There are 2 versions of this bill. View text

Click the check-box to add or remove the section, click the text link to scroll to that section.
Titles Actions Overview All Actions Cosponsors Committees Related Bills Subjects Latest Summary All Summaries

Titles (1)

Official Titles

Official Titles - Senate

Official Titles as Introduced

A bill to authorize the use of the active capacity of the Fontenelle Reservoir.


Actions Overview (2)

Date
06/08/2017Committee on Energy and Natural Resources. Reported by Senator Murkowski without amendment. With written report No. 115-96.
01/24/2017Introduced in Senate

All Actions (4)

Date
06/08/2017Placed on Senate Legislative Calendar under General Orders. Calendar No. 126.
Action By: Senate
06/08/2017Committee on Energy and Natural Resources. Reported by Senator Murkowski without amendment. With written report No. 115-96.
03/30/2017Committee on Energy and Natural Resources. Ordered to be reported without amendment favorably.
01/24/2017Read twice and referred to the Committee on Energy and Natural Resources.
Action By: Senate

Cosponsors (1)

* = Original cosponsor
CosponsorDate Cosponsored
Sen. Enzi, Michael B. [R-WY]* 01/24/2017

Committees (1)

Committees, subcommittees and links to reports associated with this bill are listed here, as well as the nature and date of committee activity and Congressional report number.

Committee / Subcommittee Date Activity Reports
Senate Energy and Natural Resources01/24/2017 Referred to
03/30/2017 Markup by
06/08/2017 Reported by S. Rept. 115-96

A related bill may be a companion measure, an identical bill, a procedurally-related measure, or one with text similarities. Bill relationships are identified by the House, the Senate, or CRS, and refer only to same-congress measures.


Subjects (5)


Latest Summary (2)

There are 2 summaries for S.199. View summaries

Shown Here:
Reported to Senate without amendment (06/08/2017)

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

(Sec. 1) This bill authorizes the Department of the Interior, in cooperation with the state of Wyoming, to amend the Definite Plan Report for the Seedskadee Project (authorized under the Colorado River Storage Project Act) to provide for the study, design, planning, and construction activities that will enable the use of all active storage capacity of Fontenelle Dam and Reservoir, including the placement of sufficient riprap on the upstream face of the dam to allow such storage capacity to be used for authorized project purposes.

Interior may enter into: (1) any contract, grant, cooperative agreement, or other agreement that is necessary to carry out this bill; and (2) contracts with Wyoming for division of any additional active capacity made available under this bill.

Interior must enter into a cooperative agreement with Wyoming for planning, design, related preconstruction activities, and construction of any modification of the Fontenelle Dam, which shall specify the responsibilities of Interior and Wyoming regarding: (1) completing the planning and final design of the modification of the dam, (2) any environmental and cultural resource compliance activities required for the modification of the dam, and (3) the construction of the modification of the dam.