There is one summary for S.1183. Bill summaries are authored by CRS.

Shown Here:
Introduced in Senate (07/16/2001)

Requires the Federal share of all design and construction costs associated with modifying a pump station intake structure and discharge line to prevent ice from interfering with pump operation at the Fort Fairfield, Maine, flood control project to be 100 percent.