Bill summaries are authored by CRS.

Shown Here:
Passed House without amendment (03/14/2016)

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

(Sec. 1) This bill authorizes the Federal Energy Regulatory Commission (FERC) to extend by six years the time period during which Jordan Hydroelectric Limited Partnership is required to commence construction on the Flannagan Dam and Reservoir Hydroelectric Project located in Dickenson County, Virginia.

In addition, FERC is authorized to reinstate the construction license if it is expired.