “Indian tribe” means any Indian tribe, band, nation, or other organized group or community, including any Alaskan Native village or regional or village corporation as defined in or established pursuant to the Alaska Native Claims Settlement Act (43 U.S.C. 1601 et seq.), that is recognized as eligible for the special programs and services provided by the United States to Indians because of their status as Indians. (a) Amendment.—The Energy Policy and Conservation Act (42 U.S.C. 6201 et seq.) is amended by inserting the following after section 324: “SEC. 324A. Energy Star Program. “There is established at the Department of Energy and the Environmental Protection Agency a voluntary program to identify and promote energy-efficient products and buildings in order to reduce energy consumption, improve energy security, and reduce pollution through voluntary labeling of or other forms of communication about products and buildings that meet the highest energy efficiency standards. Responsibilities under the program shall be divided between the Department of Energy and the Environmental Protection Agency consistent with the terms of agreements between the 2 agencies. The Administrator and the Secretary shall— “(1) promote Energy Star compliant technologies as the preferred technologies in the marketplace for achieving energy efficiency and to reduce pollution; “(2) work to enhance public awareness of the Energy Star label, including special outreach to small businesses; “(4) solicit comments from interested parties prior to establishing or revising an Energy Star product category, specification, or criterion (or effective dates for any of the foregoing); “(5) upon adoption of a new or revised product category, specification, or criterion, provide reasonable notice to interested parties of any changes (including effective dates) in product categories, specifications, or criteria along with an explanation of such changes and, where appropriate, responses to comments submitted by interested parties; and “(6) provide appropriate lead time (which shall be 9 months, unless the Agency or Department determines otherwise) prior to the effective date for a new or a significant revision to a product category, specification, or criterion, taking into account the timing requirements of the manufacturing, product marketing, and distribution process for the specific product addressed.”. Section 337 of the Energy Policy and Conservation Act (42 U.S.C. 6307) is amended by adding at the end the following: “(c) HVAC maintenance.—For the purpose of ensuring that installed air conditioning and heating systems operate at their maximum rated efficiency levels, the Secretary shall, not later than 180 days after the date of enactment of this subsection, carry out a program to educate homeowners and small business owners concerning the energy savings resulting from properly conducted maintenance of air conditioning, heating, and ventilating systems. The Secretary shall carry out the program in a cost-shared manner in cooperation with the Administrator of the Environmental Protection Agency and such other entities as the Secretary considers appropriate, including industry trade associations, industry members, and energy efficiency organizations. “(d) Small business education and assistance.—The Administrator of the Small Business Administration, in consultation with the Secretary of Energy and the Administrator of the Environmental Protection Agency, shall develop and coordinate a Government-wide program, building on the existing Energy Star for Small Business Program, to assist small businesses to become more energy efficient, understand the cost savings obtainable through efficiencies, and identify financing options for energy efficiency upgrades. The Secretary and the Administrator of the Small Business Administration shall make the program information available directly to small businesses and through other Federal agencies, including the Federal Emergency Management Program and the Department of Agriculture.”. (a) Definitions.—Section 321 of the Energy Policy and Conservation Act (42 U.S.C. 6291) is amended— (1) in paragraph (30)(S), by striking the period and adding at the end the following: “but does not include any lamp specifically designed to be used for special purpose applications and that is unlikely to be used in general purpose applications such as those described in subparagraph (D), and also does not include any lamp not described in subparagraph (D) that is excluded by the Secretary, by rule, because the lamp is designed for special applications and is unlikely to be used in general purpose applications.”; and (2) by adding at the end the following: “(32) The term ‘battery charger’ means a device that charges batteries for consumer products and includes battery chargers embedded in other consumer products. “(33) The term ‘commercial refrigerators, freezers, and refrigerator-freezers’ means refrigerators, freezers, or refrigerator-freezers that— “(34) The term ‘external power supply’ means an external power supply circuit that is used to convert household electric current into either DC current or lower-voltage AC current to operate a consumer product. “(36) (A) Except as provided in subparagraph (B), the term ‘distribution transformer’ means a transformer that—
“(B) The term ‘distribution transformer’ does not include— “(i) transformers with multiple voltage taps, with the highest voltage tap equaling at least 20 percent more than the lowest voltage tap; “(ii) transformers, such as those commonly known as drive transformers, rectifier transformers, auto-transformers, Uninterruptible Power System transformers, impedance transformers, regulating transformers, sealed and nonventilating transformers, machine tool transformers, welding transformers, grounding transformers, or testing transformers, that are designed to be used in a special purpose application and are unlikely to be used in general purpose applications; or “(37) The term ‘low-voltage dry-type distribution transformer’ means a distribution transformer that— “(38) The term ‘standby mode’ means the lowest power consumption mode that— “(B) may persist for an indefinite time when an appliance is connected to the main electricity supply and used in accordance with the manufacturer’s instructions, as defined on an individual product basis by the Secretary. “(39) The term ‘torchiere’ means a portable electric lamp with a reflector bowl that directs light upward so as to give indirect illumination. “(40) The term ‘traffic signal module’ means a standard 8-inch (200mm) or 12-inch (300mm) traffic signal indication, consisting of a light source, a lens, and all other parts necessary for operation, that communicates movement messages to drivers through red, amber, and green colors. “(41) The term ‘transformer’ means a device consisting of 2 or more coils of insulated wire that transfers alternating current by electromagnetic induction from 1 coil to another to change the original voltage or current value. “(42) The term ‘unit heater’ means a self-contained fan-type heater designed to be installed within the heated space, except that such term does not include a warm air furnace. “(43) The term ‘ceiling fan’ means a non-portable device that is suspended from a ceiling for circulating air via the rotation of fan blades. (b) Test procedures.—Section 323 of the Energy Policy and Conservation Act (42 U.S.C. 6293) is amended— (1) in subsection (b), by adding at the end the following: “(9) Test procedures for illuminated exit signs shall be based on the test method used under Version 2.0 of the Energy Star program of the Environmental Protection Agency for illuminated exit signs. “(10) Test procedures for distribution transformers and low voltage dry-type distribution transformers shall be based on the ‘Standard Test Method for Measuring the Energy Consumption of Distribution Transformers’ prescribed by the National Electrical Manufacturers Association (NEMA TP 2–1998). The Secretary may review and revise this test procedure. For purposes of section 346(a), this test procedure shall be deemed to be testing requirements prescribed by the Secretary under section 346(a)(1) for distribution transformers for which the Secretary makes a determination that energy conservation standards would be technologically feasible and economically justified, and would result in significant energy savings. “(11) Test procedures for traffic signal modules shall be based on the test method used under the Energy Star program of the Environmental Protection Agency for traffic signal modules, as in effect on the date of enactment of this paragraph. “(12) Test procedures for medium base compact fluorescent lamps shall be based on the test methods used under the August 9, 2001, version of the Energy Star program of the Environmental Protection Agency and Department of Energy for compact fluorescent lamps. Covered products shall meet all test requirements for regulated parameters in section 325(bb). However, covered products may be marketed prior to completion of lamp life and lumen maintenance at 40 percent of rated life testing provided manufacturers document engineering predictions and analysis that support expected attainment of lumen maintenance at 40 percent rated life and lamp life time. (2) by adding at the end the following: “(f) Additional consumer and commercial products.—The Secretary shall, not later than 24 months after the date of enactment of this subsection, prescribe testing requirements for suspended ceiling fans, refrigerated bottled or canned beverage vending machines, and commercial refrigerators, freezers, and refrigerator-freezers. Such testing requirements shall be based on existing test procedures used in industry to the extent practical and reasonable. In the case of suspended ceiling fans, such test procedures shall include efficiency at both maximum output and at an output no more than 50 percent of the maximum output.”. (c) New standards.—Section 325 of the Energy Policy and Conservation Act (42 U.S.C. 6295) is amended by adding at the end the following: “(u) Battery charger and external power supply electric energy consumption.— “(1) INITIAL RULEMAKING.— (A) The Secretary shall, within 18 months after the date of enactment of this subsection, prescribe by notice and comment, definitions and test procedures for the power use of battery chargers and external power supplies. In establishing these test procedures, the Secretary shall consider, among other factors, existing definitions and test procedures used for measuring energy consumption in standby mode and other modes and assess the current and projected future market for battery chargers and external power supplies. This assessment shall include estimates of the significance of potential energy savings from technical improvements to these products and suggested product classes for standards. Prior to the end of this time period, the Secretary shall hold a scoping workshop to discuss and receive comments on plans for developing energy conservation standards for energy use for these products. “(B) The Secretary shall, within 3 years after the date of enactment of this subsection, issue a final rule that determines whether energy conservation standards shall be issued for battery chargers and external power supplies or classes thereof. For each product class, any such standards shall be set at the lowest level of energy use that— “(2) REVIEW OF STANDBY ENERGY USE IN COVERED PRODUCTS.—In determining pursuant to section 323 whether test procedures and energy conservation standards pursuant to this section should be revised, the Secretary shall consider, for covered products that are major sources of standby mode energy consumption, whether to incorporate standby mode into such test procedures and energy conservation standards, taking into account, among other relevant factors, standby mode power consumption compared to overall product energy consumption. “(3) RULEMAKING.—The Secretary shall not propose a standard under this section unless the Secretary has issued applicable test procedures for each product pursuant to section 323. “(v) Suspended ceiling fans, vending machines, and commercial refrigerators, freezers, and refrigerator-Freezers.—The Secretary shall not later than 36 months after the date on which testing requirements are prescribed by the Secretary pursuant to section 323(f), prescribe, by rule, energy conservation standards for suspended ceiling fans, refrigerated bottled or canned beverage vending machines, and commercial refrigerators, freezers, and refrigerator-freezers. In establishing standards under this subsection, the Secretary shall use the criteria and procedures contained in subsections (o) and (p). Any standard prescribed under this subsection shall apply to products manufactured 3 years after the date of publication of a final rule establishing such standard. “(w) Illuminated exit signs.—Illuminated exit signs manufactured on or after January 1, 2006, shall meet the Version 2.0 Energy Star Program performance requirements for illuminated exit signs prescribed by the Environmental Protection Agency. “(y) Low voltage dry-type Distribution Transformers.—The efficiency of low voltage dry-type distribution transformers manufactured on or after January 1, 2006, shall be the Class I Efficiency Levels for distribution transformers specified in Table 4-2 of the ‘Guide for Determining Energy Efficiency for Distribution Transformers’ published by the National Electrical Manufacturers Association (NEMA TP–1–2002). “(z) Traffic signal modules.—Traffic signal modules manufactured on or after January 1, 2006, shall meet the performance requirements used under the Energy Star program of the Environmental Protection Agency for traffic signals, as in effect on the date of enactment of this subsection, and shall be installed with compatible, electrically connected signal control interface devices and conflict monitoring systems. “(aa) Unit heaters.—Unit heaters manufactured on or after the date that is 3 years after the date of enactment of this subsection shall be equipped with an intermittent ignition device and shall have either power venting or an automatic flue damper. “(bb) Medium base compact fluorescent lamps.—Bare lamp and covered lamp (no reflector) medium base compact fluorescent lamps manufactured on or after January 1, 2006, shall meet the following requirements prescribed by the August 9, 2001, version of the Energy Star Program Requirements for Compact Fluorescent Lamps, Energy Star Eligibility Criteria, Energy-Efficiency Specification issued by the Environmental Protection Agency and Department of Energy: minimum initial efficacy; lumen maintenance at 1000 hours; lumen maintenance at 40 percent of rated life; rapid cycle stress test; and lamp life. The Secretary may, by rule, establish requirements for color quality (CRI); power factor; operating frequency; and maximum allowable start time based on the requirements prescribed by the August 9, 2001, version of the Energy Star Program Requirements for Compact Fluorescent Lamps. The Secretary may, by rule, revise these requirements or establish other requirements considering energy savings, cost effectiveness, and consumer satisfaction. “(cc) Effective date.—Section 327 shall apply— “(1) to products for which standards are to be established under subsections (u) and (v) on the date on which a final rule is issued by the Department of Energy, except that any State or local standards prescribed or enacted for any such product prior to the date on which such final rule is issued shall not be preempted until the standard established under subsection (u) or (v) for that product takes effect; and “(2) to products for which standards are established under subsections (w) through (bb) on the date of enactment of those subsections, except that any State or local standards prescribed or enacted prior to the date of enactment of those subsections shall not be preempted until the standards established under subsections (w) through (bb) take effect. “(dd) Ceiling fans.— “(1) FEATURES.—All ceiling fans manufactured on or after January 1, 2006, shall have the following features: “(C) The capability of reversible fan action, except for fans sold for industrial applications, outdoor applications, and where safety standards would be violated by the use of the reversible mode. The Secretary may promulgate regulations to define in greater detail the exceptions provided under this subparagraph but may not substantively expand the exceptions. “(2) REVISED STANDARDS.— “(A) IN GENERAL.—Notwithstanding any provision of this Act, if the requirements of subsections (o) and (p) are met, the Secretary may consider and prescribe energy efficiency or energy use standards for electricity used by ceiling fans to circulate air in a room. (d) Residential furnace fans.—Section 325(f)(3) of the Energy Policy and Conservation Act (42 U.S.C. 6295(f)(3)) is amended by adding the following new subparagraph at the end: (a) Rulemaking on effectiveness of consumer product labeling.—Section 324(a)(2) of the Energy Policy and Conservation Act (42 U.S.C. 6294(a)(2)) is amended by adding at the end the following: “(F) Not later than 3 months after the date of enactment of this subparagraph, the Commission shall initiate a rulemaking to consider the effectiveness of the current consumer products labeling program in assisting consumers in making purchasing decisions and improving energy efficiency and to consider changes to the labeling rules that would improve the effectiveness of consumer product labels. Such rulemaking shall be completed not later than 2 years after the date of enactment of this subparagraph. (b) Rulemaking on labeling for additional products.—Section 324(a) of the Energy Policy and Conservation Act (42 U.S.C. 6294(a)) is further amended by adding at the end the following: “(5) The Secretary or the Commission, as appropriate, may, for covered products referred to in subsections (u) through (aa) of section 325, prescribe, by rule, pursuant to this section, labeling requirements for such products after a test procedure has been set pursuant to section 323. In the case of products to which TP–1 standards under section 325(y) apply, labeling requirements shall be based on the ‘Standard for the Labeling of Distribution Transformer Efficiency’ prescribed by the National Electrical Manufacturers Association (NEMA TP–3) as in effect upon the date of enactment of this paragraph.”. Section 327 of the Energy Policy and Conservation Act (42 U.S.C. 6297) is amended by adding at the end the following: Section 327 of the Energy Policy and Conservation Act (42 U.S.C. 6297) is amended by adding at the end the following new subsection: “(h) Limitation on preemption.—Subsections (a) and (b) shall not apply with respect to State regulation of energy consumption or water use of any covered product during any period of time— Section 251(b)(1) of the National Energy Conservation Policy Act (42 U.S.C. 8231(1)) is amended— (2) by inserting after “1959,” the following: “which are eligible multifamily housing projects (as such term is defined in section 512 of the Multifamily Assisted Housing Reform and Affordability Act of 1997 (42 U.S.C. 1437f note)) and are subject to mortgage restructuring and rental assistance sufficiency plans under such Act,”; and (3) by inserting after the period at the end of the first sentence the following new sentence: “Such improvements may also include the installation of energy and water conserving fixtures and fittings that conform to the American Society of Mechanical Engineers/American National Standards Institute standards A112.19.2-1998 and A112.18.1-2000, or any revision thereto, applicable at the time of installation.”. In purchasing appliances, a public housing agency shall purchase energy-efficient appliances that are Energy Star products or FEMP-designated products, as such terms are defined in section 553 of the National Energy Conservation Policy Act (as amended by this title), unless the purchase of energy-efficient appliances is not cost-effective to the agency. The Secretary of Housing and Urban Development shall develop and implement an integrated strategy to reduce utility expenses through cost-effective energy conservation and efficiency measures and energy efficient design and construction of public and assisted housing. The energy strategy shall include the development of energy reduction goals and incentives for public housing agencies. The Secretary shall submit a report to Congress, not later than 1 year after the date of the enactment of this Act, on the energy strategy and the actions taken by the Department of Housing and Urban Development to monitor the energy usage of public housing agencies and shall submit an update every 2 years thereafter on progress in implementing the strategy. (a) Resource assessment.—Not later than 6 months after the date of enactment of this Act, and each year thereafter, the Secretary of Energy shall review the available assessments of renewable energy resources within the United States, including solar, wind, biomass, ocean (tidal, wave, current, and thermal), geothermal, and hydroelectric energy resources, and undertake new assessments as necessary, taking into account changes in market conditions, available technologies, and other relevant factors. (b) Contents of reports.—Not later than 1 year after the date of enactment of this Act, and each year thereafter, the Secretary shall publish a report based on the assessment under subsection (a). The report shall contain— (1) a detailed inventory describing the available amount and characteristics of the renewable energy resources; and (2) such other information as the Secretary believes would be useful in developing such renewable energy resources, including descriptions of surrounding terrain, population and load centers, nearby energy infrastructure, location of energy and water resources, and available estimates of the costs needed to develop each resource, together with an identification of any barriers to providing adequate transmission for remote sources of renewable energy resources to current and emerging markets, recommendations for removing or addressing such barriers, and ways to provide access to the grid that do not unfairly disadvantage renewable or other energy producers. (a) Incentive payments.—Section 1212(a) of the Energy Policy Act of 1992 (42 U.S.C. 13317(a)) is amended by striking “and which satisfies” and all that follows through “Secretary shall establish.” and inserting “. If there are insufficient appropriations to make full payments for electric production from all qualified renewable energy facilities in any given year, the Secretary shall assign 60 percent of appropriated funds for that year to facilities that use solar, wind, geothermal, or closed-loop (dedicated energy crops) biomass technologies to generate electricity, and assign the remaining 40 percent to other projects. The Secretary may, after transmitting to Congress an explanation of the reasons therefor, alter the percentage requirements of the preceding sentence.”. (b) Qualified renewable energy facility.—Section 1212(b) of the Energy Policy Act of 1992 (42 U.S.C. 13317(b)) is amended— (1) by striking “a State or any political” and all that follows through “nonprofit electrical cooperative” and inserting “a not-for-profit electric cooperative, a public utility described in section 115 of the Internal Revenue Code of 1986, a State, Commonwealth, territory, or possession of the United States or the District of Columbia, or a political subdivision thereof, or an Indian tribal government or subdivision thereof,”; and (c) Eligibility window.—Section 1212(c) of the Energy Policy Act of 1992 (42 U.S.C. 13317(c)) is amended by striking “during the 10-fiscal year period beginning with the first full fiscal year occurring after the enactment of this section” and inserting “after October 1, 2005, and before October 1, 2015”. (d) Amount of payment.—Section 1212(e)(1) of the Energy Policy Act of 1992 (42 U.S.C. 13317(e)(1)) is amended by inserting “landfill gas, livestock methane, ocean (tidal, wave, current, and thermal),” after “wind, biomass,”. (e) Sunset.—Section 1212(f) of the Energy Policy Act of 1992 (42 U.S.C. 13317(f)) is amended by striking “the expiration of” and all that follows through “of this section” and inserting “September 30, 2025”. (f) Authorization of appropriations.—Section 1212(g) of the Energy Policy Act of 1992 (42 U.S.C. 13317(g)) is amended to read as follows: (a) Requirement.—The President, acting through the Secretary of Energy, shall seek to ensure that, to the extent economically feasible and technically practicable, of the total amount of electric energy the Federal Government consumes during any fiscal year, the following amounts shall be renewable energy: (b) Definitions.—In this section: (1) BIOMASS.—The term “biomass” means any solid, nonhazardous, cellulosic material that is derived from— (A) any of the following forest-related resources: mill residues, precommercial thinnings, slash, and brush, or nonmerchantable material; (B) solid wood waste materials, including waste pallets, crates, dunnage, manufacturing and construction wood wastes (other than pressure-treated, chemically-treated, or painted wood wastes), and landscape or right-of-way tree trimmings, but not including municipal solid waste (garbage), gas derived from the biodegradation of solid waste, or paper that is commonly recycled; (2) RENEWABLE ENERGY.—The term “renewable energy” means electric energy generated from solar, wind, biomass, landfill gas, ocean (tidal, wave, current, and thermal), geothermal, municipal solid waste, or new hydroelectric generation capacity achieved from increased efficiency or additions of new capacity at an existing hydroelectric project. Section 604 of the Act entitled “An Act to authorize appropriations for certain insular areas of the United States, and for other purposes”, approved December 24, 1980 (48 U.S.C. 1492), is amended— (2) by adding at the end of subsection (a) the following new paragraphs: “(5) electric power transmission and distribution lines in insular areas are inadequate to withstand damage caused by the hurricanes and typhoons which frequently occur in insular areas and such damage often costs millions of dollars to repair; and “(6) the refinement of renewable energy technologies since the publication of the 1982 Territorial Energy Assessment prepared pursuant to subsection (c) reveals the need to reassess the state of energy production, consumption, infrastructure, reliance on imported energy, opportunities for energy conservation and increased energy efficiency, and indigenous sources in regard to the insular areas.”; (3) by amending subsection (e) to read as follows: “(e) (1) The Secretary of the Interior, in consultation with the Secretary of Energy and the head of government of each insular area, shall update the plans required under subsection (c) by—
(4) by amending subsection (g)(4) to read as follows: “(4) POWER LINE GRANTS FOR INSULAR AREAS.— “(A) IN GENERAL.—The Secretary of the Interior is authorized to make grants to governments of insular areas of the United States to carry out eligible projects to protect electric power transmission and distribution lines in such insular areas from damage caused by hurricanes and typhoons. “(B) ELIGIBLE PROJECTS.—The Secretary may award grants under subparagraph (A) only to governments of insular areas of the United States that submit written project plans to the Secretary for projects that meet the following criteria: “(i) The project is designed to protect electric power transmission and distribution lines located in 1 or more of the insular areas of the United States from damage caused by hurricanes and typhoons. “(ii) The project is likely to substantially reduce the risk of future damage, hardship, loss, or suffering. “(iii) The project addresses 1 or more problems that have been repetitive or that pose a significant risk to public health and safety. “(iv) The project is not likely to cost more than the value of the reduction in direct damage and other negative impacts that the project is designed to prevent or mitigate. The cost benefit analysis required by this criterion shall be computed on a net present value basis. “(v) The project design has taken into consideration long-term changes to the areas and persons it is designed to protect and has manageable future maintenance and modification requirements. “(C) PRIORITY.—When making grants under this paragraph, the Secretary shall give priority to grants for projects which are likely to— “(D) MATCHING REQUIREMENT.—The Federal share of the cost for a project for which a grant is provided under this paragraph shall not exceed 75 percent of the total cost of that project. The non-Federal share of the cost may be provided in the form of cash or services. (a) In General.—Part 4 of title V of the National Energy Conservation Policy Act (42 U.S.C. 8271 et seq.) is amended by adding at the end the following: “SEC. 570. Use of photovoltaic energy in public buildings. “(a) Photovoltaic energy commercialization program.— “(1) IN GENERAL.—The Secretary may establish a photovoltaic energy commercialization program for the procurement and installation of photovoltaic solar electric systems for electric production in new and existing public buildings. “(2) PURPOSES.—The purposes of the program shall be to accomplish the following: “(A) To accelerate the growth of a commercially viable photovoltaic industry to make this energy system available to the general public as an option which can reduce the national consumption of fossil fuel. “(C) To attain the goal of installing solar energy systems in 20,000 Federal buildings by 2010, as contained in the Federal Government’s Million Solar Roof Initiative of 1997. “(3) ACQUISITION OF PHOTOVOLTAIC SOLAR ELECTRIC SYSTEMS.— “(b) Photovoltaic systems evaluation program.— (a) Findings.—Congress finds the following: (1) Thousands of communities in the United States, many located near Federal lands, are at risk to wildfire. Approximately 190,000,000 acres of land managed by the Secretary of Agriculture and the Secretary of the Interior are at risk of catastrophic fire in the near future. The accumulation of heavy forest fuel loads continues to increase as a result of disease, insect infestations, and drought, further raising the risk of fire each year. (2) In addition, more than 70,000,000 acres across all land ownerships are at risk to higher than normal mortality over the next 15 years from insect infestation and disease. High levels of tree mortality from insects and disease result in increased fire risk, loss of old growth, degraded watershed conditions, and changes in species diversity and productivity, as well as diminished fish and wildlife habitat and decreased timber values. (3) Preventive treatments such as removing fuel loading, ladder fuels, and hazard trees, planting proper species mix and restoring and protecting early successional habitat, and other specific restoration treatments designed to reduce the susceptibility of forest land, woodland, and rangeland to insect outbreaks, disease, and catastrophic fire present the greatest opportunity for long-term forest health by creating a mosaic of species-mix and age distribution. Such prevention treatments are widely acknowledged to be more successful and cost effective than suppression treatments in the case of insects, disease, and fire. (4) The byproducts of preventive treatment (wood, brush, thinnings, chips, slash, and other hazardous fuels) removed from forest lands, woodlands and rangelands represent an abundant supply of biomass for biomass-to-energy facilities and raw material for business. There are currently few markets for the extraordinary volumes of byproducts being generated as a result of the necessary large-scale preventive treatment activities. (b) Definitions.—In this section: (1) BIOMASS.—The term “biomass” means trees and woody plants, including limbs, tops, needles, and other woody parts, and byproducts of preventive treatment, such as wood, brush, thinnings, chips, and slash, that are removed— (2) INDIAN TRIBE.—The term “Indian tribe” has the meaning given the term in section 4(e) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450b(e)). (3) PERSON.—The term “person” includes— (c) Biomass commercial use grant program.— (1) IN GENERAL.—The Secretary concerned may make grants to any person that owns or operates a facility that uses biomass as a raw material to produce electric energy, sensible heat, transportation fuels, or substitutes for petroleum-based products to offset the costs incurred to purchase biomass for use by such facility. (2) GRANT AMOUNTS.—A grant under this subsection may not exceed $20 per green ton of biomass delivered. (3) MONITORING OF GRANT RECIPIENT ACTIVITIES.—As a condition of a grant under this subsection, the grant recipient shall keep such records as the Secretary concerned may require to fully and correctly disclose the use of the grant funds and all transactions involved in the purchase of biomass. Upon notice by a representative of the Secretary concerned, the grant recipient shall afford the representative reasonable access to the facility that purchases or uses biomass and an opportunity to examine the inventory and records of the facility. (d) Improved biomass use grant program.— (1) IN GENERAL.—The Secretary concerned may make grants to persons to offset the cost of projects to develop or research opportunities to improve the use of, or add value to, biomass. In making such grants, the Secretary concerned shall give preference to persons in preferred communities. (2) SELECTION.—The Secretary concerned shall select a grant recipient under paragraph (1) after giving consideration to the anticipated public benefits of the project, including the potential to develop thermal or electric energy resources or affordable energy, opportunities for the creation or expansion of small businesses and micro-businesses, and the potential for new job creation. (e) Authorization of appropriations.—There are authorized to be appropriated $50,000,000 for each of the fiscal years 2006 through 2016 to carry out this section. (f) Report.—Not later than October 1, 2012, the Secretary of Agriculture, in consultation with the Secretary of the Interior, shall submit to the Committee on Energy and Natural Resources and the Committee on Agriculture, Nutrition, and Forestry of the Senate and the Committee on Resources, the Committee on Energy and Commerce, and the Committee on Agriculture of the House of Representatives a report describing the results of the grant programs authorized by this section. The report shall include the following: (1) An identification of the size, type, and the use of biomass by persons that receive grants under this section. Section 9002(c)(1) of the Farm Security and Rural Investment Act of 2002 (7 U.S.C. 8102(c)(1)) is amended by inserting “or such items that comply with the regulations issued under section 103 of Public Law 100–556 (42 U.S.C. 6914b–1)” after “practicable”. (a) Weatherization Assistance.—Section 415(c) of the Energy Conservation and Production Act (42 U.S.C. 6865(c)) is amended— (2) in paragraph (3), by striking “$2,500 per dwelling unit average provided in paragraph (1)” and inserting “dwelling unit averages provided in paragraphs (1) and (4)”; and (3) by adding at the end the following new paragraphs: “(4) The expenditure of financial assistance provided under this part for labor, weatherization materials, and related matters for a renewable energy system shall not exceed an average of $3,000 per dwelling unit. “(5) (A) The Secretary shall by regulations—
“(B) The Secretary shall make a final determination with respect to any request filed under subparagraph (A)(ii) within 1 year after the filing of the request, together with any information required to be filed with such request under subparagraph (A)(ii). “(C) Each month the Secretary shall publish a report of any request under subparagraph (A)(ii) which has been denied during the preceding month and the reasons for the denial. “(D) The Secretary shall not specify any form of renewable energy under paragraph (6)(A)(i)(I) unless the Secretary determines that— “(6) In this subsection— “(A) the term ‘renewable energy system’ means a system which— “(i) when installed in connection with a dwelling, transmits or uses— “(ii) meets the performance and quality standards (if any) which have been prescribed by the Secretary by regulations; “(B) the term ‘biomass’ means any organic matter that is available on a renewable or recurring basis, including agricultural crops and trees, wood and wood wastes and residues, plants (including aquatic plants), grasses, residues, fibers, and animal wastes, municipal wastes, and other waste materials.”. (b) District heating and cooling programs.—Section 172 of the Energy Policy Act of 1992 (42 U.S.C. 13451 note) is amended— (1) in subsection (a)— (C) by adding at the end the following new paragraph: “(5) evaluate the use of renewable energy systems (as such term is defined in section 415(c) of the Energy Conservation and Production Act (42 U.S.C. 6865(c))) in residential buildings.”; and (c) Definition of biomass.—Section 203(2) of the Biomass Energy and Alcohol Fuels Act of 1980 (42 U.S.C. 8802(2)) is amended to read as follows: “(2) The term ‘biomass’ means any organic matter that is available on a renewable or recurring basis, including agricultural crops and trees, wood and wood wastes and residues, plants (including aquatic plants), grasses, residues, fibers, and animal wastes, municipal wastes, and other waste materials.”. (d) Rebate program.— (1) ESTABLISHMENT.—The Secretary of Energy shall establish a program providing rebates for consumers for expenditures made for the installation of a renewable energy system in connection with a dwelling unit or small business. (2) AMOUNT OF REBATE.—Rebates provided under the program established under paragraph (1) shall be in an amount not to exceed the lesser of— (3) DEFINITION.—For purposes of this subsection, the term “renewable energy system” has the meaning given that term in section 415(c)(6)(A) of the Energy Conservation and Production Act (42 U.S.C. 6865(c)(6)(A)), as added by subsection (a)(3) of this section. (a) Federal reservations.—Section 4(e) of the Federal Power Act (16 U.S.C. 797(e)) is amended by inserting after “adequate protection and utilization of such reservation.” at the end of the first proviso the following: “The license applicant shall be entitled to a determination on the record, after opportunity for an expedited agency trial-type hearing of any disputed issues of material fact, with respect to such conditions. Such hearing may be conducted in accordance with procedures established by agency regulation in consultation with the Federal Energy Regulatory Commission.”. (b) Fishways.—Section 18 of the Federal Power Act (16 U.S.C. 811) is amended by inserting after “and such fishways as may be prescribed by the Secretary of Commerce.” the following: “The license applicant shall be entitled to a determination on the record, after opportunity for an expedited agency trial-type hearing of any disputed issues of material fact, with respect to such fishways. Such hearing may be conducted in accordance with procedures established by agency regulation in consultation with the Federal Energy Regulatory Commission.”. (c) Alternative conditions and prescriptions.—Part I of the Federal Power Act (16 U.S.C. 791a et seq.) is amended by adding the following new section at the end thereof: “SEC. 33. Alternative conditions and prescriptions. “(a) Alternative conditions.— (1) Whenever any person applies for a license for any project works within any reservation of the United States, and the Secretary of the department under whose supervision such reservation falls (referred to in this subsection as ‘the Secretary’) deems a condition to such license to be necessary under the first proviso of section 4(e), the license applicant may propose an alternative condition. “(2) Notwithstanding the first proviso of section 4(e), the Secretary shall accept the proposed alternative condition referred to in paragraph (1), and the Commission shall include in the license such alternative condition, if the Secretary determines, based on substantial evidence provided by the license applicant or otherwise available to the Secretary, that such alternative condition— “(3) The Secretary shall submit into the public record of the Commission proceeding with any condition under section 4(e) or alternative condition it accepts under this section, a written statement explaining the basis for such condition, and reason for not accepting any alternative condition under this section. The written statement must demonstrate that the Secretary gave equal consideration to the effects of the condition adopted and alternatives not accepted on energy supply, distribution, cost, and use; flood control; navigation; water supply; and air quality (in addition to the preservation of other aspects of environmental quality); based on such information as may be available to the Secretary, including information voluntarily provided in a timely manner by the applicant and others. The Secretary shall also submit, together with the aforementioned written statement, all studies, data, and other factual information available to the Secretary and relevant to the Secretary’s decision. “(4) Nothing in this section shall prohibit other interested parties from proposing alternative conditions. “(5) If the Secretary does not accept an applicant’s alternative condition under this section, and the Commission finds that the Secretary’s condition would be inconsistent with the purposes of this part, or other applicable law, the Commission may refer the dispute to the Commission’s Dispute Resolution Service. The Dispute Resolution Service shall consult with the Secretary and the Commission and issue a non-binding advisory within 90 days. The Secretary may accept the Dispute Resolution Service advisory unless the Secretary finds that the recommendation will not provide for the adequate protection and utilization of the reservation. The Secretary shall submit the advisory and the Secretary’s final written determination into the record of the Commission’s proceeding. “(b) Alternative prescriptions.— (1) Whenever the Secretary of the Interior or the Secretary of Commerce prescribes a fishway under section 18, the license applicant or licensee may propose an alternative to such prescription to construct, maintain, or operate a fishway. “(2) Notwithstanding section 18, the Secretary of the Interior or the Secretary of Commerce, as appropriate, shall accept and prescribe, and the Commission shall require, the proposed alternative referred to in paragraph (1), if the Secretary of the appropriate department determines, based on substantial evidence provided by the licensee or otherwise available to the Secretary, that such alternative— “(3) The Secretary concerned shall submit into the public record of the Commission proceeding with any prescription under section 18 or alternative prescription it accepts under this section, a written statement explaining the basis for such prescription, and reason for not accepting any alternative prescription under this section. The written statement must demonstrate that the Secretary gave equal consideration to the effects of the condition adopted and alternatives not accepted on energy supply, distribution, cost, and use; flood control; navigation; water supply; and air quality (in addition to the preservation of other aspects of environmental quality); based on such information as may be available to the Secretary, including information voluntarily provided in a timely manner by the applicant and others. The Secretary shall also submit, together with the aforementioned written statement, all studies, data, and other factual information available to the Secretary and relevant to the Secretary’s decision. “(4) Nothing in this section shall prohibit other interested parties from proposing alternative prescriptions. “(5) If the Secretary concerned does not accept an applicant’s alternative prescription under this section, and the Commission finds that the Secretary’s prescription would be inconsistent with the purposes of this part, or other applicable law, the Commission may refer the dispute to the Commission’s Dispute Resolution Service. The Dispute Resolution Service shall consult with the Secretary and the Commission and issue a non-binding advisory within 90 days. The Secretary may accept the Dispute Resolution Service advisory unless the Secretary finds that the recommendation will be less protective than the fishway initially prescribed by the Secretary. The Secretary shall submit the advisory and the Secretary’s final written determination into the record of the Commission’s proceeding.”. (a) Incentive payments.—For electric energy generated and sold by a qualified hydroelectric facility during the incentive period, the Secretary of Energy (referred to in this section as the “Secretary”) shall make, subject to the availability of appropriations, incentive payments to the owner or operator of such facility. The amount of such payment made to any such owner or operator shall be as determined under subsection (e) of this section. Payments under this section may only be made upon receipt by the Secretary of an incentive payment application which establishes that the applicant is eligible to receive such payment and which satisfies such other requirements as the Secretary deems necessary. Such application shall be in such form, and shall be submitted at such time, as the Secretary shall establish. (b) Definitions.—For purposes of this section: (1) QUALIFIED HYDROELECTRIC FACILITY.—The term “qualified hydroelectric facility” means a turbine or other generating device owned or solely operated by a non-Federal entity which generates hydroelectric energy for sale and which is added to an existing dam or conduit. (2) EXISTING DAM OR CONDUIT.—The term “existing dam or conduit” means any dam or conduit the construction of which was completed before the date of the enactment of this section and which does not require any construction or enlargement of impoundment or diversion structures (other than repair or reconstruction) in connection with the installation of a turbine or other generating device. (3) CONDUIT.—The term “conduit” has the same meaning as when used in section 30(a)(2) of the Federal Power Act (16 U.S.C. 823a(a)(2)). (c) Eligibility window.—Payments may be made under this section only for electric energy generated from a qualified hydroelectric facility which begins operation during the period of 10 fiscal years beginning with the first full fiscal year occurring after the date of enactment of this subtitle. (d) Incentive period.—A qualified hydroelectric facility may receive payments under this section for a period of 10 fiscal years (referred to in this section as the “incentive period”). Such period shall begin with the fiscal year in which electric energy generated from the facility is first eligible for such payments. (e) Amount of payment.— (1) IN GENERAL.—Payments made by the Secretary under this section to the owner or operator of a qualified hydroelectric facility shall be based on the number of kilowatt hours of hydroelectric energy generated by the facility during the incentive period. For any such facility, the amount of such payment shall be 1.8 cents per kilowatt hour (adjusted as provided in paragraph (2)), subject to the availability of appropriations under subsection (g), except that no facility may receive more than $750,000 in 1 calendar year. (2) ADJUSTMENTS.—The amount of the payment made to any person under this section as provided in paragraph (1) shall be adjusted for inflation for each fiscal year beginning after calendar year 2005 in the same manner as provided in the provisions of section 29(d)(2)(B) of the Internal Revenue Code of 1986, except that in applying such provisions the calendar year 2005 shall be substituted for calendar year 1979. (f) Sunset.—No payment may be made under this section to any qualified hydroelectric facility after the expiration of the period of 20 fiscal years beginning with the first full fiscal year occurring after the date of enactment of this subtitle, and no payment may be made under this section to any such facility after a payment has been made with respect to such facility for a period of 10 fiscal years. (a) Incentive payments.—The Secretary of Energy shall make incentive payments to the owners or operators of hydroelectric facilities at existing dams to be used to make capital improvements in the facilities that are directly related to improving the efficiency of such facilities by at least 3 percent. (b) Limitations.—Incentive payments under this section shall not exceed 10 percent of the costs of the capital improvement concerned and not more than 1 payment may be made with respect to improvements at a single facility. No payment in excess of $750,000 may be made with respect to improvements at a single facility. Section 408(a)(6) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2708(a)(6)) is amended by striking “April 20, 1977” and inserting “March 4, 2003”. (a) In General.—The Secretary of the Interior and the Secretary of Energy, in consultation with the Secretary of the Army, shall jointly conduct a study of the potential for increasing electric power production capability at federally owned or operated water regulation, storage, and conveyance facilities. (b) Content.—The study under this section shall include identification and description in detail of each facility that is capable, with or without modification, of producing additional hydroelectric power, including estimation of the existing potential for the facility to generate hydroelectric power. (c) Report.—The Secretaries shall submit to the Committees on Energy and Commerce, Resources, and Transportation and Infrastructure of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report on the findings, conclusions, and recommendations of the study under this section by not later than 18 months after the date of the enactment of this Act. The report shall include each of the following: (2) A description of activities currently conducted or considered, or that could be considered, to produce additional hydroelectric power from each identified facility. (3) A summary of prior actions taken by the Secretaries to produce additional hydroelectric power from each identified facility. (4) The costs to install, upgrade, or modify equipment or take other actions to produce additional hydroelectric power from each identified facility and the level of Federal power customer involvement in the determination of such costs. (5) The benefits that would be achieved by such installation, upgrade, modification, or other action, including quantified estimates of any additional energy or capacity from each facility identified under subsection (b). (6) A description of actions that are planned, underway, or might reasonably be considered to increase hydroelectric power production by replacing turbine runners, by performing generator upgrades or rewinds, or construction of pumped storage facilities. (a) In General.—The Secretary of the Interior shall— (b) Consent of affected irrigation customers required.—The Secretary may not under this section make any adjustment in pumping at a facility without the consent of each person that has contracted with the United States for delivery of water from the facility for use for irrigation and that would be affected by such adjustment. (a) Amendment to title i of the Energy Policy and Conservation Act.—Title I of the Energy Policy and Conservation Act (42 U.S.C. 6211 et seq.) is amended— (1) by striking section 166 (42 U.S.C. 6246) and inserting the following: (2) by striking section 186 (42 U.S.C. 6250e); and (3) by striking part E (42 U.S.C. 6251; relating to the expiration of title I of the Act). (b) Amendment to title II of the Energy Policy and Conservation Act.—Title II of the Energy Policy and Conservation Act (42 U.S.C. 6271 et seq.) is amended— (1) by inserting before section 273 (42 U.S.C. 6283) the following: (2) by striking section 273(e) (42 U.S.C. 6283(e); relating to the expiration of summer fill and fuel budgeting programs); and (3) by striking part D (42 U.S.C. 6285; relating to the expiration of title II of the Act). (c) Technical amendments.—The table of contents for the Energy Policy and Conservation Act is amended— (1) by amending part D of title I to read as follows: (d) Amendment to the Energy Policy and Conservation Act.—Section 183(b)(1) of the Energy Policy and Conservation Act (42 U.S.C. 6250(b)(1)) is amended by striking all after “increases” through “mid-October through March” and inserting “by more than 60 percent over its 5-year rolling average for the months of mid-October through March (considered as a heating season average)”. (e) Fill Strategic Petroleum Reserve to capacity.—The Secretary of Energy shall, as expeditiously as practicable, acquire petroleum in amounts sufficient to fill the Strategic Petroleum Reserve to the 1,000,000,000 barrel capacity authorized under section 154(a) of the Energy Policy and Conservation Act (42 U.S.C. 6234(a)), consistent with the provisions of sections 159 and 160 of such Act (42 U.S.C. 6239, 6240). Section 713 of the Energy Act of 2000 (42 U.S.C. 6201 note) is amended by striking “4” and inserting “9”. Not later than 1 year after the date of enactment of this Act, the Secretary of Energy shall complete a proceeding to select, from sites that the Secretary has previously studied, sites necessary to enable acquisition by the Secretary of the full authorized volume of the Strategic Petroleum Reserve. The Secretary of Energy shall suspend deliveries of royalty-in-kind oil to the Strategic Petroleum Reserve until the price of oil falls below $40 per barrel for 2 consecutive weeks on the New York Mercantile Exchange. (a) Scope of natural gas act.—Section 1(b) of the Natural Gas Act (15 U.S.C. 717(b)) is amended by inserting “and to the importation or exportation of natural gas in foreign commerce and to persons engaged in such importation or exportation,” after “such transportation or sale,”. (b) Definition.—Section 2 of the Natural Gas Act (15 U.S.C. 717a) is amended by adding at the end the following new paragraph: “(11) ‘Liquefaction or gasification natural gas terminal’ includes all facilities located onshore or in State waters that are used to receive, unload, load, store, transport, gasify, liquefy, or process natural gas that is imported to the United States from a foreign country, exported to a foreign country from the United States, or transported in interstate commerce by waterborne tanker, but does not include— (c) Authorization for construction, expansion, or operation of liquefaction or gasification natural gas terminals.— (1) The title for section 3 of the Natural Gas Act (15 U.S.C. 717b) is amended by inserting “; liquefaction or gasification natural gas terminals” after “exportation or importation of natural gas”. (2) Section 3 of the Natural Gas Act (15 U.S.C. 717b) is amended by adding at the end the following: “(d) Authorization for construction, expansion, or operation of liquefaction or gasification natural gas terminals.— “(1) COMMISSION AUTHORIZATION REQUIRED.—No person shall construct, expand, or operate a liquefaction or gasification natural gas terminal without an order from the Commission authorizing such person to do so. “(2) AUTHORIZATION PROCEDURES.— “(A) NOTICE AND HEARING.—Upon the filing of any application to construct, expand, or operate a liquefaction or gasification natural gas terminal, the Commission shall— “(B) DESIGNATION AS LEAD AGENCY.— “(i) IN GENERAL.—The Commission shall act as the lead agency for the purposes of coordinating all applicable Federal authorizations and for the purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4312 et seq.) for a liquefaction or gasification natural gas terminal. “(C) SCHEDULE.— “(i) COMMISSION AUTHORITY TO SET SCHEDULE.—The Commission shall establish a schedule for all Federal and State administrative proceedings required under authority of Federal law to construct, expand, or operate a liquefaction or gasification natural gas terminal. In establishing the schedule, the Commission shall— “(ii) FAILURE TO MEET SCHEDULE.—If a Federal or State administrative agency does not complete a proceeding for an approval that is required before a person may construct, expand, or operate the liquefaction or gasification natural gas terminal, in accordance with the schedule established by the Commission under this subparagraph, and if— “(I) a determination has been made by the Court pursuant to section 19(d) that such delay is unreasonable; and that approval may be conclusively presumed by the Commission. “(D) EXCLUSIVE RECORD.—The Commission shall, with the cooperation of Federal and State administrative agencies and officials, maintain a complete consolidated record of all decisions made or actions taken by the Commission or by a Federal administrative agency or officer (or State administrative agency or officer acting under delegated Federal authority) with respect to the construction, expansion, or operation of a liquefaction or gasification natural gas terminal. Such record shall be the exclusive record for any Federal administrative proceeding that is an appeal or review of any such decision made or action taken. “(E) STATE AND LOCAL SAFETY CONSIDERATIONS.— “(i) IN GENERAL.—The Commission shall consult with the State commission of the State in which the liquefaction or gasification natural gas terminal is located regarding State and local safety considerations prior to issuing an order pursuant to this subsection and consistent with the schedule established under subparagraph (C). “(ii) STATE SAFETY INSPECTIONS.—The State commission of the State in which a liquefaction or gasification natural gas terminal is located may, after the terminal is operational, conduct safety inspections with respect to the liquefaction or gasification natural gas terminal if— Enforcement of any safety violation discovered by a State commission pursuant to this clause shall be carried out by Federal officials. The Commission shall take appropriate action in response to a report of a violation not later that 90 days after receiving such report. “(3) ISSUANCE OF COMMISSION ORDER.— “(A) IN GENERAL.—The Commission shall issue an order authorizing, in whole or in part, the construction, expansion, or operation covered by the application to any qualified applicant— “(B) TERMS AND CONDITIONS.—The Commission may by its order grant an application, in whole or in part, with such modification and upon such terms and conditions as the Commission may find necessary or appropriate. “(C) LIMITATIONS ON TERMS AND CONDITIONS TO COMMISSION ORDER.— “(i) IN GENERAL.—Any Commission order issued pursuant to this subsection before January 1, 2011, shall not be conditioned on— “(ii) INAPPLICABLE TO TERMINAL EXIT PIPELINE.—Clause (i) shall not apply to any pipeline subject to the jurisdiction of the Commission under section 7 exiting a liquefaction or gasification natural gas terminal. “(iii) EXPANSION OF REGULATED TERMINAL.—An order issued under this paragraph that relates to an expansion of an existing liquefaction or gasification natural gas terminal, where any portion of the existing terminal continues to be subject to Commission regulation of rates, charges, terms, or conditions of service, may not result in— “(4) DEFINITION.—For the purposes of this subsection, the term ‘Federal authorization’ means any authorization required under Federal law in order to construct, expand, or operate a liquefaction or gasification natural gas terminal, including such permits, special use authorizations, certifications, opinions, or other approvals as may be required, whether issued by a Federal or State agency.”. (d) Judicial review.—Section 19 of the Natural Gas Act (15 U.S.C. 717r) is amended by adding at the end the following: “(d) Judicial review.— “(1) IN GENERAL.—The United States Court of Appeals for the District of Columbia Circuit shall have original and exclusive jurisdiction over any civil action— “(A) for review of any order, action, or failure to act of any Federal or State administrative agency to issue, condition, or deny any permit, license, concurrence, or approval required under Federal law for the construction, expansion, or operation of a liquefaction or gasification natural gas terminal; “(2) COMMISSION ACTION.—For any action described in this subsection, the Commission shall file with the Court the consolidated record maintained under section 3(d)(2)(D). “(3) COURT ACTION.—If the Court finds under paragraph (1)(A) or (B) that an order, action, failure to act, or delay is inconsistent with applicable Federal law, and would prevent the construction, expansion, or operation of a liquefaction or gasification natural gas terminal, the order or action shall be deemed to have been issued or taken, subject to any conditions established by the Federal or State administrative agency upon remand from the Court, such conditions to be consistent with the order of the Court. If the Court remands the order or action to the Federal or State agency, the Court shall set a reasonable deadline for the agency to act on remand. “(4) UNREASONABLE DELAY.—For the purposes of paragraph (1)(B), the failure of an agency to issue a permit, license, concurrence, or approval within the later of— “(A) 1 year after the date of filing of an application for the permit, license, concurrence, or approval; or shall be considered unreasonable delay unless the Court, for good cause shown, determines otherwise. Paragraph (1) of section 1421(d) of the Safe Drinking Water Act (42 U.S.C. 300h(d)) is amended to read as follows: (a) Agency of record, pipeline construction projects.—Any Federal administrative agency proceeding that is an appeal or review under section 319 of the Coastal Zone Management Act of 1972 (16 U.S.C. 1465), as amended by this Act, related to Federal authority for an interstate natural gas pipeline construction project, including construction of natural gas storage and liquefied natural gas facilities, shall use as its exclusive record for all purposes the record compiled by the Federal Energy Regulatory Commission pursuant to the Commission’s proceeding under sections 3 and 7 of the Natural Gas Act (15 U.S.C. 717b, 717f). (b) Sense of Congress.—It is the sense of Congress that all Federal and State agencies with jurisdiction over interstate natural gas pipeline construction activities should coordinate their proceedings within the timeframes established by the Federal Energy Regulatory Commission when the Commission is acting under sections 3 and 7 of the Natural Gas Act (15 U.S.C. 717b, 717f) to determine whether a certificate of public convenience and necessity should be issued for a proposed interstate natural gas pipeline. (c) Agency of record, offshore mineral development projects.—Any Federal administrative agency proceeding that is an appeal or review under section 319 of the Coastal Zone Management Act of 1972 (16 U.S.C. 1465), as amended by this Act, related to Federal authority for the permitting, approval, or other authorization of energy projects, including projects to explore, develop, or produce mineral resources in or underlying the outer Continental Shelf shall use as its exclusive record for all purposes (except for the filing of pleadings) the record compiled by the relevant Federal permitting agency. The Natural Gas Act (15 U.S.C 717 et seq.) is amended— (2) by inserting after section 23 the following: “SEC. 24. Natural gas market transparency. “(a) Authorization.— (1) Not later than 180 days after the date of enactment of the Energy Policy Act of 2005, the Federal Energy Regulatory Commission shall issue rules directing all entities subject to the Commission’s jurisdiction as provided under this Act to timely report information about the availability and prices of natural gas sold at wholesale in interstate commerce to the Commission and price publishers. “(b) Timely enforcement.—No person shall be subject to any penalty under this section with respect to a violation occurring more than 3 years before the date on which the Federal Energy Regulatory Commission seeks to assess a penalty. “(c) Limitation on Commission authority.— (1) The Commission shall not condition access to interstate pipeline transportation upon the reporting requirements authorized under this section. (a) In General.—Not later than 180 days after the date of enactment of this Act, the Secretary of the Interior and the Secretary of Agriculture shall enter into a memorandum of understanding regarding oil and gas leasing on— (b) Contents.—The memorandum of understanding shall include provisions that— (1) establish administrative procedures and lines of authority that ensure timely processing of oil and gas lease applications, surface use plans of operation, and applications for permits to drill, including steps for processing surface use plans and applications for permits to drill consistent with the timelines established by the amendment made by section 348; (c) Data retrieval system.— (1) IN GENERAL.—Not later than 1 year after the date of enactment of this Act, the Secretary of the Interior and the Secretary of Agriculture shall establish a joint data retrieval system that is capable of— (a) Requirement.—The head of each Federal agency shall require that before the Federal agency takes any action that could have a significant adverse effect on the supply of domestic energy resources from Federal public land, the Federal agency taking the action shall comply with Executive Order No. 13211 (42 U.S.C. 13201 note). (b) Guidance.—Not later than 180 days after the date of enactment of this Act, the Secretary of Energy shall publish guidance for purposes of this section describing what constitutes a significant adverse effect on the supply of domestic energy resources under Executive Order No. 13211 (42 U.S.C. 13201 note). (a) Report to Congress.— (1) IN GENERAL.—Not later than 1 year after the date of enactment of this Act, the Secretary of Agriculture and the Secretary of the Interior, in consultation with the Secretary of Commerce, the Secretary of Defense, the Secretary of Energy, and the Federal Energy Regulatory Commission, shall submit to Congress a joint report— (A) that addresses— (B) that includes a plan for making available, on request, to the appropriate Federal, State, and local agencies, tribal governments, and other persons involved in the siting of oil and gas pipelines and electricity transmission facilities Geographic Information System-based information regarding the location of the existing rights-of-way and corridors and any planned rights-of-way and corridors. (2) CONSULTATIONS AND CONSIDERATIONS.—In preparing the report, the Secretary of the Interior and the Secretary of Agriculture shall consult with— (3) LIMITATION.—The Secretary of the Interior and the Secretary of Agriculture shall limit the distribution of the report and Geographic Information System-based information referred to in paragraph (1) as necessary for national and infrastructure security reasons, if either Secretary determines that the information may be withheld from public disclosure under a national security or other exception under section 552(b) of title 5, United States Code. (b) Corridor designations.— (1) 11 CONTIGUOUS WESTERN STATES.—Not later than 2 years after the date of enactment of this Act, the Secretary of Agriculture, the Secretary of Commerce, the Secretary of Defense, the Secretary of Energy, and the Secretary of the Interior, in consultation with the Federal Energy Regulatory Commission and the affected utility industries, shall jointly— (A) designate, under title V of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1761 et seq.) and other applicable Federal laws, corridors for oil and gas pipelines and electricity transmission and facilities on Federal land in the eleven contiguous Western States (as defined in section 103 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1702)); (2) OTHER STATES.—Not later than 4 years after the date of enactment of this Act, the Secretary of Agriculture, the Secretary of Commerce, the Secretary of Defense, the Secretary of Energy, and the Secretary of the Interior, in consultation with the Federal Energy Regulatory Commission and the affected utility industries, shall jointly— (3) ONGOING RESPONSIBILITIES.—The Secretary of Agriculture, the Secretary of Commerce, the Secretary of Defense, the Secretary of Energy, and the Secretary of the Interior, with respect to lands under their respective jurisdictions, in consultation with the Federal Energy Regulatory Commission and the affected utility industries, shall establish procedures that— (c) Considerations.—In carrying out this section, the Secretaries shall take into account the need for upgraded and new electricity transmission and distribution facilities to— (d) Definition of corridor.— (1) IN GENERAL.—In this section and title V of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1761 et seq.), the term “corridor” means— (A) a linear strip of land— Congress encourages no Federal or State permit or lease to be issued for new oil and gas slant, directional, or offshore drilling in or under one or more of the Great Lakes. Any State currently on the list of Affected States established under section 1339(b) of the Energy Policy Act of 1992 (42 U.S.C. 13368(b)) shall be removed from the list if, not later than 3 years after the date of enactment of this Act, the State takes, or prior to the date of enactment has taken, any of the actions required for removal from the list under such section 1339(b). This subtitle may be cited as the “United States Refinery Revitalization Act of 2005”. Congress finds the following: (1) It serves the national interest to increase petroleum refining capacity for gasoline, heating oil, diesel fuel, jet fuel, kerosene, and petrochemical feedstocks wherever located within the United States, to bring more supply to the markets for use by the American people. Nearly 50 percent of the petroleum in the United States is used for the production of gasoline. Refined petroleum products have a significant impact on interstate commerce. (2) United States demand for refined petroleum products currently exceeds the country’s petroleum refining capacity to produce such products. By 2025, United States gasoline consumption is projected to rise from 8,900,000 barrels per day to 12,900,000 barrels per day. Diesel fuel and home heating oil are becoming larger components of an increasing demand for refined petroleum supply. With the increase in air travel, jet fuel consumption is projected to be 789,000 barrels per day higher in 2025 than today. (3) The petroleum refining industry is operating at 95 percent of capacity. The United States is currently importing 5 percent of its refined petroleum products and because of the stringent United States gasoline and diesel fuel specifications, few foreign refiners can produce the clean fuels required in the United States and the number of foreign suppliers that can produce United States quality gasoline is decreasing. (4) Refiners are subject to significant environmental and other regulations and face several new Clean Air Act requirements over the next decade. New Clean Air Act requirements will benefit the environment but will also require substantial capital investment and additional government permits. (5) No new refinery has been built in the United States since 1976 and many smaller domestic refineries have become idle since the removal of the Domestic Crude Oil Allocation Program and because of regulatory uncertainty and generally low returns on capital employed. Today, the United States has 149 refineries, down from 324 in 1981. Restoration of recently idled refineries alone would amount to 483,570 barrels a day in additional capacity, or approximately 3.3 percent of the total operating capacity. (6) Refiners have met growing demand by increasing the use of existing equipment and increasing the efficiency and capacity of existing plants. But refining capacity has begun to lag behind peak summer demand. (7) Heavy industry and manufacturing jobs have closed or relocated due to barriers to investment, burdensome regulation, and high costs of operation, among other reasons. (8) Because the production and disruption in supply of refined petroleum products has a significant impact on interstate commerce, it serves the national interest to increase the domestic refining operating capacity. (10) More regulatory certainty for refinery owners is needed to stimulate investment in increased refinery capacity and required procedures for Federal, State, and local regulatory approvals need to be streamlined to ensure that increased refinery capacity can be developed and operated in a safe, timely, and cost-effective manner. (11) The proposed Yuma Arizona Refinery, a grassroots refinery facility, which only recently received its Federal air quality permit after 5 years under the current regulatory process, and is just now beginning its environmental impact statement and local permitting process, serves as an example of the obstacles a refiner would have to overcome to reopen an idle refinery. The purpose of this subtitle is to encourage the expansion of the United States refining capacity by providing an accelerated review and approval process of all regulatory approvals for certain idle refineries and lending corresponding legal and technical assistance to States with resources that may be inadequate to meet such permit review demands. Not later than 90 days after the date of enactment of this Act, the Secretary shall designate as a Refinery Revitalization Zone any area— (a) In General.—Not later than 90 days after the date of enactment of this Act, the Secretary shall enter into a memorandum of understanding with the Administrator for the purposes of this subtitle. The Secretary and the Administrator shall each designate a senior official responsible for, and dedicate sufficient other staff and resources to ensure, full implementation of the purposes of this subtitle and any regulations enacted pursuant to this subtitle. Not later than 30 days after a Revitalization Program Qualifying State becomes a signatory to the memorandum of understanding under section 375(b)— (1) the Secretary shall designate one or more employees of the Department with expertise relating to the siting and operation of refineries to provide legal and technical assistance to that Revitalization Program Qualifying State; and (2) the Administrator shall designate, to provide legal and technical assistance for that Revitalization Program Qualifying State, one or more employees of the Environmental Protection Agency with expertise on regulatory issues, relating to the siting and operation of refineries, with respect to each of— (A) the Clean Air Act (42 U.S.C. 7401 et seq.); (B) the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq.); (C) the Safe Drinking Water Act (42 U.S.C. 300f et seq.); (D) the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9601 et seq.); (E) the Solid Waste Disposal Act (42 U.S.C. 6901 et seq.); (F) the Toxic Substances Control Act (15 U.S.C. 2601 et seq.); (G) the National Historic Preservation Act (16 U.S.C. 470 et seq.); and (H) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). (a) Department of energy as lead agency.—Upon written request of a prospective applicant for Federal authorization for a refinery facility in a Refinery Revitalization Zone, the Department shall act as the lead Federal agency for the purposes of coordinating all applicable Federal authorizations and environmental reviews of the refining facility. To the maximum extent practicable under applicable Federal law, the Secretary shall coordinate this Federal authorization and review process with any Indian Tribes and State and local agencies responsible for conducting any separate permitting and environmental reviews of the refining facility. (b) Schedule.— (1) IN GENERAL.—The Secretary, in coordination with the agencies with authority over Federal authorizations and, as appropriate, with Indian Tribes and State and local agencies that are willing to coordinate their separate permitting and environmental reviews with the Federal authorizations and environmental reviews, shall establish a schedule with prompt and binding intermediate and ultimate deadlines for the review of, and Federal authorization decisions relating to, refinery facility siting and operation. (2) PREAPPLICATION PROCESS.—Prior to establishing the schedule, the Secretary shall provide an expeditious preapplication mechanism for applicants to confer with the agencies involved and to have each agency communicate to the prospective applicant within 60 days concerning— (3) SCHEDULE.—The Secretary shall consider the preapplication findings under paragraph (2) in setting the schedule and shall ensure that once an application has been submitted with such information as the Secretary considers necessary, all permit decisions and related environmental reviews under all applicable Federal laws shall be completed within 6 months or, where circumstances require otherwise, as soon as thereafter practicable. (c) Consolidated environmental review.— (1) LEAD AGENCY.—In carrying out its role as the lead Federal agency for environmental review, the Department shall coordinate all applicable Federal actions for complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and shall be responsible for preparing any environmental impact statement required by section 102(2)(C) of that Act (42 U.S.C. 4332(2)(C)) or such other form of environmental review as is required. (2) CONSOLIDATION OF STATEMENTS.—In carrying out paragraph (1), if the Department determines an environmental impact statement is required, the Department shall prepare a single environmental impact statement, which shall consolidate the environmental reviews of all Federal agencies considering any aspect of the project covered by the environmental impact statement. (d) Other agencies.—Each Federal agency considering an aspect of the siting or operation of a refinery facility in a Refinery Revitalization Zone shall cooperate with the Department and comply with the deadlines established by the Department in the preparation of any environmental impact statement or such other form of review as is required. (e) Exclusive Record.—The Department shall, with the cooperation of Federal and State administrative agencies and officials, maintain a complete consolidated record of all decisions made or actions taken by the Department or by a Federal administrative agency or officer (or State administrative agency or officer acting under delegated Federal authority) with respect to the siting or operation of a refinery facility in a Refinery Revitalization Zone. Such record shall be the exclusive record for any Federal administrative proceeding that is an appeal or review of any such decision made or action taken. (f) Appeals.—In the event any agency has denied a Federal authorization required for a refinery facility in a Refinery Revitalization Zone, or has failed to act by a deadline established by the Secretary pursuant to subsection (b) for deciding whether to issue the Federal authorization, the applicant or any State in which the refinery facility would be located may file an appeal with the Secretary. Based on the record maintained under subsection (e), and in consultation with the affected agency, the Secretary may then either issue the necessary Federal authorization with appropriate conditions, or deny the appeal. The Secretary shall issue a decision within 60 days after the filing of the appeal. In making a decision under this subsection, the Secretary shall comply with applicable requirements of Federal law, including each of the laws referred to in section 376(2)(A) through (H). Any judicial appeal of the Secretary’s decision shall be to the United States Court of Appeals for the District of Columbia. Nothing in this subtitle shall be construed to waive the applicability of environmental laws and regulations to any refinery facility. For the purposes of this subtitle, the term— (3) “Federal authorization” means any authorization required under Federal law (including the Clean Air Act, the Federal Water Pollution Control Act, the Safe Drinking Water Act, the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, the Solid Waste Disposal Act, the Toxic Substances Control Act, the National Historic Preservation Act, and the National Environmental Policy Act of 1969) in order to site, construct, upgrade, or operate a refinery facility within a Refinery Revitalization Zone, including such permits, special use authorizations, certifications, opinions, or other approvals as may be required, whether issued by a Federal, State, or local agency; (4) “idle refinery” means any real property site that has been used at any time for a refinery facility since December 31, 1979, that has not been in operation after April 1, 2005; (5) “refinery facility” means any facility designed and operated to receive, unload, store, process and refine raw crude oil by any chemical or physical process, including distillation, fluid catalytic cracking, hydrocracking, coking, alkylation, etherification, polymerization, catalytic reforming, isomerization, hydrotreating, blending, and any combination thereof; (a) Clean coal power initiative.—There are authorized to be appropriated to the Secretary of Energy (referred to in this title as the “Secretary”) to carry out the activities authorized by this subtitle $200,000,000 for each of fiscal years 2006 through 2014, to remain available until expended. (b) Report.—The Secretary shall submit to Congress the report required by this subsection not later than March 31, 2007. The report shall include, with respect to subsection (a), a 10-year plan containing— (1) a detailed assessment of whether the aggregate funding levels provided under subsection (a) are the appropriate funding levels for that program; (2) a detailed description of how proposals will be solicited and evaluated, including a list of all activities expected to be undertaken; (a) In general.—The Secretary shall not provide funding under this subtitle for any project that does not advance efficiency, environmental performance, and cost competitiveness well beyond the level of technologies that are in commercial service or have been demonstrated on a scale that the Secretary determines is sufficient to demonstrate that commercial service is viable as of the date of enactment of this Act. (b) Technical criteria for clean coal power initiative.— (1) GASIFICATION PROJECTS.— (A) IN GENERAL.—In allocating the funds made available under section 401(a), the Secretary shall ensure that at least 60 percent of the funds are used only for projects on coal-based gasification technologies, including gasification combined cycle, gasification fuel cells, gasification coproduction, and hybrid gasification/combustion. (B) TECHNICAL MILESTONES.—The Secretary shall periodically set technical milestones specifying the emission and thermal efficiency levels that coal gasification projects under this subtitle shall be designed, and reasonably expected, to achieve. The technical milestones shall become more restrictive during the life of the program. The Secretary shall set the periodic milestones so as to achieve by 2020 coal gasification projects able— (2) OTHER PROJECTS.—The Secretary shall periodically set technical milestones and ensure that up to 40 percent of the funds appropriated pursuant to section 401(a) are used for projects not described in paragraph (1). The milestones shall specify the emission and thermal efficiency levels that projects funded under this paragraph shall be designed to and reasonably expected to achieve. The technical milestones shall become more restrictive during the life of the program. The Secretary shall set the periodic milestones so as to achieve by 2010 projects able— (3) CONSULTATION.—Before setting the technical milestones under paragraphs (1)(B) and (2), the Secretary shall consult with the Administrator of the Environmental Protection Agency and interested entities, including coal producers, industries using coal, organizations to promote coal or advanced coal technologies, environmental organizations, and organizations representing workers. (4) EXISTING UNITS.—In the case of projects at units in existence on the date of enactment of this Act, in lieu of the thermal efficiency requirements set forth in paragraph (1)(B)(iv) and (2)(D), the milestones shall be designed to achieve an overall thermal design efficiency improvement, compared to the efficiency of the unit as operated, of not less than— (5) PERMITTED USES.—In carrying out this subtitle, the Secretary may fund projects that include, as part of the project, the separation and capture of carbon dioxide. The thermal efficiency goals of paragraphs (1), (2), and (4) shall not apply for projects that separate and capture at least 50 percent of the facility’s potential emissions of carbon dioxide. (c) Financial criteria.—The Secretary shall not provide a funding award under this subtitle unless the recipient documents to the satisfaction of the Secretary that— (d) Financial assistance.—The Secretary shall provide financial assistance to projects that meet the requirements of subsections (a), (b), and (c) and are likely to— (e) Federal share.—The Federal share of the cost of a coal or related technology project funded by the Secretary under this subtitle shall not exceed 50 percent. (f) Applicability.—No technology, or level of emission reduction, shall be treated as adequately demonstrated for purposes of section 111 of the Clean Air Act (42 U.S.C. 7411), achievable for purposes of section 169 of that Act (42 U.S.C. 7479), or achievable in practice for purposes of section 171 of that Act (42 U.S.C. 7501) solely by reason of the use of such technology, or the achievement of such emission reduction, by 1 or more facilities receiving assistance under this subtitle. Not later than 1 year after the date of enactment of this Act, and once every 2 years thereafter through 2014, the Secretary, in consultation with other appropriate Federal agencies, shall submit to Congress a report describing— As part of the program authorized in section 401, the Secretary shall award competitive, merit-based grants to universities for the establishment of Centers of Excellence for Energy Systems of the Future. The Secretary shall provide grants to universities that show the greatest potential for advancing new clean coal technologies. There are authorized to be appropriated to the Secretary $125,000,000 to provide a loan to the owner of the experimental plant constructed under United States Department of Energy cooperative agreement number DE-FC-22-91PC90544 on such terms and conditions as the Secretary determines, including interest rates and upfront payments. The Secretary is authorized to provide loan guarantees for a project to produce energy from a plant using integrated gasification combined cycle technology of at least 400 megawatts in capacity that produces power at competitive rates in deregulated energy generation markets and that does not receive any subsidy (direct or indirect) from ratepayers. The Secretary is authorized to provide loan guarantees for at least 5 petroleum coke gasification projects. The Secretary shall use $5,000,000 from amounts appropriated to initiate, through the Chicago Operations Office, a project to demonstrate the viability of high-energy electron scrubbing technology on commercial-scale electrical generation using high-sulfur coal. (a) Amendment.—The Energy Policy Act of 1992 is amended by adding the following new title at the end thereof: “SEC. 3101. Findings; purposes; definitions. “(a) Findings.—The Congress finds that— “(b) Purposes.—The purposes of this title are to— “(1) promote national energy policy and energy security, diversity, and economic competitiveness benefits that result from the increased use of coal; “SEC. 3102. Authorization of program. “The Secretary shall carry out a program to facilitate production and generation of coal-based power and the installation of pollution control equipment. “SEC. 3103. Authorization of appropriations. “(a) Pollution control projects.—There are authorized to be appropriated to the Secretary $300,000,000 for fiscal year 2006, $100,000,000 for fiscal year 2007, $40,000,000 for fiscal year 2008, $30,000,000 for fiscal year 2009, and $30,000,000 for fiscal year 2010, to remain available until expended, for carrying out the program for pollution control projects, which may include— “(2) pollution control equipment and processes for the control of nitrogen dioxide air emissions or sulfur dioxide emissions; “(3) pollution control equipment and processes for the mitigation or collection of more than one pollutant; “(4) advanced combustion technology for the control of at least two pollutants, including mercury, particulate matter, nitrogen oxides, and sulfur dioxide, which may also be designed to improve the energy efficiency of the unit; and “(5) advanced pollution control equipment and processes designed to allow use of the waste byproducts or other byproducts of the equipment or an electrical generation unit designed to allow the use of byproducts. “(b) Generation projects.—There are authorized to be appropriated to the Secretary $250,000,000 for fiscal year 2007, $350,000,000 for fiscal year 2008, $400,000,000 for fiscal year 2009, $400,000,000 for fiscal year 2010, $400,000,000 for fiscal year 2011, $400,000,000 for fiscal year 2012, and $300,000,000 for fiscal year 2013, to remain available until expended, for generation projects and air pollution control projects. Such projects may include— “(1) coal-based electrical generation equipment and processes, including gasification combined cycle or other coal-based generation equipment and processes; “(2) associated environmental control equipment, that will be cost-effective and that is designed to meet anticipated regulatory requirements; “(3) coal-based electrical generation equipment and processes, including gasification fuel cells, gasification coproduction, and hybrid gasification/combustion projects; and “(4) advanced coal-based electrical generation equipment and processes, including oxidation combustion techniques, ultra-supercritical boilers, and chemical looping, which the Secretary determines will be cost-effective and could substantially contribute to meeting anticipated environmental or energy needs. “(c) Limitation.—Funds placed at risk during any fiscal year for Federal loans or loan guarantees pursuant to this title may not exceed 30 percent of the total funds obligated under this title. “SEC. 3104. Air pollution control project criteria. “The Secretary shall pursuant to authorizations contained in section 3103 provide funding for air pollution control projects designed to facilitate compliance with Federal and State environmental regulations, including any regulation that may be established with respect to mercury. “SEC. 3105. Criteria for generation projects. “(a) Criteria.—The Secretary shall establish criteria on which selection of individual projects described in section 3103(b) should be based. The Secretary may modify the criteria as appropriate to reflect improvements in equipment, except that the criteria shall not be modified to be less stringent. These selection criteria shall include— “(1) prioritization of projects whose installation is likely to result in significant air quality improvements in nonattainment air quality areas; “(2) prioritization of projects that result in the repowering or replacement of older, less efficient units; “(3) documented broad interest in the procurement of the equipment and utilization of the processes used in the projects by electrical generator owners or operators; “(4) equipment and processes beginning in 2006 through 2011 that are projected to achieve an thermal efficiency of— except that energy used for coproduction or cogeneration shall not be counted in calculating the thermal efficiency under this paragraph; and “(b) Selection.— (1) In selecting the projects, up to 25 percent of the projects selected may be either coproduction or cogeneration or other gasification projects, but at least 25 percent of the projects shall be for the sole purpose of electrical generation, and priority should be given to equipment and projects less than 600 MW to foster and promote standard designs. “(2) The Secretary shall give priority to projects that have been developed and demonstrated that are not yet cost competitive, and for coal energy generation projects that advance efficiency, environmental performance, or cost competitiveness significantly beyond the level of pollution control equipment that is in operation on a full scale. “SEC. 3106. Financial criteria. “(a) In general.—The Secretary shall only provide financial assistance to projects that meet the requirements of sections 3103 and 3104 and are likely to— “(b) Conditions.—The Secretary shall not provide a funding award under this title unless— “(c) Equal access.—The Secretary shall, to the extent practical, utilize cooperative agreement, loan guarantee, and direct Federal loan mechanisms designed to ensure that all electrical generation owners have equal access to these technology deployment incentives. The Secretary shall develop and direct a competitive solicitation process for the selection of technologies and projects under this title. “The Federal share of the cost of a coal or related technology project funded by the Secretary under this title shall not exceed 50 percent. For purposes of this title, Federal funding includes only appropriated funds. “No technology, or level of emission reduction, shall be treated as adequately demonstrated for purposes of section 111 of the Clean Air Act (42 U.S.C. 7411), achievable for purposes of section 169 of the Clean Air Act (42 U.S.C. 7479), or achievable in practice for purposes of section 171 of the Clean Air Act (42 U.S.C. 7501) solely by reason of the use of such technology, or the achievement of such emission reduction, by one or more facilities receiving assistance under this title.”. (b) Table of Contents Amendment.—The table of contents of the Energy Policy Act of 1992 is amended by adding at the end the following: This title may be cited as the “Indian Tribal Energy Development and Self-Determination Act of 2005”. (a) In general.—Title II of the Department of Energy Organization Act (42 U.S.C. 7131 et seq.) is amended by adding at the end the following: “Office of Indian Energy Policy and Programs “Sec. 217. (a) Establishment.—There is established within the Department an Office of Indian Energy Policy and Programs (referred to in this section as the ‘Office’). The Office shall be headed by a Director, who shall be appointed by the Secretary and compensated at a rate equal to that of level IV of the Executive Schedule under section 5315 of title 5, United States Code. “(b) Duties of Director.—The Director, in accordance with Federal policies promoting Indian self-determination and the purposes of this Act, shall provide, direct, foster, coordinate, and implement energy planning, education, management, conservation, and delivery programs of the Department that— (b) Conforming amendments.— (1) The table of contents of the Department of Energy Organization Act (42 U.S.C. prec. 7101) is amended— (B) by striking the items relating to sections 213 through 216 and inserting the following: (2) Section 5315 of title 5, United States Code, is amended by inserting after “Inspector General, Department of Energy.” the following: (a) In general.—Title XXVI of the Energy Policy Act of 1992 (25 U.S.C. 3501 et seq.) is amended to read as follows: “For purposes of this title: “(1) The term ‘Director’ means the Director of the Office of Indian Energy Policy and Programs, Department of Energy. “(2) The term ‘Indian land’ means— “(B) any land not located within the boundaries of an Indian reservation, pueblo, or rancheria, the title to which is held— “(C) land that is owned by an Indian tribe and was conveyed by the United States to a Native Corporation pursuant to the Alaska Native Claims Settlement Act (43 U.S.C. 1601 et seq.), or that was conveyed by the United States to a Native Corporation in exchange for such land. “(3) The term ‘Indian reservation’ includes— “(4) The term ‘Indian tribe’ has the meaning given the term in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450b), except that the term ‘Indian tribe’, for the purpose of paragraph (11) and sections 2603(b)(3) and 2604, shall not include any Native Corporation. “(5) The term ‘integration of energy resources’ means any project or activity that promotes the location and operation of a facility (including any pipeline, gathering system, transportation system or facility, or electric transmission or distribution facility) on or near Indian land to process, refine, generate electricity from, or otherwise develop energy resources on, Indian land. “(6) The term ‘Native Corporation’ has the meaning given the term in section 3 of the Alaska Native Claims Settlement Act (43 U.S.C. 1602). “(7) The term ‘organization’ means a partnership, joint venture, limited liability company, or other unincorporated association or entity that is established to develop Indian energy resources. “(8) The term ‘Program’ means the Indian energy resource development program established under section 2602(a). “(10) The term ‘tribal energy resource development organization’ means an organization of 2 or more entities, at least 1 of which is an Indian tribe, that has the written consent of the governing bodies of all Indian tribes participating in the organization to apply for a grant, loan, or other assistance authorized by section 2602. “(11) The term ‘tribal land’ means any land or interests in land owned by any Indian tribe, title to which is held in trust by the United States or which is subject to a restriction against alienation under laws of the United States. “SEC. 2602. Indian tribal energy resource development. “(a) Department of the interior Program.— “(1) To assist Indian tribes in the development of energy resources and further the goal of Indian self-determination, the Secretary shall establish and implement an Indian energy resource development program to assist consenting Indian tribes and tribal energy resource development organizations in achieving the purposes of this title. “(2) In carrying out the Program, the Secretary shall— “(A) provide development grants to Indian tribes and tribal energy resource development organizations for use in developing or obtaining the managerial and technical capacity needed to develop energy resources on Indian land, and to properly account for resulting energy production and revenues; “(b) Department of energy Indian energy education planning and management assistance Program.— “(1) The Director shall establish programs to assist consenting Indian tribes in meeting energy education, research and development, planning, and management needs. “(2) In carrying out this subsection, the Director may provide grants, on a competitive basis, to an Indian tribe or tribal energy resource development organization for use in carrying out— “(B) studies and other activities supporting tribal acquisitions of energy supplies, services, and facilities; “(c) Department of energy loan guarantee Program.— “(1) Subject to paragraph (3), the Secretary of Energy may provide loan guarantees (as defined in section 502 of the Federal Credit Reform Act of 1990 (2 U.S.C. 661a)) for not more than 90 percent of the unpaid principal and interest due on any loan made to any Indian tribe for energy development. “(3) The aggregate outstanding amount guaranteed by the Secretary of Energy at any time under this subsection shall not exceed $2,000,000,000. “(4) The Secretary of Energy may issue such regulations as the Secretary of Energy determines are necessary to carry out this subsection. “(d) Federal agencies—indian energy preference.— “(1) In purchasing electricity or any other energy product or byproduct, a Federal agency or department may give preference to an energy and resource production enterprise, partnership, consortium, corporation, or other type of business organization the majority of the interest in which is owned and controlled by 1 or more Indian tribes. “SEC. 2603. Indian tribal energy resource regulation. “(a) Grants.—The Secretary may provide to Indian tribes, on an annual basis, grants for use in accordance with subsection (b). “(b) Use of funds.—Funds from a grant provided under this section may be used— “(1) by an Indian tribe for the development of a tribal energy resource inventory or tribal energy resource on Indian land; “(2) by an Indian tribe for the development of a feasibility study or other report necessary to the development of energy resources on Indian land; “(3) by an Indian tribe (other than an Indian Tribe in Alaska except the Metlakatla Indian Community) for the development and enforcement of tribal laws (including regulations) relating to tribal energy resource development and the development of technical infrastructure to protect the environment under applicable law; or “(c) Other assistance.—In carrying out the obligations of the United States under this title, the Secretary shall ensure, to the maximum extent practicable and to the extent of available resources, that upon the request of an Indian tribe, the Indian tribe shall have available scientific and technical information and expertise, for use in the Indian tribe’s regulation, development, and management of energy resources on Indian land. The Secretary may fulfill this responsibility either directly, through the use of Federal officials, or indirectly, by providing financial assistance to the Indian tribe to secure independent assistance. “SEC. 2604. Leases, business agreements, and rights-of-way involving energy development or transmission. “(a) Leases and business agreements.—Subject to the provisions of this section— “(1) an Indian tribe may, at its discretion, enter into a lease or business agreement for the purpose of energy resource development on tribal land, including a lease or business agreement for— “(2) such lease or business agreement described in paragraph (1) shall not require the approval of the Secretary under section 2103 of the Revised Statutes (25 U.S.C. 81) or any other provision of law, if— “(A) the lease or business agreement is executed pursuant to a tribal energy resource agreement approved by the Secretary under subsection (e); “(C) the Indian tribe has entered into a tribal energy resource agreement with the Secretary, as described in subsection (e), relating to the development of energy resources on tribal land (including the periodic review and evaluation of the activities of the Indian tribe under the agreement, to be conducted pursuant to the provisions required by subsection (e)(2)(D)(i)). “(b) Rights-of-way for pipelines or electric transmission or distribution lines.—An Indian tribe may grant a right-of-way over tribal land for a pipeline or an electric transmission or distribution line without approval by the Secretary if— “(1) the right-of-way is executed in accordance with a tribal energy resource agreement approved by the Secretary under subsection (e); “(4) the Indian tribe has entered into a tribal energy resource agreement with the Secretary, as described in subsection (e), relating to the development of energy resources on tribal land (including the periodic review and evaluation of the Indian tribe’s activities under such agreement described in subparagraphs (D) and (E) of subsection (e)(2)). “(c) Renewals.—A lease or business agreement entered into or a right-of-way granted by an Indian tribe under this section may be renewed at the discretion of the Indian tribe in accordance with this section. “(d) Validity.—No lease, business agreement, or right-of-way relating to the development of tribal energy resources pursuant to the provisions of this section shall be valid unless the lease, business agreement, or right-of-way is authorized by the provisions of a tribal energy resource agreement approved by the Secretary under subsection (e)(2). “(e) Tribal energy resource agreements.— “(1) On issuance of regulations under paragraph (8), an Indian tribe may submit to the Secretary for approval a tribal energy resource agreement governing leases, business agreements, and rights-of-way under this section. “(2) (A) Not later than 180 days after the date on which the Secretary receives a tribal energy resource agreement submitted by an Indian tribe under paragraph (1), or not later than 60 days after the Secretary receives a revised tribal energy resource agreement submitted by an Indian tribe under paragraph (4)(C), (or such later date as may be agreed to by the Secretary and the Indian tribe), the Secretary shall approve or disapprove the tribal energy resource agreement. “(B) The Secretary shall approve a tribal energy resource agreement submitted under paragraph (1) if— “(i) the Secretary determines that the Indian tribe has demonstrated that the Indian tribe has sufficient capacity to regulate the development of energy resources of the Indian tribe; “(iii) the tribal energy resource agreement includes provisions that, with respect to a lease, business agreement, or right-of-way under this section— “(I) ensure the acquisition of necessary information from the applicant for the lease, business agreement, or right-of-way; “(II) address the term of the lease or business agreement or the term of conveyance of the right-of-way; “(IV) address the economic return to the Indian tribe under leases, business agreements, and rights-of-way; “(X) establish a process for consultation with any affected States concerning off-reservation impacts, if any, identified pursuant to the provisions required under subparagraph (C)(i); “(XII) require each lease, business agreement, and right-of-way to include a statement that, in the event that any of its provisions violates an express term or requirement set forth in the tribal energy resource agreement pursuant to which it was executed— “(C) Tribal energy resource agreements submitted under paragraph (1) shall establish, and include provisions to ensure compliance with, an environmental review process that, with respect to a lease, business agreement, or right-of-way under this section, provides for— “(i) the identification and evaluation of all significant environmental impacts (as compared with a no-action alternative), including effects on cultural resources; “(D) A tribal energy resource agreement negotiated between the Secretary and an Indian tribe in accordance with this subsection shall include— “(i) provisions requiring the Secretary to conduct a periodic review and evaluation to monitor the performance of the Indian tribe’s activities associated with the development of energy resources under the tribal energy resource agreement; and “(ii) when such review and evaluation result in a finding by the Secretary of imminent jeopardy to a physical trust asset arising from a violation of the tribal energy resource agreement or applicable Federal laws, provisions authorizing the Secretary to take appropriate actions determined by the Secretary to be necessary to protect such asset, which actions may include reassumption of responsibility for activities associated with the development of energy resources on tribal land until the violation and conditions that gave rise to such jeopardy have been corrected. “(E) The periodic review and evaluation described in subparagraph (D) shall be conducted on an annual basis, except that, after the third such annual review and evaluation, the Secretary and the Indian tribe may mutually agree to amend the tribal energy resource agreement to authorize the review and evaluation required by subparagraph (D) to be conducted once every 2 years. “(3) The Secretary shall provide notice and opportunity for public comment on tribal energy resource agreements submitted for approval under paragraph (1). The Secretary’s review of a tribal energy resource agreement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall be limited to the direct effects of that approval. “(4) If the Secretary disapproves a tribal energy resource agreement submitted by an Indian tribe under paragraph (1), the Secretary shall, not later than 10 days after the date of disapproval— “(5) If an Indian tribe executes a lease or business agreement or grants a right-of-way in accordance with a tribal energy resource agreement approved under this subsection, the Indian tribe shall, in accordance with the process and requirements set forth in the Secretary’s regulations adopted pursuant to paragraph (8), provide to the Secretary— “(A) a copy of the lease, business agreement, or right-of-way document (including all amendments to and renewals of the document); and “(B) in the case of a tribal energy resource agreement or a lease, business agreement, or right-of-way that permits payments to be made directly to the Indian tribe, information and documentation of those payments sufficient to enable the Secretary to discharge the trust responsibility of the United States to enforce the terms of, and protect the Indian tribe’s rights under, the lease, business agreement, or right-of-way. “(6) (A) For purposes of the activities to be undertaken by the Secretary pursuant to this section, the Secretary shall—
“(B) Subject to the provisions of subsections (a)(2), (b), and (c) waiving the requirement of Secretarial approval of leases, business agreements, and rights-of-way executed pursuant to tribal energy resource agreements approved under this section, and the provisions of subparagraph (D), nothing in this section shall absolve the United States from any responsibility to Indians or Indian tribes, including, but not limited to, those which derive from the trust relationship or from any treaties, statutes, and other laws of the United States, Executive Orders, or agreements between the United States and any Indian tribe. “(C) The Secretary shall continue to have a trust obligation to ensure that the rights and interests of an Indian tribe are protected in the event that— “(D) Notwithstanding subparagraph (B), the United States shall not be liable to any party (including any Indian tribe) for any of the negotiated terms of, or any losses resulting from the negotiated terms of, a lease, business agreement, or right-of-way executed pursuant to and in accordance with a tribal energy resource agreement approved by the Secretary under paragraph (2). For the purpose of this subparagraph, the term ‘negotiated terms’ means any terms or provisions that are negotiated by an Indian tribe and any other party or parties to a lease, business agreement, or right-of-way entered into pursuant to an approved tribal energy resource agreement. “(7) (A) In this paragraph, the term ‘interested party’ means any person or entity the interests of which have sustained or will sustain a significant adverse environmental impact as a result of the failure of an Indian tribe to comply with a tribal energy resource agreement of the Indian tribe approved by the Secretary under paragraph (2). “(B) After exhaustion of tribal remedies, and in accordance with the process and requirements set forth in regulations adopted by the Secretary pursuant to paragraph (8), an interested party may submit to the Secretary a petition to review compliance of an Indian tribe with a tribal energy resource agreement of the Indian tribe approved by the Secretary under paragraph (2). “(C) (i) Not later than 120 days after the date on which the Secretary receives a petition under subparagraph (B), the Secretary shall determine whether the Indian tribe is not in compliance with the tribal energy resource agreement, as alleged in the petition. “(ii) The Secretary may adopt procedures under paragraph (8) authorizing an extension of time, not to exceed 120 days, for making the determination under clause (i) in any case in which the Secretary determines that additional time is necessary to evaluate the allegations of the petition. “(iii) Subject to subparagraph (D), if the Secretary determines that the Indian tribe is not in compliance with the tribal energy resource agreement as alleged in the petition, the Secretary shall take such action as is necessary to ensure compliance with the provisions of the tribal energy resource agreement, which action may include— “(D) Prior to seeking to ensure compliance with the provisions of the tribal energy resource agreement of an Indian tribe under subparagraph (C)(iii), the Secretary shall— “(i) make a written determination that describes the manner in which the tribal energy resource agreement has been violated; “(8) Not later than 1 year after the date of enactment of the Indian Tribal Energy Development and Self-Determination Act of 2005, the Secretary shall issue regulations that implement the provisions of this subsection, including— “(A) criteria to be used in determining the capacity of an Indian tribe described in paragraph (2)(B)(i), including the experience of the Indian tribe in managing natural resources and financial and administrative resources available for use by the Indian tribe in implementing the approved tribal energy resource agreement of the Indian tribe; “(B) a process and requirements in accordance with which an Indian tribe may— “(C) provisions setting forth the scope of, and procedures for, the periodic review and evaluation described in subparagraphs (D) and (E) of paragraph (2), including provisions for review of transactions, reports, site inspections, and any other review activities the Secretary determines to be appropriate; and “(f) No effect on other law.—Nothing in this section affects the application of— “(2) the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. 1201 et seq.); or “(3) except as otherwise provided in this title, the Indian Mineral Development Act of 1982 (25 U.S.C. 2101 et seq.) and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). “(g) Authorization of appropriations.—There are authorized to be appropriated to the Secretary such sums as are necessary for each of fiscal years 2006 through 2016 to implement the provisions of this section and to make grants or provide other appropriate assistance to Indian tribes to assist the Indian tribes in developing and implementing tribal energy resource agreements in accordance with the provisions of this section. “SEC. 2605. Indian mineral development review. “(a) In general.—The Secretary shall conduct a review of all activities being conducted under the Indian Mineral Development Act of 1982 (25 U.S.C. 2101 et seq.) as of that date. “(b) Report.—Not later than 1 year after the date of enactment of the Indian Tribal Energy Development and Self-Determination Act of 2005, the Secretary shall submit to Congress a report that includes— (b) Conforming amendments.—The table of contents for the Energy Policy Act of 1992 is amended by striking the items relating to title XXVI and inserting the following: The Dine Power Authority, an enterprise of the Navajo Nation, shall be eligible to receive grants and other assistance as authorized by section 217 of the Department of Energy Organization Act, as added by section 502 of this title, and section 2602 of the Energy Policy Act of 1992, as amended by this title, for activities associated with the development of a transmission line from the Four Corners Area to southern Nevada, including related power generation opportunities. (a) In general.—The Secretary of Housing and Urban Development shall promote energy conservation in housing that is located on Indian land and assisted with Federal resources through— (b) Amendment.—Section 202(2) of the Native American Housing and Self-Determination Act of 1996 (25 U.S.C. 4132(2)) is amended by inserting “improvement to achieve greater energy efficiency,” after “planning,”. In carrying out this title and the amendments made by this title, the Secretary of Energy and the Secretary shall, as appropriate and to the maximum extent practicable, involve and consult with Indian tribes in a manner that is consistent with the Federal trust and the government-to-government relationships between Indian tribes and the United States. This subtitle may be cited as the “Price-Anderson Amendments Act of 2005” . (a) Indemnification of nuclear regulatory commission licensees.—Section 170 c. of the Atomic Energy Act of 1954 (42 U.S.C. 2210(c)) is amended— (b) Indemnification of Department of Energy contractors.—Section 170 d.(1)(A) of the Atomic Energy Act of 1954 (42 U.S.C. 2210(d)(1)(A)) is amended by striking “December 31, 2006” and inserting “December 31, 2025”. (c) Indemnification of nonprofit educational institutions.—Section 170 k. of the Atomic Energy Act of 1954 (42 U.S.C. 2210(k)) is amended by striking “August 1, 2002” each place it appears and inserting “December 31, 2025”. Section 170 of the Atomic Energy Act of 1954 (42 U.S.C. 2210) is amended— (a) Indemnification of Department of Energy contractors.—Section 170 d. of the Atomic Energy Act of 1954 (42 U.S.C. 2210(d)) is amended by striking paragraph (2) and inserting the following: “(2) In an agreement of indemnification entered into under paragraph (1), the Secretary— “(A) may require the contractor to provide and maintain financial protection of such a type and in such amounts as the Secretary shall determine to be appropriate to cover public liability arising out of or in connection with the contractual activity; and “(B) shall indemnify the persons indemnified against such liability above the amount of the financial protection required, in the amount of $10,000,000,000 (subject to adjustment for inflation under subsection t.), in the aggregate, for all persons indemnified in connection with the contract and for each nuclear incident, including such legal costs of the contractor as are approved by the Secretary.”. (b) Contract amendments.—Section 170 d. of the Atomic Energy Act of 1954 (42 U.S.C. 2210(d)) is further amended by striking paragraph (3) and inserting the following— “(3) All agreements of indemnification under which the Department of Energy (or its predecessor agencies) may be required to indemnify any person under this section shall be deemed to be amended, on the date of enactment of the Price-Anderson Amendments Act of 2005, to reflect the amount of indemnity for public liability and any applicable financial protection required of the contractor under this subsection.”. (c) Liability limit.—Section 170 e.(1)(B) of the Atomic Energy Act of 1954 (42 U.S.C. 2210(e)(1)(B)) is amended— (a) Amount of indemnification.—Section 170 d.(5) of the Atomic Energy Act of 1954 (42 U.S.C. 2210(d)(5)) is amended by striking “$100,000,000” and inserting “$500,000,000”. (b) Liability limit.—Section 170 e.(4) of the Atomic Energy Act of 1954 (42 U.S.C. 2210(e)(4)) is amended by striking “$100,000,000” and inserting “$500,000,000”. Section 170 p. of the Atomic Energy Act of 1954 (42 U.S.C. 2210(p)) is amended by striking “August 1, 1998” and inserting “December 31, 2021”. Section 170 t. of the Atomic Energy Act of 1954 (42 U.S.C. 2210(t)) is amended— (2) by inserting after paragraph (1) the following: Section 170 b. of the Atomic Energy Act of 1954 (42 U.S.C. 2210(b)) is amended by adding at the end the following: “(5) (A) For purposes of this section only, the Commission shall consider a combination of facilities described in subparagraph (B) to be a single facility having a rated capacity of 100,000 electrical kilowatts or more. “(B) A combination of facilities referred to in subparagraph (A) is 2 or more facilities located at a single site, each of which has a rated capacity of 100,000 electrical kilowatts or more but not more than 300,000 electrical kilowatts, with a combined rated capacity of not more than 1,300,000 electrical kilowatts.”. The amendments made by sections 603, 604, and 605 do not apply to a nuclear incident that occurs before the date of the enactment of this Act. Section 170 of the Atomic Energy Act of 1954 (42 U.S.C. 2210) is amended by adding at the end the following new subsection: “u. Prohibition on assumption of liability for certain foreign incidents.—Notwithstanding this section or any other provision of law, no officer of the United States or of any department, agency, or instrumentality of the United States Government may enter into any contract or other arrangement, or into any amendment or modification of a contract or other arrangement, the purpose or effect of which would be to directly or indirectly impose liability on the United States Government, or any department, agency, or instrumentality of the United States Government, or to otherwise directly or indirectly require an indemnity by the United States Government, for nuclear incidents occurring in connection with the design, construction, or operation of a production facility or utilization facility in any country whose government has been identified by the Secretary of State as engaged in state sponsorship of terrorist activities (specifically including any country the government of which, as of September 11, 2001, had been determined by the Secretary of State under section 620A(a) of the Foreign Assistance Act of 1961 (22 U.S.C. 2371(a)), section 6(j)(1) of the Export Administration Act of 1979 (50 U.S.C. App. 2405(j)(1)), or section 40(d) of the Arms Export Control Act (22 U.S.C. 2780(d)) to have repeatedly provided support for acts of international terrorism). This subsection shall not apply to nuclear incidents occurring as a result of missions, carried out under the direction of the Secretary of Energy, the Secretary of Defense, or the Secretary of State, that are necessary to safely secure, store, transport, or remove nuclear materials for nuclear safety or nonproliferation purposes.”. (a) Repeal of automatic remission.—Section 234A b.(2) of the Atomic Energy Act of 1954 (42 U.S.C. 2282a(b)(2)) is amended by striking the last sentence. (b) Limitation for not-for-profit institutions.—Subsection d. of section 234A of the Atomic Energy Act of 1954 (42 U.S.C. 2282a(d)) is amended to read as follows: “d. (1) Notwithstanding subsection a., in the case of any not-for-profit contractor, subcontractor, or supplier, the total amount of civil penalties paid under subsection a. may not exceed the total amount of fees paid within any 1-year period (as determined by the Secretary) under the contract under which the violation occurs. (c) Effective date.—The amendments made by this section shall not apply to any violation of the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.) occurring under a contract entered into before the date of enactment of this section. (a) Amendment.—Section 170 of the Atomic Energy Act of 1954 (42 U.S.C. 2210) is amended by adding at the end the following new subsection: “v. Financial accountability.— (1) Notwithstanding subsection d., the Attorney General may bring an action in the appropriate United States district court to recover from a contractor of the Secretary (or subcontractor or supplier of such contractor) amounts paid by the Federal Government under an agreement of indemnification under subsection d. for public liability resulting from conduct which constitutes intentional misconduct of any corporate officer, manager, or superintendent of such contractor (or subcontractor or supplier of such contractor). “(2) The Attorney General may recover under paragraph (1) an amount not to exceed the amount of the profit derived by the defendant from the contract. “(3) No amount recovered from any contractor (or subcontractor or supplier of such contractor) under paragraph (1) may be reimbursed directly or indirectly by the Department of Energy. “(4) Paragraph (1) shall not apply to any nonprofit entity conducting activities under contract for the Secretary. (b) Effective date.—The amendment made by this section shall not apply to any agreement of indemnification entered into under section 170 d. of the Atomic Energy Act of 1954 (42 U.S.C. 2210(d)) before the date of the enactment of this Act. Section 103 c. of the Atomic Energy Act of 1954 (42 U.S.C. 2133(c)) is amended by inserting “from the authorization to commence operations” after “forty years”. (a) In general.—In order to maintain the human resource investment and infrastructure of the United States in the nuclear sciences, health physics, and engineering fields, in accordance with the statutory authorities of the Nuclear Regulatory Commission relating to the civilian nuclear energy program, the Nuclear Regulatory Commission shall carry out a training and fellowship program to address shortages of individuals with critical nuclear safety regulatory skills. Section 161 w. of the Atomic Energy Act of 1954 (42 U.S.C. 2201(w)) is amended— Section 161 of the Atomic Energy Act of 1954 (42 U.S.C. 2201) is amended by adding at the end the following: “y. Exempt from the application of sections 8344 and 8468 of title 5, United States Code, an annuitant who was formerly an employee of the Commission who is hired by the Commission as a consultant, if the Commission finds that the annuitant has a skill that is critical to the performance of the duties of the Commission.”. Section 105 c. of the Atomic Energy Act of 1954 (42 U.S.C. 2135(c)) is amended by adding at the end the following: Section 161 i. of the Atomic Energy Act of 1954 (42 U.S.C. 2201(i)) is amended— (2) by inserting before the semicolon at the end the following: “, and (4) to ensure that sufficient funds will be available for the decommissioning of any production or utilization facility licensed under section 103 or 104 b., including standards and restrictions governing the control, maintenance, use, and disbursement by any former licensee under this Act that has control over any fund for the decommissioning of the facility”. Title II of the Energy Reorganization Act of 1974 (42 U.S.C. 5841 et seq.) is amended by adding at the end the following new section: “Limitation on legal fee reimbursement “Sec. 212. The Department of Energy shall not, except as required under a contract entered into before the date of enactment of this section, reimburse any contractor or subcontractor of the Department for any legal fees or expenses incurred with respect to a complaint subsequent to— “(1) an adverse determination on the merits with respect to such complaint against the contractor or subcontractor by the Director of the Department of Energy’s Office of Hearings and Appeals pursuant to part 708 of title 10, Code of Federal Regulations, or by a Department of Labor Administrative Law Judge pursuant to section 211 of this Act; or “(2) an adverse final judgment by any State or Federal court with respect to such complaint against the contractor or subcontractor for wrongful termination or retaliation due to the making of disclosures protected under chapter 12 of title 5, United States Code, section 211 of this Act, or any comparable State law, Not later than 1 year after the date of the enactment of this Act, the Secretary of Energy shall submit to Congress a report on the feasibility of developing commercial nuclear energy generation facilities at Department of Energy sites in existence on the date of enactment of this Act. (a) Sales, transfers, and services.—Section 3112 of the USEC Privatization Act (42 U.S.C. 2297h–10) is amended by striking subsections (d), (e), and (f) and inserting the following: “(3) The Secretary may transfer to the Corporation, notwithstanding subsections (b)(2) and (d), natural uranium in amounts sufficient to fulfill the Department of Energy’s commitments under Article 4(B) of the Agreement between the Department and the Corporation dated June 17, 2002. “(d) Inventory Sales.— (1) In addition to the transfers and sales authorized under subsections (b) and (c) and under paragraph (5) of this subsection, the United States Government may transfer or sell uranium in any form subject to paragraphs (2), (3), and (4). “(2) Except as provided in subsections (b) and (c) and paragraph (5) of this subsection, no sale or transfer of uranium shall be made under this subsection by the United States Government unless— “(A) the President determines that the material is not necessary for national security needs and the sale or transfer has no adverse impact on implementation of existing government-to-government agreements; “(3) Except as provided in paragraph (5), the United States Government shall not make any transfer or sale of uranium in any form under this subsection that would cause the total amount of uranium transferred or sold pursuant to this subsection that is delivered for consumption by commercial nuclear power end users to exceed— “(4) Except for sales or transfers under paragraph (5), for the purposes of this subsection, the recovery of uranium from uranium bearing materials transferred or sold by the United States Government to the domestic uranium industry shall be the preferred method of making uranium available. The recovered uranium shall be counted against the annual maximum deliveries set forth in this section, when such uranium is sold to end users. “(5) The United States Government may make the following sales and transfers: “(A) Sales or transfers to a Federal agency if the material is transferred for the use of the receiving agency without any resale or transfer to another entity and the material does not meet commercial specifications. “(B) Sales or transfers to any person for national security purposes, as determined by the Secretary. “(C) Sales or transfers to any State or local agency or nonprofit, charitable, or educational institution for use other than the generation of electricity for commercial use. “(E) Sales or transfers, at fair market value, for emergency purposes in the event of a disruption in supply to commercial nuclear power end users in the United States. “(f) Services.—Notwithstanding any other provision of this section, if the Secretary determines that the Corporation has failed, or may fail, to perform any obligation under the Agreement between the Department of Energy and the Corporation dated June 17, 2002, and as amended thereafter, which failure could result in termination of the Agreement, the Secretary shall notify Congress, in such a manner that affords Congress an opportunity to comment, prior to a determination by the Secretary whether termination, waiver, or modification of the Agreement is required. The Secretary is authorized to take such action as he determines necessary under the Agreement to terminate, waive, or modify provisions of the Agreement to achieve its purposes.”. (b) Report.—Not later than 3 years after the date of enactment of this Act, the Secretary of Energy shall report to Congress on the implementation of this section. The report shall include a discussion of available excess uranium inventories; all sales or transfers made by the United States Government; the impact of such sales or transfers on the domestic uranium industry, the spot market uranium price, and the national security interests of the United States; and any steps taken to remediate any adverse impacts of such sales or transfers. (a) Authorization of appropriations.—There are authorized to be appropriated to the Secretary of Energy $10,000,000 for each of fiscal years 2006, 2007, and 2008 for— (1) cooperative, cost-shared agreements between the Department of Energy and domestic uranium producers to identify, test, and develop improved in situ leaching mining technologies, including low-cost environmental restoration technologies that may be applied to sites after completion of in situ leaching operations; and (b) Domestic uranium producer.—For purposes of this section, the term “domestic uranium producer” has the meaning given that term in section 1018(4) of the Energy Policy Act of 1992 (42 U.S.C. 2296b–7(4)), except that the term shall not include any producer that has not produced uranium from domestic reserves on or after July 30, 1998. (a) Definition of employer.—Section 211(a)(2) of the Energy Reorganization Act of 1974 (42 U.S.C. 5851(a)(2)) is amended— (b) De novo review.—Subsection (b) of such section 211 is amended by adding at the end the following new paragraph: “(4) If the Secretary has not issued a final decision within 540 days after the filing of a complaint under paragraph (1), and there is no showing that such delay is due to the bad faith of the person seeking relief under this paragraph, such person may bring an action at law or equity for de novo review in the appropriate district court of the United States, which shall have jurisdiction over such an action without regard to the amount in controversy.”. Section 134 of the Atomic Energy Act of 1954 (42 U.S.C. 2160d) is amended— (1) in subsection a., by striking “a. The Commission” and inserting “a. In General.—Except as provided in subsection b., the Commission”; (3) by inserting after subsection a. the following: “b. Medical Isotope Production.— “(1) DEFINITIONS.—In this subsection: “(A) HIGHLY ENRICHED URANIUM.—The term ‘highly enriched uranium’ means uranium enriched to include concentration of U–235 above 20 percent. “(B) MEDICAL ISOTOPE.—The term ‘medical isotope’ includes Molybdenum 99, Iodine 131, Xenon 133, and other radioactive materials used to produce a radiopharmaceutical for diagnostic, therapeutic procedures or for research and development. “(2) LICENSES.—The Commission may issue a license authorizing the export (including shipment to and use at intermediate and ultimate consignees specified in the license) to a recipient country of highly enriched uranium for medical isotope production if, in addition to any other requirements of this Act (except subsection a.), the Commission determines that— “(A) a recipient country that supplies an assurance letter to the United States Government in connection with the consideration by the Commission of the export license application has informed the United States Government that any intermediate consignees and the ultimate consignee specified in the application are required to use the highly enriched uranium solely to produce medical isotopes; and “(3) REVIEW OF PHYSICAL PROTECTION REQUIREMENTS.— “(A) IN GENERAL.—The Commission shall review the adequacy of physical protection requirements that, as of the date of an application under paragraph (2), are applicable to the transportation and storage of highly enriched uranium for medical isotope production or control of residual material after irradiation and extraction of medical isotopes. “(B) IMPOSITION OF ADDITIONAL REQUIREMENTS.—If the Commission determines that additional physical protection requirements are necessary (including a limit on the quantity of highly enriched uranium that may be contained in a single shipment), the Commission shall impose such requirements as license conditions or through other appropriate means. “(4) FIRST REPORT TO CONGRESS.— “(A) NAS STUDY.—The Secretary shall enter into an arrangement with the National Academy of Sciences to conduct a study to determine— “(i) the feasibility of procuring supplies of medical isotopes from commercial sources that do not use highly enriched uranium; “(ii) the current and projected demand and availability of medical isotopes in regular current domestic use; “(B) FEASIBILITY.—For the purpose of this subsection, the use of low enriched uranium to produce medical isotopes shall be determined to be feasible if— “(i) low enriched uranium targets have been developed and demonstrated for use in the reactors and target processing facilities that produce significant quantities of medical isotopes to serve United States needs for such isotopes; “(C) REPORT BY THE SECRETARY.—Not later than 5 years after the date of enactment of the Energy Policy Act of 2005, the Secretary shall submit to Congress a report that— “(i) contains the findings of the National Academy of Sciences made in the study under subparagraph (A); and “(ii) discloses the existence of any commitments from commercial producers to provide domestic requirements for medical isotopes without use of highly enriched uranium consistent with the feasibility criteria described in subparagraph (B) not later than the date that is 4 years after the date of submission of the report. “(5) SECOND REPORT TO CONGRESS.—If the study of the National Academy of Sciences determines under paragraph (4)(A)(i) that the procurement of supplies of medical isotopes from commercial sources that do not use highly enriched uranium is feasible, but the Secretary is unable to report the existence of commitments under paragraph (4)(C)(ii), not later than the date that is 6 years after the date of enactment of the Energy Policy Act of 2005, the Secretary shall submit to Congress a report that describes options for developing domestic supplies of medical isotopes in quantities that are adequate to meet domestic demand without the use of highly enriched uranium consistent with the cost increase described in paragraph (4)(B)(iii). “(6) CERTIFICATION.—At such time as commercial facilities that do not use highly enriched uranium are capable of meeting domestic requirements for medical isotopes, within the cost increase described in paragraph (4)(B)(iii) and without impairing the reliable supply of medical isotopes for domestic utilization, the Secretary shall submit to Congress a certification to that effect. Title III of the Nuclear Waste Policy Act of 1982 (42 U.S.C. 10221 et seq.) is amended by adding at the end the following new section: “Fernald byproduct material “Sec. 307. Notwithstanding any other law, the material in the concrete silos at the Fernald uranium processing facility managed on the date of enactment of this section by the Department shall be considered byproduct material (as defined by section 11 e.(2) of the Atomic Energy Act of 1954 (42 U.S.C. 2014(e)(2))). The Department may dispose of the material in a facility regulated by the Commission or by an Agreement State. If the Department disposes of the material in such a facility, the Commission or the Agreement State shall regulate the material as byproduct material under that Act. This material shall remain subject to the jurisdiction of the Department until it is received at a commercial, Commission-licensed, or Agreement State-licensed facility, at which time the material shall be subject to the health and safety requirements of the Commission or the Agreement State with jurisdiction over the disposal site.”. Subtitle D of title I of the Nuclear Waste Policy Act of 1982 (42 U.S.C. 10171) is amended by adding at the end the following new section: “Safe disposal of greater-than-class c radioactive waste “Sec. 152. (a) Designation of responsibility.—The Secretary shall designate an Office within the Department to have the responsibility for activities needed to develop a new, or use an existing, facility for safely disposing of all low-level radioactive waste with concentrations of radionuclides that exceed the limits established by the Commission for Class C radioactive waste (referred to in this section as ‘GTCC waste’). “(b) Comprehensive plan.—The Secretary shall develop a comprehensive plan for permanent disposal of GTCC waste which includes plans for a disposal facility. This plan shall be transmitted to Congress in a series of reports, including the following: “(1) REPORT ON SHORT-TERM PLAN.—Not later than 180 days after the date of enactment of this section, the Secretary shall submit to Congress a plan describing the Secretary’s operational strategy for continued recovery and storage of GTCC waste until a permanent disposal facility is available. “(2) UPDATE OF 1987 REPORT.— “(A) IN GENERAL.—Not later than 1 year after the date of enactment of this section, the Secretary shall submit to Congress an update of the Secretary’s February 1987 report submitted to Congress that made comprehensive recommendations for the disposal of GTCC waste. “(B) CONTENTS.—The update under this paragraph shall contain— “(ii) a description of current domestic and international programs, both Federal and commercial, for management and disposition of GTCC waste; “(iii) an identification of the Federal and private options and costs for the safe disposal of GTCC waste; “(3) REPORT ON COST AND SCHEDULE FOR COMPLETION OF ENVIRONMENTAL IMPACT STATEMENT AND RECORD OF DECISION.—Not later than 180 days after the date of submission of the update required under paragraph (2), the Secretary shall submit to Congress a report containing an estimate of the cost and schedule to complete a draft and final environmental impact statement and to issue a record of decision for a permanent disposal facility, utilizing either a new or existing facility, for GTCC waste.”. (a) In general.—Section 129 of the Atomic Energy Act of 1954 (42 U.S.C. 2158) is amended— (2) by adding at the end the following new subsection: “b. (1) Notwithstanding any other provision of law, including specifically section 121 of this Act, and except as provided in paragraphs (2) and (3), no nuclear materials and equipment or sensitive nuclear technology, including items and assistance authorized by section 57 b. of this Act and regulated under part 810 of title 10, Code of Federal Regulations, and nuclear-related items on the Commerce Control List maintained under part 774 of title 15 of the Code of Federal Regulations, shall be exported or reexported, or transferred or retransferred whether directly or indirectly, and no Federal agency shall issue any license, approval, or authorization for the export or reexport, or transfer, or retransfer, whether directly or indirectly, of these items or assistance (as defined in this paragraph) to any country whose government has been identified by the Secretary of State as engaged in state sponsorship of terrorist activities (specifically including any country the government of which has been determined by the Secretary of State under section 620A(a) of the Foreign Assistance Act of 1961 (22 U.S.C. 2371(a)), section 6(j)(1) of the Export Administration Act of 1979 (50 U.S.C. App. 2405(j)(1)), or section 40(d) of the Arms Export Control Act (22 U.S.C. 2780(d)) to have repeatedly provided support for acts of international terrorism). “(2) This subsection shall not apply to exports, reexports, transfers, or retransfers of radiation monitoring technologies, surveillance equipment, seals, cameras, tamper-indication devices, nuclear detectors, monitoring systems, or equipment necessary to safely store, transport, or remove hazardous materials, whether such items, services, or information are regulated by the Department of Energy, the Department of Commerce, or the Nuclear Regulatory Commission, except to the extent that such technologies, equipment, seals, cameras, devices, detectors, or systems are available for use in the design or construction of nuclear reactors or nuclear weapons. “(3) The President may waive the application of paragraph (1) to a country if the President determines and certifies to Congress that the waiver will not result in any increased risk that the country receiving the waiver will acquire nuclear weapons, nuclear reactors, or any materials or components of nuclear weapons and— “(A) the government of such country has not within the preceding 12-month period willfully aided or abetted the international proliferation of nuclear explosive devices to individuals or groups or willfully aided and abetted an individual or groups in acquiring unsafeguarded nuclear materials; “(B) in the judgment of the President, the government of such country has provided adequate, verifiable assurances that it will cease its support for acts of international terrorism; (b) Applicability to exports approved for transfer but Not transferred.—Subsection b. of section 129 of Atomic Energy Act of 1954, as added by subsection (a) of this section, shall apply with respect to exports that have been approved for transfer as of the date of the enactment of this Act but have not yet been transferred as of that date. The USEC Privatization Act (42 U.S.C. 2297h et seq.) is amended by adding at the end the following new section: “(a) Stockpile creation.—The Secretary of Energy may create a national low-enriched uranium stockpile with the goals to— If a quorum of the Nuclear Regulatory Commission gathers to discuss official Commission business the discussions shall be recorded, and the Commission shall notify the public of such discussions within 15 days after they occur. The Commission shall promptly make a transcript of the recording available to the public on request, except to the extent that public disclosure is exempted or prohibited by law. This section shall not apply to a meeting, within the meaning of that term under section 552b(a)(2) of title 5, United States Code. Section 3110(a) of the USEC Privatization Act (42 U.S.C. 2297h-8(a)) is amended by adding at the end the following new paragraph: “(8) Continuity of benefits.—Not later than 30 days after the date of enactment of this paragraph, the Secretary shall implement such actions as are necessary to ensure that any employee who— “(A) is involved in providing infrastructure or environmental remediation services at the Portsmouth, Ohio, or the Paducah, Kentucky, Gaseous Diffusion Plant; “(B) has been an employee of the Department of Energy’s predecessor management and integrating contractor (or its first or second tier subcontractors), or of the Corporation, at the Portsmouth, Ohio, or the Paducah, Kentucky, facility; and “(C) was eligible as of April 1, 2005, to participate in or transfer into the Multiple Employer Pension Plan or the associated multiple employer retiree health care benefit plans, as defined in those plans, shall continue to be eligible to participate in or transfer into such pension or health care benefit plans.”. (a) Advanced reactor hydrogen cogeneration project.— (1) PROJECT ESTABLISHMENT.— The Secretary is directed to establish an Advanced Reactor Hydrogen Cogeneration Project. (2) PROJECT DEFINITION.— The project shall consist of the research, development, design, construction, and operation of a hydrogen production cogeneration research facility that, relative to the current commercial reactors, enhances safety features, reduces waste production, enhances thermal efficiencies, increases proliferation resistance, and has the potential for improved economics and physical security in reactor siting. This facility shall be constructed so as to enable research and development on advanced reactors of the type selected and on alternative approaches for reactor-based production of hydrogen. (3) PROJECT MANAGEMENT.— (A) MANAGEMENT.—The project shall be managed within the Department by the Office of Nuclear Energy, Science, and Technology. (B) LEAD LABORATORY.—The lead laboratory for the project, providing the site for the reactor construction, shall be the Idaho National Laboratory (in this subsection referred to as “INL”). (C) STEERING COMMITTEE.—The Secretary shall establish a national steering committee with membership from the national laboratories, universities, and industry to provide advice to the Secretary and the Director of the Office of Nuclear Energy, Science, and Technology on technical and program management aspects of the project. (4) PROJECT REQUIREMENTS.— (A) RESEARCH AND DEVELOPMENT.— (i) IN GENERAL.—The project shall include planning, research and development, design, and construction of an advanced, next-generation, nuclear energy system suitable for enabling further research and development on advanced reactor technologies and alternative approaches for reactor-based generation of hydrogen. (ii) REACTOR TEST CAPABILITIES AT INL.—The project shall utilize, where appropriate, extensive reactor test capabilities resident at INL. (B) INTERNATIONAL COLLABORATION.— (i) IN GENERAL.—The Secretary shall seek international cooperation, participation, and financial contribution in this project. (ii) ASSISTANCE FROM INTERNATIONAL PARTNERS.—The Secretary may contract for assistance from specialists or facilities from member countries of the Generation IV International Forum, the Russian Federation, or other international partners where such specialists or facilities provide access to cost-effective and relevant skills or test capabilities. (C) DEMONSTRATION.—The overall project, which may involve demonstration of selected project objectives in a partner nation, must demonstrate both electricity and hydrogen production and may provide flexibility, where technically and economically feasible in the design and construction, to enable tests of alternative reactor core and cooling configurations. (D) PARTNERSHIPS.—The Secretary shall establish cost-shared partnerships with domestic industry or international participants for the research, development, design, construction, and operation of the research facility, and preference in determining the final project structure shall be given to an overall project which retains United States leadership while maximizing cost sharing opportunities and minimizing Federal funding responsibilities. (E) TARGET DATE.—The Secretary shall select technologies and develop the project to provide initial testing of either hydrogen production or electricity generation by 2011, or provide a report to Congress explaining why this date is not feasible. (F) WAIVER OF CONSTRUCTION TIMELINES.—The Secretary is authorized to conduct the Advanced Reactor Hydrogen Cogeneration Project without the constraints of DOE Order 413.3, relating to program and project management for the acquisition of capital assets, as necessary to meet the specified operational date. (G) COMPETITION.—The Secretary may fund up to 2 teams for up to 1 year to develop detailed proposals for competitive evaluation and selection of a single proposal and concept for further progress. The Secretary shall define the format of the competitive evaluation of proposals. (H) USE OF FACILITIES.—Research facilities in industry, national laboratories, or universities either within the United States or with cooperating international partners may be used to develop the enabling technologies for the research facility. Utilization of domestic university-based facilities shall be encouraged to provide educational opportunities for student development. (I) ROLE OF NUCLEAR REGULATORY COMMISSION.— (i) IN GENERAL.—The Nuclear Regulatory Commission shall have licensing and regulatory authority for any reactor authorized under this subsection, pursuant to section 202 of the Energy Reorganization Act of 1974 (42 U.S.C. 5842). (b) Advanced nuclear reactor technologies.—The Secretary shall— (1) prepare a detailed roadmap for carrying out the provisions in this subtitle related to advanced nuclear reactor technologies and for implementing the recommendations related to advanced nuclear reactor technologies that are included in the report transmitted under subsection (d); and (2) provide for the establishment of 5 projects in geographic areas that are regionally and climatically diverse to demonstrate the commercial production of hydrogen at existing nuclear power plants, including one demonstration project at a national laboratory or institution of higher education using an advanced gas-cooled reactor. (c) Collocation with hydrogen production facility.—Section 103 of the Atomic Energy Act of 1954 (42 U.S.C. 2011) is amended by adding at the end the following new subsection: “g. The Commission shall give priority to the licensing of a utilization facility that is collocated with a hydrogen production facility. The Commission shall issue a final decision approving or disapproving the issuance of a license to construct and operate a utilization facility not later than the expiration of 3 years after the date of the submission of such application, if the application references a Commission-certified design and an early site permit, unless the Commission determines that the applicant has proposed material and substantial changes to the design or the site design parameters.”. (d) Report.—The Secretary shall transmit to the Congress not later than 120 days after the date of enactment of this Act a report containing detailed summaries of the roadmaps prepared under subsection (b)(1), descriptions of the Secretary’s progress in establishing the projects and other programs required under this section, and recommendations for promoting the availability of advanced nuclear reactor energy technologies for the production of hydrogen. For purposes of this subtitle— (1) the term “advanced nuclear reactor technologies” means— (A) technologies related to advanced light water reactors that may be commercially available in the near-term, including mid-sized reactors with passive safety features, for the generation of electric power from nuclear fission and the production of hydrogen; and (B) technologies related to other nuclear reactors that may require prototype demonstration prior to availability in the mid-term or long-term, including high-temperature, gas-cooled reactors and liquid metal reactors, for the generation of electric power from nuclear fission and the production of hydrogen; (2) the term “institution of higher education” has the meaning given to that term in section 101(a) of the Higher Education Act of 1965 (20 U.S.C. 1001(a)); and (a) Study.—The President, in consultation with the Nuclear Regulatory Commission (referred to in this subtitle as the “Commission”) and other appropriate Federal, State, and local agencies and private entities, shall conduct a study to identify the types of threats that pose an appreciable risk to the security of the various classes of facilities licensed by the Commission under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.). Such study shall take into account, but not be limited to— (3) the potential for attack on facilities by multiple coordinated teams of a large number of individuals; (10) the potential for attacks on spent fuel shipments by multiple coordinated teams of a large number of individuals; (b) Summary and classification report.—Not later than 180 days after the date of the enactment of this Act, the President shall transmit to Congress and the Commission a report— (2) classifying each type of threat identified under subsection (a), in accordance with existing laws and regulations, as either— (c) Federal action report.—Not later than 90 days after the date on which a report is transmitted under subsection (b), the President shall transmit to Congress a report on actions taken, or to be taken, to address the types of threats identified under subsection (b)(2)(A), including identification of the Federal, State, and local agencies responsible for carrying out the obligations and authorities of the United States. Such report may include a classified annex, as appropriate. (d) Regulations.—Not later than 180 days after the date on which a report is transmitted under subsection (b), the Commission may revise, by rule, the design basis threats issued before the date of enactment of this section as the Commission considers appropriate based on the summary and classification report. (e) Physical security program.—The Commission shall establish an operational safeguards response evaluation program that ensures that the physical protection capability and operational safeguards response for sensitive nuclear facilities, as determined by the Commission consistent with the protection of public health and the common defense and security, shall be tested periodically through Commission approved or designed, observed, and evaluated force-on-force exercises to determine whether the ability to defeat the design basis threat is being maintained. For purposes of this subsection, the term “sensitive nuclear facilities” includes at a minimum commercial nuclear power plants and category I fuel cycle facilities. (f) Control of information.—Notwithstanding any other provision of law, the Commission may undertake any rulemaking under this subtitle in a manner that will fully protect safeguards and classified national security information. (g) Federal security coordinators.— (1) REGIONAL OFFICES.—Not later than 18 months after the date of enactment of this Act, the Commission shall assign a Federal security coordinator, under the employment of the Commission, to each region of the Commission. (2) RESPONSIBILITIES.—The Federal security coordinator shall be responsible for— (A) communicating with the Commission and other Federal, State, and local authorities concerning threats, including threats against such classes of facilities as the Commission determines to be appropriate; (a) In general.—Subsection a. of section 149 of the Atomic Energy Act of 1954 (42 U.S.C. 2169(a)) is amended— (1) by striking “a. The Nuclear” and all that follows through “section 147.” and inserting the following: “a. In general.— “(1) REQUIREMENTS.— “(A) IN GENERAL.—The Commission shall require each individual or entity— “(i) that is licensed or certified to engage in an activity subject to regulation by the Commission; “(ii) that has filed an application for a license or certificate to engage in an activity subject to regulation by the Commission; or “(iii) that has notified the Commission, in writing, of an intent to file an application for licensing, certification, permitting, or approval of a product or activity subject to regulation by the Commission, to fingerprint each individual described in subparagraph (B) before the individual is permitted unescorted access or access, whichever is applicable, as described in subparagraph (B). (2) by striking “All fingerprints obtained by a licensee or applicant as required in the preceding sentence” and inserting the following: (3) by striking “The costs of any identification and records check conducted pursuant to the preceding sentence shall be paid by the licensee or applicant.” and inserting the following: (4) by striking “Notwithstanding any other provision of law, the Attorney General may provide all the results of the search to the Commission, and, in accordance with regulations prescribed under this section, the Commission may provide such results to the licensee or applicant submitting such fingerprints.” and inserting the following: “(4) PROVISION TO INDIVIDUAL OR ENTITY REQUIRED TO CONDUCT FINGERPRINTING.—Notwithstanding any other provision of law, the Attorney General may provide all the results of the search to the Commission, and, in accordance with regulations prescribed under this section, the Commission may provide such results to the individual or entity required to conduct the fingerprinting under paragraph (1)(A).”. (b) Administration.—Subsection c. of section 149 of the Atomic Energy Act of 1954 (42 U.S.C. 2169(c)) is amended— (c) Biometric methods.—Subsection d. of section 149 of the Atomic Energy Act of 1954 (42 U.S.C. 2169(d)) is redesignated as subsection e., and the following is inserted after subsection c.: Section 161 of the Atomic Energy Act of 1954 (42 U.S.C. 2201) is amended by adding at the end the following subsection: “(z) (1) notwithstanding section 922(o), (v), and (w) of title 18, United States Code, or any similar provision of any State law or any similar rule or regulation of a State or any political subdivision of a State prohibiting the transfer or possession of a handgun, a rifle or shotgun, a short-barreled shotgun, a short-barreled rifle, a machinegun, a semiautomatic assault weapon, ammunition for the foregoing, or a large capacity ammunition feeding device, authorize security personnel of licensees and certificate holders of the Commission (including employees of contractors of licensees and certificate holders) to receive, possess, transport, import, and use 1 or more of those weapons, ammunition, or devices, if the Commission determines that— “(A) such authorization is necessary to the discharge of the security personnel’s official duties; and “(B) the security personnel— “(i) are not otherwise prohibited from possessing or receiving a firearm under Federal or State laws pertaining to possession of firearms by certain categories of persons; “(ii) have successfully completed requirements established through guidelines implementing this subsection for training in use of firearms and tactical maneuvers; “(iii) are engaged in the protection of— “(I) facilities owned or operated by a Commission licensee or certificate holder that are designated by the Commission; or “(II) radioactive material or other property owned or possessed by a person that is a licensee or certificate holder of the Commission, or that is being transported to or from a facility owned or operated by such a licensee or certificate holder, and that has been determined by the Commission to be of significance to the common defense and security or public health and safety; and “(2) Such receipt, possession, transportation, importation, or use shall be subject to— “(A) chapter 44 of title 18, United States Code, except for section 922(a)(4), (o), (v), and (w); “(B) chapter 53 of title 26, United States Code, except for section 5844; and “(C) a background check by the Attorney General, based on fingerprints and including a check of the system established under section 103(b) of the Brady Handgun Violence Prevention Act (18 U.S.C. 922 note) to determine whether the person applying for the authority is prohibited from possessing or receiving a firearm under Federal or State law. “(3) This subsection shall become effective upon the issuance of guidelines by the Commission, with the approval of the Attorney General, to govern the implementation of this subsection. “(4) In this subsection, the terms ‘handgun’, ‘rifle’, ‘shotgun’, ‘firearm’, ‘ammunition’, ‘machinegun’, ‘semiautomatic assault weapon’, ‘large capacity ammunition feeding device’, ‘short-barreled shotgun’, and ‘short-barreled rifle’ shall have the meanings given those terms in section 921(a) of title 18, United States Code.”. Section 229 a. of the Atomic Energy Act of 1954 (42 U.S.C. 2278a(a)) is amended in the first sentence by inserting “or subject to the licensing authority of the Commission or to certification by the Commission under this Act or any other Act” before the period at the end. (a) In general.—Section 236 a. of the Atomic Energy Act of 1954 (42 U.S.C. 2284(a)) is amended— (1) in paragraph (2), by striking “storage facility” and inserting “storage, treatment, or disposal facility”; (2) in paragraph (3)— (3) in paragraph (4)— (4) by inserting after paragraph (4) the following: “(5) any production, utilization, waste storage, waste treatment, waste disposal, uranium enrichment, uranium conversion, or nuclear fuel fabrication facility subject to licensing or certification under this Act during construction of the facility, if the destruction or damage caused or attempted to be caused could adversely affect public health and safety during the operation of the facility; “(6) any primary facility or backup facility from which a radiological emergency preparedness alert and warning system is activated; or “(7) any radioactive material or other property subject to regulation by the Nuclear Regulatory Commission that, before the date of the offense, the Nuclear Regulatory Commission determines, by order or regulation published in the Federal Register, is of significance to the public health and safety or to common defense and security,”. (b) Penalties.—Section 236 of the Atomic Energy Act of 1954 (42 U.S.C. 2284) is amended by striking “$10,000 or imprisoned for not more than 20 years, or both, and, if death results to any person, shall be imprisoned for any term of years or for life” both places it appears and inserting “$1,000,000 or imprisoned for up to life without parole”. (a) Amendment.—Chapter 14 of the Atomic Energy Act of 1954 (42 U.S.C. 2201–2210b) is amended by adding at the end the following new section: “SEC. 170C. Secure transfer of nuclear materials. “a. The Nuclear Regulatory Commission shall establish a system to ensure that materials described in subsection b., when transferred or received in the United States by any party pursuant to an import or export license issued pursuant to this Act, are accompanied by a manifest describing the type and amount of materials being transferred or received. Each individual receiving or accompanying the transfer of such materials shall be subject to a security background check conducted by appropriate Federal entities. “b. Except as otherwise provided by the Commission by regulation, the materials referred to in subsection a. are byproduct materials, source materials, special nuclear materials, high-level radioactive waste, spent nuclear fuel, transuranic waste, and low-level radioactive waste (as defined in section 2(16) of the Nuclear Waste Policy Act of 1982 (42 U.S.C. 10101(16))).”. (b) Regulations.—Not later than 1 year after the date of the enactment of this Act, and from time to time thereafter as it considers necessary, the Nuclear Regulatory Commission shall issue regulations identifying radioactive materials or classes of individuals that, consistent with the protection of public health and safety and the common defense and security, are appropriate exceptions to the requirements of section 170C of the Atomic Energy Act of 1954, as added by subsection (a) of this section. (c) Effective date.—The amendment made by subsection (a) shall take effect upon the issuance of regulations under subsection (b), except that the background check requirement shall become effective on a date established by the Commission. (d) Effect on other law.—Nothing in this section or the amendment made by this section shall waive, modify, or affect the application of chapter 51 of title 49, United States Code, part A of subtitle V of title 49, United States Code, part B of subtitle VI of title 49, United States Code, and title 23, United States Code. Before issuing a license for a utilization facility, the Nuclear Regulatory Commission shall consult with the Department of Homeland Security concerning the potential vulnerabilities of the location of the proposed facility to terrorist attack. (a) In general.—There are authorized to be appropriated such sums as are necessary to carry out this subtitle and the amendments made by this subtitle. (b) Nuclear regulatory commission user fees and annual charges.—Section 6101 of the Omnibus Budget Reconciliation Act of 1990 (42 U.S.C. 2214) is amended— (1) in subsection (a)— (2) in subsection (c)— (C) by adding at the end of paragraph (2)(A) the following new clauses: “(iii) amounts appropriated to the Commission for the fiscal year for implementation of section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005; and “(iv) amounts appropriated to the Commission for homeland security activities of the Commission for the fiscal year, except for the costs of fingerprinting and background checks required by section 149 of the Atomic Energy Act of 1954 (42 U.S.C. 2169) and the costs of conducting security inspections.”; and (c) Repeal.—Section 7601 of the Consolidated Omnibus Budget Reconciliation Act of 1985 (42 U.S.C. 2213) is repealed. Section 400AA(a)(3)(E) of the Energy Policy and Conservation Act (42 U.S.C. 6374(a)(3)(E)) is amended to read as follows: “(E) (i) Dual fueled vehicles acquired pursuant to this section shall be operated on alternative fuels unless the Secretary determines that an agency qualifies for a waiver of such requirement for vehicles operated by the agency in a particular geographic area in which— “(I) the alternative fuel otherwise required to be used in the vehicle is not reasonably available to retail purchasers of the fuel, as certified to the Secretary by the head of the agency; or “(II) the cost of the alternative fuel otherwise required to be used in the vehicle is unreasonably more expensive compared to gasoline, as certified to the Secretary by the head of the agency. “(ii) The Secretary shall monitor compliance with this subparagraph by all such fleets and shall report annually to Congress on the extent to which the requirements of this subparagraph are being achieved. The report shall include information on annual reductions achieved from the use of petroleum-based fuels and the problems, if any, encountered in acquiring alternative fuels.”. Section 303(c) of the Energy Policy Act of 1992 (42 U.S.C. 13212(c)) is amended by striking “may” and inserting “shall”. (a) Lease condensate fuels.—Section 301 of the Energy Policy Act of 1992 (42 U.S.C. 13211) is amended— (1) in paragraph (2), by inserting “mixtures containing 50 percent or more by volume of lease condensate or fuels extracted from lease condensate;” after “liquefied petroleum gas;”; (b) Lease condensate use credits.— (1) IN GENERAL.—Title III of the Energy Policy Act of 1992 (42 U.S.C. 13211 et seq.) is amended by adding at the end the following: “SEC. 313. Lease condensate use credits. “(a) In general.—Subject to subsection (d), the Secretary shall allocate 1 credit under this section to a fleet or covered person for each qualifying volume of the lease condensate component of fuel containing at least 50 percent lease condensate, or fuels extracted from lease condensate, after the date of enactment of this section for use by the fleet or covered person in vehicles owned or operated by the fleet or covered person that weigh more than 8,500 pounds gross vehicle weight rating. “(b) Requirements.—A credit allocated under this section— “(c) Regulation.— “(1) IN GENERAL.—Subject to subsection (d), not later than January 1, 2006, after the collection of appropriate information and data that consider usage options, uses in other industries, products, or processes, potential volume capacities, costs, air emissions, and fuel efficiencies, the Secretary shall issue a regulation establishing requirements and procedures for the implementation of this section. (c) Emergency exemption.—Section 301 of the Energy Policy Act of 1992 (42 U.S.C. 13211) is amended in paragraph (9)(E) by inserting before the semicolon at the end “, including vehicles directly used in the emergency repair of transmission lines and in the restoration of electricity service following power outages, as determined by the Secretary”. (a) In general.—Not later than 180 days after the date of enactment of this section, the Secretary of Energy shall complete a study to determine the effect that titles III, IV, and V of the Energy Policy Act of 1992 (42 U.S.C. 13211 et seq.) have had on— (b) Topics.—As part of the study under subsection (a), the Secretary shall specifically identify— (1) the number of alternative fueled vehicles acquired by fleets or covered persons required to acquire alternative fueled vehicles; (2) the quantity, by type, of alternative fuel actually used in alternative fueled vehicles acquired by fleets or covered persons; (3) the quantity of petroleum displaced by the use of alternative fuels in alternative fueled vehicles acquired by fleets or covered persons; (4) the direct and indirect costs of compliance with requirements under titles III, IV, and V of the Energy Policy Act of 1992 (42 U.S.C. 13211 et seq.), including— (c) Report.—Upon completion of the study under this section, the Secretary shall submit to Congress a report that describes the results of the study and includes any recommendations of the Secretary for legislative or administrative changes concerning the alternative fueled vehicle requirements under titles III, IV and V of the Energy Policy Act of 1992 (42 U.S.C. 13211 et seq.). Section 310(b)(1) of the Energy Policy Act of 1992 (42 U.S.C. 13218(b)(1)) is amended by striking “1 year after the date of enactment of this subsection” and inserting “February 15, 2006”. The Secretary of Energy shall accelerate efforts directed toward the improvement of batteries and other rechargeable energy storage systems, power electronics, hybrid systems integration, and other technologies for use in hybrid vehicles. (a) Establishment.—The Administrator of the Environmental Protection Agency, in consultation with the Secretary, shall establish a program for awarding grants on a competitive basis to entities for the installation of hybrid retrofit and electric conversion technologies for combustion engine vehicles. (c) Awards.— (d) Conditions of grant.—A grant shall be provided under this section on the conditions that— (1) combustion engine vehicles on which hybrid retrofit or conversion technology are to be demonstrated— (e) Verification.—Not later than 90 days after the date of enactment of this Act, the Administrator shall publish in the Federal Register procedures to verify— In this part: (1) ALTERNATIVE FUELED VEHICLE.— (A) IN GENERAL.—The term “alternative fueled vehicle” means a vehicle propelled solely on an alternative fuel (as defined in section 301 of the Energy Policy Act of 1992 (42 U.S.C. 13211)). (2) FUEL CELL VEHICLE.—The term “fuel cell vehicle” means a vehicle propelled by an electric motor powered by a fuel cell system that converts chemical energy into electricity by combining oxygen (from air) with hydrogen fuel that is stored on the vehicle or is produced onboard by reformation of a hydrocarbon fuel. Such fuel cell system may or may not include the use of auxiliary energy storage systems to enhance vehicle performance. (3) HYBRID VEHICLE.—The term “hybrid vehicle” means a medium or heavy duty vehicle propelled by an internal combustion engine or heat engine using any combustible fuel and an onboard rechargeable energy storage device. (4) NEIGHBORHOOD ELECTRIC VEHICLE.—The term “neighborhood electric vehicle” means a motor vehicle that— (A) meets the definition of a low-speed vehicle (as defined in part 571 of title 49, Code of Federal Regulations); (5) PILOT PROGRAM.—The term “pilot program” means the competitive grant program established under section 722. (7) ULTRA-LOW SULFUR DIESEL VEHICLE.—The term “ultra-low sulfur diesel vehicle” means a vehicle manufactured in any of model years 2004 through 2006 powered by a heavy-duty diesel engine that— (a) Establishment.—The Secretary, in consultation with the Secretary of Transportation, shall establish a competitive grant pilot program, to be administered through the Clean Cities Program of the Department of Energy, to provide not more than 15 geographically dispersed project grants to State governments, local governments, or metropolitan transportation authorities to carry out a project or projects for the purposes described in subsection (b). (b) Grant purposes.—A grant under this section may be used for the following purposes: (2) The acquisition of alternative fueled vehicles, hybrid vehicles, or fuel cell vehicles, including— (c) Applications.— (1) REQUIREMENTS.— (A) IN GENERAL.—The Secretary shall issue requirements for applying for grants under the pilot program. (B) MINIMUM REQUIREMENTS.—At a minimum, the Secretary shall require that an application for a grant— (i) be submitted by the head of a State or local government or a metropolitan transportation authority, or any combination thereof, and a registered participant in the Clean Cities Program of the Department of Energy; and (ii) include— (I) a description of the project proposed in the application, including how the project meets the requirements of this part; (III) an estimate of the air pollution emissions reduced and fossil fuel displaced as a result of the project, and a plan to collect and disseminate environmental data, related to the project to be funded under the grant, over the life of the project; (IV) a description of how the project will be sustainable without Federal assistance after the completion of the term of the grant; (V) a complete description of the costs of the project, including acquisition, construction, operation, and maintenance costs over the expected life of the project; (d) Selection criteria.—In evaluating applications under the pilot program, the Secretary shall— (2) give priority consideration to applications that— (e) Pilot project requirements.— (1) MAXIMUM AMOUNT.—The Secretary shall not provide more than $20,000,000 in Federal assistance under the pilot program to any applicant. (2) COST SHARING.—The Secretary shall not provide more than 50 percent of the cost, incurred during the period of the grant, of any project under the pilot program. (3) MAXIMUM PERIOD OF GRANTS.—The Secretary shall not fund any applicant under the pilot program for more than 5 years. (4) DEPLOYMENT AND DISTRIBUTION.—The Secretary shall seek to the maximum extent practicable to ensure a broad geographic distribution of project sites. (5) TRANSFER OF INFORMATION AND KNOWLEDGE.—The Secretary shall establish mechanisms to ensure that the information and knowledge gained by participants in the pilot program are transferred among the pilot program participants and to other interested parties, including other applicants that submitted applications. (f) Schedule.— (1) PUBLICATION.—Not later than 90 days after the date of enactment of this Act, the Secretary shall publish in the Federal Register, Commerce Business Daily, and elsewhere as appropriate, a request for applications to undertake projects under the pilot program. Applications shall be due not later than 180 days after the date of publication of the notice. (a) Initial report.—Not later than 60 days after the date on which grants are awarded under this part, the Secretary shall submit to Congress a report containing— (b) Evaluation.—Not later than 3 years after the date of enactment of this Act, and annually thereafter until the pilot program ends, the Secretary shall submit to Congress a report containing an evaluation of the effectiveness of the pilot program, including— There are authorized to be appropriated to the Secretary to carry out this part $200,000,000, to remain available until expended. (a) In general.—The Secretary of Energy, in consultation with the Secretary of Transportation, shall establish a transit bus demonstration program to make competitive, merit-based awards for 5-year projects to demonstrate not more than 25 fuel cell transit buses (and necessary infrastructure) in 5 geographically dispersed localities. In this subtitle: (1) ADMINISTRATOR.—The term “Administrator” means the Administrator of the Environmental Protection Agency. (2) ALTERNATIVE FUEL.—The term “alternative fuel” means liquefied natural gas, compressed natural gas, liquefied petroleum gas, hydrogen, propane, or methanol or ethanol at no less than 85 percent by volume. (3) ALTERNATIVE FUEL SCHOOL BUS.—The term “alternative fuel school bus” means a school bus that meets all of the requirements of this subtitle and is operated solely on an alternative fuel. (4) EMISSIONS CONTROL RETROFIT TECHNOLOGY.—The term “emissions control retrofit technology” means a particulate filter or other emissions control equipment that is verified or certified by the Administrator or the California Air Resources Board as an effective emission reduction technology when installed on an existing school bus. (5) IDLING.—The term “idling” means operating an engine while remaining stationary for more than approximately 15 minutes, except that the term does not apply to routine stoppages associated with traffic movement or congestion. (a) Establishment.—The Administrator, in consultation with the Secretary and other appropriate Federal departments and agencies, shall establish a program for awarding grants on a competitive basis to eligible entities for the replacement of existing school buses manufactured before model year 1991 with alternative fuel school buses and ultra-low sulfur diesel fuel school buses. (b) Requirements.— (1) IN GENERAL.—Not later than 90 days after the date of enactment of this Act, the Administrator shall establish and publish in the Federal Register grant requirements on eligibility for assistance, and on implementation of the program established under subsection (a), including instructions for the submission of grant applications and certification requirements to ensure compliance with this subtitle. (c) Eligible recipients.—A grant shall be awarded under this section only— (1) to 1 or more local or State governmental entities responsible for providing school bus service to 1 or more public school systems or responsible for the purchase of school buses; (2) to 1 or more contracting entities that provide school bus service to 1 or more public school systems, if the grant application is submitted jointly with the 1 or more school systems to be served by the buses, except that the application may provide that buses purchased using funds awarded shall be owned, operated, and maintained exclusively by the 1 or more contracting entities; or (d) Award deadlines.— (1) IN GENERAL.—Subject to paragraph (2), the Administrator shall award a grant made to a qualified applicant for a fiscal year— (2) INSUFFICIENT NUMBER OF QUALIFIED GRANT APPLICATIONS.—If the Administrator does not receive a sufficient number of qualified grant applications to meet the requirements of subsection (i)(1) for a fiscal year, the Administrator shall award a grant made to a qualified applicant under subsection (i)(2) not later than September 30 of the fiscal year. (e) Types of grants.— (1) IN GENERAL.—A grant under this section shall be used for the replacement of school buses manufactured before model year 1991 with alternative fuel school buses and ultra-low sulfur diesel fuel school buses. (f) Conditions of grant.—A grant provided under this section shall include the following conditions: (1) SCHOOL BUS FLEET.—All buses acquired with funds provided under the grant shall be operated as part of the school bus fleet for which the grant was made for a minimum of 5 years. (2) USE OF FUNDS.—Funds provided under the grant may only be used— (A) to pay the cost, except as provided in paragraph (3), of new alternative fuel school buses or ultra-low sulfur diesel fuel school buses, including State taxes and contract fees associated with the acquisition of such buses; and (3) GRANT RECIPIENT FUNDS.—The grant recipient shall be required to provide at least— (4) ULTRA-LOW SULFUR DIESEL FUEL.—In the case of a grant recipient receiving a grant for ultra-low sulfur diesel fuel school buses, the grant recipient shall be required to provide documentation to the satisfaction of the Administrator that diesel fuel containing sulfur at not more than 15 parts per million is available for carrying out the purposes of the grant, and a commitment by the applicant to use such fuel in carrying out the purposes of the grant. (g) Buses.— (1) IN GENERAL.—Except as provided in paragraph (2), funding under a grant made under this section for the acquisition of new alternative fuel school buses or ultra-low sulfur diesel fuel school buses shall only be used to acquire school buses— (2) LIMITATIONS.—A bus shall not be acquired under this section that emits nonmethane hydrocarbons, oxides of nitrogen, or particulate matter at a rate greater than the best performing technology of the same class of ultra-low sulfur diesel fuel school buses commercially available at the time the grant is made. (h) Deployment and distribution.—The Administrator shall— (i) Allocation of funds.— (1) IN GENERAL.—Subject to paragraph (2), of the amount of grant funding made available to carry out this section for any fiscal year, the Administrator shall use— (2) INSUFFICIENT NUMBER OF QUALIFIED GRANT APPLICATIONS.—After the first fiscal year in which this program is in effect, if the Administrator does not receive a sufficient number of qualified grant applications to meet the requirements of subparagraph (A) or (B) of paragraph (1) for a fiscal year, effective beginning on August 1 of the fiscal year, the Administrator shall make the remaining funds available to other qualified grant applicants under this section. (j) Reduction of school bus idling.—Each local educational agency (as defined in section 9101 of the Elementary and Secondary Education Act of 1965 (20 U.S.C. 7801)) that receives Federal funds under the Elementary and Secondary Education Act of 1965 (20 U.S.C. 6301 et seq.) is encouraged to develop a policy, consistent with the health, safety, and welfare of students and the proper operation and maintenance of school buses, to reduce the incidence of unnecessary school bus idling at schools when picking up and unloading students. (k) Annual report.— (1) IN GENERAL.—Not later than January 31 of each year, the Administrator shall transmit to Congress a report evaluating implementation of the programs under this section and section 743. (2) COMPONENTS.—The reports shall include a description of— (B) the number and types of alternative fuel school buses, ultra-low sulfur diesel fuel school buses, and retrofitted buses requested in grant applications; (D) certified engine emission levels of all buses purchased or retrofitted under the programs under this section and section 743; (a) Establishment.—The Administrator, in consultation with the Secretary, shall establish a program for awarding grants on a competitive basis to entities for the installation of retrofit technologies for diesel school buses. (b) Eligible recipients.—A grant shall be awarded under this section only— (1) to a local or State governmental entity responsible for providing school bus service to 1 or more public school systems; (2) to 1 or more contracting entities that provide school bus service to 1 or more public school systems, if the grant application is submitted jointly with the 1 or more school systems that the buses will serve, except that the application may provide that buses purchased using funds awarded shall be owned, operated, and maintained exclusively by the 1 or more contracting entities; or (c) Awards.— (1) IN GENERAL.—The Administrator shall seek, to the maximum extent practicable, to ensure a broad geographic distribution of grants under this section. (d) Conditions of grant.—A grant shall be provided under this section on the conditions that— (1) buses on which retrofit emissions-control technology are to be demonstrated— (e) Verification.—Not later than 90 days after the date of enactment of this Act, the Administrator shall publish in the Federal Register procedures to verify— (a) Establishment.—The Secretary shall establish a program for entering into cooperative agreements— (b) Cost sharing.—The non-Federal contribution for activities funded under this section shall be not less than— (a) Establishment.—The Secretary of Energy shall, in cooperation with the Secretary of Transportation and the Administrator of the Environmental Protection Agency, establish a cost-shared, public-private research partnership involving the Federal Government, railroad carriers, locomotive manufacturers and equipment suppliers, and the Association of American Railroads, to develop and demonstrate railroad locomotive technologies that increase fuel economy, reduce emissions, and lower costs of operation. (a) In general.—Not later than 180 days after the date of enactment of this Act, the Administrator of the Environmental Protection Agency shall submit to Congress a report on the experience of the Administrator with the trading of mobile source emission reduction credits for use by owners and operators of stationary source emission sources to meet emission offset requirements within a nonattainment area. (b) Contents.—The report shall describe— (1) projects approved by the Administrator that include the trading of mobile source emission reduction credits for use by stationary sources in complying with offset requirements, including a description of— (2) the significant issues identified by the Administrator in consideration and approval of trading in the projects; (a) In general.—Not later than 60 days after the date of enactment of this Act, the Administrator of the Federal Aviation Administration and the Administrator of the Environmental Protection Agency shall jointly initiate a study to identify— (b) Focus.—The study under subsection (a) shall focus on how air traffic management inefficiencies, such as aircraft idling at airports, result in unnecessary fuel burn and air emissions. (c) Report.—Not later than 1 year after the date of the initiation of the study under subsection (a), the Administrator of the Federal Aviation Administration and the Administrator of the Environmental Protection Agency shall jointly submit to the Committee on Energy and Commerce and the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works and the Committee on Commerce, Science, and Transportation of the Senate a report that— (a) Definition of tier 2 emission standards.—In this section, the term “tier 2 emission standards” means the motor vehicle emission standards that apply to passenger cars, light trucks, and larger passenger vehicles manufactured after the 2003 model year, as issued on February 10, 2000, by the Administrator of the Environmental Protection Agency under sections 202 and 211 of the Clean Air Act (42 U.S.C. 7521, 7545). (b) Diesel combustion and after-treatment technologies.—The Secretary of Energy shall accelerate efforts to improve diesel combustion and after-treatment technologies for use in diesel fueled motor vehicles. (a) In general.—Not later that 180 days after the date of enactment of this Act, the Secretary shall initiate a partnership with diesel engine, diesel fuel injection system, and diesel vehicle manufacturers and diesel and biodiesel fuel providers, to include biodiesel testing in advanced diesel engine and fuel system technology. (b) Scope.—The program shall provide for testing to determine the impact of biodiesel from different sources on current and future emission control technologies, with emphasis on— (c) Report.—Not later than 2 years after the date of enactment of this Act, the Secretary shall provide an interim report to Congress on the findings of the program, including a comprehensive analysis of impacts from biodiesel on engine operation for both existing and expected future diesel technologies, and recommendations for ensuring optimal emissions reductions and engine performance with biodiesel. (d) Authorization of appropriations.—There are authorized to be appropriated $5,000,000 for each of fiscal years 2006 through 2010 to carry out this section. (e) Definition.—For purposes of this section, the term “biodiesel” means a diesel fuel substitute produced from nonpetroleum renewable resources that meets the registration requirements for fuels and fuel additives established by the Environmental Protection Agency under section 211 of the Clean Air Act (42 U.S.C. 7545) and that meets the American Society for Testing and Materials D6751-02a Standard Specification for Biodiesel Fuel (B100) Blend Stock for Distillate Fuels. (a) Ultra-Efficient engine technology partnership.—The Secretary of Energy shall enter into a cooperative agreement with the National Aeronautics and Space Administration for the development of ultra-efficient engine technology for aircraft. In addition to any other funds authorized by law, there are authorized to be appropriated to the National Highway Traffic Safety Administration to carry out its obligations with respect to average fuel economy standards $2,000,000 for each of fiscal years 2006 through 2010. Section 32902(f) of title 49, United States Code, is amended to read as follows: “(f) Considerations for decisions on maximum feasible average fuel economy.—When deciding maximum feasible average fuel economy under this section, the Secretary of Transportation shall consider the following matters: (a) Manufacturing incentives.—Section 32905 of title 49, United States Code, is amended— (b) Maximum fuel economy increase.—Subsection (a)(1) of section 32906 of title 49, United States Code, is amended— (a) In general.—Not later than 30 days after the date of the enactment of this Act, the Administrator of the National Highway Traffic Safety Administration shall initiate a study of the feasibility and effects of reducing by model year 2014, by a significant percentage, the amount of fuel consumed by automobiles. (b) Subjects of study.—The study under this section shall include— (1) examination of, and recommendation of alternatives to, the policy under current Federal law of establishing average fuel economy standards for automobiles and requiring each automobile manufacturer to comply with average fuel economy standards that apply to the automobiles it manufactures; (2) examination of how automobile manufacturers could contribute toward achieving the reduction referred to in subsection (a); In this title: (1) ADVISORY COMMITTEE.—The term “Advisory Committee” means the Hydrogen Technical and Fuel Cell Advisory Committee established under section 805. (3) FUEL CELL.—The term “fuel cell” means a device that directly converts the chemical energy of a fuel and an oxidant into electricity by an electrochemical process taking place at separate electrodes in the device. (4) INFRASTRUCTURE.—The term “infrastructure” means the equipment, systems, or facilities used to produce, distribute, deliver, or store hydrogen. Not later than 6 months after the date of enactment of this Act, the Secretary shall transmit to Congress a coordinated plan for the programs described in this title and any other programs of the Department that are directly related to fuel cells or hydrogen. The plan shall describe, at a minimum— (1) the agenda for the next 5 years for the programs authorized under this title, including the agenda for each activity enumerated in section 803(a); (2) the types of entities that will carry out the activities under this title and what role each entity is expected to play; (a) Activities.—The Secretary, in partnership with the private sector, shall conduct programs to address— (5) storage of hydrogen or hydrogen-carrier fuels, including development of materials for safe and economic storage in gaseous, liquid, or solid form at refueling facilities and onboard vehicles; (6) development of safe, durable, affordable, and efficient fuel cells, including fuel-flexible fuel cell power systems, improved manufacturing processes, high-temperature membranes, cost-effective fuel processing for natural gas, fuel cell stack and system reliability, low temperature operation, and cold start capability; (7) development, after consultation with the private sector, of necessary codes and standards (including international codes and standards and voluntary consensus standards adopted in accordance with OMB Circular A–119) and safety practices for the production, distribution, storage, and use of hydrogen, hydrogen-carrier fuels, and related products; (b) Program goals.— (1) VEHICLES.—For vehicles, the goals of the program are— (A) to enable a commitment by automakers no later than year 2015 to offer safe, affordable, and technically viable hydrogen fuel cell vehicles in the mass consumer market; and (2) HYDROGEN ENERGY AND ENERGY INFRASTRUCTURE.—For hydrogen energy and energy infrastructure, the goals of the program are to enable a commitment not later than 2015 that will lead to infrastructure by 2020 that will provide— (c) Demonstration.—In carrying out the programs under this section, the Secretary shall fund a limited number of demonstration projects, consistent with a determination of the maturity, cost-effectiveness, and environmental impacts of technologies supporting each project. In selecting projects under this subsection, the Secretary shall, to the extent practicable and in the public interest, select projects that— (1) involve using hydrogen and related products at existing facilities or installations, such as existing office buildings, military bases, vehicle fleet centers, transit bus authorities, or units of the National Park System; (3) lead to the replication of hydrogen technologies and draw such technologies into the marketplace; (4) include vehicle, portable, and stationary demonstrations of fuel cell and hydrogen-based energy technologies; (5) address the interdependency of demand for hydrogen fuel cell applications and hydrogen fuel infrastructure; (9) address applications specific to rural or remote locations, including isolated villages and islands, the National Park System, and tribal entities. (d) Deployment.—In carrying out the programs under this section, the Secretary shall, in partnership with the private sector, conduct activities to facilitate the deployment of hydrogen energy and energy infrastructure, fuel cells, and advanced vehicle technologies. (e) Funding.— (f) Cost sharing.— (1) RESEARCH AND DEVELOPMENT.—Except as otherwise provided in this title, for research and development programs carried out under this title the Secretary shall require a commitment from non-Federal sources of at least 20 percent of the cost of the project. The Secretary may reduce or eliminate the non-Federal requirement under this paragraph if the Secretary determines that the research and development is of a basic or fundamental nature or involves technical analyses or educational activities. (2) DEMONSTRATION AND COMMERCIAL APPLICATION.—Except as otherwise provided in this title, the Secretary shall require at least 50 percent of the costs directly and specifically related to any demonstration or commercial application project under this title to be provided from non-Federal sources. The Secretary may reduce the non-Federal requirement under this paragraph if the Secretary determines that the reduction is necessary and appropriate considering the technological risks involved in the project and is necessary to meet the objectives of this title. (g) Disclosure.—Section 623 of the Energy Policy Act of 1992 (42 U.S.C. 13293) relating to the protection of information shall apply to projects carried out through grants, cooperative agreements, or contracts under this title. (a) Establishment.—Not later than 120 days after the date of enactment of this Act, the President shall establish an interagency task force chaired by the Secretary with representatives from each of the following: (b) Duties.— (1) PLANNING.—The interagency task force shall work toward— (A) a safe, economical, and environmentally sound fuel infrastructure for hydrogen and hydrogen-carrier fuels, including an infrastructure that supports buses and other fleet transportation; (B) fuel cells in government and other applications, including portable, stationary, and transportation applications; (2) ACTIVITIES.—The interagency task force may organize workshops and conferences, may issue publications, and may create databases to carry out its duties. The interagency task force shall— (A) foster the exchange of generic, nonproprietary information and technology among industry, academia, and government; (B) develop and maintain an inventory and assessment of hydrogen, fuel cells, and other advanced technologies, including the commercial capability of each technology for the economic and environmentally safe production, distribution, delivery, storage, and use of hydrogen; (a) Establishment.—The Hydrogen Technical and Fuel Cell Advisory Committee is established to advise the Secretary on the programs and activities under this title. (b) Membership.— (1) MEMBERS.—The Advisory Committee shall be comprised of not fewer than 12 nor more than 25 members. The members shall be appointed by the Secretary to represent domestic industry, academia, professional societies, government agencies, Federal laboratories, previous advisory panels, and financial, environmental, and other appropriate organizations based on the Department’s assessment of the technical and other qualifications of committee members and the needs of the Advisory Committee. (2) TERMS.—The term of a member of the Advisory Committee shall not be more than 3 years. The Secretary may appoint members of the Advisory Committee in a manner that allows the terms of the members serving at any time to expire at spaced intervals so as to ensure continuity in the functioning of the Advisory Committee. A member of the Advisory Committee whose term is expiring may be reappointed. (c) Review.—The Advisory Committee shall review and make recommendations to the Secretary on— (d) Response.— (1) CONSIDERATION OF RECOMMENDATIONS.—The Secretary shall consider, but need not adopt, any recommendations of the Advisory Committee under subsection (c). (2) BIENNIAL REPORT.—The Secretary shall transmit a biennial report to Congress describing any recommendations made by the Advisory Committee since the previous report. The report shall include a description of how the Secretary has implemented or plans to implement the recommendations, or an explanation of the reasons that a recommendation will not be implemented. The report shall be transmitted along with the President’s budget proposal. (a) Plan.—The Secretary shall enter into an arrangement with the National Academy of Sciences to review the plan prepared under section 802, which shall be completed not later than 6 months after the Academy receives the plan. Not later than 45 days after receiving the review, the Secretary shall transmit the review to Congress along with a plan to implement the review’s recommendations or an explanation of the reasons that a recommendation will not be implemented. (b) Additional review.—The Secretary shall enter into an arrangement with the National Academy of Sciences under which the Academy will review the programs under section 803 during the fourth year following the date of enactment of this Act. The Academy’s review shall include the research priorities and technical milestones, and evaluate the progress toward achieving them. The review shall be completed not later than 5 years after the date of enactment of this Act. Not later than 45 days after receiving the review, the Secretary shall transmit the review to Congress along with a plan to implement the review’s recommendations or an explanation for the reasons that a recommendation will not be implemented. (a) Representation.—The Secretary may represent the United States interests with respect to activities and programs under this title, in coordination with the Department of Transportation, the National Institute of Standards and Technology, and other relevant Federal agencies, before governments and nongovernmental organizations including— Nothing in this title shall be construed to affect the authority of the Secretary of Transportation that may exist prior to the date of enactment of this Act with respect to— (1) research into, and regulation of, hydrogen-powered vehicles fuel systems integrity, standards, and safety under subtitle VI of title 49, United States Code; (2) regulation of hazardous materials transportation under chapter 51 of title 49, United States Code; (3) regulation of pipeline safety under chapter 601 of title 49, United States Code; (4) encouragement and promotion of research, development, and deployment activities relating to advanced vehicle technologies under section 5506 of title 49, United States Code; (5) regulation of motor vehicle safety under chapter 301 of title 49, United States Code; (6) automobile fuel economy under chapter 329 of title 49, United States Code; or There are authorized to be appropriated to the Secretary to carry out this title, in addition to any amounts made available for these purposes under other Acts— (a) Solar energy technologies.—The Secretary shall— (1) prepare a detailed roadmap for carrying out the provisions in this subtitle related to solar energy technologies and for implementing the recommendations related to solar energy technologies that are included in the report transmitted under subsection (c); (2) provide for the establishment of 5 projects in geographic areas that are regionally and climatically diverse to demonstrate the production of hydrogen at solar energy facilities, including one demonstration project at a national laboratory or institution of higher education; (3) establish a research and development program— (4) coordinate with activities sponsored by the Department of Energy’s Office of Nuclear Energy, Science, and Technology on high-temperature materials, thermochemical cycles, and economic issues related to solar energy; (5) provide for the construction and operation of new concentrating solar power devices or solar power cogeneration facilities that produce hydrogen either concurrently with, or independently of, the production of electricity; (6) support existing facilities and research programs dedicated to the development and advancement of concentrating solar power devices; and (b) Wind energy technologies.—The Secretary shall— (c) Program support.—The Secretary shall support research programs at institutions of higher education for the development of solar energy technologies and wind energy technologies for the production of hydrogen. The research programs supported under this subsection shall— (3) encourage collaborative research among industry, national laboratories, and institutions of higher education; (d) Institutions of higher education and national laboratory interactions.—In conjunction with the programs supported under this section, the Secretary shall develop sabbatical, fellowship, and visiting scientist programs to encourage national laboratories and institutions of higher education to share and exchange personnel. (e) Definitions.—For purposes of this section— (1) the term “concentrating solar power devices” means devices that concentrate the power of the sun by reflection or refraction to improve the efficiency of a photovoltaic or thermal generation process; (2) the term “institution of higher education” has the meaning given to that term in section 101(a) of the Higher Education Act of 1965 (20 U.S.C. 1001(a)); (3) the term “minority institution” has the meaning given to that term in section 365 of the Higher Education Act of 1965 (20 U.S.C. 1067k); (4) the term “part B institution” has the meaning given to that term in section 322 of the Higher Education Act of 1965 (20 U.S.C. 1061); and (a) In General.—The Secretary shall conduct a balanced set of programs of study to support Federal energy policy and programs by the Department. Such programs shall be focused on— (b) Goals.—The Secretary shall publish measurable 5-year cost and performance-based goals with each annual budget submission in at least the following areas: (3) Renewable energy technologies including wind power, photovoltaics, solar thermal systems, geothermal energy, hydrogen-fueled systems, biomass-based systems, biofuels, and hydropower. (c) Public comment.—The Secretary shall provide mechanisms for input on the annually published goals from industry, university, and other public sources. For purposes of this title: (2) DEPARTMENTAL MISSION.—The term “departmental mission” means any of the functions vested in the Secretary of Energy by the Department of Energy Organization Act (42 U.S.C. 7101 et seq.) or other law. (3) INSTITUTION OF HIGHER EDUCATION.—The term “institution of higher education” has the meaning given that term in section 101(a) of the Higher Education Act of 1965 (20 U.S.C. 1001(a)). (a) In general.—The following sums are authorized to be appropriated to the Secretary for energy efficiency and conservation activities, including activities authorized under this subtitle: (b) Allocations.—From amounts authorized under subsection (a), the following sums are authorized: (c) Extended authorization.—There are authorized to be appropriated to the Secretary for activities under section 905, $50,000,000 for each of fiscal years 2011 through 2015. (d) Limitation on use of funds.—None of the funds authorized to be appropriated under this section may be used for— (2) the Weatherization Assistance Program under part A of title IV of the Energy Conservation and Production Act (42 U.S.C. 6861 et seq.); (3) the State Energy Program under part D of title III of the Energy Policy and Conservation Act (42 U.S.C. 6321 et seq.); or (4) the Federal Energy Management Program under part 3 of title V of the National Energy Conservation Policy Act (42 U.S.C. 8251 et seq.). (a) In general.—The Secretary shall carry out a Next Generation Lighting Initiative in accordance with this section to support activities related to advanced solid-state lighting technologies based on white light emitting diodes. (b) Objectives.—The objectives of the initiative shall be to develop advanced solid-state organic and inorganic lighting technologies based on white light emitting diodes that, compared to incandescent and fluorescent lighting technologies, are longer lasting; more energy-efficient; and cost-competitive, and have less environmental impact. (c) Industry alliance.—The Secretary shall, not later than 3 months after the date of enactment of this section, competitively select an Industry Alliance to represent participants that are private, for-profit firms which, as a group, are broadly representative of United States solid state lighting expertise as a whole. (d) Study.— (1) IN GENERAL.—The Secretary shall carry out the activities of the Next Generation Lighting Initiative through competitively awarded grants, including to Industry Alliance participants, National Laboratories, and institutions of higher education. (e) Intellectual property.—The Secretary may require, in accordance with the authorities provided in section 202(a)(ii) of title 35, United States Code, section 152 of the Atomic Energy Act of 1954 (42 U.S.C. 2182), and section 9 of the Federal Nonnuclear Energy Research and Development Act of 1974 (42 U.S.C. 5908), that— (1) for any new invention resulting from activities under subsection (d)— (A) the Industry Alliance members that are active participants in research, development, and demonstration activities related to the advanced solid-state lighting technologies that are the subject of this section shall be granted first option to negotiate with the invention owner nonexclusive licenses and royalties for uses of the invention related to solid-state lighting on terms that are reasonable under the circumstances; and (f) National academy review.—The Secretary shall enter into an arrangement with the National Academy of Sciences to conduct periodic reviews of the Next Generation Lighting Initiative. The Academy shall review the priorities, technical milestones, and plans for technology transfer and progress towards achieving them. The Secretary shall consider the results of such reviews in evaluating the information obtained under subsection (d)(2). (g) Definitions.—As used in this section: (1) ADVANCED SOLID-STATE LIGHTING.—The term “advanced solid-state lighting” means a semiconducting device package and delivery system that produces white light using externally applied voltage. (a) Interagency group.—Not later than 90 days after the date of enactment of this Act, the President shall establish an interagency group to develop, in coordination with the advisory committee established under subsection (e), a National Building Performance Initiative (in this section referred to as the “Initiative”). The interagency group shall be co-chaired by appropriate officials of the Department and the Department of Commerce, who shall jointly arrange for the provision of necessary administrative support to the group. (b) Integration of efforts.—The Initiative, working with the National Institute of Building Sciences, shall integrate Federal, State, and voluntary private sector efforts to reduce the costs of construction, operation, maintenance, and renovation of commercial, industrial, institutional, and residential buildings. (c) Department of energy role.—Within the Federal portion of the Initiative, the Department shall be the lead agency for all aspects of building performance related to use and conservation of energy. (d) Advisory committee.— (1) ESTABLISHMENT.—The Secretary, in consultation with the Secretary of Commerce and the Director of the Office of Science and Technology Policy, shall establish an advisory committee to— (a) Definitions.—For purposes of this section: (b) Program.—The Secretary shall establish and conduct a program of study for the secondary use of batteries if the Secretary finds that there are sufficient numbers of such batteries to support the program. The program shall be— (1) designed to demonstrate the use of batteries in secondary applications, including utility and commercial power storage and power quality; (c) Solicitation.—Not later than 180 days after the date of enactment of this Act, if the Secretary finds under subsection (b) that there are sufficient numbers of batteries to support the program, the Secretary shall solicit proposals to demonstrate the secondary use of batteries and associated equipment and supporting infrastructure in geographic locations throughout the United States. The Secretary may make additional solicitations for proposals if the Secretary determines that such solicitations are necessary to carry out this section. (d) Selection of proposals.— (1) IN GENERAL.—The Secretary shall, not later than 90 days after the closing date established by the Secretary for receipt of proposals under subsection (c), select up to 5 proposals which may receive financial assistance under this section, subject to the availability of appropriations. (2) DIVERSITY; ENVIRONMENTAL EFFECT.—In selecting proposals, the Secretary shall consider diversity of battery type, geographic and climatic diversity, and life-cycle environmental effects of the approaches. (3) LIMITATION.—No 1 project selected under this section shall receive more than 25 percent of the funds authorized for the program under this section. (a) Establishment.—The Secretary shall establish an Energy Efficiency Science Initiative to be managed by the Assistant Secretary in the Department with responsibility for energy conservation under section 203(a)(9) of the Department of Energy Organization Act (42 U.S.C. 7133(a)(9)), in consultation with the Director of the Office of Science, for grants to be competitively awarded and subject to peer review for studies relating to energy efficiency. (b) Report.—The Secretary shall submit to Congress, along with the President’s annual budget request under section 1105(a) of title 31, United States Code, a report on the activities of the Energy Efficiency Science Initiative, including a description of the process used to award the funds and an explanation of how the studies relate to energy efficiency. The Secretary shall conduct a program of study on advanced control devices to improve the energy efficiency of electric motors used in heating, ventilation, air conditioning, and comparable systems. The Secretary shall establish a comprehensive program of study to improve energy efficiency of high power density facilities, including data centers, server farms, and telecommunications facilities. Such program shall consider technologies that provide significant improvement in thermal controls, metering, load management, peak load reduction, or the efficient cooling of electronics. The Secretary shall conduct a program of study regarding fuel system optimization and emissions reduction after-treatment technologies for industrial reciprocating engines. Such after-treatment technologies shall use processes that reduce emissions by recirculating exhaust gases and shall be designed to be retrofitted to any new or existing diesel or natural gas engine used for power generation, peaking power generation, combined heat and power, or compression. (b) Organization.—The universities identified and utilized under subsection (a)(2) are authorized to establish an organization to promote small scale portable power devices. (c) Definition.—For purposes of this section, the term “small scale portable power device” means a field deployable portable mechanical or electromechanical device that can be used for applications such as communications, computation, mobility enhancement, weapons systems, optical devices, cooling, sensors, medical devices and active biological agent detection systems. (a) In general.—The following sums are authorized to be appropriated to the Secretary for renewable energy activities, including activities authorized under this subtitle: (b) Bioenergy.—From the amounts authorized under subsection (a), the following sums are authorized to be appropriated to carry out section 919: (c) Concentrating solar power.—From amounts authorized under subsection (a), the following sums are authorized to be appropriated to carry out section 920: (d) Public buildings.—From the amounts authorized under subsection (a), $30,000,000 for each of the fiscal years 2006 through 2010 are authorized to be appropriated to carry out section 922. (e) Limits on use of funds.— (1) NO FUNDS FOR RENEWABLE SUPPORT AND IMPLEMENTATION.—None of the funds authorized to be appropriated under this section may be used for Renewable Support and Implementation. (2) GRANTS.—Of the funds authorized under subsection (b), not less than $5,000,000 for each fiscal year shall be made available for grants to Historically Black Colleges and Universities, Tribal Colleges, and Hispanic-Serving Institutions. (f) Consultation.—In carrying out this subtitle, the Secretary, in consultation with the Secretary of Agriculture, shall demonstrate the use of advanced wind power technology, including combined use with coal gasification; biomass; geothermal energy systems; and other renewable energy technologies to assist in delivering electricity to rural and remote locations. (a) Definitions.—For the purposes of this section: (1) The term “agricultural byproducts” includes waste products, including poultry fat and poultry waste. (2) The term “cellulosic biomass” means any portion of a crop containing lignocellulose or hemicellulose, including barley grain, grapeseed, forest thinnings, rice bran, rice hulls, rice straw, soybean matter, and sugarcane bagasse, or any crop grown specifically for the purpose of producing cellulosic feedstocks. (c) Biofuels and bio-based products.—The goals of the biofuels and bio-based products programs shall be to promote, in partnership with industry— (1) advanced biochemical and thermochemical conversion technologies capable of making biofuels that are price-competitive with gasoline or diesel in either internal combustion engines or fuel cell-powered vehicles, and bio-based products from a variety of feedstocks, including grains, cellulosic biomass, and other agricultural byproducts; and (a) In general.—The Secretary shall conduct a program of study to evaluate the potential of concentrating solar power for hydrogen production, including cogeneration approaches for both hydrogen and electricity. Such program shall take advantage of existing facilities to the extent possible and shall include— (1) development of optimized technologies that are common to both electricity and hydrogen production; (b) Assessment.—In carrying out the program under this section, the Secretary shall— (1) assess conflicting guidance on the economic potential of concentrating solar power for electricity production received from the National Research Council report entitled “Renewable Power Pathways: A Review of the U.S. Department of Energy’s Renewable Energy Programs” in 2000 and subsequent Department-funded reviews of that report; and The Secretary may conduct studies for— (a) Technology transfer Program.—The Secretary shall establish a program for the transfer of innovative technologies for solar and other renewable energy sources in buildings owned or operated by a State or local government, and for the dissemination of information resulting from an assessment of such program to interested parties. (b) Limit on Federal funding.—The Secretary shall provide under this section no more than 40 percent of the incremental costs of the solar or other renewable energy source project funded. (a) Study.—The Secretary shall conduct a study and provide a report to Congress not later than August 1, 2006. The study shall— (2) review current domestic and international Department, Department of Defense, Department of State, and commercial programs to manage and dispose of radioactive sources; (b) Program.—The Secretary shall establish a research and development program to implement the program plan developed under subsection (a)(4). The program shall include miniaturized particle accelerators for well-logging or other industrial applications and portable accelerators for production of short-lived radioactive materials at an industrial site. The Secretary shall conduct a study to determine the feasibility of deep borehole disposal of spent nuclear fuel and high-level radioactive waste. The study shall emphasize geological, chemical, and hydrological characterization of, and design of engineered structures for, deep borehole environments. Not later than 1 year after the date of enactment of this Act, the Secretary shall transmit the study to Congress. (a) In general.—The following sums are authorized to be appropriated to the Secretary for fossil energy activities, including activities authorized under this part: (b) Allocations.—From amounts authorized under subsection (a), the following sums are authorized: (1) For activities under section 932(b)(2), $28,000,000 for each of the fiscal years 2006 through 2010. (4) For the Office of Arctic Energy under section 3197 of the Floyd D. Spence National Defense Authorization Act for Fiscal Year 2001 (42 U.S.C. 7144d), $25,000,000 for each of fiscal years 2006 through 2010. (c) Extended authorization.—There are authorized to be appropriated to the Secretary for the Office of Arctic Energy under section 3197 of the Floyd D. Spence National Defense Authorization Act for Fiscal Year 2001 (42 U.S.C. 7144d), $25,000,000 for each of fiscal years 2009 through 2012. (a) Oil and gas studies.—The Secretary shall conduct a program of studies on oil and gas, including— (b) Fuel cells.— (c) Natural gas and oil deposits report.—Not later than 2 years after the date of enactment of this Act, and every 2 years thereafter, the Secretary of the Interior, in consultation with other appropriate Federal agencies, shall transmit a report to Congress of the latest estimates of natural gas and oil reserves, reserves growth, and undiscovered resources in Federal and State waters off the coast of Louisiana and Texas. (d) Integrated clean power and energy.— (1) NATIONAL CENTER OR CONSORTIUM OF EXCELLENCE.—The Secretary shall establish a national center or consortium of excellence in clean energy and power generation to address the Nation’s critical dependence on energy and the need to reduce emissions. The Secretary shall establish a competitive program to award a contract to a nonprofit entity for the purpose of transferring technologies developed with public funds. The entity selected under this section shall have experience in offshore oil and gas technology management, in the transfer of technologies developed with public funds to the offshore and maritime industry, and in management of an offshore and maritime industry consortium. The program consortium selected under section 942 shall not be eligible for selection under this section. When appropriate, the Secretary shall consider utilizing the entity selected under this section when implementing the activities authorized by section 975. (a) Establishment.—The Secretary shall carry out a program of studies on coal mining technologies. The Secretary shall cooperate with appropriate Federal agencies, coal producers, trade associations, equipment manufacturers, institutions of higher education with mining engineering departments, and other relevant entities. (a) In general.—In addition to the programs authorized under title IV, the Secretary shall conduct a program of technology to study coal and power systems, including programs to facilitate production and generation of coal-based power through— (b) Cost and performance goals.—In carrying out programs authorized by this section, the Secretary shall identify cost and performance goals for coal-based technologies that would permit the continued cost-competitive use of coal for electricity generation, as chemical feedstocks, and as transportation fuel in 2007, 2015, and the years after 2020. In establishing such cost and performance goals, the Secretary shall— (1) consider activities and studies undertaken to date by industry in cooperation with the Department in support of such assessment; (2) consult with interested entities, including coal producers, industries using coal, organizations to promote coal and advanced coal technologies, environmental organizations, and organizations representing workers; (3) not later than 120 days after the date of enactment of this Act, publish in the Federal Register proposed draft cost and performance goals for public comments; and (4) not later than 180 days after the date of enactment of this Act and every 4 years thereafter, submit to Congress a report describing final cost and performance goals for such technologies that includes a list of technical milestones as well as an explanation of how programs authorized in this section will not duplicate the activities authorized under the Clean Coal Power Initiative authorized under subtitle A of title IV. The Secretary, in coordination with industry leaders in extended research drilling technology, shall establish a Complex Well Technology Testing Facility at the Rocky Mountain Oilfield Testing Center to increase the range of extended drilling technologies. (a) In general.—The Secretary shall carry out a program under this part regarding technologies for ultra-deepwater and unconventional natural gas and other petroleum resource exploration and production, including addressing the technology challenges for small producers, safe operations, and environmental mitigation (including reduction of greenhouse gas emissions and sequestration of carbon). (b) Program elements.—The program under this part shall address the following areas, including improving safety and minimizing environmental impacts of activities within each area: (c) Limitation on location of field activities.—Field activities under the program under this part shall be carried out only— (1) in— (A) areas in the territorial waters of the United States not under any Outer Continental Shelf moratorium as of September 30, 2002; (a) In general.—The Secretary shall carry out the activities under section 941(a), to maximize the use of the ultra-deepwater natural gas and other petroleum resources of the United States by increasing the supply of such resources, through reducing the cost and increasing the efficiency of exploration for and production of such resources, while improving safety and minimizing environmental impacts. (b) Role of the Secretary.—The Secretary shall have ultimate responsibility for, and oversight of, all aspects of the program under this section. (c) Role of the Program consortium.— (1) IN GENERAL.—The Secretary may contract with a consortium to— (2) LIMITATION.—The Secretary may not assign any activities to the program consortium except as specifically authorized under this section. (3) CONFLICT OF INTEREST.— (A) PROCEDURES.—The Secretary shall establish procedures— (i) to ensure that each board member, officer, or employee of the program consortium who is in a decision-making capacity under subsection (f)(3) or (4) shall disclose to the Secretary any financial interests in, or financial relationships with, applicants for or recipients of awards under this section, including those of his or her spouse or minor child, unless such relationships or interests would be considered to be remote or inconsequential; and (d) Selection of the Program consortium.— (1) IN GENERAL.—The Secretary shall select the program consortium through an open, competitive process. (2) MEMBERS.—The program consortium may include corporations, trade associations, institutions of higher education, National Laboratories, or other research institutions. After submitting a proposal under paragraph (4), the program consortium may not add members without the consent of the Secretary. (3) TAX STATUS.—The program consortium shall be an entity that is exempt from tax under section 501(c)(3) of the Internal Revenue Code of 1986. (4) SCHEDULE.—Not later than 180 days after the date of enactment of this Act, the Secretary shall solicit proposals from eligible consortia to perform the duties in subsection (c)(1), which shall be submitted not later than 360 days after the date of enactment of this Act. The Secretary shall select the program consortium not later than 18 months after such date of enactment. (e) Annual plan.— (1) IN GENERAL.—The program under this section shall be carried out pursuant to an annual plan prepared by the Secretary in accordance with paragraph (2). (2) DEVELOPMENT.— (A) SOLICITATION OF RECOMMENDATIONS.—Before drafting an annual plan under this subsection, the Secretary shall solicit specific written recommendations from the program consortium for each element to be addressed in the plan, including those described in paragraph (4). The Secretary may request that the program consortium submit its recommendations in the form of a draft annual plan. (B) SUBMISSION OF RECOMMENDATIONS; OTHER COMMENT.—The Secretary shall submit the recommendations of the program consortium under subparagraph (A) to the Ultra-Deepwater Advisory Committee established under section 945(a) for review, and such Advisory Committee shall provide to the Secretary written comments by a date determined by the Secretary. The Secretary may also solicit comments from any other experts. (3) PUBLICATION.—The Secretary shall transmit to Congress and publish in the Federal Register the annual plan, along with any written comments received under paragraph (2)(A) and (B). (4) CONTENTS.—The annual plan shall describe the ongoing and prospective activities of the program under this section and shall include— (5) ESTIMATES OF INCREASED ROYALTY RECEIPTS.—The Secretary, in consultation with the Secretary of the Interior, shall provide an annual report to Congress with the President’s budget on the estimated cumulative increase in Federal royalty receipts (if any) resulting from the implementation of this part. The initial report under this paragraph shall be submitted in the first President’s budget following the completion of the first annual plan required under this subsection. (f) Awards.— (1) IN GENERAL.—The Secretary shall make awards to carry out activities under the program under this section. The program consortium shall not be eligible to receive such awards, but members of the program consortium may receive such awards. (2) PROPOSALS.—The Secretary shall solicit proposals for awards under this subsection in such manner and at such time as the Secretary may prescribe, in consultation with the program consortium. (3) REVIEW.—The Secretary shall make awards under this subsection through a competitive process, which shall include a review by individuals selected by the Secretary. Such individuals shall include, for each application, Federal officials, the program consortium, and non-Federal experts who are not board members, officers, or employees of the program consortium or of a member of the program consortium. (4) OVERSIGHT.— (A) IN GENERAL.—The program consortium shall oversee the implementation of awards under this subsection, consistent with the annual plan under subsection (e), including disbursing funds and monitoring activities carried out under such awards for compliance with the terms and conditions of the awards. (g) Administrative costs.— (1) IN GENERAL.—To compensate the program consortium for carrying out its activities under this section, the Secretary shall provide to the program consortium funds sufficient to administer the program. This compensation may include a management fee consistent with Department of Energy contracting practices and procedures. (h) Audit.—The Secretary shall retain an independent, commercial auditor to determine the extent to which funds provided to the program consortium, and funds provided under awards made under subsection (f), have been expended in a manner consistent with the purposes and requirements of this part. The auditor shall transmit a report annually to the Secretary, who shall transmit the report to Congress, along with a plan to remedy any deficiencies cited in the report. (a) In general.—The Secretary shall carry out activities under subsection 941(b)(3), to maximize the use of the onshore unconventional natural gas and other petroleum resources of the United States, by increasing the supply of such resources, through reducing the cost and increasing the efficiency of exploration for and production of such resources, while improving safety and minimizing environmental impacts. (b) Awards.— (1) IN GENERAL.—The Secretary shall carry out this section through awards to consortia made through an open, competitive process. As a condition of award of funds, qualified consortia shall— (A) demonstrate capability and experience in unconventional onshore natural gas or other petroleum technologies; (2) PRODUCTION POTENTIAL.—The Secretary shall seek to ensure that the number and types of awards made under this subsection have reasonable potential to lead to additional oil and natural gas production on Federal lands. (3) SCHEDULE.—To carry out this subsection, not later than 180 days after the date of enactment of this Act, the Secretary shall solicit proposals from consortia, which shall be submitted not later than 360 days after the date of enactment of this Act. The Secretary shall select the first group of research consortia to receive awards under this subsection not later than 18 months after such date of enactment. (c) Audit.—The Secretary shall retain an independent, commercial auditor to determine the extent to which funds provided under awards made under this section have been expended in a manner consistent with the purposes and requirements of this part. The auditor shall transmit a report annually to the Secretary, who shall transmit the report to Congress, along with a plan to remedy any deficiencies cited in the report. (d) Focus areas for awards.— (1) UNCONVENTIONAL RESOURCES.—Awards from allocations under section 949(d)(2) shall focus on areas including advanced coalbed methane, deep drilling, natural gas production from tight sands, natural gas production from gas shales, stranded gas, innovative exploration and production techniques, enhanced recovery techniques, and environmental mitigation of unconventional natural gas and other petroleum resources exploration and production. (2) SMALL PRODUCERS.—Awards from allocations under section 949(d)(3) shall be made to consortia consisting of small producers or organized primarily for the benefit of small producers, and shall focus on areas including complex geology involving rapid changes in the type and quality of the oil and gas reservoirs across the reservoir; low reservoir pressure; unconventional natural gas reservoirs in coalbeds, deep reservoirs, tight sands, or shales; and unconventional oil reservoirs in tar sands and oil shales. (e) Annual plan.— (1) IN GENERAL.—The program under this section shall be carried out pursuant to an annual plan prepared by the Secretary in accordance with paragraph (2). (2) DEVELOPMENT.— (A) WRITTEN RECOMMENDATIONS.—Before drafting an annual plan under this subsection, the Secretary shall solicit specific written recommendations from the consortia receiving awards under subsection (b) and the Unconventional Resources Technology Advisory Committee for each element to be addressed in the plan, including those described in subparagraph (D). (B) CONSULTATION.—The Secretary shall consult regularly with the consortia throughout the preparation of the annual plan. (C) PUBLICATION.—The Secretary shall transmit to Congress and publish in the Federal Register the annual plan, along with any written comments received under subparagraph (A). (D) CONTENTS.—The annual plan shall describe the ongoing and prospective activities under this section and shall include a list of any solicitations for awards that the Secretary plans to issue to carry out activities, including the topics for such work, who would be eligible to apply, selection criteria, and the duration of awards. (3) ESTIMATES OF INCREASED ROYALTY RECEIPTS.—The Secretary, in consultation with the Secretary of the Interior, shall provide an annual report to Congress with the President’s budget on the estimated cumulative increase in Federal royalty receipts (if any) resulting from the implementation of this part. The initial report under this paragraph shall be submitted in the first President’s budget following the completion of the first annual plan required under this subsection. (a) Demonstration projects.—An application for an award under this part for a demonstration project shall describe with specificity the intended commercial use of the technology to be demonstrated. (b) Flexibility in locating demonstration projects.—Subject to the limitation in section 941(c), a demonstration project under this part relating to an ultra-deepwater technology or an ultra-deepwater architecture may be conducted in deepwater depths. (c) Intellectual property agreements.—If an award under this part is made to a consortium (other than the program consortium), the consortium shall provide to the Secretary a signed contract agreed to by all members of the consortium describing the rights of each member to intellectual property used or developed under the award. (d) Technology transfer.—2.5 percent of the amount of each award made under this part shall be designated for technology transfer and outreach activities under this title. (e) Cost sharing reduction for independent producers.—In applying the cost sharing requirements under section 972 to an award under this part the Secretary may reduce or eliminate the non-Federal requirement if the Secretary determines that the reduction is necessary and appropriate considering the technological risks involved in the project. (a) Ultra-Deepwater Advisory Committee.— (1) ESTABLISHMENT.—Not later than 270 days after the date of enactment of this Act, the Secretary shall establish an advisory committee to be known as the Ultra-Deepwater Advisory Committee. (2) MEMBERSHIP.—The advisory committee under this subsection shall be composed of members appointed by the Secretary including— (A) individuals with extensive experience or operational knowledge of offshore natural gas and other petroleum exploration and production; (3) DUTIES.—The advisory committee under this subsection shall— (4) COMPENSATION.—A member of the advisory committee under this subsection shall serve without compensation but shall receive travel expenses in accordance with applicable provisions under subchapter I of chapter 57 of title 5, United States Code. (b) Unconventional Resources Technology Advisory Committee.— (1) ESTABLISHMENT.—Not later than 270 days after the date of enactment of this Act, the Secretary shall establish an advisory committee to be known as the Unconventional Resources Technology Advisory Committee. (2) MEMBERSHIP.—The advisory committee under this subsection shall be composed of members appointed by the Secretary including— (A) a majority of members who are employees or representatives of independent producers of natural gas and other petroleum, including small producers; (B) individuals with extensive research experience or operational knowledge of unconventional natural gas and other petroleum resource exploration and production; (3) DUTIES.—The advisory committee under this subsection shall advise the Secretary on the development and implementation of activities under this part related to unconventional natural gas and other petroleum resources. (4) COMPENSATION.—A member of the advisory committee under this subsection shall serve without compensation but shall receive travel expenses in accordance with applicable provisions under subchapter I of chapter 57 of title 5, United States Code. An entity shall be eligible to receive an award under this part only if the Secretary finds— (1) that the entity’s participation in the program under this part would be in the economic interest of the United States; and (2) that either— (B) the entity is organized under the laws of the United States and has a parent entity organized under the laws of a country that affords— (i) to United States-owned entities opportunities, comparable to those afforded to any other entity, to participate in any cooperative research venture similar to those authorized under this part; The authority provided by this part shall terminate on September 30, 2014. In this part: (1) DEEPWATER.—The term “deepwater” means a water depth that is greater than 200 but less than 1,500 meters. (2) INDEPENDENT PRODUCER OF OIL OR GAS.— (A) IN GENERAL.—The term “independent producer of oil or gas” means any person that produces oil or gas other than a person to whom subsection (c) of section 613A of the Internal Revenue Code of 1986 does not apply by reason of paragraph (2) (relating to certain retailers) or paragraph (4) (relating to certain refiners) of section 613A(d) of such Code. (B) RULES FOR APPLYING PARAGRAPHS (2) AND (4) OF SECTION 613A(d).—For purposes of subparagraph (A), paragraphs (2) and (4) of section 613A(d) of the Internal Revenue Code of 1986 shall be applied by substituting “calendar year” for “taxable year” each place it appears in such paragraphs. (3) PROGRAM CONSORTIUM.—The term “program consortium” means the consortium selected under section 942(d). (4) REMOTE OR INCONSEQUENTIAL.—The term “remote or inconsequential” has the meaning given that term in regulations issued by the Office of Government Ethics under section 208(b)(2) of title 18, United States Code. (5) SMALL PRODUCER.—The term “small producer” means an entity organized under the laws of the United States with production levels of less than 1,000 barrels per day of oil equivalent. (6) ULTRA-DEEPWATER.—The term “ultra-deepwater” means a water depth that is equal to or greater than 1,500 meters. (7) ULTRA-DEEPWATER ARCHITECTURE.—The term “ultra-deepwater architecture” means the integration of technologies for the exploration for, or production of, natural gas or other petroleum resources located at ultra-deepwater depths. (a) In general.— (1) OIL AND GAS LEASE INCOME.—For each of fiscal years 2005 through 2014, from any Federal royalties, rents, and bonuses derived from Federal onshore and offshore oil and gas leases issued under the Outer Continental Shelf Lands Act and the Mineral Leasing Act which are deposited in the Treasury, and after distribution of any such funds as described in subsection (c), $50,000,000 shall be deposited into the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Research Fund (in this section referred to as the Fund). For purposes of this section, the term “royalties” excludes proceeds from the sale of royalty production taken in kind and royalty production that is transferred under section 27(a)(3) of the Outer Continental Shelf Lands Act (43 U.S.C. 1353(a)(3)). (b) Obligational authority.—Monies in the Fund shall be available to the Secretary for obligation under this part without fiscal year limitation, to remain available until expended. (c) Prior distributions.—The distributions described in subsection (a) are those required by law— (1) to States and to the Reclamation Fund under the Mineral Leasing Act (30 U.S.C. 191(a)); and (2) to other funds receiving monies from Federal oil and gas leasing programs, including— (A) any recipients pursuant to section 8(g) of the Outer Continental Shelf Lands Act (43 U.S.C. 1337(g)); (B) the Land and Water Conservation Fund, pursuant to section 2(c) of the Land and Water Conservation Fund Act of 1965 (16 U.S.C. 4601–5(c)); (C) the Historic Preservation Fund, pursuant to section 108 of the National Historic Preservation Act (16 U.S.C. 470h); and (a) Declaration of policy.—It shall be the policy of the United States to conduct a program of activities to ensure that the United States is competitive with other nations in providing fusion energy for its own needs and the needs of other nations. (b) Planning.— (1) IN GENERAL.—Not later than 180 days after the date of enactment of this Act, the Secretary shall present to Congress a plan, with proposed cost estimates, budgets, and potential international partners, for the implementation of the policy described in subsection (a). (a) Definition.—For the purposes of this section, the term “Spallation Neutron Source” means Department Project 99–E–334, Oak Ridge National Laboratory, Oak Ridge, Tennessee. The Secretary shall conduct studies on biological nitrogen fixation, including plant genomics research relevant to the development of commercial crop varieties with enhanced nitrogen fixation efficiency and ability. (a) Grant authority.—The Secretary may make a single grant to a qualified institution to examine burning post-consumer carpet in cement kilns as an alternative energy source. The purposes of the grant shall include determining— (a) Report.—Not later than 1 year after the date of enactment of this Act, the Secretary shall transmit to Congress a report on the results of a study of the establishment of a test center for next-generation fuel cells at an institution of higher education that has available a continuous source of hydrogen and access to the electric transmission grid. Such report shall include a conceptual design for such test center and a projection of the costs of establishing the test center. (a) In general.—The Secretary of Energy (referred to in this section as the “Secretary”) in consultation with the Secretary of Transportation and the United States Arctic Research Commission shall provide annual grants to a university located adjacent to the Arctic Energy Office of the Department of Energy, to establish and operate a university research center to be headquartered in Fairbanks and to be known as the “Arctic Engineering Research Center” (referred to in this section as the “Center”). (b) Purpose.—The purpose of the Center shall be to conduct research on, and develop improved methods of, construction and use of materials to improve the overall performance of roads, bridges, residential, commercial, and industrial structures, and other infrastructure in the Arctic region, with an emphasis on developing— (1) new construction techniques for roads, bridges, rail, and related transportation infrastructure and residential, commercial, and industrial infrastructure that are capable of withstanding the Arctic environment and using limited energy resources as efficiently as possible; (2) technologies and procedures for increasing road, bridge, rail, and related transportation infrastructure and residential, commercial, and industrial infrastructure safety, reliability, and integrity in the Arctic region; (c) Objectives.—The Center shall carry out— The Administrator of the Environmental Protection Agency, in consultation with the State of Michigan and affected local officials, shall conduct a demonstration project to address the effect of transported ozone and ozone precursors in Southwestern Michigan. The demonstration program shall address projected nonattainment areas in Southwestern Michigan that include counties with design values for ozone of less than .095 based on years 2000 to 2002 or the most current 3-year period of air quality data. The Administrator shall assess any difficulties such areas may experience in meeting the 8 hour national ambient air quality standard for ozone due to the effect of transported ozone or ozone precursors into the areas. The Administrator shall work with State and local officials to determine the extent of ozone and ozone precursor transport, to assess alternatives to achieve compliance with the 8 hour standard apart from local controls, and to determine the timeframe in which such compliance could take place. The Administrator shall complete this demonstration project no later than 2 years after the date of enactment of this section and shall not impose any requirement or sanction that might otherwise apply during the pendency of the demonstration project. (a) Program.—The Secretary of Energy shall— (1) establish a program with respect to the feasibility of using hydrogen propulsion in light-weight vehicles and the integration of the associated hydrogen production infrastructure using off-the-shelf components; and (a) Grant authority.—The Secretary of Energy is authorized to make a single grant to a qualified institution to design and fabricate a 5-kilowatt prototype coal-based fuel cell with the following performance objectives: (b) Qualified institution.—For the purposes of subsection (a), a qualified institution is a research-intensive institution of higher education with demonstrated expertise in the development of carbon-based fuel cells allowing the direct use of high sulfur content coal as fuel, and which has produced a laboratory-scale carbon-based fuel cell with a proven current density of 100 milliamps per square centimeter at a voltage of 0.6 volts. (a) Findings.—The Congress finds that— (1) on February 1, 1996, United States Secretary of Energy Hazel R. O’Leary and Israeli Minister of Energy and Infrastructure Gonen Segev signed the Agreement between the Department of Energy of the United States of America and the Ministry of Energy and Infrastructure of Israel Concerning Energy Cooperation, to establish a framework for collaboration between the United States and Israel in energy research and development activities; (b) Report to Congress.— (1) The Secretary of Energy shall report to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate on—
(a) Additional Assistant Secretary position to enable improved management of nuclear energy issues.— (1) IN GENERAL.—Section 203(a) of the Department of Energy Organization Act (42 U.S.C. 7133(a)) is amended by striking “six Assistant Secretaries” and inserting “7 Assistant Secretaries”. (b) Technical and conforming amendments.— (1) TITLE 5.—Section 5315 of title 5, United States Code, is amended by striking “Assistant Secretaries of Energy (6)” and inserting “Assistant Secretaries of Energy (7)”. (2) DEPARTMENT OF ENERGY ORGANIZATION ACT.—The table of contents for the Department of Energy Organization Act (42 U.S.C. 7101 note) is amended— Section 646 of the Department of Energy Organization Act (42 U.S.C. 7256) is amended by adding at the end the following: “(g) (1) In addition to other authorities granted to the Secretary under law, the Secretary may enter into other transactions on such terms as the Secretary may deem appropriate in furtherance of research, development, or demonstration functions vested in the Secretary. Such other transactions shall not be subject to the provisions of section 9 of the Federal Nonnuclear Energy Research and Development Act of 1974 (42 U.S.C. 5908) or section 152 of the Atomic Energy Act of 1954 (42 U.S.C. 2182). “(2) (A) The Secretary shall ensure that— “(i) to the maximum extent the Secretary determines practicable, no transaction entered into under paragraph (1) provides for research, development, or demonstration that duplicates research, development, or demonstration being conducted under existing projects carried out by the Department; “(3) (A) The Secretary shall protect from disclosure, including disclosure under section 552 of title 5, United States Code, for up to 5 years after the date the information is received by the Secretary—
“(B) The Secretary may protect from disclosure, for up to 5 years after the information was developed, any information developed pursuant to a transaction under paragraph (1) which developed information is of a character that it would be protected from disclosure under section 552(b)(4) of title 5, United States Code, if obtained from a person other than a Federal agency. “(4) Not later than 90 days after the date of enactment of this subsection, the Secretary shall prescribe guidelines for using other transactions authorized by paragraph (1). Such guidelines shall be published in the Federal Register for public comment under rulemaking procedures of the Department. “(5) The authority of the Secretary under this subsection may be delegated only to an officer of the Department who is appointed by the President by and with the advice and consent of the Senate and may not be delegated to any other person. “(6) (A) Not later than September 31, 2006, the Comptroller General of the United States shall report to Congress on the Department’s use of the authorities granted under this section, including the ability to attract nontraditional government contractors and whether additional safeguards are needed with respect to the use of such authorities. “(B) In this section, the term ‘nontraditional Government contractor’ has the same meaning as the term ‘nontraditional defense contractor’ as defined in section 845(e) of the National Defense Authorization Act for Fiscal Year 1994 (Public Law 103–160; 10 U.S.C. 2371 note).”. Not later than 2 years after the date of enactment of this Act, the Secretary of Energy shall transmit to the Congress a report that examines the feasibility of promoting collaborations between major universities and other colleges and universities in grants, contracts, and cooperative agreements made by the Secretary for energy projects. For purposes of this section, major universities are schools listed by the Carnegie Foundation as Doctoral Research Extensive Universities. The Secretary shall also consider providing incentives to increase the inclusion of small institutions of higher education, including minority-serving institutions, in energy grants, contracts, and cooperative agreements. It is the sense of the Congress that— This title may be cited as the “Electric Reliability Act of 2005”. (a) In general.—Part II of the Federal Power Act (16 U.S.C 824 et seq.) is amended by adding at the end the following: “SEC. 215. Electric reliability. “(a) Definitions.—For purposes of this section: “(1) The term ‘bulk-power system’ means— “(A) facilities and control systems necessary for operating an interconnected electric energy transmission network (or any portion thereof); and The term does not include facilities used in the local distribution of electric energy. “(2) The terms ‘Electric Reliability Organization’ and ‘ERO’ mean the organization certified by the Commission under subsection (c) the purpose of which is to establish and enforce reliability standards for the bulk-power system, subject to Commission review. “(3) The term ‘reliability standard’ means a requirement, approved by the Commission under this section, to provide for reliable operation of the bulk-power system. The term includes requirements for the operation of existing bulk-power system facilities, including cybersecurity protection, and the design of planned additions or modifications to such facilities to the extent necessary to provide for reliable operation of the bulk-power system, but the term does not include any requirement to enlarge such facilities or to construct new transmission capacity or generation capacity. “(4) The term ‘reliable operation’ means operating the elements of the bulk-power system within equipment and electric system thermal, voltage, and stability limits so that instability, uncontrolled separation, or cascading failures of such system will not occur as a result of a sudden disturbance, including a cybersecurity incident, or unanticipated failure of system elements. “(5) The term ‘Interconnection’ means a geographic area in which the operation of bulk-power system components is synchronized such that the failure of 1 or more of such components may adversely affect the ability of the operators of other components within the system to maintain reliable operation of the facilities within their control. “(6) The term ‘transmission organization’ means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities. “(7) The term ‘regional entity’ means an entity having enforcement authority pursuant to subsection (e)(4). “(8) The term ‘cybersecurity incident’ means a malicious act or suspicious event that disrupts, or was an attempt to disrupt, the operation of those programmable electronic devices and communication networks including hardware, software and data that are essential to the reliable operation of the bulk power system. “(b) Jurisdiction and applicability.— (1) The Commission shall have jurisdiction, within the United States, over the ERO certified by the Commission under subsection (c), any regional entities, and all users, owners and operators of the bulk-power system, including but not limited to the entities described in section 201(f), for purposes of approving reliability standards established under this section and enforcing compliance with this section. All users, owners and operators of the bulk-power system shall comply with reliability standards that take effect under this section. “(c) Certification.—Following the issuance of a Commission rule under subsection (b)(2), any person may submit an application to the Commission for certification as the Electric Reliability Organization. The Commission may certify 1 such ERO if the Commission determines that such ERO— “(1) has the ability to develop and enforce, subject to subsection (e)(2), reliability standards that provide for an adequate level of reliability of the bulk-power system; and “(2) has established rules that— “(A) assure its independence of the users and owners and operators of the bulk-power system, while assuring fair stakeholder representation in the selection of its directors and balanced decisionmaking in any ERO committee or subordinate organizational structure; “(B) allocate equitably reasonable dues, fees, and other charges among end users for all activities under this section; “(C) provide fair and impartial procedures for enforcement of reliability standards through the imposition of penalties in accordance with subsection (e) (including limitations on activities, functions, or operations, or other appropriate sanctions); “(D) provide for reasonable notice and opportunity for public comment, due process, openness, and balance of interests in developing reliability standards and otherwise exercising its duties; and “(E) provide for taking, after certification, appropriate steps to gain recognition in Canada and Mexico. The total amount of all dues, fees, and other charges collected by the ERO in each of the fiscal years 2006 through 2015 and allocated under subparagraph (B) shall not exceed $50,000,000. “(d) Reliability standards.— (1) The Electric Reliability Organization shall file each reliability standard or modification to a reliability standard that it proposes to be made effective under this section with the Commission. “(2) The Commission may approve, by rule or order, a proposed reliability standard or modification to a reliability standard if it determines that the standard is just, reasonable, not unduly discriminatory or preferential, and in the public interest. The Commission shall give due weight to the technical expertise of the Electric Reliability Organization with respect to the content of a proposed standard or modification to a reliability standard and to the technical expertise of a regional entity organized on an Interconnection-wide basis with respect to a reliability standard to be applicable within that Interconnection, but shall not defer with respect to the effect of a standard on competition. A proposed standard or modification shall take effect upon approval by the Commission. “(3) The Electric Reliability Organization shall rebuttably presume that a proposal from a regional entity organized on an Interconnection-wide basis for a reliability standard or modification to a reliability standard to be applicable on an Interconnection-wide basis is just, reasonable, and not unduly discriminatory or preferential, and in the public interest. “(4) The Commission shall remand to the Electric Reliability Organization for further consideration a proposed reliability standard or a modification to a reliability standard that the Commission disapproves in whole or in part. “(5) The Commission, upon its own motion or upon complaint, may order the Electric Reliability Organization to submit to the Commission a proposed reliability standard or a modification to a reliability standard that addresses a specific matter if the Commission considers such a new or modified reliability standard appropriate to carry out this section. “(6) The final rule adopted under subsection (b)(2) shall include fair processes for the identification and timely resolution of any conflict between a reliability standard and any function, rule, order, tariff, rate schedule, or agreement accepted, approved, or ordered by the Commission applicable to a transmission organization. Such transmission organization shall continue to comply with such function, rule, order, tariff, rate schedule or agreement accepted approved, or ordered by the Commission until— “(e) Enforcement.— (1) The ERO may impose, subject to paragraph (2), a penalty on a user or owner or operator of the bulk-power system for a violation of a reliability standard approved by the Commission under subsection (d) if the ERO, after notice and an opportunity for a hearing—
“(2) A penalty imposed under paragraph (1) may take effect not earlier than the 31st day after the ERO files with the Commission notice of the penalty and the record of proceedings. Such penalty shall be subject to review by the Commission, on its own motion or upon application by the user, owner or operator that is the subject of the penalty filed within 30 days after the date such notice is filed with the Commission. Application to the Commission for review, or the initiation of review by the Commission on its own motion, shall not operate as a stay of such penalty unless the Commission otherwise orders upon its own motion or upon application by the user, owner or operator that is the subject of such penalty. In any proceeding to review a penalty imposed under paragraph (1), the Commission, after notice and opportunity for hearing (which hearing may consist solely of the record before the ERO and opportunity for the presentation of supporting reasons to affirm, modify, or set aside the penalty), shall by order affirm, set aside, reinstate, or modify the penalty, and, if appropriate, remand to the ERO for further proceedings. The Commission shall implement expedited procedures for such hearings. “(3) On its own motion or upon complaint, the Commission may order compliance with a reliability standard and may impose a penalty against a user or owner or operator of the bulk-power system if the Commission finds, after notice and opportunity for a hearing, that the user or owner or operator of the bulk-power system has engaged or is about to engage in any acts or practices that constitute or will constitute a violation of a reliability standard. “(4) The Commission shall issue regulations authorizing the ERO to enter into an agreement to delegate authority to a regional entity for the purpose of proposing reliability standards to the ERO and enforcing reliability standards under paragraph (1) if— “(f) Changes in Electric Reliability Organization rules.—The Electric Reliability Organization shall file with the Commission for approval any proposed rule or proposed rule change, accompanied by an explanation of its basis and purpose. The Commission, upon its own motion or complaint, may propose a change to the rules of the ERO. A proposed rule or proposed rule change shall take effect upon a finding by the Commission, after notice and opportunity for comment, that the change is just, reasonable, not unduly discriminatory or preferential, is in the public interest, and satisfies the requirements of subsection (c). “(g) Reliability reports.—The ERO shall conduct periodic assessments of the reliability and adequacy of the bulk-power system in North America. “(h) Coordination with Canada and Mexico.—The President is urged to negotiate international agreements with the governments of Canada and Mexico to provide for effective compliance with reliability standards and the effectiveness of the ERO in the United States and Canada or Mexico. “(i) Savings provisions.— (1) The ERO shall have authority to develop and enforce compliance with reliability standards for only the bulk-power system. “(2) This section does not authorize the ERO or the Commission to order the construction of additional generation or transmission capacity or to set and enforce compliance with standards for adequacy or safety of electric facilities or services. “(3) Nothing in this section shall be construed to preempt any authority of any State to take action to ensure the safety, adequacy, and reliability of electric service within that State, as long as such action is not inconsistent with any reliability standard, except that the State of New York may establish rules that result in greater reliability within that State, as long as such action does not result in lesser reliability outside the State than that provided by the reliability standards. “(4) Within 90 days of the application of the Electric Reliability Organization or other affected party, and after notice and opportunity for comment, the Commission shall issue a final order determining whether a State action is inconsistent with a reliability standard, taking into consideration any recommendation of the ERO. “(j) Regional advisory bodies.—The Commission shall establish a regional advisory body on the petition of at least 2⁄3 of the States within a region that have more than 1⁄2 of their electric load served within the region. A regional advisory body shall be composed of 1 member from each participating State in the region, appointed by the Governor of each State, and may include representatives of agencies, States, and provinces outside the United States. A regional advisory body may provide advice to the Electric Reliability Organization, a regional entity, or the Commission regarding the governance of an existing or proposed regional entity within the same region, whether a standard proposed to apply within the region is just, reasonable, not unduly discriminatory or preferential, and in the public interest, whether fees proposed to be assessed within the region are just, reasonable, not unduly discriminatory or preferential, and in the public interest and any other responsibilities requested by the Commission. The Commission may give deference to the advice of any such regional advisory body if that body is organized on an Interconnection-wide basis. (b) Status of ERO.—The Electric Reliability Organization certified by the Federal Energy Regulatory Commission under section 215(c) of the Federal Power Act and any regional entity delegated enforcement authority pursuant to section 215(e)(4) of that Act are not departments, agencies, or instrumentalities of the United States Government. (a) Amendment of Federal Power Act.—Part II of the Federal Power Act is amended by adding at the end the following: “SEC. 216. Siting of interstate electric transmission facilities. “(a) Designation of national interest electric transmission corridors.— “(1) TRANSMISSION CONGESTION STUDY.—Within 1 year after the enactment of this section, and every 3 years thereafter, the Secretary of Energy, in consultation with affected States, shall conduct a study of electric transmission congestion. After considering alternatives and recommendations from interested parties, including an opportunity for comment from affected States, the Secretary shall issue a report, based on such study, which may designate any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers as a national interest electric transmission corridor. The Secretary shall conduct the study and issue the report in consultation with any appropriate regional entity referenced in section 215 of this Act. “(2) CONSIDERATIONS.—In determining whether to designate a national interest electric transmission corridor referred to in paragraph (1) under this section, the Secretary may consider whether— “(A) the economic vitality and development of the corridor, or the end markets served by the corridor, may be constrained by lack of adequate or reasonably priced electricity; “(b) Construction permit.—Except as provided in subsection (i), the Commission is authorized, after notice and an opportunity for hearing, to issue a permit or permits for the construction or modification of electric transmission facilities in a national interest electric transmission corridor designated by the Secretary under subsection (a) if the Commission finds that— “(1) (A) a State in which the transmission facilities are to be constructed or modified is without authority to—
“(B) the applicant for a permit is a transmitting utility under this Act but does not qualify to apply for a permit or siting approval for the proposed project in a State because the applicant does not serve end-use customers in the State; or “(C) a State commission or other entity that has authority to approve the siting of the facilities has— “(2) the facilities to be authorized by the permit will be used for the transmission of electric energy in interstate commerce; “(c) Permit applications.—Permit applications under subsection (b) shall be made in writing to the Commission. The Commission shall issue rules setting forth the form of the application, the information to be contained in the application, and the manner of service of notice of the permit application upon interested persons. “(d) Comments.—In any proceeding before the Commission under subsection (b), the Commission shall afford each State in which a transmission facility covered by the permit is or will be located, each affected Federal agency and Indian tribe, private property owners, and other interested persons, a reasonable opportunity to present their views and recommendations with respect to the need for and impact of a facility covered by the permit. “(e) Rights-of-way.—In the case of a permit under subsection (b) for electric transmission facilities to be located on property other than property owned by the United States or a State, if the permit holder cannot acquire by contract, or is unable to agree with the owner of the property to the compensation to be paid for, the necessary right-of-way to construct or modify such transmission facilities, the permit holder may acquire the right-of-way by the exercise of the right of eminent domain in the district court of the United States for the district in which the property concerned is located, or in the appropriate court of the State in which the property is located. The practice and procedure in any action or proceeding for that purpose in the district court of the United States shall conform as nearly as may be with the practice and procedure in similar action or proceeding in the courts of the State where the property is situated. “(f) State law.—Nothing in this section shall preclude any person from constructing or modifying any transmission facility pursuant to State law. “(g) Compensation.—Any exercise of eminent domain authority pursuant to this section shall be considered a taking of private property for which just compensation is due. Just compensation shall be an amount equal to the full fair market value of the property taken on the date of the exercise of eminent domain authority, except that the compensation shall exceed fair market value if necessary to make the landowner whole for decreases in the value of any portion of the land not subject to eminent domain. Any parcel of land acquired by eminent domain under this subsection shall be transferred back to the owner from whom it was acquired (or his heirs or assigns) if the land is not used for the construction or modification of electric transmission facilities within a reasonable period of time after the acquisition. Other than construction, modification, operation, or maintenance of electric transmission facilities and related facilities, property acquired under subsection (e) may not be used for any purpose (including use for any heritage area, recreational trail, or park) without the consent of the owner of the parcel from whom the property was acquired (or the owner’s heirs or assigns). “(h) Coordination of Federal authorizations for transmission and distribution facilities.— “(1) LEAD AGENCY.—If an applicant, or prospective applicant, for a Federal authorization related to an electric transmission or distribution facility so requests, the Department of Energy (DOE) shall act as the lead agency for purposes of coordinating all applicable Federal authorizations and related environmental reviews of the facility. For purposes of this subsection, the term ‘Federal authorization’ means any authorization required under Federal law in order to site a transmission or distribution facility, including but not limited to such permits, special use authorizations, certifications, opinions, or other approvals as may be required, whether issued by a Federal or a State agency. To the maximum extent practicable under applicable Federal law, the Secretary of Energy shall coordinate this Federal authorization and review process with any Indian tribes, multi-State entities, and State agencies that are responsible for conducting any separate permitting and environmental reviews of the facility, to ensure timely and efficient review and permit decisions. “(2) AUTHORITY TO SET DEADLINES.—As lead agency, the Department of Energy, in consultation with agencies responsible for Federal authorizations and, as appropriate, with Indian tribes, multi-State entities, and State agencies that are willing to coordinate their own separate permitting and environmental reviews with the Federal authorization and environmental reviews, shall establish prompt and binding intermediate milestones and ultimate deadlines for the review of, and Federal authorization decisions relating to, the proposed facility. The Secretary of Energy shall ensure that once an application has been submitted with such data as the Secretary considers necessary, all permit decisions and related environmental reviews under all applicable Federal laws shall be completed within 1 year or, if a requirement of another provision of Federal law makes this impossible, as soon thereafter as is practicable. The Secretary of Energy also shall provide an expeditious pre-application mechanism for prospective applicants to confer with the agencies involved to have each such agency determine and communicate to the prospective applicant within 60 days of when the prospective applicant submits a request for such information concerning— “(3) CONSOLIDATED ENVIRONMENTAL REVIEW AND RECORD OF DECISION.—As lead agency head, the Secretary of Energy, in consultation with the affected agencies, shall prepare a single environmental review document, which shall be used as the basis for all decisions on the proposed project under Federal law. The document may be an environmental assessment or environmental impact statement under the National Environmental Policy Act of 1969 if warranted, or such other form of analysis as may be warranted. The Secretary of Energy and the heads of other agencies shall streamline the review and permitting of transmission and distribution facilities within corridors designated under section 503 of the Federal Land Policy and Management Act (43 U.S.C. 1763) by fully taking into account prior analyses and decisions relating to the corridors. Such document shall include consideration by the relevant agencies of any applicable criteria or other matters as required under applicable laws. “(4) APPEALS.—In the event that any agency has denied a Federal authorization required for a transmission or distribution facility, or has failed to act by the deadline established by the Secretary pursuant to this section for deciding whether to issue the authorization, the applicant or any State in which the facility would be located may file an appeal with the Secretary, who shall, in consultation with the affected agency, review the denial or take action on the pending application. Based on the overall record and in consultation with the affected agency, the Secretary may then either issue the necessary authorization with any appropriate conditions, or deny the application. The Secretary shall issue a decision within 90 days of the filing of the appeal. In making a decision under this paragraph, the Secretary shall comply with applicable requirements of Federal law, including any requirements of the Endangered Species Act, the Clean Water Act, the National Forest Management Act, the National Environmental Policy Act of 1969, and the Federal Land Policy and Management Act. “(5) CONFORMING REGULATIONS AND MEMORANDA OF UNDERSTANDING.—Not later than 18 months after the date of enactment of this section, the Secretary of Energy shall issue any regulations necessary to implement this subsection. Not later than 1 year after the date of enactment of this section, the Secretary and the heads of all Federal agencies with authority to issue Federal authorizations shall enter into Memoranda of Understanding to ensure the timely and coordinated review and permitting of electricity transmission and distribution facilities. The head of each Federal agency with authority to issue a Federal authorization shall designate a senior official responsible for, and dedicate sufficient other staff and resources to ensure, full implementation of the DOE regulations and any Memoranda. Interested Indian tribes, multi-State entities, and State agencies may enter such Memoranda of Understanding. “(6) DURATION AND RENEWAL.—Each Federal land use authorization for an electricity transmission or distribution facility shall be issued— “(A) for a duration, as determined by the Secretary of Energy, commensurate with the anticipated use of the facility, and “(B) with appropriate authority to manage the right-of-way for reliability and environmental protection. Upon the expiration of any such authorization (including an authorization issued prior to enactment of this section), the authorization shall be reviewed for renewal taking fully into account reliance on such electricity infrastructure, recognizing its importance for public health, safety and economic welfare and as a legitimate use of Federal lands. “(7) MAINTAINING AND ENHANCING THE TRANSMISSION INFRASTRUCTURE.—In exercising the responsibilities under this section, the Secretary of Energy shall consult regularly with the Federal Energy Regulatory Commission (FERC), FERC-approved electric reliability organizations (including related regional entities), and FERC-approved Regional Transmission Organizations and Independent System Operators. “(i) Interstate compacts.—The consent of Congress is hereby given for 3 or more contiguous States to enter into an interstate compact, subject to approval by Congress, establishing regional transmission siting agencies to facilitate siting of future electric energy transmission facilities within such States and to carry out the electric energy transmission siting responsibilities of such States. The Secretary of Energy may provide technical assistance to regional transmission siting agencies established under this subsection. Such regional transmission siting agencies shall have the authority to review, certify, and permit siting of transmission facilities, including facilities in national interest electric transmission corridors (other than facilities on property owned by the United States). The Commission shall have no authority to issue a permit for the construction or modification of electric transmission facilities within a State that is a party to a compact, unless the members of a compact are in disagreement and the Secretary makes, after notice and an opportunity for a hearing, the finding described in subsection (b)(1)(C). “(j) Savings clause.—Nothing in this section shall be construed to affect any requirement of the environmental laws of the United States, including, but not limited to, the National Environmental Policy Act of 1969. Subsection (h)(4) of this section shall not apply to any Congressionally-designated components of the National Wilderness Preservation System, the National Wild and Scenic Rivers System, or the National Park system (including National Monuments therein). (b) Reports to Congress on corridors and rights of way on Federal lands.—The Secretary of the Interior, the Secretary of Energy, the Secretary of Agriculture, and the Chairman of the Council on Environmental Quality shall, within 90 days of the date of enactment of this subsection, submit a joint report to Congress identifying each of the following: (1) All existing designated transmission and distribution corridors on Federal land and the status of work related to proposed transmission and distribution corridor designations under Title V of the Federal Land Policy and Management Act (43 U.S.C. 1761 et. Seq.), the schedule for completing such work, any impediments to completing the work, and steps that Congress could take to expedite the process. (2) The number of pending applications to locate transmission and distribution facilities on Federal lands, key information relating to each such facility, how long each application has been pending, the schedule for issuing a timely decision as to each facility, and progress in incorporating existing and new such rights-of-way into relevant land use and resource management plans or their equivalent. (a) Existing facilities.—The Secretary of Energy (hereinafter in this section referred to as the “Secretary”), acting through the Administrator of the Western Area Power Administration (hereinafter in this section referred to as “WAPA”), or through the Administrator of the Southwestern Power Administration (hereinafter in this section referred to as “SWPA”), or both, may design, develop, construct, operate, maintain, or own, or participate with other entities in designing, developing, constructing, operating, maintaining, or owning, an electric power transmission facility and related facilities (“Project”) needed to upgrade existing transmission facilities owned by SWPA or WAPA if the Secretary of Energy, in consultation with the applicable Administrator, determines that the proposed Project— (1) (A) is located in a national interest electric transmission corridor designated under section 216(a) of the Federal Power Act and will reduce congestion of electric transmission in interstate commerce; or (b) New facilities.—The Secretary, acting through WAPA or SWPA, or both, may design, develop, construct, operate, maintain, or own, or participate with other entities in designing, developing, constructing, operating, maintaining, or owning, a new electric power transmission facility and related facilities (“Project”) located within any State in which WAPA or SWPA operates if the Secretary, in consultation with the applicable Administrator, determines that the proposed Project— (1) (A) is located in an area designated under section 216(a) of the Federal Power Act and will reduce congestion of electric transmission in interstate commerce; or (2) is consistent with— (c) Other funds.— (1) IN GENERAL.—In carrying out a Project under subsection (a) or (b), the Secretary may accept and use funds contributed by another entity for the purpose of carrying out the Project. (2) AVAILABILITY.—The contributed funds shall be available for expenditure for the purpose of carrying out the Project— (3) ALLOCATION OF COSTS.—In carrying out a Project under subsection (a) or (b), any costs of the Project not paid for by contributions from another entity shall be collected through rates charged to customers using the new transmission capability provided by the Project and allocated equitably among these project beneficiaries using the new transmission capability. (d) Relationship to other laws.—Nothing in this section affects any requirement of— (1) any Federal environmental law, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); (e) Savings clause.—Nothing in this section shall constrain or restrict an Administrator in the utilization of other authority delegated to the Administrator of WAPA or SWPA. Within 6 months after the date of enactment of this Act, the Secretary of Energy and the Federal Energy Regulatory Commission shall study and report to Congress on the steps which must be taken to establish a system to make available to all transmission system owners and Regional Transmission Organizations (as defined in the Federal Power Act) within the Eastern and Western Interconnections real-time information on the functional status of all transmission lines within such Interconnections. In such study, the Commission shall assess technical means for implementing such transmission information system and identify the steps the Commission or Congress must take to require the implementation of such system. (a) Authority.—The Federal Energy Regulatory Commission, in the exercise of its authorities under the Federal Power Act and the Public Utility Regulatory Policies Act of 1978, shall encourage the deployment of advanced transmission technologies. (b) Definition.—For the purposes of this section, the term “advanced transmission technologies” means technologies that increase the capacity, efficiency, or reliability of existing or new transmission facilities, including, but not limited to— (3) advanced conductor technology (including advanced composite conductors, high-temperature low-sag conductors, and fiber optic temperature sensing conductors); (11) energy storage devices (including pumped hydro, compressed air, superconducting magnetic energy storage, flywheels, and batteries); (a) Electric transmission and distribution program.—The Secretary of Energy (hereinafter in this section referred to as the “Secretary”) acting through the Director of the Office of Electric Transmission and Distribution shall establish a comprehensive research, development, demonstration and commercial application program to promote improved reliability and efficiency of electrical transmission and distribution systems. This program shall include— (1) advanced energy delivery and storage technologies, materials, and systems, including new transmission technologies, such as flexible alternating current transmission systems, composite conductor materials and other technologies that enhance reliability, operational flexibility, or power-carrying capability; (6) the development and use of high-temperature superconductors to— (7) integration of power systems, including systems to deliver high-quality electric power, electric power reliability, and combined heat and power; (b) Program plan.—Not later than 1 year after the date of the enactment of this legislation, the Secretary, in consultation with other appropriate Federal agencies, shall prepare and transmit to Congress a 5-year program plan to guide activities under this section. In preparing the program plan, the Secretary may consult with utilities, energy services providers, manufacturers, institutions of higher education, other appropriate State and local agencies, environmental organizations, professional and technical societies, and any other persons the Secretary considers appropriate. (c) Implementation.—The Secretary shall consider implementing this program using a consortium of industry, university and national laboratory participants. (d) Report.—Not later than 2 years after the transmittal of the plan under subsection (b), the Secretary shall transmit a report to Congress describing the progress made under this section and identifying any additional resources needed to continue the development and commercial application of transmission and distribution infrastructure technologies. (e) Power delivery research initiative.— (1) IN GENERAL.—The Secretary shall establish a research, development, demonstration, and commercial application initiative specifically focused on power delivery utilizing components incorporating high temperature superconductivity. (2) GOALS.—The goals of this initiative shall be to— (A) establish facilities to develop high temperature superconductivity power applications in partnership with manufacturers and utilities; (B) provide technical leadership for establishing reliability for high temperature superconductivity power applications including suitable modeling and analysis; (3) REQUIREMENTS.—The initiative shall include— (A) feasibility analysis, planning, research, and design to construct demonstrations of superconducting links in high power, direct current and controllable alternating current transmission systems; (a) Program.—The Secretary of Energy is authorized to establish an Advanced Power System Technology Incentive Program to support the deployment of certain advanced power system technologies and to improve and protect certain critical governmental, industrial, and commercial processes. Funds provided under this section shall be used by the Secretary to make incentive payments to eligible owners or operators of advanced power system technologies to increase power generation through enhanced operational, economic, and environmental performance. Payments under this section may only be made upon receipt by the Secretary of an incentive payment application establishing an applicant as either— (b) Incentives.—Subject to availability of funds, a payment of 1.8 cents per kilowatt-hour shall be paid to the owner or operator of a qualifying advanced power system technology facility under this section for electricity generated at such facility. An additional 0.7 cents per kilowatt-hour shall be paid to the owner or operator of a qualifying security and assured power facility for electricity generated at such facility. Any facility qualifying under this section shall be eligible for an incentive payment for up to, but not more than, the first 10,000,000 kilowatt-hours produced in any fiscal year. (c) Eligibility.—For purposes of this section: (1) QUALIFYING ADVANCED POWER SYSTEM TECHNOLOGY FACILITY.—The term “qualifying advanced power system technology facility” means a facility using an advanced fuel cell, turbine, or hybrid power system or power storage system to generate or store electric energy. (2) QUALIFYING SECURITY AND ASSURED POWER FACILITY.—The term “qualifying security and assured power facility” means a qualifying advanced power system technology facility determined by the Secretary of Energy, in consultation with the Secretary of Homeland Security, to be in critical need of secure, reliable, rapidly available, high-quality power for critical governmental, industrial, or commercial applications. (a) Creation of an Office of Electric Transmission and Distribution.—Title II of the Department of Energy Organization Act (42 U.S.C. 7131 et seq.) (as amended by section 502(a) of this Act) is amended by inserting the following after section 217, as added by title V of this Act: “SEC. 218. Office of Electric Transmission and Distribution. “(a) Establishment.—There is established within the Department an Office of Electric Transmission and Distribution. This Office shall be headed by a Director, subject to the authority of the Secretary. The Director shall be appointed by the Secretary. The Director shall be compensated at the annual rate prescribed for level IV of the Executive Schedule under section 5315 of title 5, United States Code. “(b) Director.—The Director shall— “(1) coordinate and develop a comprehensive, multi-year strategy to improve the Nation’s electricity transmission and distribution; “(2) implement or, where appropriate, coordinate the implementation of, the recommendations made in the Secretary’s May 2002 National Transmission Grid Study; “(3) oversee research, development, and demonstration to support Federal energy policy related to electricity transmission and distribution; “(4) grant authorizations for electricity import and export pursuant to section 202(c), (d), (e), and (f) of the Federal Power Act (16 U.S.C. 824a); (b) Conforming amendments.— (1) The table of contents of the Department of Energy Organization Act (42 U.S.C. 7101 note) is amended by inserting after the item relating to section 217 the following new item:
(2) Section 5315 of title 5, United States Code, is amended by inserting after the item relating to “Inspector General, Department of Energy.” the following: Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by inserting after section 211 the following new section: “SEC. 211A. Open access by unregulated transmitting utilities. “(a) Transmission services.—Subject to section 212(h), the Commission may, by rule or order, require an unregulated transmitting utility to provide transmission services— “(b) Exemption.—The Commission shall exempt from any rule or order under this section any unregulated transmitting utility that— “(c) Local distribution facilities.—The requirements of subsection (a) shall not apply to facilities used in local distribution. “(d) Exemption termination.—Whenever the Commission, after an evidentiary hearing held upon a complaint and after giving consideration to reliability standards established under section 215, finds on the basis of a preponderance of the evidence that any exemption granted pursuant to subsection (b) unreasonably impairs the continued reliability of an interconnected transmission system, it shall revoke the exemption granted to that transmitting utility. “(e) Application to unregulated transmitting utilities.—The rate changing procedures applicable to public utilities under subsections (c) and (d) of section 205 are applicable to unregulated transmitting utilities for purposes of this section. “(f) Remand.—In exercising its authority under paragraph (1) of subsection (a), the Commission may remand transmission rates to an unregulated transmitting utility for review and revision where necessary to meet the requirements of subsection (a). “(g) Other requests.—The provision of transmission services under subsection (a) does not preclude a request for transmission services under section 211. “(h) Limitation.—The Commission may not require a State or municipality to take action under this section that would violate a private activity bond rule for purposes of section 141 of the Internal Revenue Code of 1986 (26 U.S.C. 141). “(i) Transfer of control of transmitting facilities.—Nothing in this section authorizes the Commission to require an unregulated transmitting utility to transfer control or operational control of its transmitting facilities to an RTO or any other Commission-approved independent transmission organization designated to provide nondiscriminatory transmission access. It is the sense of Congress that, in order to promote fair, open access to electric transmission service, benefit retail consumers, facilitate wholesale competition, improve efficiencies in transmission grid management, promote grid reliability, remove opportunities for unduly discriminatory or preferential transmission practices, and provide for the efficient development of transmission infrastructure needed to meet the growing demands of competitive wholesale power markets, all transmitting utilities in interstate commerce should voluntarily become members of Regional Transmission Organizations as defined in section 3 of the Federal Power Act. Not later than 120 days after the date of enactment of this section, the Federal Energy Regulatory Commission shall submit to Congress a report containing each of the following: (1) A list of all regional transmission organization applications filed at the Commission pursuant to subpart F of part 35 of title 18, Code of Federal Regulations (in this section referred to as “Order No. 2000”), including an identification of each public utility and other entity included within the proposed membership of the regional transmission organization. (2) A brief description of the status of each pending regional transmission organization application, including a precise explanation of how each fails to comply with the minimal requirements of Order No. 2000 and what steps need to be taken to bring each application into such compliance. (3) For any application that has not been finally approved by the Commission, a detailed description of every aspect of the application that the Commission has determined does not conform to the requirements of Order No. 2000. (4) For any application that has not been finally approved by the Commission, an explanation by the Commission of why the items described pursuant to paragraph (3) constitute material noncompliance with the requirements of the Commission’s Order No. 2000 sufficient to justify denial of approval by the Commission. (a) Definitions.—For purposes of this section— (1) APPROPRIATE FEDERAL REGULATORY AUTHORITY.—The term “appropriate Federal regulatory authority” means— (A) with respect to a Federal power marketing agency (as defined in the Federal Power Act), the Secretary of Energy, except that the Secretary may designate the Administrator of a Federal power marketing agency to act as the appropriate Federal regulatory authority with respect to the transmission system of that Federal power marketing agency; and (b) Transfer.—The appropriate Federal regulatory authority is authorized to enter into a contract, agreement or other arrangement transferring control and use of all or part of the Federal utility’s transmission system to an RTO or ISO (as defined in the Federal Power Act), approved by the Federal Energy Regulatory Commission. Such contract, agreement or arrangement shall include— (1) performance standards for operation and use of the transmission system that the head of the Federal utility determines necessary or appropriate, including standards that assure recovery of all the Federal utility’s costs and expenses related to the transmission facilities that are the subject of the contract, agreement or other arrangement; consistency with existing contracts and third-party financing arrangements; and consistency with said Federal utility’s statutory authorities, obligations, and limitations; (2) provisions for monitoring and oversight by the Federal utility of the RTO’s or ISO’s fulfillment of the terms and conditions of the contract, agreement or other arrangement, including a provision for the resolution of disputes through arbitration or other means with the regional transmission organization or with other participants, notwithstanding the obligations and limitations of any other law regarding arbitration; and (3) a provision that allows the Federal utility to withdraw from the RTO or ISO and terminate the contract, agreement or other arrangement in accordance with its terms. (c) Existing statutory and other obligations.— (1) SYSTEM OPERATION REQUIREMENTS.—No statutory provision requiring or authorizing a Federal utility to transmit electric power or to construct, operate or maintain its transmission system shall be construed to prohibit a transfer of control and use of its transmission system pursuant to, and subject to all requirements of subsection (b). (2) OTHER OBLIGATIONS.—This subsection shall not be construed to— (A) suspend, or exempt any Federal utility from, any provision of existing Federal law, including but not limited to any requirement or direction relating to the use of the Federal utility’s transmission system, environmental protection, fish and wildlife protection, flood control, navigation, water delivery, or recreation; or (3) REPEAL.—Section 311 of title III of Appendix B of the Act of October 27, 2000 (P.L. 106–377, section 1(a)(2); 114 Stat. 1441, 1441A–80; 16 U.S.C. 824n) is repealed. (a) Remand.—The Commission’s proposed rulemaking entitled “Remedying Undue Discrimination through Open Access Transmission Service and Standard Electricity Market Design” (Docket No. RM01–12–000) (“SMD NOPR”) is remanded to the Commission for reconsideration. No final rule mandating a standard electricity market design pursuant to the proposed rulemaking, including any rule or order of general applicability within the scope of the proposed rulemaking, may be issued before October 31, 2006, or take effect before December 31, 2006. Any final rule issued by the Commission pursuant to the proposed rulemaking shall be preceded by a second notice of proposed rulemaking issued after the date of enactment of this Act and an opportunity for public comment. (b) Savings clause.—This section shall not be construed to modify or diminish any authority or obligation the Commission has under this Act, the Federal Power Act, or other applicable law, including, but not limited to, any authority to— (1) issue any rule or order (of general or particular applicability) pursuant to any such authority or obligation; or (2) act on a filing or filings by 1 or more transmitting utilities for the voluntary formation of a Regional Transmission Organization or Independent System Operator (as defined in the Federal Power Act) (and related market structures or rules) or voluntary modification of an existing Regional Transmission Organization or Independent System Operator (and related market structures or rules). Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: “SEC. 217. Native load service obligation. “(a) Meeting service obligations.— (1) Any load-serving entity that, as of the date of enactment of this section—
“(2) To the extent that all or a portion of the service obligation covered by such firm transmission rights or equivalent tradable or financial transmission rights is transferred to another load-serving entity, the successor load-serving entity shall be entitled to use the firm transmission rights or equivalent tradable or financial transmission rights associated with the transferred service obligation. Subsequent transfers to another load-serving entity, or back to the original load-serving entity, shall be entitled to the same rights. “(3) The Commission shall exercise its authority under this Act in a manner that facilitates the planning and expansion of transmission facilities to meet the reasonable needs of load-serving entities to satisfy their service obligations, and enables load-serving entities to secure firm transmission rights (or equivalent tradable or financial rights) on a long term basis for long term power supply arrangements made, or planned, to meet such needs. “(b) Allocation of transmission rights.—Nothing in subsections (a)(1) and (a) (2) of this section shall affect any existing or future methodology employed by an RTO or ISO for allocating or auctioning transmission rights if such RTO or ISO was authorized by the Commission to allocate or auction financial transmission rights on its system as of January 1, 2005, and the Commission determines that any future allocation or auction is just, reasonable and not unduly discriminatory or preferential, provided, however, that if such an RTO or ISO never allocated financial transmission rights on its system that pertained to a period before January 1, 2005, with respect to any application by such RTO or ISO that would change its methodology the Commission shall exercise its authority in a manner consistent with the Act and the policies expressed in subsections (a)(1) and (a)(2) as applied to firm transmission rights held by a load serving entity as of January 1, 2005, to the extent the associated generation ownership or power purchase arrangements remain in effect. “(c) Certain transmission rights.—The Commission may exercise authority under this Act to make transmission rights not used to meet an obligation covered by subsection (a) available to other entities in a manner determined by the Commission to be just, reasonable, and not unduly discriminatory or preferential. “(d) Obligation to build.—Nothing in this Act shall relieve a load-serving entity from any obligation under State or local law to build transmission or distribution facilities adequate to meet its service obligations. “(e) Contracts.—Nothing in this section shall provide a basis for abrogating any contract or service agreement for firm transmission service or rights in effect as of the date of the enactment of this subsection. If an ISO in the Western Interconnection had allocated financial transmission rights prior to the date of enactment of this section but had not done so with respect to one or more load-serving entities’ firm transmission rights held under contracts to which the preceding sentence applies (or held by reason of ownership of transmission facilities), such load-serving entities may not be required, without their consent, to convert such firm transmission rights to tradable or financial rights, except where the load-serving entity has voluntarily joined the ISO as a participating transmission owner (or its successor) in accordance with the ISO tariff. “(f) Water pumping facilities.—The Commission shall ensure that any entity described in section 201(f) that owns transmission facilities used predominately to support its own water pumping facilities shall have, with respect to such facilities, protections for transmission service comparable to those provided to load-serving entities pursuant to this section. “(g) FERC rulemaking on long-term transmission rights in organized markets.—Within one year after the date of enactment of this section and after notice and an opportunity for comment, the Commission shall by rule or order implement subsection (a)(3) in Commission-approved RTOs and ISOs with organized electricity markets. “(i) Jurisdiction.—This section does not authorize the Commission to take any action not otherwise within its jurisdiction. “(j) Effect of exercising rights.—An entity that lawfully exercises rights granted under subsection (a) shall not be considered by such action as engaging in undue discrimination or preference under this Act. “(k) TVA Area.—For purposes of subsection (a)(1)(B), a load-serving entity that is located within the service area of the Tennessee Valley Authority and that has a firm wholesale power supply contract with the Tennessee Valley Authority shall be deemed to hold firm transmission rights for the transmission of such power. “(l) Definitions.—For purposes of this section: “(1) The term ‘distribution utility’ means an electric utility that has a service obligation to end-users or to a State utility or electric cooperative that, directly or indirectly, through 1 or more additional State utilities or electric cooperatives, provides electric service to end-users. “(2) The term ‘load-serving entity’ means a distribution utility or an electric utility that has a service obligation. “(3) The term ‘service obligation’ means a requirement applicable to, or the exercise of authority granted to, an electric utility under Federal, State or local law or under long-term contracts to provide electric service to end-users or to a distribution utility. “(4) The term ‘State utility’ means a State or any political subdivision of a State, or any agency, authority, or instrumentality of any 1 or more of the foregoing, or a corporation which is wholly owned, directly or indirectly, by any 1 or more of the foregoing, competent to carry on the business of developing, transmitting, utilizing or distributing power.”. (a) Study.—The Secretary of Energy, in coordination and consultation with the States, shall conduct a study on— (b) Definition.—The term “economic dispatch” when used in this section means the operation of generation facilities to produce energy at the lowest cost to reliably serve consumers, recognizing any operational limits of generation and transmission facilities. (c) Report to Congress and the States.—Not later than 90 days after the date of enactment of this Act, and on a yearly basis following, the Secretary of Energy shall submit a report to Congress and the States on the results of the study conducted under subsection (a), including recommendations to Congress and the States for any suggested legislative or regulatory changes. Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: “SEC. 218. Transmission infrastructure investment. “(a) Rulemaking requirement.—Within 1 year after the enactment of this section, the Commission shall establish, by rule, incentive-based (including, but not limited to performance-based) rate treatments for the transmission of electric energy in interstate commerce by public utilities for the purpose of benefiting consumers by ensuring reliability and reducing the cost of delivered power by reducing transmission congestion. Such rule shall— “(1) promote reliable and economically efficient transmission and generation of electricity by promoting capital investment in the enlargement, improvement, maintenance and operation of facilities for the transmission of electric energy in interstate commerce; “(2) provide a return on equity that attracts new investment in transmission facilities (including related transmission technologies); “(3) encourage deployment of transmission technologies and other measures to increase the capacity and efficiency of existing transmission facilities and improve the operation of such facilities; and “(4) allow recovery of all prudently incurred costs necessary to comply with mandatory reliability standards issued pursuant to section 215 of this Act. “(b) Additional incentives for RTO participation.—In the rule issued under this section, the Commission shall, to the extent within its jurisdiction, provide for incentives to each transmitting utility or electric utility that joins a Regional Transmission Organization or Independent System Operator. Incentives provided by the Commission pursuant to such rule shall include— “(1) recovery of all prudently incurred costs to develop and participate in any proposed or approved RTO, ISO, or independent transmission company; “(2) recovery of all costs previously approved by a State commission which exercised jurisdiction over the transmission facilities prior to the utility’s participation in the RTO or ISO, including costs necessary to honor preexisting transmission service contracts, in a manner which does not reduce the revenues the utility receives for transmission services for a reasonable transition period after the utility joins the RTO or ISO; “(3) recovery as an expense in rates of the costs prudently incurred to conduct transmission planning and reliability activities, including the costs of participating in RTO, ISO and other regional planning activities and design, study and other precertification costs involved in seeking permits and approvals for proposed transmission facilities; “(4) a current return in rates for construction work in progress for transmission facilities and full recovery of prudently incurred costs for constructing transmission facilities; “(6) a maximum 15 year accelerated depreciation on new transmission facilities for rate treatment purposes. “(c) Just and reasonable rates.—All rates approved under the rules adopted pursuant to this section, including any revisions to such rules, are subject to the requirement of sections 205 and 206 that all rates, charges, terms, and conditions be just and reasonable and not unduly discriminatory or preferential.”. (a) Adoption of standards.—Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: “(11) NET METERING.—Each electric utility shall make available upon request net metering service to any electric consumer that the electric utility serves. For purposes of this paragraph, the term ‘net metering service’ means service to an electric consumer under which electric energy generated by that electric consumer from an eligible on-site generating facility and delivered to the local distribution facilities may be used to offset electric energy provided by the electric utility to the electric consumer during the applicable billing period. (b) Compliance.— (1) TIME LIMITATIONS.—Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended by adding at the end the following: “(3) (A) Not later than 2 years after the enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 111, or set a hearing date for such consideration, with respect to each standard established by paragraphs (11) through (13) of section 111(d). “(B) Not later than 3 years after the date of the enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 111 with respect to each standard established by paragraphs (11) through (13) of section 111(d).”. (2) FAILURE TO COMPLY.—Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following: (3) PRIOR STATE ACTIONS.— (A) IN GENERAL.—Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following: “(d) Prior State actions.—Subsections (b) and (c) of this section shall not apply to the standards established by paragraphs (11) through (13) of section 111(d) in the case of any electric utility in a State if, before the enactment of this subsection— (B) CROSS REFERENCE.—Section 124 of such Act (16 U.S.C. 2634) is amended by adding the following at the end thereof: “In the case of each standard established by paragraphs (11) through (13) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraphs (11) through (13).”. (a) In general.—Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: “(14) TIME-BASED METERING AND COMMUNICATIONS.— “(A) Not later than 18 months after the date of enactment of this paragraph, each electric utility shall offer each of its customer classes, and provide individual customers upon customer request, a time-based rate schedule under which the rate charged by the electric utility varies during different time periods and reflects the variance, if any, in the utility’s costs of generating and purchasing electricity at the wholesale level. The time-based rate schedule shall enable the electric consumer to manage energy use and cost through advanced metering and communications technology. “(B) The types of time-based rate schedules that may be offered under the schedule referred to in subparagraph (A) include, among others— “(i) time-of-use pricing whereby electricity prices are set for a specific time period on an advance or forward basis, typically not changing more often than twice a year, based on the utility’s cost of generating and/or purchasing such electricity at the wholesale level for the benefit of the consumer. Prices paid for energy consumed during these periods shall be pre-established and known to consumers in advance of such consumption, allowing them to vary their demand and usage in response to such prices and manage their energy costs by shifting usage to a lower cost period or reducing their consumption overall; “(ii) critical peak pricing whereby time-of-use prices are in effect except for certain peak days, when prices may reflect the costs of generating and/or purchasing electricity at the wholesale level and when consumers may receive additional discounts for reducing peak period energy consumption; “(C) Each electric utility subject to subparagraph (A) shall provide each customer requesting a time-based rate with a time-based meter capable of enabling the utility and customer to offer and receive such rate, respectively. “(D) For purposes of implementing this paragraph, any reference contained in this section to the date of enactment of the Public Utility Regulatory Policies Act of 1978 shall be deemed to be a reference to the date of enactment of this paragraph. “(E) In a State that permits third-party marketers to sell electric energy to retail electric consumers, such consumers shall be entitled to receive the same time-based metering and communications device and service as a retail electric consumer of the electric utility. “(F) Notwithstanding subsections (b) and (c) of section 112, each State regulatory authority shall, not later than 18 months after the date of enactment of this paragraph conduct an investigation in accordance with section 115(i) and issue a decision whether it is appropriate to implement the standards set out in subparagraphs (A) and (C).”. (b) State investigation of demand response and time-based metering.—Section 115 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2625) is amended as follows: (1) By inserting in subsection (b) after the phrase “the standard for time-of-day rates established by section 111(d)(3)” the following: “and the standard for time-based metering and communications established by section 111(d)(14)”. (2) By inserting in subsection (b) after the phrase “are likely to exceed the metering” the following: “and communications”. (3) By adding the at the end the following: “(i) Time-based metering and communications.—In making a determination with respect to the standard established by section 111(d)(14), the investigation requirement of section 111(d)(14)(F) shall be as follows: Each State regulatory authority shall conduct an investigation and issue a decision whether or not it is appropriate for electric utilities to provide and install time-based meters and communications devices for each of their customers which enable such customers to participate in time-based pricing rate schedules and other demand response programs.”. (c) Federal assistance on demand response.—Section 132(a) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2642(a)) is amended by striking “and” at the end of paragraph (3), striking the period at the end of paragraph (4) and inserting “; and”, and by adding the following at the end thereof: (d) Federal guidance.—Section 132 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2642) is amended by adding the following at the end thereof: “(d) Demand response.—The Secretary shall be responsible for— “(1) educating consumers on the availability, advantages, and benefits of advanced metering and communications technologies, including the funding of demonstration or pilot projects; (e) Demand response and regional coordination.— (1) IN GENERAL.—It is the policy of the United States to encourage States to coordinate, on a regional basis, State energy policies to provide reliable and affordable demand response services to the public. (2) TECHNICAL ASSISTANCE.—The Secretary of Energy shall provide technical assistance to States and regional organizations formed by 2 or more States to assist them in— (B) identifying and resolving problems in transmission and distribution networks, including through the use of demand response; (3) REPORT.—Not later than 1 year after the date of enactment of the Energy Policy Act of 2005, the Commission shall prepare and publish an annual report, by appropriate region, that assesses demand response resources, including those available from all consumer classes, and which identifies and reviews— (A) saturation and penetration rate of advanced meters and communications technologies, devices and systems; (D) the potential for demand response as a quantifiable, reliable resource for regional planning purposes; (f) Federal encouragement of demand response devices.—It is the policy of the United States that time-based pricing and other forms of demand response, whereby electricity customers are provided with electricity price signals and the ability to benefit by responding to them, shall be encouraged, the deployment of such technology and devices that enable electricity customers to participate in such pricing and demand response systems shall be facilitated, and unnecessary barriers to demand response participation in energy, capacity and ancillary service markets shall be eliminated. It is further the policy of the United States that the benefits of such demand response that accrue to those not deploying such technology and devices, but who are part of the same regional electricity entity, shall be recognized. (g) Time limitations.—Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended by adding at the end the following: “(4) (A) Not later than 1 year after the enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 111, or set a hearing date for such consideration, with respect to the standard established by paragraph (14) of section 111(d). “(B) Not later than 2 years after the date of the enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 111 with respect to the standard established by paragraph (14) of section 111(d).”. (h) Failure to comply.—Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following: (i) Prior State actions regarding smart metering standards.— (1) IN GENERAL.—Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following: “(e) Prior State actions.—Subsections (b) and (c) of this section shall not apply to the standard established by paragraph (14) of section 111(d) in the case of any electric utility in a State if, before the enactment of this subsection— (2) CROSS REFERENCE.—Section 124 of such Act (16 U.S.C. 2634) is amended by adding the following at the end thereof: “In the case of the standard established by paragraph (14) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraph (14).”. (a) Termination of mandatory purchase and sale requirements.—Section 210 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 824a–3) is amended by adding at the end the following: “(m) Termination of mandatory purchase and sale requirements.— “(1) OBLIGATION TO PURCHASE.—After the date of enactment of this subsection, no electric utility shall be required to enter into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility or a qualifying small power production facility under this section if the Commission finds that the qualifying cogeneration facility or qualifying small power production facility has nondiscriminatory access to— “(A) (i) independently administered, auction-based day ahead and real time wholesale markets for the sale of electric energy; and (ii) wholesale markets for long-term sales of capacity and electric energy; or “(B) (i) transmission and interconnection services that are provided by a Commission-approved regional transmission entity and administered pursuant to an open access transmission tariff that affords nondiscriminatory treatment to all customers; and (ii) competitive wholesale markets that provide a meaningful opportunity to sell capacity, including long-term and short-term sales, and electric energy, including long-term, short-term and real-time sales, to buyers other than the utility to which the qualifying facility is interconnected. In determining whether a meaningful opportunity to sell exists, the Commission shall consider, among other factors, evidence of transactions within the relevant market; or “(2) REVISED PURCHASE AND SALE OBLIGATION FOR NEW FACILITIES.— (A) After the date of enactment of this subsection, no electric utility shall be required pursuant to this section to enter into a new contract or obligation to purchase from or sell electric energy to a facility that is not an existing qualifying cogeneration facility unless the facility meets the criteria for qualifying cogeneration facilities established by the Commission pursuant to the rulemaking required by subsection (n). “(3) COMMISSION REVIEW.—Any electric utility may file an application with the Commission for relief from the mandatory purchase obligation pursuant to this subsection on a service territory-wide basis. Such application shall set forth the factual basis upon which relief is requested and describe why the conditions set forth in subparagraphs (A), (B) or (C) of paragraph (1) of this subsection have been met. After notice, including sufficient notice to potentially affected qualifying cogeneration facilities and qualifying small power production facilities, and an opportunity for comment, the Commission shall make a final determination within 90 days of such application regarding whether the conditions set forth in subparagraphs (A), (B) or (C) of paragraph (1) have been met. “(4) REINSTATEMENT OF OBLIGATION TO PURCHASE.—At any time after the Commission makes a finding under paragraph (3) relieving an electric utility of its obligation to purchase electric energy, a qualifying cogeneration facility, a qualifying small power production facility, a State agency, or any other affected person may apply to the Commission for an order reinstating the electric utility’s obligation to purchase electric energy under this section. Such application shall set forth the factual basis upon which the application is based and describe why the conditions set forth in subparagraphs (A), (B) or (C) of paragraph (1) of this subsection are no longer met. After notice, including sufficient notice to potentially affected utilities, and opportunity for comment, the Commission shall issue an order within 90 days of such application reinstating the electric utility’s obligation to purchase electric energy under this section if the Commission finds that the conditions set forth in subparagraphs (A), (B) or (C) of paragraph (1) which relieved the obligation to purchase, are no longer met. “(5) OBLIGATION TO SELL.—After the date of enactment of this subsection, no electric utility shall be required to enter into a new contract or obligation to sell electric energy to a qualifying cogeneration facility or a qualifying small power production facility under this section if the Commission finds that— “(6) NO EFFECT ON EXISTING RIGHTS AND REMEDIES.—Nothing in this subsection affects the rights or remedies of any party under any contract or obligation, in effect or pending approval before the appropriate State regulatory authority or non-regulated electric utility on the date of enactment of this subsection, to purchase electric energy or capacity from or to sell electric energy or capacity to a qualifying cogeneration facility or qualifying small power production facility under this Act (including the right to recover costs of purchasing electric energy or capacity). “(7) RECOVERY OF COSTS.— (A) The Commission shall issue and enforce such regulations as are necessary to ensure that an electric utility that purchases electric energy or capacity from a qualifying cogeneration facility or qualifying small power production facility in accordance with any legally enforceable obligation entered into or imposed under this section recovers all prudently incurred costs associated with the purchase. “(B) A regulation under subparagraph (A) shall be enforceable in accordance with the provisions of law applicable to enforcement of regulations under the Federal Power Act (16 U.S.C. 791a et seq.). “(n) Rulemaking for new qualifying facilities.— (1) (A) Not later than 180 days after the date of enactment of this section, the Commission shall issue a rule revising the criteria in 18 C.F.R. 292.205 for new qualifying cogeneration facilities seeking to sell electric energy pursuant to section 210 of this Act to ensure— “(i) that the thermal energy output of a new qualifying cogeneration facility is used in a productive and beneficial manner; “(ii) the electrical, thermal, and chemical output of the cogeneration facility is used fundamentally for industrial, commercial, or institutional purposes and is not intended fundamentally for sale to an electric utility, taking into account technological, efficiency, economic, and variable thermal energy requirements, as well as State laws applicable to sales of electric energy from a qualifying facility to its host facility; and “(B) The rule issued pursuant to paragraph (1)(A) of this subsecvtion shall be applicable only to facilities that seek to sell electric energy pursuant to section 210 of this Act. For all other purposes, except as specifically provided in subsection (m)(2)(A), qualifying facility status shall be determined in accordance with the rules and regulations of this Act. (b) Elimination of ownership limitations.— (1) QUALIFYING SMALL POWER PRODUCTION FACILITY.—Section 3(17)(C) of the Federal Power Act (16 U.S.C. 796(17)(C)) is amended to read as follows: (2) QUALIFYING COGENERATION FACILITY.—Section 3(18)(B) of the Federal Power Act (16 U.S.C. 796(18)(B)) is amended to read as follows: (a) Adoption of standards.—Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621 (d) ) is amended by adding at the end the following: “(16) INTERCONNECTION.—Each electric utility shall make available, upon request, interconnection service to any electric consumer that the electric utility serves. For purposes of this paragraph, the term ‘interconnection service’ means service to an electric consumer under which an on-site generating facility on the consumer’s premises shall be connected to the local distribution facilities. Interconnection services shall be offered based upon the standards developed by the Institute of Electrical and Electronics Engineers: IEEE Standard 1547 for Interconnecting Distributed Resources with Electric Power Systems, as they may be amended from time to time. In addition, agreements and procedures shall be established whereby the services are offered shall promote current best practices of interconnection for distributed generation, including but not limited to practices stipulated in model codes adopted by associations of state regulatory agencies. All such agreements and procedures shall be just and reasonable, and not unduly discriminatory or preferential.”. (b) Compliance.— (1) TIME LIMITATIONS.—Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended by adding at the end the following: “(5) (A) Not later than one year after the enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated utility shall commence the consideration referred to in section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (16) of section 111(d). “(B) Not later than two years after the date of the enactment of the this paragraph, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 111 with respect to each standard established by paragraph (16) of section 111(d).”. (2) FAILURE TO COMPLY.—Section 112 (d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622 (c)) is amended by adding at the end the following: “In the case of the standard established by paragraph (16), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of paragraph (16).”. (3) PRIOR STATE ACTIONS.— (A) IN GENERAL.—Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following: “(f) Prior State actions.—Subsections (b) and (c) of this section shall not apply to the standards established by paragraph (16) of section 111(d) in the case of any electric utility in a State if, before the enactment of this subsection— (B) CROSS REFERENCE.—Section 124 of such Act (16 U.S.C. 2634) is amended by adding the following at the end thereof: “In the case of each standard established by paragraph (16) of section 111(d), the reference contained in this subsection to the date of enactment of the Act shall be deemed to be a reference to the date of enactment of paragraph (16).”. This subtitle may be cited as the “Public Utility Holding Company Act of 2005”. For purposes of this subtitle: (1) AFFILIATE.—The term “affiliate” of a company means any company, 5 percent or more of the outstanding voting securities of which are owned, controlled, or held with power to vote, directly or indirectly, by such company. (2) ASSOCIATE COMPANY.—The term “associate company” of a company means any company in the same holding company system with such company. (4) COMPANY.—The term “company” means a corporation, partnership, association, joint stock company, business trust, or any organized group of persons, whether incorporated or not, or a receiver, trustee, or other liquidating agent of any of the foregoing. (5) ELECTRIC UTILITY COMPANY.—The term “electric utility company” means any company that owns or operates facilities used for the generation, transmission, or distribution of electric energy for sale. (6) EXEMPT WHOLESALE GENERATOR AND FOREIGN UTILITY COMPANY.—The terms “exempt wholesale generator” and “foreign utility company” have the same meanings as in sections 32 and 33, respectively, of the Public Utility Holding Company Act of 1935 (15 U.S.C. 79z–5a, 79z–5b), as those sections existed on the day before the effective date of this subtitle. (7) GAS UTILITY COMPANY.—The term “gas utility company” means any company that owns or operates facilities used for distribution at retail (other than the distribution only in enclosed portable containers or distribution to tenants or employees of the company operating such facilities for their own use and not for resale) of natural or manufactured gas for heat, light, or power. (8) HOLDING COMPANY.—The term “holding company” means— (A) any company that directly or indirectly owns, controls, or holds, with power to vote, 10 percent or more of the outstanding voting securities of a public-utility company or of a holding company of any public-utility company; and (B) any person, determined by the Commission, after notice and opportunity for hearing, to exercise directly or indirectly (either alone or pursuant to an arrangement or understanding with 1 or more persons) such a controlling influence over the management or policies of any public-utility company or holding company as to make it necessary or appropriate for the rate protection of utility customers with respect to rates that such person be subject to the obligations, duties, and liabilities imposed by this subtitle upon holding companies. (9) HOLDING COMPANY SYSTEM.—The term “holding company system” means a holding company, together with its subsidiary companies. (10) JURISDICTIONAL RATES.—The term “jurisdictional rates” means rates accepted or established by the Commission for the transmission of electric energy in interstate commerce, the sale of electric energy at wholesale in interstate commerce, the transportation of natural gas in interstate commerce, and the sale in interstate commerce of natural gas for resale for ultimate public consumption for domestic, commercial, industrial, or any other use. (11) NATURAL GAS COMPANY.—The term “natural gas company” means a person engaged in the transportation of natural gas in interstate commerce or the sale of such gas in interstate commerce for resale. (13) PUBLIC UTILITY.—The term “public utility” means any person who owns or operates facilities used for transmission of electric energy in interstate commerce or sales of electric energy at wholesale in interstate commerce. (14) PUBLIC-UTILITY COMPANY.—The term “public-utility company” means an electric utility company or a gas utility company. (15) STATE COMMISSION.—The term “State commission” means any commission, board, agency, or officer, by whatever name designated, of a State, municipality, or other political subdivision of a State that, under the laws of such State, has jurisdiction to regulate public utility companies. (16) SUBSIDIARY COMPANY.—The term “subsidiary company” of a holding company means— (A) any company, 10 percent or more of the outstanding voting securities of which are directly or indirectly owned, controlled, or held with power to vote, by such holding company; and (B) any person, the management or policies of which the Commission, after notice and opportunity for hearing, determines to be subject to a controlling influence, directly or indirectly, by such holding company (either alone or pursuant to an arrangement or understanding with 1 or more other persons) so as to make it necessary for the rate protection of utility customers with respect to rates that such person be subject to the obligations, duties, and liabilities imposed by this subtitle upon subsidiary companies of holding companies. The Public Utility Holding Company Act of 1935 (15 U.S.C. 79 et seq.) is repealed. (a) In general.—Each holding company and each associate company thereof shall maintain, and shall make available to the Commission, such books, accounts, memoranda, and other records as the Commission determines are relevant to costs incurred by a public utility or natural gas company that is an associate company of such holding company and necessary or appropriate for the protection of utility customers with respect to jurisdictional rates. (b) Affiliate companies.—Each affiliate of a holding company or of any subsidiary company of a holding company shall maintain, and shall make available to the Commission, such books, accounts, memoranda, and other records with respect to any transaction with another affiliate, as the Commission determines are relevant to costs incurred by a public utility or natural gas company that is an associate company of such holding company and necessary or appropriate for the protection of utility customers with respect to jurisdictional rates. (c) Holding company systems.—The Commission may examine the books, accounts, memoranda, and other records of any company in a holding company system, or any affiliate thereof, as the Commission determines are relevant to costs incurred by a public utility or natural gas company within such holding company system and necessary or appropriate for the protection of utility customers with respect to jurisdictional rates. (d) Confidentiality.—No member, officer, or employee of the Commission shall divulge any fact or information that may come to his or her knowledge during the course of examination of books, accounts, memoranda, or other records as provided in this section, except as may be directed by the Commission or by a court of competent jurisdiction. (a) In general.—Upon the written request of a State commission having jurisdiction to regulate a public-utility company in a holding company system, the holding company or any associate company or affiliate thereof, other than such public-utility company, wherever located, shall produce for inspection books, accounts, memoranda, and other records that— (b) Limitation.—Subsection (a) does not apply to any person that is a holding company solely by reason of ownership of 1 or more qualifying facilities under the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2601 et seq.). (c) Confidentiality of information.—The production of books, accounts, memoranda, and other records under subsection (a) shall be subject to such terms and conditions as may be necessary and appropriate to safeguard against unwarranted disclosure to the public of any trade secrets or sensitive commercial information. (d) Effect on State law.—Nothing in this section shall preempt applicable State law concerning the provision of books, accounts, memoranda, and other records, or in any way limit the rights of any State to obtain books, accounts, memoranda, and other records under any other Federal law, contract, or otherwise. (a) Rulemaking.—Not later than 90 days after the effective date of this subtitle, the Commission shall issue a final rule to exempt from the requirements of section 1264 (relating to Federal access to books and records) any person that is a holding company, solely with respect to 1 or more— (1) qualifying facilities under the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2601 et seq.); (b) Other authority.—The Commission shall exempt a person or transaction from the requirements of section 1264 (relating to Federal access to books and records) if, upon application or upon the motion of the Commission— (a) Commission authority unaffected.—Nothing in this subtitle shall limit the authority of the Commission under the Federal Power Act (16 U.S.C. 791a et seq.) to require that jurisdictional rates are just and reasonable, including the ability to deny or approve the pass through of costs, the prevention of cross-subsidization, and the issuance of such rules and regulations as are necessary or appropriate for the protection of utility consumers. (b) Recovery of costs.—Nothing in this subtitle shall preclude the Commission or a State commission from exercising its jurisdiction under otherwise applicable law to determine whether a public-utility company, public utility, or natural gas company may recover in rates any costs of an activity performed by an associate company, or any costs of goods or services acquired by such public-utility company from an associate company. Except as otherwise specifically provided in this subtitle, no provision of this subtitle shall apply to, or be deemed to include— Nothing in this subtitle precludes the Commission or a State commission from exercising its jurisdiction under otherwise applicable law to protect utility customers. The Commission shall have the same powers as set forth in sections 306 through 317 of the Federal Power Act (16 U.S.C. 825e–825p) to enforce the provisions of this subtitle. (a) In general.—Nothing in this subtitle, or otherwise in the Public Utility Holding Company Act of 1935, or rules, regulations, or orders thereunder, prohibits a person from engaging in or continuing to engage in activities or transactions in which it is legally engaged or authorized to engage on the date of enactment of this Act, if that person continues to comply with the terms (other than an expiration date or termination date) of any such authorization, whether by rule or by order. (b) Effect on other Commission authority.—Nothing in this subtitle limits the authority of the Commission under the Federal Power Act (16 U.S.C. 791a et seq.) or the Natural Gas Act (15 U.S.C. 717 et seq.). Not later than 12 months after the date of enactment of this subtitle, the Commission shall— All books and records that relate primarily to the functions transferred to the Commission under this subtitle shall be transferred from the Securities and Exchange Commission to the Commission. (a) In general.—Except for section 1272 (relating to implementation), this subtitle shall take effect 12 months after the date of enactment of this subtitle. (b) Compliance with certain rules.—If the Commission approves and makes effective any final rulemaking modifying the standards of conduct governing entities that own, operate, or control facilities for transmission of electricity in interstate commerce or transportation of natural gas in interstate commerce prior to the effective date of this subtitle, any action taken by a public-utility company or utility holding company to comply with the requirements of such rulemaking shall not subject such public-utility company or utility holding company to any regulatory requirement applicable to a holding company under the Public Utility Holding Company Act of 1935 (15 U.S.C. 79 et seq.). (a) FERC review.—In the case of non-power goods or administrative or management services provided by an associate company organized specifically for the purpose of providing such goods or services to any public utility in the same holding company system, at the election of the system or a State commission having jurisdiction over the public utility, the Commission, after the effective date of this subtitle, shall review and authorize the allocation of the costs for such goods or services to the extent relevant to that associate company in order to assure that each allocation is appropriate for the protection of investors and consumers of such public utility. (b) Cost allocation.—Nothing in this section shall preclude the Commission or a State commission from exercising its jurisdiction under other applicable law with respect to the review or authorization of any costs allocated to a public utility in a holding company system located in the affected State as a result of the acquisition of non-power goods or administrative and management services by such public utility from an associate company organized specifically for that purpose. (c) Rules.—Not later than 6 months after the date of enactment of this Act, the Commission shall issue rules (which rules shall be effective no earlier than the effective date of this subtitle) to exempt from the requirements of this section any company in a holding company system whose public utility operations are confined substantially to a single State and any other class of transactions that the Commission finds is not relevant to the jurisdictional rates of a public utility. There are authorized to be appropriated such funds as may be necessary to carry out this subtitle. (a) Conflict of jurisdiction.—Section 318 of the Federal Power Act (16 U.S.C. 825q) is repealed. (b) Definitions.— (1) Section 201(g)(5) of the Federal Power Act (16 U.S.C. 824(g)(5)) is amended by striking “1935” and inserting “2005”. (2) Section 214 of the Federal Power Act (16 U.S.C. 824m) is amended by striking “1935” and inserting “2005”. Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: “SEC. 220. Market transparency rules. “(a) In general.—Not later than 180 days after the date of enactment of this section, the Commission shall issue rules establishing an electronic information system to provide the Commission and the public with access to such information as is necessary or appropriate to facilitate price transparency and participation in markets subject to the Commission’s jurisdiction under this Act. Such systems shall provide information about the availability and market price of wholesale electric energy and transmission services to the Commission, State commissions, buyers and sellers of wholesale electric energy, users of transmission services, and the public on a timely basis. The Commission shall have authority to obtain such information from any electric utility or transmitting utility, including any entity described in section 201(f). “(b) Exemptions.—The Commission shall exempt from disclosure information it determines would, if disclosed, be detrimental to the operation of an effective market or jeopardize system security. This section shall not apply to transactions for the purchase or sale of wholesale electric energy or transmission services within the area described in section 212(k)(2)(A). In determining the information to be made available under this section and time to make such information available, the Commission shall seek to ensure that consumers and competitive markets are protected from the adverse effects of potential collusion or other anti-competitive behaviors that can be facilitated by untimely public disclosure of transaction-specific information. “(c) Commodity Futures Trading Commission.—This section shall not affect the exclusive jurisdiction of the Commodity Futures Trading Commission with respect to accounts, agreements, contracts, or transactions in commodities under the Commodity Exchange Act (7 U.S.C. 1 et seq.). Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: “SEC. 221. Prohibition on filing false information. “No person or other entity (including an entity described in section 201(f)) shall willfully and knowingly report any information relating to the price of electricity sold at wholesale or availability of transmission capacity, which information the person or any other entity knew to be false at the time of the reporting, to a Federal agency with intent to fraudulently affect the data being compiled by such Federal agency. “SEC. 222. Prohibition on round trip trading. “(a) Prohibition.—No person or other entity (including an entity described in section 201(f)) shall willfully and knowingly enter into any contract or other arrangement to execute a ‘round trip trade’ for the purchase or sale of electric energy at wholesale. “(b) Definition.—For the purposes of this section, the term ‘round trip trade’ means a transaction, or combination of transactions, in which a person or any other entity— “(1) enters into a contract or other arrangement to purchase from, or sell to, any other person or other entity electric energy at wholesale; “(2) simultaneously with entering into the contract or arrangement described in paragraph (1), arranges a financially offsetting trade with such other person or entity for the same such electric energy, at the same location, price, quantity and terms so that, collectively, the purchase and sale transactions in themselves result in no financial gain or loss; and (a) Complaints.—Section 306 of the Federal Power Act (16 U.S.C. 825e) is amended as follows: (b) Review of Commission orders.—Section 313(a) of the Federal Power Act (16 U.S.C. 8251) is amended by inserting “electric utility,” after “person,” in the first 2 places it appears and by striking “any person unless such person” and inserting “any entity unless such entity”. (c) Investigations.—Section 307(a) of the Federal Power Act (16 U.S.C. 825f(a)) is amended as follows: (d) Criminal penalties.—Section 316 of the Federal Power Act (16 U.S.C. 825o) is amended— (e) Civil penalties.—Section 316A of the Federal Power Act (16 U.S.C. 825o–1) is amended as follows: Section 206(b) of the Federal Power Act (16 U.S.C. 824e(b)) is amended as follows: (1) By striking “the date 60 days after the filing of such complaint nor later than 5 months after the expiration of such 60-day period” in the second sentence and inserting “the date of the filing of such complaint nor later than 5 months after the filing of such complaint”. (3) By striking “expiration of such 60-day period” in the third sentence and inserting “publication date”. (4) By striking the fifth sentence and inserting the following: “If no final decision is rendered by the conclusion of the 180-day period commencing upon initiation of a proceeding pursuant to this section, the Commission shall state the reasons why it has failed to do so and shall state its best estimate as to when it reasonably expects to make such decision.”. Section 206 of the Federal Power Act (16 U.S.C. 824e) is amended by adding the following new subsection at the end thereof: “(e) (1) Except as provided in paragraph (2), if an entity described in section 201(f) voluntarily makes a short-term sale of electric energy and the sale violates Commission rules in effect at the time of the sale, such entity shall be subject to the Commission’s refund authority under this section with respect to such violation. “(3) For purposes of this subsection, the term ‘short-term sale’ means an agreement for the sale of electric energy at wholesale in interstate commerce that is for a period of 31 days or less (excluding monthly contracts subject to automatic renewal). “(4) The Commission shall have refund authority under subsection (e)(1) with respect to a voluntary short-term sale of electric energy by the Bonneville Power Administration (in this section ‘Bonneville’) only if the sale is at an unjust and unreasonable rate and, in that event, may order a refund only for short-term sales made by Bonneville at rates that are higher than the highest just and reasonable rate charged by any other entity for a short-term sale of electric energy in the same geographic market for the same, or most nearly comparable, period as the sale by Bonneville. (a) In general.—The Federal Energy Regulatory Commission (in this section, “the Commission”) shall have no authority to abrogate or modify any provision of an executed contract or executed contract amendment described in subsection (b) that has been entered into or taken effect, except upon a finding that failure to take such action would be contrary to the public interest. (b) Limitation.—Except as provided in subsection (c), this section shall apply only to a contract or contract amendment— (2) entered into— (A) for the purchase or sale of electric energy under section 205 of the Federal Power Act (16 U.S.C. 824d) where the seller has been authorized by the Commission to charge market-based rates; or (B) under section 4 of the Natural Gas Act (15 U.S.C. 717c) where the natural gas company has been authorized by the Commission to charge market-based rates for the service described in the contract. (a) Privacy.—The Federal Trade Commission may issue rules protecting the privacy of electric consumers from the disclosure of consumer information obtained in connection with the sale or delivery of electric energy to electric consumers. (b) Slamming.—The Federal Trade Commission may issue rules prohibiting the change of selection of an electric utility except with the informed consent of the electric consumer or if approved by the appropriate State regulatory authority. (c) Cramming.—The Federal Trade Commission may issue rules prohibiting the sale of goods and services to an electric consumer unless expressly authorized by law or the electric consumer. (d) Rulemaking.—The Federal Trade Commission shall proceed in accordance with section 553 of title 5, United States Code, when prescribing a rule under this section. (e) State authority.—If the Federal Trade Commission determines that a State’s regulations provide equivalent or greater protection than the provisions of this section, such State regulations shall apply in that State in lieu of the regulations issued by the Commission under this section. (f) Definitions.—For purposes of this section: (1) STATE REGULATORY AUTHORITY.—The term “State regulatory authority” has the meaning given that term in section 3(21) of the Federal Power Act (16 U.S.C. 796(21)). (2) ELECTRIC CONSUMER AND ELECTRIC UTILITY.—The terms “electric consumer” and “electric utility” have the meanings given those terms in section 3 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2602). (a) Merger review reform.—Within 180 days after the date of enactment of this Act, the Secretary of Energy, in consultation with the Federal Energy Regulatory Commission and the Attorney General of the United States, shall prepare, and transmit to Congress each of the following: (b) Merger review accountability.—Not later than 1 year after the date of enactment of this Act and annually thereafter, with respect to all orders issued within the preceding year that impose a condition on a sale, lease, or other disposition of public utility facilities under section 203(b) of the Federal Power Act, the Federal Energy Regulatory Commission shall transmit a report to Congress explaining each of the following: (a) Amendment.—Section 203(a) of the Federal Power Act (16 U.S.C. 824b(a)) is amended to read as follows: “(a) (1) No public utility shall, without first having secured an order of the Commission authorizing it to do so— “(A) sell, lease, or otherwise dispose of the whole of its facilities subject to the jurisdiction of the Commission, or any part thereof of a value in excess of $10,000,000; “(2) No holding company in a holding company system that includes a public utility shall purchase, acquire, or take any security with a value in excess of $10,000,000 of, or, by any means whatsoever, directly or indirectly, merge or consolidate with, a public utility or a holding company in a holding company system that includes a public utility with a value in excess of $10,000,000 without first having secured an order of the Commission authorizing it to do so. “(3) Upon receipt of an application for such approval the Commission shall give reasonable notice in writing to the Governor and State commission of each of the States in which the physical property affected, or any part thereof, is situated, and to such other persons as it may deem advisable. “(4) After notice and opportunity for hearing, the Commission shall approve the proposed disposition, consolidation, acquisition, or change in control, if it finds that the proposed transaction will be consistent with the public interest. In evaluating whether a transaction will be consistent with the public interest, the Commission shall consider whether the proposed transaction— “(5) The Commission shall, by rule, adopt procedures for the expeditious consideration of applications for the approval of dispositions, consolidations, or acquisitions under this section. Such rules shall identify classes of transactions, or specify criteria for transactions, that normally meet the standards established in paragraph (4). The Commission shall provide expedited review for such transactions. The Commission shall grant or deny any other application for approval of a transaction not later than 180 days after the application is filed. If the Commission does not act within 180 days, such application shall be deemed granted unless the Commission finds, based on good cause, that further consideration is required to determine whether the proposed transaction meets the standards of paragraph (4) and issues an order tolling the time for acting on the application for not more than 180 days, at the end of which additional period the Commission shall grant or deny the application. (a) Electric utility.—Section 3(22) of the Federal Power Act (16 U.S.C. 796(22)) is amended to read as follows: (b) Transmitting utility.—Section 3(23) of the Federal Power Act (16 U.S.C. 796(23)) is amended to read as follows: (c) Additional definitions.—Section 3 of the Federal Power Act (16 U.S.C. 796) is amended by adding at the end the following: “(26) ELECTRIC COOPERATIVE.—The term ‘electric cooperative’ means a cooperatively owned electric utility. “(27) RTO.—The term ‘Regional Transmission Organization’ or ‘RTO’ means an entity of sufficient regional scope approved by the Commission to exercise operational or functional control of facilities used for the transmission of electric energy in interstate commerce and to ensure nondiscriminatory access to such facilities. (d) Commission.—For the purposes of this title, the term “Commission” means the Federal Energy Regulatory Commission. (e) Applicability.—Section 201(f) of the Federal Power Act (16 U.S.C. 824(f)) is amended by adding after “political subdivision of a state,” the following: “an electric cooperative that has financing under the Rural Electrification Act of 1936 (7 U.S.C. 901 et seq.) or that sells less than 4,000,000 megawatt hours of electricity per year,”. The Federal Power Act is amended as follows: (1) Section 201(b)(2) of such Act (16 U.S.C. 824(b)(2)) is amended as follows: (A) In the first sentence by striking “210, 211, and 212” and inserting “203(a)(2), 206(e), 210, 211, 211A, 212, 215, 216, 217, 218, 219, 220, 221, and 222”. (2) Section 201(e) of such Act is amended by striking “210, 211, or 212” and inserting “206(e), 206(f), 210, 211, 211A, 212, 215, 216, 217, 218, 219, 220, 221, and 222”. (3) Section 206 of such Act (16 U.S.C. 824e) is amended as follows: (4) Section 211(c) of such Act (16 U.S.C. 824j(c)) is amended by— (5) Section 211(d)(1) of such Act (16 U.S.C. 824j(d)(1)) is amended by striking “electric utility” the second time it appears and inserting “transmitting utility”. (6) Section 315 (c) of such Act (16 U.S.C. 825n(c)) is amended by striking “subsection” and inserting “section”. Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: “SEC. 223. Joint board on economic dispatch. “(a) In general.—The Commission shall convene a joint board pursuant to section 209 of this Act to study the issue of security constrained economic dispatch for a market region. “(b) Membership.—The Commission shall request each State to nominate a representative for such joint board. Department of Energy Order No. 202–03–2, issued by the Secretary of Energy on August 28, 2003, shall remain in effect unless rescinded by Federal statute. Section 7 of the Natural Gas Act (15 U.S.C. 717f) is amended by adding at the end the following: “(i) (1) The United States Court of Appeals for the District of Columbia Circuit shall have original and exclusive jurisdiction over any civil action— “(A) for review of any order or action of any Federal or State administrative agency or officer to issue, condition, or deny any permit, license, concurrence, or approval issued under authority of any Federal law, other than the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.), required for the construction of a natural gas pipeline for which a certificate of public convenience and necessity is issued by the Commission under this section; “(2) (A) If the Court finds that the order, action, or failure to act is not consistent with the public convenience and necessity (as determined by the Commission under this section), or would prevent the construction and operation of natural gas facilities authorized by the certificate of public convenience and necessity, the permit, license, concurrence, or approval that is the subject of the order, action, or failure to act shall be deemed to have been issued subject to any conditions set forth in the reviewed order or action that the Court finds to be consistent with the public convenience and necessity. “(B) For purposes of paragraph (1)(B), the failure of an agency or officer to issue any such permit, license, concurrence, or approval within the later of 1 year after the date of filing of an application for the permit, license, concurrence, or approval or 60 days after the date of issuance of the certificate of public convenience and necessity under this section, shall be considered to be unreasonable delay unless the Court, for good cause shown, determines otherwise. Section 181 of the Clean Air Act (42 U.S.C.7511) is amended by adding the following new subsection at the end thereof: “(d) Extended attainment date for certain downwind areas.— “(1) DEFINITIONS.— (A) The term ‘upwind area’ means an area that— “(i) significantly contributes to nonattainment in another area, hereinafter referred to as a ‘downwind area’; and “(ii) is either— “(II) an area in another State that the Administrator has found to be significantly contributing to nonattainment in the downwind area in violation of section 110(a)(2)(D) and for which the Administrator has established requirements through notice and comment rulemaking to eliminate the emissions causing such significant contribution. “(2) EXTENSION.—If the Administrator— “(A) determines that any area is a downwind area with respect to a particular national ambient air quality standard for ozone; and “(B) approves a plan revision for such area as provided in paragraph (3) prior to a reclassification under subsection (b)(2)(A), the Administrator, in lieu of such reclassification, shall extend the attainment date for such downwind area for such standard in accordance with paragraph (5). “(3) REQUIRED APPROVAL.—In order to extend the attainment date for a downwind area under this subsection, the Administrator must approve a revision of the applicable implementation plan for the downwind area for such standard that— “(4) PRIOR RECLASSIFICATION DETERMINATION.—If, no more than 18 months prior to the date of enactment of this subsection, the Administrator made a reclassification determination under subsection (b)(2)(A) for any downwind area, and the Administrator approves the plan revision referred to in paragraph (3) for such area within 12 months after the date of enactment of this subsection, the reclassification shall be withdrawn and the attainment date extended in accordance with paragraph (5) upon such approval. The Administrator shall also withdraw a reclassification determination under subsection (b)(2)(A) made after the date of enactment of this subsection and extend the attainment date in accordance with paragraph (5) if the Administrator approves the plan revision referred to in paragraph (3) within 12 months of the date the reclassification determination under subsection (b)(2)(A) is issued. In such instances the ‘current classification’ used for evaluating the revision of the applicable implementation plan under paragraph (3) shall be the classification of the downwind area under this section immediately prior to such reclassification. “(5) EXTENDED DATE.—The attainment date extended under this subsection shall provide for attainment of such national ambient air quality standard for ozone in the downwind area as expeditiously as practicable but no later than the date on which the last reductions in pollution transport necessary for attainment in the downwind area are required to be achieved by the upwind area or areas.”. (a) In general.—A State may provide to any entity— (b) Eligible entities.—Subsection (a) shall apply with respect to the production in the State of— Notwithstanding any other provision of law, or rule promulgated by the Environmental Protection Agency, vegetable oil made from soybeans and used in electric transformers as thermal insulation shall not be regulated as an oil as defined under section 2(a)(1)(A) of the Edible Oil Regulatory Reform Act (33 U.S.C. 2720(a)(1)(A)). Subtitle B of title XXX of the Energy Policy Act of 1992 is amended by adding at the end the following new section: “Federal agencies conducting assessments of risks to human health and the environment from energy technology, production, transport, transmission, distribution, storage, use, or conservation activities shall use sound and objective scientific practices in assessing such risks, shall consider the best available science (including peer reviewed studies), and shall include a description of the weight of the scientific evidence concerning such risks.”. (a) Program.—The Secretary of Energy shall establish a program on oxygen-fuel systems. If feasible, the program shall include renovation of at least one existing large unit and one existing small unit, and construction of one new large unit and one new small unit. Cost sharing shall not be required. (b) Authorization of appropriations.—There are authorized to be appropriated to the Secretary for carrying out this section— (c) Definitions.—For purposes of this section— (a) Establishment.—The Secretary of Energy shall conduct a study of direct and significant health impacts to persons resulting from living in proximity to petrochemical and oil refinery facilities. The Secretary shall consult with the Director of the National Cancer Institute and other Federal Government bodies with expertise in the field it deems appropriate in the design of such study. The study shall be conducted according to sound and objective scientific practices and present the weight of the scientific evidence. The Secretary shall obtain scientific peer review of the draft study. (a) In general.—Section 211 of the Clean Air Act (42 U.S.C. 7545) is amended— (2) by inserting after subsection (n) the following: “(o) Renewable fuel program.— “(1) DEFINITIONS.—In this section: “(A) ETHANOL.— (i) The term ‘cellulosic biomass ethanol’ means ethanol derived from any lignocellulosic or hemicellulosic matter that is available on a renewable or recurring basis, including—
“(B) RENEWABLE FUEL.— “(i) IN GENERAL.—The term ‘renewable fuel’ means motor vehicle fuel that— “(ii) INCLUSION.—The term ‘renewable fuel’ includes cellulosic biomass ethanol, waste derived ethanol, and biodiesel (as defined in section 312(f) of the Energy Policy Act of 1992 (42 U.S.C. 13220(f)) and any blending components derived from renewable fuel (provided that only the renewable fuel portion of any such blending component shall be considered part of the applicable volume under the renewable fuel program established by this subsection). “(2) RENEWABLE FUEL PROGRAM.— “(A) IN GENERAL.—Not later than 1 year after the enactment of this subsection, the Administrator shall promulgate regulations ensuring that motor vehicle fuel sold or dispensed to consumers in the contiguous United States, on an annual average basis, contains the applicable volume of renewable fuel as specified in subparagraph (B). Regardless of the date of promulgation, such regulations shall contain compliance provisions for refiners, blenders, and importers, as appropriate, to ensure that the requirements of this section are met, but shall not restrict where renewable fuel can be used, or impose any per-gallon obligation for the use of renewable fuel. If the Administrator does not promulgate such regulations, the applicable percentage referred to in paragraph (4), on a volume percentage of gasoline basis, shall be 2.2 in 2005. “(B) APPLICABLE VOLUME.— “(i) CALENDAR YEARS 2005 THROUGH 2012.—For the purpose of subparagraph (A), the applicable volume for any of calendar years 2005 through 2012 shall be determined in accordance with the following table: “(ii) CALENDAR YEAR 2013 AND THEREAFTER.—For the purpose of subparagraph (A), the applicable volume for calendar year 2013 and each calendar year thereafter shall be equal to the product obtained by multiplying— “(3) NON-CONTIGUOUS STATE OPT-IN.—Upon the petition of a non-contiguous State, the Administrator may allow the renewable fuel program established by subtitle A of title XV of the Energy Policy Act of 2005 to apply in such non-contiguous State at the same time or any time after the Administrator promulgates regulations under paragraph (2). The Administrator may promulgate or revise regulations under paragraph (2), establish applicable percentages under paragraph (4), provide for the generation of credits under paragraph (6), and take such other actions as may be necessary to allow for the application of the renewable fuels program in a non-contiguous State. “(4) APPLICABLE PERCENTAGES.— “(A) PROVISION OF ESTIMATE OF VOLUMES OF GASOLINE SALES.—Not later than October 31 of each of calendar years 2005 through 2011, the Administrator of the Energy Information Administration shall provide to the Administrator of the Environmental Protection Agency an estimate of the volumes of gasoline that will be sold or introduced into commerce in the United States during the following calendar year. “(B) DETERMINATION OF APPLICABLE PERCENTAGES.— “(i) IN GENERAL.—Not later than November 30 of each of the calendar years 2005 through 2011, based on the estimate provided under subparagraph (A), the Administrator shall determine and publish in the Federal Register, with respect to the following calendar year, the renewable fuel obligation that ensures that the requirements of paragraph (2) are met. “(5) EQUIVALENCY.—For the purpose of paragraph (2), 1 gallon of either cellulosic biomass ethanol or waste derived ethanol— “(6) CREDIT PROGRAM.— “(A) IN GENERAL.—The regulations promulgated to carry out this subsection shall provide for the generation of an appropriate amount of credits by any person that refines, blends, or imports gasoline that contains a quantity of renewable fuel that is greater than the quantity required under paragraph (2). Such regulations shall provide for the generation of an appropriate amount of credits for biodiesel fuel. If a small refinery notifies the Administrator that it waives the exemption provided paragraph (11), the regulations shall provide for the generation of credits by the small refinery beginning in the year following such notification. “(B) USE OF CREDITS.—A person that generates credits under subparagraph (A) may use the credits, or transfer all or a portion of the credits to another person, for the purpose of complying with paragraph (2). “(D) INABILITY TO PURCHASE SUFFICIENT CREDITS.—The regulations promulgated to carry out this subsection shall include provisions allowing any person that is unable to generate or purchase sufficient credits to meet the requirements under paragraph (2) to carry forward a renewable fuel deficit provided that, in the calendar year following the year in which the renewable fuel deficit is created, such person shall achieve compliance with the renewable fuel requirement under paragraph (2), and shall generate or purchase additional renewable fuel credits to offset the renewable fuel deficit of the previous year. “(7) SEASONAL VARIATIONS IN RENEWABLE FUEL USE.— “(A) STUDY.—For each of the calendar years 2005 through 2012, the Administrator of the Energy Information Administration shall conduct a study of renewable fuels blending to determine whether there are excessive seasonal variations in the use of renewable fuels. “(B) REGULATION OF EXCESSIVE SEASONAL VARIATIONS.—If, for any calendar year, the Administrator of the Energy Information Administration, based on the study under subparagraph (A), makes the determinations specified in subparagraph (C), the Administrator shall promulgate regulations to ensure that 35 percent or more of the quantity of renewable fuels necessary to meet the requirement of paragraph (2) is used during each of the periods specified in subparagraph (D) of each subsequent calendar year. “(C) DETERMINATIONS.—The determinations referred to in subparagraph (B) are that— “(i) less than 35 percent of the quantity of renewable fuels necessary to meet the requirement of paragraph (2) has been used during one of the periods specified in subparagraph (D) of the calendar year; “(8) WAIVERS.— “(A) IN GENERAL.—The Administrator, in consultation with the Secretary of Agriculture and the Secretary of Energy, may waive the requirement of paragraph (2) in whole or in part on petition by one or more States by reducing the national quantity of renewable fuel required under this subsection— “(B) PETITIONS FOR WAIVERS.—The Administrator, in consultation with the Secretary of Agriculture and the Secretary of Energy, shall approve or disapprove a State petition for a waiver of the requirement of paragraph (2) within 90 days after the date on which the petition is received by the Administrator. “(9) STUDY AND WAIVER FOR INITIAL YEAR OF PROGRAM.—Not later than 180 days after the enactment of this subsection, the Secretary of Energy shall complete for the Administrator a study assessing whether the renewable fuels requirement under paragraph (2) will likely result in significant adverse consumer impacts in 2005, on a national, regional, or State basis. Such study shall evaluate renewable fuel supplies and prices, blendstock supplies, and supply and distribution system capabilities. Based on such study, the Secretary shall make specific recommendations to the Administrator regarding waiver of the requirements of paragraph (2), in whole or in part, to avoid any such adverse impacts. Within 270 days after the enactment of this subsection, the Administrator shall, consistent with the recommendations of the Secretary, waive, in whole or in part, the renewable fuels requirement under paragraph (2) by reducing the national quantity of renewable fuel required under this subsection in 2005. This paragraph shall not be interpreted as limiting the Administrator’s authority to waive the requirements of paragraph (2) in whole, or in part, under paragraph (8) or paragraph (10), pertaining to waivers. “(10) ASSESSMENT AND WAIVER.—The Administrator, in consultation with the Secretary of Energy and the Secretary of Agriculture, shall evaluate the requirement of paragraph (2) and determine, prior to January 1, 2007, and prior to January 1 of any subsequent year in which the applicable volume of renewable fuel is increased under paragraph (2)(B), whether the requirement of paragraph (2), including the applicable volume of renewable fuel contained in paragraph (2)(B) should remain in effect, in whole or in part, during 2007 or any year or years subsequent to 2007. In evaluating the requirement of paragraph (2) and in making any determination under this section, the Administrator shall consider the best available information and data collected by accepted methods or best available means regarding— “(A) the capacity of renewable fuel producers to supply an adequate amount of renewable fuel at competitive prices to fulfill the requirement of paragraph (2); “(B) the potential of the requirement of paragraph (2) to significantly raise the price of gasoline, food (excluding the net price impact on the requirement in paragraph (2) on commodities used in the production of ethanol), or heating oil for consumers in any significant area or region of the country above the price that would otherwise apply to such commodities in the absence of such requirement; “(C) the potential of the requirement of paragraph (2) to interfere with the supply of fuel in any significant gasoline market or region of the country, including interference with the efficient operation of refiners, blenders, importers, wholesale suppliers, and retail vendors of gasoline, and other motor fuels; and “(D) the potential of the requirement of paragraph (2) to cause or promote exceedances of Federal, State, or local air quality standards. If the Administrator determines, by clear and convincing information, after public notice and the opportunity for comment, that the requirement of paragraph (2) would have significant and meaningful adverse impact on the supply of fuel and related infrastructure or on the economy, public health, or environment of any significant area or region of the country, the Administrator may waive, in whole or in part, the requirement of paragraph (2) in any one year for which the determination is made for that area or region of the country, except that any such waiver shall not have the effect of reducing the applicable volume of renewable fuel specified in paragraph (2)(B) with respect to any year for which the determination is made. In determining economic impact under this paragraph, the Administrator shall not consider the reduced revenues available from the Highway Trust Fund (section 9503 of the Internal Revenue Code of 1986) as a result of the use of ethanol. “(11) SMALL REFINERIES.— “(A) IN GENERAL.—The requirement of paragraph (2) shall not apply to small refineries until the first calendar year beginning more than 5 years after the first year set forth in the table in paragraph (2)(B)(i). Not later than December 31, 2007, the Secretary of Energy shall complete for the Administrator a study to determine whether the requirement of paragraph (2) would impose a disproportionate economic hardship on small refineries. For any small refinery that the Secretary of Energy determines would experience a disproportionate economic hardship, the Administrator shall extend the small refinery exemption for such small refinery for no less than two additional years. “(B) ECONOMIC HARDSHIP.— “(i) EXTENSION OF EXEMPTION.—A small refinery may at any time petition the Administrator for an extension of the exemption from the requirement of paragraph (2) for the reason of disproportionate economic hardship. In evaluating a hardship petition, the Administrator, in consultation with the Secretary of Energy, shall consider the findings of the study in addition to other economic factors. “(12) ETHANOL MARKET CONCENTRATION ANALYSIS.— “(A) ANALYSIS.— “(i) IN GENERAL.—Not later than 180 days after the date of enactment of this subsection, and annually thereafter, the Federal Trade Commission shall perform a market concentration analysis of the ethanol production industry using the Herfindahl-Hirschman Index to determine whether there is sufficient competition among industry participants to avoid price setting and other anticompetitive behavior. (b) Penalties and enforcement.—Section 211(d) of the Clean Air Act (42 U.S.C. 7545(d)) is amended as follows: (c) Survey of renewable fuel market.— (1) SURVEY AND REPORT.—Not later than December 1, 2006, and annually thereafter, the Administrator of the Environmental Protection Agency (in consultation with the Secretary of Energy acting through the Administrator of the Energy Information Administration) shall— (2) RECORDKEEPING AND REPORTING REQUIREMENTS.—The Administrator of the Environmental Protection Agency (hereinafter in this subsection referred to as the “Administrator”) may require any refiner, blender, or importer to keep such records and make such reports as are necessary to ensure that the survey conducted under paragraph (1) is accurate. The Administrator, to avoid duplicative requirements, shall rely, to the extent practicable, on existing reporting and recordkeeping requirements and other information available to the Administrator including gasoline distribution patterns that include multistate use areas. (a) In general.—Notwithstanding any other provision of Federal or State law, no renewable fuel, as defined by section 211(o)(1) of the Clean Air Act, or methyl tertiary butyl ether (hereinafterin this section referred to as “MTBE”), used or intended to be used as a motor vehicle fuel, nor any motor vehicle fuel containing such renewable fuel or MTBE, shall be deemed a defective product by virtue of the fact that it is, or contains, such a renewable fuel or MTBE, if it does not violate a control or prohibition imposed by the Administrator of the Environmental Protection Agency (hereinafter in this section referred to as the “Administrator”) under section 211 of such Act, and the manufacturer is in compliance with all requests for information under subsection (b) of such section 211 of such Act. If the safe harbor provided by this section does not apply, the existence of a claim of defective product shall be determined under otherwise applicable law. Nothing in this subsection shall be construed to affect the liability of any person for environmental remediation costs, drinking water contamination, negligence for spills or other reasonably foreseeable events, public or private nuisance, trespass, breach of warranty, breach of contract, or any other liability other than liability based upon a claim of defective product. (a) Findings.—Congress finds that— (1) since 1979, methyl tertiary butyl ether (hereinafter in this section referred to as “MTBE”) has been used nationwide at low levels in gasoline to replace lead as an octane booster or anti-knocking agent; (2) Public Law 101–549 (commonly known as the “Clean Air Act Amendments of 1990”) (42 U.S.C. 7401 et seq.) established a fuel oxygenate standard under which reformulated gasoline must contain at least 2 percent oxygen by weight; (3) at the time of the adoption of the fuel oxygen standard, Congress was aware that significant use of MTBE would result from the adoption of that standard, and that the use of MTBE would likely be important to the cost-effective implementation of that program; (4) Congress was aware that gasoline and its component additives can and do leak from storage tanks; (5) the fuel industry responded to the fuel oxygenate standard established by Public Law 101–549 by making substantial investments in— (6) having previously required oxygenates like MTBE for air quality purposes, Congress has— (b) Purposes.—The purpose of this section is to provide assistance to merchant producers of MTBE in making the transition from producing MTBE to producing other fuel additives. (c) MTBE merchant producer conversion assistance.—Section 211(c) of the Clean Air Act (42 U.S.C. 7545(c)) is amended by adding at the end the following: “(5) MTBE MERCHANT PRODUCER CONVERSION ASSISTANCE.— “(A) IN GENERAL.— “(i) GRANTS.—The Secretary of Energy, in consultation with the Administrator, may make grants to merchant producers of methyl tertiary butyl ether (hereinafter in this subsection referred to as ‘MTBE’) in the United States to assist the producers in the conversion of eligible production facilities described in subparagraph (C) to the production of iso-octane, iso-octene, alkylates, or renewable fuels. “(ii) DETERMINATION.—The Administrator, in consultation with the Secretary of Energy, may determine that transition assistance for the production of iso-octane, iso-octene, alkylates, or renewable fuels is inconsistent with the provisions of subparagraph (B) and, on that basis, may deny applications for grants authorized by this paragraph. “(B) FURTHER GRANTS.—The Secretary of Energy, in consultation with the Administrator, may also further make grants to merchant producers of MTBE in the United States to assist the producers in the conversion of eligible production facilities described in subparagraph (C) to the production of such other fuel additives (unless the Administrator determines that such fuel additives may reasonably be anticipated to endanger public health or the environment) that, consistent with this subsection— (a) In general.—Subject to subsections (e) and (f), not later than December 31, 2014, the use of methyl tertiary butyl ether (hereinafter in this section referred to as “MTBE”) in motor vehicle fuel in any State other than a State described in subsection (c) is prohibited. (b) Regulations.—The Administrator of the Environmental Protection Agency (hereafter referred to in this section as the “Administrator”) shall promulgate regulations to effect the prohibition in subsection (a). (c) States that authorize use.—A State described in this subsection is a State in which the Governor of the State submits a notification to the Administrator authorizing the use of MTBE in motor vehicle fuel sold or used in the State. (d) Publication of notice.—The Administrator shall publish in the Federal Register each notice submitted by a State under subsection (c). (e) Trace quantities.—In carrying out subsection (a), the Administrator may allow trace quantities of MTBE, not to exceed 0.5 percent by volume, to be present in motor vehicle fuel in cases that the Administrator determines to be appropriate. (a) NAS review.—Not later than May 31, 2013, the Secretary shall enter into an arrangement with the National Academy of Sciences to review the use of methyl tertiary butyl ether (hereafter referred to in this section as “MTBE”) in fuel and fuel additives. The review shall only use the best available scientific information and data collected by accepted methods or the best available means. The review shall examine the use of MTBE in fuel and fuel additives, significant beneficial and detrimental effects of this use on environmental quality or public health or welfare including the costs and benefits of such effects, likely effects of controls or prohibitions on MTBE regarding fuel availability and price, and other appropriate and reasonable actions that are available to protect the environment or public health or welfare from any detrimental effects of the use of MTBE in fuel or fuel additives. The review shall be peer-reviewed prior to publication and all supporting data and analytical models shall be available to the public. The review shall be completed no later than May 31, 2014. (b) Presidential determination.—No later than June 30, 2014, the President may make a determination that restrictions on the use of MTBE to be implemented pursuant to section 1504 shall not take place and that the legal authority contained in section 1504 to prohibit the use of MTBE in motor vehicle fuel shall become null and void. (a) Elimination.— (1) IN GENERAL.—Section 211(k) of the Clean Air Act (42 U.S.C. 7545(k)) is amended as follows: (b) Maintenance of toxic air pollutant emission reductions.—Section 211(k)(1) of the Clean Air Act (42 U.S.C. 7545(k)(1)) is amended as follows: (1) By striking “Within 1 year after the enactment of the Clean Air Act Amendments of 1990,” and inserting the following: (2) By adding at the end the following: “(B) MAINTENANCE OF TOXIC AIR POLLUTANT EMISSIONS REDUCTIONS FROM REFORMULATED GASOLINE.— “(i) DEFINITIONS.—In this subparagraph the term ‘PADD’ means a Petroleum Administration for Defense District. “(ii) REGULATIONS REGARDING EMISSIONS OF TOXIC AIR POLLUTANTS.—Not later than 270 days after the date of enactment of this subparagraph the Administrator shall establish, for each refinery or importer, standards for toxic air pollutants from use of the reformulated gasoline produced or distributed by the refinery or importer that maintain the reduction of the average annual aggregate emissions of toxic air pollutants for reformulated gasoline produced or distributed by the refinery or importer during calendar years 1999 and 2000, determined on the basis of data collected by the Administrator with respect to the refinery or importer. “(iii) STANDARDS APPLICABLE TO SPECIFIC REFINERIES OR IMPORTERS.— “(I) APPLICABILITY OF STANDARDS.—For any calendar year, the standards applicable to a refinery or importer under clause (ii) shall apply to the quantity of gasoline produced or distributed by the refinery or importer in the calendar year only to the extent that the quantity is less than or equal to the average annual quantity of reformulated gasoline produced or distributed by the refinery or importer during calendar years 1999 and 2000. “(II) APPLICABILITY OF OTHER STANDARDS.—For any calendar year, the quantity of gasoline produced or distributed by a refinery or importer that is in excess of the quantity subject to subclause (I) shall be subject to standards for toxic air pollutants promulgated under subparagraph (A) and paragraph (3)(B). “(iv) CREDIT PROGRAM.—The Administrator shall provide for the granting and use of credits for emissions of toxic air pollutants in the same manner as provided in paragraph (7). “(v) REGIONAL PROTECTION OF TOXICS REDUCTION BASELINES.— “(I) IN GENERAL.—Not later than 60 days after the date of enactment of this subparagraph, and not later than April 1 of each calendar year that begins after that date of enactment, the Administrator shall publish in the Federal Register a report that specifies, with respect to the previous calendar year— “(II) EFFECT OF FAILURE TO MAINTAIN AGGREGATE TOXICS REDUCTIONS.—If, in any calendar year, the reduction of the average annual aggregate emissions of toxic air pollutants in a PADD fails to meet or exceed the reduction of the average annual aggregate emissions of toxic air pollutants in the PADD in calendar years 1999 and 2000, the Administrator, not later than 90 days after the date of publication of the report for the calendar year under subclause (I), shall— “(aa) identify, to the maximum extent practicable, the reasons for the failure, including the sources, volumes, and characteristics of reformulated gasoline that contributed to the failure; and “(bb) promulgate revisions to the regulations promulgated under clause (ii), to take effect not earlier than 180 days but not later than 270 days after the date of promulgation, to provide that, notwithstanding clause (iii)(II), all reformulated gasoline produced or distributed at each refinery or importer shall meet the standards applicable under clause (ii) not later than April 1 of the year following the report in subclause (II) and for subsequent years. “(vi) REGULATIONS TO CONTROL HAZARDOUS AIR POLLUTANTS FROM MOTOR VEHICLES AND MOTOR VEHICLE FUELS.—Not later than July 1, 2005, the Administrator shall promulgate final regulations to control hazardous air pollutants from motor vehicles and motor vehicle fuels, as provided for in section 80.1045 of title 40, Code of Federal Regulations (as in effect on the date of enactment of this subparagraph).”. (c) Consolidation in reformulated gasoline regulations.—Not later than 180 days after the date of enactment of this Act, the Administrator of the Environmental Protection Agency shall revise the reformulated gasoline regulations under subpart D of part 80 of title 40, Code of Federal Regulations, to consolidate the regulations applicable to VOC-Control Regions 1 and 2 under section 80.41 of that title by eliminating the less stringent requirements applicable to gasoline designated for VOC-Control Region 2 and instead applying the more stringent requirements applicable to gasoline designated for VOC-Control Region 1. (d) Savings clause.—Nothing in this section is intended to affect or prejudice either any legal claims or actions with respect to regulations promulgated by the Administrator of the Environmental Protection Agency (hereinafter in this subsection referred to as the “Administrator”) prior to the date of enactment of this Act regarding emissions of toxic air pollutants from motor vehicles or the adjustment of standards applicable to a specific refinery or importer made under such prior regulations and the Administrator may apply such adjustments to the standards applicable to such refinery or importer under clause (iii)(I) of section 211(k)(1)(B) of the Clean Air Act, except that— (1) the Administrator shall revise such adjustments to be based only on calendar years 1999–2000; and (2) for adjustments based on toxic air pollutant emissions from reformulated gasoline significantly below the national annual average emissions of toxic air pollutants from all reformulated gasoline, the Administrator may revise such adjustments to take account of the scope of Federal or State prohibitions on the use of methyl tertiary butyl ether imposed after the date of the enactment of this paragraph, except that any such adjustment shall require such refiner or importer, to the greatest extent practicable, to maintain the reduction achieved during calendar years 1999–2000 in the average annual aggregate emissions of toxic air pollutants from reformulated gasoline produced or distributed by the refinery or importer; Provided, that any such adjustment shall not be made at a level below the average percentage of reductions of emissions of toxic air pollutants for reformulated gasoline supplied to PADD I during calendar years 1999–2000. Section 211 of the Clean Air Act (42 U.S.C. 7545) is amended by inserting after subsection (o) the following: “(p) Analyses of motor vehicle fuel changes and emissions model.— “(1) ANTI-BACKSLIDING ANALYSIS.— “(A) DRAFT ANALYSIS.—Not later than 4 years after the date of enactment of this subsection, the Administrator shall publish for public comment a draft analysis of the changes in emissions of air pollutants and air quality due to the use of motor vehicle fuel and fuel additives resulting from implementation of the amendments made by subtitle A of title XV of the Energy Policy Act of 2005. “(2) EMISSIONS MODEL.—For the purposes of this subsection, as soon as the necessary data are available, the Administrator shall develop and finalize an emissions model that reasonably reflects the effects of gasoline characteristics or components on emissions from vehicles in the motor vehicle fleet during calendar year 2005.”. Section 205 of the Department of Energy Organization Act (42 U.S.C. 7135) is amended by adding at the end the following: “(m) Renewable fuels survey.— (1) In order to improve the ability to evaluate the effectiveness of the Nation’s renewable fuels mandate, the Administrator shall conduct and publish the results of a survey of renewable fuels demand in the motor vehicle fuels market in the United States monthly, and in a manner designed to protect the confidentiality of individual responses. In conducting the survey, the Administrator shall collect information both on a national and regional basis, including each of the following:
“(2) The Administrator shall also collect or estimate information both on a national and regional basis, pursuant to subparagraphs (A) through (F) of paragraph (1), for the 5 years prior to implementation of this subsection. “(3) This subsection does not affect the authority of the Administrator to collect data under section 52 of the Federal Energy Administration Act of 1974 (15 U.S.C. 790a).”. (a) EPA approval of State plans with fuel controls.—Section 211(c)(4)(C) of the Clean Air Act (42 U.S.C. 7545(c)(4)(C)) is amended by adding at the end the following: “The Administrator shall not approve a control or prohibition respecting the use of a fuel or fuel additive under this subparagraph unless the Administrator, after consultation with the Secretary of Energy, publishes in the Federal Register a finding that, in the Administrator’s judgment, such control or prohibition will not cause fuel supply or distribution interruptions or have a significant adverse impact on fuel producibility in the affected area or contiguous areas.”. (b) Study.—The Administrator of the Environmental Protection Agency (hereinafter in this subsection referred to as the “Administrator”), in cooperation with the Secretary of Energy, shall undertake a study of the projected effects on air quality, the proliferation of fuel blends, fuel availability, and fuel costs of providing a preference for each of the following: (A) Reformulated gasoline referred to in subsection (k) of section 211 of the Clean Air Act. (B) A low RVP gasoline blend that has been certified by the Administrator as having a Reid Vapor Pressure of 7.0 pounds per square inch (psi). (C) A low RVP gasoline blend that has been certified by the Administrator as having a Reid Vapor Pressure of 7.8 pounds per square inch (psi). In carrying out such study, the Administrator shall obtain comments from affected parties. The Administrator shall submit the results of such study to the Congress not later than 18 months after the date of enactment of this Act, together with any recommended legislative changes. (a) Study.— (1) IN GENERAL.—The Administrator of the Environmental Protection Agency (hereinafter in this section referred to as the “Administrator”) and the Secretary of Energy shall jointly conduct a study of Federal, State, and local requirements concerning motor vehicle fuels, including— (2) REQUIRED ELEMENTS.—The study shall assess— (A) the effect of the variety of requirements described in paragraph (1) on the supply, quality, and price of motor vehicle fuels available to consumers in various States and localities; (C) the effect of Federal, State, and local motor vehicle fuel regulations, including multiple motor vehicle fuel requirements, on— (D) the effect of the requirements described in paragraph (1) on emissions from vehicles, refineries, and fuel handling facilities; (E) the feasibility of developing national or regional motor vehicle fuel slates for the 48 contiguous States that, while improving air quality at the national, regional and local levels consistent with the attainment of national ambient air quality standards, could— (G) the extent to which improvements in air quality and any increases or decreases in the price of motor fuel can be projected to result from the Environmental Protection Agency’s Tier II requirements for conventional gasoline and vehicle emission systems, the reformulated gasoline program, the renewable content requirements established by this subtitle, State programs regarding gasoline volatility, and any other requirements imposed by States or localities affecting the composition of motor fuel. (b) Report.— (1) IN GENERAL.—Not later than December 31, 2007, the Administrator and the Secretary of Energy shall submit to Congress a report on the results of the study conducted under subsection (a). (a) Definition of municipal solid waste.—In this section, the term “municipal solid waste” has the meaning given the term “solid waste” in section 1004 of the Solid Waste Disposal Act (42 U.S.C. 6903). (b) Establishment of program.—The Secretary of Energy (hereinafter in this section referred to as the “Secretary”) shall establish a program to provide guarantees of loans by private institutions for the construction of facilities for the processing and conversion of municipal solid waste and cellulosic biomass into fuel ethanol and other commercial byproducts. (c) Requirements.—The Secretary may provide a loan guarantee under subsection (b) to an applicant if— (1) without a loan guarantee, credit is not available to the applicant under reasonable terms or conditions sufficient to finance the construction of a facility described in subsection (b); (d) Criteria.—In selecting recipients of loan guarantees from among applicants, the Secretary shall give preference to proposals that— (e) Maturity.—A loan guaranteed under subsection (b) shall have a maturity of not more than 20 years. (f) Terms and conditions.—The loan agreement for a loan guaranteed under subsection (b) shall provide that no provision of the loan agreement may be amended or waived without the consent of the Secretary. (g) Assurance of repayment.—The Secretary shall require that an applicant for a loan guarantee under subsection (b) provide an assurance of repayment in the form of a performance bond, insurance, collateral, or other means acceptable to the Secretary in an amount equal to not less than 20 percent of the amount of the loan. (h) Guarantee fee.—The recipient of a loan guarantee under subsection (b) shall pay the Secretary an amount determined by the Secretary to be sufficient to cover the administrative costs of the Secretary relating to the loan guarantee. (i) Full faith and credit.—The full faith and credit of the United States is pledged to the payment of all guarantees made under this section. Any such guarantee made by the Secretary shall be conclusive evidence of the eligibility of the loan for the guarantee with respect to principal and interest. The validity of the guarantee shall be incontestable in the hands of a holder of the guaranteed loan. (j) Reports.—Until each guaranteed loan under this section has been repaid in full, the Secretary shall annually submit to Congress a report on the activities of the Secretary under this section. Section 211 of the Clean Air Act (42 U.S.C. 7545) is amended by adding at the end the following: “(r) Cellulosic biomass and waste-derived ethanol conversion assistance.— “(1) IN GENERAL.—The Secretary of Energy may provide grants to merchant producers of cellulosic biomass ethanol and waste-derived ethanol in the United States to assist the producers in building eligible production facilities described in paragraph (2) for the production of ethanol. Section 211 of the Clean Air Act (42 U.S.C. 7545) is amended by adding at the end the following: “(s) Blending of compliant reformulated gasolines.— “(1) IN GENERAL.—Notwithstanding subsections (h) and (k) and subject to the limitations in paragraph (2) of this subsection, it shall not be a violation of this subtitle for a gasoline retailer, during any month of the year, to blend at a retail location batches of ethanol-blended and non-ethanol-blended reformulated gasoline, provided that— “(A) each batch of gasoline to be blended has been individually certified as in compliance with subsections (h) and (k) prior to being blended; “(B) the retailer notifies the Administrator prior to such blending, and identifies the exact location of the retail station and the specific tank in which such blending will take place; “(2) Limitations.— “(3) SURVEYS.—A sample of gasoline taken from a retail location that has blended gasoline within the past 30 days and is in compliance with subparagraphs (A), (B), (C), and (D) of paragraph (1) shall not be used in a VOC survey mandated by 40 C.F.R. Part 80. “(4) STATE IMPLEMENTATION PLANS.—A State shall be held harmless and shall not be required to revise its State implementation plan under section 110 to account for the emissions from blended gasoline authorized under paragraph (1). “(6) REGULATIONS.—The Administrator shall promulgate, after notice and comment, regulations implementing this subsection within one year after the date of enactment of this subsection. “(7) EFFECTIVE DATE.—This subsection shall become effective 15 months after the date of its enactment and shall apply to blended batches of reformulated gasoline on or after that date, regardless of whether the implementing regulations required by paragraph (6) have been promulgated by the Administrator by that date. This subtitle may be cited as the “Underground Storage Tank Compliance Act of 2005”. (a) In general.—Section 9004 of the Solid Waste Disposal Act (42 U.S.C. 6991c) is amended by adding at the end the following: “(f) Trust Fund distribution.— “(1) IN GENERAL.— “(A) AMOUNT AND PERMITTED USES OF DISTRIBUTION.—The Administrator shall distribute to States not less than 80 percent of the funds from the Trust Fund that are made available to the Administrator under section 9014(2)(A) for each fiscal year for use in paying the reasonable costs, incurred under a cooperative agreement with any State for— “(B) USE OF FUNDS FOR ENFORCEMENT.—In addition to the uses of funds authorized under subparagraph (A), the Administrator may use funds from the Trust Fund that are not distributed to States under subparagraph (A) for enforcement of any regulation promulgated by the Administrator under this subtitle. “(C) PROHIBITED USES.—Funds provided to a State by the Administrator under subparagraph (A) shall not be used by the State to provide financial assistance to an owner or operator to meet any requirement relating to underground storage tanks under subparts B, C, D, H, and G of part 280 of title 40, Code of Federal Regulations (as in effect on the date of enactment of this subsection). “(2) ALLOCATION.— “(A) PROCESS.—Subject to subparagraphs (B) and (C), in the case of a State with which the Administrator has entered into a cooperative agreement under section 9003(h)(7)(A), the Administrator shall distribute funds from the Trust Fund to the State using an allocation process developed by the Administrator. “(B) DIVERSION OF STATE FUNDS.—The Administrator shall not distribute funds under subparagraph (A)(iii) of subsection (f)(1) to any State that has diverted funds from a State fund or State assurance program for purposes other than those related to the regulation of underground storage tanks covered by this subtitle, with the exception of those transfers that had been completed earlier than the date of enactment of this subsection. “(C) REVISIONS TO PROCESS.—The Administrator may revise the allocation process referred to in subparagraph (A) after— “(i) consulting with State agencies responsible for overseeing corrective action for releases from underground storage tanks; and (b) Withdrawal of approval of State funds.—Section 9004(c) of the Solid Waste Disposal Act (42 U.S.C. 6991c(c)) is amended by inserting the following new paragraph at the end thereof: “(6) WITHDRAWAL OF APPROVAL.—After an opportunity for good faith, collaborative efforts to correct financial deficiencies with a State fund, the Administrator may withdraw approval of any State fund or State assurance program to be used as a financial responsibility mechanism without withdrawing approval of a State underground storage tank program under section 9004(a).”. (c) Ability to pay.—Section 9003(h)(6) of the Solid Waste Disposal Act (42 U.S.C. 6591a(h)(6)) is amended by adding the following new subparagraph at the end thereof: “(E) INABILITY OR LIMITED ABILITY TO PAY.— “(i) IN GENERAL.—In determining the level of recovery effort, or amount that should be recovered, the Administrator (or the State pursuant to paragraph (7)) shall consider the owner or operator’s ability to pay. An inability or limited ability to pay corrective action costs must be demonstrated to the Administrator (or the State pursuant to paragraph (7)) by the owner or operator. “(ii) CONSIDERATIONS.—In determining whether or not a demonstration is made under clause (i), the Administrator (or the State pursuant to paragraph (7)) shall take into consideration the ability of the owner or operator to pay corrective action costs and still maintain its basic business operations, including consideration of the overall financial condition of the owner or operator and demonstrable constraints on the ability of the owner or operator to raise revenues. “(iii) INFORMATION.—An owner or operator requesting consideration under this subparagraph shall promptly provide the Administrator (or the State pursuant to paragraph (7)) with all relevant information needed to determine the ability of the owner or operator to pay corrective action costs. “(iv) ALTERNATIVE PAYMENT METHODS.—The Administrator (or the State pursuant to paragraph (7)) shall consider alternative payment methods as may be necessary or appropriate if the Administrator (or the State pursuant to paragraph (7)) determines that an owner or operator cannot pay all or a portion of the costs in a lump sum payment. “(v) MISREPRESENTATION.—If an owner or operator provides false information or otherwise misrepresents their financial situation under clause (ii), the Administrator (or the State pursuant to paragraph (7)) shall seek full recovery of the costs of all such actions pursuant to the provisions of subparagraph (A) without consideration of the factors in subparagraph (B).”. (a) Inspection requirements.—Section 9005 of the Solid Waste Disposal Act (42 U.S.C. 6991d) is amended by inserting the following new subsection at the end thereof: “(c) Inspection requirements.— “(1) UNINSPECTED TANKS.—In the case of underground storage tanks regulated under this subtitle that have not undergone an inspection since December 22, 1998, not later than 2 years after the date of enactment of this subsection, the Administrator or a State that receives funding under this subtitle, as appropriate, shall conduct on-site inspections of all such tanks to determine compliance with this subtitle and the regulations under this subtitle (40 C.F.R. 280) or a requirement or standard of a State program developed under section 9004. “(2) PERIODIC INSPECTIONS.—After completion of all inspections required under paragraph (1), the Administrator or a State that receives funding under this subtitle, as appropriate, shall conduct on-site inspections of each underground storage tank regulated under this subtitle at least once every 3 years to determine compliance with this subtitle and the regulations under this subtitle (40 C.F.R. 280) or a requirement or standard of a State program developed under section 9004. The Administrator may extend for up to one additional year the first 3-year inspection interval under this paragraph if the State demonstrates that it has insufficient resources to complete all such inspections within the first 3-year period. (b) Study of alternative inspection programs.—The Administrator of the Environmental Protection Agency, in coordination with a State, shall gather information on compliance assurance programs that could serve as an alternative to the inspection programs under section 9005(c) of the Solid Waste Disposal Act (42 U.S.C. 6991d(c)) and shall, within 4 years after the date of enactment of this Act, submit a report to the Congress containing the results of such study. (a) In general.—Section 9010 of the Solid Waste Disposal Act (42 U.S.C. 6991i) is amended to read as follows: “SEC. 9010. Operator training. “(a) Guidelines.— “(1) IN GENERAL.—Not later than 2 years after the date of enactment of the Underground Storage Tank Compliance Act of 2005, in consultation and cooperation with States and after public notice and opportunity for comment, the Administrator shall publish guidelines that specify training requirements for— “(A) persons having primary responsibility for on-site operation and maintenance of underground storage tank systems; “(2) CONSIDERATIONS.—The guidelines described in paragraph (1) shall take into account— “(B) training programs that are being employed by tank owners and tank operators as of the date of enactment of the Underground Storage Tank Compliance Act of 2005; “(b) State programs.— “(1) IN GENERAL.—Not later than 2 years after the date on which the Administrator publishes the guidelines under subsection (a)(1), each State that receives funding under this subtitle shall develop State-specific training requirements that are consistent with the guidelines developed under subsection (a)(1). “(c) Training.—All persons that are subject to the operator training requirements of subsection (a) shall— (b) State program requirement.—Section 9004(a) of the Solid Waste Disposal Act (42 U.S.C. 6991c(a)) is amended by striking “and” at the end of paragraph (7), by striking the period at the end of paragraph (8) and inserting “; and”, and by adding the following new paragraph at the end thereof: (c) Enforcement.—Section 9006(d)(2) of such Act (42 U.S.C. 6991e) is amended as follows: Section 9003(h) of the Solid Waste Disposal Act (42 U.S.C. 6991b(h)) is amended as follows: (1) In paragraph (7)(A)— (2) By adding at the end the following: “(12) REMEDIATION OF OXYGENATED FUEL CONTAMINATION.— (a) Release prevention and compliance.—Subtitle I of the Solid Waste Disposal Act (42 U.S.C. 6991 et seq.) is amended by adding at the end the following: “SEC. 9011. Use of funds for release prevention and compliance. “Funds made available under section 9014(2)(D) from the Trust Fund may be used to conduct inspections, issue orders, or bring actions under this subtitle— (b) Government-owned tanks.—Section 9003 of the Solid Waste Disposal Act (42 U.S.C. 6991b) is amended by adding at the end the following: “(i) Government-owned tanks.— “(1) STATE COMPLIANCE REPORT.— (A) Not later than 2 years after the date of enactment of this subsection, each State that receives funding under this subtitle shall submit to the Administrator a State compliance report that—
(c) Public record.—Section 9002 of the Solid Waste Disposal Act (42 U.S.C. 6991a) is amended by adding at the end the following: “(d) Public record.— “(1) IN GENERAL.—The Administrator shall require each State that receives Federal funds to carry out this subtitle to maintain, update at least annually, and make available to the public, in such manner and form as the Administrator shall prescribe (after consultation with States), a record of underground storage tanks regulated under this subtitle. (d) Incentive for performance.—Section 9006 of the Solid Waste Disposal Act (42 U.S.C. 6991e) is amended by adding at the end the following: (a) In general.—Subtitle I of the Solid Waste Disposal Act (42 U.S.C. 6991 et seq.) is amended by adding at the end the following: “SEC. 9012. Delivery prohibition. “(a) Requirements.— “(1) PROHIBITION OF DELIVERY OR DEPOSIT.—Beginning 2 years after the date of enactment of this section, it shall be unlawful to deliver to, deposit into, or accept a regulated substance into an underground storage tank at a facility which has been identified by the Administrator or a State implementing agency to be ineligible for fuel delivery or deposit. “(2) GUIDANCE.—Within 1 year after the date of enactment of this section, the Administrator and States that receive funding under this subtitle shall, in consultation with the underground storage tank owner and product delivery industries, for territory for which they are the primary implementing agencies, publish guidelines detailing the specific processes and procedures they will use to implement the provisions of this section. The processes and procedures include, at a minimum— “(A) the criteria for determining which underground storage tank facilities are ineligible for delivery or deposit; “(3) DELIVERY PROHIBITION NOTICE.— “(A) ROSTER.—The Administrator and each State implementing agency that receives funding under this subtitle shall establish within 24 months after the date of enactment of this section a Delivery Prohibition Roster listing underground storage tanks under the Administrator’s or the State’s jurisdiction that are determined to be ineligible for delivery or deposit pursuant to paragraph (2). “(B) NOTIFICATION.—The Administrator and each State, as appropriate, shall make readily known, to underground storage tank owners and operators and to product delivery industries, the underground storage tanks listed on a Delivery Prohibition Roster by: “(C) ROSTER UPDATES.—The Administrator and the State shall update the Delivery Prohibition Rosters as appropriate, but not less than once a month on the first day of the month. “(D) TAMPERING WITH DEVICE.— “(i) PROHIBITION.—It shall be unlawful for any person, other than an authorized representative of the Administrator or a State, as appropriate, to remove, tamper with, destroy, or damage a device installed by the Administrator or a State, as appropriate, under subparagraph (B)(iii) of this subsection. “(4) LIMITATION.— “(A) RURAL AND REMOTE AREAS.—Subject to subparagraph (B), the Administrator or a State shall not include an underground storage tank on a Delivery Prohibition Roster under paragraph (3) if an urgent threat to public health, as determined by the Administrator, does not exist and if such a delivery prohibition would jeopardize the availability of, or access to, fuel in any rural and remote areas. “(b) Effect on State authority.—Nothing in this section shall affect the authority of a State to prohibit the delivery of a regulated substance to an underground storage tank. “(c) Defense to violation.—A person shall not be in violation of subsection (a)(1) if the underground storage tank into which a regulated substance is delivered is not listed on the Administrator’s or the appropriate State’s Prohibited Delivery Roster 7 calendar days prior to the delivery being made.”. (b) Enforcement.—Section 9006(d)(2) of such Act (42 U.S.C. 6991e(d)(2)) is amended as follows: (2) By adding the following new sentence at the end thereof: “Any person making or accepting a delivery or deposit of a regulated substance to an underground storage tank at an ineligible facility in violation of section 9012 shall also be subject to the same civil penalty for each day of such violation.”. Section 9007 of the Solid Waste Disposal Act (42 U.S.C. 6991f) is amended to read as follows: “SEC. 9007. Federal facilities. “(a) In general.—Each department, agency, and instrumentality of the executive, legislative, and judicial branches of the Federal Government (1) having jurisdiction over any underground storage tank or underground storage tank system, or (2) engaged in any activity resulting, or which may result, in the installation, operation, management, or closure of any underground storage tank, release response activities related thereto, or in the delivery, acceptance, or deposit of any regulated substance to an underground storage tank or underground storage tank system shall be subject to, and comply with, all Federal, State, interstate, and local requirements, both substantive and procedural (including any requirement for permits or reporting or any provisions for injunctive relief and such sanctions as may be imposed by a court to enforce such relief), respecting underground storage tanks in the same manner, and to the same extent, as any person is subject to such requirements, including the payment of reasonable service charges. The Federal, State, interstate, and local substantive and procedural requirements referred to in this subsection include, but are not limited to, all administrative orders and all civil and administrative penalties and fines, regardless of whether such penalties or fines are punitive or coercive in nature or are imposed for isolated, intermittent, or continuing violations. The United States hereby expressly waives any immunity otherwise applicable to the United States with respect to any such substantive or procedural requirement (including, but not limited to, any injunctive relief, administrative order or civil or administrative penalty or fine referred to in the preceding sentence, or reasonable service charge). The reasonable service charges referred to in this subsection include, but are not limited to, fees or charges assessed in connection with the processing and issuance of permits, renewal of permits, amendments to permits, review of plans, studies, and other documents, and inspection and monitoring of facilities, as well as any other nondiscriminatory charges that are assessed in connection with a Federal, State, interstate, or local underground storage tank regulatory program. Neither the United States, nor any agent, employee, or officer thereof, shall be immune or exempt from any process or sanction of any State or Federal Court with respect to the enforcement of any such injunctive relief. No agent, employee, or officer of the United States shall be personally liable for any civil penalty under any Federal, State, interstate, or local law concerning underground storage tanks with respect to any act or omission within the scope of the official duties of the agent, employee, or officer. An agent, employee, or officer of the United States shall be subject to any criminal sanction (including, but not limited to, any fine or imprisonment) under any Federal or State law concerning underground storage tanks, but no department, agency, or instrumentality of the executive, legislative, or judicial branch of the Federal Government shall be subject to any such sanction. The President may exempt any underground storage tank of any department, agency, or instrumentality in the executive branch from compliance with such a requirement if he determines it to be in the paramount interest of the United States to do so. No such exemption shall be granted due to lack of appropriation unless the President shall have specifically requested such appropriation as a part of the budgetary process and the Congress shall have failed to make available such requested appropriation. Any exemption shall be for a period not in excess of one year, but additional exemptions may be granted for periods not to exceed one year upon the President’s making a new determination. The President shall report each January to the Congress all exemptions from the requirements of this section granted during the preceding calendar year, together with his reason for granting each such exemption. “(b) Review of and report on Federal underground storage tanks.— “(1) REVIEW.—Not later than 12 months after the date of enactment of the Underground Storage Tank Compliance Act of 2005, each Federal agency that owns or operates 1 or more underground storage tanks, or that manages land on which 1 or more underground storage tanks are located, shall submit to the Administrator, the Committee on Energy and Commerce of the United States House of Representatives, and the Committee on the Environment and Public Works of the United States Senate a compliance strategy report that— “(B) lists all tanks that are not in compliance with this subtitle that are owned or operated by the Federal agency; “(C) specifies the date of the last inspection by a State or Federal inspector of each underground storage tank owned or operated by the agency; “(D) lists each violation of this subtitle respecting any underground storage tank owned or operated by the agency; (a) In general.—Subtitle I of the Solid Waste Disposal Act (42 U.S.C. 6991 et seq.) is amended by adding the following at the end thereof: “SEC. 9013. Tanks on Tribal lands. “(a) Strategy.—The Administrator, in coordination with Indian tribes, shall, not later than 1 year after the date of enactment of this section, develop and implement a strategy— “(b) Report.—Not later than 2 years after the date of enactment of this section, the Administrator shall submit to Congress a report that summarizes the status of implementation and enforcement of this subtitle in areas located wholly within— (a) In general.—Section 9003 of the Solid Waste Disposal Act (42 U.S.C. 6991b) is amended by adding the following new subsection at the end: “(i) Additional measures to protect groundwater from contaimination.—The Administrator shall require each State that receives funding under this subtitle to require one of the following: “(1) TANK AND PIPING SECONDARY CONTAINMENT.— (A) Each new underground storage tank, or piping connected to any such new tank, installed after the effective date of this subsection, or any existing underground storage tank, or existing piping connected to such existing tank, that is replaced after the effective date of this subsection, shall be secondarily contained and monitored for leaks if the new or replaced underground storage tank or piping is within 1,000 feet of any existing community water system or any existing potable drinking water well. “(B) In the case of a new underground storage tank system consisting of one or more underground storage tanks and connected by piping, subparagraph (A) shall apply to all underground storage tanks and connected pipes comprising such system. “(C) In the case of a replacement of an existing underground storage tank or existing piping connected to the underground storage tank, subparagraph (A) shall apply only to the specific underground storage tank or piping being replaced, not to other underground storage tanks and connected pipes comprising such system. “(D) Each installation of a new motor fuel dispenser system, after the effective date of this subsection, shall include under-dispenser spill containment if the new dispenser is within 1,000 feet of any existing community water system or any existing potable drinking water well. “(E) This paragraph shall not apply to repairs to an underground storage tank, piping, or dispenser that are meant to restore a tank, pipe, or dispenser to operating condition “(F) As used in this subsection: “(i) The term ‘secondarily contained’ means a release detection and prevention system that meets the requirements of 40 CFR 280.43(g), but shall not include under-dispenser spill containment or control systems. “(ii) The term ‘underground storage tank’ has the meaning given to it in section 9001, except that such term does not include tank combinations or more than a single underground pipe connected to a tank. “(iii) The term ‘installation of a new motor fuel dispenser system’ means the installation of a new motor fuel dispenser and the equipment necessary to connect the dispenser to the underground storage tank system, but does not mean the installation of a motor fuel dispenser installed separately from the equipment need to connect the dispenser to the underground storage tank system. “(2) EVIDENCE OF FINANCIAL RESPONSIBILITY AND CERTIFICATION.— “(A) MANUFACTURER AND INSTALLER FINANCIAL RESPONSIBILITY.—A person that manufactures an underground storage tank or piping for an underground storage tank system or that installs an underground storage tank system is required to maintain evidence of financial responsibility under section 9003(d) in order to provide for the costs of corrective actions directly related to releases caused by improper manufacture or installation unless the person can demonstrate themselves to be already covered as an owner or operator of an underground storage tank under section 9003. “(B) INSTALLER CERTIFICATION.—The Administrator and each State that receives funding under this subtitle, as appropriate, shall require that a person that installs an underground storage tank system is— “(iii) has their underground storage tank system installation certified by a registered professional engineer with education and experience in underground storage tank system installation; “(iv) has had their installation of the underground storage tank inspected and approved by the Administrator or the State, as appropriate; (b) Effective date.—This subsection shall take effect 18 months after the date of enactment of this subsection (c) Promulgation of regulations or guidelines.—The Administrator shall issue regulations or guidelines implementing the requirements of this subsection, including guidance to differentiate between the terms “repair” and “replace” for the purposes of section 9003(i)(1) of the Solid Waste Disposal Act. (d) Penalties.—Section 9006(d)(2) of such Act (42 U.S.C. 6991e(d)(2)) is amended by adding the following new subparagraph after subparagraph (C): (a) In general.—Subtitle I of the Solid Waste Disposal Act (42 U.S.C. 6991 et seq.) is amended by adding at the end the following: “SEC. 9014. Authorization of appropriations. “There are authorized to be appropriated to the Administrator the following amounts: “(1) To carry out subtitle I (except sections 9003(h), 9005(c), 9011 and 9012) $50,000,000 for each of fiscal years 2005 through 2009. “(2) From the Trust Fund, notwithstanding section 9508(c)(1) of the Internal Revenue Code of 1986: “(A) to carry out section 9003(h) (except section 9003(h)(12)) $200,000,000 for each of fiscal years 2005 through 2009; (a) In general.—Section 9001 of the Solid Waste Disposal Act (42 U.S.C. 6991) is amended as follows: (2) By redesignating paragraphs (1), (2), (3), (4), (5), (6), (7), and (8) as paragraphs (10), (7), (4), (3), (8), (5), (2), and (6), respectively. (3) By inserting before paragraph (2) (as redesignated by paragraph (2) of this subsection) the following: “(1) INDIAN TRIBE.— “(A) IN GENERAL.—The term ‘Indian tribe’ means any Indian tribe, band, nation, or other organized group or community that is recognized as being eligible for special programs and services provided by the United States to Indians because of their status as Indians. “(B) INCLUSIONS.—The term ‘Indian tribe’ includes an Alaska Native village, as defined in or established under the Alaska Native Claims Settlement Act (43 U.S.C. 1601 et seq.).”. (4) By inserting after paragraph (8) (as redesignated by paragraph (2) of this subsection) the following: “(9) TRUST FUND.—The term ‘Trust Fund’ means the Leaking Underground Storage Tank Trust Fund established by section 9508 of the Internal Revenue Code of 1986.”. (b) Conforming amendments.—The Solid Waste Disposal Act (42 U.S.C. 6901 and following) is amended as follows: (1) Section 9003(f) (42 U.S.C. 6991b(f)) is amended— (2) Section 9003(h) (42 U.S.C. 6991b(h)) is amended in paragraphs (1), (2)(C), (7)(A), and (11) by striking “Leaking Underground Storage Tank Trust Fund” each place it appears and inserting “Trust Fund”. (3) Section 9009 (42 U.S.C. 6991h) is amended— The Solid Waste Disposal Act is amended as follows: (1) Section 9001(4)(A) (42 U.S.C. 6991(4)(A)) is amended by striking “sustances” and inserting “substances”. (2) Section 9003(f)(1) (42 U.S.C. 6991b(f)(1)) is amended by striking “subsection (c) and (d) of this section” and inserting “subsections (c) and (d)”. (3) Section 9004(a) (42 U.S.C. 6991c(a)) is amended by striking “in 9001(2) (A) or (B) or both” and inserting “in subparagraph (A) or (B) of section 9001(7)”. (4) Section 9005 (42 U.S.C. 6991d) is amended— (a) Temporary waivers during supply emergencies.—Section 211(c)(4)(C) of the Clean Air Act (42 U.S.C. 7545(c)(4)(C)) is amended by inserting “(i)” after “(C)” and by adding the following new clauses at the end thereof: “(ii) The Administrator may temporarily waive a control or prohibition respecting the use of a fuel or fuel additive required or regulated by the Administrator pursuant to subsection (c), (h), (i), (k), or (m) of this section or prescribed in an applicable implementation plan under section 110 approved by the Administrator under clause (i) of this subparagraph if, after consultation with, and concurrence by, the Secretary of Energy, the Administrator determines that— “(I) extreme and unusual fuel or fuel additive supply circumstances exist in a State or region of the Nation which prevent the distribution of an adequate supply of the fuel or fuel additive to consumers; “(II) such extreme and unusual fuel and fuel additive supply circumstances are the result of a natural disaster, an Act of God, a pipeline or refinery equipment failure, or another event that could not reasonably have been foreseen or prevented and not the lack of prudent planning on the part of the suppliers of the fuel or fuel additive to such State or region; and “(iii) If the Administrator makes the determinations required under clause (ii), such a temporary extreme and unusual fuel and fuel additive supply circumstances waiver shall be permitted only if— “(I) the waiver applies to the smallest geographic area necessary to address the extreme and unusual fuel and fuel additive supply circumstances; “(II) the waiver is effective for a period of 20 calendar days or, if the Administrator determines that a shorter waiver period is adequate, for the shortest practicable time period necessary to permit the correction of the extreme and unusual fuel and fuel additive supply circumstances and to mitigate impact on air quality; “(III) the waiver permits a transitional period, the exact duration of which shall be determined by the Administrator, after the termination of the temporary waiver to permit wholesalers and retailers to blend down their wholesale and retail inventory; “(V) the Administrator has given public notice to all parties in the motor fuel distribution system, and local and State regulators, in the State or region to be covered by the waiver. The term ‘motor fuel distribution system’ as used in this clause shall be defined by the Administrator through rulemaking. “(iv) Within 180 days of the date of enactment of this clause, the Administrator shall promulgate regulations to implement clauses (ii) and (iii). (b) Limit on number of boutique fuels.—Section 211(c)(4)(C) of the Clean Air Act (42 U.S.C. 7545(c)(4)), as amended by subsection (a), is further amended by adding at the end the following: “(vi) (I) The Administrator shall have no authority, when considering a State implementation plan or a State implementation plan revision, to approve under this paragraph any fuel included in such plan or revision if the effect of such approval increases the total number of fuels approved under this paragraph as of September 1, 2004, in all State implementation plans. “(II) The Administrator, in consultation with the Secretary of Energy, shall determine the total number of fuels approved under this paragraph as of September 1, 2004, in all State implementation plans and shall publish a list of such fuels, including the states and Petroleum Administration for Defense District in which they are used, in the Federal Register for public review and comment no later than 90 days after enactment. “(III) The Administrator shall remove a fuel from the list published under subclause (II) if a fuel ceases to be included in a State implementation plan or if a fuel in a State implementation plan is identical to a Federal fuel formulation implemented by the Administrator, but the Administrator shall not reduce the total number of fuels authorized under the list published under subclause (II). “(IV) Subclause (I) shall not limit the Administrator’s authority to approve a control or prohibition respecting any new fuel under this paragraph in a State implementation plan or revision to a State implementation plan if such new fuel: “(bb) does not increase the total number of fuels on the list published under subclause (II) as of September 1, 2004. In the event that the total number of fuels on the list published under subclause (II) at the time of the Administrator's consideration of a control or prohibition respecting a new fuel is lower than the total number of fuels on such list as of September 1, 2004, the Administrator may approve a control or prohibition respecting a new fuel under this subclause if the Administrator, after consultation with the Secretary of Energy, publishes in the Federal Register after notice and comment a finding that, in the Administrator’s judgment, such control or prohibition respecting a new fuel will not cause fuel supply or distribution interruptions or have a significant adverse impact on fuel producibility in the affected area or contiguous areas. “(V) The Administrator shall have no authority under this paragraph, when considering any particular State's implementation plan or a revision to that State's implementation plan, to approve any fuel unless that fuel was, as of the date of such consideration, approved in at least one State implementation plan in the applicable Petroleum Administration for Defense District. However, the Administrator may approve as part of a State implementation plan or State implementation plan revision a fuel with a summertime Reid Vapor Pressure of 7.0 psi. In no event shall such approval by the Administrator cause an increase in the total number of fuels on the list published under subclause (II). “(VI) Nothing in this clause shall be construed to have any effect regarding any available authority of States to require the use of any fuel additive registered in accordance with subsection (b), including any fuel additive registered in accordance with subsection (b) after the enactment of this subclause.”. (c) Study and report to Congress on boutique fuels.— (1) JOINT STUDY.—The Administrator of the Environmental Protection Agency and the Secretary of Energy shall undertake a study of the effects on air quality, on the number of fuel blends, on fuel availability, on fuel fungibility, and on fuel costs of the State plan provisions adopted pursuant to section 211(c)(4)(C) of the Clean Air Act (42 U.S.C. 7545(c)(4)(C)). (2) FOCUS OF STUDY.—The primary focus of the study required under paragraph (1) shall be to determine how to develop a Federal fuels system that maximizes motor fuel fungibility and supply, preserves air quality standards, and reduces motor fuel price volatility that results from the proliferation of boutique fuels, and to recommend to Congress such legislative changes as are necessary to implement such a system. The study should include the impacts on overall energy supply, distribution, and use as a result of the legislative changes recommended. (3) RESPONSIBILITY OF ADMINISTRATOR.—In carrying out the study required by this section, the Administrator shall coordinate obtaining comments from affected parties interested in the air quality impact assessment portion of the study. The Administrator shall use sound and objective science practices, shall consider the best available science, and shall consider and include a description of the weight of the scientific evidence. (4) RESPONSIBILITY OF SECRETARY.—In carrying out the study required by this section, the Secretary shall coordinate obtaining comments from affected parties interested in the fuel availability, number of fuel blends, fuel fungibility and fuel costs portion of the study. (5) REPORT TO CONGRESS.—The Administrator and the Secretary jointly shall submit the results of the study required by this section in a report to the Congress not later than 12 months after the date of the enactment of this Act, together with any recommended regulatory and legislative changes. Such report shall be submitted to the Committee on Energy and Commerce of the House of Representatives and the Committee on Environment and Public Works of the Senate. (a) Definition.—For purposes of this section “petroleum” means crude oil, motor gasoline, jet fuel, distillates, and propane. (b) Study.—The Secretary of Energy shall conduct a study on petroleum and natural gas storage capacity and operational inventory levels, nationwide and by major geographical regions. The Secretary of Energy shall contract with the National Academy of Sciences for a study, to be completed within 1 year after the date of enactment of this Act, to examine whether the goals of energy efficiency standards are best served by measurement of energy consumed, and efficiency improvements, at the actual site of energy consumption, or through the full fuel cycle, beginning at the source of energy production. The Secretary shall submit the report to Congress. (a) Study required.—The Secretary, in consultation with the Commission, the Director of the Office of Personnel Management, the Administrator of General Services, and the Administrator of NTIA, shall conduct a study of the energy conservation implications of the widespread adoption of telecommuting by Federal employees in the United States. (b) Required subjects of study.—The study required by subsection (a) shall analyze the following subjects in relation to the energy saving potential of telecommuting by Federal employees: (1) Reductions of energy use and energy costs in commuting and regular office heating, cooling, and other operations. (c) Report required.—The Secretary shall submit to the President and Congress a report on the study required by this section not later than 6 months after the date of enactment of this Act. Such report shall include a description of the results of the analysis of each of the subject described in subsection (b). (d) Definitions.—As used in this section: (3) NTIA.—The term “NTIA” means the National Telecommunications and Information Administration of the Department of Commerce. (4) TELECOMMUTING.—The term “telecommuting” means the performance of work functions using communications technologies, thereby eliminating or substantially reducing the need to commute to and from traditional worksites. (5) FEDERAL EMPLOYEE.—The term “Federal employee” has the meaning provided the term “employee” by section 2105 of title 5, United States Code. Not later than 1 year after the date of enactment of this Act, the Secretary of Health and Human Services shall transmit to Congress a report on how the Low-Income Home Energy Assistance Program could be used more effectively to prevent loss of life from extreme temperatures. In preparing such report, the Secretary shall consult with appropriate officials in all 50 States and the District of Columbia. The Secretary of Energy and the Administrator of the Environmental Protection Agency shall— (1) conduct a joint study of the benefits of oil bypass filtration technology in reducing demand for oil and protecting the environment; The Secretary of Energy shall— Not later than 2 years after the date of enactment of this Act, the Secretary of Energy shall transmit to Congress a report that examines the feasibility of promoting collaborations between large institutions of higher education and small institutions of higher education through grants, contracts, and cooperative agreements made by the Secretary for energy projects. The Secretary shall also consider providing incentives for the inclusion of small institutions of higher education, including minority-serving institutions, in energy research grants, contracts, and cooperative agreements. Not later than 5 years after the date of enactment of this Act, and each 5 years thereafter, the Federal Energy Regulatory Commission shall assess the effects of the exemption of electric cooperatives and government-owned utilities from Commission regulation under section 201(f) of the Federal Power Act. The assessment shall include any effects on— The Secretary of Energy shall submit an annual report to the Committee on Energy and Commerce of the United States House of Representatives and to the Committee on Energy and Natural Resources of the United States Senate concerning the status of energy export development in Latin America and efforts by the Secretary and other departments and agencies of the United States to promote energy integration with Latin America. The report shall contain a detailed analysis of the status of energy export development in Mexico and a description of all significant efforts by the Secretary and other departments and agencies to promote a constructive relationship with Mexico regarding the development of that nation’s energy capacity. In particular this report shall outline efforts the Secretary and other departments and agencies have made to ensure that regulatory approval and oversight of United States/Mexico border projects that result in the expansion of Mexican energy capacity are effectively coordinated across departments and with the Mexican government. (a) Study.—The Secretary of Energy shall make a grant to an organization of oil and gas producing States, specifically those containing significant numbers of marginal oil and natural gas wells, for conducting an annual study of low-volume natural gas reservoirs. Such organization shall work with the State geologist of each State being studied. (b) Contents.—The studies under this section shall— (c) Data analysis.—Data development and analysis under this section shall be performed by an institution of higher education with GIS capabilities. If the organization receiving the grant under subsection (a) does not have GIS capabilities, such organization shall contract with one or more entities with— (1) technological capabilities and resources to perform advanced image processing, GIS programming, and data analysis; and
Sec. 1. Short title; table of contents
Sec. 101. Energy and water saving measures in congressional buildings
Sec. 102. Energy management requirements
Sec. 103. Energy use measurement and accountability
Sec. 104. Procurement of energy efficient products
Sec. 105. Energy Savings Performance Contracts
Sec. 107. Voluntary commitments to reduce industrial energy intensity
Sec. 108. Advanced Building Efficiency Testbed
Sec. 109. Federal building performance standards
Sec. 110. Daylight savings
Sec. 121. Low Income Home Energy Assistance Program
Sec. 122. Weatherization assistance
Sec. 123. State energy programs
Sec. 124. Energy efficient appliance rebate programs
Sec. 125. Energy efficient public buildings
Sec. 126. Low income community energy efficiency pilot program
Sec. 131. Energy Star Program
Sec. 132. HVAC maintenance consumer education program
Sec. 133. Energy conservation standards for additional products
Sec. 134. Energy labeling
Sec. 135. Preemption
Sec. 136. State consumer product energy efficiency standards
Sec. 145. Grants for energy-conserving improvements for assisted housing
Sec. 147. Energy-efficient appliances
Sec. 149. Energy strategy for HUD
Sec. 201. Assessment of renewable energy resources
Sec. 202. Renewable energy production incentive
Sec. 203. Federal purchase requirement
Sec. 204. Insular areas energy security
Sec. 205. Use of photovoltaic energy in public buildings
Sec. 206. Grants to improve the commercial value of forest biomass for electric energy, useful heat, transportation fuels, petroleum-based product substitutes, and other commercial purposes
Sec. 207. Biobased products
Sec. 208. Renewable energy security
Sec. 231. Alternative conditions and fishways
Sec. 241. Hydroelectric production incentives
Sec. 242. Hydroelectric efficiency improvement
Sec. 243. Small hydroelectric power projects
Sec. 244. Increased hydroelectric generation at existing Federal facilities
Sec. 245. Shift of project loads to off-peak periods
Sec. 301. Permanent authority to operate the Strategic Petroleum Reserve and other energy programs
Sec. 302. National Oilheat Research Alliance
Sec. 303. Site selection
Sec. 304. Suspension of Strategic Petroleum Reserve deliveries
Sec. 320. Liquefaction or gasification natural gas terminals
Sec. 327. Hydraulic fracturing
Sec. 330. Appeals relating to pipeline construction or offshore mineral development projects
Sec. 333. Natural gas market transparency
Sec. 344. Consultation regarding oil and gas leasing on public land
Sec. 346. Compliance with executive order 13211; actions concerning regulations that significantly affect energy supply, distribution, or use
Sec. 350. Energy facility rights-of-way and corridors on Federal land
Sec. 355. Encouraging Great Lakes oil and gas drilling ban
Sec. 358. Federal coalbed methane regulation
Sec. 371. Short title
Sec. 372. Findings
Sec. 373. Purpose
Sec. 374. Designation of Refinery Revitalization Zones
Sec. 375. Memorandum of understanding
Sec. 376. State environmental permitting assistance
Sec. 377. Coordination and expeditious review of permitting process
Sec. 378. Compliance with all environmental regulations required
Sec. 379. Definitions
Sec. 401. Authorization of appropriations
Sec. 402. Project criteria
Sec. 403. Report
Sec. 404. Clean Coal Centers of Excellence
Sec. 411. Coal technology loan
Sec. 412. Coal gasification
Sec. 414. Petroleum coke gasification
Sec. 416. Electron scrubbing demonstration
Sec. 441. Clean air coal program
Sec. 501. Short title
Sec. 502. Office of Indian Energy Policy and Programs
Sec. 503. Indian energy
Sec. 504. Four Corners transmission line project
Sec. 505. Energy efficiency in federally assisted housing
Sec. 506. Consultation with Indian tribes
Sec. 601. Short title
Sec. 602. Extension of indemnification authority
Sec. 603. Maximum assessment
Sec. 604. Department of Energy liability limit
Sec. 605. Incidents outside the United States
Sec. 606. Reports
Sec. 607. Inflation adjustment
Sec. 608. Treatment of modular reactors
Sec. 609. Applicability
Sec. 610. Prohibition on assumption by United States Government of liability for certain foreign incidents
Sec. 611. Civil penalties
Sec. 612. Financial accountability
Sec. 621. Licenses
Sec. 622. NRC training program
Sec. 623. Cost recovery from government agencies
Sec. 624. Elimination of pension offset
Sec. 625. Antitrust review
Sec. 626. Decommissioning
Sec. 627. Limitation on legal fee reimbursement
Sec. 629. Report on feasibility of developing commercial nuclear energy generation facilities at existing Department of Energy sites
Sec. 630. Uranium sales
Sec. 631. Cooperative research and development and special demonstration projects for the uranium mining industry
Sec. 632. Whistleblower protection
Sec. 633. Medical isotope production
Sec. 634. Fernald byproduct material
Sec. 635. Safe disposal of greater-than-class c radioactive waste
Sec. 636. Prohibition on nuclear exports to countries that sponsor terrorism
Sec. 638. National uranium stockpile
Sec. 639. Nuclear Regulatory Commission meetings
Sec. 640. Employee benefits
Sec. 651. Hydrogen production programs
Sec. 652. Definitions
Sec. 661. Nuclear facility threats
Sec. 662. Fingerprinting for criminal history record checks
Sec. 663. Use of firearms by security personnel of licensees and certificate holders of the Commission
Sec. 664. Unauthorized introduction of dangerous weapons
Sec. 665. Sabotage of nuclear facilities or fuel
Sec. 666. Secure transfer of nuclear materials
Sec. 667. Department of Homeland Security consultation
Sec. 668. Authorization of appropriations
Sec. 701. Use of alternative fuels by dual-fueled vehicles
Sec. 704. Incremental cost allocation
Sec. 705. Lease condensates
Sec. 706. Review of Energy Policy Act of 1992 programs
Sec. 707. Report concerning compliance with alternative fueled vehicle purchasing requirements
Sec. 711. Hybrid vehicles
Sec. 712. Hybrid retrofit and electric conversion program
Sec. 721. Definitions
Sec. 722. Pilot program
Sec. 723. Reports to Congress
Sec. 724. Authorization of appropriations
Sec. 731. Fuel cell transit bus demonstration
Sec. 741. Definitions
Sec. 742. Program for replacement of certain school buses with clean school buses
Sec. 743. Diesel retrofit program
Sec. 744. Fuel cell school buses
Sec. 751. Railroad efficiency
Sec. 752. Mobile emission reductions trading and crediting
Sec. 753. Aviation fuel conservation and emissions
Sec. 754. Diesel fueled vehicles
Sec. 757. Biodiesel engine testing program
Sec. 759. Ultra-efficient engine technology for aircraft
Sec. 771. Authorization of appropriations for implementation and enforcement of fuel economy standards
Sec. 772. Revised considerations for decisions on maximum feasible average fuel economy
Sec. 773. Extension of maximum fuel economy increase for alternative fueled vehicles
Sec. 774. Study of feasibility and effects of reducing use of fuel for automobiles
Sec. 801. Definitions
Sec. 802. Plan
Sec. 803. Programs
Sec. 804. Interagency task force
Sec. 805. Advisory Committee
Sec. 806. External review
Sec. 807. Miscellaneous provisions
Sec. 808. Savings clause
Sec. 809. Authorization of appropriations
Sec. 810. Solar and wind technologies
Sec. 901. Goals
Sec. 902. Definitions
Sec. 904. Energy efficiency
Sec. 905. Next Generation Lighting Initiative
Sec. 906. National Building Performance Initiative
Sec. 907. Secondary electric vehicle battery use program
Sec. 908. Energy efficiency study initiative
Sec. 909. Electric motor control technology
Sec. 911. Distributed energy and electric energy systems
Sec. 913. High power density industry program
Sec. 916. Reciprocating power
Sec. 917. Advanced portable power devices
Sec. 918. Renewable energy
Sec. 919. Bioenergy programs
Sec. 920. Concentrating solar power study program
Sec. 921. Miscellaneous projects
Sec. 922. Renewable energy in public buildings
Sec. 923. University biodiesel program
Sec. 929. Alternatives to industrial radioactive sources
Sec. 930. Geological isolation of spent fuel
Sec. 931. Fossil energy
Sec. 932. Oil and gas studies
Sec. 933. Technology transfer
Sec. 934. Coal mining technologies
Sec. 935. Coal and related technologies program
Sec. 936. Complex Well Technology Testing Facility
Sec. 941. Program authority
Sec. 942. Ultra-deepwater Program
Sec. 943. Unconventional natural gas and other petroleum resources Program
Sec. 944. Additional requirements for awards
Sec. 945. Advisory committees
Sec. 946. Limits on participation
Sec. 947. Sunset
Sec. 948. Definitions
Sec. 949. Funding
Sec. 953. Plan for Fusion Energy Sciences Program
Sec. 954. Spallation Neutron Source
Sec. 962. Nitrogen fixation
Sec. 966. Waste reduction and use of alternatives
Sec. 967. Report on fuel cell test center
Sec. 968. Arctic Engineering Research Center
Sec. 970. Western Michigan demonstration project
Sec. 971. Low-cost hydrogen propulsion and infrastructure
Sec. 972. Carbon-based fuel cell development
Sec. 981. United States-Israel cooperation
Sec. 1001. Additional Assistant Secretary position
Sec. 1002. Other transactions authority
Sec. 1003. University collaboration
Sec. 1004. Sense of Congress
Sec. 1201. Short title
Sec. 1211. Electric reliability standards
Sec. 1221. Siting of interstate electric transmission facilities
Sec. 1222. Third-party finance
Sec. 1223. Transmission system monitoring
Sec. 1224. Advanced transmission technologies
Sec. 1225. Electric transmission and distribution programs
Sec. 1226. Advanced Power System Technology Incentive Program
Sec. 1227. Office of Electric Transmission and Distribution
Sec. 1231. Open nondiscriminatory access
Sec. 1232. Sense of Congress on Regional Transmission Organizations
Sec. 1233. Regional Transmission Organization applications progress report
Sec. 1234. Federal utility participation in Regional Transmission Organizations
Sec. 1235. Standard market design
Sec. 1236. Native load service obligation
Sec. 1237. Study on the benefits of economic dispatch
Sec. 1241. Transmission infrastructure investment
Sec. 1251. Net metering and additional standards
Sec. 1252. Smart metering
Sec. 1253. Cogeneration and small power production purchase and sale requirements
Sec. 1254. Interconnection
Sec. 1261. Short title
Sec. 1262. Definitions
Sec. 1263. Repeal of the Public Utility Holding Company Act of 1935
Sec. 1264. Federal access to books and records
Sec. 1265. State access to books and records
Sec. 1266. Exemption authority
Sec. 1267. Affiliate transactions
Sec. 1268. Applicability
Sec. 1269. Effect on other regulations
Sec. 1270. Enforcement
Sec. 1271. Savings provisions
Sec. 1272. Implementation
Sec. 1273. Transfer of resources
Sec. 1274. Effective date
Sec. 1275. Service allocation
Sec. 1276. Authorization of appropriations
Sec. 1277. Conforming amendments to the Federal Power Act
Sec. 1281. Market transparency rules
Sec. 1282. Market manipulation
Sec. 1283. Enforcement
Sec. 1284. Refund effective date
Sec. 1285. Refund authority
Sec. 1286. Sanctity of contract
Sec. 1287. Consumer privacy and unfair trade practices
Sec. 1291. Merger review reform and accountability
Sec. 1292. Electric utility mergers
Sec. 1295. Definitions
Sec. 1297. Conforming amendments
Sec. 1298. Economic dispatch
Sec. 1441. Continuation of transmission security order
Sec. 1442. Review of agency determinations
Sec. 1443. Attainment dates for downwind ozone nonattainment areas
Sec. 1444. Energy production incentives
Sec. 1446. Regulation of certain oil used in transformers
Sec. 1447. Risk assessments
Sec. 1448. Oxygen-fuel
Sec. 1449. Petrochemical and oil refinery facility health assessment
Sec. 1501. Renewable content of motor vehicle fuel
Sec. 1502. Fuels safe harbor
Sec. 1503. Findings and MTBE transition assistance
Sec. 1504. Use of MTBE
Sec. 1505. National Academy of Sciences review and presidential determination
Sec. 1506. Elimination of oxygen content requirement for reformulated gasoline
Sec. 1507. Analyses of motor vehicle fuel changes
Sec. 1508. Data collection
Sec. 1509. Reducing the proliferation of State fuel controls
Sec. 1510. Fuel system requirements harmonization study
Sec. 1511. Commercial byproducts from municipal solid waste and cellulosic biomass loan guarantee program
Sec. 1512. Cellulosic biomass and waste-derived ethanol conversion assistance
Sec. 1513. Blending of compliant reformulated gasolines
Sec. 1521. Short title
Sec. 1522. Leaking underground storage tanks
Sec. 1523. Inspection of underground storage tanks
Sec. 1524. Operator training
Sec. 1525. Remediation from oxygenated fuel additives
Sec. 1526. Release prevention, compliance, and enforcement
Sec. 1527. Delivery prohibition
Sec. 1528. Federal facilities
Sec. 1529. Tanks on Tribal lands
Sec. 1530. Additional measures to protect groundwater
Sec. 1531. Authorization of appropriations
Sec. 1532. Conforming amendments
Sec. 1533. Technical amendments
Sec. 1541. Reducing the proliferation of boutique fuels
Sec. 1601. Study on inventory of petroleum and natural gas storage
Sec. 1605. Study of energy efficiency standards
Sec. 1606. Telecommuting study
Sec. 1607. LIHEAP report
Sec. 1608. Oil bypass filtration technology
Sec. 1609. Total integrated thermal systems
Sec. 1610. University collaboration
Sec. 1611. Reliability and consumer protection assessment
Sec. 1612. Report on energy integration with Latin America
Sec. 1613. Low-volume gas reservoir study
“Sec. 552. Energy and water savings measures in congressional buildings”.
“Fiscal Year
Percentage reduction
2006
2
2007
4
2008
6
2009
8
2010
10
2011
12
2012
14
2013
16
2014
18
2015
20.
“Sec. 181. Establishment
“Sec. 182. Authority
“Sec. 183. Conditions for release; plan
“Sec. 184. Northeast Home Heating Oil Reserve Account
“Sec. 185. Exemptions”;
“Sec. 3101. Findings; purposes; definitions
“Sec. 3102. Authorization of program
“Sec. 3103. Authorization of appropriations
“Sec. 3104. Air pollution control project criteria
“Sec. 3105. Criteria for generation projects
“Sec. 3106. Financial criteria
“Sec. 3107. Federal share
“Sec. 3108. Applicability”.
“Sec. 213. Establishment of policy for National Nuclear Security Administration
“Sec. 214. Establishment of security, counterintelligence, and intelligence policies
“Sec. 215. Office of Counterintelligence
“Sec. 216. Office of Intelligence
“Sec. 217. Office of Indian Energy Policy and Programs”.
“Sec. 2601. Definitions
“Sec. 2602. Indian tribal energy resource development
“Sec. 2603. Indian tribal energy resource regulation
“Sec. 2604. Leases, business agreements, and rights-of-way involving energy development or transmission
“Sec. 2605. Indian mineral development review”.
“Sec. 218. Office of Electric Transmission and Distribution”.
Applicable volume of renewable fuel
“Calendar year
(in billions of gallons)
2005
3.1
2006
3.3
2007
3.5
2008
3.8
2009
4.1
2010
4.4
2011
4.7
2012
5.0
Union Calendar No. 122 | |||||
| |||||
[Report No. 109–215, Part I]
| |||||
A BILL | |||||
To ensure jobs for our future with secure and reliable energy.
| |||||
July 29, 2005 | |||||
Reported from the Committee on Energy and Commerce with an amendment | |||||
July 29, 2005 | |||||
Committees on Science, Resources, Education and the Workforce, Transportation and Infrastructure, Financial Services, and Agriculture discharged; committed to the Committee of the Whole House on the State of the Union and ordered to be printed |