[Congressional Bills 117th Congress]
[From the U.S. Government Publishing Office]
[H.R. 9078 Introduced in House (IH)]
<DOC>
117th CONGRESS
2d Session
H. R. 9078
To require that certain actions taken by the Secretary of Defense be
treated as an eligible transportation project, and for other purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
September 29, 2022
Ms. Slotkin (for herself, Mr. Waltz, Mr. Garamendi, Mr. Horsford, and
Mr. Costa) introduced the following bill; which was referred to the
Committee on Natural Resources
_______________________________________________________________________
A BILL
To require that certain actions taken by the Secretary of Defense be
treated as an eligible transportation project, and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Permit Reform In Mining for Energy
and Defense Act'' or the ``PRIMED Act''.
SEC. 2. TREATMENT OF ACTIONS UNDER PRESIDENTIAL DETERMINATION 2022-11
FOR FEDERAL PERMITTING IMPROVEMENT PURPOSES.
(a) In General.--Except as provided by subsection (c), an action
described in subsection (b) shall be--
(1) treated as a covered project, as defined in section
41001(6) of the Fixing America's Surface Transportation Act (42
U.S.C. 4370m(6)), without regard to the requirements of that
section; and
(2) included in the Permitting Dashboard maintained
pursuant to section 41003(b) of that Act (42 U.S.C. 4370m-
2(b)).
(b) Actions Described.--An action described in this subsection is
an action taken by the Secretary of Defense pursuant to Presidential
Determination 2022-11 (87 Fed. Reg. 19775; relating to certain actions
under section 303 of the Defense Production Act of 1950) to create,
maintain, protect, expand, or restore sustainable and responsible
domestic production capabilities for strategic and critical materials
through--
(1) supporting feasibility studies for mature mining,
beneficiation, and value-added processing projects;
(2) by-product and co-product production at existing
mining, mine waste reclamation, and other industrial
facilities;
(3) modernization of mining, beneficiation, and value-added
processing to increase productivity, environmental
sustainability, and workforce safety; or
(4) any other activity authorized under section 303(a)(1)
of the Defense Production Act of 1950 (50 U.S.C. 4533(a)(1)).
(c) Exception.--An action described in subsection (b) may not be
treated as a covered project or be included in the Permitting Dashboard
under subsection (a) if the project sponsor (as defined in section
41001(18) of the Fixing America's Surface Transportation Act (42 U.S.C.
4370m(18))) requests that the action not be treated as a covered
project.
<all>