Purpose

To increase the transfer capability of electric energy transmission systems through participant-funded investment.


Actions (12)

Date All Actions
04/24/2002Proposed amendment SA 3050 withdrawn in Senate.
04/24/2002Considered by Senate. (consideration: CR S3233, S3287)
04/23/2002Considered by Senate. (consideration: CR S3117, S3148; text: CR S3148)
04/22/2002Considered by Senate. (consideration: CR S3009)
04/18/2002Considered by Senate. (consideration: CR S2872)
04/17/2002Considered by Senate. (consideration: CR S2763)
04/16/2002Considered by Senate. (consideration: CR S2696)
04/11/2002Considered by Senate. (consideration: CR S2508)
04/10/2002Considered by Senate. (consideration: CR S2425)
04/09/2002Considered by Senate. (consideration: CR S2389)
04/08/2002Considered by Senate. (consideration: CR S2345)
03/21/2002Amendment SA 3050 proposed by Senator Landrieu to Amendment SA 2917. (consideration: CR S2224-2225; text: CR S2224) To increase the transfer capability of electric energy transmission systems through participant-funded investment.

Cosponsors (1)

* = Original cosponsor
Cosponsor Date Cosponsored
Sen. Kyl, Jon [R-AZ]* 03/21/2002