[Congressional Bills 117th Congress]
[From the U.S. Government Publishing Office]
[H.R. 3717 Introduced in House (IH)]
<DOC>
117th CONGRESS
1st Session
H. R. 3717
To require the Secretary of Energy to establish a program to provide
grants to improve power lines.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
June 4, 2021
Mr. Sean Patrick Maloney of New York introduced the following bill;
which was referred to the Committee on Energy and Commerce
_______________________________________________________________________
A BILL
To require the Secretary of Energy to establish a program to provide
grants to improve power lines.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Power Line Resiliency Act''.
SEC. 2. POWER LINE IMPROVEMENT GRANT PROGRAM.
(a) Establishment.--Not later than 1 year after the date of
enactment of this section, the Secretary of Energy shall establish a
program to provide grants to electric utilities to carry out eligible
activities.
(b) Grants.--
(1) Application.--To apply for a grant provided under this
section, an electric utility shall submit to the Secretary of
Energy an application at such time, in such manner, and
containing such information as the Secretary of Energy may
require.
(2) Selection.--The Secretary of Energy shall provide
grants under this section--
(A) on a competitive basis; and
(B) to geographically diverse electric utilities.
(3) Priority.--The Secretary of Energy shall prioritize
providing a grant under this section to any electric utility
that sells electricity in an area that has a history of extreme
weather events.
(c) Sunset.--The program established under subsection (a) shall
terminate on the date that is 5 years after the date of enactment of
this section.
(d) Definitions.--In this section:
(1) Electric utility.--The term ``electric utility'' has
the meaning given such term in section 3(22) of the Federal
Power Act (16 U.S.C. 796(22)).
(2) Eligible activity.--
(A) In general.--The term ``eligible activity''
means an activity that--
(i) is designed to improve the performance
or efficiency of a power line;
(ii) makes a power line more resilient to
an extreme weather event; or
(iii) otherwise ensures that an end-user
has access to electricity during an extreme
weather event.
(B) Includes.--The term ``eligible activity''
includes--
(i) burying a power line;
(ii) hardening a power line; and
(iii) if burying a power line is not
feasible, providing a generator to a household
that is located in a remote area.
(3) Extreme weather event.--The term ``extreme weather
event'' means an historically rare or severe natural disaster,
including a heat wave, drought, flood, tornado, and hurricane.
(4) Power line.--The term ``power line'' includes
distribution lines and transmission lines.
<all>