Summary: H.R.923 — 101st Congress (1989-1990)All Information (Except Text)

There is one summary for H.R.923. Bill summaries are authored by CRS.

Shown Here:
Introduced in House (02/07/1989)

Redesignates the Federal hydropower generating facilities located at Dam B on the Neches River at Town Bluff, Texas, as the Robert Douglas Willis Hydropower Project.