Text: H.R.3793 — 101st Congress (1989-1990)All Information (Except Text)

There is one version of the bill.

Text available as:

Shown Here:
Introduced in House

 
 
HR 3793 IH
101st CONGRESS
1st Session
 H. R. 3793
To amend the High Plains States Groundwater Demonstration Program Act of
1983 to authorize additional appropriations, and for other purposes.
IN THE HOUSE OF REPRESENTATIVES
November 21, 1989
Mr. BEREUTER introduced the following bill; which was referred to the
Committee on Interior and Insular Affairs
A BILL
To amend the High Plains States Groundwater Demonstration Program Act of
1983 to authorize additional appropriations, and for other purposes.
  Be it enacted by the Senate and House of Representatives of the United
  States of America in Congress assembled,
SECTION 1. HIGH PLAINS STATES GROUNDWATER DEMONSTRATION PROGRAM ACT OF 1983.
  The High Plains States Groundwater Demonstration Program Act of 1983
  (43 U.S.C. 390g-1 et seq.) is amended as follows:
  (1) Section 4(c)(2) and section 5 are each amended by striking `final
  report' each place it appears and inserting `summary report'.
  (2) Section 4(c) is amended by adding at the end the following:
  `(3)(A) In addition to recommendations made under section 3, the Secretary
  shall make additional recommendations for design, construction, and operation
  of demonstration projects. Such projects are authorized to be designed,
  constructed, and operated in accordance with subsection (a).
  `(4) Each project under this section shall terminate 5 years after the
  date on which construction on that project is completed.
  `(5) At the conclusion of Phase II the Secretary shall submit a final
  report to the Congress which shall include, but not be limited to, a
  detailed evaluation of the projects under this section.'.
  (3) Section 7 is amended by striking `$20,000,000 (October 1983 price
  levels)' and inserting in lieu thereof `$45,000,000 (October 1988 price
  levels) plus or minus such amounts, if any, as may be required by reason
  of ordinary fluctuations in construction costs as indicated by engineering
  cost indexes applicable to the type of construction involved herein.'.