[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 7288 Introduced in House (IH)]

<DOC>






119th CONGRESS
  2d Session
                                H. R. 7288

    To require the Secretary of the Interior to conduct a study to 
     determine the feasibility of constructing a project to supply 
 municipal, rural, and industrial water from the Missouri River to the 
     Western Dakota Regional Water System, and for other purposes.


_______________________________________________________________________


                    IN THE HOUSE OF REPRESENTATIVES

                            January 30, 2026

 Mr. Johnson of South Dakota introduced the following bill; which was 
             referred to the Committee on Natural Resources

_______________________________________________________________________

                                 A BILL


 
    To require the Secretary of the Interior to conduct a study to 
     determine the feasibility of constructing a project to supply 
 municipal, rural, and industrial water from the Missouri River to the 
     Western Dakota Regional Water System, and for other purposes.

    Be it enacted by the Senate and House of Representatives of the 
United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

    This Act may be cited as the ``Western South Dakota Water Supply 
Project Feasibility Study Act''.

SEC. 2. DEFINITIONS.

    In this Act:
            (1) Non-federal project entity.--The term ``non-Federal 
        project entity'' means the Western Dakota Regional Water 
        System, Inc., a nonprofit corporation.
            (2) Proposed rural water supply project.--The term 
        ``proposed rural water supply project'' means the proposed 
        project to supply municipal, rural, and industrial water from 
        the Missouri River to the Western Dakota Regional Water System.
            (3) Secretary.--The term ``Secretary'' means the Secretary 
        of the Interior.

SEC. 3. WESTERN SOUTH DAKOTA WATER SUPPLY PROJECT FEASIBILITY STUDY.

    (a) Study.--
            (1) In general.--The Secretary, in coordination with the 
        non-Federal project entity, shall carry out a study to 
        determine the feasibility of the proposed rural water supply 
        project.
            (2) Feasibility report.--After completion of the 
        feasibility study for the proposed rural water supply project 
        under paragraph (1), the Secretary shall--
                    (A) develop a feasibility report that includes a 
                recommendation of the Secretary on--
                            (i) whether the proposed rural water supply 
                        project should be authorized for construction; 
                        and
                            (ii) the appropriate non-Federal share of 
                        construction costs, which shall be--
                                    (I) at least 25 percent of the 
                                total construction costs; and
                                    (II) determined based on an 
                                analysis of the financial capability-
                                to-pay the allocated construction and 
                                operations, maintenance, and 
                                replacement costs of the recommended 
                                plan;
                    (B) submit the report under subparagraph (A) to the 
                Committee on Energy and Natural Resources of the Senate 
                and the Committee on Natural Resources of the House of 
                Representatives; and
                    (C) make the report under subparagraph (A) publicly 
                available, along with associated feasibility study 
                documents.
            (3) Consultation and cooperation.--In addition to the non-
        Federal project entity, the Secretary shall consult and 
        cooperate with appropriate Federal, State, Tribal, regional, 
        and local authorities during the conduct of the feasibility 
        study and development of the feasibility report under this 
        subsection.
    (b) Cost-Sharing Agreement for Feasibility Study Costs.--The 
Secretary shall enter into a cost-sharing agreement (or an appropriate 
financial assistance agreement, as determined by the Secretary) with 
the non-Federal project entity to conduct a study under subsection (a) 
that complies with the reclamation feasibility standards.
    (c) Federal Share of Feasibility Study Costs.--The Federal share of 
the total costs of carrying out the feasibility study under subsection 
(a) shall not exceed 50 percent.
    (d) Authorization of Appropriations.--There is authorized to be 
appropriated to the Secretary to carry out this section $10,000,000.
    (e) Termination of Authority.--The authority provided by this 
section expires on the date that is 10 years after the date of 
enactment of this Act.
                                 <all>