There is one summary. Bill summaries are authored by CRS.

Shown Here:
Introduced in House (06/11/1975)

Authorizes the Federal Power Commission to exempt from the provisions of the Natural Gas Act for a period of up to three years the transportation of natural gas from a producer or an intrastate pipeline to an intrastate pipeline or distributor located within the same State.