[H.R. 7119 Introduced in House (IH)]
<DOC>
117th CONGRESS
2d Session
H. R. 7119
To amend the Water Infrastructure Finance and Innovation Act of 2014 to
authorize the selection of eligible projects to be carried out using
collaborative project delivery methods, and for other purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
March 17, 2022
Ms. Davids of Kansas (for herself and Ms. Mace) introduced the
following bill; which was referred to the Committee on Transportation
and Infrastructure, and in addition to the Committee on Energy and
Commerce, for a period to be subsequently determined by the Speaker, in
each case for consideration of such provisions as fall within the
jurisdiction of the committee concerned
_______________________________________________________________________
A BILL
To amend the Water Infrastructure Finance and Innovation Act of 2014 to
authorize the selection of eligible projects to be carried out using
collaborative project delivery methods, and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Water Design-Build Improvement Act
of 2022''.
SEC. 2. COLLABORATIVE PROJECT DELIVERY METHODS.
Section 5028 of the Water Infrastructure Finance and Innovation Act
of 2014 (33 U.S.C. 3907) is amended--
(1) by redesignating subsection (c) as subsection (d); and
(2) by inserting after subsection (b) the following:
``(c) Collaborative Project Delivery Methods.--
``(1) Authorization.--The Secretary or the Administrator,
as applicable, may select, in accordance with this section, a
project to be carried out using a collaborative project
delivery method (consistent with any applicable State or local
law), including a construction management at-risk method and a
design-build method.
``(2) Definitions.--In this subsection:
``(A) Collaborative project delivery method.--The
term `collaborative project delivery method' means a
method for carrying out a capital project that involves
close collaboration among the eligible entity, the
owner of the project (if different from the eligible
entity), the designer of the project, and the
contractor for the project, from design through
completion of construction.
``(B) Construction management at-risk method.--The
term `construction management at-risk method' means a
collaborative project delivery method in which an
engineering firm and a construction management at-risk
firm are retained under 2 separate contracts for design
and construction, respectively.
``(C) Design-build method.--The term `design-build
method' means a collaborative project delivery method
under which a single lead contract is entered into with
a design-builder for design and construction.''.
SEC. 3. STUDY ON THE USE OF COLLABORATIVE PROJECT DELIVERY METHODS.
Not later than 180 days after the date of enactment of this Act,
the Administrator of the Environmental Protection Agency, in
coordination with the Regional Administrators, and the Secretary of the
Army, acting through the Chief of Engineers, shall carry out, and make
public the results of, a study that--
(1) evaluates the use of collaborative project delivery
methods in projects carried out using assistance received under
the Water Infrastructure Finance and Innovation Act of 2014 (33
U.S.C. 3901 et seq.);
(2) determines barriers to increased use of collaborative
project delivery methods in such projects;
(3) assesses the potential benefits of using collaborative
project delivery methods in such projects; and
(4) identifies areas of need to educate agency staff in
collaborative project delivery method implementation and best
practices.