                                                       Calendar No. 107

105th Congress                                                   Report
 1st Session                     SENATE                          105-44

=======================================================================


 
         ENERGY AND WATER DEVELOPMENT APPROPRIATION BILL, 1998

                                _______
                                

                 July 10, 1997.--Ordered to be printed

                                _______


   Mr. Domenici, from the Committee on Appropriations, submitted the 
                               following

                              R E P O R T

                         [To accompany S. 1004]

    The Committee on Appropriations reports the bill (S. 1004) 
making appropriations for energy and water development for the 
fiscal year ending September 30, 1998, and for other purposes, 
reports favorably thereon and recommends that the bill do pass.


Amount in new budget (obligational) authority, fiscal year 1998

Budget estimates considered by Senate................... $23,047,903,000
Amount of bill as reported to the Senate................  21,209,623,000
The bill as reported to the Senate--
    Below the budget estimate, 1998.....................   1,838,280,000
    Over enacted bill, 1997.............................     219,596,000


41-960 cc


                            C O N T E N T S

                              ----------                              

                                TITLE I

Department of Defense--Civil: Department of the Army:
    Corps of Engineers--Civil:
                                                                   Page
        General investigations...................................     9
        Construction, general....................................    28
        Flood control, Mississippi River and tributaries.........    46
        Operation and maintenance, general.......................    51
        Regulatory program.......................................    71
        Flood control and coastal emergencies....................    71
        General expenses.........................................    72

                                TITLE II

Department of the Interior:
    Central Utah project completion account......................    73
    Bureau of Reclamation: Water and related resources...........    73

                               TITLE III

Department of Energy:
    Energy Research Programs.....................................    89
        Solar and renewable energy...............................    89
        Nuclear energy programs..................................    92
        Environment, safety, and health..........................    92
        Magnetic fusion..........................................    93
        Energy support...........................................    94
    Environmental management (nondefense)........................    94
    Uranium enrichment decontamination and decommissioning fund..    95
    Nuclear waste fund...........................................    95
    Science......................................................    95
        High energy physics......................................    96
        Nuclear physics..........................................    96
        Biological and environmental research....................    96
        Basic energy sciences....................................    97
        Other energy research programs...........................    97
    Departmental administration..................................    98
        Miscellaneous revenues...................................    98
    Office of Inspector General..................................    98
    Atomic energy defense activities.............................    99
    Power marketing administrations:
        Operations and maintenance, Alaska Power Administration..   115
        Bonneville Power Administration fund.....................   116
        Operations and maintenance, Southeastern Power 
          Administration.........................................   118
        Operations and maintenance, Southwestern Power 
          Administration.........................................   118
        Construction, rehabilitation, operations and maintenance, 
          Western Area Power Administration......................   119
    Federal Energy Regulatory Commission.........................   120

                                TITLE IV

Independent Agencies:
    Appalachian Regional Commission..............................   138
    Defense Nuclear Facilities Safety Board......................   138
    Nuclear Regulatory Commission................................   138
    Office of Inspector General..................................   139
    Nuclear Waste Technical Review Board.........................   139
    Tennessee Valley Authority...................................   139

                                TITLE V

General provisions...............................................   141
Compliance with paragraph 7(c), rule XXVI, of the Standing Rules 
  of the Senate..................................................   141
Compliance with paragraph 12, rule XXVI, of the Standing Rules of 
  the Senate.....................................................   142
Budgetary impact statement.......................................   144



                                Purpose

    The purpose of this bill is to provide appropriations for 
the fiscal year 1998 beginning October 1, 1997, and ending 
September 30, 1998, for energy and water development, and for 
other related purposes. It supplies funds for water resources 
development programs and related activities of the Department 
of the Army, Civil Functions--U.S. Army Corps of Engineers' 
Civil Works Program in title I; for the Department of the 
Interior's Bureau of Reclamation in title II; for the 
Department of Energy's energy research activities (except for 
fossil fuel programs and certain conservation and regulatory 
functions), including environmental restoration and waste 
management, and atomic energy defense activities in title III; 
and for related independent agencies and commissions, including 
the Appalachian Regional Commission and Appalachian regional 
development programs, the Nuclear Regulatory Commission, and 
the Tennessee Valley Authority in title IV.

                Summary of Estimates and Recommendations

    The fiscal year 1998 budget estimates for the bill total 
$23,047,903,000 in new budget (obligational) authority. The 
recommendation of the Committee totals $21,209,623,000. This is 
$1,838,280,000 below the budget estimates and $219,596,000 over 
the enacted appropriation for the current fiscal year.

                     subcommittee budget allocation

    The Energy and Water Development Subcommittee allocation 
under section 602(b)(1) of the Budget Act totals 
$20,842,000,000 in budget authority and $20,883,000,000 in 
outlays for fiscal year 1998. The bill as recommended by the 
Committee is within the subcommittee allocation for fiscal year 
1998 in budget authority and outlays.
    The Committee allocation for nondefense discretionary 
funding for fiscal year 1998 continues the downward trend 
experience for the past several years. For fiscal year 1998, 
the allocation has been reduced about $310,000,000 below the 
President's budget request for 1998, excluding the late budget 
amendment which reduced the Corps of Engineers funding by 
$330,000,000. With the severely limited resources and the 
heightened expectation created by a new Water Resources 
Development Act and the expanded wastewater and ground water 
reuse authorization which passed late last year, the Committee 
has been faced with an overwhelming number of requests for 
funding to initiate work on new projects and studies for the 
Corps of Engineers and the Bureau of Reclamation.
    To complicate matters further, severely constrained budget 
targets within the executive branch have forced both the Corps 
and the Bureau of Reclamation to significantly lengthen project 
completion schedules envisioned last year. The effect of this 
action, while reducing the funding needs for fiscal year 1998, 
has created a situation in which sizable additional funding is 
needed on many ongoing projects to keep up with previous 
construction schedules. To cite one example, the Los Angeles 
Harbor project in California was included in the budget at 
$16,100,000, but the Corps has informed the Committee that 
$60,000,0000 is needed to continue the project at an optimum 
rate. This $44,000,000 difference is caused by the lack of 
budgetary resources for the Energy and Water Development 
Subcommittee. There are several critical lock and dam 
replacement projects on the Nation's inland waterway system 
which the Committee has not been able to recommend for 
construction because their large estimated project cost makes 
it extremely difficult to accommodate the annual funding 
requirements in future years. These are just two examples of 
many items which contribute significantly to the national 
economy, that the Committee has not been able to fully support 
in the fiscal year 1998 budget.
    The 5-year budget agreement just completed does not place a 
priority on infrastructure programs such as the water resource 
development activities of the Corps of Engineers and the Bureau 
of Reclamation. Yet, the subcommittee continues to receive 
increasing numbers of requests from Members to fund new 
projects and programs, or to increase the funding allocation on 
projects included in the budget. If the trend of lower 
allocations for the Energy and Water Subcommittee continues, 
the Committee will be required to further reduce the 
recommendation for individual projects, despite the interest of 
Members.

                 Government Performance and Results Act

    In accordance with the Government Performance and Results 
Act, the Department of Energy and the Nuclear Regulatory 
Commission submitted draft strategic plans to the Committee on 
June 16 and July 1 respectively.
    The Committee recommends that the Department consider using 
the 1996 performance agreement between President Clinton and 
Secretary O'Leary as the basis for future versions of its 
strategic plan. Unlike the draft plan, the performance 
agreement enunciates goals and quantifies criteria for 
evaluating the Department's performance. It is a document that, 
if incorporated into policy, planning, and budgeting decisions, 
can contribute to the Department's management as envisioned by 
sponsors of the Government Performance and Results Act, and can 
assist the Congress in evaluating the Department's performance.
    The Committee recommends that the Department establish a 
secretarial officers concurrence process for the strategic plan 
and, as was done with the performance plan, circulate copies of 
the concurrence sheet with future drafts of the strategic plan.
    The Committee commends the Commission for its efforts 
regarding a draft strategic plan. The Commission assembled a 
senior group of staffers from numerous program offices to 
contribute to the plan, and the broad perspective is evident. 
Discussions between Committee and Commission staff identified 
some shortcomings in the plan; some of the strategies are 
unnecessarily vague, and more qualitative measurements of 
success need to be included. The Committee recommends the 
Federal Energy Regulatory Commission's budget request to the 
Commission. Many aspects of the FERC's regulatory 
responsibilities are comparable to those of the Commission and 
the FERC deserves credit for quantifying its workload.

                            Bill Highlights

                    atomic energy defense activities

    The amount recommended in the bill includes $11,749,405,000 
for atomic energy defense activities. Major programs and 
activities include:

Stockpile stewardship...................................  $1,925,900,000
Stockpile management....................................   2,108,050,000
Nonproliferation and national security..................     662,000,000
Other defense programs..................................     975,981,000
Defense waste management and environmental restoration..   5,311,974,000
Defense environmental privatization.....................     343,000,000

                            energy research

    The bill recommended by the Committee provides a total of 
$966,940,000 for energy research programs including:

Solar and renewable energy..............................    $301,422,000
Nuclear fission R&D.....................................;     244,281,000
Magnetic fusion.........................................     240,000,000

                  nondefense environmental management

    An appropriation of $664,684,000 is recommended for 
nondefense environmental management activities of the 
Department of Energy.

                                science

    The Committee recommendation also provides a net 
appropriation of $2,223,077,000 for general science and 
research activities in life sciences, high energy physics, and 
nuclear physics. Major programs are:

High energy physics research............................    $675,035,000
Nuclear physics.........................................     315,925,000
Basic energy sciences and other research................     668,240,000
Biological and environmental R&D........................;     376,710,000

               regulatory and other independent agencies

    Also recommended in the bill is $887,840,000 for various 
regulatory and independent agencies of the Federal Government. 
Major programs include:

Appalachian Regional Commission.........................    $160,000,000
Federal Energy Regulatory Commission....................     162,141,000
Nuclear Regulatory Commission...........................     476,500,000
Tennessee Valley Authority..............................      86,000,000

                      water resources development

Corps of Engineers:
    General investigations..............................    $164,065,000
    Construction........................................   1,284,266,000
    Flood control Mississippi River and tributaries.....     289,000,000
    Operations and maintenance..........................   1,661,205,000

    Corps of Engineers, regulatory activities

                                                             106,000,000
Bureau of Reclamation:
    Water resource management and development...........     452,211,000

    Facility operation, maintenance and rehabilitation

                                                             236,168,000

    The Committee has also recommended appropriations totaling 
approximately $4,611,279,000 for Federal water resource 
development programs. This includes projects and related 
activities of the U.S. Army Corps of Engineers--Civil and the 
Bureau of Reclamation of the Department of the Interior. The 
Federal water resource development program provides lasting 
benefits to the Nation in the area of flood control, municipal 
and industrial water supply, irrigation of agricultural lands, 
water conservation, commercial navigation, hydroelectric power, 
recreation, and fish and wildlife enhancement.
    Water is our Nation's most precious and valuable resource. 
It is evident that water supply in the near future will be as 
important, if not more so, than energy. There is only so much 
water available. Water cannot be manufactured. Our Nation 
cannot survive without water, and economic prosperity cannot 
occur without a plentiful supply.
    While many areas of the country suffer from severe 
shortages of water, others suffer from the other extreme--an 
excess of water which threatens both rural and urban areas with 
floods. Because water is a national asset, and because the 
availability and control of water affect and benefit all States 
and jurisdictions, the Federal Government has historically 
assumed much of the responsibility for financing of water 
resource development.
    The existing national water resource infrastructure in 
America is an impressive system of dams, locks, harbors, 
canals, irrigation systems, reservoirs, and recreation sites 
with a central purpose--to serve the public's needs.
    Our waterways and harbors are an essential part of our 
national transportation system--providing clean, efficient, and 
economical transportation of fuels for energy generation and 
agricultural production, and making possible residential and 
industrial development to provide homes and jobs for the 
American people.
    Reservoir projects provide hydroelectric power production 
and downstream flood protection, make available recreational 
opportunities for thousands of urban residents, enhance fish 
and wildlife habitat, and provide our communities and 
industries with abundant and clean water supplies which are 
essential not only to life itself, but also to help maintain a 
high standard of living for the American people.
    When projects are completed, they make enormous 
contributions to America. The benefits derived from completed 
projects, in many instances, vastly exceed those contemplated 
during project development.

                         subcommittee hearings

    The Subcommittee on Energy and Water Development of the 
Committee on Appropriations held four sessions in connection 
with the fiscal year 1998 appropriation bill. Witnesses 
included officials and representatives of the Federal agencies 
under the subcommittee's jurisdiction.
    In addition, the subcommittee received numerous statements 
and letters from Members of the U.S. Senate and House of 
Representatives, Governors, State and local officials and 
representatives, and hundreds of private citizens of all walks 
of life throughout the United States. Testimony, both for and 
against many items, was presented to the subcommittee. The 
recommendations for fiscal year 1998, therefore, have been 
developed after careful consideration of available data.

                         votes in the committee

    The subcommittee, by unanimous vote on July 10, 1997, 
recommended that the bill, as amended, be reported to the full 
Committee on Appropriations.
    By unanimous vote of 28 to 0 the Committee on July 10, 
1997, recommended that the bill, as amended, be reported to the 
Senate.
                 TITLE I--DEPARTMENT OF DEFENSE--CIVIL

                         DEPARTMENT OF THE ARMY

                       Corps of Engineers--Civil

                         general investigations

Appropriations, 1997....................................    $153,872,000
Budget estimate, 1998...................................     150,000,000
Committee recommendation................................     164,065,000

    The budget request and the approved Committee allowance are 
shown on the following table:

                                                       CORPS OF ENGINEERS--GENERAL INVESTIGATIONS                                                       
                                                                  [Amounts in dollars]                                                                  
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                  Budget estimate            Committee recommendation   
Type of                   Project title                    Total Federal   Allocated to  ---------------------------------------------------------------
project                                                        cost            date       Investigations     Planning     Investigations     Planning   
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                        
                           ALABAMA                                                                                                                      
                                                                                                                                                        
  (SPE)CAHABA RIVER WATERSHED, AL                            1,100,000         100,000         400,000  ..............         400,000  ..............  
    (N)DOG RIVER, AL                                           700,000         200,000         200,000  ..............         200,000  ..............  
  (SPE)VILLAGE CREEK, JEFFERSON COUNTY (BIRMINGHAM           1,100,000         100,000         400,000  ..............         400,000  ..............  
        WATERSHED)                                                                                                                                      
                                                                                                                                                        
                            ALASKA                                                                                                                      
                                                                                                                                                        
    (N)ANCHOR POINT HARBOR, AK                                 587,000         233,000          54,000  ..............          54,000  ..............  
  (FDP)ANIAK, AK                                               550,000         133,000         125,000  ..............         125,000  ..............  
    (E)CHENA RIVER WATERSHED, AK                               680,000         262,000         168,000  ..............         168,000  ..............  
    (N)COASTAL STUDIES NAVIGATION IMPROVEMENT, AK            1,800,000         446,000         450,000  ..............         600,000  ..............  
   (FC)COOK INLET, AK                                        3,755,000         205,000  ..............         125,000  ..............         125,000  
    (N)DOUGLAS HARBOR, AK                                      100,000  ..............  ..............  ..............         100,000  ..............  
    (N)DUTCH HARBOR, AK                                        920,000         653,000          50,000  ..............          50,000  ..............  
  (FDP)KENAI RIVER, AK                                         100,000  ..............  ..............  ..............         100,000  ..............  
    (N)KENAI RIVER NAVIGATION, AK                              600,000          89,000         150,000  ..............         150,000  ..............  
    (N)KUSKOKWIM RIVER, AK                                     737,000         362,000         100,000  ..............         100,000  ..............  
  (FDP)MATANUSKA RIVER. AK                                     100,000  ..............  ..............  ..............         100,000  ..............  
    (N)NOME HARBOR IMPROVEMENTS, AK                            777,000         287,000         450,000  ..............         490,000  ..............  
    (N)PORT LIONS HARBOR, AK                                   100,000  ..............  ..............  ..............         100,000  ..............  
    (N)SAND POINT HARBOR, AK                                13,500,000  ..............  ..............          37,000  ..............          37,000  
    (N)SAND POINT HARBOR, AK                                   580,000         462,000         118,000  ..............         118,000  ..............  
    (N)SEWARD HARBOR, AK                                       485,000         261,000         150,000  ..............         225,000  ..............  
  (FDP)SHIP CREEK, AK                                          100,000  ..............  ..............  ..............         100,000  ..............  
    (N)SITKA LIGHTERING FACILITY, AK                           340,000          80,000         120,000  ..............         120,000  ..............  
    (N)ST PAUL HARBOR, AK                                   14,851,000         759,000  ..............         138,000  ..............  ..............  
    (N)WRANGELL HARBOR, AK                                     653,000         261,000         200,000  ..............         330,000  ..............  
       VALDEZ HARBOR, AK                                       100,000  ..............  ..............  ..............         100,000  ..............  
                                                                                                                                                        
                           ARIZONA                                                                                                                      
                                                                                                                                                        
  (SPE)COLONIAS ALONG U.S.--MEXICO BORDER, AZ AND TX           300,000         200,000         100,000  ..............         100,000  ..............  
  (FDP)GILA RIVER, NORTH SCOTTSDALE, AZ                      1,775,000       1,003,000         400,000  ..............         400,000  ..............  
  (FDP)GILA RIVER, SANTA CRUZ RIVER BASIN, AZ                1,475,000         742,000         400,000  ..............         400,000  ..............  
  (FDP)RIO DE FLAG, FLAGSTAFF, AZ                            1,850,000         750,000         325,000  ..............         325,000  ..............  
    (E)RIO SALADO WATERSHED ECOSYSTEM, AZ                    2,045,000       1,505,000         540,000  ..............         540,000  ..............  
    (E)TRES RIOS, AZ                                         1,600,000         130,000         400,000  ..............         400,000  ..............  
   (FC)TUCSON DRAINAGE AREA, AZ                             18,000,000         100,000  ..............         825,000  ..............         825,000  
                                                                                                                                                        
                           ARKANSAS                                                                                                                     
                                                                                                                                                        
  (FDP)MAY BRANCH, FORT SMITH, AR                              740,000         136,000         240,000  ..............         240,000  ..............  
   (FC)MCKINNEY BAYOU, AR AND TX                        ..............          57,000  ..............         200,000  ..............         200,000  
    (N)WHITE RIVER TO NEWPORT, AR                            2,400,000  ..............  ..............  ..............  ..............         500,000  
                                                                                                                                                        
                          CALIFORNIA                                                                                                                    
                                                                                                                                                        
   (FC)AMERICAN RIVER WATERSHED, CA                         29,160,000      15,109,000  ..............         401,000  ..............         401,000  
  (FDP)ARROYO PASAJERO, CA                                   3,665,000       3,519,000         146,000  ..............         146,000  ..............  
   (FC)ARROYO PASAJERO, CA                                  50,500,000  ..............  ..............       1,000,000  ..............       1,000,000  
    (E)BOLINAS LAGOON ECOSYSTEM RESTORATION, CA              1,100,000         100,000         240,000  ..............         750,000  ..............  
       HAMILTON AIRFIELD WETLAND RESTORATION, CA               100,000  ..............  ..............  ..............         100,000  ..............  
    (E)IMPERIAL COUNTY WATERSHED STUDY, CA                   1,250,000         622,000         200,000  ..............         200,000  ..............  
   (FC)KAWEAH RIVER, CA                                     18,400,000         900,000  ..............       1,100,000  ..............       1,100,000  
  (SPE)LACDA WATER CONS AND SUP(HANSEN AND LOPEZ             1,270,000       1,066,000         204,000  ..............         204,000  ..............  
        DAMS), CA                                                                                                                                       
  (SPE)LACDA WATER CONS AND SUP(WHITTIER NARROWS AND         1,360,000       1,171,000         189,000  ..............         189,000  ..............  
        SANTA FE  DAM                                                                                                                                   
  (FDP)MARIN COUNTY SHORELINE, SAN CLEMENTE CREEK, CA        1,447,000       1,297,000         150,000  ..............         150,000  ..............  
    (N)MARINA DEL REY AND BALLONA CREEK, CA                  1,825,000         712,000         530,000  ..............         530,000  ..............  
  (SPE)MOJAVE RIVER DAM, CA                                  1,300,000         100,000         200,000  ..............         200,000  ..............  
    (E)N CA STREAMS, CACHE CREEK ENVIRONMENTAL               1,090,000         680,000         250,000  ..............         250,000  ..............  
        RESTORATION, C                                                                                                                                  
    (E)N CA STREAMS, COLUSA BASIN, CA                        1,100,000         100,000         100,000  ..............         100,000  ..............  
  (FDP)N CA STREAMS, DRY CREEK, MIDDLETOWN, CA               1,100,000          89,000         200,000  ..............         200,000  ..............  
    (E)N CA STREAMS, FAIRFIELD STREAMS AND CORDELIA          1,600,000          89,000         250,000  ..............         250,000  ..............  
        MARSH, CA                                                                                                                                       
    (E)N CA STREAMS, LOWER SACRAMENTO RVR RIPARIAN           1,520,000         720,000         300,000  ..............         300,000  ..............  
        REVEGETATI                                                                                                                                      
    (E)N CA STREAMS, MIDDLE CREEK, CA                        1,500,000         609,000         350,000  ..............         350,000  ..............  
    (E)N CA STREAMS, SACRAMENTO RIVER WATERSHED              1,600,000          89,000         400,000  ..............         400,000  ..............  
        MANAGEMENT PL                                                                                                                                   
  (FDP)N CA STREAMS, VACAVILLE, DIXON AND VICINITY, CA       1,100,000          89,000         200,000  ..............         200,000  ..............  
   (FC)N CA STREAMS, YUBA RIVER BASIN, CA                   20,605,000  ..............  ..............          50,000  ..............          50,000  
  (FDP)N CA STREAMS, YUBA RIVER BASIN, CA                    2,070,000       1,745,000         325,000  ..............         325,000  ..............  
   (FC)NAPA RIVER, CA                                       70,800,000      12,980,000  ..............       1,600,000  ..............       1,600,000  
    (E)NAPA RIVER, SALT MARSH RESTORATION, CA                1,125,000         450,000         500,000  ..............         500,000  ..............  
    (E)NEWPORT BAY HARBOR, CA                                1,155,000         775,000         270,000  ..............         270,000  ..............  
    (E)NORCO BLUFFS, CA                                        380,000         180,000  ..............  ..............  ..............         200,000  
   (FC)PAJARO RIVER AT WATSONVILLE, CA                       6,800,000       1,770,000  ..............         500,000  ..............         500,000  
    (N)PILLAR POINT HARBOR, CA                                 925,000         700,000         225,000  ..............         225,000  ..............  
    (N)PORT HUENEME, CA                                      6,500,000  ..............  ..............         250,000  ..............         250,000  
    (N)PORT HUENEME, CA                                        990,000         950,000          40,000  ..............          40,000  ..............  
    (N)PORT OF LONG BEACH (DEEPENING), CA                   16,420,000         750,000  ..............         160,000  ..............         160,000  
    (E)PRADO BASIN WATER SUPPLY, CA                            790,000         412,000         378,000  ..............         378,000  ..............  
  (FDP)RANCHO PALOS VERDES, CA                               1,230,000       1,151,000          79,000  ..............          79,000  ..............  
    (E)RUSSIAN RIVER, ECOSYSTEM RESTORATION, CA              1,125,000         450,000         240,000  ..............         240,000  ..............  
  (SPC)SACRAMENTO AND SAN JOAQUIN RIVERS COMPREHENSIVE  ..............  ..............  ..............  ..............         500,000  ..............  
        BASIN STUDY, CA                                                                                                                                 
  (SPE)SACRAMENTO--SAN JOAQUIN DELTA, CA                     5,940,000       4,337,000         750,000  ..............         750,000  ..............  
    (E)SACRAMENTO--SAN JOAQUIN DELTA, WESTERN DELTA          1,898,000         718,000         300,000  ..............         300,000  ..............  
        ISLANDS,                                                                                                                                        
  (FDP)SAN ANTONIO CREEK, CA                                   865,000         687,000         178,000  ..............         178,000  ..............  
    (N)SAN DIEGO HARBOR (DEEPENING), CA                      1,100,000         100,000         300,000  ..............         400,000  ..............  
    (N)SAN FRANCISCO BAY BAR CHANNEL, CA                     1,100,000         100,000         600,000  ..............         600,000  ..............  
  (FDP)SAN JOAQUIN RIVER BASIN, FARMINGTON DAM, CA           1,000,000  ..............  ..............  ..............         225,000  ..............  
    (E)SAN JOAQUIN R BASIN, PINE FLAT DAM, F&WL;              1,915,000       1,201,000         400,000  ..............         400,000  ..............  
        HABITAT RESTO                                                                                                                                   
   (FC)SAN JOAQUIN RIVER BASIN, SOUTH SACRAMENTO            26,000,000  ..............  ..............         500,000  ..............         500,000  
        COUNTY STREA                                                                                                                                    
  (FDP)SAN JOAQUIN RIVER BASIN, SOUTH SACRAMENTO             2,070,000       1,890,000         180,000  ..............         180,000  ..............  
        COUNTY STREA                                                                                                                                    
  (FDP)SAN JOAQUIN RIVER BASIN, STOCKTON METROPOLITAN        2,000,000         816,000         450,000  ..............         225,000  ..............  
        AREA, C                                                                                                                                         
  (FDP)SAN JOAQUIN RIVER BASIN, TULE RIVER, CA               1,378,000         893,000         250,000  ..............         250,000  ..............  
  (FDP)SAN JOAQUIN RIVER BASIN, WEST STANISLAUS              1,100,000          89,000         150,000  ..............         150,000  ..............  
        COUNTY, CA                                                                                                                                      
    (E)SAN JUAN AND ALISO CREEKS WATERSHED MANAGEMENT,       1,250,000         596,000         315,000  ..............         315,000  ..............  
        CA                                                                                                                                              
  (FDP)SANTA BARBARA COUNTY STREAMS, LOWER MISSION           2,849,000       2,349,000         380,000  ..............         380,000  ..............  
        CREEK, CA                                                                                                                                       
  (FDP)SANTA MARGARITA RIVER AND TRIBUTARIES, CA             1,600,000         100,000         300,000  ..............         300,000  ..............  
    (E)TAHOE BASIN, CA AND NV                                1,600,000         100,000         320,000  ..............         320,000  ..............  
   (FC)UPPER GUADALUPE RIVER, CA                            42,500,000  ..............  ..............         750,000  ..............         750,000  
  (FDP)UPPER PENITENCIA CREEK, CA                            1,815,000         556,000         475,000  ..............         475,000  ..............  
    (N)VENTURA HARBOR SAND BYPASS, CA                          850,000         100,000         150,000  ..............         150,000  ..............  
  (FDP)WHITEWATER RIVER BASIN, CA                            2,080,000       1,468,000         370,000  ..............         370,000  ..............  
                                                                                                                                                        
                         CONNECTICUT                                                                                                                    
                                                                                                                                                        
    (E)COASTAL CONNECTICUT ECOSYSTEM RESTORATION, CT           700,000  ..............         100,000  ..............         100,000  ..............  
                                                                                                                                                        
                           DELAWARE                                                                                                                     
                                                                                                                                                        
    (N)C&D; CANAL--BALTIMORE HBR CONN CHANNELS, DE AND       69,800,000       1,225,000  ..............       1,625,000  ..............       1,625,000  
        MD (DEEP                                                                                                                                        
   (SP)DELAWARE BAY COASTLINE, DE AND NJ                     3,406,000       3,205,000         150,000  ..............         150,000  ..............  
   (SP)DELAWARE COAST FROM CAPE HENLOPEN TO FENWICK          2,845,000       2,377,000         293,000  ..............         293,000  ..............  
        ISLAND, D                                                                                                                                       
                                                                                                                                                        
                           FLORIDA                                                                                                                      
                                                                                                                                                        
    (N)BIG BEND CHANNEL                                      4,900,000         223,000  ..............          80,000  ..............          80,000  
  (FDP)BISCAYNE BAY, FL                                      3,270,000         955,000         250,000  ..............         250,000  ..............  
   (FC)CEDAR HAMMOCK (WARES CREEK), FL                       8,900,000         100,000  ..............         300,000  ..............         300,000  
    (N)CHICOPIT BAY, FL                                        350,000         100,000         100,000  ..............         100,000  ..............  
    (N)FORT PIERCE HARBOR, FL                                  850,000         100,000         250,000  ..............         250,000  ..............  
    (N)HILLSBORO INLET, FL                                   1,577,000         245,000  ..............         230,000  ..............         230,000  
    (N)INTRACOASTAL WATERWAY, PALM BEACH COUNTY, FL          4,027,000         126,000  ..............          90,000  ..............          90,000  
    (N)JACKSONVILLE HARBOR, FL                          ..............  ..............  ..............         100,000  ..............         100,000  
    (N)JACKSONVILLE HARBOR, FL                               1,308,000       1,007,000         301,000  ..............         301,000  ..............  
   (BE)LIDO KEY BEACH, FL                                      100,000  ..............  ..............  ..............         100,000  ..............  
   (BE)NASSAU COUNTY, FL                                    13,000,000       1,434,000  ..............         140,000  ..............         290,000  
    (N)PONCE DE LEON INLET, FL                               6,250,000  ..............  ..............         175,000  ..............         175,000  
    (N)PORT EVERGLADES HARBOR, FL                              425,000         100,000         325,000  ..............         325,000  ..............  
    (N)ST LUCIE INLET, FL                                    1,100,000         598,000  ..............         280,000  ..............         280,000  
                                                                                                                                                        
                           GEORGIA                                                                                                                      
                                                                                                                                                        
    (N)BRUNSWICK HARBOR, GA                                  2,527,000       2,434,000          93,000  ..............          93,000  ..............  
    (N)BRUNSWICK HARBOR, GA                                 26,650,000  ..............  ..............       1,100,000  ..............       1,100,000  
  (FDP)FLINT RIVER BASIN STUDY, GA                           1,000,000         100,000         300,000  ..............         300,000  ..............  
    (N)LOWER SAVANNAH RIVER, GA AND SC                       2,580,000         506,000  ..............          94,000  ..............          94,000  
    (E)METRO ATLANTA WATERSHED, GA                           1,600,000         600,000         400,000  ..............         400,000  ..............  
    (N)SAVANNAH HARBOR EXPANSION, GA                         2,470,000         739,000         800,000  ..............         800,000  ..............  
  (FDP)SAVANNAH/CHATHAM COUNTY REGIONAL FLOOD CONTROL,         800,000         100,000         250,000  ..............         250,000  ..............  
        GA                                                                                                                                              
 (SPEC)SAVANNAH RIVER BASIN COMPREHENSIVE, GA AND SC           600,000  ..............  ..............  ..............         300,000  ..............  
                                                                                                                                                        
                            HAWAII                                                                                                                      
                                                                                                                                                        
    (N)BARBERS POINT HARBOR MODIFICATION, OAHU, HI           1,243,000         835,000         333,000  ..............         333,000  ..............  
    (N)HONOLULU HARBOR MODIFICATIONS, OAHU, HI               1,250,000  ..............         100,000  ..............         100,000  ..............  
    (N)KIKIAOLA SMALL BOAT HARBOR, KAUAI, HI                 6,471,000         902,000  ..............         267,000  ..............         267,000  
  (FDP)LAULAULEI, HI                                           200,000  ..............  ..............  ..............         200,000  ..............  
  (FDP)WAILUPE STREAM FLOOD CONTROL STUDY, OAHU, HI          1,016,000         789,000         227,000  ..............         227,000  ..............  
                                                                                                                                                        
                           ILLINOIS                                                                                                                     
                                                                                                                                                        
  (FDP)ALEXANDER AND PULASKI COUNTIES, IL                    1,352,000       1,011,000         200,000  ..............         200,000  ..............  
   (FC)DES PLAINES RIVER, IL                               100,000,000  ..............  ..............         400,000  ..............         400,000  
  (FDP)KANKAKEE RIVER BASIN, IL AND IN                         765,000         100,000         250,000  ..............         250,000  ..............  
  (FDP)MISSISSIPPI RIVER AT QUINCY, IL                         850,000          89,000         250,000  ..............         250,000  ..............  
   (FC)NUTWOOD DRAINAGE AND LEVEE DISTRICT, IL               7,662,000         175,000  ..............         395,000  ..............         395,000  
  (SPE)UPPER MISS RVR SYSTEM FLD PROFILE STUDY, IL,         10,000,000         350,000       1,957,000  ..............       1,957,000  ..............  
        IA, MN, M                                                                                                                                       
  (RCP)UPPER MISSISSIPPI AND ILLINOIS NAV STUDY, IL,        51,690,000      39,329,000       7,700,000  ..............       7,700,000  ..............  
        IA, MN, MO                                                                                                                                      
   (FC)WOOD RIVER D&LD;, MADISON COUNTY, IL                   2,069,000  ..............  ..............         112,000  ..............         112,000  
                                                                                                                                                        
                           INDIANA                                                                                                                      
                                                                                                                                                        
   (FC)INDIANAPOLIS, WHITE RIVER (NORTH), IN                 7,500,000         492,000  ..............         458,000  ..............         458,000  
  (FDP)WABASH RIVER BASIN (MIDDLE REACHES), IN AND IL        1,142,000       1,086,000          56,000  ..............          56,000  ..............  
                                                                                                                                                        
                             IOWA                                                                                                                       
                                                                                                                                                        
  (RCP)CORALVILLE LAKE, IA                                   1,150,000         300,000         339,000  ..............         339,000  ..............  
  (FDP)DES MOINES AND RACCOON RIVERS, IA                       100,000  ..............  ..............  ..............         100,000  ..............  
                                                                                                                                                        
                            KANSAS                                                                                                                      
                                                                                                                                                        
  (RCP)SALINA, KS                                              850,000         325,000         135,000  ..............         135,000  ..............  
  (RCP)TOPEKA, KS                                              968,000         372,000         155,000  ..............         155,000  ..............  
   (FC)TURKEY CREEK BASIN, KS AND MO                        28,600,000  ..............  ..............         261,000  ..............         261,000  
  (FDP)TURKEY CREEK BASIN, KS AND MO                         1,967,000       1,937,000          30,000  ..............          30,000  ..............  
  (RCP)WILSON LAKE, KS                                         400,000         160,000          38,000  ..............          38,000  ..............  
                                                                                                                                                        
                           KENTUCKY                                                                                                                     
                                                                                                                                                        
    (N)GREEN AND BARREN RIVERS NAVIGATION DISPOSITION          830,000         230,000         300,000  ..............         300,000  ..............  
        STUDY,                                                                                                                                          
    (N)KENTUCKY LOCK, KY                                   197,500,000       9,131,000  ..............       1,750,000  ..............       1,750,000  
  (FDP)LEXINGTON, FAYETTE COUNTY, KY                         1,109,000         359,000         375,000  ..............         375,000  ..............  
   (FC)LICKING RIVER WATERSHEAD, KY                            500,000  ..............  ..............  ..............         500,000  ..............  
   (FC)METROPOLITAN LOUISVILLE, BEARGRASS CREEK, KY          5,925,000          83,000  ..............         525,000  ..............         525,000  
  (FDP)METROPOLITAN LOUISVILLE, MILL CREEK BASIN, KY           850,000         100,000         300,000  ..............         300,000  ..............  
  (FDP)METROPOLITAN LOUISVILLE, SOUTHWEST, KY                1,502,000         600,000         470,000  ..............         470,000  ..............  
    (N)OHIO RIVER MAIN STEM SYSTEMS STUDY, KY, IL, IN,      38,400,000      14,925,000       8,800,000  ..............       8,800,000  ..............  
        PA, WV                                                                                                                                          
                                                                                                                                                        
                          LOUISIANA                                                                                                                     
                                                                                                                                                        
    (E)GRAND ISLE AND VICINITY, LA                             800,000  ..............  ..............  ..............  ..............         800,000  
  (FDP)AMITE RIVER--DARLINGTON RESERVOIR, LA                   880,000         380,000         300,000  ..............         300,000  ..............  
  (FDP)BAYOU TIGRE, ERATH, LA                                1,340,000         185,000         350,000  ..............         350,000  ..............  
  (FDP)BLACK BAYOU DIVERSION, LA                             1,500,000         522,000         350,000  ..............         350,000  ..............  
   (FC)COMITE RIVER, LA                                     70,577,000       6,135,000  ..............         265,000  ..............         265,000  
   (FC)EAST BATON ROUGE PARISH, LA                          69,400,000       1,165,000  ..............         620,000  ..............         620,000  
    (N)INTRACOASTAL WATERWAY LOCKS, LA                       4,880,000       2,976,000         850,000  ..............         850,000  ..............  
  (FDP)JEFFERSON PARISH, LA                                  3,044,000       2,378,000         138,000  ..............         138,000  ..............  
  (FDP)LAFAYETTE PARISH, LA                                  2,660,000       1,222,000         600,000  ..............         600,000  ..............  
    (N)MISSISSIPPI RIVER SHIP CHANNEL IMPROVEMENTS, LA       4,000,000         600,000         400,000  ..............         400,000  ..............  
  (FDP)ORLEANS PARISH, LA                                    2,700,000       2,031,000         350,000  ..............         350,000  ..............  
    (N)PORT FOURCHON, LA                                     2,500,000         244,000  ..............         129,000  ..............         129,000  
  (FDP)WEST SHORE--LAKE PONTCHARTRAIN, LA                    1,875,000         500,000         250,000  ..............         250,000  ..............  
                                                                                                                                                        
                           MARYLAND                                                                                                                     
                                                                                                                                                        
  (FDP)ANACOSTIA RIVER AND TRIBUTARIES, MD AND DC            3,195,000       2,097,000         600,000  ..............         600,000  ..............  
    (E)ANACOSTIA RIVER FEDERAL WATERSHED IMPACT              3,000,000         590,000         690,000  ..............         690,000  ..............  
        ASSESSMENT, M                                                                                                                                   
    (N)BALTIMORE HARBOR ANCHORAGES AND CHANNELS, MD         24,000,000         150,000  ..............         338,000  ..............         338,000  
        AND VA                                                                                                                                          
  (FDP)BALTIMORE METROPOLITAN WATER RESOURCES STUDY,         1,791,000       1,326,000         415,000  ..............         415,000  ..............  
        MD                                                                                                                                              
    (N)OCEAN CITY, MD AND VICINITY                           2,689,000       2,581,000         108,000  ..............         108,000  ..............  
  (FDP)PATUXENT RIVER WATER RESOURCES, MD                    2,400,000         760,000         600,000  ..............         600,000  ..............  
    (E)SMITH ISLAND ENVIRONMENTAL RESTORATION, MD            1,100,000         450,000         200,000  ..............         200,000  ..............  
                                                                                                                                                        
                        MASSACHUSETTS                                                                                                                   
                                                                                                                                                        
    (E)BLACKSTONE RIVER WATERSHED RESTORATION, MA AND        1,600,000         400,000         350,000  ..............         350,000  ..............  
        RI                                                                                                                                              
                                                                                                                                                        
                          MINNESOTA                                                                                                                     
                                                                                                                                                        
   (FC)CROOKSTON, MN                                         6,190,000         169,000  ..............         400,000  ..............         400,000  
                                                                                                                                                        
                         MISSISSIPPI                                                                                                                    
                                                                                                                                                        
   (FC)PEARL RIVER WATERSHED, MS                            85,056,000         355,000  ..............       2,640,000  ..............       2,640,000  
                                                                                                                                                        
                           MISSOURI                                                                                                                     
                                                                                                                                                        
   (FC)BLUE RIVER BASIN, KANSAS CITY, MO                    12,000,000         392,000  ..............         656,000  ..............         656,000  
  (FDP)CHESTERFIELD, MO                                      1,079,000         548,000         365,000  ..............         365,000  ..............  
  (FDP)FESTUS AND CRYSTAL CITY, MO                             563,000         390,000         173,000  ..............         173,000  ..............  
  (RCP)KANSAS CITY, MO AND KS                                1,710,000  ..............         100,000  ..............         400,000  ..............  
  (FDP)KIMMSWICK, MO                                           223,000         172,000          51,000  ..............          51,000  ..............  
  (FDP)LOWER RIVER DES PERES, MO                               398,000         341,000          57,000  ..............          57,000  ..............  
  (RCP)MISSOURI RIVER LEVEE SYSTEM, UNITS L455 AND           1,875,000         755,000         300,000  ..............         300,000  ..............  
        R460-471, MO                                                                                                                                    
  (RCP)ST LOUIS FLOOD PROTECTION, MO                         1,500,000  ..............         100,000  ..............         100,000  ..............  
    (N)ST LOUIS HARBOR, MO AND IL                           13,986,000       2,041,000  ..............         500,000  ..............         500,000  
  (FDP)SWOPE PARK INDUSTRIAL AREA, KANSAS CITY, MO             585,000         283,000         120,000  ..............         120,000  ..............  
                                                                                                                                                        
                           NEBRASKA                                                                                                                     
                                                                                                                                                        
  (FDP)ANTELOPE CREEK, LINCOLN, NE                             838,000         692,000          90,000  ..............          90,000  ..............  
  (FDP)LOWER PLATTE RIVER AND TRIBUTARIES, NE                1,526,000         776,000         300,000  ..............         300,000  ..............  
                                                                                                                                                        
                            NEVADA                                                                                                                      
                                                                                                                                                        
    (E)LOWER LAS VEGAS WASH WETLANDS, NV                     1,300,000         600,000         200,000  ..............         200,000  ..............  
    (E)LOWER TRUCKEE RIVER, PYRAMID LAKE PAIUTE             13,000,000  ..............  ..............         300,000  ..............         300,000  
        RESERVATION,                                                                                                                                    
    (E)LOWER TRUCKEE RIVER, PYRAMID LAKE PAIUTE              1,228,000         874,000         354,000  ..............         354,000  ..............  
        RESERVATION,                                                                                                                                    
    (E)LOWER TRUCKEE RIVER, WASHOE COUNTY, NV                  505,000         328,000         177,000  ..............         177,000  ..............  
    (E)LOWER TRUCKEE RIVER, WASHOE COUNTY, NV               13,000,000  ..............  ..............         150,000  ..............         150,000  
  (FDP)NORTH LAS VEGAS, CHANNEL "A", NV                      1,100,000         100,000         100,000  ..............         100,000  ..............  
  (FDP)TRUCKEE MEADOWS, RENO, NV                             1,700,000         630,000         300,000  ..............         300,000  ..............  
    (E)WALKER RIVER BASIN, NV                                1,800,000         175,000         300,000  ..............         300,000  ..............  
                                                                                                                                                        
                          NEW JERSEY                                                                                                                    
                                                                                                                                                        
    (E)BARNEGAT INLET TO LITTLE EGG INLET, NJ           ..............  ..............  ..............  ..............         400,000  ..............  
    (E)BARNEGAT BAY, NJ                                      1,000,000         100,000         450,000  ..............         450,000  ..............  
   (SP)BRIGANTINE INLET TO GREAT EGG HARBOR INLET, NJ        1,717,000       1,645,000          72,000  ..............          72,000  ..............  
   (SP)LOWER CAPE MAY MEADOWS--CAPE MAY POINT, NJ            1,300,000       1,246,000          54,000  ..............          54,000  ..............  
    (E)NEW JERSEY INTRACOASTAL WATERWAY, ENV                 1,050,000         100,000         450,000  ..............         450,000  ..............  
        RESTORATION, NJ                                                                                                                                 
   (SP)RARITAN BAY AND SANDY HOOK BAY, NJ                    5,247,000       2,399,000       1,200,000  ..............       1,200,000  ..............  
  (FDP)SOUTH RIVER, RARITAN RIVER BASIN, NJ                  2,800,000       1,054,000         510,000  ..............         510,000  ..............  
    (E)TOWNSEND INLET TO CAPE MAY INLET                 ..............  ..............  ..............  ..............  ..............         200,000  
                                                                                                                                                        
                          NEW MEXICO                                                                                                                    
                                                                                                                                                        
    (E)RIO GRANDE ECOSYSTEM RESTORATION, NM AND CO           2,270,000  ..............         100,000  ..............         100,000  ..............  
                                                                                                                                                        
                           NEW YORK                                                                                                                     
                                                                                                                                                        
  (RCP)ADDISON, NY                                           1,380,000         305,000         350,000  ..............         350,000  ..............  
    (N)ARTHUR KILL CHANNEL--HOWLAND HOOK MARINE             45,400,000       3,222,000  ..............         378,000  ..............         878,000  
        TERMINAL, NY                                                                                                                                    
   (SP)ATLANTIC COAST OF NEW YORK, NY                        7,000,000       3,205,000       1,400,000  ..............       1,400,000  ..............  
    (E)CHEMUNG RIVER BASIN ENVIRONMENTAL RESTORATION,        1,300,000         100,000         200,000  ..............         200,000  ..............  
        NY AND PA                                                                                                                                       
       FLUSHING BAY AND CREEK, NY                              100,000  ..............  ..............  ..............         100,000  ..............  
    (N)HUDSON RIVER HABITAT RESTORATION, NY                  2,399,000         859,000         250,000  ..............         250,000  ..............  
   (SP)JAMAICA BAY, MARINE PARK AND PLUMB BEACH, NY          3,000,000       1,243,000         400,000  ..............         400,000  ..............  
    (N)NEW YORK AND NEW JERSEY HARBOR, NY AND NJ             2,700,000         178,000       1,250,000  ..............       1,250,000  ..............  
  (SPE)ONONDAGA LAKE, NY                                       890,000         653,000         115,000  ..............         115,000  ..............  
   (BE)ORCHARD BEACH, BRONX, NY                                300,000  ..............  ..............  ..............         300,000  ..............  
    (E)SOUTH SHORE OF LONG ISLAND, NY                        2,100,000         100,000         150,000  ..............         150,000  ..............  
  (FDP)SUSQUEHANNA RIVER BASIN WATER MANAGEMENT, NY,         2,500,000         789,000         300,000  ..............         300,000  ..............  
        PA AND MD                                                                                                                                       
  (FDP)UPPER DELAWARE RIVER WATERSHED, NY                    1,300,000         100,000         451,000  ..............         451,000  ..............  
  (FDP)UPPER SUSQUEHANNA RIVER BASIN ENVIRON                 1,200,000         100,000         200,000  ..............         200,000  ..............  
        RESTORATION, NY                                                                                                                                 
                                                                                                                                                        
                        NORTH CAROLINA                                                                                                                  
                                                                                                                                                        
   (FC)BRUNSWICK COUNTY BEACHES, NC                         31,200,000       2,640,000  ..............       1,000,000  ..............       1,000,000  
    (N)CAPE FEAR--NORTHEAST (CAPE FEAR) RIVER, NC          154,124,000       1,000,000  ..............         330,000  ..............         330,000  
   (SP)DARE COUNTY BEACHES, NC                               2,097,000       1,568,000         450,000  ..............         450,000  ..............  
    (N)WILMINGTON HARBOR--NORTHEAST CAPE FEAR RIVER,        26,330,000       1,980,000  ..............         100,000  ..............         100,000  
        NC                                                                                                                                              
                                                                                                                                                        
                         NORTH DAKOTA                                                                                                                   
                                                                                                                                                        
  (SPE)DEVILS LAKE, ND                                       4,445,000       2,275,000       1,100,000  ..............       1,100,000  ..............  
  (FDP)GRAND FORKS, ND                                       1,560,000       1,432,000         128,000  ..............         128,000  ..............  
   (FC)GRAND FORKS / EAST GRAND FORKS, ND AND MN        ..............  ..............  ..............         178,000  ..............       2,678,000  
                                                                                                                                                        
                             OHIO                                                                                                                       
                                                                                                                                                        
    (E)GREAT MIAMI RIVER, OXBOW AREA, OH                       450,000  ..............         100,000  ..............         100,000  ..............  
    (N)MAUMEE RIVER, OH                                        600,000  ..............         100,000  ..............         100,000  ..............  
                                                                                                                                                        
                           OKLAHOMA                                                                                                                     
                                                                                                                                                        
       GRAND NEOSHO RIVER BASIN, OK                          1,500,000       1,000,000  ..............  ..............         500,000  ..............  
                                                                                                                                                        
                            OREGON                                                                                                                      
                                                                                                                                                        
    (N)COLUMBIA RIVER NAVIGATION CHANNEL DEEPENING, OR       4,228,000       2,916,000         724,000  ..............         724,000  ..............  
        AND WA                                                                                                                                          
    (E)COLUMBIA SLOUGH, OR                                     970,000         420,000         150,000  ..............         150,000  ..............  
    (E)WALLA WALLA RIVER WATERSHED, OR AND WA                  866,000         265,000         217,000  ..............         217,000  ..............  
  (COM)WILLAMETTE RIVER BASIN REVIEW, OR                     2,284,000       1,286,000         420,000  ..............         420,000  ..............  
    (E)WILLAMETTE RIVER FLOODPLAIN RESTORATION, OR           1,465,000  ..............         100,000  ..............         100,000  ..............  
   (MP)WILLAMETTE RIVER TEMPERATURE CONTROL, OR             46,000,000       2,413,000  ..............         520,000  ..............         520,000  
       TILLAMOOK BAY AND ESTUARY, OR                           100,000  ..............  ..............  ..............         100,000  ..............  
                                                                                                                                                        
                         PENNSYLVANIA                                                                                                                   
                                                                                                                                                        
    (E)CONEMAUGH RVR BASIN, NANTY GLO ENVIRONMENTAL          3,000,000  ..............  ..............          90,000  ..............          90,000  
        RESTORATI                                                                                                                                       
    (E)LOWER WEST BR SUSQUEHANNA RIVER BASIN ENVIR           1,300,000         100,000         200,000  ..............         200,000  ..............  
        RESTORATIO                                                                                                                                      
  (FDP)MILTON, PA                                            1,560,000         560,000         500,000  ..............         500,000  ..............  
    (E)TIOGA RIVER WATERSHED, PA                             1,000,000         100,000         200,000  ..............         200,000  ..............  
   (FC)TURTLE CREEK, PA                                        300,000  ..............  ..............  ..............         300,000  ..............  
  (RCP)YOUGHIOGHENY RIVER LAKE, STORAGE REALLOCATION,          625,000         375,000         125,000  ..............         125,000  ..............  
        PA AND MD                                                                                                                                       
                                                                                                                                                        
                         PUERTO RICO                                                                                                                    
                                                                                                                                                        
   (FC)ARECIBO RIVER, PR                                    12,469,000       1,035,000  ..............         665,000  ..............         665,000  
   (FC)RIO GUANAJIBO, PR                                    21,116,000         150,000  ..............         700,000  ..............         700,000  
   (FC)RIO NIGUA AT SALINAS, PR                              8,888,000         150,000  ..............         267,000  ..............         267,000  
                                                                                                                                                        
                         RHODE ISLAND                                                                                                                   
                                                                                                                                                        
    (E)RHODE ISLAND SOUTH COAST, HABITAT REST AND SRTM         700,000         100,000         200,000  ..............         200,000  ..............  
        DMG REDU                                                                                                                                        
       PROVIDENCE, RI (FOX PT. HURRICANE BARRIER)              350,000  ..............  ..............  ..............         350,000  ..............  
                                                                                                                                                        
                        SOUTH CAROLINA                                                                                                                  
                                                                                                                                                        
  (RCP)ATLANTIC INTRACOASTAL WATERWAY, SC                    3,100,000         100,000         500,000  ..............         500,000  ..............  
    (E)CHARLESTON ESTUARY, SC                                1,600,000  ..............         100,000  ..............         100,000  ..............  
    (N)CHARLESTON HARBOR, SC (DEEPENING AND WIDENING)       95,174,000         225,000  ..............         200,000  ..............         200,000  
   (BE)PAWLEY'S ISLAND, SC                                      100,00  ..............  ..............  ..............         100,000  ..............  
    (N)SANTEE, COOPER, CONGAREE RIVERS, SC                   1,828,000         504,000         300,000  ..............         300,000  ..............  
    (E)YADKIN-PEE DEE RIVER WATERSHED, SC AND NC             1,615,000         100,000         300,000  ..............         300,000  ..............  
                                                                                                                                                        
                          TENNESSEE                                                                                                                     
                                                                                                                                                        
   (FC)EAST RIDGE, HAMILTON CO, TN                          12,500,000         200,000  ..............         300,000  ..............         300,000  
   (FC)METRO CENTER LEVEE, DAVIDSON CO, TN                   3,100,000  ..............  ..............         150,000  ..............         150,000  
                                                                                                                                                        
                            TEXAS                                                                                                                       
                                                                                                                                                        
  (FDP)ALPINE, TX                                            1,143,000         393,000         300,000  ..............         300,000  ..............  
   (FC)BRAYS BAYOU, HOUSTON, TX                            271,110,000       4,059,000  ..............       1,830,000  ..............       1,830,000  
    (N)CORPUS CHRISTI SHIP CHANNEL, TX                       5,740,000         525,000         800,000  ..............         800,000  ..............  
   (FC)CYPRESS CREEK, HOUSTON, TX                          125,733,000       1,963,000  ..............         937,000  ..............         937,000  
    (E)CYPRESS VALLEY WATERSHED, TX                          2,040,000       1,015,000         220,000  ..............         220,000  ..............  
   (FC)DALLAS FLOODWAY EXTENSION, TRINITY RIVER, TX         30,900,000       3,347,000  ..............         940,000  ..............         940,000  
   (FC)FORT WORTH SUMPS, 14 AND 15, UPPER TRINITY           11,050,000  ..............  ..............          70,000  ..............          70,000  
        RIVER BASIN,                                                                                                                                    
    (N)GIWW--ARANSAS NATIONAL WILDLIFE REFUGE, TX           19,510,000       1,506,000  ..............         324,000  ..............         324,000  
  (RCP)GIWW--BRAZOS RIVER TO PORT O'CONNOR, TX               2,420,000          89,000         220,000  ..............         220,000  ..............  
  (RDP)GIWW--HIGH ISLAND TO BRAZOS RIVER, TX                 3,679,000       1,651,000       1,000,000  ..............       1,000,000  ..............  
  (RCP)GIWW--PORT O'CONNOR TO CORPUS CHRISTI BAY, TX         1,180,000         100,000         170,000  ..............         170,000  ..............  
   (FC)GRAHAM, TX (BRAZOS RIVER BASIN)                       6,470,000          45,000  ..............         105,000  ..............         105,000  
   (FC)GREENS BAYOU, HOUSTON, TX                           162,240,000       3,704,000  ..............       1,000,000  ..............       1,000,000  
    (N)NECHES RIVER AND TRIBUTARIES SALTWATER BARRIER,      17,955,000       2,312,000  ..............         400,000  ..............         400,000  
        TX                                                                                                                                              
  (FDP)NORTHWEST EL PASO, TX                                   870,000         100,000         130,000  ..............         130,000  ..............  
    (N)PACKERY CHANNEL, CORPUS CHRISTI BAY, TX                 100,000  ..............  ..............  ..............         100,000  ..............  
  (FDP)PECAN BAYOU, BROWNWOOD, TX                              888,000         709,000         179,000  ..............         179,000  ..............  
    (E)PLAINVIEW, BRAZOS RIVER BASIN, TX                       773,000         523,000         211,000  ..............         211,000  ..............  
   (FC)RAYMONDVILLE DRAIN, TX                               75,818,000         134,000  ..............         370,000  ..............         370,000  
   (FC)SOUTH MAIN CHANNEL, TX                              141,465,000       4,110,000  ..............       1,000,000  ..............       1,000,000  
  (FDP)UPPER TRINITY RIVER BASIN, TX                         8,235,000       5,569,000       1,200,000  ..............       1,200,000  ..............  
    (N)RINCON CANAL, CORPUS CHRISTI SHIP CHANNEL, TX           100,000  ..............  ..............  ..............         100,000  ..............  
                                                                                                                                                        
                             UTAH                                                                                                                       
                                                                                                                                                        
  (FDP)PROVO AND VICINITY, UT                                1,550,000         635,000         350,000  ..............         350,000  ..............  
    (E)UPPER JORDAN RIVER RESTORATION, UT                    1,100,000          89,000         150,000  ..............         150,000  ..............  
                                                                                                                                                        
                        VIRGIN ISLANDS                                                                                                                  
                                                                                                                                                        
    (N)CROWN BAY CHANNEL, VI                                 3,710,000          89,000  ..............         270,000  ..............         270,000  
                                                                                                                                                        
                           VERMONT                                                                                                                      
                                                                                                                                                        
       SUMERSET AND SEARSBORG DAMS, DEERFIELD RIVER,    ..............  ..............  ..............  ..............         100,000  ..............  
        VT                                                                                                                                              
                                                                                                                                                        
                           VIRGINIA                                                                                                                     
                                                                                                                                                        
    (N)AIWW BRIDGE REPLACEMENT, DEEP CREEK, VA               1,168,000  ..............         100,000  ..............         100,000  ..............  
  (SPE)ELIZABETH RIVER BASIN, ENVIR RESTORATION,             1,451,000         100,000         200,000  ..............         200,000  ..............  
        HAMPTON ROAD                                                                                                                                    
    (E)LOWER POTOMAC ESTUARY WATERSHED, VA AND MD              900,000         100,000         200,000  ..............         200,000  ..............  
  (SPE)NANSEMOND RIVER BASIN, VA                             1,630,000         500,000         250,000  ..............         250,000  ..............  
       RAPPAHANNOCK RIVER, VA (EMBREY DAM REMOVAL)             100,000  ..............  ..............  ..............         100,000  ..............  
                                                                                                                                                        
                          WASHINGTON                                                                                                                    
                                                                                                                                                        
    (N)BLAIR WATERWAY NAVIGATION STUDY, TACOMA HARBOR,       1,300,000         100,000         600,000  ..............         600,000  ..............  
        WA                                                                                                                                              
  (SPE)CHIEF JOSEPH POOL RAISE, WA                           1,727,000         554,000         100,000  ..............         100,000  ..............  
    (E)DUWAMISH AND GREEN RIVER, WA                            900,000         440,000         252,000  ..............         252,000  ..............  
   (FC)HOWARD HANSON DAM, WA                                11,250,000  ..............  ..............         460,000  ..............         460,000  
  (RCP)HOWARD HANSON DAM, WA                                 2,225,000       2,169,000          56,000  ..............          56,000  ..............  
  (RCP)LAKE WASHINGTON SHIP CANAL, WA                          799,000         356,000         100,000  ..............         100,000  ..............  
    (N)PUGET SOUND CONFINED DISPOSAL SITES, WA               2,099,000         700,000         386,000  ..............         386,000  ..............  
  (FDP)SKAGIT RIVER, WA                                      2,435,000         721,000         400,000  ..............         400,000  ..............  
    (E)STILLAGUAMISH RIVER, WA                                 900,000         400,000         100,000  ..............         100,000  ..............  
                                                                                                                                                        
                        WEST VIRGINIA                                                                                                                   
                                                                                                                                                        
  (SPE)CHEAT RIVER BASIN, WV                                 1,277,000         792,000         200,000  ..............         200,000  ..............  
    (N)KANAWHA RIVER NAVIGATION, WV                         11,700,000      11,579,000         121,000  ..............         121,000  ..............  
    (N)LONDON LOCKS AND DAM, WV                             17,000,000         207,000  ..............         672,000  ..............       1,000,000  
    (N)MARMET LOCKS AND DAM, WV                            230,000,000       9,850,000  ..............         830,000  ..............         830,000  
  (FDP)NORTH BRANCH POTOMAC RIVER ENVIRON RESTORATION,       1,915,000       1,086,000         553,000  ..............         553,000  ..............  
        WV, MD                                                                                                                                          
    (E)TYGART THREE BASIN ENVIRONMENTAL RESTORATION,           875,000         375,000         200,000  ..............         200,000  ..............  
        WV                                                                                                                                              
    (E)TYGART VALLEY R B, GRASSY RUN ENVIRONMENTAL           1,212,000         924,000         100,000  ..............         100,000  ..............  
        RESTORATIO                                                                                                                                      
 (COMP)WEST VIRGINIA STATEWIDE FLOOD PROTECT PLAN            2,000,000  ..............  ..............  ..............         400,000  ..............  
                                                                                                                                                        
                           WYOMING                                                                                                                      
                                                                                                                                                        
    (E)JACKSON HOLE RESTORATION, WY                          1,482,000       1,080,000         200,000  ..............         200,000  ..............  
                                                                                                                                                        
                        MISCELLANEOUS                                                                                                                   
                                                                                                                                                        
       AUTOMATED INFORMATION SYSTEM SUPPORT             ..............  ..............         650,000  ..............         650,000  ..............  
       COASTAL FIELD DATA COLLECTION                    ..............  ..............       1,500,000  ..............       1,500,000  ..............  
       COORDINATION STUDIES WITH OTHER AGENCIES         ..............  ..............      11,690,000  ..............      12,810,000  ..............  
       ENVIRONMENTAL DATA STUDIES                       ..............  ..............         100,000  ..............         100,000  ..............  
       FLOOD DAMAGE DATA                                ..............  ..............         400,000  ..............         400,000  ..............  
       FLOOD PLAIN MANAGEMENT SERVICES                  ..............  ..............       9,000,000  ..............       9,000,000  ..............  
       HYDROLOGIC STUDIES                               ..............  ..............         500,000  ..............         500,000  ..............  
       INTERNATIONAL WATER STUDIES                      ..............  ..............         340,000  ..............         340,000  ..............  
       NATIONAL DREDGING NEEDS STUDY OF PORTS AND       ..............  ..............         671,000  ..............         671,000  ..............  
        HARBORS                                                                                                                                         
       PRECIPITATION STUDIES (NATIONAL WEATHER          ..............  ..............         400,000  ..............         400,000  ..............  
        SERVICE)                                                                                                                                        
       REMOTE SENSING/GEOGRAPHIC INFORMATION SYSTEM     ..............  ..............         420,000  ..............         420,000  ..............  
        SUPPORT                                                                                                                                         
       RESEARCH AND DEVELOPMENT                         ..............  ..............      37,000,000  ..............      37,000,000  ..............  
       SCIENTIFIC AND TECHNICAL INFORMATION CENTERS     ..............  ..............         130,000  ..............         130,000  ..............  
       STREAM GAGING (U.S. GEOLOGICAL SURVEY)           ..............  ..............         800,000  ..............         800,000  ..............  
       TRANSPORTATION SYSTEMS                           ..............  ..............         800,000  ..............         800,000  ..............  
       REDUCTION FOR ANTICIPATED SAVINGS AND SLIPPAGE   ..............  ..............     -26,006,000  ..............     -24,956,000  ..............  
                                                       -------------------------------------------------------------------------------------------------
             TOTAL, GENERAL INVESTIGATIONS              ..............  ..............     114,098,000      36,102,000     122,923,000      41,142,000  
--------------------------------------------------------------------------------------------------------------------------------------------------------
         TYPE OF PROJECT:                                                                                                                               
           (N)  NAVIGATION                                                                                                                              
           (BE)  BEACH EROSION CONTROL                                                                                                                  
           (FC)  FLOOD CONTROL                                                                                                                          
           (MP)  MULTIPURPOSE, INCLUDING POWER                                                                                                          
           (SP)  SHORELINE PROTECTION                                                                                                                   
           (FDP)  FLOOD DAMAGE PREVENTION                                                                                                               
           (RCP)  REVIEW OF COMPLETED PROJECT                                                                                                           
           (RDP)  REVIEW OF DEFERRED PROJECT                                                                                                            
           (COMP)  COMPREHENSIVE                                                                                                                        
           (SPEC)  SPECIAL                                                                                                                              

    Coastal studies of navigation improvements, Alaska.--An 
appropriation of $600,000, an increase of $450,000, has been 
included for the Corps to initiate feasibility studies at 
Kotzebue, Akutan, and False Pass in Alaska. The feasibility 
studies continue the effort to evaluate the navigation needs of 
Alaska's coastal communities. By combining several harbor and 
navigation studies into this one study, the Corps is expected 
to be able to continue significant work substantially below the 
cost to address each project separately.
    Nome Harbor, AK.--The Committee has provided an additional 
$40,000 over the budget request for the Nome Harbor project in 
Alaska for the Corps to complete the feasibility study 
improvements at the harbor.
    Valdez Harbor, AK.--Funding in the amount of $100,000 has 
been included for the Corps to undertake a reconnaissance study 
of expanding the harbor at Valdez, AK.
    White River navigation to Newport, AR.--The Committee 
recommendation includes $500,000 for the Corps to complete a 
project study plan and initiate a general reevaluation study to 
confirm economic justification and the environmental 
acceptability of providing navigation improvements for a 
segment of the White River in central Arkansas in the vicinity 
of Newport, AR.
    Bolinas Lagoon, CA.--The Committee has provided an 
additional $510,000 over the budget request for the Bolinas 
Lagoon, CA, project for the Corps to expedite feasibility phase 
activities.
    Sacramento and San Joaquin Rivers, comprehensive basin 
study, California.--An appropriation of $500,000 is recommended 
for the Corps of Engineers to undertake comprehensive basin 
studies for the Sacramento/San Joaquin River basins in 
California. The study would analyze the flood risk in the 
watersheds and evaluate environmental sensitive and long-term 
solutions from a system perspective. Given the size and 
complexity of the activities associated with this study, the 
Committee believes that the normal funding for reconnaissance 
studies should not apply.
    San Joaquin River Basin Stockton metro area, CA.--The 
Committee has provided $225,000 for a feasibility study for 
flood damage reduction of the Stockton metropolitan area and 
$225,000 for a feasibility study of Farmington Dam. The 
Committee understands that the Corps and the local sponsors 
have agreed that upon completion of the reconnaissance study, 
two separate feasibility studies will be conducted. The 
Committee directs that the flood damage reduction feasibility 
study focus on the flood protection project under construction 
by the local sponsor and the study be developed as a report for 
review by the Chief and Secretary as required by section 
211(e)(2) of Public Law 104-303. Upon completion of the report 
and approval by the Secretary, the recommended project is 
considered eligible for reimbursement and credit as provided in 
section 211 of Public Law 104-303.
    Florida mitigation banking study.--In order to further the 
goals established in section 307(a) of the Water Resources 
Development Act of 1990, the Committee directs the Corps to use 
$400,000 of available funds to complete, within 1 year, a study 
to determine what measures need to be taken to facilitate the 
establishment of private and public mitigation banks in Florida 
where significant wetland and aquatic resource impacts are 
expected.
    Naussau County, FL.--The Committee recommends an 
appropriation of $290,000 for the Naussau County, FL, study, an 
increase of $150,000, for the Corps to conduct a general 
reevaluation report for the project.
    Savannah River basin comprehensive water resources study, 
Georgia and South Carolina.--An amount of $300,000 is 
recommended for the Corps to initiate a comprehensive study to 
address the current and future needs for flood damage 
prevention and reduction, water supply, and other related water 
resource needs in the Savannah River basin in Georgia and South 
Carolina. The study is to be limited to an analysis of water 
resource issues that fall within the traditional civil works 
mission of the Corps.
    Kaumalapau Harbor, HI.--The Corps of Engineers may use up 
to $900,000 to complete preconstruction engineering and design 
activities at Kaumalapau Harbor, HI. Funding is contingent upon 
the State of Hawaii taking control over the harbor. The 
Committee is aware that Lanai's petroleum products supplier has 
indicated its intention to cancel all deliveries to the island 
due to the unsafe condition of the breakwater.
    The Committee recognizes that the standard procedures in 
determining a benefit/cost ratio may not fully take into 
consideration the unique requirements of an island State 
dependent on ocean traffic for the delivery of supplies. The 
Committee, therefore, expects the Army Corps of Engineers to 
continue efforts to resolve concerns about the formula for 
establishing a benefit/cost ratio. Similarly, the Committee 
urges the Corps to work with residents and businesses on Lanai, 
the barge operators, the State of Hawaii to determine how best 
to resolve the safety problems at Kaumalapau Harbor.
    Laulaulei, HI.--The Committee has included $200,000 for the 
Corps to undertake a reconnaissance level study of flooding 
problems at Laulaulie, HI, at the naval magazine and the 
surrounding area.
    Upper Mississippi and Illinois navigation study, Illinois, 
Iowa, Minnesota, Missouri, and Wisconsin.--The Committee has 
included $7,700,000, the full budget request, for the Upper 
Mississippi and Illinois navigation study. Given the importance 
of the undertaking, the Committee expects the Corps to make 
additional resources available in fiscal year 1998, if 
necessary, to maintain the completion schedule for the study. 
The Committee reaffirms the position taken on this project in 
the conference report on the Energy and Water Development Act 
for 1996.
    Kentucky lock and dam, Kentucky.--The Committee has 
provided the full budget request of $1,750,000 for the Kentucky 
lock and dam to continue preconstruction engineering and design 
activities. The Committee understands that the preconstruction 
engineering and design is scheduled to be completed in 
September 1998. If additional funding is needed during the year 
to keep work on schedule, the Committee urges the Corps to take 
appropriate actions to reprogram funds into the project.
    The Committee is supportive of the Corps efforts to include 
the Kentucky lock project in the fiscal year 1999 budget and 
future year budget schedules. Through 1998, over $10,000,000 
will have been spent on preconstruction engineering and design. 
The Corps and the administration should make every effort to 
avoid further delays in commencing the next stage for this 
project.
    Licking River watershed, Kentucky.--The Committee 
recommendation includes $500,000 for the Corps to initiate 
individual reconnaissance studies to investigate structural and 
nonstructural measures to reduce flood damages in communities 
along the Licking River in Kentucky, including Falmouth, 
Butler, Cynthiana, and other South and North Fork damage 
centers. In conducting the studies, the Corps is to evaluate 
the feasibility of constructing a flood wall around Falmouth, 
KY.
    Grand Isle and vicinity, Lousiana.--The recommendation 
includes an amount of $800,000 for the Corps of Engineers to 
complete preconstruction engineering and design for the Grand 
Isle and vicinity, LA, project.
    North Branch Potomac River environmental restoration, 
Maryland and West Virginia.--In carrying out the planning and 
development of the environmental restoration projects on the 
North Branch, Potomac River, Maryland and West Virginia, the 
Secretary is encouraged to investigate projects that 
demonstrate the feasibility of resource recycling and reuse, 
including the utilization of coal combustion byproducts (fly 
ash fluidized combustion ash, flue gas desulfurization 
byproducts) in the abatement of acid mine drainage.
    Ocean City and vicinity, Maryland, (Assateaque Island).--
The Committee is aware of concerns about the severe erosion on 
the north end of Assateaque Island National Seashore which is 
partially attributable to the Federal navigation project at 
Ocean City, MD. Last year, the Committee provided $150,000 to 
initiate preconstruction engineering and design of measures to 
mitigate associated damages to the shoreline. The Committee 
expects that once the Corps and the National Park Service 
resolve remaining issues of allocation of costs and operation 
and maintenance that the Corps should include funding in their 
next budget request.
    Grand Forks, ND, East Grand Forks, MN.--In an effort to 
address the flood control needs in the Grand Forks, ND, and 
East Grand Forks, MN, areas which were devastated by flooding 
this spring, the Committee has included $2,500,000 for the 
Corps to conduct planning for a combined flood control project 
for the area. By combining both projects under one 
postauthorization report, it is hoped that comprehensive flood 
control project will be eligible for authorization in the next 
water resources authorization bill to be considered by 
Congress.
    Kansas City, MO-KS.--The Committee is aware that the Kansas 
City, MO, and Kansas City, KS, flood control study encompasses 
two States, two rivers, seven separable units, and five 
separate sponsors; and, therefore, believes that the study area 
and issues are too large and complex to be adequately address 
by the standard reconnaissance study simplified analysis of 
limited scope as set forth in current Corps policy. 
Accordingly, the Committee directs the Corps to use the 
additional $300,000 provided to scope potential 
multifeasibility studies, develop associated project study 
plans and negotiate feasibility cost sharing agreements related 
to the study.
    Devils Lake, ND.--An appropriation of $1,100,000, the full 
budget request, has been included for the Corps to expedite 
work on the Devils Lake, ND, feasibility study for lake 
stabilization. The Committee urges the Corps to work 
cooperatively with the Bureau of Reclamation, the State of 
North Dakota, other interested parties, and Canada in this 
effort. The Committee expects the study, which is the document 
on which a project authorization will be based, will address 
all aspects of the project set out in the study evaluation.
    Lower Platte River and tributaries, Nebraska.--
Appropriations made for the Lower Platte and tributaries study 
in Nebraska should also be used to conduct studies authorized 
by section 503(d)(11) of the Water Resources Development Act of 
1996.
    Grand Neosho River basin, OK.--An appropriation of $500,000 
is recommended for the Corps of Engineers to complete the Grand 
Neosho River basin reconnaissance study in Oklahoma.
    Tahoe basin, Nevada and California.--The Committee 
recommendation includes $750,000 for the Tahoe basin study in 
Nevada and California. The study will examine flood control, 
water quality, wetland habitat, and other environmental 
restoration opportunities. The study is critical for restoring 
the health of Lake Tahoe and the Lake Tahoe basin. If 
additional funding is needed during the year to keep work on 
schedule, the Committee urges the Corps to take appropriate 
actions to reprogram additional funds into the project.
    Tillamook Bay and estuary, OR.--The Committee 
recommendation includes $100,000 for the Corps to undertake a 
reconnaissance study of the Tilamook Bay estuary and watershed 
in Oregon. The primary focus of the study is dredging to reduce 
the risk of flooding, but the study will also address ecosystem 
restoration possibilities and other water resource needs.
    Turtle Creek watershed, Pennsylvania.--The Committee has 
provided $100,000 each for the Corps to undertake 
reconnaissance studies at the following locations: Upper Turtle 
Creek, Lyons Run, and Brush Creek within the Turtle Creek 
basin. The purpose of the reconnaissance studies is to identify 
and prioritize corrective actions concerning acid mine drainage 
within the watershed near the Borough of Export, PA.
    Charleston Harbor, SC (deepening and widening).--The 
Committee continues to support the Charleston Harbor deepening 
and widening project in South Carolina and has provided the 
full budget request of $200,000 for fiscal year 1998, which 
will allow the Corps to complete all preconstruction 
engineering and design in fiscal year 1998, including 
preparation of plans and specifications for the first 
construction contract, making the project ready for a fiscal 
year 1999 new construction start. The Committee would be 
supportive of the Corps efforts to include the Charleston 
Harbor deepening and widening project in the fiscal year 1999 
budget and future year budget schedules. If additional funding 
is needed during the year to keep work on schedule, the 
Committee urges the Corps to take appropriate actions to 
reprogram funds into the project.
    Mustang Island, Corpus Christi, TX (Packery Channel).--The 
Committee understands the need to construct Packery Channel in 
Nueces County, Texas. This channel will be an important outlet 
from Corpus Christi Bay and the Gulf Intracoastal Waterway to 
the Gulf of Mexico, providing significant economic and safety 
benefits for waterborne traffic. The Committee is concerned 
that the Corps did not request any funding to perform an 
initial study, as authorized by the Water Resources Act of 
1996. The Committee has provided $100,000 for the Corps to 
perform this study.
    Rincon Canal, TX.--The Rincon Canal system connects the 
Corpus Christi ship channel to the Rincon industrial park, 
where a number of businesses are located. The Corps is directed 
to use $100,000 provide herein to perform necessary studies to 
determine the acceptability of the project during fiscal year 
1998. If the Secretary determines that maintenance dredging is 
acceptable, he is urged to use available funds to perform 
necessary dredging this fiscal year.
    Somerset and Searsburg Dams, VT.--The Committee 
recommendation includes $100,000 for the Corps to initiate and 
complete a reconaissance study of possible operational or other 
changes, including the conveyance of Somerset and Searsburg 
Dams to the Corps, to enhance ecosystem restoration.
    Marmet lock and dam, WV.--The Committee continues to 
support the Marmet lock and dam project in West Virginia and 
has provided the full budget request of $830,000 for fiscal 
year 1998 which will allow the Corps to complete all 
preconstruction engineering and design in fiscal year 1998, 
making the project ready for a fiscal year 1999 new 
construction start. Given the size of this and other inland 
navigation projects and the severely limited resource 
availability in future years, it will be necessary to carefully 
schedule the funding needs into out-year budget profiles. The 
Committee would be supportive of the Corps efforts to include 
the Marmet project in the fiscal year 1999 budget and future 
year budget schedules. The Marmet project has already had 
nearly 10 million dollars' worth of preconstruction engineering 
and design over a 5-year period, and the Corps and the 
administration should make every effort to avoid further delays 
in commencing the next stage for this project. If additional 
funding is needed during the year to keep work on schedule, the 
Committee urges the Corps to take appropriate actions to 
reprogram funds into the project.
    Research and development.--An appropriation of $37,000,000 
is recommended for research and development activities of the 
Corps of Engineers. The Committee believes it inappropriate to 
earmark funding for university research institutions given the 
limited resources and severe budget constraints.
    The Committee has provided $2,500,000 for zebra mussel 
research. The Committee has been informed of the need to 
conduct activities in the Great Lakes region and Lake 
Champlain, VT. The Committee expects the Corps of Engineers to 
apply the funds to various regions geographically, and on 
varying technologies and applications in order to accomplish 
the highest-priority work.
    The Committee recommendation also supports the full budget 
request for the Corps to continue activities related to the 
comprehensive flood impact response modeling system [CFIRMS].
    Coordination and studies with other agencies.--An 
appropriation of $12,810,000 is recommended for coordination 
studies with other agencies for fiscal year 1998. An additional 
$1,000,000 over the budget request is provided for planning 
assistance to States to reduce the backlog of activities 
waiting funding.
    The Committee recommendation includes $400,000 for the 
Corps of Engineers to continue to participate as a stakeholder 
in the interagency ecosystem management task force's Pacific 
Northwest forest case study with responsibility to restore, 
sustain, and develop coordinated watershed ecosystem management 
strategies for species viability on all public lands.

                         construction, general

Appropriations, 1997....................................  $1,081,942,000
Budget estimate, 1998...................................   1,062,470,000
Committee recommendation................................   1,284,266,000

    An appropriation of $1,284,266,000 is recommended for 
ongoing construction activities.

                Budget Constraints and Program Execution

    The Committee has been faced with difficult choices in 
development of the budget for the Corps of Engineers for fiscal 
year 1998. Lack of allocation for nondefense discretionary 
programs has severely limited the Committee's ability to 
respond to needs of the Corps of Engineers' Civil Works Program 
as contained in the numerous requests of Members. The 
constrained budget environment will also require changes in the 
way the Corps manages their programs in order to realize the 
greatest efficiency and public benefit from the funding 
available for fiscal year 1998. Therefore, the Committee 
expects the Corps to manage resources on a nationwide basis.
    The budget request and the approved Committee allowance are 
shown on the following table:

                                                        CORPS OF ENGINEERS--CONSTRUCTION, GENERAL                                                       
                                                                  [Amounts in dollars]                                                                  
--------------------------------------------------------------------------------------------------------------------------------------------------------
Type of                                                                                    Total Federal   Allocated to       Budget         Committee  
project                                   Project title                                        cost            date          estimate     recommendation
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                        
                                           ALABAMA                                                                                                      
                                                                                                                                                        
    (N)BLACK WARRIOR AND TOMBIGBEE RIVERS, VICINITY OF JACKSO                               16,331,000       1,703,000         500,000         500,000  
    (N)TENNESSEE--TOMBIGBEE WATERWAY WILDLIFE MITIGATION, AL                                91,200,000      87,760,000       3,440,000       3,440,000  
   (MP)WALTER F GEORGE LOCK AND DAM, AL AND GA (MAJOR REHAB)                                27,400,000         473,000       2,800,000       2,800,000  
                                                                                                                                                        
                                            ALASKA                                                                                                      
                                                                                                                                                        
    (N)COOK INLET, AK                                                                        4,000,000         205,000  ..............       3,945,000  
    (N)CHIGNIK HARBOR, AK                                                                    5,000,000         172,000  ..............       4,500,000  
    (N)DILLINGHAM, AK (SHORELINE EROSION)                                                    3,623,000       2,423,000  ..............       1,200,000  
    (N)KAKE HARBOR, AK                                                                      10,116,000       2,528,000       3,600,000       3,600,000  
    (N)ST. PAUL HARBOR, AK                                                                  13,200,000         760,000  ..............       6,638,000  
                                                                                                                                                        
                                           ARIZONA                                                                                                      
                                                                                                                                                        
   (FC)CLIFTON, AZ                                                                          13,800,000      11,500,000       2,300,000       2,300,000  
                                                                                                                                                        
                                           ARKANSAS                                                                                                     
                                                                                                                                                        
   (FC)ARKANSAS RIVER, TUCKER CREEK, AR                                                 ..............  ..............  ..............         300,000  
   (MP)DARDANELLE LOCK AND DAM POWERHOUSE, AR (MAJOR REHAB)                                 29,700,000      10,579,000       3,000,000       3,000,000  
    (N)MCCLELLAN--KERR ARKANSAS RIVER NAVIGATION SYSTEM, AR                                632,500,000     601,803,000       2,000,000       2,000,000  
    (N)MONTGOMERY POINT LOCK AND DAM, AR                                                   242,000,000      25,238,000      10,000,000      10,000,000  
    (E)RED RIVER ENERGENCY BANK PROTECTION, AR                                               3,500,000  ..............  ..............       3,500,000  
                                                                                                                                                        
                                          CALIFORNIA                                                                                                    
                                                                                                                                                        
   (FC)AMERICAN RIVER WATERSHED, CA                                                         47,500,000       2,756,000       9,400,000       9,400,000  
   (FC)CORTE MADERA CREEK, CA                                                               43,800,000      22,527,000         500,000         500,000  
   (FC)COYOTE AND BERRYESSA CREEKS, CA                                                      43,900,000      32,187,000       1,000,000       1,000,000  
   (FC)GUADALUPE RIVER, CA                                                                  69,200,000      44,775,000      19,000,000      19,000,000  
    (N)HUMBOLDT HARBOR AND BAY, CA                                                          12,300,000       3,035,000       6,000,000       6,000,000  
   (FC)LOS ANGELES COUNTY DRAINAGE AREA, CA                                                180,000,000      29,668,000      11,700,000      20,700,000  
    (N)LOS ANGELES HARBOR, CA                                                              121,700,000      13,903,000      16,100,000      26,100,000  
   (FC)LOWER SACRAMENTO AREA LEVEE RECONSTRUCTION, CA                                        3,560,000       1,280,000         300,000       2,300,000  
   (FC)MARYSVILLE/YUBA CITY LEVEE RECONSTRUCTION, CA                                        23,600,000      10,485,000       7,300,000       9,300,000  
   (FC)MERCED COUNTY STREAMS, CA                                                            91,800,000      16,490,000       1,100,000       6,885,000  
   (FC)MID-VALLEY AREA LEVEE RECONSTRUCTION, CA                                             15,300,000       4,195,000       3,100,000       5,600,000  
    (N)OAKLAND HARBOR, CA                                                                   62,500,000      53,565,000       8,935,000       8,935,000  
    (N)RICHMOND HARBOR, CA                                                                  25,700,000      13,042,000       8,620,000       8,620,000  
   (FC)SACRAMENTO RIVER BANK PROTECTION PROJECT, CA                                        179,100,000      99,593,000       5,500,000       5,500,000  
   (FC)SACRAMENTO RIVER, GLENN-COLUSA IRRIGATION DISTRICT, CA                               10,650,000       3,693,000         600,000         600,000  
   (FC)SAN LORENZO RIVER, CA                                                                12,640,000       1,571,000       4,200,000       4,200,000  
   (FC)SAN LUIS REY RIVER, CA                                                               61,100,000      55,700,000       5,400,000       5,400,000  
   (FC)SANTA ANA RIVER MAINSTEM, CA                                                        778,000,000     513,462,000      52,900,000      52,900,000  
   (FC)SANTA PAULA CREEK, CA                                                                20,300,000      13,680,000       4,000,000       4,000,000  
   (FC)UPPER SACRAMENTO AREA LEVEE RECONSTRUCTION, CA                                        4,660,000       1,587,000         200,000         200,000  
   (FC)WEST SACRAMENTO, CA                                                                  16,200,000       4,346,000       7,500,000       7,500,000  
                                                                                                                                                        
                                           COLORADO                                                                                                     
                                                                                                                                                        
   (FC)ALAMOSA, CO                                                                           6,000,000       2,702,000       3,298,000       3,298,000  
                                                                                                                                                        
                                           DELAWARE                                                                                                     
                                                                                                                                                        
   (BE)DELAWARE COAST PROTECTION, DE                                                        13,300,000       4,694,000         224,000         224,000  
                                                                                                                                                        
                                           FLORIDA                                                                                                      
                                                                                                                                                        
    (N)CANAVERAL HARBOR, FL                                                                123,760,000      31,114,000       2,500,000       3,500,000  
   (FC)CENTRAL AND SOUTHERN FLORIDA, FL                                                  1,431,000,000     435,207,000      27,400,000      27,400,000  
   (BE)DADE COUNTY, FL                                                                     163,300,000      55,847,000       8,185,000       8,185,000  
   (BE)DUVAL COUNTY, FL                                                                    111,200,000      19,986,000         278,000         278,000  
   (FC)EVERGLADES AND SOUTH FLORIDA ECOSYSTEM RESTORATION, FL                               75,000,000  ..............      10,000,000      10,000,000  
       FT. PIERCE BEACH, FL                                                                 13,000,000       1,492,000  ..............       2,300,000  
   (FC)FOUR RIVER BASINS, FL                                                               180,700,000      73,819,000         693,000         693,000  
   (MP)JIM WOODRUFF LOCK AND DAM POWERHOUSE, FL AND GA (MAJOR R                             30,600,000       2,225,000       6,000,000       6,000,000  
    (E)KISSIMMEE RIVER, FL                                                                 231,500,000      31,371,000       3,000,000       3,000,000  
   (BE)MANATEE COUNTY, FL                                                                   43,600,000       5,518,000         206,000         206,000  
    (N)MANATEE HARBOR, FL                                                                   19,985,000       6,098,000       1,872,000       1,872,000  
   (BE)MARTIN COUNTY, FL                                                                    25,600,000       4,906,000          99,000          99,000  
    (N)MIAMI HARBOR CHANNEL, FL                                                             51,066,000      18,071,000       2,889,000       2,889,000  
   (BE)PALM BEACH COUNTY, FL (REIMBURSEMENT)                                                75,900,000       9,591,000         202,000         202,000  
   (BE)PINELLAS COUNTY, FL                                                                 129,000,000      31,147,000       4,586,000       4,586,000  
   (BE)SARASOTA COUNTY, FL                                                                  55,200,000      13,213,000         500,000         500,000  
       PANAMA CITY BEACHES, FL                                                              62,400,000       4,779,000  ..............       5,000,000  
                                                                                                                                                        
                                           GEORGIA                                                                                                      
                                                                                                                                                        
   (MP)BUFORD POWERHOUSE, GA (MAJOR REHAB)                                                  27,200,000  ..............         900,000         900,000  
   (MP)HARTWELL LAKE POWERHOUSE, GA AND SC (MAJOR REHAB)                                    17,700,000       8,748,000       7,000,000       7,000,000  
   (MP)RICHARD B RUSSELL DAM AND LAKE, GA AND SC                                           596,150,000     590,195,000       4,000,000       4,000,000  
   (MP)THURMOND LAKE POWERHOUSE, GA AND SC (MAJOR REHAB)                                    69,700,000       5,145,000      11,000,000      11,000,000  
                                                                                                                                                        
                                            HAWAII                                                                                                      
                                                                                                                                                        
   (FC)IAO STREAM FLOOD CONTROL, MAUI, HI (DEF CORR)                                        13,046,000         326,000         275,000         275,000  
    (N)MAALAEA HARBOR, MAUI, HI                                                              9,117,000       2,129,000         691,000         691,000  
                                                                                                                                                        
                                           ILLINOIS                                                                                                     
                                                                                                                                                        
   (FC)ALTON TO GALE ORGANIZED LEVEE DISTRICT, IL AND MO (DEF C                            108,530,000      96,484,000         575,000         575,000  
   (BE)CHICAGO SHORELINE, IL                                                               144,000,000       9,953,000      10,000,000      10,000,000  
   (FC)EAST ST LOUIS, IL                                                                    28,859,000      24,336,000       2,800,000       2,800,000  
    (N)LOCK AND DAM 24, MISSISSIPPI RIVER, IL AND MO (MAJOR REH                             25,736,000       3,608,000       4,370,000       5,370,000  
    (N)LOCK AND DAM 25, MISSISSIPPI RIVER, IL AND MO (MAJOR REH                             22,926,000       8,770,000       4,230,000       4,230,000  
   (FC)LOVES PARK, IL                                                                       18,800,000      11,005,000         500,000         500,000  
    (N)MELVIN PRICE LOCK AND DAM, IL AND MO                                                741,332,000     723,363,000       1,900,000       1,900,000  
       O'HARE RESERVOIR, IL                                                                 27,100,000      25,000,000  ..............       2,100,000  
    (N)OLMSTED LOCKS AND DAM, IL AND KY                                                  1,020,000,000     243,620,000      98,440,000      98,440,000  
   (FC)REND LAKE, IL (DEF CORR)                                                              5,940,000         678,000       5,262,000       5,262,000  
    (N)UPPER MISS RVR SYSTEM ENV MGMT PROGRAM, IL, IA, MO, MN                              241,399,000     144,124,000      14,000,000      14,000,000  
                                                                                                                                                        
                                           INDIANA                                                                                                      
                                                                                                                                                        
    (N)BURNS WATERWAY HARBOR, IN (MAJOR REHAB)                                              14,600,000      10,050,000       3,000,000       3,000,000  
   (FC)FORT WAYNE METROPOLITAN AREA, IN                                                     34,550,000      16,108,000       5,300,000       6,300,000  
   (FC)LITTLE CALUMET RIVER, IN                                                            114,000,000      48,012,000       5,300,000       5,300,000  
       WABASH RIVER, NEW HARMONY, IN                                                         2,433,000         112,000  ..............         500,000  
                                                                                                                                                        
                                             IOWA                                                                                                       
                                                                                                                                                        
    (N)LOCK AND DAM 14, MISSISSIPPI RIVER, IA (MAJOR REHAB)                                 20,900,000       3,050,000       6,600,000       6,600,000  
    (N)MISSOURI RIVER FISH AND WILDLIFE MITIGATION, IA, NE, K                               81,400,000      32,026,000       3,895,000       3,895,000  
   (FC)MISSOURI RIVER LEVEE SYSTEM, IA, NE, KS AND MO                                      217,567,000      95,788,000       1,000,000       1,000,000  
   (FC)MUSCATINE ISLAND, IA                                                                  6,610,000       1,527,000       2,000,000       2,000,000  
   (FC)PERRY CREEK, IA                                                                      41,874,000      14,283,000       8,255,000       8,255,000  
                                                                                                                                                        
                                            KANSAS                                                                                                      
                                                                                                                                                        
   (FC)ARKANSAS CITY, KS                                                                    27,230,000       3,271,000       2,000,000       2,000,000  
   (FC)WINFIELD, KS                                                                          8,177,000       2,443,000       2,000,000       2,000,000  
                                                                                                                                                        
                                           KENTUCKY                                                                                                     
                                                                                                                                                        
   (MP)BARKLEY DAM AND LAKE BARKLEY, KY AND TN                                             157,299,000     147,466,000       3,500,000       3,500,000  
   (FC)DEWEY LAKE, KY (DAM SAFETY)                                                          18,500,000       2,052,000         250,000         250,000  
    (N)MCALPINE LOCKS AND DAMS, KY AND IN                                                  268,000,000      13,768,000       1,720,000       1,720,000  
   (FC)METROPOLITAN LOUISVILLE, POND CREEK, KY                                              11,571,000       2,617,000       1,800,000       1,800,000  
                                                                                                                                                        
                                          LOUISIANA                                                                                                     
                                                                                                                                                        
   (FC)ALOHA--RIGOLETTE, LA                                                                  7,378,000       4,035,000       1,510,000       1,510,000  
       LAKE PONTCHARTRAIN STORMWATER DISCHARGE, LA                                      ..............  ..............  ..............       3,000,000  
   (FC)LAKE PONTCHARTRAIN AND VICINITY, LA (HURRICANE PROTECT                              505,000,000     348,022,000       6,448,000      16,448,000  
   (FC)LAROSE TO GOLDEN MEADOW, LA (HURRICANE PROTECTION)                                   80,500,000      69,793,000         541,000         541,000  
    (N)MISSISSIPPI RIVER--GULF OUTLET, LA                                                  610,000,000     104,930,000       2,018,000       2,018,000  
    (N)MISSISSIPPI RIVER SHIP CHANNEL, GULF TO BATON ROUGE, L                              164,000,000      21,665,000       1,793,000       1,793,000  
   (FC)NEW ORLEANS TO VENICE, LA (HURRICANE PROTECTION)                                    168,000,000     139,612,000       1,700,000       1,700,000  
    (N)RED RIVER WATERWAY, MISSISSIPPI RIVER TO SHREVEPORT, L                            1,888,342,000   1,671,783,000       9,990,000      16,490,000  
   (FC)SOUTHEAST LOUISIANA, LA                                                             280,000,000      18,560,000       6,440,000       6,440,000  
   (FC)WEST BANK--EAST OF HARVEY CANAL, LA (HURRICANE PROTEC                               120,000,000       3,098,000       2,385,000       2,385,000  
   (FC)WESTWEGO TO HARVEY CANAL, LA (HURRICANE PROTECTION)                                  61,900,000      29,134,000       4,300,000       4,300,000  
                                                                                                                                                        
                                           MARYLAND                                                                                                     
                                                                                                                                                        
   (FC)ANACOSTIA RIVER AND TRIBUTARIES, MD AND DC                                           12,000,000       1,201,000       4,400,000       4,400,000  
   (BE)ATLANTIC COAST OF MARYLAND, MD                                                      265,000,000      29,930,000       1,797,000       1,797,000  
       CHESAPEAKE BAY ENVIR. RESTORATION AND PROJECT, MD, VA                                10,000,000  ..............  ..............       1,000,000  
    (E)CHESAPEAKE BAY OYSTER RECOVERY, MD                                                    2,500,000         627,000         542,000         542,000  
 (SPEC)CUMBERLAND, MD (SEC. 535 WRDA 96)                                                       375,000  ..............  ..............         375,000  
    (E)POPLAR ISLAND, MD                                                                   320,000,000      10,784,000      30,621,000      25,621,000  
                                                                                                                                                        
                                        MASSACHUSETTS                                                                                                   
                                                                                                                                                        
    (N)BOSTON HARBOR, MA                                                                    19,350,000       2,563,000       3,920,000       5,920,000  
   (FC)HODGES VILLAGE DAM, MA (MAJOR REHAB)                                                 17,400,000       2,000,000       7,900,000       7,900,000  
   (FC)ROUGHANS POINT, REVERE, MA                                                            7,930,000       3,950,000       1,880,000       1,880,000  
   (FC)TOWN BROOK, QUINCY AND BRAINTREE, MA                                                 29,100,000      28,100,000         700,000         700,000  
                                                                                                                                                        
                                          MINNESOTA                                                                                                     
                                                                                                                                                        
  (FDP)ST. CROIX RIVER, STILLWATER, MN                                                       8,700,000       2,874,000  ..............       1,000,000  
    (N)LOCK AND DAM 3, MISSISSIPPI RIVER, MN (MAJOR REHAB)                                  12,400,000  ..............         800,000         800,000  
   (FC)MARSHALL, MN                                                                          7,220,000       1,832,000         500,000       1,500,000  
    (N)PINE RIVER DAM, CROSS LAKE, MN (DAM SAFETY)                                          14,900,000       1,283,000         300,000         300,000  
                                                                                                                                                        
                                         MISSISSIPPI                                                                                                    
                                                                                                                                                        
  (FDP)JACKSON COUNTY, MS WATER SUPPLY                                                      10,000,000  ..............  ..............       3,000,000  
  (FDP)NATCHER BLUFF, MS                                                                    12,900,000      45,000,000  ..............       4,000,000  
  (FDP)PEARL RIVER VICINITY OF WALKIAK BLUFF, MS                                             4,000,000       2,000,000  ..............       2,000,000  
                                                                                                                                                        
                                           MISSOURI                                                                                                     
                                                                                                                                                        
   (FC)BLUE RIVER CHANNEL, KANSAS CITY, MO                                                 198,000,000      92,173,000      17,900,000      17,900,000  
   (FC)CAPE GIRARDEAU--JACKSON, MO                                                          33,400,000      24,908,000       1,800,000       1,800,000  
   (FC)MERAMEC RIVER BASIN, VALLEY PARK LEVEE, MO                                           17,738,000       8,905,000       2,347,000       2,347,000  
    (N)MISS RIVER BTWN THE OHIO AND MO RIVERS (REG WORKS), MO                              278,000,000     183,901,000       3,446,000       3,446,000  
   (FC)ST GENEVIEVE, MO                                                                     35,387,000       8,569,000       4,145,000       4,145,000  
   (MP)TABLE ROCK LAKE, MO AND AR (DAM SAFETY)                                              60,200,000       1,100,000         800,000         800,000  
                                                                                                                                                        
                                           MONTANA                                                                                                      
                                                                                                                                                        
       NORTH FORK, FLATHEAD RIVER, MT (SEC. 584 MONITORING STATION)                             50,000  ..............  ..............          50,000  
                                                                                                                                                        
                                           NEBRASKA                                                                                                     
                                                                                                                                                        
   (FC)MISSOURI NATIONAL RECREATIONAL RIVER, NE AND SD                                      21,000,000       2,089,000         150,000         150,000  
   (FC)WOOD RIVER, GRAND ISLAND, NE                                                          6,036,000       1,850,000         500,000         500,000  
                                                                                                                                                        
                                            NEVADA                                                                                                      
                                                                                                                                                        
   (FC)TROPICANA AND FLAMINGO WASHES, NV                                                   176,200,000      29,028,000      20,000,000      20,000,000  
                                                                                                                                                        
                                          NEW JERSEY                                                                                                    
                                                                                                                                                        
   (BE)CAPE MAY INLET TO LOWER TOWNSHIP, NJ                                                 92,700,000      13,699,000         280,000         280,000  
   (BE)GREAT EGG HARBOR INLET AND PECK BEACH, NJ                                           375,000,000      29,894,000       3,076,000       3,076,000  
   (FC)MOLLY ANN'S BROOK AT HALEDON, PROSPECT PARK AND PATERS                               20,700,000      10,334,000       7,090,000       7,090,000  
   (FC)PASSAIC RIVER PRESERVATION OF NATURAL STORAGE AREAS, N                               14,800,000         500,000       3,500,000       3,500,000  
   (FC)RAMAPO RIVER AT OAKLAND, NJ                                                          10,600,000       2,226,000         277,000       3,000,000  
   (BE)SANDY HOOK TO BARNEGAT INLET, NJ                                                  1,115,000,000      84,304,000      15,116,000      15,116,000  
                                                                                                                                                        
                                          NEW MEXICO                                                                                                    
                                                                                                                                                        
   (FC)ABIQUIU DAM EMERGENCY GATES, NM                                                       7,200,000       1,616,000       1,400,000       1,400,000  
   (FC)ACEQUIAS IRRIGATION SYSTEM, NM                                                       64,500,000      11,386,000         600,000       1,000,000  
   (FC)ALAMOGORDO, NM                                                                       34,800,000       3,720,000         400,000         400,000  
   (FC)GALISTEO DAM, NM (DAM SAFETY)                                                         8,300,000         407,000       2,720,000       2,720,000  
   (FC)LAS CRUCES, NM                                                                        6,600,000         600,000         300,000       3,000,000  
   (FC)MIDDLE RIO GRANDE FLOOD PROTECTION, BERNALILLO TO BELE                               46,800,000       8,675,000         560,000         560,000  
   (FC)RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE,                                59,500,000       3,720,000         280,000         280,000  
   (FC)TWO RIVERS DAM, NM (DAM SAFETY)                                                       3,020,000         457,000       2,563,000       2,563,000  
                                                                                                                                                        
                                           NEW YORK                                                                                                     
                                                                                                                                                        
   (BE)ATLANTIC COAST OF NYC, ROCKAWAY INLET TO NORTON POINT,                               81,000,000      12,500,000       1,000,000       1,000,000  
   (BE)EAST ROCKAWAY INLET TO ROCKAWAY INLET AND JAMAICA BAY,                               62,400,000      38,465,000         600,000         600,000  
   (BE)FIRE ISLAND INLET TO JONES INLET, NY                                                326,000,000      30,588,000         285,000         285,000  
   (BE)FIRE ISLAND INLET TO MONTAUK POINT, NY                                              526,000,000      41,678,000       4,802,000       4,802,000  
    (N)KILL VAN KULL AND NEWARK BAY CHANNEL, NY AND NJ                                     324,000,000     197,606,000         429,000         429,000  
   (BE)LONG BEACH ISLAND, NY                                                                51,300,000       1,050,000  ..............       2,000,000  
                                                                                                                                                        
                                        NORTH CAROLINA                                                                                                  
                                                                                                                                                        
    (N)AIWW--REPLACEMENT OF FEDERAL HIGHWAY BRIDGES, NC                                     75,972,000      54,756,000       7,000,000       7,000,000  
   (BE)CAROLINA BEACH AND VICINITY, NC                                                     169,780,000      21,419,000       2,840,000       2,840,000  
    (N)WILMINGTON HARBOR CHANNEL WIDENING, NC                                              224,200,000       4,068,000       3,700,000       2,430,000  
   (BE)WRIGHTSVILLE BEACH, NC                                                               25,200,000       3,529,000       1,070,000       1,070,000  
                                                                                                                                                        
                                         NORTH DAKOTA                                                                                                   
                                                                                                                                                        
       BUFORD TRENTON IRRIGATION DIST., ND                                                  34,000,000      15,992,000  ..............       3,000,000  
   (MP)GARRISON DAM AND POWER PLANT, ND (MAJOR REHAB)                                       40,840,000         319,000         300,000         300,000  
   (FC)HOMME LAKE, ND (DAM SAFETY)                                                          14,700,000       1,226,000         200,000         200,000  
   (FC)LAKE ASHTABULA AND BALDHILL DAM, ND (DAM SAFETY)                                     15,800,000      13,365,000         500,000         500,000  
   (FC)LAKE ASHTABULA AND BALDHILL DAM, ND (MAJOR REHAB)                                     7,150,000       4,797,000       1,200,000       1,200,000  
   (FC)SHEYENNE RIVER, ND                                                                   33,580,000      22,632,000         500,000         500,000  
                                                                                                                                                        
                                             OHIO                                                                                                       
                                                                                                                                                        
   (FC)BEACH CITY LAKE, MUSKINGUM RIVER LAKES, OH (DAM SAFETY                                3,300,000         552,000         105,000         105,000  
   (FC)HOLES CREEK, WEST CARROLLTON, OH                                                      3,414,000       1,524,000       1,890,000       1,890,000  
   (FC)METROPOLITAN REGION OF CINCINNATI, DUCK CREEK, OH                                    13,138,000       1,588,000       2,120,000       2,120,000  
   (FC)MILL CREEK, OH                                                                      163,000,000      97,431,000       2,518,000       2,518,000  
   (FC)WEST COLUMBUS, OH                                                                    82,758,000      35,000,000      15,181,000      15,181,000  
                                                                                                                                                        
                                           OKLAHOMA                                                                                                     
                                                                                                                                                        
   (FC)FRY CREEKS, BIXBY, OK                                                                 9,260,000       5,332,000       3,928,000       3,928,000  
   (FC)MINGO CREEK, TULSA, OK                                                               74,800,000      62,394,000       7,000,000       7,000,000  
   (MP)TENKILLER FERRY LAKE, OK (DAM SAFETY)                                                36,000,000       2,009,000          95,000          95,000  
                                                                                                                                                        
                                            OREGON                                                                                                      
                                                                                                                                                        
   (MP)BONNEVILLE POWERHOUSE PHASE II, OR AND WA (MAJOR REHAB)                              89,100,000      10,990,000      13,000,000      13,000,000  
   (MP)COLUMBIA RIVER TREATY FISHING ACCESS SITES, OR AND WA                                75,000,000      13,011,000       8,400,000       8,400,000  
   (FC)ELK CREEK LAKE, OR                                                                  174,000,000     109,025,000       3,900,000       3,900,000  
                                                                                                                                                        
                                         PENNSYLVANIA                                                                                                   
                                                                                                                                                        
    (N)GRAYS LANDING LOCK AND DAM, MONONGAHELA RIVER, PA                                   181,000,000     173,894,000         250,000       2,900,000  
   (FC)JOHNSTOWN, PA (MAJOR REHAB)                                                          32,500,000       2,950,000       6,205,000       6,205,000  
   (FC)LACKAWANNA RIVER, OLYPHANT, PA                                                        9,800,000       2,639,000         400,000         400,000  
   (FC)LACKAWANNA RIVER, SCRANTON, PA                                                       14,800,000       2,764,000         425,000         425,000  
    (N)LOCKS AND DAMS 2, 3 AND 4, MONONGAHELA RIVER, PA                                    695,000,000      42,426,000       2,700,000      12,700,000  
   (BE)PRESQUE ISLE PENINSULA, PA (PERMANENT)                                               61,730,000      15,553,000         500,000         500,000  
   (FC)SAW MILL RUN, PITTSBURGH, PA                                                         10,575,000       2,534,000         500,000         500,000  
   (FC)WYOMING VALLEY, PA (LEVEE RAISING)                                                  108,000,000      28,745,000      13,000,000      13,000,000  
                                                                                                                                                        
                                         PUERTO RICO                                                                                                    
                                                                                                                                                        
   (FC)PORTUGUES AND BUCANA RIVERS, PR                                                     418,825,000     359,772,000      12,712,000      12,712,000  
   (FC)RIO DE LA PLATA, PR                                                                  63,318,000       4,586,000         510,000         510,000  
   (FC)RIO PUERTO NUEVO, PR                                                                322,100,000      25,199,000      11,868,000      11,868,000  
    (N)SAN JUAN HARBOR, PR                                                                  34,400,000       4,092,000       2,400,000       2,400,000  
                                                                                                                                                        
                                        SOUTH CAROLINA                                                                                                  
                                                                                                                                                        
    (N)COOPER RIVER, CHARLESTON HARBOR, SC                                                 206,673,000     203,935,000       1,869,000       1,869,000  
   (BE)MYRTLE BEACH, SC                                                                    140,535,000      19,365,000      10,000,000      10,000,000  
                                                                                                                                                        
                                            TEXAS                                                                                                       
                                                                                                                                                        
    (N)CHANNEL TO VICTORIA, TX                                                              22,293,000      11,006,000       7,300,000       7,300,000  
   (FC)CLEAR CREEK, TX                                                                      70,024,000      19,478,000         750,000         750,000  
   (FC)EL PASO, TX                                                                         114,500,000      96,351,000       5,290,000       5,290,000  
    (N)FREEPORT HARBOR, TX                                                                  63,557,000      56,429,000       4,900,000       4,900,000  
    (N)GIWW--SARGENT BEACH, TX                                                              58,770,000      51,848,000         940,000         940,000  
    (N)HOUSTON--GALVESTON NAVIGATION CHANNELS, TX                                          316,541,000      18,800,000      15,000,000      15,000,000  
   (FC)MCGRATH CREEK, WICHITA FALLS, TX                                                      9,516,000       6,225,000       3,291,000       3,291,000  
   (FC)SAN ANTONIO CHANNEL IMPROVEMENT, TX                                                 147,800,000     147,410,000         390,000         390,000  
   (FC)SIMS BAYOU, HOUSTON, TX                                                             209,480,000      49,409,000       9,590,000      13,000,000  
   (FC)WACO LAKE, TX (DAM SAFETY)                                                            9,800,000         729,000       1,700,000       1,700,000  
       WALLISVILLE LAKE, TX                                                                 62,512,000      58,544,000  ..............      10,000,000  
                                                                                                                                                        
                                             UTAH                                                                                                       
                                                                                                                                                        
   (FC)LITTLE DELL LAKE, UT                                                             ..............  ..............  ..............       1,000,000  
   (FC)UPPER JORDAN RIVER, UT                                                                9,400,000       2,076,000         700,000         700,000  
                                                                                                                                                        
                                           VIRGINIA                                                                                                     
                                                                                                                                                        
    (N)AIWW BRIDGE AT GREAT BRIDGE, VA                                                      23,100,000       1,961,000       1,526,000       1,526,000  
    (N)NORFOLK HARBOR AND CHANNELS (DEEPENING), VA                                         137,400,000      19,368,000       1,098,000       1,098,000  
   (FC)ROANOKE RIVER UPPER BASIN, HEADWATERS AREA, VA                                       23,400,000       5,130,000       4,400,000       4,400,000  
   (BE)VIRIGINIA BEACH, VA (REIMBURSEMENT)                                                   8,460,000       7,535,000  ..............         925,000  
       VIRGINIA BEACH VA (HURRICANE PROTECTION)                                             66,810,000      15,992,000  ..............      15,000,000  
                                                                                                                                                        
                                          WASHINGTON                                                                                                    
                                                                                                                                                        
   (MP)COLUMBIA RIVER FISH MITIGATION, WA, OR AND ID                                     1,376,217,000     380,014,000     127,000,000     117,000,000  
   (MP)LOWER SNAKE RIVER FISH AND WILDLIFE COMPENSATION, WA, OR                            232,000,000     224,217,000       4,000,000       4,000,000  
   (MP)THE DALLES POWERHOUSE (UNITS 1-14), WA AND OR (MAJOR REH                             87,700,000       1,893,000       4,000,000       4,000,000  
                                                                                                                                                        
                                        WEST VIRGINIA                                                                                                   
                                                                                                                                                        
   (FC)GREENBRIER RIVER BASIN, WV                                                           12,000,000      15,992,000  ..............       1,500,000  
   (FC)LEVISA AND TUG FORKS AND UPPER CUMBERLAND RIVER, WV, V                            1,597,597,000     607,164,000       7,927,000      55,667,000  
  (FDP)LOWER MUD RIVER, MILTON, WV                                                             100,000  ..............  ..............         100,000  
    (N)ROBERT C BYRD LOCKS AND DAM, WV AND OH                                              373,000,000     340,212,000       5,356,000       5,356,000  
   (FC)TYGART LAKE, WV (DAM SAFETY)                                                         29,500,000       1,457,000       1,000,000       1,000,000  
    (N)WINFIELD LOCKS AND DAM, WV                                                          221,600,000     201,566,000       8,500,000       8,500,000  
                                                                                                                                                        
                                          WISCONSIN                                                                                                     
                                                                                                                                                        
       LAFARGE LAKE, KICKAPOO RIVER, WI                                                     17,000,000  ..............  ..............         713,000  
   (FC)PORTAGE, WI                                                                           7,260,000       3,102,000       1,500,000       1,500,000  
                                                                                                                                                        
                                        MISCELLANEOUS                                                                                                   
                                                                                                                                                        
       AQUATIC PLANT CONTROL PROGRAM                                                    ..............  ..............       2,600,000       6,600,000  
       AQUATIC ECOSYSTEM RESTORATION (SECTION 206)                                      ..............  ..............       2,000,000       2,750,000  
       BEACH EROSION CONTROL PROJECTS (SECTION 103)                                     ..............  ..............       3,000,000       3,000,000  
       BENEFICIAL USES OF DREDGED MATERIAL (SECTION 204)                                ..............  ..............       2,000,000       2,000,000  
       CLEARING AND SNAGGING PROJECT (SECTION 208)                                      ..............  ..............         500,000         500,000  
       EMERGENCY STREAMBANK AND SHORELINE PROTECTION (SEC. 14)                          ..............  ..............       7,800,000       7,800,000  
       EMPLOYEES' COMPENSATION                                                          ..............  ..............      18,048,000      18,048,000  
       ENVIRONMENTAL INFRASTRUCTURE                                                     ..............  ..............  ..............      10,000,000  
       FLOOD CONTROL PROJECTS (SECTION 205)                                             ..............  ..............      32,400,000      34,300,000  
       INLAND WATERWAYS USERS BOARD--BOARD EXPENSE                                      ..............  ..............          40,000          40,000  
       INLAND WATERWAYS USERS BOARD--CORPS EXPENSE                                      ..............  ..............         185,000         185,000  
       NAVIGATION MITIGATION PROJECT (SECTION 111)                                      ..............  ..............         500,000         500,000  
       NAVIGATION PROJECTS (SECTION 107)                                                ..............  ..............       5,800,000       6,885,000  
                                                                                                                                                        
       PROJECT MODIFICATIONS FOR IMPROVEMENT OF THE ENVIRONME                           ..............  ..............      21,175,000      24,752,000  
       REDUCTION FOR ANTICIPATED SAVINGS AND SLIPPAGE                                   ..............  ..............     -45,863,000     -46,153,000  
                                                                                       -----------------------------------------------------------------
             TOTAL, CONSTRUCTION GENERAL                                                ..............  ..............   1,077,470,000   1,284,266,000  
--------------------------------------------------------------------------------------------------------------------------------------------------------
       TYPE OF PROJECT:                                                                                                                                 
           (N)  NAVIGATION                                                                                                                              
           (BE)  BEACH EROSION CONTROL                                                                                                                  
           (FC)  FLOOD CONTROL                                                                                                                          
           (MP)  MULTIPURPOSE, INCLUDING POWER                                                                                                          

    Dillingham, AK, shoreline erosion.--The Committee has 
included $1,200,000 for the Corps of Engineers to complete the 
Dillingham, AK, shoreline erosion control project. The 
Committee understands that serious erosion has endangered 
public facilities and that the project helps eliminate the 
erosion.
    St. Paul Harbor, AK.--An appropriation of $6,638,000 is 
recommended for the Corps of Engineers to complete planning for 
the St. Paul Harbor, AK, project and initiate construction in 
fiscal year 1998. The Committee understands that a large part 
of the first year funding requirement is mobilization costs 
associated with this remote Alaska island.
    McClellan-Kerr Arkansas River navigation system (Montgomery 
Point lock and dam), Arkansas.--The bill includes $10,000,000 
for the McClellan-Kerr Arkansas River navigation project, as 
proposed in the budget request, which is $3,000,000 more than 
the appropriation for the current fiscal year.
    Red River emergency bank protection, Arkansas.--An 
appropriation of $3,500,000 is included in the bill for the 
Corps of Engineers to initiate and complete construction of the 
Black Lake revetment feature of the Red River emergency bank 
protection project in Arkansas.
    Arkansas River, Tucker Creek, AR.--Using $300,000 provided 
herein, the Committee directs the Corps of Engineers to 
complete reconstruction and rehabilitation of Faulkner County 
Levee No. 1 (Tucker Creek) in accordance with section 110 of 
Public Law 101-640, and in accordance with Public Law 99-662 
cost-sharing requirements.
    Los Angeles Harbor, CA.--An appropriation of $26,100,000 is 
recommended for the Los Angeles Harbor project in California. 
This is $10,000,000 over the budget for fiscal year 1998. This 
is a good example for the impact of current and future budget 
constraints have on providing for the infrastructure needs of 
the Nation. The Committee understands that the Corps of 
Engineers could utilize $60,000,000 to maintain efficient 
progress on this project which contributes billions of dollars 
to the national economy through export and import of goods, 
direct and indirect employment, and associated economic 
activity generated in the region. Yet, only $16,100,000 has 
been included in the budget request for fiscal year 1998. The 
Committee is unable to provide the full amount required for 
1998, and budget profiles for the next several years project a 
continued decline in available resources to support projects 
such as the Los Angeles Harbor that contribute so much to the 
national economy.
    Marysville/Yuba City, CA.--An amount of $9,300,000 has been 
included by the Committee to accelerate work on flood control 
levee work in the Marysville and Yuba City area of California. 
The Committee understands that a levee break during the January 
1997 flood caused loss of life and substantial property damage 
in the area.
    Mid-Valley area levee reconstruction, California.--The 
Committee has provided an increase of $2,500,000 over the 
budget request for the Corps to accelerate construction of 
levee reconstruction work of the Mid-Valley Area Levee 
Reconstruction project in California in order to have flood 
protection in place at the earliest possible time.
    Sacramento River flood control project, (Glenn-Colusa 
irrigation district), California.--The Committee has provided 
$600,000, the same as the budget request for the Corps of 
Engineers to continue construction on the riffle restoration 
project.
    Faulkner Island Lighthouse, CT.--The Committee is aware 
that the budget request did not include funding to continue the 
shoreline protection project for the Faulkner Island Lighthouse 
in Connecticut, but understands the available fiscal year 1997 
carryover funds could be used to continue the project in fiscal 
year 1998. The Corps is directed to use $400,000 of available 
funds to continue the project in fiscal year 1998.
    Canaveral Harbor, FL.--The recommendation includes 
$3,500,000 for the Corps to proceed with the Canaveral Harbor 
project in Florida. The Committee understands that contract 
work had to be terminated and funding reprogrammed from the 
project following the explosion of an Air Force rocket and 
subsequent contamination of the project area. Since the problem 
is now resolved, the Committee has provided the full capability 
of the Corps to award a new contract and resume work.
    Everglades and south Florida ecosystem restoration, 
Florida.--The Committee recommendation includes $10,000,000 for 
the Everglades and south Florida ecosystem restoration project 
in Florida as requested by the President. The President's 
budget transmitted to the Congress in February of this year 
contained $75,000,000 for this project. However, a subsequent 
budget amendment reduced this amount to the annual incremental 
amount which could actually be spent in fiscal year 1998 
without carrying over large unused balances into future years. 
The Committee concurs with the amended request and has provided 
the full $10,000,000 as requested.
    Fort Pierce Beach, FL.--The Committee recommends an 
appropriation of $2,300,000 for the Corps to continue work on 
the Fort Pierce Beach, FL, project. Activities include 
completion of a general reevaluation report and renourishment 
work.
    Kissimmee River restoration, Florida.--The Committee 
recommendation includes $3,000,000 for the Corps of Engineers 
to continue the Kissimmee River restoration project in Florida. 
This is the same amount as included in the budget request.
    Panama City beaches, FL.--The Committee is aware that 
Hurricane Opal devastated the beaches and area around Panama 
City, FL, in the summer of 1995. The Hurricane left the area 
without hurricane and flood protection by stripping the 
coastline of all beach sand which provides storm surge 
protection. The Committee understands that the State and local 
officials believe that restoration of hurricane protection is 
essential. Therefore, the Committee has provided $5,000,000 to 
continue this important project.
    McCook Reservoir, IL.--While the budget request for the 
McCook Reservoir, IL, project does not include a request for 
new funding, the Committee understands that programmed 
carryover funding will finance fiscal year 1998 work 
activities.
    O'Hare Reservoir [CUP], IL.--The Committee understands that 
the Corps has not requested funding in their fiscal year 1998 
budget to complete the O'Hare Reservoir, IL, project, but plans 
to reprogram available funding to this purpose. Given the 
importance of this project, the Committee has recommended an 
appropriation of $2,100,000 to ensure completion in fiscal year 
1998.
    Upper Mississippi River System Environmental Management 
Program.--In the report to Congress on the Environmental 
Management Program, the Corps should include, as complete as 
possible, a quantification and qualification of project 
results, since inception, to provide an assessment of the 
Nation's return on investment for projects completed. This 
report will help give the Congress a fuller basis to evaluate 
the success of the program.
    Lake Pontchartrain storm water discharge, Louisiana.--The 
Committee has included $3,000,000 to continue the development 
of the Lake Pontchartrain storm water discharge project in 
Louisiana.
    Lake Pontchartrain and vicinity, Louisiana.--The Committee 
has provided an additional $10,000,000 for this project to be 
used by the Corps of Engineers to continue construction of 
parallel protection and other priority work in fiscal year 
1998.
    Red River Waterway, Mississippi River to Shreveport, LA.--
An appropriation of $16,490,000 is recommended for the Red 
River Waterway, LA, project. The additional funding is provided 
for the Corps to complete the Eagle Bend Capout, and to 
initiate the Hadden-Fort DeRussy reinforcement; Ben Routh-Dupre 
reinforcement, and saline reinforcement in pool 1; Powhatan 
Dikes in pool 3; East Point Dikes in pool 4; and Moss Capout 
phase 2 in pool 5.
    The Committee is informed of the discovery of the 
shipwreck, Kentucky, located in the Red River Waterway. Given 
the significance of this find, the Committee expects the Corps 
to follow applicable rules and guidelines in the recovery of 
the Kentucky, and to include in future budget requests funding 
to address this new requirement.
    Baltimore Harbor and Channels, MD.--The Committee 
understands the Corps' Baltimore District recently completed a 
limited reevaluation report with a favorable recommendation for 
the Brewerton Channel extension and that the report is 
presently under review by the Corps. Given the fact that the 
project was authorized in 1958 and is necessary for safety and 
efficient passage of the larger ships calling on the Port of 
Baltimore, the Committee hopes the Corps will give serious 
consideration to including the project in the fiscal year 1999 
budget request.
    Poplar Island, MD.--The Committee recommends an 
appropriation of $25,621,000 for the Poplar Island restoration 
project in Maryland, which is $5,000,000 below the budget 
request for fiscal year 1998. The reduction is made without 
prejudice and is based on delays being experienced with real 
estate acquisition during the current year. The Committee is 
informed that previously appropriated funds will be carried 
over into fiscal year 1998, thus reducing the need for new 
appropriations to the amount recommended. The Committee further 
understands that phase I work can be fully funded with the 
amount included for fiscal 1998 and the expected carryover.
    North Jefferson City, MO.--The Committee notes that despite 
its encouragement in last year's report, only minimal progress 
has been made. The Committee directs that the Corps proceed 
expeditiously on the project, develop a project timetable, and 
submit a report to the Committee.
    Tennessee-Tombigbee Waterway wildlife mitigation, Alabama 
and Mississippi.--Of the funds provided for wildlife mitigation 
on the Tennessee-Tombigbee Waterway, the Committee encourages 
the Corps to consider acquiring additional acreage in Neshoba 
County, MS, using existing authorization for the Tennessee-
Tombigbee Waterway mitigation, to alleviate access problems 
associated with previously acquired mitigation lands in that 
area.
    Reno, NV, flood warning system.--The Committee understands 
that the Corps is proceeding with activities related to the 
need for a flood preparedness and flood warning system for 
Reno, NV, as directed in the 1997 Emergency Supplemental 
Appropriations Act. The Corps is directed to use $250,000 of 
available funds to undertake planning for this work in fiscal 
year 1998.
    Acequias irrigation system, New Mexico.--The Committee has 
provided $1,000,000 for the acequias irrigation system in New 
Mexico in order to continue progress on this important project.
    Wilmington Harbor channel widening, North Carolina.--The 
Committee is aware that the Wilmington Harbor project in North 
Carolina involves three features which, if consolidated and not 
undertaken separately, would improve the construction 
management of the total project and produce a lower overall 
project cost to the Federal Government. In light of the 
potential efficiencies and savings, the Committee has included 
language in the bill to consolidate the three features of the 
project by modifying the project authorization. The Committee 
has included $2,430,000, $1,270,000 below the budget request, 
to begin construction of the modified Wilmington Harbor project 
in fiscal year 1998.
    Buford Trenton Irrigation District, ND.--An appropriation 
of $3,000,000 is recommended for the Corps of Engineers to 
begin to prioritizing the sites and land acquisition process 
for the Buford Trenton Irrigation District project in North 
Dakota.
    Houston-Galveston navigation channels, Texas.--The 
Committee understands the critical importance of widening and 
deepening the Houston-Galveston navigation channels, including 
the Port of Houston and the Houston ship channel. The Port of 
Houston draws cargo from every State, provides over 
$5,500,000,000 to the Nation's economy, generates nearly 
200,000 jobs, and is the largest container port in the Nation. 
It is the only major port in the United States that remains at 
a 40-foot depth, and the Committee understands the need to 
widen and deepen the Houston-Galveston navigation channels to 
permit safer, more cost-effective movement of cargo. The 
Committee is informed that the Corps believes it could use 
$23,900,000 in fiscal year 1998, although only $15,000,000 has 
been requested. If additional funds are needed in fiscal year 
1998, the Committee urges the Corps to reprogram additional 
resources to the project.
    Columbia River juvenile fish mitigation, Washington, 
Oregon, and Idaho.--Due to budget constraints, the Committee 
has had to recommend a $10,000,000 reduction below the budget 
request. The amount recommended is $21,000,000 more than the 
appropriation for the current fiscal year.
    The amount recommended supports continued improvements to 
juvenile fish bypass activities including extended length 
screens, electronic smolt monitoring, and other items. Funding 
is also included to complete the John Day passive integrated 
transponder [PIT] tag detector facility and to evaluate the 
impacts of reservoir drawdowns.
    The Committee believes that the regional consensus is 
important in carrying out the Columbia Fish Mitigation Program 
and that the region is better able to determine priorities for 
fish passage facilities and other modifications to scheduled 
activities. Therefore, the Committee expects adjustments 
required by the reduction in funding be made in a cooperative 
way in the region by the system configuration team [SCT].
    The Committee approved the Corps February 25, 1997, 
reprogramming request related to a study of the biological, 
social, and economic impacts of a drawdown of John Day, 
consistent with the terms and conditions specified in its June 
6, 1997, letter to the Assistant Secretary of the Army for 
Civil Works. The Bonneville Power Administration shall be 
responsible for preparing the analysis of direct and indirect 
power costs for this purpose. The Corps is directed to provide 
a final scoping document for the Committee's approval no later 
than 90 days from the date of enactment of this act. Based upon 
and acceptable review of the final scoping document, the 
Committee will permit the Corps to continue forward with the 
study within available funds. The Committee specifies that no 
funds shall be made available to drawdown John Day or make any 
physical modifications related to such an activity.
    Port Seattle, East Waterway, WA.--The Committee encourages 
the Corps to work with the non-Federal interest to carry out 
any work associated with the project which is later recommended 
by the Chief of Engineers and approved by the Secretary, and 
which is determined to be compatible with the project. The 
Secretary is further encouraged to credit, as appropriate, such 
non-Federal interest with the cost of such work in accordance 
with law and established cost sharing procedures. In analyzing 
the costs and benefits of such project, the Secretary may 
consider the costs and benefits produced by any work which is 
carried out by non-Federal interests and which the Secretary 
determines is compatible with such project.
    John Day lock and dam, WA--Kennewick skeletal remains.--The 
Committee is aware of a recent discovery of prehistoric 
skeletal remains and believes that it is in the public interest 
that information providing greater insight into America 
prehistory should be collected, preserved, and disseminated for 
the benefit of the country as a whole. The Corps should work 
cooperatively with all affected interest groups in determining 
the treatment and disposition of the Kennewick man skeleton, a 
set of ancient human remains found near Kennewick, WA, on the 
Columbia River is accomplished in the interest of all 
Americans. The Committee expects the Corps to keep such 
objectives in mind and act as an impartial party in resolving 
questions concerning the study and disposition of the remains.
    Houston-Galveston navigation channels, TX.--The Committee 
has provided $15,000,000 to initiate construction of the 
Houston-Galveston navigation channels project in Texas. The 
recommendation is the full amount requested in the amended 
budget request for fiscal year 1998. The Committee does not 
concur with the fully funded policy proposed by the 
administration and directs the Corps of Engineers to enter into 
a project cooperation agreement for the entire authorized 
project.
    Little Dell Lake, UT.--The Committee has included an 
appropriation of $1,000,000 to complete construction of 
recreation facilities at the Little Dell Lake, UT, project, and 
reimbursement to the Metropolitan Water District of Salt Lake 
City consistent with the May 23, 1997, project cooperation 
agreement.
    Levisa and Tug Forks of the Big Sandy River and Upper 
Cumberland River, West Virginia, Kentucky, and Virginia.--The 
Committee has provided a total of $55,667,000 for the Levisa 
and Tug Forks of the Big Sandy River and Upper Cumberland River 
project.
    In addition to amounts provided in the budget request, the 
bill includes $18,000,000 to continue the Harlan, KY, element 
of the project; $4,690,000 for the Williamsburg, KY, element of 
the project; $5,800,000 for the Pike County (Tug Fork) element; 
and $7,200,000 for continuation of flood proofing on the 
Middlesboro, KY, element of the project. In addition, the Corps 
is directed to continue construction of the Pike County, KY, 
element using funds previously appropriated.
    The Committee recommendation also includes $3,000,000 for 
the Upper Mingo County, WV, element; $6,300,000 for the Lower 
Mingo (Kermit), WV, element; $1,200,000 for the Wayne County, 
WV, element; $400,000 for the Tug Fork basin flood warning 
system; $1,000,000 for the Hatfield Bottom, WV, nonstructural 
element of the Levisa and Tug Forks of the Big Sandy River and 
Upper Cumberland River, (sec. 202) project; and $150,000 to 
complete the Lower Mingo, WV, detail project report.
    Lower Mud River, Milton, WV.--The Committee has included 
$100,000 for the Corps to initiate and complete a review of a 
National Resource Conservation Service [NRCS] watershed plan 
and environmental impact statement to determine what changes, 
if any, are required before construction begins.
    Aquatic plant control program.--The Committee has included 
$6,600,000, a $4,000,000 increase over the budget request, to 
continue the aquatic plant control program. In light of severe 
budget constraints and the fact that this is a nationwide 
program, the Committee believes it inappropriate to earmark the 
small amount of funding available for fiscal year 1997. The 
appropriations are to undertake the highest priority 
activities.
    Small flood control projects, (sec. 205).--The Committee 
recommendation for section 205 small flood control projects is 
$34,300,000.
    The Committee recommendation includes $75,000 to initiate 
and complete feasibly studies for the Resurrection River, AK, 
project; $300,000 for design of the Fort Fairfield, ME, flood 
control project; $275,000 for a cost shared feasibility study 
at Lake Carl Blackwell, OK; $280,000 for the Snoqualmie River, 
WA, small flood control project; $250,000 for the Corps to 
initiate and complete feasibility studies on the March Run 
(Sullivan County), PA, project; and $100,000 for a reevaluation 
of the economics and alternatives for flood protection on the 
Winooski River at Colchester, VT.
    Small navigation projects, (sec. 107).--An appropriation of 
$6,885,000 is recommended for small navigation projects, 
section 107, projects.
    The Committee recommendation includes $175,000 to initiate 
plans and specification on the Whittier Harbor, AK, project; 
$75,000 to initiate and complete plans and specifications for 
the Tatitlik Harbor, AK, project; $35,000 to complete the 
feasibility report the Tamgas Harbor, AK, project; $100,000 
each for the Corps to undertake limited reevaluation reports 
for the Haines Harbor and Kitchikan Harbor, AK, projects; 
$500,000 for initiation and completion of plans and 
specifications for the Unalaska Harbor, AK, project; and 
$100,000 to initiate studies on the Des Arc, AR, project.
    Emergency streambank and shoreline protection, (sec. 14).--
The Committee recommendation for section 14, emergency 
streambank and shoreline protection projects is $7,800,000. The 
recommendation includes $100,000 for the Corps to undertake 
erosion studies at Homer Harbor, AK.
    The Committee is aware that Tioga County, PA, communities 
have been devastated regularly by flooding and that there is a 
need for streambank protection and stabilization as well as 
stream restoration. The Committee directs the Corps to consider 
Tioga County for such a project.
    Beach erosion control, (sec. 103).--An appropriation of 
$3,000,000 is recommended for beach erosion control, section 
103 projects for fiscal year 1997.
    Projects modifications for improvement of the environment, 
(sec. 1135).--The Committee has provided a total of $24,752,000 
for section 1135, projects modifications for improvements of 
the environment. The recommendation includes $125,000 to 
initiate and complete plans and specifications for the 
Talkneetna, AK, project; $2,000,000 to continue the Amazon 
Creek wetlands restoration project in Oregon; $1,052,000 for 
feasibility studies, plans and specification, and construction 
of the Bear Creek, King County, WA, project; and $400,000 for 
feasibility studies for the Lake Washington Ship Canal, WA, 
Smolt Passage restoration project.
    Aquatic ecosystem restoration, (sec. 206).--An 
appropriation of $2,750,000 is recommended for the newly 
authorized aquatic ecosystem restoration program. Included in 
the Committee recommendation is $75,000 for the Badger Slough, 
AK; $100,000 for the Ship Creek, AK; $75,000 for the Snake 
River, AK, projects for the Corps to initiate and complete 
feasibility studies; and $500,000 for the Drakes Creek, Old 
Hickory Lake, TN, project.
    Environmental infrastructure assistance.--Several 
provisions of the Water Resources Development Acts of 1990, 
1992, and 1996 authorized pilot programs to demonstrate the 
need for Federal planning, design, and construction assistance 
for water related environmental infrastructure and 
environmental resources development projects. Many of these 
pilot programs, such as those authorized in sections 217 
through 222, 303, 304, 307, 313, 324, 331 and 340 of the 1992 
act, and sections 504 and 531 of the 1996 act, recognize that 
there are serious water and wastewater problems facing rural 
and small municipal localities which these small communities 
simply cannot afford to fix. The high cost per capita of these 
projects not only reflect the relatively small population 
served, but also the difficult construction conditions in 
mountainous and cold areas.
    Through these programs, the U.S. Army Corps of Engineers 
has contacted many of these communities, offered to provide 
assistance, and subsequently has undertaken several projects. 
Under the authority of section 313 of the 1992 act, for 
example, the Corps this year will complete construction of the 
Mill Run water treatment project, and start construction of the 
Broad Top/Coaldale wastewater management project, both in south 
central Pennsylvania. Design work will begin on one flood 
control and two water line projects. In fiscal year 1998, 
construction of the Chestnut Ridge wastewater management 
project will begin. The Chestnut Ridge Joint Municipal 
Authority, Broad Top Township, and Coaldale Borough are 
actively pursuing additional funding. Having been planned as 
much as 20 years ago, these projects are now proceeding and, 
once completed, will provide higher standard of living for the 
communities they serve.
    Therefore, in an effort to bring about efficiencies and 
focus the effort of the Corps of Engineers, the Committee has 
recommended a general provision which would consolidate the 
numerous environmental infrastructure programs and has included 
$10,000,000 to undertake these types of projects. In carrying 
out this program, the Secretary of the Army is directed to give 
priority to projects located in rural areas and small 
municipalities.
    Shoreline protection policy.--The Committee continues to be 
troubled by the administration's policy regarding the Federal 
role in shore protection projects and smaller navigation 
projects. While these proposals would only directly affect the 
coastal States, including the Great Lakes States, the impacts 
of terminating the Federal Government's role in protecting our 
shorelines and maintaining small boat harbors would be felt 
throughout the Nation. The Committee also strongly rejects 
these proposals.

 Flood Control, Mississippi River and Tributaries Arkansas, Illinois, 
       Kentucky, Louisiana, Mississippi, Missouri, and Tennessee

Appropriations, 1997....................................\1\ $330,374,000
Budget estimate, 1998...................................     266,000,000
Committee recommendation................................     289,000,000

\1\ Includes a $20,000,000 emergency supplemental appropriation.

    The budget request and the approved Committee allowance are 
shown on the following table:

                                          CORPS OF ENGINEERS--FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES                                          
                                                                  [Amounts in dollars]                                                                  
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                           Benefit                                                                                      
Type of                   Project title                      cost     Total Federal     Allocated to     Current year   Budget estimate     Committee   
project                                                     ratio          cost             date          allocation                      recommendation
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                        
                    GENERAL INVESTIGATIONS                                                                                                              
                                                                                                                                                        
       SURVEYS:                                                                                                                                         
           GENERAL STUDIES:                                                                                                                             
  (FDP)        MEMPHIS METRO AREA, TN AND MS            .........       2,175,000          100,000          100,000          800,000          800,000   
  (FDP)        MORGANZA, LA TO THE GULF OF MEXICO       .........       4,805,000        2,980,000          912,000        1,070,000        3,070,000   
  (FDP)        REELFOOT LAKE, TN AND KY                 .........       1,982,000        1,574,000          219,000          335,000          335,000   
               SOUTHEAST ARKANSAS, AR                   .........       4,000,000   ...............  ...............  ...............         500,000   
  (FDP)        WOLF RIVER, MEMPHIS, TN                  .........       1,329,000          782,000          282,000          465,000          465,000   
       COLLECTION AND STUDY OF BASIC DATA               .........  ...............  ...............  ...............         345,000          345,000   
                                                       -------------------------------------------------------------------------------------------------
             SUBTOTAL, GENERAL INVESTIGATIONS           .........  ...............  ...............  ...............       3,015,000        5,515,000   
                                                       =================================================================================================
                         CONSTRUCTION                                                                                                                   
                                                                                                                                                        
   (FC)CHANNEL IMPROVEMENT, AR, IL, KY, LA, MS, MO AND      39.30   3,620,000,000    2,449,373,000       48,030,000       44,490,000       44,490,000   
        TN                                                                                                                                              
   (FC)EIGHT MILE CREEK, AR                                  2.30       8,500,000        2,324,000          195,000          812,000          812,000   
   (FC)HELENA AND VICINITY, AR                               1.90       7,700,000        2,167,000          142,000          700,000          700,000   
   (FC)MISSISSIPPI RIVER LEVEES, AR, IL, KY, LA, MS,        39.30   1,457,000,000      800,931,000       25,715,000       24,238,000       25,238,000   
        MO AND TN                                                                                                                                       
   (FC)ST FRANCIS BASIN, AR AND MO                           1.30     381,000,000      352,884,000        9,305,000        5,000,000        5,000,000   
   (FC)WHITEMAN'S CREEK, AR                                  5.50       3,300,000        1,587,000          845,000        1,105,000        1,105,000   
   (FC)ATCHAFALAYA BASIN, FLOODWAY SYSTEM, LA               39.30     185,000,000       53,187,000        5,148,000        3,300,000        3,300,000   
   (FC)ATCHAFALAYA BASIN, LA                                39.30   1,750,000,000      801,131,000       17,586,000       19,100,000       22,100,000   
   (FC)MISSISSIPPI AND LOUISIANA ESTUARINE AREAS, LA         1.70      63,300,000        7,863,000          756,000          300,000          300,000   
        AND MS                                                                                                                                          
   (FC)MISSISSIPPI DELTA REGION, LA                          7.10      97,300,000       52,367,000       11,157,000       11,500,000       11,500,000   
   (FC)TENSAS BASIN, RED RIVER BACKWATER, LA                 2.10     170,969,000       97,992,000       10,772,000        7,006,000        7,006,000   
       YAZOO BASIN, MS                                  .........  (1,391,574,000)    (649,157,000)     (42,039,000)     (25,470,000)     (25,470,000)  
   (FC)    BACKWATER LESS ROCKY BAYOU, MS                    1.40     228,482,000       59,101,000           19,000           20,000          520,000   
   (FC)    BIG SUNFLOWER RIVER, MS                           2.20     102,684,000       83,893,000        9,272,000        3,862,000        3,862,000   
   (FC)    DEMONSTRATION EROSION CONTROL, MS            .........     221,424,000      211,424,000       17,150,000       10,000,000       15,000,000   
   (FC)    F&WL; MITIGATION LANDS, MS                    .........       7,410,000        6,182,000          322,000          363,000          363,000   
   (FC)    MAIN STEM, MS                                     1.30     212,800,000       34,518,000           24,000           25,000           25,000   
   (FC)    REFORMULATION UNIT, MS                       .........      32,408,000       23,740,000        3,270,000        2,000,000        2,000,000   
   (FC)    TRIBUTARIES, MS                                   1.30     247,366,000      107,245,000        2,402,000          200,000          200,000   
   (FC)    UPPER YAZOO PROJECTS, MS                          1.40     339,000,000      123,054,000        9,580,000        9,000,000       11,000,000   
   (FC)ST. JOHNS BAYOU--NEW MADRID FLOODWAY, MO         .........      54,700,000        4,150,000           95,000        3,000,000        3,000,000   
   (FC)NONCONNAH CREEK, FLOOD CONTROL FEATURE, TN AND        6.20      17,930,000       10,948,000        1,105,000        2,000,000        2,000,000   
        MS                                                                                                                                              
   (FC)WEST TENNESSEE TRIBUTARIES, TN                          77     140,000,000       50,447,000        2,859,000        2,200,000        2,200,000   
                                                       -------------------------------------------------------------------------------------------------
             SUBTOTAL, CONSTRUCTION                     .........  ...............  ...............  ...............     150,221,000      161,721,000   
                                                       =================================================================================================
                         MAINTENANCE                                                                                                                    
                                                                                                                                                        
   (FC)CHANNEL IMPROVEMENT, AR, IL, KY, LA, MS, MO AND  .........  ...............  ...............  ...............      56,112,000       61,112,000   
        TN                                                                                                                                              
    (N)HELENA HARBOR, PHILLIPS CO, AR                   .........  ...............  ...............  ...............         280,000          280,000   
   (FC)INSPECTION OF COMPLETED WORKS, AR                .........  ...............  ...............  ...............         472,000          472,000   
   (FC)LOWER ARKANSAS RIVER--NORTH BANK, AR             .........  ...............  ...............  ...............         840,000          840,000   
   (FC)LOWER ARKANSAS RIVER--SOUTH BANK, AR             .........  ...............  ...............  ...............         124,000          124,000   
   (FC)MISSISSIPPI RIVER LEVEES, AR, IL, KY, LA, MS,    .........  ...............  ...............  ...............       7,252,000        7,252,000   
        MO AND TN                                                                                                                                       
   (FC)ST FRANCIS RIVER BASIN, AR AND MO                .........  ...............  ...............  ...............       8,130,000        8,130,000   
   (FC)TENSAS BASIN, BOEUF AND TENSAS RIVERS, AR AND    .........  ...............  ...............  ...............       2,807,000        2,807,000   
        LA                                                                                                                                              
   (FC)WHITE RIVER BACKWATER, AR                        .........  ...............  ...............  ...............       1,500,000        1,500,000   
   (FC)INSPECTION OF COMPLETED WORKS, IL                .........  ...............  ...............  ...............          49,000           49,000   
   (FC)INSPECTION OF COMPLETED WORKS, KY                .........  ...............  ...............  ...............          27,000           27,000   
   (FC)ATCHAFALAYA BASIN, FLOODWAY SYSTEM, LA           .........  ...............  ...............  ...............         670,000          670,000   
   (FC)ATCHAFALAYA BASIN, LA                            .........  ...............  ...............  ...............      10,700,000       12,700,000   
   (FC)BATON ROUGE HARBOR--DEVIL SWAMP, LA              .........  ...............  ...............  ...............         150,000          150,000   
   (FC)BAYOU COCODRIE AND TRIBUTARIES, LA               .........  ...............  ...............  ...............          92,000           92,000   
   (FC)BONNET CARRE, LA                                 .........  ...............  ...............  ...............       1,000,000        1,000,000   
   (FC)INSPECTION OF COMPLETED WORKS, LA                .........  ...............  ...............  ...............         390,000          390,000   
   (FC)LOWER RED RIVER--SOUTH BANK LEVEES, LA           .........  ...............  ...............  ...............         378,000          378,000   
   (FC)MISSISSIPPI DELTA REGION, LA                     .........  ...............  ...............  ...............         377,000          377,000   
   (FC)OLD RIVER, LA                                    .........  ...............  ...............  ...............       4,390,000        4,390,000   
   (FC)TENSAS BASIN, RED RIVER BACKWATER, LA            .........  ...............  ...............  ...............       2,891,000        2,891,000   
    (N)GREENVILLE HARBOR, MS                            .........  ...............  ...............  ...............         361,000          361,000   
   (FC)INSPECTION OF COMPLETED WORKS, MS                .........  ...............  ...............  ...............         203,000          203,000   
    (N)VICKSBURG HARBOR, MS                             .........  ...............  ...............  ...............         237,000          237,000   
       YAZOO BASIN, MS                                  .........  ...............  ...............  ...............     (21,902,000)     (21,902,000)  
   (FC)    ARKABUTLA LAKE, MS                           .........  ...............  ...............  ...............       3,514,000        3,514,000   
   (FC)    BIG SUNFLOWER RIVER, MS                      .........  ...............  ...............  ...............         237,000        2,237,000   
   (FC)    ENID LAKE, MS                                .........  ...............  ...............  ...............       3,556,000        3,556,000   
   (FC)    GREENWOOD, MS                                .........  ...............  ...............  ...............         816,000          816,000   
   (FC)    GRENADA LAKE, MS                             .........  ...............  ...............  ...............       4,662,000        4,662,000   
   (FC)    MAIN STEM, MS                                .........  ...............  ...............  ...............       1,151,000        1,151,000   
   (FC)    SARDIS LAKE, MS                              .........  ...............  ...............  ...............       4,766,000        4,766,000   
   (FC)    TRIBUTARIES, MS                              .........  ...............  ...............  ...............       1,343,000        1,343,000   
   (FC)    WILL M WHITTINGTON AUX CHAN, MS              .........  ...............  ...............  ...............         498,000          498,000   
   (FC)    YAZOO BACKWATER AREA, MS                     .........  ...............  ...............  ...............         524,000          524,000   
   (FC)    YAZOO CITY, MS                               .........  ...............  ...............  ...............         835,000          835,000   
   (FC)INSPECTION OF COMPLETED WORKS, MO                .........  ...............  ...............  ...............         220,000          220,000   
   (FC)WAPPAPELLO LAKE, MO                              .........  ...............  ...............  ...............       7,468,000        7,468,000   
   (FC)INSPECTION OF COMPLETED WORKS, TN                .........  ...............  ...............  ...............         124,000          124,000   
    (N)MEMPHIS HARBOR (MCKELLAR LAKE), TN               .........  ...............  ...............  ...............       1,345,000        1,345,000   
   (FC)MAPPING                                          .........  ...............  ...............  ...............       1,027,000        1,027,000   
       REDUCTION FOR SAVINGS AND SLIPPAGE               .........  ...............  ...............  ...............     -18,754,000      -18,754,000   
                                                       -------------------------------------------------------------------------------------------------
             SUBTOTAL, MAINTENANCE                      .........  ...............  ...............  ...............     112,764,000      121,764,000   
                                                       =================================================================================================
             TOTAL, FLOOD CONTROL, MISSISSIPPI RIVER    .........  ...............  ...............  ...............     266,000,000      289,000,000   
              AND TRIBUTARIES                                                                                                                           
--------------------------------------------------------------------------------------------------------------------------------------------------------
       TYPE OF PROJECT:                                                                                                                                 
           (N)  NAVIGATION                                                                                                                              
           (FC)  FLOOD CONTROL                                                                                                                          

    The Committee is concerned by the severe reduction, nearly 
$45,000,000, in the budget request for fiscal year 1998 for the 
Mississippi River and Tributaries project. The Committee feels 
this is unacceptable when only a few short years ago the 
Mississippi River was experiencing devastating flooding. The 
Mississippi River has the third largest drainage basin in the 
world, exceeded in size only by the Amazon and Congo River 
watersheds. It drains a total of 1,245,000 square miles, 
covering 41 percent of the contiguous United States including 
all or part of 31 States and two Canadian Provinces. Water from 
as far east as New York and as far west as Wyoming contribute 
to floods in the lower Mississippi River Valley, flowing 
through the basin roughly resembling a funnel which has its 
spout at the Gulf of Mexico. In addition, the project provides 
for navigation which is central to the Nation's economy.
    Therefore, flood control and protection and maintaining 
navigation along the Mississippi River and its tributaries is 
not an option, it is mandatory. The floods of 1993 demonstrated 
the projects' importance by averting $8,100,000,000 in flood 
damages. Over the years, the MR&T; project has saved an 
estimated $150,000,000,000 in flood damages based on a Federal 
investment of $8,121,000,000. Another outcome of the recent 
floods is the need to raise and strengthen numerous section of 
levees. The nearly $45,000,000 reduction below the 
appropriation for 1997 severely impacts this effort and 
increases the likelihood of higher flood damage disaster 
payments as the result of major flooding. The Committee hopes 
that future budgets will reflect the unique nature of the 
Mississippi River and Tributaries project and the area its 
protects.
    Southeast Arkansas, AR.--The Committee has included 
$500,000 for the Corps to complete the feasibility phase of the 
Southeast Arkansas, AR, study looking into the need to protect 
groundwater and to better utilize surface water resources in 
the Boeuf Tensas basin in Arkansas.
    Yazoo basin Backwater project, MR&T.--The; Committee is 
aware that the Water Resources Development Act of 1996 
clarified the definition of ``physical construction'', thus 
emphasizing the Federal responsibility on the Yazoo Backwater 
project. The Committee understands that due to emergencies 
caused by flooding, delays will be experienced in the 
completion of planning documents for the tributaries project 
and the backwater project in the Yazoo basin. Therefore, the 
Committee has provided an additional $500,000 for the Corps to 
resume the original schedule of work on these two flood 
protection measures in order to accelerate the process for 
identifying the best alternative for reducing floods.
    Yazoo basin, demonstration erosion control, MR&T.--The; 
Committee remains concerned by the significant decrease in 
funding for the demonstration erosion control project. The 
Committee has provided $15,000,000, $5,000,000 above the budget 
request, and expects the Corps to expedite work on East Goose 
Creek in Oxford, MS.
    Horn Lake Creek, MS.--The Committee encourages the Corps to 
continue to work with the city of Horn Lake, MS, in addressing 
flooding problems along Horn Lake Creek.
    Grand Prairie/Bayou Metro, AR.--The Committee directs the 
Corps to continue design activities on the Grand Prairie 
portion of the Grand Prairie/Bayou Metro, AR, project and to 
initiate a revaluation of the Bayou Metro portion and expects 
the local cost share of that reevaluation to be recovered 
during project construction.

                   operation and maintenance, general

Appropriations, 1997..................................\1\ $1,866,015,000
Budget estimate, 1998...................................   1,618,000,000
Committee recommendation................................   1,661,203,000

\1\ Includes $165,000,000 in emergency supplemental appropriations.

    The budget request and the approved Committee allowance are 
shown on the following table:

         CORPS OF ENGINEERS--OPERATION AND MAINTENANCE, GENERAL         
                          [Amounts in dollars]                          
------------------------------------------------------------------------
                                              Budget         Committee  
              Project title                  estimate     recommendation
------------------------------------------------------------------------
                                                                        
                 ALABAMA                                                
                                                                        
ALABAMA--COOSA RIVER, AL................       4,903,000       4,903,000
BAYOU LA BATRE, AL......................           5,000           5,000
BLACK WARRIOR AND TOMBIGBEE RIVERS, AL..      16,252,000      18,252,000
DAUPHIN ISLAND BAY, AL..................         500,000         500,000
GULF INTRACOASTAL WATERWAY, AL..........       3,677,000       3,677,000
INSPECTION OF COMPLETED WORKS, AL.......          30,000          30,000
MILLERS FERRY LOCK AND DAM, WILLIAM                                     
 "BILL" DANNELLY LA.....................       5,835,000       5,835,000
MOBILE HARBOR, AL.......................      17,936,000      20,936,000
PERDIDO PASS CHANNEL, AL................  ..............         300,000
PROJECT CONDITION SURVEYS, AL...........         300,000         300,000
ROBERT F HENRY LOCK AND DAM, AL.........       3,858,000       3,858,000
SCHEDULING RESERVOIR OPERATIONS, AL.....          20,000          20,000
TENNESSEE--TOMBIGBEE WATERWAY, AL AND MS      16,058,000      18,713,000
WALTER F GEORGE LOCK AND DAM, AL AND GA.       6,044,000       6,044,000
                                                                        
                 ALASKA                                                 
                                                                        
ANCHORAGE HARBOR, AK....................       1,400,000       1,400,000
BETHEL HARBOR, AK.......................          20,000          20,000
CHENA RIVER LAKES, AK...................       1,766,000       2,566,000
DILLINGHAM HARBOR, AK...................         459,000         459,000
HOMER HARBOR, AK........................         245,000         245,000
INSPECTION OF COMPLETED WORKS, AK.......          27,000          27,000
NINILCHIK HARBOR, AK....................         200,000         200,000
NOME HARBOR, AK.........................         260,000         260,000
PROJECT CONDITION SURVEYS, AK...........         565,000         565,000
WRANGELL NARROWS, AK....................         400,000         400,000
                                                                        
                 ARIZONA                                                
                                                                        
ALAMO LAKE, AZ..........................       1,055,000       1,055,000
INSPECTION OF COMPLETED WORKS, AZ.......         107,000         107,000
PAINTED ROCK DAM, AZ....................       2,293,000       2,293,000
SCHEDULING RESERVOIR OPERATIONS, AZ.....          22,000          22,000
WHITLOW RANCH DAM, AZ...................         199,000         199,000
                                                                        
                ARKANSAS                                                
                                                                        
BEAVER LAKE, AR.........................       3,918,000       3,918,000
BLAKELY MT DAM--LAKE OUACHITA, AR.......       4,632,000       4,632,000
BLUE MOUNTAIN LAKE, AR..................       1,105,000       1,105,000
BULL SHOALS LAKE, AR....................       4,810,000       4,810,000
DARDANELLE LOCK AND DAM, AR.............       5,679,000       5,679,000
DEGRAY LAKE, AR.........................       3,959,000       3,959,000
DEQUEEN LAKE, AR........................       1,012,000       2,341,000
DIERKS LAKE, AR.........................       1,015,000       1,015,000
GILLHAM LAKE, AR........................         946,000         946,000
GREERS FERRY LAKE, AR...................       4,241,000       4,241,000
HELENA HARBOR, AR.......................         283,000         283,000
INSPECTION OF COMPLETED WORKS, AR.......         210,000         210,000
MCCLELLAN--KERR ARKANSAS RIVER                                          
 NAVIGATION SYSTEM, AR..................      21,604,000      21,604,000
MILLWOOD LAKE, AR.......................       1,647,000       1,647,000
NARROWS DAM--LAKE GREESON, AR...........       3,568,000       3,568,000
NIMROD LAKE, AR.........................       1,284,000       1,284,000
NORFORK LAKE, AR........................       3,183,000       3,183,000
OSCEOLA HARBOR, AR......................         311,000         311,000
OUACHITA AND BLACK RIVERS, AR AND LA....       5,179,000       5,179,000
OZARK--JETA TAYLOR LOCK AND DAM, AR.....       3,789,000       3,789,000
PROJECT CONDITION SURVEYS, AR...........           5,000           5,000
WHITE RIVER, AR.........................       2,265,000       2,265,000
YELLOW BEND PORT, AR....................         120,000         120,000
                                                                        
               CALIFORNIA                                               
                                                                        
BLACK BUTTE LAKE, CA....................       1,587,000       1,587,000
BUCHANAN DAM--H V EASTMAN LAKE, CA......       1,372,000       1,372,000
CHANNEL ISLANDS HARBOR, CA..............       3,000,000       3,000,000
COYOTE VALLEY DAM (LAKE MENDOCINO), CA..       2,718,000       2,718,000
CRESCENT CITY HARBOR, CA................       1,140,000       1,140,000
DRY CREEK (WARM SPRINGS) LAKE AND                                       
 CHANNEL, CA............................       3,451,000       3,451,000
FARMINGTON DAM, CA......................         281,000         281,000
HIDDEN DAM--HENSLEY LAKE, CA............       1,371,000       1,371,000
HUMBOLDT HARBOR AND BAY, CA.............       3,775,000       3,775,000
INSPECTION OF COMPLETED WORKS, CA.......       1,326,000       1,326,000
ISABELLA LAKE, CA.......................       1,413,000       1,413,000
LOS ANGELES--LONG BEACH HARBOR MODEL, CA         165,000         165,000
LOS ANGELES COUNTY DRAINAGE AREA, CA....       4,288,000       4,288,000
MERCED COUNTY STREAM GROUP, CA..........         252,000         252,000
MOJAVE RIVER DAM, CA....................         307,000         307,000
NEW HOGAN LAKE, CA......................       2,110,000       2,110,000
NEW MELONES LAKE (DOWNSTREAM CHANNEL),                                  
 CA.....................................         938,000         938,000
OAKLAND HARBOR, CA......................       3,146,000       4,350,000
PETALUMA RIVER, CA......................       2,090,000       2,090,000
PINE FLAT LAKE, CA......................       1,968,000       1,968,000
PROJECT CONDITION SURVEYS, CA...........       1,615,000       1,615,000
RICHMOND HARBOR, CA.....................       2,667,000       2,667,000
SACRAMENTO RIVER (30 FOOT PROJECT), CA..       1,778,000       1,778,000
SACRAMENTO RIVER AND TRIBUTARIES (DEBRIS                                
 CONTROL), CA...........................         884,000         884,000
SACRAMENTO RIVER SHALLOW DRAFT CHANNEL,                                 
 CA.....................................         133,000         133,000
SAN DIEGO HARBOR, CA....................         175,000         175,000
SAN FRANCISCO BAY--DELTA MODEL                                          
 STRUCTURE, CA..........................       1,787,000       1,787,000
SAN FRANCISCO HARBOR AND BAY (DRIFT                                     
 REMOVAL), CA...........................       2,309,000       2,309,000
SAN FRANCISCO HARBOR, CA................       2,267,000       2,267,000
SAN JOAQUIN RIVER, CA...................       1,494,000       1,494,000
SAN PABLO BAY AND MARE ISLAND STRAIT, CA       1,680,000       1,680,000
SANTA ANA RIVER BASIN, CA...............       2,762,000       2,762,000
SANTA BARBARA HARBOR, CA................       1,492,000       1,492,000
SCHEDULING RESERVOIR OPERATIONS, CA.....         968,000         968,000
SUCCESS LAKE, CA........................       1,573,000       1,573,000
SUISUN BAY CHANNEL, CA..................         952,000         952,000
TERMINUS DAM (LAKE KAWEAH), CA..........       2,073,000       2,073,000
VENTURA HARBOR, CA......................       2,236,000       2,236,000
                                                                        
                COLORADO                                                
                                                                        
BEAR CREEK LAKE, CO.....................         361,000         361,000
CHATFIELD LAKE, CO......................         715,000         715,000
CHERRY CREEK LAKE, CO...................         945,000         945,000
INSPECTION OF COMPLETED WORKS, CO.......         110,000         110,000
JOHN MARTIN RESERVOIR, CO...............       1,595,000       1,595,000
SCHEDULING RESERVOIR OPERATIONS, CO.....         368,000         368,000
TRINIDAD LAKE, CO.......................         627,000         627,000
                                                                        
               CONNECTICUT                                              
                                                                        
BLACK ROCK LAKE, CT.....................         400,000         400,000
COLEBROOK RIVER LAKE, CT................         558,000         558,000
HANCOCK BROOK LAKE, CT..................         199,000         199,000
HOP BROOK LAKE, CT......................         843,000         843,000
INSPECTION OF COMPLETED WORKS, CT.......          35,000          35,000
MANSFIELD HOLLOW LAKE, CT...............         360,000         360,000
NORTHFIELD BROOK LAKE, CT...............         401,000         401,000
PATCHOGUE RIVER, CT.....................         466,000         466,000
PROJECT CONDITION SURVEYS, CT...........       1,241,000       1,241,000
STAMFORD HURRICANE BARRIER, CT..........         351,000         351,000
THOMASTON DAM, CT.......................         489,000         489,000
WEST THOMPSON LAKE, CT..................         395,000         395,000
                                                                        
                DELAWARE                                                
                                                                        
CHESAPEAKE AND DELAWARE CANAL--ST                                       
 GEORGE'S BRIDGE REP....................      14,000,000      14,000,000
INTRACOASTAL WATERWAY, DELAWARE R TO                                    
 CHESAPEAKE BAY, D......................      11,794,000      11,794,000
MISPILLION RIVER, DE....................         165,000         165,000
PROJECT CONDITION SURVEYS, DE...........          50,000          50,000
WILMINGTON HARBOR, DE...................       2,360,000       2,360,000
                                                                        
          DISTRICT OF COLUMBIA                                          
                                                                        
INSPECTION OF COMPLETED WORKS, DC.......           6,000           6,000
POTOMAC AND ANACOSTIA RIVERS (DRIFT                                     
 REMOVAL), DC...........................         840,000         840,000
PROJECT CONDITION SURVEYS, DC...........          32,000          32,000
WASHINGTON HARBOR, DC...................          35,000          35,000
                                                                        
                 FLORIDA                                                
                                                                        
AIWW, NORFOLK TO ST JOHNS RIVER, FL, GA,                                
 SC, NC AND VA..........................          30,000          30,000
CANAVERAL HARBOR, FL....................       6,460,000       6,460,000
CARRABELLE HARBOR, FL...................         520,000         520,000
CENTRAL AND SOUTHERN FLORIDA, FL........       9,500,000       9,500,000
CHARLOTTE HARBOR, FL....................  ..............       2,750,000
FERNANDINA HARBOR, FL...................       1,536,000       1,536,000
FORT PIERCE HARBOR, FL..................         717,000         717,000
INSPECTION OF COMPLETED WORKS, FL.......          50,000          50,000
INTRACOASTAL WATERWAY, CALOOSAHATCHEE R                                 
 TO ANCLOTE R,..........................          47,000          47,000
INTRACOASTAL WATERWAY, JACKSONVILLE TO                                  
 MIAMI, FL..............................       2,909,000       2,909,000
JACKSONVILLE HARBOR, FL.................       5,961,000       5,961,000
JIM WOODRUFF LOCK AND DAM, LAKE                                         
 SEMINOLE, FL, AL AND GA................       5,399,000       5,399,000
MIAMI HARBOR, FL........................         408,000         408,000
OKEECHOBEE WATERWAY, FL.................       3,503,000       3,503,000
PALM BEACH HARBOR, FL...................       1,079,000       1,079,000
PANAMA CITY HARBOR, FL..................         700,000         700,000
PENSACOLA HARBOR, FL....................          50,000          50,000
PONCE DE LEON INLET, FL.................       3,500,000       3,500,000
PORT EVERGLADES HARBOR, FL..............           5,000           5,000
PROJECT CONDITION SURVEYS, FL...........         410,000         410,000
REMOVAL OF AQUATIC GROWTH, FL...........       3,032,000       3,032,000
ST PETERSBURG HARBOR, FL................          10,000          10,000
STEINHATCHEE RIVER, FL..................           5,000           5,000
TAMPA HARBOR, FL........................       6,607,000       6,607,000
WITHLACOOCHIE RIVER, FL.................          34,000          34,000
                                                                        
                 GEORGIA                                                
                                                                        
ALLATOONA LAKE, GA......................       4,628,000       4,628,000
APALACHICOLA CHATTAHOOCHEE AND FLINT                                    
 RIVERS, GA, AL &.......................       4,741,000       7,041,000
ATLANTIC INTRACOASTAL WATERWAY, GA......       1,783,000       1,783,000
BRUNSWICK HARBOR, GA....................       3,030,000       3,030,000
BUFORD DAM AND LAKE SIDNEY LANIER, GA...       6,179,000       6,179,000
CARTERS DAM AND LAKE, GA................       4,500,000       4,500,000
HARTWELL LAKE, GA AND SC................       9,547,000       9,547,000
INSPECTION OF COMPLETED WORKS, GA.......          40,000          40,000
J STROM THURMOND LAKE, GA AND SC........       8,982,000       8,982,000
RICHARD B RUSSELL DAM AND LAKE, GA AND                                  
 SC.....................................       7,520,000       7,520,000
SAVANNAH HARBOR, GA.....................       8,053,000      13,053,000
SAVANNAH RIVER BELOW AUGUSTA, GA........         207,000         207,000
WEST POINT DAM AND LAKE, GA AND AL......       4,631,000       4,631,000
                                                                        
                 HAWAII                                                 
                                                                        
BARBERS POINT HARBOR, HI................          84,000          84,000
HALEIWA SMALL BOAT HARBOR, HI...........         334,000         334,000
INSPECTION OF COMPLETED WORKS, HI.......         188,000         188,000
PROJECT CONDITION SURVEYS, HI...........         415,000         415,000
WAIANAE SMALL BOAT HARBOR, HI...........         334,000         334,000
                                                                        
                  IDAHO                                                 
                                                                        
ALBENI FALLS DAM, ID....................       4,775,000       4,775,000
DWORSHAK DAM AND RESERVOIR, ID..........       7,866,000       7,866,000
INSPECTION OF COMPLETED WORKS, ID.......          89,000          89,000
LUCKY PEAK LAKE, ID.....................       1,087,000       1,087,000
SCHEDULING RESERVOIR OPERATIONS, ID.....         193,000         193,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, ID.............................          64,000          64,000
                                                                        
                ILLINOIS                                                
                                                                        
CALUMET HARBOR AND RIVER, IL AND IN.....         717,000         717,000
CARLYLE LAKE, IL........................       3,908,000       3,908,000
CHICAGO HARBOR, IL......................       4,545,000       4,545,000
CHICAGO RIVER, IL.......................         343,000         343,000
FARM CREEK RESERVOIRS, IL...............         294,000         294,000
ILLINOIS WATERWAY (LMVD PORTION), IL....       1,310,000       1,310,000
ILLINOIS WATERWAY (NCD PORTION), IL AND                                 
 IN.....................................      22,738,000      22,738,000
INSPECTION OF COMPLETED WORKS, IL.......         657,000         657,000
KASKASKIA RIVER NAVIGATION, IL..........       1,433,000       1,923,000
LAKE MICHIGAN DIVERSION, IL.............         796,000         796,000
LAKE SHELBYVILLE, IL....................       4,820,000       4,820,000
MISS R BETWEEN MO R AND MINNEAPOLIS                                     
 (LMVD PORTION), IL.....................      10,535,000      10,535,000
MISS R BETWEEN MO R AND MINNEAPOLIS, IL,                                
 IA, MN, MO &...........................      81,363,000      81,363,000
PROJECT CONDITION SURVEYS, IL...........         110,000         110,000
REND LAKE, IL...........................       3,451,000       3,451,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, IL.............................         129,000         129,000
WAUKEGAN HARBOR, IL.....................         643,000         643,000
                                                                        
                 INDIANA                                                
                                                                        
BEVERLY SHORES, IN......................  ..............       1,700,000
BROOKVILLE LAKE, IN.....................         754,000         754,000
BURNS WATERWAY HARBOR, IN...............         902,000         902,000
CAGLES MILL LAKE, IN....................         709,000         709,000
CECIL M HARDEN LAKE, IN.................         715,000         715,000
HUNTINGTON LAKE, IN.....................       1,242,000       1,242,000
INDIANA HARBOR, IN......................         732,000         732,000
INSPECTION OF COMPLETED WORKS, IN.......         133,000         133,000
MICHIGAN CITY HARBOR, IN................          56,000          56,000
MISSISSINEWA LAKE, IN...................         975,000         975,000
MONROE LAKE, IN.........................         778,000         778,000
PATOKA LAKE, IN.........................         739,000         739,000
PROJECT CONDITION SURVEYS, IN...........          30,000          30,000
SALAMONIE LAKE, IN......................         832,000         832,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, IN.............................         120,000         120,000
                                                                        
                  IOWA                                                  
                                                                        
CORALVILLE LAKE, IA.....................       2,731,000       2,731,000
INSPECTION OF COMPLETED WORKS, IA.......         183,000         183,000
MISSOURI RIVER--KENSLERS BEND, NE TO                                    
 SIOUX CITY, IA.........................         152,000         152,000
MISSOURI RIVER--SIOUX CITY TO MOUTH, IA,                                
 NE, KS AND MO..........................       6,496,000       6,496,000
RATHBUN LAKE, IA........................       1,746,000       1,746,000
RED ROCK DAM--LAKE RED ROCK, IA.........       3,291,000       3,291,000
SAYLORVILLE LAKE, IA....................       4,191,000       4,191,000
                                                                        
                 KANSAS                                                 
                                                                        
CLINTON LAKE, KS........................       1,482,000       1,482,000
COUNCIL GROVE LAKE, KS..................       1,003,000       1,003,000
EL DORADO LAKE, KS......................         488,000         488,000
ELK CITY LAKE, KS.......................         699,000         699,000
FALL RIVER LAKE, KS.....................         772,000         772,000
HILLSDALE LAKE, KS......................         790,000         790,000
INSPECTION OF COMPLETED WORKS, KS.......         250,000         250,000
JOHN REDMOND DAM AND RESERVOIR, KS......       1,019,000       1,019,000
KANOPOLIS LAKE, KS......................       1,219,000       1,219,000
MARION LAKE, KS.........................       1,630,000       1,630,000
MELVERN LAKE, KS........................       1,580,000       1,580,000
MILFORD LAKE, KS........................       1,537,000       1,537,000
PEARSON--SKUBITZ BIG HILL LAKE, KS......         799,000         799,000
PERRY LAKE, KS..........................       1,673,000       1,673,000
POMONA LAKE, KS.........................       1,533,000       1,533,000
SCHEDULING RESERVOIR OPERATIONS, KS.....         178,000         178,000
TORONTO LAKE, KS........................         364,000         364,000
TUTTLE CREEK LAKE, KS...................       1,858,000       1,858,000
WILSON LAKE, KS.........................       1,349,000       1,349,000
                                                                        
                KENTUCKY                                                
                                                                        
BARKLEY DAM AND LAKE BARKLEY, KY AND TN.       8,127,000       8,127,000
BARREN RIVER LAKE, KY...................       1,918,000       1,918,000
BIG SANDY HARBOR, KY....................       1,120,000       1,120,000
BUCKHORN LAKE, KY.......................       1,309,000       1,309,000
CARR FORK LAKE, KY......................       1,374,000       1,374,000
CAVE RUN LAKE, KY.......................         908,000         908,000
DEWEY LAKE, KY..........................       1,167,000       1,167,000
ELVIS STAHR (HICKMAN) HARBOR, KY........         334,000         334,000
FISHTRAP LAKE, KY.......................       1,602,000       1,602,000
GRAYSON LAKE, KY........................       1,014,000       1,014,000
GREEN AND BARREN RIVERS, KY.............       1,915,000       1,915,000
GREEN RIVER LAKE, KY....................       1,759,000       1,759,000
INSPECTION OF COMPLETED WORKS, KY.......         137,000         137,000
KENTUCKY RIVER, KY......................       4,843,000       4,843,000
LAUREL RIVER LAKE, KY...................       1,233,000       1,233,000
LICKING RIVER OPEN CHANNEL WORK, KY.....          22,000          22,000
MARTINS FORK LAKE, KY...................         654,000         654,000
MIDDLESBORO CUMBERLAND RIVER BASIN, KY..          52,000          52,000
NOLIN LAKE, KY..........................       1,795,000       1,795,000
OHIO RIVER LOCKS AND DAMS, KY, IL, IN,                                  
 OH, PA AND WV..........................      53,126,000      53,126,000
OHIO RIVER OPEN CHANNEL WORK, KY, IL,                                   
 IN, OH, PA AND WV......................       5,889,000       5,889,000
PAINTSVILLE LAKE, KY....................         878,000         878,000
PROJECT CONDITION SURVEYS, KY...........           5,000           5,000
ROUGH RIVER LAKE, KY....................       1,669,000       1,669,000
TAYLORSVILLE LAKE, KY...................       1,086,000       1,086,000
WOLF CREEK DAM--LAKE CUMBERLAND, KY.....       4,290,000       4,290,000
YATESVILLE LAKE, KY.....................       1,111,000       1,111,000
                                                                        
                LOUISIANA                                               
                                                                        
ATCHAFALAYA RIVER AND BAYOUS CHENE,                                     
 BOEUF AND BLACK, L.....................      10,436,000      10,436,000
BARATARIA BAY WATERWAY, LA..............         505,000         505,000
BAYOU BODCAU RESERVOIR, LA..............         466,000         466,000
BAYOU LAFOURCHE AND LAFOURCHE JUMP                                      
 WATERWAY, LA...........................           5,000           5,000
BAYOU PIERRE, LA........................          25,000          25,000
BAYOU SEGNETTE WATERWAY, LA.............          10,000          10,000
BAYOU TECHE AND VERMILION RIVER, LA.....          25,000          25,000
BAYOU TECHE, LA.........................         172,000         172,000
CADDO LAKE, LA..........................          78,000          78,000
CALCASIEU RIVER AND PASS, LA............       6,480,000       6,680,000
FRESHWATER BAYOU, LA....................       2,452,000       2,452,000
GULF INTRACOASTAL WATERWAY, LA AND TX...      15,015,000      15,015,000
HOUMA NAVIGATION CANAL, LA..............         826,000         826,000
INSPECTION OF COMPLETED WORKS, LA.......         414,000         414,000
LAKE PROVIDENCE HARBOR, LA..............         371,000         371,000
MADISON PARISH PORT, LA.................          56,000          56,000
MERMENTAU RIVER, LA.....................       1,143,000       1,143,000
MISSISSIPPI RIVER--BATON ROUGE TO GULF                                  
 OF MEXICO, LA..........................      41,000,000      41,000,000
MISSISSIPPI RIVER--GULF OUTLET, LA......      10,998,000      10,998,000
PROJECT CONDITION SURVEYS, LA...........         144,000         144,000
RED RIVER WATERWAY, MISSISSIPPI RIVER TO                                
 SHREVEPORT, L..........................       7,714,000       7,714,000
REMOVAL OF AQUATIC GROWTH, LA...........       1,960,000       1,960,000
WALLACE LAKE, LA........................         152,000         152,000
WATERWAY--EMPIRE TO THE GULF, LA........         765,000         765,000
WATERWAY FROM INTRACOASTAL WATERWAY TO B                                
 DULAC, LA..............................         335,000         335,000
                                                                        
                  MAINE                                                 
                                                                        
INSPECTION OF COMPLETED WORKS, ME.......          15,000          15,000
PROJECT CONDITION SURVEYS, ME...........         722,000         722,000
                                                                        
                MARYLAND                                                
                                                                        
BALTIMORE HARBOR AND CHANNELS, MD (50                                   
 FT)....................................      12,025,000      12,025,000
BALTIMORE HARBOR (DRIFT REMOVAL), MD....         425,000         425,000
BALTIMORE HARBOR (PREVENTION OF                                         
 OBSTRUCTIVE DEPOSITS),.................         560,000         560,000
CHESTER RIVER, MD.......................          65,000          65,000
CUMBERLAND, MD AND RIDGELEY, WV.........         111,000         111,000
HONGA RIVER AND TAR BAY, MD.............         677,000         677,000
INSPECTION OF COMPLETED WORKS, MD.......          28,000          28,000
JENNINGS RANDOLPH LAKE, MD AND WV.......       1,528,000       1,528,000
LOWER THOROFARE, DEAL ISLAND, MD........          63,000          63,000
OCEAN CITY HARBOR AND INLET AND                                         
 SINEPUXENT BAY, MD.....................          47,000          47,000
PROJECT CONDITION SURVEYS, MD...........         306,000         306,000
SCHEDULING RESERVOIR OPERATIONS, MD.....          79,000          79,000
TWITCH COVE AND BIG THOROFARE RIVER, MD.       2,600,000       2,600,000
UPPER THOROFARE, MD.....................          53,000          53,000
WICOMICO RIVER, MD......................         829,000         829,000
                                                                        
              MASSACHUSETTS                                             
                                                                        
BARRE FALLS DAM, MA.....................         340,000         340,000
BIRCH HILL DAM, MA......................         385,000         385,000
BOSTON HARBOR, MA.......................      16,500,000      16,500,000
BUFFUMVILLE LAKE, MA....................         359,000         359,000
CAPE COD CANAL, MA......................       8,855,000       8,855,000
CHARLES RIVER NATURAL VALLEY STORAGE                                    
 AREA, MA...............................         156,000         156,000
COHASSET HARBOR, MA.....................  ..............       1,500,000
CONANT BROOK LAKE, MA...................         138,000         138,000
EAST BRIMFIELD LAKE, MA.................         327,000         327,000
GREEN HARBOR, MA........................         296,000         296,000
HODGES VILLAGE DAM, MA..................         348,000         348,000
INSPECTION OF COMPLETED WORKS, MA.......          78,000          78,000
KNIGHTVILLE DAM, MA.....................         527,000         527,000
LITTLEVILLE LAKE, MA....................         459,000         459,000
NEW BEDFORD FAIRHAVEN AND ACUSHNET                                      
 HURRICANE BARRIER,.....................         242,000         242,000
PROJECT CONDITION SURVEYS, MA...........       1,117,000       1,117,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, MA.............................          16,000          16,000
TULLY LAKE, MA..........................         391,000         391,000
WEST HILL DAM, MA.......................         415,000         415,000
WESTVILLE LAKE, MA......................         488,000         488,000
                                                                        
                MICHIGAN                                                
                                                                        
CEDAR RIVER HARBOR, MI..................  ..............       2,377,000
ALPENA HARBOR, MI.......................         324,000         324,000
CHANNELS IN LAKE ST CLAIR, MI...........         805,000         805,000
CHARLEVOIX HARBOR, MI...................         475,000         475,000
DETROIT RIVER, MI.......................       2,839,000       2,839,000
FRANKFORT HARBOR, MI....................         210,000         210,000
GRAND HAVEN HARBOR, MI..................       1,129,000       1,129,000
HARBOR BEACH HARBOR, MI.................         359,000         359,000
HOLLAND HARBOR, MI......................         392,000         392,000
INSPECTION OF COMPLETED WORKS, MI.......         205,000         205,000
KEWEENAW WATERWAY, MI...................         976,000         976,000
LUDINGTON HARBOR, MI....................         607,000         607,000
MANISTEE HARBOR, MI.....................         276,000         276,000
MANISTIQUE HARBOR, MI...................          60,000          60,000
MARQUETTE HARBOR, MI....................         257,000         257,000
MENOMINEE HARBOR, MI AND WI.............         337,000         337,000
MONROE HARBOR, MI.......................         316,000         316,000
MUSKEGON HARBOR, MI.....................         157,000         157,000
ONTONAGON HARBOR, MI....................         407,000         407,000
PENTWATER HARBOR, MI....................       1,579,000       1,579,000
PORTAGE LAKE HARBOR, MI.................          21,000          21,000
PROJECT CONDITION SURVEYS, MI...........         211,000         211,000
ROUGE RIVER, MI.........................         134,000         134,000
SAGINAW RIVER, MI.......................       1,291,000       1,291,000
SEBEWAING RIVER (ICE JAM REMOVAL), MI...          10,000          10,000
ST CLAIR RIVER, MI......................       1,014,000       1,014,000
ST JOSEPH HARBOR, MI....................         587,000         587,000
ST MARYS RIVER, MI......................      17,744,000      17,744,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, MI.............................       2,353,000       2,353,000
WHITE LAKE HARBOR, MI...................       1,585,000       1,585,000
                                                                        
                MINNESOTA                                               
                                                                        
BIGSTONE LAKE WHETSTONE RIVER, MN AND SD         184,000         184,000
DULUTH--SUPERIOR HARBOR, MN AND WI......       3,749,000       3,749,000
INSPECTION OF COMPLETED WORKS, MN.......         103,000         103,000
LAC QUI PARLE LAKES, MINNESOTA RIVER, MN         549,000         549,000
MINNESOTA RIVER, MN.....................         150,000         150,000
ORWELL LAKE, MN.........................         930,000         930,000
PROJECT CONDITION SURVEYS, MN...........          70,000          70,000
RED LAKE RESERVOIR, MN..................         175,000         175,000
RESERVOIRS AT HEADWATERS OF MISSISSIPPI                                 
 RIVER, MN..............................       2,677,000       2,677,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, MN.............................         239,000         239,000
                                                                        
               MISSISSIPPI                                              
                                                                        
BILOXI HARBOR, MS.......................         464,000         464,000
CLAIBORNE COUNTY PORT, MS...............         158,000         158,000
EAST FORK, TOMBIGBEE RIVER, MS..........         120,000         120,000
GULFPORT HARBOR, MS.....................       2,121,000       2,121,000
INSPECTION OF COMPLETED WORKS, MS.......         114,000         114,000
MOUTH OF YAZOO RIVER, MS................          79,000          79,000
OKATIBBEE LAKE, MS......................       1,500,000       1,500,000
PASCAGOULA HARBOR, MS...................       2,620,000       2,620,000
PEARL RIVER, MS AND LA..................         391,000         391,000
PROJECT CONDITION SURVEYS, MS...........           5,000           5,000
ROSEDALE HARBOR, MS.....................         406,000         406,000
YAZOO RIVER, MS.........................          15,000          15,000
                                                                        
                MISSOURI                                                
                                                                        
CARUTHERSVILLE HARBOR, MO...............         176,000         176,000
CLARENCE CANNON DAM AND MARK TWAIN LAKE,                                
 MO.....................................       4,677,000       5,527,000
CLEARWATER LAKE, MO.....................       1,991,000       2,341,000
HARRY S TRUMAN DAM AND RESERVOIR, MO....       8,006,000       8,006,000
INSPECTION OF COMPLETED WORKS, MO.......         399,000         399,000
LITTLE BLUE RIVER LAKES, MO.............         867,000         867,000
LONG BRANCH LAKE, MO....................         889,000         889,000
MISS RIVER BTWN THE OHIO AND MO RIVERS                                  
 (REG WORKS), MO........................      14,839,000      14,839,000
NEW MADRID HARBOR, MO...................          21,000          21,000
POMME DE TERRE LAKE, MO.................       1,668,000       1,668,000
PROJECT CONDITION SURVEYS, MO...........           5,000           5,000
SMITHVILLE LAKE, MO.....................       1,063,000       1,063,000
SOUTHEAST MISSOURI PORT, MISSISSIPPI                                    
 RIVER, MO..............................         275,000         275,000
STOCKTON LAKE, MO.......................       2,988,000       2,988,000
TABLE ROCK LAKE, MO.....................       4,576,000       4,576,000
UNION LAKE, MO..........................           5,000           5,000
WAPPAPELLO LAKE, MO.....................          20,000          20,000
                                                                        
                 MONTANA                                                
                                                                        
FT PECK DAM AND LAKE, MT................       3,664,000       3,664,000
INSPECTION OF COMPLETED WORKS, MT.......          23,000          23,000
LIBBY DAM, LAKE KOOCANUSA, MT...........       6,517,000       6,517,000
SCHEDULING RESERVOIR OPERATIONS, MT.....          53,000          53,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, MT.............................          69,000          69,000
                                                                        
                NEBRASKA                                                
                                                                        
GAVINS POINT DAM, LEWIS AND CLARK LAKE,                                 
 NE AND SD..............................       5,469,000       5,469,000
HARLAN COUNTY LAKE, NE..................       1,395,000       1,395,000
INSPECTION OF COMPLETED WORKS, NE.......         164,000         164,000
MISSOURI R MASTER WTR CONTROL MANUAL,                                   
 NE, IA, KS, MO,........................       1,800,000       1,800,000
MISSOURI RIVER BASIN COLLABORATIVE WATER                                
 PLANNING, NE...........................         250,000         250,000
MISSOURI NATIONAL RECREATIONAL RIVER, NE  ..............         100,000
PAPILLION CREEK AND TRIBUTARIES LAKES,                                  
 NE.....................................         690,000         690,000
SALT CREEK AND TRIBUTARIES, NE..........         854,000         854,000
SCHEDULING RESERVOIR OPERATIONS, NE.....         116,000         116,000
                                                                        
                 NEVADA                                                 
                                                                        
MARTIS CREEK LAKE, NV AND CA............         480,000         480,000
PINE AND MATHEWS CANYONS LAKES, NV......         145,000         145,000
                                                                        
              NEW HAMPSHIRE                                             
                                                                        
BLACKWATER DAM, NH......................         404,000         404,000
EDWARD MACDOWELL LAKE, NH...............         456,000         456,000
FRANKLIN FALLS DAM, NH..................         813,000         813,000
HOPKINTON--EVERETT LAKES, NH............         973,000         973,000
INSPECTION OF COMPLETED WORKS, NH.......          10,000          10,000
OTTER BROOK LAKE, NH....................         478,000         478,000
PROJECT CONDITION SURVEYS, NH...........         161,000         161,000
SURRY MOUNTAIN LAKE, NH.................         616,000         616,000
                                                                        
               NEW JERSEY                                               
                                                                        
BARNEGAT INLET, NJ......................       1,050,000       1,050,000
CHEESEQUAKE CREEK, NJ...................  ..............       1,500,000
COLD SPRING INLET, NJ...................         375,000         375,000
DELAWARE RIVER AT CAMDEN, NJ............          20,000          20,000
DELAWARE RIVER, PHILADELPHIA TO THE SEA,                                
 NJ, PA AND DE..........................      15,098,000      15,098,000
DELAWARE RIVER, PHILADELPHIA, PA TO                                     
 TRENTON, NJ............................       1,480,000       1,480,000
INSPECTION OF COMPLETED WORKS, NJ.......         443,000         443,000
NEW JERSEY INTRACOASTAL WATERWAY, NJ....       2,040,000       2,040,000
NEWARK BAY, HACKENSACK AND PASSAIC                                      
 RIVERS, NJ.............................         670,000         670,000
PROJECT CONDITION SURVEYS, NJ...........       1,021,000       1,021,000
RARITAN RIVER TO ARTHUR KILL CUT-OFF, NJ         250,000         250,000
TUCKERTON CREEK, NJ.....................  ..............         650,000
                                                                        
               NEW MEXICO                                               
                                                                        
ABIQUIU DAM, NM.........................       1,295,000       1,295,000
COCHITI LAKE, NM........................       1,922,000       1,922,000
CONCHAS LAKE, NM........................       1,081,000       1,081,000
GALISTEO DAM, NM........................         299,000         299,000
INSPECTION OF COMPLETED WORKS, NM.......          66,000          66,000
JEMEZ CANYON DAM, NM....................         457,000         457,000
SANTA ROSA DAM AND LAKE, NM.............         891,000         891,000
SCHEDULING RESERVOIR OPERATIONS, NM.....          64,000          64,000
TWO RIVERS DAM, NM......................         323,000         323,000
UPPER RIO GRANDE WATER OPERATIONS MODEL.  ..............       1,000,000
                                                                        
                NEW YORK                                                
                                                                        
ALMOND LAKE, NY.........................         435,000         435,000
ARKPORT DAM, NY.........................         218,000         218,000
BLACK ROCK CHANNEL AND TONAWANDA HARBOR,                                
 NY.....................................       4,350,000       4,350,000
BRONX RIVER, NY.........................         600,000         600,000
BUFFALO HARBOR, NY......................       1,550,000       1,550,000
BUTTERMILK CHANNEL, NY..................         220,000         220,000
CATSKILL CREEK, NY......................          20,000          20,000
DUNKIRK HARBOR, NY......................         545,000         545,000
EAST ROCKAWAY INLET, NY.................       2,000,000       2,000,000
EAST SIDNEY LAKE, NY....................         483,000         483,000
EASTCHESTER CREEK, NY...................         650,000         650,000
FLUSHING BAY AND CREEK, NY..............         155,000         155,000
GLEN COVE CREEK, NY.....................         540,000         540,000
HUDSON RIVER, NY........................       3,275,000       3,275,000
INSPECTION OF COMPLETED WORKS, NY.......         549,000         549,000
JAMAICA BAY, NY.........................         100,000         100,000
MT MORRIS LAKE, NY......................       1,385,000       1,385,000
NEW YORK AND NEW JERSEY CHANNELS, NY....         800,000         800,000
NEW YORK HARBOR (DRIFT REMOVAL), NY AND                                 
 NJ.....................................       4,800,000       4,800,000
NEW YORK HARBOR (PREVENTION OF                                          
 OBSTRUCTIVE DEPOSITS),.................         730,000         730,000
NEW YORK HARBOR, NY.....................       7,764,000       7,764,000
PROJECT CONDITION SURVEYS, NY...........       1,504,000       1,504,000
RONDOUT HARBOR, NY......................       1,245,000       1,245,000
SAUGERTIES HARBOR, NY...................          20,000          20,000
SOUTHERN NEW YORK FLOOD CONTROL                                         
 PROJECTS, NY...........................         526,000         526,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, NY.............................         651,000         651,000
WESTCHESTER CREEK, NY...................         500,000         500,000
WHITNEY POINT LAKE, NY..................         627,000         627,000
                                                                        
             NORTH CAROLINA                                             
                                                                        
ATLANTIC INTRACOASTAL WATERWAY, NC......       5,438,000       5,438,000
B EVERETT JORDAN DAM AND LAKE, NC.......         973,000         973,000
BOGUE INLET AND CHANNEL, NC.............         590,000         590,000
CAPE FEAR RIVER ABOVE WILMINGTON, NC....         648,000         648,000
CAROLINA BEACH INLET, NC................       1,340,000       1,340,000
FALLS LAKE, NC..........................         867,000         867,000
INSPECTION OF COMPLETED WORKS, NC.......          22,000          22,000
LOCKWOODS FOLLY RIVER, NC...............         375,000         375,000
MANTEO (SHALLOWBAG) BAY, NC.............       5,074,000       5,074,000
MASONBORO INLET AND CONNECTING CHANNELS,                                
 NC.....................................       2,200,000       2,200,000
MOREHEAD CITY HARBOR, NC................       2,672,000       2,672,000
NEW RIVER INLET, NC.....................         650,000         650,000
NEW TOPSAIL INLET AND CONNECTING                                        
 CHANNELS, NC...........................         180,000         180,000
PAMLICO AND TAR RIVERS, NC..............         100,000         100,000
PROJECT CONDITION SURVEYS, NC...........          59,000          59,000
ROANOKE RIVER, NC.......................         100,000         100,000
W KERR SCOTT DAM AND RESERVOIR, NC......       1,468,000       1,468,000
WILMINGTON HARBOR, NC...................       5,834,000       5,834,000
                                                                        
              NORTH DAKOTA                                              
                                                                        
SD AND NE, BTID (SEC. 33)...............  ..............         750,000
BOWMAN--HALEY LAKE, ND..................         194,000         194,000
GARRISON DAM, LAKE SAKAKAWEA, ND........       9,143,000       9,193,000
HOMME LAKE, ND..........................         188,000         188,000
INSPECTION OF COMPLETED WORKS, ND.......          60,000          60,000
LAKE ASHTABULA AND BALDHILL DAM, ND.....       1,149,000       1,149,000
MISSOURI RIVER BETION FT. PECK, MT AND                                  
 GAVINS FT. DAM.........................  ..............         750,000
PIPESTEM LAKE, ND.......................         395,000         395,000
SOURIS RIVER, ND........................         188,000         188,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, ND.............................          30,000          30,000
                                                                        
                  OHIO                                                  
                                                                        
ALUM CREEK LAKE, OH.....................         616,000         616,000
ASHTABULA HARBOR, OH....................       1,175,000       1,175,000
BERLIN LAKE, OH.........................       2,368,000       2,368,000
CAESAR CREEK LAKE, OH...................       1,153,000       1,153,000
CLARENCE J BROWN DAM, OH................         726,000         726,000
CLEVELAND HARBOR, OH....................       6,560,000       6,560,000
CONNEAUT HARBOR, OH.....................       1,358,000       1,358,000
DEER CREEK LAKE, OH.....................         678,000         678,000
DELAWARE LAKE, OH.......................         814,000         814,000
DILLON LAKE, OH.........................         501,000         501,000
FAIRPORT HARBOR, OH.....................         400,000         400,000
HURON HARBOR, OH........................       1,035,000       1,035,000
INSPECTION OF COMPLETED WORKS, OH.......         220,000         220,000
LORAIN HARBOR, OH.......................       1,325,000       1,325,000
MASSILLON LOCAL PROTECTION PROJECT, OH..          25,000          25,000
MICHAEL J KIRWAN DAM AND RESERVOIR, OH..         882,000         882,000
MOSQUITO CREEK LAKE, OH.................         965,000         965,000
MUSKINGUM RIVER LAKES, OH...............       6,060,000       6,060,000
NORTH BRANCH KOKOSING RIVER LAKE, OH....         311,000         311,000
PAINT CREEK LAKE, OH....................         569,000         569,000
PORTSMOUTH HARBOR, OH...................          75,000          75,000
PROJECT CONDITION SURVEYS, OH...........          74,000          74,000
ROSEVILLE LOCAL PROTECTION PROJECT, OH..          30,000          30,000
SANDUSKY HARBOR, OH.....................       1,015,000       1,015,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, OH.............................         206,000         206,000
TOLEDO HARBOR, OH.......................       3,575,000       3,575,000
TOM JENKINS DAM, OH.....................         245,000         245,000
WEST FORK OF MILL CREEK LAKE, OH........         546,000         546,000
WILLIAM H HARSHA LAKE, OH...............         846,000         846,000
                                                                        
                OKLAHOMA                                                
                                                                        
ARCADIA LAKE, OK........................         277,000         277,000
BIRCH LAKE, OK..........................         836,000         836,000
BROKEN BOW LAKE, OK.....................       1,671,000       1,671,000
CANDY LAKE, OK..........................          39,000          39,000
CANTON LAKE, OK.........................       1,756,000       1,756,000
COPAN LAKE, OK..........................         906,000         906,000
EUFAULA LAKE, OK........................       3,959,000       3,959,000
FORT GIBSON LAKE, OK....................       3,354,000       3,354,000
FORT SUPPLY LAKE, OK....................         817,000         817,000
GREAT SALT PLAINS LAKE, OK..............         323,000         323,000
HEYBURN LAKE, OK........................         813,000         813,000
HUGO LAKE, OK...........................       1,510,000       1,510,000
HULAH LAKE, OK..........................         462,000         462,000
INSPECTION OF COMPLETED WORKS, OK.......         168,000         168,000
KAW LAKE, OK............................       1,735,000       1,735,000
KEYSTONE LAKE, OK.......................       3,453,000       3,453,000
OOLOGAH LAKE, OK........................       1,329,000       1,329,000
OPTIMA LAKE, OK.........................         265,000         265,000
PENSACOLA RESERVOIR--LAKE OF THE                                        
 CHEROKEES, OK..........................          20,000          20,000
PINE CREEK LAKE, OK.....................       1,088,000       1,088,000
ROBERT S KERR LOCK AND DAM AND                                          
 RESERVOIRS, OK.........................       3,795,000       3,795,000
SARDIS LAKE, OK.........................       1,037,000       1,037,000
SCHEDULING RESERVOIR OPERATIONS, OK.....         558,000         558,000
SKIATOOK LAKE, OK.......................         949,000         949,000
TENKILLER FERRY LAKE, OK................       3,423,000       3,423,000
WAURIKA LAKE, OK........................       1,486,000       1,486,000
WEBBERS FALLS LOCK AND DAM, OK..........       3,288,000       3,288,000
WISTER LAKE, OK.........................         824,000         824,000
                                                                        
                 OREGON                                                 
                                                                        
APPLEGATE LAKE, OR......................         787,000         787,000
BLUE RIVER LAKE, OR.....................         276,000         276,000
BONNEVILLE LOCK AND DAM, OR AND WA......      16,576,000      16,576,000
CHETCO RIVER, OR........................         284,000         500,000
COLUMBIA AND LWR WILLAMETTE R BLW                                       
 VANCOUVER, WA AND PORTLA...............      11,332,000      11,332,000
COLUMBIA RIVER AT THE MOUTH, OR AND WA..       7,904,000       7,904,000
COLUMBIA RIVER BETWEEN VANCOUVER, WA AND                                
 THE DALLES, O..........................         346,000         346,000
COOS BAY, OR............................       4,892,000       4,892,000
COQUILLE RIVER, OR......................         377,000         377,000
COTTAGE GROVE LAKE, OR..................         708,000         708,000
COUGAR LAKE, OR.........................       1,157,000       1,157,000
DEPOE BAY, OR...........................          33,000          33,000
DETROIT LAKE, OR........................       2,200,000       2,200,000
DORENA LAKE, OR.........................         512,000         512,000
FALL CREEK LAKE, OR.....................         618,000         618,000
FERN RIDGE LAKE, OR.....................         955,000         955,000
GREEN PETER--FOSTER LAKES, OR...........       2,545,000       2,545,000
HILLS CREEK LAKE, OR....................         748,000         748,000
INSPECTION OF COMPLETED WORKS, OR.......         179,000         179,000
JOHN DAY LOCK AND DAM, OR AND WA........      12,886,000      12,886,000
LOOKOUT POINT LAKE, OR..................       3,991,000       3,991,000
LOST CREEK LAKE, OR.....................       4,030,000       4,030,000
MCNARY LOCK AND DAM, OR AND WA..........      12,333,000      12,333,000
PORT ORFORD, OR.........................         484,000         484,000
PROJECT CONDITION SURVEYS, OR...........         135,000         135,000
ROGUE RIVER, OR.........................         746,000       1,353,000
SCHEDULING RESERVOIR OPERATIONS, OR.....         115,000         115,000
SIUSLAW RIVER, OR.......................         965,000         965,000
SKIPANON CHANNEL, OR....................           5,000           5,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, OR.............................           7,000           7,000
TILLAMOOK BAY AND BAR, OR...............          13,000          13,000
UMPQUA RIVER, OR........................       1,321,000       1,321,000
WILLAMETTE RIVER AT WILLAMETTE FALLS, OR         606,000         606,000
WILLAMETTE RIVER BANK PROTECTION, OR....          61,000          61,000
WILLOW CREEK LAKE, OR...................         564,000         564,000
YAQUINA BAY AND HARBOR, OR..............       1,607,000       1,607,000
                                                                        
              PENNSYLVANIA                                              
                                                                        
ALLEGHENY RIVER, PA.....................       6,700,000       6,700,000
ALVIN R BUSH DAM, PA....................         622,000         622,000
AYLESWORTH CREEK LAKE, PA...............         200,000         200,000
BELTZVILLE LAKE, PA.....................       1,046,000       1,046,000
BLUE MARSH LAKE, PA.....................       1,986,000       1,986,000
CONEMAUGH RIVER LAKE, PA................       3,127,000       3,127,000
COWANESQUE LAKE, PA.....................       1,679,000       1,679,000
CROOKED CREEK LAKE, PA..................       1,452,000       1,452,000
CURWENSVILLE LAKE, PA...................         677,000         677,000
EAST BRANCH CLARION RIVER LAKE, PA......         799,000         799,000
ERIE HARBOR, PA.........................         635,000         635,000
FOSTER JOSEPH SAYERS DAM, PA............         728,000         728,000
FRANCIS E WALTER DAM, PA................         715,000         715,000
GENERAL EDGAR JADWIN DAM AND RESERVOIR,                                 
 PA.....................................         287,000         287,000
INSPECTION OF COMPLETED WORKS, PA.......         205,000         205,000
JOHNSTOWN, PA...........................       1,109,000       1,109,000
KINZUA DAM AND ALLEGHENY RESERVOIR, PA..       1,400,000       1,400,000
LOYALHANNA LAKE, PA.....................       1,182,000       1,182,000
MAHONING CREEK LAKE, PA.................         826,000         826,000
MONONGAHELA RIVER, PA...................      13,864,000      13,864,000
PROJECT CONDITION SURVEYS, PA...........          15,000          15,000
PROMPTON LAKE, PA.......................         438,000         438,000
PUNXSUTAWNEY, PA........................          13,000          13,000
RAYSTOWN LAKE, PA.......................       2,520,000       2,520,000
SCHEDULING RESERVOIR OPERATIONS, PA.....          53,000          53,000
SCHUYLKILL RIVER, PA....................       1,290,000       1,290,000
SHENANGO RIVER LAKE, PA.................       1,916,000       1,916,000
STILLWATER LAKE, PA.....................         334,000         334,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, PA.............................          82,000          82,000
TIOGA--HAMMOND LAKES, PA................       1,775,000       1,775,000
TIONESTA LAKE, PA.......................       1,293,000       1,293,000
UNION CITY LAKE, PA.....................         324,000         324,000
WOODCOCK CREEK LAKE, PA.................         821,000         821,000
YORK INDIAN ROCK DAM, PA................         518,000         518,000
YOUGHIOGHENY RIVER LAKE, PA AND MD......       1,663,000       1,663,000
                                                                        
              RHODE ISLAND                                              
                                                                        
BLOCK ISLAND HARBOR OF REFUGE, RI.......         342,000         342,000
INSPECTION OF COMPLETED WORKS, RI.......           5,000           5,000
PROJECT CONDITION SURVEYS, RI...........         677,000         677,000
                                                                        
             SOUTH CAROLINA                                             
                                                                        
ATLANTIC INTRACOASTAL WATERWAY, SC......       2,850,000       2,850,000
CHARLESTON HARBOR, SC...................       3,815,000       4,715,000
COOPER RIVER, CHARLESTON HARBOR, SC.....       3,372,000       3,562,000
FOLLY RIVER, SC.........................         246,000         246,000
GEORGETOWN HARBOR, SC...................       3,165,000       3,665,000
INSPECTION OF COMPLETED WORKS, SC.......          27,000          27,000
PORT ROYAL HARBOR, SC...................         981,000         981,000
PROJECT CONDITION SURVEYS, SC...........          20,000          20,000
SHIPYARD RIVER, SC......................         400,000         400,000
TOWN CREEK, SC..........................  ..............         360,000
                                                                        
              SOUTH DAKOTA                                              
                                                                        
BIG BEND DAM--LAKE SHARPE, SD...........       5,759,000       5,759,000
COLD BROOK LAKE, SD.....................         325,000         325,000
COTTONWOOD SPRINGS LAKE, SD.............         200,000         200,000
FT RANDALL DAM--LAKE FRANCIS CASE, SD...       7,863,000       7,863,000
INSPECTION OF COMPLETED WORKS, SD.......          14,000          14,000
JAMES RIVER, JAMESTWON AND PIPESTEM                                     
 RESERV., SD............................  ..............         100,000
LAKE TRAVERSE, SD AND MN................       1,499,000       1,499,000
OAHE DAM--LAKE OAHE, SD AND ND..........       8,854,000       9,154,000
SCHEDULING RESERVOIR OPERATIONS, SD.....          67,000          67,000
                                                                        
                TENNESSEE                                               
                                                                        
CENTER HILL LAKE, TN....................       5,373,000       5,373,000
CHEATHAM LOCK AND DAM, TN...............       4,832,000       4,832,000
CORDELL HULL DAM AND RESERVOIR, TN......       4,097,000       4,097,000
DALE HOLLOW LAKE, TN....................       3,622,000       3,622,000
INSPECTION OF COMPLETED WORKS, TN.......         133,000         133,000
J PERCY PRIEST DAM AND RESERVOIR, TN....       3,348,000       3,348,000
OLD HICKORY LOCK AND DAM, TN............       6,404,000       6,404,000
PROJECT CONDITION SURVEYS, TN...........           4,000           4,000
TENNESSEE RIVER, TN.....................      10,266,000      10,266,000
WOLF RIVER HARBOR, TN...................         310,000         310,000
                                                                        
                  TEXAS                                                 
                                                                        
AQUILLA LAKE, TX........................         602,000         602,000
ARKANSAS--RED RIVER BASINS CHLORIDE                                     
 CONTROL--AREA VI.......................       1,185,000       1,185,000
BARBOUR TERMINAL CHANNEL, TX............         845,000         845,000
BARDWELL LAKE, TX.......................       1,301,000       1,301,000
BAYPORT SHIP CHANNEL, TX................       1,170,000       1,170,000
BELTON LAKE, TX.........................       2,650,000       2,650,000
BENBROOK LAKE, TX.......................       1,660,000       1,660,000
BRAZOS ISLAND HARBOR, TX................       1,050,000       1,050,000
BUFFALO BAYOU AND TRIBUTARIES, TX.......       3,457,000       3,457,000
CANYON LAKE, TX.........................       2,052,000       2,052,000
CHANNEL TO PORT MANSFIELD, TX...........         155,000         155,000
COOPER LAKE AND CHANNELS, TX............         978,000         978,000
CORPUS CHRISTI SHIP CHANNEL, TX.........       1,885,000       1,885,000
DENISON DAM--LAKE TEXOMA, TX............       4,681,000       4,681,000
ESTELLINE SPRINGS EXPERIMENTAL PROJECT,                                 
 TX.....................................          14,000          14,000
FERRELLS BRIDGE DAM--LAKE O'THE PINES,                                  
 TX.....................................       2,113,000       2,113,000
FREEPORT HARBOR, TX.....................       4,350,000       4,350,000
GALVESTON HARBOR AND CHANNEL, TX........       3,010,000       3,010,000
GIWW--CHANNEL TO VICTORIA, TX...........       1,940,000       1,940,000
GIWW--CHOCOLATE BAYOU, TX...............       1,160,000       1,160,000
GRANGER DAM AND LAKE, TX................       1,517,000       1,517,000
GRAPEVINE LAKE, TX......................       1,804,000       1,804,000
GULF INTRACOASTAL WATERWAY, TX..........      17,072,000      17,072,000
HORDS CREEK LAKE, TX....................       1,133,000       1,133,000
HOUSTON SHIP CHANNEL, TX................       7,617,000       7,617,000
INSPECTION OF COMPLETED WORKS, TX.......         296,000         296,000
JOE POOL LAKE, TX.......................         817,000         817,000
LAKE KEMP, TX...........................         235,000         235,000
LAVON LAKE, TX..........................       2,476,000       2,476,000
LEWISVILLE DAM, TX......................       2,467,000       2,467,000
MATAGORDA SHIP CHANNEL, TX..............       3,460,000       3,460,000
MOUTH OF THE COLORADO RIVER, TX.........       1,900,000       1,900,000
NAVARRO MILLS LAKE, TX..................       1,373,000       1,373,000
NORTH SAN GABRIEL DAM AND LAKE                                          
 GEORGETOWN, TX.........................       1,650,000       1,650,000
O C FISHER DAM AND LAKE, TX.............       1,287,000       1,287,000
PAT MAYSE LAKE, TX......................         856,000         856,000
PROCTOR LAKE, TX........................       2,197,000       2,197,000
PROJECT CONDITION SURVEYS, TX...........          85,000          85,000
RAY ROBERTS LAKE, TX....................         768,000         768,000
SABINE--NECHES WATERWAY, TX.............       8,020,000       8,020,000
SAM RAYBURN DAM AND RESERVOIR, TX.......       4,038,000       4,038,000
SCHEDULING RESERVOIR OPERATIONS, TX.....          49,000          49,000
SOMERVILLE LAKE, TX.....................       2,367,000       2,367,000
STILLHOUSE HOLLOW DAM, TX...............       1,514,000       1,514,000
TEXAS CITY SHIP CHANNEL, TX.............         770,000         770,000
TOWN BLUFF DAM--B A STEINHAGEN LAKE, TX.       1,469,000       1,469,000
WACO LAKE, TX...........................       2,031,000       2,031,000
WALLISVILLE LAKE, TX....................         488,000         488,000
WHITNEY LAKE, TX........................       3,628,000       3,628,000
WRIGHT PATMAN DAM AND LAKE, TX..........       2,446,000       2,446,000
                                                                        
                  UTAH                                                  
                                                                        
INSPECTION OF COMPLETED WORKS, UT.......          58,000          58,000
SCHEDULING RESERVOIR OPERATIONS, UT.....         452,000         452,000
                                                                        
                 VERMONT                                                
                                                                        
BALL MOUNTAIN LAKE, VT..................         606,000         606,000
CONNECTICUT RIVER BASIN (MASTER PLAN),                                  
 VT.....................................  ..............         200,000
INSPECTION OF COMPLETED WORKS, VT.......          40,000          40,000
NARROWS OF LAKE CHAMPLAIN, VT AND NY....         556,000         556,000
NORTH HARTLAND LAKE, VT.................         672,000         672,000
NORTH SPRINGFIELD LAKE, VT..............         570,000         570,000
TOWNSHEND LAKE, VT......................         602,000         602,000
UNION VILLAGE DAM, VT...................         439,000         439,000
                                                                        
                VIRGINIA                                                
                                                                        
APPOMATTOX RIVER, VA....................          25,000          25,000
ATLANTIC INTRACOASTAL WATERWAY, VA......       1,971,000       1,971,000
CHANNEL TO NEWPORT NEWS, VA.............         485,000         485,000
CHINCOTEAGUE INLET, VA..................       1,094,000       1,094,000
GATHRIGHT DAM AND LAKE MOOMAW, VA.......       1,544,000       1,544,000
HAMPTON RDS, NORFOLK AND NEWPORT NEWS                                   
 HBR, VA (DRIFT REM.....................         707,000         707,000
INSPECTION OF COMPLETED WORKS, VA.......          69,000          69,000
JAMES RIVER CHANNEL, VA.................       3,635,000       3,635,000
JOHN H KERR LAKE, VA AND NC.............       7,906,000       7,906,000
JOHN W FLANNAGAN DAM AND RESERVOIR, VA..       1,192,000       1,192,000
NORFOLK HARBOR (PREVENTION OF                                           
 OBSTRUCTIVE DEPOSITS), V...............         280,000         280,000
NORFOLK HARBOR, VA......................       5,310,000       5,310,000
NORTH FORK OF POUND RIVER LAKE, VA......         301,000         301,000
PHILPOTT LAKE, VA.......................       2,075,000       2,075,000
PROJECT CONDITION SURVEYS, VA...........         711,000         711,000
RUDEE INLET, VA.........................  ..............         535,000
THIMBLE SHOAL CHANNEL, VA...............         177,000         177,000
WATERWAY ON THE COAST OF VIRGINIA, VA...       1,082,000       1,082,000
                                                                        
               WASHINGTON                                               
                                                                        
ANACORTES HARBOR, WA....................         240,000         240,000
CHIEF JOSEPH DAM, WA....................      12,547,000      12,547,000
COLUMBIA RIVER AT BAKER BAY, WA AND OR..          10,000          10,000
COLUMBIA RIVER BETWEEN CHINOOK AND SAND                                 
 ISLAND, WA.............................           6,000           6,000
EVERETT HARBOR AND SNOHOMISH RIVER, WA..       1,202,000       1,202,000
GRAYS HARBOR AND CHEHALIS RIVER, WA.....       7,226,000       7,226,000
HOWARD HANSON DAM, WA...................       1,271,000       1,271,000
ICE HARBOR LOCK AND DAM, WA.............       8,090,000       8,090,000
INSPECTION OF COMPLETED WORKS, WA.......         173,000         173,000
LAKE CROCKETT (KEYSTONE HARBOR), WA.....         352,000         352,000
LAKE WASHINGTON SHIP CANAL, WA..........       6,558,000       6,558,000
LITTLE GOOSE LOCK AND DAM, WA...........       5,672,000       5,672,000
LOWER GRANITE LOCK AND DAM, WA..........       7,684,000       7,684,000
LOWER MONUMENTAL LOCK AND DAM, WA.......       5,461,000       5,461,000
MILL CREEK LAKE, WA.....................         762,000         762,000
MT ST HELENS, WA........................         415,000         415,000
MUD MOUNTAIN DAM, WA....................       1,953,000       1,953,000
PROJECT CONDITION SURVEYS, WA...........         294,000         294,000
PUGET SOUND AND TRIBUTARY WATERS, WA....       1,050,000       1,050,000
SCHEDULING RESERVOIR OPERATIONS, WA.....         492,000         492,000
SEATTLE HARBOR, WA......................         787,000         787,000
STILLAGUAMISH RIVER, WA.................         186,000         186,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, WA.............................          61,000          61,000
SWINOMISH CHANNEL, WA...................         375,000         375,000
TACOMA, PUYALLUP RIVER, WA..............          72,000          72,000
THE DALLES LOCK AND DAM, WA AND OR......      10,744,000      10,744,000
WILLAPA RIVER AND HARBOR, WA............         615,000       3,615,000
                                                                        
              WEST VIRGINIA                                             
                                                                        
BEECH FORK LAKE, WV.....................       1,018,000       1,018,000
BLUESTONE LAKE, WV......................       1,253,000       1,828,000
BURNSVILLE LAKE, WV.....................       1,167,000       1,167,000
EAST LYNN LAKE, WV......................       1,563,000       1,563,000
ELK RIVER HARBOR, WV....................         370,000         370,000
ELKINS, WV..............................          11,000          11,000
INSPECTION OF COMPLETED WORKS, WV.......          93,000          93,000
KANAWHA RIVER LOCKS AND DAMS, WV........       8,743,000       8,743,000
R D BAILEY LAKE, WV.....................       1,418,000       1,418,000
STONEWALL JACKSON LAKE, WV..............         970,000         970,000
SUMMERSVILLE LAKE, WV...................       1,612,000       1,612,000
SUTTON LAKE, WV.........................       1,611,000       1,611,000
TYGART LAKE, WV.........................       1,243,000       1,243,000
                                                                        
                WISCONSIN                                               
                                                                        
EAU GALLE RIVER LAKE, WI................         910,000         910,000
FOX RIVER, WI...........................       1,926,000       1,926,000
GREEN BAY HARBOR, WI....................       1,048,000       1,048,000
GREEN BAY HARBOR, WI (DIKE DISPOSAL)....       3,613,000       3,613,000
INSPECTION OF COMPLETED WORKS, WI.......          15,000          15,000
KEWAUNEE HARBOR, WI.....................         188,000         188,000
LA FARGE LAKE, WI.......................          93,000          93,000
MANITOWOC HARBOR, WI....................         407,000         407,000
MILWAUKEE HARBOR, WI....................       1,779,000       1,779,000
PORT WASHINGTON HARBOR, WI..............         175,000         175,000
PORT WING HARBOR, WI....................         222,000         222,000
PROJECT CONDITION SURVEYS, WI...........          96,000          96,000
SHEBOYGAN HARBOR, WI....................         511,000         511,000
STURGEON BAY HARBOR AND LAKE MICHIGAN                                   
 SHIP CANAL, WI.........................         324,000         324,000
SURVEILLANCE OF NORTHERN BOUNDARY                                       
 WATERS, WI.............................         475,000         475,000
TWO RIVERS HARBOR, WI...................         199,000         199,000
                                                                        
                 WYOMING                                                
                                                                        
JACKSON HOLE LEVEES, WY.................         553,000         553,000
SCHEDULING RESERVOIR OPERATIONS, WY.....         315,000         315,000
                                                                        
              MISCELLANEOUS                                             
                                                                        
COASTAL INLET RESEARCH PROGRAM..........       4,000,000       4,000,000
CULTURAL RESOURCES (NAGPRA/CURATION)....       2,000,000       2,000,000
DREDGING DATA AND LOCK PERFORMANCE                                      
 MONITORING SYSTEM......................         735,000         735,000
DREDGING OPERATIONS AND ENVIRONMENTAL                                   
 RESEARCH (DOER)........................       6,000,000       6,000,000
DREDGING OPERATIONS TECHNICAL SUPPORT                                   
 (DOTS) PROGRAM.........................       1,700,000       1,700,000
EARTHQUAKE HAZARDS PROGRAM FOR BUILDINGS                                
 AND LIFELINES..........................       2,930,000       2,930,000
HARBOR MAINTENANCE FEE DATA COLLECTION..         600,000         600,000
MONITORING OF COASTAL NAVIGATION                                        
 PROJECTS...............................       1,900,000       1,900,000
NATIONAL DAM SAFETY PROGRAM.............          20,000          20,000
NATIONAL EMERGENCY PREPAREDNESS PROGRAMS                                
 (NEPP).................................       5,500,000       5,500,000
NATIONAL RESOURCES TECHNICAL SUPPORT                                    
 (NRTS).................................         900,000         900,000
PERFORMANCE BASED BUDGETING SUPPORT                                     
 PROGRAM................................         415,000         415,000
PROTECT, CLEAR AND STRAIGHTEN CHANNELS                                  
 (SECTION 3)............................          50,000          50,000
RELIABILITY MODELS PROGRAM FOR MAJOR                                    
 REHABILITATION.........................         675,000         675,000
REMOVAL OF SUNKEN VESSELS...............         500,000         500,000
REPAIR, EVALUATION, MAINT AND REHAB                                     
 RESEARCH (REMR II).....................       3,000,000       3,000,000
WATER OPERATIONS TECHNICAL SUPPORT                                      
 (WOTS) PROGRAM.........................         850,000         850,000
WATERBORNE COMMERCE STATISTICS..........       4,000,000       4,000,000
REDUCTION FOR ANTICIPATED SAVINGS AND                                   
 SLIPPAGE...............................     -29,368,000     -27,253,000
                                         -------------------------------
      TOTAL, OPERATION AND MAINTENANCE..   1,618,000,000   1,661,203,000
------------------------------------------------------------------------
TYPE OF PROJECT:                                                        
    (N)  NAVIGATION                                                     
    (BE)  BEACH EROSION CONTROL                                         
    (FC)  FLOOD CONTROL                                                 
    (MP)  MULTIPURPOSE, INCLUDING POWER                                 

    The Committee continues to believe that it is essential to 
provide adequate resources and attention to operation and 
maintenance requirements in order to protect the large Federal 
investment. Yet current and projected budgetary constraints 
require the Committee to limit the amount of work that can be 
accomplished in the fiscal year. In order to cope with the 
current situation, the Corps has had to defer or delay 
scheduled maintenance activities.
    Maintenance backlogs continue to grow with much of the 
backlog being essential maintenance dredging needed to keep the 
Nation's ports, harbors, and waterways open and able to 
efficiently handle important national and international trade 
activities. Yet the Committee is aware that out-year budget 
planning guidance for the Corps of Engineers projects that the 
current appropriations for their critical operation and 
maintenance activities will continue to decline for the 
foreseeable future. If additional resources are not made 
available, the Committee will be forced to cut back on 
services, and begin to terminate and close many projects and 
activities.
    The Committee is aware of the Corps' efforts to stretch the 
limited resources to cover all of its projects and to effect 
savings through a variety of means. As more and more projects 
enter the inventory and budgetary constraints continue, it is 
clear that the Corps will need to find innovated ways to 
accomplish required O&M; work nationwide. Adjustment in lower 
priority programs and noncritical work should be made in 
conjunction with efforts to optimize the use of the limited 
resources in order to maximize the public benefit.
    Lower Chena River dredging, Alaska.--The Committee has 
included $800,000 for the Corps of Engineers to dredge a 
navigational channel within the lower reaches of the Chena 
River to reestablish safe water depths.
    Mississippi River between the Missouri River and 
Minneapolis, IA.--The Committee urges the Corps of Engineers to 
work cooperatively with the city of Dubuque, IA, to deposit 
dredge material at appropriate points near the Dubuque 
Riverboat Museum.
    Kaskaskia River navigation, Illinois.--The Committee 
recommendation includes an additional $490,000 for the Corps to 
examine the feasibility of operating remotely the low volume 
Kaskaskia Lock and Dam from a high volume lock and dam located 
elsewhere within the St. Louis District.
    Calcasieu River and Pass, LA.--The Committee has provided 
an additional $200,000 for the Corps of Engineers to reevaluate 
the feasibility of dredging a 40-foot channel in the Cameron 
Loop to the Port of Cameron, LA.
    Baltimore Harbor and Channels, Tolchester Channel S-turn, 
Maryland.--In fiscal years 1996-97, the Committee directed the 
Corps to complete ongoing studies and design work associated 
with correcting the dangerous S-turn in the Tolchester Channel. 
This serious safety issue has been brought to the attention on 
numerous occasions over the years. The Committee understands 
the Corps' Baltimore District recently completed report with a 
favorable recommendation and that the report is currently under 
review by Corps headquarters, and that dredging work could 
begin in fiscal year 1999 once approved. Given the safety 
considerations, the Committee urges the Corps to request funds 
in its fiscal year 1999 budget request to Congress.
    Cedar River Harbor, MI.--An appropriation of $2,377,000 is 
recommended for the Corps to advertise, award and construct 
repairs to the east breakwater at Cedar River Harbor in 
Michigan.
    Clearwater Lake, MO.--The Committee has included an 
additional $350,000 for the Corps of Engineers to undertake 
engineering and design activities related to the relocation of 
facilities impacted by flooding at Clearwater Lake in Missouri.
    Cheesequake Creek, NJ.--Funding in the amount of $1,500,000 
is recommended for the Corps to undertake repairs to the south 
jetty at Cheesequake Creek in New Jersey.
    Tuckerton Creek, NJ.--The recommendation includes $650,000 
for the Corps to complete the maintenance dredging cycle for 
the Tuckerton Creek in New Jersey.
    Upper Rio Grande water operation model, New Mexico.--The 
Committee has provide $1,000,000 for scheduling reservoir 
operations for the Corps to continue joint activities with 
other Federal agencies related to the need for an Upper Rio 
Grande water operations model to help water managers in flood 
control operations, water accounting, and evaluation of water 
operations alternatives.
    Clarence Cannon Dam and Reservoir, MO.--The Committee has 
provided an additional $850,000 for the Corps to accomplish 
necessary infrastructure repairs at the Clarence Cannon Dam and 
Reservoir in Missouri. Of this amount $300,000 to repair 
cavitation damage necessary to ensure continued operation and 
reliability of service to the power customer and $550,000 is to 
repair deteriorated project roads, as appropriate, to ensure 
public safety.
    Missouri River between Fort Peck, MT, and Gavins Point Dam, 
ND.--An appropriation of $750,000 is recommended to allow the 
Corps to undertake weir construction for bank stabilization in 
the vicinity of Buford Trenton in North Dakota.
    Garrison Dam, Lake Sakakawea, ND.--The Committee 
recommendation for the Garrison Dam, Lake Sakakawea project in 
North Dakota includes $50,000 for the Corps to continue 
mosquito control activities.
    Rogue River, OR.--The Committee has provided an additional 
$607,000 for the Rogue River project in Oregon. The 
recommendation includes an additional $407,000 for maintenance 
dredging and $200,000 for the Corps to conduct a study to 
update the advisability of relocating the existing entrance in 
order to reduce annual maintenance dredging costs.
    Charleston Harbor, SC.--The Committee has included an 
additional $900,000 for the Corps to accomplish ditching, 
clearing, site preparation, and diking of the southern and 
middle cells of the Clouter Creek disposal area which are owned 
by the Army Corps for purposes of disposal of dredge material 
from areas previously occupied by the Charleston Navy Base.
    Oahe Dam-Lake Oahe, SD.--The Committee has included an 
additional $325,000 for the Oahe Dam-Lake Oahe, SD, project to 
address sediment buildup problems downstream in the vicinity of 
Pierre and Fort Pierre, SD. The Committee understands that 
sediment buildup at the base of Oahe Dam combined with winter 
ice conditions creates a situation which results in either 
severe flooding in the Pierre and Fort Pierre area or reduced 
power generation. The additional funding is to be used by the 
Corps to assess the causes, problems, and solutions to the 
problem. The Committee directs the Corps to coordinate the 
study effort with the Western Power Administration.
    Ball Mountain Dam, VT.--The Committee directs the Corps to 
use available funds to take additional steps, described in its 
Ball Mountain Dam report, if sediment control steps already 
taken prove to be inadequate.
    Burlington Harbor, VT.--The Committee directs the Corps of 
Engineers to inspect the breakwater at Burlington Harbor, VT, 
and make needed repairs. The Corps should work with local 
interest to evaluate the configuration of the breakwater, the 
condition of the shoreline, and to address other navigation 
related concerns.
    Connecticut River basin (master plan), VT.--The Committee 
has provided an appropriation of $200,000 for the Corps to 
continue a comprehensive update of the master plans for the 
five Corps of Engineer flood control reservoirs in the 
Connecticut River basin in Vermont.
    Willapa River and Harbor, WA.--An additional $3,000,000 is 
provided for the Corps to undertake structural and beach 
nourishment measures to protect the highway from wave erosion, 
and to halt further migration of the North Channel.
    Tricities land conveyance, Washington.--The Committee is 
informed that the Corps and local interests are negotiating an 
agreement associated with land transfer work in the tricities 
of Washington. All parties are to be commended for working 
diligently to solve the costs allocation issues. The Committee 
understands that the six local government entities are working 
on an agreement to pay the Corps for the reasonable costs of 
administrative support, as authorized by law, currently 
estimated at $120,000. The Committee also recognizes the 
parties are continuing to resolve responsibility for potential 
NEPA documentation and CERCLA costs in association with the 
land Conveyance. Since this is to be a joint agreement between 
the parties, the Committee expects all costs associated with 
this effort to be held to a minimum so that the cost allocation 
agreement is adhered to.
    Bluestone Lake and Dam, WV.--The Committee recommends an 
appropriation of $1,828,000 for the Bluestone Lake and Dam in 
West Virginia, including $575,000 for the Corps to initiate 
engineering and design and model study of proposed 
modifications to the dam to allow for drift and debris removal 
and for completion of a dam safety report.
    In addition, the attention of the Corps of Engineers is 
directed to the following projects in need of maintenance or 
review and for which the Committee has received requests: 
Coosa-Alabama River navigation system, Alabama; Anclote River, 
FL; Brunswick Harbor, GA; and Little River and Murrells Inlets, 
SC.
    Direct funding of O&M; requirements, hydropower generation 
facilities.--The Committee is aware that the Corps of Engineers 
and the Department of Energy have been discussing an agreement 
under which the Bonneville Power Administration [BPA] would 
provide direct funding for the annual operations and 
maintenance costs associated with Corps hydropower generation 
facilities in the Pacific Northwest. This approach would 
replace the existing procedure under which the Corps requests 
annual appropriations to cover those costs with BPA providing 
reimbursement to the Treasury. The Committee believes that such 
an agreement for O&M; costs would provide greater assurance to 
the Corps of an appropriate level of funding for maintenance of 
power facilities, thereby reducing the frequency of costly 
overhauls and increasing the reliability of BPA's power supply 
to Federal Columbia River Power System electric ratepayers.
    Last year, the energy and water development appropriations 
conference agreement supported implementation of such a direct 
funding agreement for all hydropower O&M; costs between the 
Bureau of Reclamation and the BPA by assuming such an agreement 
would be implemented at the beginning of fiscal year 1997 and 
removing all associated discretionary funding effective with 
that date. The Committee recently heard testimony from the 
Regional Director of the Pacific Northwest region of the Bureau 
of Reclamation stating that: (1) the now implemented 
Reclamation/BPA O&M; agreement has created a more businesslike 
arrangement, fostered better joint planning, reduced costs, and 
improved the lines of communications between BPA and 
Reclamation, and (2) while Reclamation had concerns similar to 
those of the Corps, regarding the alignment of multipurpose 
projects priorities, prior to completion of the agreement, 
those concerns have been found to be misplaced.
    Given this experience, the Committee strongly urges the 
Corps to consider the potential benefits and savings by 
entering into a direct funding agreement similar to that of the 
Bureau of Reclamation for operations and maintenance activities 
with the Bonneville Power Administration and to take steps to 
move to finalize an agreement in this regard.

                           regulatory program

Appropriations, 1997....................................    $101,000,000
Budget estimate, 1998...................................     112,000,000
Committee recommendation................................     106,000,000

    An appropriation of $106,000,000 is recommended for 
regulatory programs of the Corps of Engineers. The Committee 
has recommended an increase of $5,000,000 over the current year 
funding level to offset the inflation impacts in this program. 
This program, which has been held at the 1995 level of 
appropriation, is labor intensive and has had to absorb 
inflationary increases for several years.
    This appropriation provides for salaries and related costs 
to administer laws pertaining to regulation of navigable waters 
and wetlands of the United States in accordance with the Rivers 
and Harbors Act of 1899, the Clean Water Act of 1977, and the 
Marine Protection Act of 1972.
    In discharging its responsibilities under 33 U.S.C. Section 
1344 for a permit for completion of the terminal 5 berth 
enhancement project in the West Waterway of the Duwamish River 
in Seattle, the Corps shall recognize that both the tribe and 
the applicant hold legally protected interests with respect to 
the permit. The applicant has a legally protected right to 
construct and operate facilities for maritime commerce, the 
applicant has continuously exercised this right at the location 
of the proposed project for many decades. The tribes have a 
legally protected right to harvest fish in their usual and 
accustomed areas. The rights of both parties were recognized in 
the creation of the applicable treaties. The Corps shall not 
interpret either party's rights in a manner that unreasonably 
interferes with any party's protected interests. The Corps 
shall seek to maximize maritime usage for this facility 
provided that treaty harvesters' physical access to the site, 
as measured by their functional ability to harvest fish at that 
location or at newly created or enhanced fishing sites of the 
same or greater quality in the vicinity of the West Waterway, 
is not materially diminished.

                 Flood Control and Coastal Emergencies

Appropriations, 1997....................................\1\ $425,000,000
Budget estimate, 1998...................................      14,000,000
Committee recommendation................................      10,000,000

\1\ Includes $415,000,000 in emergency supplemental appropriations.

    The Committee recommends an appropriation of $10,000,000 
for flood control and coastal emergencies. This is $4,000,000 
below the budget request.
    This activity provides for flood emergency preparation, 
flood fighting and rescue operations, and repair of flood 
control and Federal hurricane or shore protection works. It 
also provides for emergency supplies of clean drinking water 
where the source has been contaminated and in drought 
distressed areas, provision of adequate supplies of water for 
human and livestock consumption.

                            general expenses

Appropriations, 1997....................................    $149,000,000
Budget estimate, 1998...................................     148,000,000
Committee recommendation................................     148,000,000

    This appropriation finances the expenses of the Office, 
Chief of Engineers, the Division Offices, and certain research 
and statistical functions of the Corps of Engineers. The 
Committee recommends an appropriation of $148,000,000 which is 
the same as the budget request.


                  TITLE II--DEPARTMENT OF THE INTERIOR

                Central Utah Project Completion Account

Appropriations, 1997....................................     $43,627,000
Budget estimate, 1998...................................      41,153,000
Committee recommendation................................      41,153,000

    The Committee recommendation for fiscal year 1998 to carry 
out the provisions of the Central Utah Project Completion Act 
is $41,153,000, the same as the budget request.
    The Central Utah Project Completion Act (titles II-VI of 
Public Law 102-575) provides for the completion of the central 
Utah project by the Central Utah Water Conservancy District. 
The act also authorizes the appropriation of funds for fish, 
wildlife, and recreation mitigation and conservation; 
establishes an account in the Treasury for the deposit of these 
funds and of other contributions for mitigation and 
conservation activities; and establishes a Utah Reclamation 
Mitigation and Conservation Commission to administer funds in 
that account. The act further assigns responsibilities for 
carrying out the act to the Secretary of the Interior and 
prohibits delegation of those responsibilities to the Bureau of 
Reclamation.

                         Bureau of Reclamation

                      Water and Related Resources

Appropriations, 1997....................................\1\ $685,937,000
Budget estimate, 1998...................................     651,552,000
Committee recommendation................................     688,379,000

\1\ Includes $7,355,000 in emergency supplemental appropriations.

    An appropriation of $688,379,000 is recommended by the 
Committee for water and related resources activities of the 
Bureau of Reclamation.
    The budget request for fiscal year 1998 restructures the 
accounts of the Bureau of Reclamation to better reflect the 
activities and evolving role of the Bureau as a water 
management agency. By depicting more clearly how the Bureau of 
Reclamation uses its budgetary resources, this account also 
will facilitate compliance with the Government Performance and 
Results Act [GPRA].
    A new account, ``Water and related resources,'' 
incorporates activities previously funded under general 
investigations, construction program, and operation and 
maintenance. The budget request for fiscal year 1998 totals 
$651,552,000, which is $27,030,000 below the comparable 
appropriation for 1997.
    The amounts recommended by the Committee are shown on the 
following table along with the budget request.

                                                   BUREAU OF RECLAMATION--WATER AND RELATED RESOURCES                                                   
                                                                  [Amounts in dollars]                                                                  
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                            Budget estimate                Committee recommendation     
                                                                                 -----------------------------------------------------------------------
                                                Total Federal     Allocated to                          Facility                            Facility    
                Project title                       cost              date            Resource         operations,        Resource         operations,  
                                                                                   management and   maintenance, and   management and   maintenance, and
                                                                                     development     rehabilitation      development     rehabilitation 
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                        
                   ARIZONA                                                                                                                              
                                                                                                                                                        
CENTRAL ARIZONA PROJECT (LCRBDF)............     4,268,481,350     3,291,727,350        61,242,000  ................        55,920,000  ................
COLORADO RIVER BASIN SALINITY CONTROL, TITLE                                                                                                            
 I..........................................       458,959,000       403,900,936         3,078,000         6,500,000         3,078,000         6,500,000
COLORADO RIVER FRONT WORK AND LEVEE SYSTEM..       183,158,000        90,408,165         4,200,000  ................         4,200,000  ................
INDIAN WATER RIGHTS SETTLEMENT PROJECT......  ................  ................  ................         8,317,000  ................         8,317,000
SALT RIVER PROJECT, HORSE MESA DAM..........        15,606,000         1,150,000  ................         1,200,000  ................         1,200,000
SOUTHERN ARIZONA REGIONAL WATER MANAGEMENT                                                                                                              
 STUDY......................................           500,000           150,000           200,000  ................           200,000  ................
SOUTHERN ARIZONA WATER RIGHTS SETTLEMENT ACT        47,363,000         7,000,000         6,693,000  ................         6,693,000  ................
TRES RIOS WETLANDS DEMONSTRATION............         6,025,000         1,800,090         1,000,000  ................         1,000,000  ................
VERDE RIVER BASIN MANAGEMENT STUDY..........         1,000,000           374,999           200,000  ................           200,000  ................
WEST SALT RIVER VALLEY WATER MANAGEMENT                                                                                                                 
 STUDY......................................         1,400,000           200,000            75,000  ................           475,000  ................
YUMA AREA PROJECTS..........................  ................  ................         1,670,000        11,868,000         1,670,000        11,868,000
                                                                                                                                                        
                 CALIFORNIA                                                                                                                             
                                                                                                                                                        
CACHUMA PROJECT.............................        25,489,000        11,489,039           565,000         8,881,000           565,000         8,881,000
CENTRAL VALLEY PROJECT:                                                                                                                                 
    AMERICAN RIVER DIVISION.................     2,645,604,143       521,924,282         2,219,000        16,204,000         2,219,000        18,204,000
    CENTRAL VALLEY PROJECT IMPROVEMENT ACT..  ................  ................         4,362,000  ................         4,362,000  ................
    DELTA DIVISION..........................       392,403,000       187,622,389        13,368,000         4,682,000        13,368,000         4,682,000
    EAST SIDE DIVISION......................           100,000           100,000           199,000         3,190,000           199,000         3,190,000
    FRIANT DIVISION.........................            75,000            75,000         3,426,000         5,406,000         3,426,000         5,406,000
    MISCELLANEOUS PROJECT PROGRAMS..........       534,039,000       280,346,005        16,632,000         2,504,000        19,632,000         2,504,000
    SACRAMENTO RIVER DIVISION...............       538,955,000       366,513,607         7,685,000         1,186,000         7,685,000         1,186,000
    SAN FELIPE DIVISION.....................       352,451,000       306,661,315         1,345,000  ................         1,345,000  ................
    SAN JOAQUIN DIVISION....................       194,278,000        47,740,226         6,955,000  ................         6,955,000  ................
    SHASTA DIVISION.........................       297,793,000       262,116,544         6,619,000         4,929,000         6,619,000         4,929,000
    TRINITY RIVER DIVISION..................       322,908,000       314,118,294         5,643,000         4,220,000         5,643,000         4,220,000
    WATER AND POWER OPERATIONS..............  ................  ................           445,000         4,981,000           445,000         4,981,000
    WEST SAN JOAQUIN DIVISION, SAN LUIS UNIT     1,541,408,000       568,833,122         2,839,000         9,833,000         2,839,000         9,833,000
IMPERIAL VALLEY WATER RECLAMATION STUDY.....           500,000           275,000            75,000  ................            75,000  ................
LOS ANGELES AREA WATER RECLAMATION AND REUSE        69,970,000        38,585,000        10,000,000  ................        10,000,000  ................
LOWER OWENS RIVER ENVIRONMENTAL STUDY.......           300,000           100,000           100,000  ................           100,000  ................
MAMMOTH LAKES WATER OPTIMIZATION STUDY......           350,000  ................            80,000  ................            80,000  ................
ORLAND PROJECT..............................  ................  ................           431,000            45,000           431,000            45,000
PORT HUENEME BRACKISH WATER RECLAMATION                                                                                                                 
 DEMO., CA..................................         4,000,000         1,000,000  ................  ................         2,000,000  ................
SALTON SEA RESEARCH PROJECT.................        10,000,000           500,000           400,000  ................           400,000  ................
SAN DIEGO AREA WATER RECLAMATION PROGRAM....       172,590,000        14,907,000        13,000,000  ................        13,000,000  ................
SAN FRANCISCO AREA WATER RECLAMATION STUDY..         3,790,000         3,415,000           375,000  ................           375,000  ................
SAN GABRIEL BASIN PROJECT...................        38,090,000        22,203,000         5,235,000  ................         5,235,000  ................
SAN JOSE AREA WATER RECLAMATION AND REUSE...       120,236,000         6,523,677         3,000,000  ................         3,000,000  ................
SOLANO PROJECT..............................  ................  ................         1,624,000           208,000         1,624,000           208,000
SOUTHERN CALIFORNIA COASTAL WATER SUPPLY                                                                                                                
 STUDY......................................           750,000           275,000           350,000  ................           350,000  ................
SO. CALIF. COMPREHENSIVE WATER RECLAMATION                                                                                                              
 STUDY......................................         3,291,999         2,522,999           769,000  ................           769,000  ................
                                                                                                                                                        
                  COLORADO                                                                                                                              
                                                                                                                                                        
ANIMAS-LAPLATA PROJECT, SECT. 5 AND 8.......       503,765,700        71,591,478         6,000,000  ................         6,000,000  ................
BOSTWICK PARK PROJECT.......................  ................  ................            40,000            36,000            40,000            36,000
COLLBRAN PROJECT............................  ................  ................            72,000           716,000            72,000           716,000
COLORADO-BIG THOMPSON PROJECT...............  ................  ................           115,000         6,539,000           115,000         6,539,000
DALLAS CREEK PROJECT........................  ................  ................            18,000           134,000            18,000           134,000
DOLORES PROJECT.............................       567,962,780       557,394,780        10,592,000           433,000        10,592,000           433,000
FRYINGPAN-ARKANSAS PROJECT..................  ................  ................            46,000         3,864,000            46,000         3,864,000
GRAND VALLEY UNIT, CRBSCP...................       160,905,000       155,822,911         4,456,000           635,000         4,456,000           635,000
LEADVILLE/ARKANSAS RIVER RECOVERY PROJECT...  ................  ................           770,000           798,000           770,000           798,000
LOWER GUNNISON BASIN UNIT, CRBSCP...........  ................  ................  ................           444,000  ................           444,000
MESA COUNTY WATER CONSERVATION STUDY........           325,000  ................            90,000  ................            90,000  ................
PARADOX UNIT, CRBSCP........................  ................  ................  ................         2,782,000  ................         2,782,000
SAN LUIS VALLEY PROJECT, CLOSED BASIN/                                                                                                                  
 CONEJOS....................................  ................  ................            70,000         3,052,000            70,000         3,052,000
UPPER COLORADO AREA PROJECTS................  ................  ................           103,000            57,000           103,000            57,000
                                                                                                                                                        
                    IDAHO                                                                                                                               
                                                                                                                                                        
BOISE AREA PROJECTS.........................  ................  ................         2,577,000         2,421,000         2,577,000         2,421,000
COLUMBIA-SNAKE RIVER SALMON RECOVERY PROJECT        87,536,121        36,042,121        13,062,000  ................        13,062,000  ................
IDAHO RIVER SYSTEMS MANAGEMENT STUDY........         1,898,870           998,870           300,000  ................           300,000  ................
MINIDOKA AREA PROJECTS......................  ................  ................         3,728,000         1,742,000         3,728,000         1,742,000
MINIDOKA NORTHSIDE DRAINWATER PROJECT.......         1,830,000           232,485           300,000  ................           300,000  ................
UPPER SALMON RIVER WATER OPTIMIZATION STUDY.           922,496           422,496           175,000  ................           175,000  ................
                                                                                                                                                        
                   KANSAS                                                                                                                               
                                                                                                                                                        
CHENEY RESERVOIR WATER QUALITY STUDY........         1,000,000           100,000           131,000  ................           131,000  ................
CHEYENNE BOTTOMS WILDLIFE AREA STUDY........         1,400,000  ................           101,000  ................           101,000  ................
EQUUS BEDS GROUNDWATER RECHARGE.............         3,200,000         1,500,000  ................  ................           500,000  ................
WICHITA PROJECT.............................  ................  ................           122,000            68,000           122,000            68,000
                                                                                                                                                        
                   MONTANA                                                                                                                              
                                                                                                                                                        
COLD CLIMATE WASTEWATER TREATMENT...........           875,000            35,000            37,000  ................            37,000  ................
FT. PECK RESERVATION, MR&I; WATER SYSTEM.....           450,000           210,000  ................  ................           240,000  ................
FT. PECK RURAL COUNTY WATER SYSTEM..........         5,700,000  ................  ................  ................           300,000  ................
HUNGRY HORSE PROJECT........................  ................  ................  ................           408,000  ................           408,000
JEFFERSON RIVER BASIN RETURN FLOW STUDY.....           400,000            80,000            86,000  ................            86,000  ................
MILK RIVER PROJECT..........................  ................  ................            53,000           706,000            53,000           706,000
MONTANA RIVER SYSTEMS STUDY.................         1,275,000           100,000           180,000  ................           180,000  ................
PALLID STURGEON RECOVERY DECISION...........           344,638           204,936            65,000  ................            65,000  ................
WESTERN MONTANA WATER CONSERVATION STUDY....           828,593           778,593            50,000  ................            50,000  ................
YELLOWSTONE RIVER BASIN STUDY...............           319,830           195,361            75,000  ................            75,000  ................
                                                                                                                                                        
                  NEBRASKA                                                                                                                              
                                                                                                                                                        
NEBRASKA RAINWATER BASIN ASSESSMENT.........           450,000  ................           133,000  ................           133,000  ................
NEBRASKA WATER SUPPLY ASSESSMENT............           275,261           175,261            88,000  ................            88,000  ................
                                                                                                                                                        
                   NEVADA                                                                                                                               
                                                                                                                                                        
NEWLANDS PROJECT............................         9,409,708         9,409,708         3,750,000  ................         3,750,000           500,000
LAS VEGAS SHALLOW AQUIFER DESALINATION DEMO.  ................  ................  ................  ................         3,750,000  ................
WALKER RIVER BASIN..........................  ................  ................  ................  ................           300,000  ................
WASHOE PROJECT..............................  ................  ................           866,000           461,000           866,000           461,000
                                                                                                                                                        
                 NEW MEXICO                                                                                                                             
                                                                                                                                                        
ALBUQUERQUE WASTEWATER RECYCLING............  ................  ................  ................  ................         5,000,000  ................
BRANTLEY PROJECT............................  ................  ................         1,200,000  ................         1,200,000  ................
CARLSBAD PROJECT............................  ................  ................         1,059,000           437,000         1,059,000           437,000
MIDDLE RIO GRANDE PROJECT...................         1,402,992           293,992         1,830,000         8,932,000         1,830,000         9,432,000
MIDDLE RIO GRANDE WATER CONVEYANCE                                                                                                                      
 MANAGEMENT PLAN............................           180,000           100,000            80,000  ................            80,000  ................
PECOS RIVER BASIN WATER SALVAGE PROJECT.....  ................  ................  ................           129,000  ................           129,000
RIO GRANDE CONVEYANCE CANAL/PIPELINE........           750,000           350,000  ................  ................           400,000  ................
RIO GRANDE PROJECT..........................  ................  ................           537,000         2,475,000           537,000         2,475,000
RIO GRANDE RIPARIAN TREE SPECIES CONSUMPTIVE                                                                                                            
 USE........................................           175,000  ................            75,000  ................            75,000  ................
SAN JUAN-CHAMA PROJECT......................  ................  ................            70,000           153,000            70,000           153,000
SAN JUAN GALLUP-NAVAJO PIPELINE.............  ................  ................  ................  ................           450,000  ................
SANTE FE WATER REUSE........................           500,000  ................  ................  ................           500,000  ................
VELARDE COMMUNITY DITCH PROJECT.............        31,754,000        17,008,870  ................         1,000,000  ................         1,000,000
                                                                                                                                                        
                NORTH DAKOTA                                                                                                                            
                                                                                                                                                        
FREEZE/THAW DESALINATION DEMONSTRATION                                                                                                                  
 PROJECT....................................           360,000  ................           360,000  ................           360,000  ................
GARRISON DIVERSION UNIT, P-SMBP.............     1,508,875,139       594,481,936        17,025,000         6,350,000        24,525,000         6,350,000
                                                                                                                                                        
                  OKLAHOMA                                                                                                                              
                                                                                                                                                        
ARBUCKLE PROJECT............................  ................  ................            39,000            55,000            39,000            55,000
LUGERT-ALTUS WATER RESOURCE MANAGEMENT                                                                                                                  
 OPTIONS....................................           850,000  ................           100,000  ................           100,000  ................
MCGEE CREEK PROJECT.........................  ................  ................           162,000           383,000           162,000           383,000
MOUNTAIN PARK PROJECT.......................  ................  ................            79,000            44,000            79,000            44,000
NORMAN PROJECT..............................  ................  ................           104,000            12,000           104,000            12,000
OKLAHOMA WATER SUPPLY STUDY.................           375,000           200,000           135,000  ................           135,000  ................
WASHITA BASIN PROJECT.......................  ................  ................           143,000           172,000           143,000           172,000
W.C. AUSTIN PROJECT.........................  ................  ................            70,000            85,000            70,000            85,000
                                                                                                                                                        
                   OREGON                                                                                                                               
                                                                                                                                                        
CENTRAL OREGON IRRIG. SYSTEM CONSERVATION                                                                                                               
 FEASIBILITY................................           767,056           442,056           225,000  ................           225,000  ................
CROOKED RIVER PROJECT.......................  ................  ................           116,000           400,000           116,000           400,000
DESCHUTES PROJECT...........................  ................  ................            89,000           146,000            89,000           146,000
GRANDE RONDE WATER OPTIMIZATION STUDY.......           995,807           895,807            50,000  ................            50,000  ................
KLAMATH PROJECT.............................        62,925,000        56,499,301         2,405,000           370,000         2,405,000           370,000
OREGON STREAM RESTORATION PLANNING STUDY....           908,209           833,209            75,000  ................            75,000  ................
OREGON SUBBASIN CONSERVATION PLANNING STUDY.         1,886,495           836,495           175,000  ................           175,000  ................
ROGUE RIVER BASIN PROJECT, TALENT DIVISION..  ................  ................            87,000           682,000            87,000           682,000
SOUTHERN OREGON COASTAL RIVER BASINS STUDY..           734,416           284,416           175,000  ................           175,000  ................
TUALATIN PROJECT............................  ................  ................            13,000           111,000            13,000           111,000
UMATILLA PROJECT............................        57,760,804        50,060,804         7,849,000         1,505,000         7,849,000         1,505,000
                                                                                                                                                        
                SOUTH DAKOTA                                                                                                                            
                                                                                                                                                        
BELLE FOURCHE, P-SMBP.......................        62,787,000        60,267,000  ................         2,520,000  ................         2,520,000
BLACK HILLS REGIONAL WATER STUDY............           750,000           517,660           100,000  ................           100,000  ................
MID-DAKOTA RURAL WATER PROJECT..............       122,814,000        27,914,303        10,000,000  ................        13,000,000  ................
MISSOURI RIVER BASIN TRIBES WATER MANAGEMENT                                                                                                            
 PLAN.......................................         1,218,512           859,512           208,000  ................           208,000  ................
MNI WICONI PROJECT..........................       278,976,000        80,432,868        20,976,000         3,349,000        27,976,000         3,349,000
RAPID CITY WASTEWATER REUSE STUDY...........           225,000  ................            75,000  ................            75,000  ................
                                                                                                                                                        
                    TEXAS                                                                                                                               
                                                                                                                                                        
CANADIAN RIVER PROJECT......................  ................  ................            25,000            55,000            25,000            55,000
COLORADO RIVER PROJECT......................  ................  ................             2,000             7,000             2,000             7,000
NORTHEAST EL PASO WATER RECLAMATION AND                                                                                                                 
 REUSE......................................         4,500,000         3,500,000  ................  ................         1,000,000  ................
NUECES RIVER PROJECT........................  ................  ................           127,000           195,000           127,000           195,000
PALMETTO BEND PROJECT.......................  ................  ................           169,000           314,000           169,000           314,000
RINCON BAYOU--NUECES MARSH RESTORATION STUDY           853,970           703,360           150,000  ................           150,000  ................
RIO GRANDE PROJECT DRAINS WATER QUALITY                                                                                                                 
 STUDY......................................           300,000  ................            95,000  ................            95,000  ................
RIO GRANDE/RIO BRAVO INTERNATIONAL BASIN                                                                                                                
 ASSESSMNT..................................           596,844           346,844           150,000  ................           150,000  ................
SAN ANGELO PROJECT..........................  ................  ................           100,000        20,479,000           100,000        20,479,000
                                                                                                                                                        
                    UTAH                                                                                                                                
                                                                                                                                                        
ASHLEY/BRUSH CREEKS OPTIMIZATION STUDY......           452,788           237,778           130,000  ................           130,000  ................
CARBON/EMERY COUNTIES WATER MANAGEMENT PLAN.           500,000            50,000           130,000  ................           130,000  ................
CENTRAL UTAH PROJECT, BONNEVILLE/JENSEN.....     1,323,786,000     1,317,358,066         3,921,000            44,000         3,921,000            44,000
OGDEN RIVER BASIN WATER QUALITY MANAGEMENT                                                                                                              
 STUDY......................................           450,000            50,000           125,000  ................           125,000  ................
PROVO RIVER PROJECT.........................  ................  ................           235,000           217,000           235,000           217,000
TOOELE WASTEWATER TREATMENT AND REUSE.......  ................  ................  ................  ................           500,000  ................
WEBER BASIN PROJECT.........................        19,639,000        15,779,723           373,000         1,538,000           373,000         1,538,000
                                                                                                                                                        
                 WASHINGTON                                                                                                                             
                                                                                                                                                        
COLUMBIA BASIN PROJECT......................  ................  ................         4,239,000         6,099,000         4,239,000         6,099,000
WASHINGTON RIVER BASIN PLANNING.............         1,114,142           164,142           175,000  ................           175,000  ................
YAKIMA PROJECT..............................       164,674,178         6,660,505         8,980,000         8,839,000         8,980,000         8,839,000
                                                                                                                                                        
                   WYOMING                                                                                                                              
                                                                                                                                                        
KENDRICK PROJECT............................  ................  ................           107,000         2,547,000           107,000         2,547,000
NORTH PLATTE PROJECT........................  ................  ................            93,000         1,137,000            93,000         1,137,000
SHOSHONE PROJECT............................  ................  ................            80,000         1,152,000            80,000         1,152,000
                                                                                                                                                        
                   VARIOUS                                                                                                                              
                                                                                                                                                        
COLORADO RIVER BASIN SALINITY CONTROL, T. II                                                                                                            
 BASINWIDE..................................        75,000,000         5,145,187         7,600,000  ................         7,600,000  ................
COLORADO RIVER STORAGE, SECT. 8, REC, FISH                                                                                                              
 AND WILDLIFE...............................        70,465,000        47,312,099         2,284,000  ................         2,284,000  ................
COLORADO RIVER WATER QUALITY IMPROVEMENT....        61,000,000        39,574,985           310,000  ................           310,000  ................
DEPARTMENT IRRIGATION DRAINAGE PROGRAM......  ................  ................         3,553,000  ................         3,553,000  ................
EFFICIENCY INCENTIVES PROGRAM...............  ................  ................         5,250,000  ................         3,000,000  ................
ENDANGERED SPECIES RECOVERY IMPLEMENTATION..       101,107,000        31,939,263        14,257,000  ................        14,257,000  ................
ENVIRONMENTAL PROGRAM ADMINISTRATION........  ................  ................         1,990,000  ................         1,990,000  ................
ENVIRONMENTAL/INTERAGENCY COORDINATION                                                                                                                  
 ACTIVITIES.................................  ................  ................         1,665,000  ................         1,665,000  ................
EXAMINATION OF EXISTING STRUCTURES..........  ................  ................  ................         2,142,000  ................         2,142,000
GENERAL PLANNING STUDIES....................  ................  ................         1,730,000  ................         1,730,000  ................
INVESTIGATION OF EXISTING PROJECTS..........  ................  ................           500,000  ................           500,000  ................
LAND RESOURCES MANAGEMENT PROGRAM...........  ................  ................         7,602,000  ................         7,602,000  ................
MINOR WORK ON COMPLETED INVESTIGATIONS......  ................  ................            90,000  ................            90,000  ................
MISCELLANEOUS FLOOD CONTROL OPERATIONS......  ................  ................           105,000           766,000           105,000           766,000
NATIONAL FISH AND WILDLIFE FOUNDATION.......  ................  ................         1,500,000  ................         1,500,000  ................
NATIVE AMERICAN AFFAIRS.....................  ................  ................         8,459,000  ................         8,000,000  ................
NEGOTIATION AND ADMINISTRATION OF WATER                                                                                                                 
 MARKETING..................................  ................  ................           662,000  ................           662,000  ................
OPERATION AND MAINTENANCE PROGRAM MANAGEMENT  ................  ................           107,000           215,000           107,000           215,000
PICK-SLOAN MISSOURI BASIN--OTHER PROJECTS...  ................  ................         3,648,000        16,376,000         3,648,000        16,376,000
POWER PROGRAM SERVICES......................  ................  ................           622,000         1,050,000           622,000         1,050,000
PUBLIC ACCESS AND SAFETY PROGRAM............  ................  ................           394,000            66,000           394,000            66,000
RECLAMATION LAW ADMINISTRATION..............  ................  ................         4,996,000  ................         4,996,000  ................
RECLAMATION RECREATION MANAGEMENT--TITLE 28.  ................  ................         4,288,000  ................         4,288,000  ................
RECREATION AND FISH AND WILDLIFE PROGRAM                                                                                                                
 ADMINISTRA-  TION..........................  ................  ................         4,922,000  ................         4,500,000  ................
SAFETY OF DAMS:                                                                                                                                         
    DEPARTMENT DAM SAFETY PROGRAM...........  ................  ................  ................         1,200,000  ................         1,200,000
    SAFETY OF DAMS EVALUATION AND                                                                                                                       
     MODIFICATION...........................  ................  ................  ................        42,433,000  ................        42,433,000
SCIENCE AND TECHNOLOGY:                                                                                                                                 
    APPLIED SCIENCE AND TECHNOLOGY                                                                                                                      
     DEVELOPMENT............................       143,418,905        51,084,633         3,850,000  ................         3,850,000  ................
    DESALINATION RESEARCH DEV PROGRAM.......        19,222,270         7,222,270         2,000,000  ................         5,000,000  ................
    GROUNDWATER RECHARGE....................        25,530,039        24,583,039           199,000  ................           199,000  ................
    IMPROVED RIVER BASIN MANAGEMENT CONTROL.         1,260,000  ................           400,000  ................           400,000  ................
    TECHNOLOGY ADVANCEMENT..................         2,763,962           563,962           400,000  ................           400,000  ................
    WATERSHED/RIVER SYSTEMS MANAGEMENT......         5,012,259         2,012,259         1,000,000  ................         1,000,000  ................
SITE SECURITY...............................  ................  ................  ................         5,000,000  ................         5,000,000
SOIL AND MOISTURE CONSERVATION..............  ................  ................           239,000  ................           239,000  ................
TECHNICAL ASSISTANCE TO STATES..............  ................  ................         1,700,000  ................         1,700,000  ................
WATER MANAGEMENT CONSERVATION PROGRAM.......  ................  ................         9,801,000  ................         9,301,000  ................
WETLANDS DEVELOPMENT........................  ................  ................         6,309,000  ................         6,759,000  ................
ADJUSTMENT FOR FISCAL YEAR 1997 ITEMS NOT                                                                                                               
 REQUESTED IN FISCAL YEAR 1998..............  ................  ................  ................  ................  ................  ................
UNDISTRIBUTED REDUCTION BASED ON ANTICIPATED                                                                                                            
 DELAYS.....................................  ................  ................  ................       -30,953,000  ................       -27,463,000
                                             ===========================================================================================================
      TOTAL, WATER AND RELATED RESOURCES....  ................  ................       421,874,000       229,678,000       452,211,000       236,168,000
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Central Arizona project, Arizona.--The Committee has 
recommended a reduction of $5,322,000 for the Central Arizona 
project. The recommendation includes a reduction of $3,872,000 
for excess noncontract costs and $1,450,000 in nonproject fish 
and wildlife management and development costs. The Committee 
directs the Bureau to carefully analyze future requirements to 
ensure that noncontract costs more accurately reflect 
Reclamation's construction activities which are nearly 
complete.
    West Salt River Valley, AZ.--Funding in the amount of 
$475,000 has been provided for the Bureau of Reclamation to 
continue studies of alternatives for water resource management 
of the different water sources, infrastructure development, and 
economic and environmental issues in the west Phoenix 
metropolitan area.
    Hungry Horse Dam, MT.--The Committee is concerned with the 
impacts of operations at Hungry Horse Dam on recreation, and 
the resident fish populations. In accordance with the Northwest 
Power Planning Council's amendments, the Secretary of the 
Interior, acting through the Bureau of Reclamation, should 
consider the Council's plan and to the maximum extent possible 
operate in accordance with the plan.
    Animas-La Plata project, Colorado and New Mexico.--The 
Committee recommendation includes $6,000,000, the same amount 
requested in the budget request. The Committee is aware that 
last year the Governor of Colorado and the Secretary of the 
Interior initiated a process to examine alternatives to the 
authorized Animas-La Plata project. The process calls for a 
proposal from parties to the settlement and one from opponents. 
Funding is provided to support this process and other aspects 
of the project as may be possible.
    Middle Rio Grande project, New Mexico.--An additional 
$500,000 is recommended for the Bureau of Reclamation to 
install drains in the Pena Blanca area to eliminate seepage 
problems caused by Cochiti Lake.
    San Juan River Gallup, Navajo water supply project, New 
Mexico.--The Committee has included $450,000 for the San Juan 
Gallup-Navajo pipeline project, including $150,000 for the 
Bureau of Reclamation to continue activities related to ongoing 
activities and $300,000 for the Bureau to undertake a study of 
the feasibility of using the Mount Taylor mine as a possible 
source of water supply for the city of Gallup.
    Santa Fe water reclamation and reuse, New Mexico.--The 
Committee has included $500,000 for the Bureau of Reclamation 
to initiate preconstruction feasibility, studies and activities 
for the Santa Fe water reclamation and reuse project in New 
Mexico.
    Upper Rio Grande water operation model study, New Mexico.--
The Committee directs the Bureau of Reclamation to use $400,000 
of available funds to continue the upper Rio Grande water 
operation model study in New Mexico which investigates ways to 
be responsive to current drought conditions and other current 
water resource management issues.
    Newlands project, Nevada.--The Committee recommendation 
includes $500,000 to mitigate the impact of increased fish and 
wildlife activities associated with the newlands project. The 
Bureau is directed to make an assessment of the need for 
additional operation and maintenance funding related to 
increased operations of the Marble Bluff fish facility.
    Garrison diversion project, North Dakota.--The Committee 
recommendation for the Garrison diversion project is 
$30,875,000, an increase of $7,500,000 over the budget request 
for the Bureau of Reclamation to continue development of 
municipal, rural, and industrial water programs for the Oaks 
test area, and for Indian water systems. The Committee has also 
included language in the bill to increase the authorized level 
of appropriations for the municipal, rural, and industrial 
water systems for the Fort Berthold, Stand Rock, and Spirit 
Lake Nation (formerly Fort Totten) in order to allow activities 
to continue.
    National Fish and Wildlife Foundation.--The recommendation 
for the National Fish and Wildlife Foundation includes 
$1,500,000, the same as the budget request, for fish and 
wildlife management and development.
    The Committee is generally pleased with the way activities 
have been carried out in the cooperative program between the 
National Fish and Wildlife Foundation and the Bureau of 
Reclamation. It is still the Committee's expectation that, 
while not required by law, the Foundation will make every 
effort to secure a 2- or 3-to-1 non-Federal contribution on 
projects and activities undertaken through these 
appropriations. Further, the Committee directs the Bureau of 
Reclamation to submit to the Committee as soon as practical 
after the end of the fiscal year a status report on how the 
funding for the previous year has been allocated by project, 
the level and source of funding both Federal and non-Federal, a 
completion schedule for each project, and an analysis of the 
unobligated and unexpended balances related to these 
appropriations.
    Ground Water Recharge Demonstration Program.--The Committee 
recommendation for the Ground Water Recharge Demonstration 
Program includes $500,000 for the Bureau of Reclamation to 
continue the Equus beds recharge project in Kansas. The 
Committee understands that the project is being cost shared on 
a 50-50 basis.
    Applied science and technology development.--Additional 
funding of $1,000,000 has been included for the Bureau to 
conduct and complete the in situ technology research field test 
to achieve conclusive demonstration of the technology, 
including the efficient control and manipulation of transport 
solutions, a cost-shared field demonstration. These funds are 
to be cost shared by the private sector participant as provided 
for in the contract. An additional $300,000 is also provided 
for oversight Bureau oversight and related technology transfer 
activities to other ground water programs administered by the 
Bureau to assure that the Federal investment in this technology 
is maximized.
    Desalination Research and Development Program.--The 
Committee recommends an appropriation of $3,000,000 for the 
Desalination Research and Development Program. The recommended 
increase over the budgeted amount is in response to new 
authorizing legislation expanding the Bureau's desalination 
responsibilities. The Bureau is directed to make an effort to 
extend the benefits under this program to small rural 
communities. The Committee recommendation also includes 
additional funds for research and development activities to 
develop lower cost and implementable desalting solutions, and 
funds for cost-shared work to develop the most efficient pump 
for reverse osmosis desalination.
    Wetlands development.--The Committee recommends a 
$1,000,000 reduction in the increase request in the budget for 
1998. Within the $6,659,000 recommended, the Committee has 
included $1,450,000 under fish and wildlife management and 
development for the Bureau to undertake Central Arizona project 
fish and wildlife activities.
    Operation and maintenance program costs.--The Committee has 
been made aware of and is concerned about reports of 
exceptionally large increases in operation and maintenance 
costs attributable to a number of Bureau of Reclamation 
projects including incidents where, is some cases, overhead 
costs are responsible for more than one-half of the costs 
growth for the year. On the other hand, the Committee is 
informed that the inspector general of the Department of the 
Interior accomplishes annual audits and none has show any 
indication that reclamation costs are excessive or questionable 
in any way. Yet, the Committee still finds the criticism 
disturbing, if in fact, it is true. Therefore, the Bureau of 
Reclamation is directed to conduct a survey of program 
operation and maintenance costs associated with each of its 
projects and provide a report to the Committee on the amount of 
operation and maintenance costs attributable to each project; 
the percentage change on an annual basis for each project; the 
amount of overhead cost associated with the O&M; costs for each 
project; the charge to beneficiaries for municipal industrial, 
irrigation, power, fish and wildlife, recreation, and other 
reclamation purposes; the percentage of O&M; attributable to 
overhead for each project; and a brief explanation of why any 
overhead rate exceeds 20 percent of the total O&M; cost 
attributable to each project. The information shall cover 
fiscal years 1995-97 and be provided to Appropriations 
Committees of the House and Senate.
    Finally, the Committee strongly encourages the Bureau to 
create new opportunities for stakeholders to participate in the 
review and development of operation and maintenance budgets for 
their respective projects. The Committee believes that those 
responsible for the repayment of O&M; charges should have an 
opportunity for meaningful consultation and coordination with 
the Bureau during the formulation of the annual budget 
submission.
    Title XVI--Reclamation Wastewater and Ground Water 
Program.--The Committee is concerned with the increasing size, 
potential Federal liability, and commitments being made by 
local interests with the expectation of Federal participation 
in the Title--XVI Reclamation Wastewater and Ground Water 
Program. It should be pointed out that Federal participation in 
projects started in previous years have not kept pace with the 
expected level of support anticipated by local interests, and 
the reauthorization legislation, which became law last year, 
has placed an even greater expectation and burden on already 
strained budget resources of the Committee. Further, in 
reviewing specific project schedules, the Committee understands 
that more and more local sponsors are proceeding on their own 
in advance of a commitment by the Federal Government to 
participate in the project. Local sponsor who take this action 
do so at their own risk.
    It is also clear that budget constraints in the future will 
continue to hold down the ability of the Committee to commit to 
additional new projects, particularly projects that carry large 
amounts of Federal cost sharing. Therefore, the Committee 
supports efforts of the Bureau of Reclamation to develop and 
apply criteria to prioritize the numerous projects awaiting 
funding as a result of the new authorizing legislation. The 
process and criteria should be consistent with the authorizing 
legislation.

               bureau of reclamation loan program account

Appropriations, 1997....................................     $12,715,000
Budget estimate, 1998...................................      10,425,000
Committee recommendation................................      10,425,000

    The Committee concurs with the House in recommending an 
appropriation of $10,425,000, the same as the budget request, 
for the small reclamation program of the Bureau of Reclamation.
    Under the Small Reclamation Projects Act (43 U.S.C. 422a-
422l), loans and/or grants can be made to non-Federal 
organizations for construction or rehabilitation and betterment 
of small water resource projects.
    As required by the Federal Credit Reform Act of 1990, this 
account records the subsidy costs associated with the direct 
loans, as well as administrative expenses of this program.
    The budget request and the approved Committee allowance are 
shown on the following table:

                                                           BUREAU OF RECLAMATION--LOAN PROGRAM                                                          
                                                                  [Amounts in dollars]                                                                  
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                            Budget estimate                Committee recommendation     
                                                                                 -----------------------------------------------------------------------
                                                Total Federal     Allocated to                          Facility                            Facility    
                Project title                       cost              date            Resource         operations,        Resource         operations,  
                                                                                   management and   maintenance, and   management and   maintenance, and
                                                                                     development     rehabilitation      development     rehabilitation 
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                        
                   ARIZONA                                                                                                                              
                                                                                                                                                        
TOHONO O'ODHAM NATION--SCHUK TOAK DISTRICT..         5,353,000         5,353,000  ................  ................  ................  ................
                                                                                                                                                        
                 CALIFORNIA                                                                                                                             
                                                                                                                                                        
CASTROVILLE IRRIGATION WATER................        14,604,000         4,564,000         2,100,000  ................         2,100,000  ................
CHINO BASIN DESALINATION....................         8,980,000         3,650,000         1,718,000  ................         1,718,000  ................
EASTERN MUNICIPAL WATER DISTRICT NO. 3......        13,650,411        13,650,411  ................  ................  ................  ................
SALINAS VALLEY..............................         9,391,000         3,500,000         1,300,000  ................         1,300,000  ................
SAN SEVAINE PROJECT.........................        28,100,000  ................           976,000  ................           976,000  ................
TEMESCAL VALLEY PROJECT.....................         5,797,000         2,700,000           651,000  ................           651,000  ................
                                                                                                                                                        
                   OREGON                                                                                                                               
                                                                                                                                                        
MILLTOWN HILL, DOUGLAS COUNTY...............        17,468,000         2,750,000         3,255,000  ................         3,255,000  ................
                                                                                                                                                        
                   VARIOUS                                                                                                                              
                                                                                                                                                        
LOAN ADMINISTRATION.........................  ................  ................           425,000  ................           425,000  ................
                                             ===========================================================================================================
      TOTAL, LOAN PROGRAM...................  ................  ................        10,425,000  ................        10,425,000  ................
--------------------------------------------------------------------------------------------------------------------------------------------------------

               California Bay-Delta Ecosystem Restoration

Appropriations, 1997....................................................
Budget request, 1998....................................    $143,300,000
Committee recommendation................................      50,000,000

    The California Bay-Delta Ecosystem Restoration Program, 
commonly referred to as CALFED, is a joint program between the 
State of California, and several Federal agencies with the 
objective of developing a comprehensive, long-term solution to 
the complex and interrelated water and other resource problems 
in the bay-delta region. The California Bay-Delta Environmental 
Enhancement Act, which authorized this program, became law in 
November 1996 and authorizes $143,300,000 per year in 
additional Federal funding for bay-delta ecosystem restoration 
activities in 1998, 1999, and 2000. It is estimated that the 
total cost of this effort could be $2,000,000,000 to 
$8,000,000,000. The program will focus on ways to improve the 
health of the ecosystem and improving management of the water 
resources in the region.
    The Committee commends the diverse interest groups for 
their efforts and interest in solving the challenging issues 
related to restoring the bay-delta ecosystem. But the Committee 
is concerned that the program is not ready or capable of 
efficiently and effectively utilizing $143,300,000 in the first 
year of existence. Recent efforts associated with the central 
Utah project demonstrates that 4 to 5 years is needed for a 
program of this nature to mature and grow thereby reducing the 
chances of waste and ensuring that only the best projects and 
activities receive funding.
    Further, critical planning and environment reviews, namely 
the programmatic EIR/EIS which will set out the preferred 
alternative restoration program, are currently not complete and 
it will be late in calendar year 1998 before it is finalized 
and in place. The mechanism to review project proposals is 
unclear and time will be needed to strengthen this process and 
sort through the thousands of proposals for which funding will 
be requested. While CALFED is an important undertaking, it must 
be kept in mind that this initiative must compete with other 
high priority programs during a time of reduced budget 
allocations and constraints. Therefore, it is essential that 
the Committee have a high level of confidence that the funding 
made available will be used fully and efficiently.
    Based on the information available to the Committee, and in 
light of the many requests made for fiscal year 1998, the 
Committee can recommend only $50,000,000 for the CALFED 
initiative. This action is taken without prejudice and in the 
spirit of ensuring the long-term success of the program. As the 
restoration program matures, the review process is finalized 
and strengthened, and the required environmental documentation 
is completed, the Committee will review the program for 
additional funding needs. During fiscal year 1998, the 
Committee expects a rigorous, competitive review process will 
be established--a process which ensures that Federal funds are 
allocated to only those projects that will provide the greatest 
benefit to the bay-delta ecosystem. The Committee also expects 
that performance measures, indicators of ecosystem health and 
associated monitoring protocols, be established as part of the 
review process. Further, the Committee directs that, to the 
greatest extent possible, Federal funds be spent primarily for 
on the ground activities and not for administrative, overhead, 
or support activities. It is thus the Committee's expectation 
that the participating Federal agencies will obtain these 
administrative and other costs from the individual agency 
appropriations account. Similarly, the restoration coordination 
program's administrative costs should be held to a minimum.

                central valley project restoration fund

Appropriations, 1997....................................     $38,096,000
Budget estimate, 1998...................................      39,130,000
Committee recommendation................................      25,130,000

    The Committee recommends an appropriation of $25,130,000. 
The Committee understands that $14,000,000 of carryover 
appropriations from prior years is available for use in 1998 
and, therefore, has reduced the funding request accordingly.
    The Central Valley project restoration fund was authorized 
in the Central Valley Project Improvement Act, title 34 of 
Public Law 102-575. This fund was established to provide 
funding from project beneficiaries for habitat restoration, 
improvement and acquisition, and other fish and wildlife 
restoration activities in the Central Valley project area of 
California. Revenues are derived from payments by project 
beneficiaries and from donations. Payments from project 
beneficiaries include several required by the act (Friant 
Division surcharges, higher charges on water transferred to 
non-CVP users, and tiered water prices) and, to the extent 
required in appropriations acts, additional annual mitigation 
and restoration payments.

                       policy and administration

Appropriations, 1997....................................     $46,000,000
Budget estimate, 1998...................................      47,658,000
Committee recommendation................................      47,558,000

    The Committee recommendation for policy and administration 
expenses is $47,558,000.
    This program provides for the executive direction and 
management of all reclamation activities, as performed by the 
Commissioner's offices in Washington, DC, Denver, CO, and five 
regional offices. The Denver office and regional offices charge 
individual projects or activities for direct beneficial 
services and related administrative and technical costs. These 
charges are covered under other appropriations.
    The Committee is concerned about the administrative 
overhead costs in the Sacramento regional office of the Bureau 
of Reclamation and has recommended a $100,000 reduction in 
those costs. The Committee is aware of criticism of the 
regional office that it has been unresponsive to concerns 
regarding its management practices and neglect of regional 
issues.
                    TITLE III--DEPARTMENT OF ENERGY

    Title III provides for the Department of Energy's defense 
and nondefense functions, the power marketing administrations, 
and the Federal Energy Regulatory Commission. The Committee has 
reorganized the Department of Energy's nondefense accounts to 
create the following structure:
    Energy research:
        Solar and renewable energy;
        Nuclear energy;
        Environment, safety, and health;
        Magnetic fusion energy; and
        Energy support activities.
    Uranium supply and enrichment.
    Nondefense environmental management.
    Uranium enrichment decontamination and decommissioning 
fund.
    Nuclear waste fund.
    Science:
        High energy physics;
        Nuclear physics;
        Biological and environmental research;
        Basic energy sciences; and
        Other energy research.
    Departmental administration.
    Inspector general.
    Community relations.--The Department of Energy's success in 
forging support among communities in which DOE facilities are 
located has been mixed. The Committee recommends that 
particular effort be made to improve community relations by 
encouraging DOE and contractor employees to interact with and 
become a part of their communities.
    Community relations have been particularly difficult in 
those situations in which the Department's facilities have been 
isolated by secrecy and set apart by social and economic 
factors. The Committee commends the Department for its initial 
efforts to recognize and address these difficult issues and, in 
particular, for the establishment of the Hispanic outreach 
initiative.
    The Department, its employees, and the employees of its 
contractors have unique capabilities that could be of great 
benefit to their communities. The Committee has reestablished 
the university and science education program to formalize a 
portion of the Department's efforts in this regard and will 
continue to review other specific proposals that could assist 
in this regard.

                       executive order no. 12902

    The Committee is aware of interest over many years in 
feasible cost-effective applications for solar energy within 
the Federal Government. The goal has been addressed in 
legislation and in Executive Order No. 12902, dated March 8, 
1994. The Committee intends that the Federal Government utilize 
solar technology wherever economically feasible.
    Consistent with these goals and objectives, the Office of 
Management and Budget [OMB] is directed to coordinate a 
Governmentwide effort to find feasible, cost-effective 
applications for solar energy within the Federal Government and 
in the application of Federal programs. The OMB shall assess 
progress made under Executive Order No. 12902 and report to 
Congress no later than 120 days after enactment of this 
provision. The report shall compile existing data, identify 
viable, cost-effective use of solar technology, and specify 
further actions necessary to assure progress in Federal 
Government use of solar technology.

                        energy research programs

Appropriations, 1997....................................................
Budget estimate, 1998...................................  $1,084,178,000
Committee recommendation................................     966,940,000

    The Committee has consolidated the Department of Energy's 
programs related to energy production and consumption within a 
new account: energy research. Those programs are: solar and 
renewable energy; nuclear energy; nondefense environment 
safety, and health; magnetic fusion, and; related energy 
support activities.

                       solar and renewable energy

Appropriations, 1997....................................    $266,344,000
Budget estimate, 1998...................................     344,700,000
Committee recommendation................................     301,422,000

    The Committee urges the Department to develop an agencywide 
program to pool resources and work with States to develop and 
implement their renewable energy portfolios in preparation for 
utility deregulation. This should include funding for 
organizations like the National Renewable Energy Laboratory to 
provide assistance with advanced resource assessment and 
mapping techniques.
    Solar energy.--The Committee has provided $189,111,000, an 
increase of $14,774,000 over the current level, for solar 
energy programs. The Committee recommendation includes: 
$2,500,000 for solar building technology research to be 
allocated among quality assurance, technology deployment, and 
technology development as it is in the current year; the 
Committee has provided $69,521,000, an increase of $10,000,000 
over the current year for photovoltaic energy systems to 
provide, in part, for the President's million solar roofs 
initiative, within that amount, $2,000,000 shall be made 
available to support the ongoing research in photovoltaics 
conducted by the Southeast and Southwest regional photovoltaic 
experiment stations, and; $14,350,000 for solar thermal energy 
systems to be allocated in accordance with the request except 
that funds are not provided to deploy additional dish/engine 
systems since two were deployed in fiscal year 1997 and funds 
are not provided for systems and markets/industrial assistance.
    Biofuels.--The Committee recommendation includes 
$60,000,000 for biofuels energy systems, an increase of 
$5,025,000 over the current level. The Committee recommends 
that the funds provided be allocated in the following manner: 
within the ``Biopower energy systems'' account: $1,500,000 for 
thermochemical conversion, $23,000,000 for system development, 
and $3,000,000 for biomass for cogeneration; within biofuels 
energy systems: $27,000,000 for ethanol production, including 
the requested amount for the biomass ethanol plant in Jennings, 
LA, $3,500,000 for feedstock development, and $2,000,000 for 
the regional biomass energy program.
    In fiscal year 1997, the Department completed funding for 
biomass gasifiers in Vermont and Hawaii. The Committee is aware 
of proposals to upgrade those facilities to demonstrate the 
application of more advanced energy conversion technologies. 
The Committee is supportive of those proposals and recommends 
that the Department enter into cost-shared partnerships to 
demonstrate those advanced technologies if the non-Federal 
partners are willing to provide 50/50 cost sharing for the 
additional costs.
    The Committee is also aware of proposals to use switchgrass 
that is beneficial to control soil erosion as a fuel for 
electric generation, is supportive and recommends that the 
Department enter into cost sharing partnerships to demonstrate 
the technologies if the non-Federal partners provide the 
required cost sharing.
    Wind.--The Committee recommends $34,640,000 for wind energy 
systems, an increase of $5,654,000 over fiscal year 1997, and 
recommends the following amounts within turbine research: 
$2,000,000 for near-term research and testing, an increase of 
$2,000,000 over fiscal year 1997; $5,000,000 for the next-
generation turbine project, an increase of $5,000,000 over the 
fiscal year 1997 level; and no funds have been provided for the 
small wind turbine project which has received no new funds in 
the last 2 years. The Committee recommends $8,300,000, the same 
as the fiscal year 1997 level, for cooperative research and 
testing. From the funds provided, $2,000,000 is to complete 
installation of wind turbines at Kotzebue, AK.
    International solar energy.--The Committee recommends 
$2,000,000, an increase of $1,250,000 over the fiscal year 1997 
level for the U.S. initiative on joint implementation.
    Geothermal.--The Committee recommends $30,000,000, a slight 
increase over the level provided in fiscal year 1997, of which 
$300,000 is provided to continue operation of the ocean thermal 
energy conversion system at Keahole Point, Kona, HI, in order 
to: obtain operation data regarding components, performance, 
and output; provide potential commercial partners with a 
functioning demonstration of the technology; and continue to 
demonstrate U.S. leadership in the development of ocean thermal 
energy conversion technology.
    The Committee has provided $300,000, the same as the budget 
request, for the Geo-Heat Center at the Oregon Institute of 
Technology.
    Hydrogen research.--The Committee recommends $19,000,000, a 
$4,000,000 increase above the level of the request.
    The Committee is concerned that the Department of Energy 
has invested heavily in hydrogen research and development with 
inadequate attention to the validation and deployment of new 
technologies. Therefore, the Committee recommends that an 
operational test and evaluation program be established and 
administered at the Nevada test site wherein production, 
storage, distribution, and utilization can be integrated at a 
single site. This initiative will facilitate quantitative 
understanding of technology capabilities in a comprehensive 
functional system.
    The Committee directs the Department to support the 
Russian-American Fuel Cell Consortium [RAFCO] demonstration of 
United States fuel cell power. The Committee has included 
$4,000,000 for this initiative.
    Renewable Indian energy resources.--The Committee has 
provided $4,000,000, the same amount as provided in fiscal year 
1997, for the renewable Indian energy resources program to 
encourage the vertical integration of energy production on 
Indian reservations.
    Electric energy systems and storage.--The Committee 
recommendation for electric energy systems and storage is 
$44,500,000, an increase of $12,750,000 over the amount 
provided in fiscal year 1997. The increase is due to a 
$12,750,000 increase in funding for high temperature 
superconducting research and development; one of the 
Department's most promising research programs. The Committee 
has provided $8,000,000 to complete the electric and magnetic 
fields research and development program. The Committee has not 
provided funding for the climate challenge program which 
received no funding in fiscal year 1997.
    Remote power.--The Committee is concerned by the uncertain 
future renewable energy technologies face in a deregulated 
electricity market. However, there is one area of applications 
for which the Committee contends renewable energy technologies 
are close to being a viable alternative to traditional energy 
sources.
    In much of the developing world, and portions of the United 
States, the costs of electricity transmission and distribution 
systems are prohibitive. As a result, large amounts of 
electricity are generated using comparatively expensive and 
polluting diesel generators. In may cases, renewable energy 
technologies are cost competitive. They are not utilized, 
however, for two related reasons; reliability and acceptance.
    For technologies that will be unable to compete in a 
deregulated, utility-based electricity market, the Committee 
directs the Department to focus near-term research on the 
development of reliable systems for remote applications in 
occasionally hostile climates.
    For example, the Department should consider programs to 
deploy solar, wind, fuel cell, and biomass technologies in 
remote areas of the United States. The objective of the 
demonstrations should be to displace diesel generation. 
Therefore, the Department should develop and demonstrate cost 
competitive, modular technologies as reliable, easy to operate, 
and maintain as diesel generators. The Committee has included 
$5,000,000 for this initiative.
    Program direction.--The Committee recommendation for solar 
and renewable energy program direction is $13,811,000, a 
$2,083,000 increase from the amount provided in fiscal year 
1997. The amount recommended provides for a 15-percent 
reduction in the amount requested for salaries.

                        nuclear energy programs

Appropriations, 1997....................................    $219,890,000
Budget estimate, 1998...................................     311,877,000
Committee recommendation................................     244,281,000

    The Committee recommendation for nuclear energy research 
and development is $66,642,000, a reduction of $45,261,000 from 
the request.
    Advanced radioisotope power systems.--The Committee 
recommends $45,000,000 for advanced radioisotope power systems, 
an increase of $6,738,000 from the amount provided in fiscal 
year 1997.
    Advanced test reactor fusion irradiation.--An amount of 
$2,000,000 was requested for materials irradiation to support 
the magnetic fusion energy program. The Committee has provided 
no funds within the ``Nuclear energy'' account for this 
activity but has included a significant increase above the 
amount requested in the magnetic fusion energy program. Of that 
increase, $2,000,000 is available for advanced test reactor 
fusion irradiation.
    Nuclear energy security.--The Committee has not provided 
funds for the Department's proposed nuclear energy security 
program. The Committee supports the use of nuclear energy to 
produce electricity. However, it is the view of the Committee 
that utility companies' decisions regarding the continued use 
of nuclear energy will be based on cost, public perception, and 
technical considerations in that order. It is the Committee's 
view that the Department's proposed program to address 
technical issues will have insufficient impact to justify the 
expense and that any technical issues that need to be resolved 
by utilities can well be resolved at their own expense.
    Uranium programs.--Due to budget constraints, the Committee 
has provided $71,400,000 instead of the requested $85,535,000 
for uranium programs.
    Isotope support.--The Committee recommendation for isotope 
support is $17,504,000, an increase of $4,800,000 from the 
fiscal year 1997 level. The $4,200,000 reduction from the 
request is due to the Committee's recommendation that 
$6,704,000, the same as the amount provide in fiscal year 1997, 
be provided for isotope production and distribution, instead of 
the $10,904,000 requested.
    Termination costs.--The Committee has provided $72,035,000, 
a reduction of $4,000,000 for termination costs. The reduction 
results from the Committee's recommendation to provide only 
$3,000,000 of the requested $5,500,000 to terminate the 
advanced light water reactor program and to not provide the 
requested $1,500,000 for management studies and evaluations.

                    environment, safety, and health

Appropriations, 1997....................................     $84,003,000
Budget estimate, 1998...................................     108,916,000
Committee recommendation................................      87,779,000

    The Committee recommendation includes $87,779,000 for 
environment safety, and health.
    The reduction results from the Committee's recommendation 
to shift $18,731,000 requested for health studies to the 
``Atomic energy defense, environment safety and health'' 
account as the Committee has done in previous years and to 
reduce the remaining amount of the request by $2,406,000.
    Line management support.--The Committee has provided 
$16,244,000 for line management support, the same amount as 
provided in fiscal year 1997 when a $4,500,000 adjustment is 
made to reflect the shift of the certification, packaging, and 
transportation of nuclear materials program from this account 
to the nondefense ``Environmental management'' account in 
fiscal year 1998.
    External regulation.--The Committee notes with interest the 
joint efforts by the Department of Energy and the Nuclear 
Regulatory Commission to evaluate the costs and benefits of an 
independent regulatory entity overseeing certain DOE nuclear 
activities or facilities. In particular, the Committee 
understands that the NRC and the DOE are developing a small 
pilot program to test regulatory concepts for DOE nuclear 
activities or facilities and understands that this work will be 
performed under a reimbursable arrangement from the DOE to the 
NRC. The Committee recommends that the pilot program have the 
following objectives: to obtain sufficient information about a 
set of DOE nuclear activities or facilities to determine the 
value added if NRC had regulatory oversight of the activities 
or facilities; to evaluate alternative regulatory approaches to 
NRC regulation of DOE nuclear activities or facilities; to 
determine the status of a set of DOE facilities with respect to 
meeting existing NRC requirements, and to identify any 
significant safety issues; to identify potential issues 
associated with a transition to NRC oversight of DOE nuclear 
facilities; and to assess the costs (to NRC and DOE) associated 
with NRC regulation of DOE nuclear facilities. The Committee 
recommendation includes $1,000,000 for this purpose.
    Program direction.--The Committee recommendation for 
environment, safety, and health program direction is 
$45,835,000. The $350,000 reduction from the request is to be 
taken from the proposed travel budget resulting in a travel 
budget of $2,000,000, a $500,000 increase over the fiscal year 
1997 level.

                         magnetic fusion energy

Appropriations, 1997....................................    $232,337,000
Budget estimate, 1998...................................     225,000,000
Committee recommendation................................     240,000,000

    This Fiscal Year 1996 Energy and Water Development 
Appropriations Act provided $244,144,000, a reduction of 
$128,419,000 or 34 percent from the amount requested, for the 
magnetic fusion energy program. In the conference report 
accompanying the act, the conferees instructed the Department 
to prepare, with the participation of the Fusion Energy 
Advisory Committee, a strategic plan to implement the 
necessarily restructured program. The conferees directed that 
the plan should assume a constant level of funding in the base 
program for the next several years; as appropriate, it should 
be integrated with the plans of the international magnetic 
fusion program; and it should address the institutional makeup 
of a domestic program consistent with the funding assumptions.
    Last year, the Committee was impressed that, with the 
assistance of the Fusion Energy Advisory Committee, the 
Department was able to develop a balanced program consistent 
with the directions of the Committee. However, because of 
budget pressures, the Committee was able to recommend only 
$240,000,000. That amount was further reduced in conference 
with the House so that the final level provided for fiscal year 
1997 was $232,337,000.
    For fiscal year 1998, the Committee recommends $240,000,000 
for the magnetic fusion energy program. This amount will 
fulfill the Committee's commitment to provide level funding in 
light of the magnetic fusion community's successful effort to 
restructure the program. This amount includes $2,000,000 
transferred to the ``Magnetic fusion energy'' account from the 
``Nuclear energy'' account for advanced test reactor fusion 
irradiation.

                       energy support activities

Appropriations, 1997....................................    $110,300,000
Budget estimate, 1998...................................     112,220,000
Committee recommendation................................     111,993,000

    Energy support activities include the technical information 
management program, program direction, construction, and field 
office management. The Committee recommends $111,993,000, a 
reduction of $227,000 from the request.
    Technical information management.--The Committee recommends 
$2,200,000 for technical information management, $227,000 below 
the request and the same amount as provided in fiscal year 
1997.

                        environmental management

                              (nondefense)

Appropriations, 1997....................................    $591,711,000
Budget estimate, 1998...................................     684,684,000
Committee recommendation................................     664,684,000

    In previous years, nondefense environmental restoration and 
waste management and nuclear materials and facilities 
stabilization were included in the ``Energy supply, research, 
and development'' account.
    FUSRAP.--The reduction from the request is due to budget 
constraints, and the Committee recommends that it be taken from 
the Formerly Utilized Site Remediation Action Program [FUSRAP]. 
The Committee strongly supports FUSRAP and last year urged the 
Department to increase the request for FUSRAP. The Committee 
appreciates the Department's responsiveness in this regard; the 
budget request increases from $75,085,000 to $182,079,000, a 
142-percent increase. Unfortunately, budget constraints prevent 
the Committee from providing the full amount of the increase. 
The Committee recommendation includes $162,079,000 for the 
program, a 116-percent increase over fiscal year 1997.
    From within available funds, the Committee recommendation 
is to continue the support of the University Research Program 
in Robotics at $3,500,000.
    The Committee supports the multi-institution, multistate 
consortium known as the Integrated Petroleum Environmental 
Consortium [IPEC], and is especially encouraged with its level 
of research expertise and development of technology to address 
biological waste treatment and bioremediation. The Committee 
encourages the Department to fully support the initiative of 
this multi-institution consortium.
    These funds also support continued standby condition for 
the fast flux test facility to be evaluated as a possible 
backup option for tritium production.

      uranium enrichment decontamination and decommissioning fund

Appropriations, 1997....................................    $200,200,000
Budget estimate, 1998...................................     248,788,000
Committee recommendation................................     230,000,000

    The uranium enrichment decontamination and decommissioning 
fund was established in accordance with title XI of Public Law 
102-486, the National Energy Policy Act of 1992. The funds 
provided for the environmental cleanup of the Department's 
uranium enrichment plants, two of which are currently leased to 
the USEC, and the cleanup of uranium mill tailings and thorium 
piles resulting from production and sales to the Federal 
Government for the Manhattan project and other national 
security purposes.
    Due to severe budget constraints, the Committee 
recommendation includes a reduction of $18,788,000 from the 
budget request of $248,788,000.

                           nuclear waste fund

Appropriations, 1997....................................    $182,000,000
Budget estimate, 1998...................................     190,000,000
Committee recommendation................................     160,000,000

    The Committee has provided $350,000,000 for the civilian 
nuclear waste program; $160,000,000 derived from the nuclear 
waste fund and $190,000,000 derived from the ``Atomic energy 
defense'' account. These funds should be used to proceed in 
accordance with the Civilian Radioactive Waste Management Draft 
Program plan issued by the Department in May 1996. No later 
than September 30, 1998, the Secretary shall provide to the 
President and to the Congress a viability assessment of the 
Yucca Mountain site. The viability assessment shall include: 
the preliminary design for the critical elements for the 
repository and waste package; a total system performance 
assessment, based upon the design concept and the scientific 
data and analysis available on June 30, 1998, describing the 
probable behavior of the Yucca Mountain geologic setting 
relative to the overall system performance standards; a plan 
and cost estimate for the remaining work required to complete a 
license application; and an estimate of the costs to construct 
and operate the repository in accordance with the design.
    The Committee has provided $1,500,000 for the State of 
Nevada and $6,175,000 for affected local governments in 
accordance with statutory restrictions contained in the act.

                                science

Appropriations, 1997....................................  $2,239,517,000
Budget estimate, 1998...................................   2,260,377,000
Committee recommendation................................   2,223,077,000

    The Committee has consolidated the Department's science 
programs, previously in energy supply research and development 
and general science and research, into a single ``Science'' 
account. Those programs are: high energy physics, nuclear 
physics, biological and environmental research, basic energy 
sciences, and other energy research.
    The Committee is concerned that the level of funding 
requested by the Department for science is inadequate to make 
full use of research facilities in which the Federal Government 
has made significant capitol investments. The Committee urges 
the Department, in preparing its fiscal year 1999 budget 
request, to more fully support the capabilities of new 
facilities, including support for laboratory completion and 
operating costs and for university researchers conducting 
experiments at these facilities.

                          high energy physics

Appropriations, 1997....................................    $670,075,000
Budget estimate, 1998...................................     675,035,000
Committee recommendation................................     675,035,000

    The Committee has provided the full amount of the request 
for high energy physics and strongly endorses U.S. 
participation in the large hadron collider.

                            nuclear physics

Appropriations, 1997....................................    $315,925,000
Budget estimate, 1998...................................     315,925,000
Committee recommendation................................     315,925,000

    The Committee has provided the full amount of the request 
for nuclear physics.
    The Committee understands that by providing an additional 
$3,000,000 in operating funds for the Thomas Jefferson National 
Laboratory such that its budget is $70,400,000 instead of the 
requested $67,400,000, the laboratory could operate for an 
additional 8 weeks in fiscal year 1998. The Committee 
encourages the Department to review its budget for nuclear 
physics and provide the additional funds if possible.

                 biological and environmental research

Appropriations, 1997....................................    $389,075,000
Budget estimate, 1998...................................     376,710,000
Committee recommendation................................     376,710,000

    The Committee has provided the full amount of the request 
for biological and environmental research, including $9,700,000 
for the National Institute for Global Environmental Change.
    The Committee has provided $3,930,266, an increase of 
$730,266 over the current year, to continue the nuclear 
medicine research program in biological imaging at the 
University of California Los Angeles. Also, at the University 
of Nevada Las Vegas, $300,000 is recommended to establish a 
biological and environmental research genetic biodiversity 
laboratory and $150,000 to study indoor air quality.
    The Committee notes that the Albert Einstein Medical Center 
in Philadelphia, PA, is establishing a new women's cancer 
center as a focal point of care for its own patients and those 
of community hospitals by introducing new technologies and 
promoting and facilitating biomedical research. The Committee 
further notes that the Einstein Center is located in an area 
with nearly twice the national proportion of households with 
incomes under $15,000 per year and that cancer is a particular 
problem for the poor, who often neglect their health for 
financial reasons. The Committee directs the Department to 
consider a proposal from the Einstein Center for a research and 
health care delivery project to determine whether it meets the 
objective of using the Department's unique scientific and 
technical capabilities to solve major problems in medicine and 
biology.

                         basic energy sciences

Appropriations, 1997....................................    $649,348,000
Budget estimate, 1998...................................     668,240,000
Committee recommendation................................     668,240,000

    The Committee has included the amount of the budget request 
for basic energy sciences.
    EPSCoR.--The Committee recommendation includes $10,000,000 
to continue the Department's Experimental Program to Stimulate 
Competitive Research [EPSCoR] Program. Also, the Midwest 
superconductivity consortium is continued at the current level.

                     other energy research programs

Appropriations, 1997....................................    $205,094,000
Budget estimate, 1998...................................     229,267,000
Committee recommendation................................     212,167,000

    Other energy research programs such as energy research 
analysis, laboratory technology transfer, advisory and 
oversight, multiprogram energy laboratory support, and program 
direction are funded in this section.
    University and science education.--The Department of Energy 
through its national laboratories and sites has unique physical 
and intellectual resources available to support the Nation's 
efforts to prepare the next generation of scientists and 
engineers by improving teaching and learning in science, 
technology, engineering, and math at all levels. The Committee 
regrets the elimination last year of the university and science 
education program and has provided $10,000,000 to reinstate it. 
The Department is directed to focus its educational efforts on 
two areas in fiscal year 1998: expanding undergraduate and 
faculty research opportunities through programs such as the 
successful University Lab Cooperative Program; and reinstating 
programs to support minority institutional development, in 
particular, the Minority Technical Education Program.
    Next-generation internet.--The Committee has not provided 
the $25,000,000 requested for the Department's participation in 
the next-generation internet. The Committee concurs with the 
Department's finding that increased internet capabilities would 
facilitate broader use of and benefit from the Department's 
scientific user facilities. However, given the rapid rate of 
commercial internet technology development, the Committee 
concludes it is unnecessary for the Department to fund the 
development of enabling technologies to meet its internet 
requirements.
    Computational and technology research.--The Committee 
recommendation for other energy research programs includes 
$760,000 for computing equipment at the Institute for 
Computational Chemistry and Molecular Modeling at the 
University of Georgia.
    Program direction.--The Committee has provided $28,500,000 
for program direction, the same as the amount provided in 
fiscal year 1997 and $2,100,000 less than the request.

                      Departmental Administration

                                (gross)

Appropriations, 1997....................................    $215,021,000
Budget estimate, 1998...................................     232,604,000
Committee recommendation................................     220,847,000

                        (miscellaneous revenues)

Revenues, 1997..........................................    $125,388,000
Budget estimate, 1998...................................     131,330,000
Committee recommendation................................     131,330,000

    For fiscal year 1997, the Congress reduced funding for 
departmental administration by 9 percent and is generally 
pleased with the Department's implementation of the reduction. 
However, during the reduction, the Department maintained the 
number of full-time equivalents [FTE's] in the Office of 
General Counsel and increased the number of FTE's in the Office 
of the Secretary. In order to return the number of FTE's in the 
Office of the Secretary to the 1996 level, the Committee has 
provided $2,500,000, $500,000 more than was provided in fiscal 
year 1997 but $350,000 less than the request, for the Office of 
the Secretary. Within general management--personnel 
compensation and benefits, the Committee has provided 
$13,950,000 for salary and benefits for the Office of General 
Counsel and expects the Secretary to reduce the number of FTE's 
in the Office to 150 instead of increase it to 170 as 
requested. In accordance with a budget amendment submitted by 
the Department, of the amount provided for other expenses 
within Departmental Administration, $1,623,000 is available for 
salaries and expenses in the Office of the Secretary in order 
to pay the salaries and expenses of employees otherwise on 
detail to the Office of the Secretary.

                           inspector general

Appropriations, 1997....................................     $23,853,000
Budget estimate, 1998...................................      29,499,000
Committee recommendation................................      27,500,000

    The Committee has provided $27,500,000, $1,999,000 less 
than the request, for the Office of the Inspector General. The 
Committee is aware that, by utilizing unobligated balances, the 
Office of the Inspector General has maintained total program 
costs of $28,000,000 and $28,600,000 for the previous 2 years. 
Due to budget constraints, the Office will have to reduce its 
total program costs in fiscal year 1998.

                         recommendation summary

    Details of the Committee's recommendations are included in 
the table at the end of this title.

                    Atomic Energy Defense Activities

    The atomic energy defense activities programs of the 
Department of Energy are divided into four separate 
appropriation accounts: weapons activities; defense 
environmental restoration and waste management; other defense 
programs; and defense nuclear waste disposal. Descriptions of 
each of these accounts are provided below.

                           Weapons Activities

Appropriations, 1997....................................  $3,911,198,000
Budget estimate, 1998..................................\1\ 3,576,255,000
Committee recommendation...............................\2\ 4,302,450,000

\1\ Excludes funding requested for asset acquisitions.
\2\ Reflects incremental funding for asset acquisition projects.

    Weapons activities support the Nation's national security 
mission of nuclear deterrence by preserving nuclear weapons 
technology and competence in the laboratories and maintaining 
the reliability and safety of the weapons in the enduring 
nuclear stockpile. The United States continues to retain 
strategic nuclear forces sufficient to deter future hostile 
countries from seeking a nuclear advantage. In the past, 
confidence in the nuclear weapons stockpile was assured through 
a combination of underground nuclear and laboratory testing. 
Since October 1992, the United States has maintained a 
moratorium on underground nuclear testing and has explored 
other means to assure confidence in the safety, reliability, 
and performance of nuclear weapons.
    The mission of defense programs is to maintain the safety, 
security, and reliability of the Nation's enduring nuclear 
weapons stockpile within the constraints of a comprehensive 
test ban, utilizing a science-based approach to stockpile 
stewardship and management in a smaller, more efficient weapons 
complex infrastructure. The future weapons complex will rely on 
scientific understanding and expert judgment, rather than on 
underground nuclear testing and the development of new weapons, 
to predict, identify, and correct problems affecting the safety 
and reliability of the stockpile. Enhanced experimental 
capabilities and new tools in computation, surveillance, and 
advanced manufacturing will become necessary to certify weapon 
safety, performance, and reliability without underground 
nuclear testing. Weapons will be maintained, modified, or 
retired and dismantled as needed to meet arms control 
objectives or remediate potential safety and reliability 
issues. As new tools are developed and validated, they will be 
incorporated into a smaller, more flexible and agile weapons 
complex infrastructure for the future.
    The Stockpile Stewardship and Management Program is a 
single, highly integrated technical program for maintaining the 
safety and reliability of the U.S. nuclear stockpile in an era 
without underground nuclear testing and without new nuclear 
weapons development and production. Traditionally, the 
activities of the three weapons laboratories and the Nevada 
test site have been regarded separately from those of the 
weapons production plants. However, although there remain 
separate budget items within defense programs, all stockpile 
stewardship and management activities have achieved a new, 
closer linkage to each other.
    There are three primary goals of the Stockpile Stewardship 
and Management Program: (1) provide high confidence in the 
safety, security, and reliability of the U.S. stockpile to 
ensure the continuing effectiveness of the U.S. nuclear 
deterrent while simultaneously supporting U.S. arms control and 
nonproliferation policy; (2) provide a small, affordable, and 
effective production complex to provide component and weapon 
replacements when needed, including limited lifetime components 
and tritium; and (3) provide the ability to reconstitute U.S. 
nuclear testing and weapon production capacities, consistent 
with Presidential directives and the ``Nuclear Posture 
Review,'' should national security so demand in the future.
    The policy framework which guides the Department of 
Energy's stockpile stewardship and management activities is the 
``Nuclear Posture Review'' which is approved by the President. 
The requirements for DOE stated in terms of infrastructure to 
support U.S. nuclear forces are: (1) maintain nuclear weapons 
capability (without underground nuclear testing); (2) 
demonstrate the capability to design, fabricate, and certify 
weapon types in the enduring stockpile; (3) maintain the 
capability to design, fabricate, and certify new warheads; and 
(4) ensure tritium availability. In addition, the President has 
also requested a new annual certification process to certify 
that the stockpile is safe and reliable in the absence of 
underground nuclear testing, and to produce a statement about 
the future confidence in the safety and reliability of the 
stockpile.
    The Committee has serious concerns that projected budget 
profiles for the Department of Energy may be insufficient to 
sustain important stockpile stewardship and management 
initiatives, such as the national ignition facility; a new 
tritium source; critical diagnostic tools; and a production 
infrastructure supporting a START II stockpile with the 
capability of returning to START I levels, while at the same 
time allowing the Nation's nuclear weapons laboratories to 
certify the safety and reliability of the weapons in the 
stockpile. The Committee believes that the issue of sufficient 
resources to ensure the certification of the weapons stockpile 
safety and reliability is of such importance it requires the 
immediate attention of the Department of Defense, the 
Department of Energy, the National Security Council, and the 
President. The capability of the national laboratories to 
provide the certification required by the President must not be 
allowed to erode in future years.
    The Committee's recommendation for weapons activities is 
$4,302,450,000, an increase of $391,252,000 over the enacted 
funding level for fiscal year 1997. While this is a sizable 
increase over last year, it is still well short of the amount 
that those require to certify the safety and reliability of the 
stockpile feel is adequate to fulfill their responsibility. 
Details of the recommended funding levels follow.

                         stockpile stewardship

    An appropriation of $1,925,900,000 is recommended for the 
stockpile stewardship activities of the Department of Energy.
    The stockpile stewardship program addresses issues of 
maintaining confidence in weapons stockpile safety and 
reliability without underground nuclear testing through a 
technically challenging science-based stockpile stewardship 
program utilizing upgraded or new experimental and 
computational capabilities.
    The Committee continues to view laboratory directed 
research and development [LDRD] as an integral, essential 
component of the Department's ability to respond to changing 
needs and requirements, and maintaining the preeminence of the 
national laboratories in the areas of science and engineering. 
The Committee directs DOE to continue current guidelines for 
managing laboratory directed research and development.
    Core stockpile stewardship.--The Core Stockpile Stewardship 
Program provides the physical, technical, and intellectual 
infrastructure necessary to support a reliable, safe, and 
secure nuclear weapons stockpile. The Committee has recommended 
a total of $1,333,290,000 for core stockpile stewardship base 
operating programs. This is $175,000,000 more than the budget 
request.
    The Committee is concerned that the funding level proposed 
for fiscal year 1998 and future budget planning projections of 
the Department of Energy may not be sufficient to address the 
critical needs of an aging stockpile. The Committee believes 
that preservation of core intellectual, scientific, and 
technical competencies and the continued ability of the weapons 
complex to respond to changing world situations is critically 
important. Further, the Committee is not convinced that 
engineering and surveillance approaches of yesterday will be 
adequate to maintain the safety and reliability of the nuclear 
weapons stockpile in the absence of underground testing.
    The Committee recommendation includes an additional 
$50,000,000 for the Core Research and Advanced Technology 
Program. This program provides the science and technology 
infrastructure needed to support DOE's defense mission. 
Emphasis is placed on those research and technology development 
activities necessary to maintain and improve the understanding 
of the underpinning science of complex nuclear weapons systems 
and subsystems and to advance the enabling technologies used in 
weapon assessment, engineering, certification, surveillance, 
and disposal. This program sustains the DOE defense core 
competencies and core technologies which provide the principal 
opportunities for assistance in advanced manufacturing.
    The Committee is aware of the significant scientific 
advancements made over the past year on the Z-accelerator at 
Sandia National Laboratory. Major increases in energy and 
temperature production enhance prospects that pulsed power may 
contribute in a significant way to both weapons and energy 
applications. Much has been accomplished, but more remains to 
be done to enhance the maturity of the technology. Therefore, 
DOE is urged to develop a scientific and technical contract, 
including milestones and deliverables, in order to guide and 
assess the future progress of the pulsed power program.
    The Committee increase places emphasis on critical core 
activities such as advanced hydrodynamic radiography, advanced 
manufacturing components and technologies, electronics, 
photonics, and microelectronic. The Department is to continue 
to emphasize and advance activities related to an advanced 
hydrodynamic test facility. Additional funding is also provided 
for chemistry and material science technology.
    Up to $30,000,000 is provided to develop an in-house, 
contingent source of radiation hardened microelectronics. It is 
not the Committee's preference that the Department supply its 
own radiation hardened microelectronics. To the contrary, the 
Committee would prefer that the private sector be positioned to 
supply radiation hardened microelectronics; an essential 
component for a variety of Department of Energy applications. 
However, in recent years, 13 of 15 radiation hardened 
microelectronics suppliers have left the business, and the 
remaining 2 face an uncertain future. Given the importance of 
these components, the Committee directs the Department to 
develop a capability, should it be necessary, to rapidly 
transfer production capability to private sector vendors to 
produce radiation hardened microelectronics.
    An increase of $25,000,000 is included for the accelerated 
strategic computing initiative [ASCI]. The ASCI program will 
provide the computing software, computer platforms, and an 
operating environment to allow the national laboratories to 
make critical decisions about the safety and reliability of the 
nuclear weapon stockpile without underground nuclear testing. 
Additional funding is recommended to support code development 
and simulation, for additional physics modeling, and other 
essential activities.
    An additional $10,000,000 is recommended to enhance 
nonnuclear component assessment and experimental activities.
    Consistent with Senate authorizing committee action, no 
funding is included for the Greenville Road project.
    Landmine remediation.--The problem of abandoned 
antipersonnel landmines has reached crisis proportions with 
more than 30,000 people killed or seriously injured by these 
abandoned weapons each year. The national laboratories of the 
Department of Energy have developed a cooperative effort to 
accelerate their technical contributions to this important 
endeavor. New technologies have been developed which have the 
potential of detection, localization, and discrimination of 
both metallic and nonmetallic antipersonnel landmines. A test 
and evaluation facility at the Nevada test site provides a 
unique environment to field test and evaluate performance of 
the technologies. The Committee directs the Department of 
Energy to use such funds as are available within the stockpile 
stewardship for operation of this testing facility and for 
further technology development for detecting, locating, and 
removing the threat of abandoned landmines.
    Testing capabilities and readiness.--An appropriation of 
$187,002,000 is recommended for testing capabilities and 
readiness activities. The Committee is concerned that 
insufficient resources and emphasis is being given to the 
Testing Capability and Readiness Program. Current Presidential 
direction is to maintain a readiness capability to conduct an 
underground nuclear test at the Nevada test site. Therefore, 
infrastructure and other measures are to be maintained to 
support this requirement. Presidential direction also indicates 
that resources should be included that are necessary to conduct 
experimental activities planned by the nuclear weapons design 
laboratories and appropriate to the national nuclear testing 
policy. It should be pointed out that DOE's budget document 
made it clear that the decrease proposed in the budget for 
fiscal year 1998 may impact test readiness activities.
    The additional funds recommended will protect the Nation's 
ability to return to underground testing, if required; execute 
the planned subcritical experiments for fiscal year 1998; and 
adequately plan for future experiments, and conduct the 
required number of hydrodynamic experiments.
    Infrastructure and capital equipment.--The three weapons 
laboratories and the Nevada test site will continue to form the 
foundation upon which the science-based stewardship program is 
built and from which many capabilities to support other 
critical work will originate. However, the institutional 
infrastructure of the laboratories cannot be ignored if their 
longer-term vitality is to be maintained. Therefore, the 
Committee has included an additional $50,000,000 to reduce the 
backlog of deferred maintenance and for facility refurbishment; 
and $10,000,000 to address the capital equipment needs at the 
laboratories and Nevada test site.
    Construction projects.--An appropriation of $98,810,000 is 
recommended for construction projects under core stockpile 
stewardship activities for fiscal year 1998. The Committee 
action does not concur with the budget proposal to fully fund 
DOE's stockpile stewardship construction projects in a 
consolidated ``Defense asset acquisition'' account. The 
incremental funding amount has been included by the Committee.
    Inertial confinement fusion [ICF].--An appropriation of 
$227,000,000 is recommended for the Inertial Confinement Fusion 
Program. The ICF Program continues to be a major contributor to 
the science and technology base supporting the nuclear 
deterrent through improved understanding of the underlying 
physics of nuclear weapons and computational modeling that will 
provide the future basis for ensuring safety, reliability, and 
performance on nuclear components.
    Recognizing the increased value of the Inertial Confinement 
Fusion Program to Stockpile Stewardship and Management, the 
Committee has recommended an increase of $10,000,000 to better 
exploit the capabilities of the Omega and Nova lasers as well 
as other assets for the stockpile stewardship program.
    Project 96-D-111, national ignition facility [NIF].--The 
NIF is a key facility in maintaining nuclear weapons science 
expertise required for the stockpile stewardship program, and 
to supporting weapons effects testing. An appropriation of 
$197,800,000, the full amount needed in fiscal year 1998, is 
recommended for the NIF project. Funding is provided to 
complete the project design and initiate construction.
    Technology transfer and education.--The technology transfer 
and education program directly supports core competencies 
through the development of technologies and intellectual 
capabilities to meet current and future defense mission needs.
    The Committee recommends an appropriation of $69,000,000 
for these activities for fiscal year 1998 to support ongoing 
cooperative research and development agreements, including 
AMTEX; and education activities.

                          stockpile management

    The Committee recommends an appropriation of $2,108,050,000 
for stockpile management activities. This is $164,219,000 over 
the current year appropriation.
    The stockpile management mission is to provide for 
maintenance, evaluation, dismantlement, transportation, and 
disposal of nuclear weapons in accordance with quality, 
quantity, and schedule requirements approved by the President 
in the nuclear weapons stockpile plan. The program addresses 
issues of near-term and long-range support for the enduring 
stockpile, and for ensuring an adequate supply of tritium. 
Along with routine stockpile surveillance, this includes 
corrective maintenance and system replacement, as well as 
weapon dismantlement. The goal is to support the national 
security of the United States by maintaining a safe and 
reliable nuclear deterrent.
    The Committee understands that recent risk reduction 
analysis has indicated the need for additional funding in 
fiscal year 1998 to support near-term workload activities in 
support of the W-87 program and to provide capability in 
preparation of expected future stockpile life extension 
activities. Therefore, an increase of $25,000,000 is 
recommended in the Stockpile Life Extension Program for fiscal 
year 1998.
    Joint development of manufacturing technologies with the 
labs is an integral part of the effort needed to help determine 
when aging concerns justify refurbishment or remanufacturing. 
The production plants need new and more efficient means to 
manufacture components in a fashion consistent with the 
existing nuclear test data base, and advanced manufacturing 
technologies to save costs by reducing the number and 
complexity of the integral manufacturing process steps as well 
as to monitor product quality. An additional $10,000,000 is 
provided to support these efforts.
    An additional $10,000,000 is recommended for activities 
related to DOE's environmental surety program. The additional 
funding is to focus on waste minimization activities within the 
complex to ensure the weapons complex of the future reduces 
waste streams in meeting defense requirements.
    An additional $15,000,000 is recommended to sustain the 
modernization of the weapons complex begun last year, and for 
more efficient and effective manufacturing and infrastructure 
needs of the weapon production plants. It is critical that the 
evaluation, surveillance, maintenance, repair, and 
dismantlement capabilities in the production complex be 
maintained; along with improving the manufacturing technologies 
needed to support the stockpile. In addition, these funds are 
intended to address aging processing equipment, information 
system upgrades, and funding deficits for ongoing production 
activities. The Committee expects that the additional funding 
will be allocated equitably across the production plants and 
with recognition that the weapons laboratories must be involved 
in this effort.
    The Committee recommendation includes $8,000,000 in 
operating funds for the Department to continue upgrades to the 
existing tritium recycling facility begun in fiscal year 1997.
    The Department is directed to explore ways to utilize the 
device assembly facility at Nevada in training and other 
activities associated with nonproliferation and terrorist 
programs consistent with other weapons activities and 
requirements.
    Tritium source.--An appropriation of $184,485,000 is 
recommended for activities related to providing a new tritium 
source. This amount is $34,485,000 over the current year and 
the same as the budget request. Tritium is a key element used 
in nuclear weapons which must be replaced periodically in order 
for the weapon to operate as designed. Currently, there is no 
capability to produce tritium and, therefore, it is essential 
that activities related to providing a new source of tritium 
proceed as quickly as possible and requirements dictate. The 
Committee continues to support the dual-track program being 
developed by the Department.
    Infrastructure and capital equipment.--The four production 
plants will continue to perform the production mission into the 
future. However, the institutional infrastructure of the plants 
cannot be ignored if their longer-term vitality is to be 
maintained. Therefore, the Committee has included an additional 
$40,000,000 to reduce the backlog of deferred maintenance and 
for facility refurbishment and to address critical capital 
equipment needs.
    Construction projects.--An appropriation of $171,585,000 is 
recommended for line item construction projects under core 
stockpile management for fiscal year 1998. The Committee action 
does not concur with the budget proposal to fully fund DOE's 
stockpile management construction projects in a consolidated 
``Defense asset acquisition'' account. The incremental funding 
amount for fiscal year 1998 has been included by the Committee.

                           program direction

    An appropriation of $268,500,000 is recommended for program 
direction activities. This is a reduction of $35,000,000 below 
the budget request and reflects the recommendations of the 
Institute for Defense Analysis on how best to streamline the 
management structure of DOE's Office of Defense Programs. The 
Committee recommendation includes $9,250,000 for the community 
assistance program at Los Alamos, which is the same as the 
budget request.

                        recommendation summaries

    Details of the Committee's recommendations are included in 
the table at the end of this title.

         Defense Environmental Restoration and Waste Management

Appropriations, 1997....................................  $5,459,304,000
Budget estimate, 1998..................................\1\ 5,052,499,000
Committee recommendation...............................\2\ 5,311,974,000

\1\ Excludes funding requested for asset acquisition.
\2\ Reflects incremental funding for asset acquisition.

    The Department's environmental management program is 
responsible for identifying and reducing health and safety 
risks, and managing waste at sites where the Department carried 
out nuclear energy or weapons research and production 
activities which resulted in radioactive, hazardous, and mixed 
waste contamination. The environmental management program goals 
are to eliminate and manage the urgent risk in the system; 
emphasize health and safety for workers and the public; 
establish a system that increases managerial and financial 
control; and establish a stronger partnership between DOE and 
its stakeholders. Environmental management activities of the 
Department of Energy are budgeted under three appropriation 
accounts: defense environmental restoration and waste 
management; energy supply, research, and development; and the 
uranium enrichment decontamination and decommissioning fund.
    This ``Defense environmental restoration and waste 
management'' account includes waste management functions, 
environmental restoration activities, science and technology 
activities, nuclear materials and facilities stabilization 
functions, and a variety of other crosscutting and program 
support activities, such as policy and management, analysis, 
and education and risk management.
    The recommended funding for defense environmental 
restoration and waste management, excluding the privatization 
initiative is $5,311,974,000.
    The Committee believes that the environmental management 
program of the Department of Energy is beginning to turn the 
corner in the cleanup effort. Leadership within the Department 
has put in place initiatives which have produced greater 
efficiencies, reduced costs growth on many projects, and 
resulted in moving the program from the study phase to the 
cleanup of facilities. Yet, the Committee feels that additional 
funding is warranted and that it is critical to future program 
success to have a stable and predictable stream of funding. The 
Committee believes that the program recommended for fiscal year 
1998 is within the acceptable range and will meet all legal 
requirements and other agreements.
    As stated last year, budget constraints will continue to 
check future increases and additional efficiencies will be 
required. However, even with these constraints, tremendous 
progress continues to be made both in tangible, on-the-ground 
results and in the business practices within the program. The 
Committee expects the Department to continue to seek every 
opportunity to bring about more efficiencies and tough 
businesslike approaches to program execution, including 
reductions in headquarters staffing. The Department should 
continue the critical review of the need and requirement for 
each individual support service contract, duplicative and 
overlapping organizational arrangements, and employees 
performing functions which duplicate other headquarters 
functions.
    The Committee is concerned about the high cost of disposing 
of low-level waste and mixed low-level waste from Department of 
Energy sites. The Committee directs the Department to conduct 
competitive procurements among non-Federal entities for the 
disposal of its low-level waste and/or mixed low-level waste. 
The Committee recommends that those procurements allow for the 
evaluation of alternative regulatory structures allowed under 
the Atomic Energy Act.
    While it is imperative that the Department's cleanup costs 
be brought down, there are instances where relative small 
amounts of additional funding invested in the near-term offer 
the potential for significant reductions in long-term budgetary 
requirements. The Committee continues to be concerned with 
growing landlord costs required to maintaining buildings and 
facilities that are ready for demolition, and the high costs 
associated with temporarily storing and monitoring wastes that 
are ready for permanent disposal. In order to reduce these 
costs in the future, it is important that the Department 
expedite demolition work, waste shipments, and permanent 
storage whenever possible. Therefore, in prioritizing spending 
for environmental management work, the Secretary should 
continue to give special attention to those specific facilities 
which offer the opportunity to accelerate closure thereby 
reducing significantly out-year costs.

                       environmental restoration

    An appropriation of $1,762,073,000 is recommended for 
environmental restoration programs, an increase of $17,500,000 
over the budget request for fiscal year 1998. The Environmental 
Restoration Program conducts cleanup activities to stabilize 
radioactive waste, carries out remediation efforts, and 
performs decommissioning and decontamination work at 
contaminated DOE sites. Other activities include performing 
assessments and characterizations to determine potential 
radioactive and hazardous waste releases and to reduce and 
remove the potential risks to the environment, human health, 
and safety resulting from past defense-related Department 
activities.
    The Committee has provided an additional $17,500,000 for 
the Department to undertake accelerate efforts to reduce 
growing landlord costs as discussed earlier in this report, to 
meet current commitments, and to address high priority removal 
and remedial actions at various sites including the Savannah 
River site, Rocky Flats, and the Fernald site. The Committee 
directs that increased funding be applied to those specific 
activities and sites where remediation can occurs.

                            Closure Projects

    The Committee is concerned with the way the Department 
allocated and managed the funding provided for closure projects 
in fiscal year 1997. Instead of allocating additional funding 
to specific projects with a high likelihood of accelerating the 
reduction of landlord and mortgage cost, the funding was 
essentially provided to the sites on a proportional basis 
thereby reducing the effectiveness and potential savings of the 
closure initiative.
    The Committee continues to believe that a closure fund 
which targets funding at specific facilities whose accelerated 
closure in the near term results in significantly reduced out-
year costs is important in freeing up budgetary resources in 
the longer term. Since this is not a new initiative or concept 
to the Department, the Committee expects that clear selection 
guidelines based on maximizing the return on investment from 
specific, individual projects be put in place at the earliest 
possible time in order that the recommended funding can be 
effectively utilized. The Committee has included $65,000,000 
for DOE to carry out this program. Sites such as Savannah 
River, Hanford, Rocky Flats, and Oak Ridge would each have the 
opportunity to propose specific projects to be accomplished 
under this program.

                            waste management

    The Committee recommends an appropriation of $1,571,644,000 
for the Waste Management Program, including $1,490,876,000 in 
operating expenses. The Waste Management Program seeks to 
protect the public and workers by seeking to minimize, treat, 
store, and dispose of radioactive, hazardous, mixed, and 
sanitary waste generated by past and ongoing operations at DOE 
facilities.
    The Committee continues to be concerned with the approach 
taken by DOE in development of the fiscal year 1998 budget 
request for waste management activities, specifically the 
reductions required in ongoing program activities such as 
reducing large mortgages, safety and compliance monitoring, 
cleanup of surface contamination, and tank monitoring upgrades 
and maintenance at Hanford tank farms, in order to undertake 
DOE's new environmental management privatization initiative.
    The Committee recommendation provides significant 
additional resources to continue critical ongoing activities in 
an effort to mitigate the impact of proposed budget reductions 
for fiscal year 1998. Stable and predictable funding levels for 
ongoing cleanup work are essential in order to sustain the 
excellent progress being made.
    The Committee has recommended additional appropriations for 
the ``Waste management'' account in order to bring the 
operation funding back up closer to the current year level. The 
recommendation includes additional funding to support increased 
operations at the defense waste processing facility [DWPF], 
high level waste research and development work, tank farm 
characterization and retrieval, and the consolidated 
incineration facility consistent with the authorized level in 
the Senate.
    Funding has been provided under environment, safety and 
health in other defense programs to complete the Hanford 
thyroid study.
    Construction projects.--An amount of $80,768,000 is 
provided for waste management construction activities for 
fiscal year 1998. This reflects the incremental funding level 
for construction projects which were requesting in the 
``Defense asset acquisition'' account proposed in the fiscal 
year 1998 budget request. The Committee recommendation does not 
concur with a separate acquisition account.

             nuclear materials and facilities stabilization

    The Committee recommendation for nuclear material and 
facility stabilization is $1,266,021,000. The Nuclear Material 
and Facility Stabilization Program reflects the change in the 
Department's mission from production of nuclear weapons to the 
cleanup of the former production complex. The activities of 
this program reduce the level of potential risk to people and 
the environment and drive down the cost of maintaining surplus 
facilities. Nuclear material and facility stabilization 
activities that reduce risk include stabilizing nuclear 
materials and deactivating surplus production facilities. As 
stabilization and deactivation work is completed, the cost of 
implementing other environmental management activities should 
decrease.
    The recommendation includes an increase of $63,000,000 in 
operating expenses for nuclear material and facility 
stabilization activities. The Committee recommendation supports 
continuation of the National Spent Fuel Program, and nuclear 
materials stabilization and site operations at Savannah River F 
and H Canyons consistent with the authorization.

                         technology development

    The Committee recommendation for technology development 
activities is $232,881,000, a reduction of $25,000,000 below 
the budget request.
    The mission of the Office of Technology Development is to 
develop new technologies or improve existing technologies that 
reduce risks and the cost of cleanup at the Department's 
facilities and contaminated areas. The Committee again states 
its belief that advanced technology development is key to a 
successful restoration and waste management program, and to 
significantly reducing costs.
    However, the Committee has serious concern with the 
Department's efforts to develop appropriate and effective 
technologies to facilitate the cleanup of the legacy of past 
nuclear weapon production activities. A recent analysis by the 
Congressional Research Service [CRS] indicated that about 
$2,000,000,000 has been provided to the DOE Environmental 
Management Program for technology development. CRS found that 
with this funding DOE had ``funded 1,370 different technology 
projects and that 50 of those have been deployed or used for 
actual cleanup work. Another 12 technologies have been selected 
for deployment. DOE statistics list about 100 additional 
technologies that may be deployed.'' The analysis further 
indicated that the nearly $2,000,000,000 investment had 
resulted in approximately $309,000,000 in life-cycle cost 
savings. With this level of return on investment, it is clear 
to the Committee that changes need to be made in the 
management, execution, and oversight of the Technology 
Development Program.
    In light of this situation, the Committee has recommended a 
$25,000,000 reduction for fiscal year 1998. The funding level 
recommended supports technology development and the technology 
deployment initiative at lower levels. The Department is to 
provide a report to the Committee, at the earliest possible 
time after enactment, which lays out the actions and steps 
needed to improve the results to this program.
    The Committee is informed of the on-site asbestos 
conversion/recycling unit at Hanford and the successful outcome 
of the unit's demonstration. The Committee understands that the 
Hanford technology shows promise as a safe alternative to 
landfill disposal of asbestos containing material. Therefore, 
the Committee urges the Secretary to take steps to upgrade the 
unit to operate at full capacity and potential, if appropriate. 
In taking this action, the Committee expects the Department to 
review asbestos disposal needs across DOE and to ensure this 
technology is allowed to compete with other options to meet 
disposal needs with the goal of reducing the overall costs as 
much as possible.
    The Committee is aware of the work carried out under the 
Department's Environmental Management Program in cooperation 
with university-based researchers who have developed advanced 
monitoring equipment, including instruments for use in 
verifying the content of plutonium in waste forms and systems 
to extend the useful life of melters used to convert DOE waste 
to glass. The Committee supports these efforts and directs the 
Department to continue its support for efforts that will lead 
to cost effective, nonbiased, flexible testing of environmental 
technologies.

                         Policy and Management

    The Committee recommendation provides an appropriation of 
$18,104,000, a reduction of $5,000,000 below the budget 
request, for policy and management activities. The Committee 
continues to have concern about the overlap and duplication of 
responsibilities between the Policy Office and other 
environmental management organizations.

                     Environmental Science Program

    A total of $50,000,000 is included for the Environmental 
Science Program. This is the same as the budget request. The 
goal of this program is to strengthen the Department's 
environmental management basic science activities through a 
competitive process between DOE's national laboratories, 
academic, and industrial organizations. This program was 
initiated by Congress in fiscal year 1996 in response to the 
Galvin Commission report.

                 Environmental Management Privatization

    An appropriation of $343,000,000 is recommended for the 
environmental management privatization initiative. The 
Committee action is taken without prejudice, but in recognition 
that the new privatization concept has yet to be proven 
effective.
    Based upon the Committee's analysis, the amount recommended 
is sufficient to meet the Department's privatization 
requirements.
    While recommending sizable reductions in the Department's 
privatization initiative, the Committee believes that such an 
approach may have application in some cases, particularly 
projects that are more traditional in scope and complexity, and 
ones that are not heavily dependent upon scientific and 
technological advances for success.
    Yet serious questions and issues remain to be addressed if 
DOE's privatization program, as currently structured, is to be 
successful. Management, regulatory, and budget issues, to name 
a few, must be overcome. The Department and those in the 
Environmental Management Program are to be commended for the 
hard work and effort to find a solution the cleaning up the 
waste left from decades of cold war weapons production. The 
environmental restoration and management is one of the biggest 
challenges facing this county. The Committee expects the 
Department to continue to work cooperatively with the 
legislative branch in an effort to move the program forward, 
and to provide periodic updates on those steps and actions 
takes to address the major issues and strengthen the 
Environmental Restoration and Waste Management Program.
    The Committee notes that the tank waste remediation system 
[TWRS] privatization project is a critical element of the 
cleanup program at the Hanford site. Adequately treating and 
disposing of the high-level nuclear waste in Hanford's 177 
underground storage tanks is an essential cleanup priority. 
While reductions in the fiscal year 1998 request for the TWRS 
project have been recommended, the Committee supports the 
privatization of cleanup activities. The Committee feels that 
the funding proposed should be sufficient for TWRS to proceed 
in fiscal year 1998.
    The Committee also recognizes the importance of treating or 
removing waste in silo three at Fernald, OH. The Committee 
recommends that a portion of the funds provided should be used 
to treat or remove that waste.

                           Program Direction

    The Committee recommendation for program direction totals 
$373,251,000, which is $15,000,000 below the budget request. 
The amount recommended is consistent with that provided by the 
authorizing committee in the Senate. Program direction provides 
the overall direction and administrative support for the 
environmental management programs of the Department of Energy.

                       Use of prior year balances

    The Committee has included a $20,000,000 reduction from 
prior year balances from the ``Defense environmental 
restoration and waste management'' account for fiscal year 
1998.

                        Fixed Asset Acquisition

    The budget proposed a new account to consolidate several 
capital construction project and requested funding to cover the 
full cost of those projects. The Committee dose not concur with 
this approach. The recommendation put forth by the Committee 
provides the incremental portion for each project.

                        recommendation summaries

    Details of the Committee's recommendations are included in 
the table at the end of this title.

                        Other Defense Activities

Appropriations, 1997....................................  $1,605,733,000
Budget estimate, 1998..................................\1\ 1,605,981,000
Committee recommendation...............................\2\ 1,637,981,000

\1\ Excludes funding requested for asset acquisition.
\2\ Reflects incremental funding for asset acquisition

    An appropriation of $1,637,981,000 is recommended by the 
Committee for other defense activities.
    This account includes the following programs: verification 
and control technology, nuclear safeguards and security, 
security investigations, security evaluations, the Office of 
Nuclear Safety, Worker, and Community Transition Assistance, 
fissile materials control and disposition, emergency 
management, international nuclear safety and security 
activities, and naval reactors. Descriptions of each account 
are provided below.

                 Nonproliferation and National Security

    Verification and control technology/arms control.--The 
Verification and Control Technology Program includes activities 
related to nonproliferation and verification research and 
development, arms control, and intelligence. The Department is 
engaged in an active nuclear nonproliferation program through 
research and development activities performed at the national 
laboratories, by providing technical and analytical support to 
treaty development and implementation, and by providing 
intelligence support to these efforts.
    The Committee recommendation totals $478,200,000. This is 
the same as the budget request. The Committee continues to 
strongly support these important national security programs.
    The Committee recommendation for verification and control 
technology research and development, and arms control totals 
$444,600,000. The funding level recommended by the Committee 
provides significant increases over the current year level for 
DOE to continue important activities related to the 
proliferation of weapons of mass destruction, including 
chemical and biological weapons; and initiatives to reduce the 
danger of nuclear smuggling and the associated nuclear 
terrorism threat.
    The recommendation provides an additional $137,008,000 over 
the current level, which is the same as the budget request, for 
material protection, control, and accounting [MPC&A;] 
activities. The Committee continues to consider these 
activities important to reducing the threat created by the 
breakup of the former Soviet Union.
    Intelligence.--The Office of Intelligence provides 
information and technical analysis on international arms 
proliferation, foreign nuclear programs, and other energy-
related matters to policymakers in the Department and other 
U.S. Government agencies. The focus of the Department's 
intelligence analysis and reporting is on emerging proliferant 
nations, nuclear technology transfers, foreign nuclear 
materials production, and proliferation implications of the 
breakup of the former Soviet Union.
    The Committee recommendation totals $33,600,000, the same 
as the budget request.
    Emergency management.--The Committee has provided 
$27,700,000 for emergency management activities. The Office of 
Emergency Management serves as the single point of contact and 
control for all DOE emergency and threat assessment-related 
activities, and ensures an integrated response to emergencies 
affecting the departmental operations and activities or 
requiring departmental assistance. The amount recommended by 
the Committee supports increased emphasis to plan and conduct 
realistic exercises to prepare Federal, State, and local 
organizations to work effectively in response to domestic 
terrorism and the use of existing national assets such as the 
Nevada test site to train Federal, State, and local first 
responders as part of domestic emergency response program.
    Nuclear safeguards and security.--This program includes 
activities to assure adequate protection of nuclear weapons, 
nuclear materials, facilities, and classified information 
against theft, sabotage, espionage, and terrorist activities. 
As departmental sites and facilities are decommissioned, 
safeguards and security costs are expected to decrease 
Department-wide. The Committee concurs with the budget request 
of $47,200,000.
    Security investigations.--This program includes those 
activities necessary for granting appropriate security 
clearances to agency and Government contractor personnel who 
must in the performance of their work have access to restricted 
data, national security information, or special nuclear 
material, or who occupy a designated critical sensitive 
position. An appropriation of $20,000,000 is recommended by the 
Committee. This is the same as the budget request.

               Environment, Safety, and Health (Defense)

    The Office of Environment, Safety, and Health is the 
departmental resource that provides oversight in the areas of 
environment, safety, health, and safeguards and security 
performance. The Committee recommends an appropriation of 
$74,000,000, a $20,000,000 increase over the budget request.
    The Committee recommendation continues funding to support 
commitments under State health agreements, and studies 
conducted under a memorandum with the Department of Health and 
Human Services under defense activities as in past years. The 
recommendation also supports the program to monitor former DOE 
workers with significant occupational exposures. Included in 
the amount recommended is $2,000,000 for the Hanford thyroid 
study. The Committee understands that the study will be 
completed in fiscal year 1998 with the funds recommended.

               WORKER AND COMMUNITY TRANSITION ASSISTANCE

    In accordance with section 3161 of the National Defense 
Authorization Act of 1993 and as a result of a change in the 
work force at defense nuclear facilities, defense employees of 
the Department may be provided various options to minimize 
impacts of these work force structure changes. These options 
include retraining, early retirement incentives, preference in 
hiring, outplacement assistance, and relocation assistance. In 
addition, this program funds contractor employment reduction 
requirements for severance and separation payments. The 
Committee recommendation is $62,000,000, the same as the amount 
provided for the current fiscal year.
    The Committee recognizes the efforts of the city of Paducah 
and the surrounding western Kentucky communities to establish a 
community reuse organization [CRO]. This organization is 
charged with developing a regional economic plan to minimize 
possible work force reductions at the Department of Energy's 
gaseous diffusion plant in Paducah. The Committee directs the 
Department of Energy to support the establishment of the CRO 
and participate in the development of a strategic plan for the 
diversification of the regional economy.

               FISSILE MATERIALS CONTROL AND DISPOSITION

    The Fissile Materials Control and Disposition Program is 
responsible for the technical and management activities to 
assess, plan, and direct efforts to provide for the safe, 
secure, environmentally sound long-term storage of all weapons-
usable fissile materials and the disposition of fissile 
materials declared surplus to national defense needs. The 
Committee recommendation is $95,796,000, which is $9,000,000 
over the comparable level for the current level.

                        Nuclear Energy (Defense)

    An appropriation of $81,000,000 is recommended by the 
Committee for international nuclear safety and nuclear security 
programs of DOE. This is the same as the budget request.
    Nuclear energy (defense) supports development of 
technologies to address issues associated with long-term 
operation of nuclear powerplants, and to reduce the national 
security and environmental threats posed by the operation of 
unsafe and aging nuclear facilities around the world. 
Particular attention is given to improving the safety of 
Soviet-designed nuclear powerplants, threats posed by 
reprocessing of spent fuel in Russia and the former Soviet 
Union states, and spent fuel management activities that 
minimize the risks of proliferation of weapons-usable nuclear 
material.

                             NAVAL REACTORS

    The Naval Reactors Program provides for the design, 
development, testing, and evaluation of improved naval nuclear 
propulsion plants and reactor cores having long fuel life, high 
reliability, improved performances, and simplified operating 
and maintenance requirements. The nuclear propulsion plants and 
cores cover a wide range of configurations and power ratings 
suitable for installation in naval combatants varying in size 
from small submarines to large surface ships. The Committee 
recommendation is $660,500,000.
    The Committee recommendation includes an additional 
$20,000,000 to continue inactivation and dismantlement of 
shutdown prototype naval reactor plants at DOE naval nuclear 
propulsion sites.

                        RECOMMENDATION SUMMARIES

    Details of the Committee's recommendations are included in 
the table at the end of this title.

                     Defense Nuclear Waste Disposal

Appropriations, 1997....................................    $200,000,000
Budget estimate, 1998...................................     190,000,000
Committee recommendation................................     190,000,000

    The Committee recommends $190,000,000 for defense nuclear 
waste disposal.
    Since passage of the Nuclear Waste Policy Act of 1982, as 
amended, the nuclear waste fund has incurred costs for 
activities related to disposal of high-level waste generated 
from the atomic energy defense activities of the Department of 
Energy. At the end of fiscal year 1994, the balance owed by the 
Federal Government to the nuclear waste fund was $1,071,000,000 
(including principal and interest). The ``Defense nuclear waste 
disposal'' appropriation was established to ensure payment of 
the Federal Government's contribution to the nuclear waste 
fund.

                    Power Marketing Administrations

    Public Law 95-91 transferred to the Department of Energy 
the power marketing functions under section 5 of the Flood 
Control Act of 1944 and all other functions of the Department 
of the Interior with respect to the Alaska Power 
Administration, Bonneville Power Administration, Southeastern 
Power Administration, Southwestern Power Administration, and 
the power marketing functions of the Bureau of Reclamation, now 
included in the Western Area Power Administration.
    All power marketing administrations except Bonneville are 
funded annually with appropriations, and related receipts are 
deposited in the Treasury. Bonneville operations are self-
financed under authority of Public Law 93-454, the Federal 
Columbia River Transmission System Act of 1974, which 
authorizes Bonneville to use its revenues to finance operating 
costs, maintenance and capital construction, and sell bonds to 
the Treasury if necessary to finance any remaining capital 
program requirements.

         operation and maintenance, alaska power administration

Appropriations, 1997....................................      $4,000,000
Budget estimate, 1998...................................       1,000,000
Committee recommendation................................      23,500,000

    The Alaska Power Administration [APA] is responsible for 
operation, maintenance, and marketing of power for Alaska's two 
Federal hydroelectric projects. The operating projects are the 
30-megawatt Eklutna project near Anchorage and the 78-megawatt 
Snettisham project near Juneau. Project facilities include 
dams, reservoirs, powerplants, transmission systems, and 
necessary maintenance facilities.
    Public Law 104-58 authorizes the sale of the APA assets. 
The Snettisham project will be sold to the State of Alaska and 
Eklutna project to the three current power customers: Municipal 
Light & Power, Chugach Electric Association, Inc., and 
Matanuska Electric Association, Inc. The Department and the APA 
expect to complete sale of the Eklutna project by November 28, 
1997, and of the Snettisham project by December 31, 1997.
    The Department has requested, and the Committee has 
provided, $1,000,000 to meet obligations that may be incurred 
prior to the sales. Any unobligated balances resulting from 
that appropriation will be returned to the Treasury of the 
United States upon the sale of the APA.
    The Committee is aware that oil is leaking from one of the 
APA's submerged cables used to transmit power from the 
Snettisham hydroelectric facility to Juneau. Unfortunately, 
because the APA staff has been reduced from 31 to 8 over the 
previous year in anticipation of the APA's sale, the staff no 
longer has the engineering or procurement expertise to conduct 
the major technical procurement necessary to replace the cable.
    In order to address this problem, in addition to the 
$1,000,000 requested, the Committee has provided an additional 
$2,500,000; the estimated cost of replacing a single cable. It 
is the Committee's hope that, prior to final disposition of 
this act, an agreement could be reached between the APA and the 
State of Alaska by which the APA would make a contribution to 
the State to cover the cost of replacing a single cable or, at 
the discretion of the State, the funds could be used to 
partially fund the replacement of all four cables.
    The Committee has allocated $20,000,000 for the Swan Lake-
Lake Tyee Intertie project to promote the economic self-
sufficiency of the community of Wrangell, Peterburg, and 
Ketchikan, AK, which are recovering from the economic disaster 
attributed to lost timber sales income.

                  bonneville power administration fund

    The Bonneville Power Administration is the Federal electric 
power marketing agency in the Pacific Northwest, a 300,000-
square-mile service area that encompasses Oregon, Washington, 
Idaho, western Montana, and small portions of adjacent Western 
States in the Columbia River drainage basin. Bonneville markets 
hydroelectric power from 29 Corps of Engineers and Bureau of 
Reclamation projects, as well as thermal energy from non-
Federal generating facilities in the region. Bonneville also 
markets and exchanges surplus electric power interregionally 
over the Pacific Northwest-Pacific Southwest Intertie with 
California, and in Canada over interconnections with utilities 
in British Columbia.
    Bonneville constructs, operates, and maintains the Nation's 
largest high-voltage transmission system, consisting of 14,800 
circuit-miles of transmission line and 400 substations with an 
installed capacity of 21,500 megawatts.
    Public Law 93-454, the Federal Columbia River Transmission 
System Act of 1974, placed Bonneville on a self-financed basis. 
With the passage in 1980 of Public Law 96-501, the Pacific 
Northwest Electric Power Planning and Conservation Act, 
Bonneville's responsibilities were expanded to include meeting 
the net firm load growth of the region, investing in cost-
effective, regionwide energy conservation, and acquiring 
generating resources to meet these requirements.
    Borrowing authority.--A total of $3,750,000,000 has been 
made available to Bonneville as permanent borrowing authority. 
Each year the Committee reviews the budgeted amounts Bonneville 
plans to use of this total and reports a recommendation on 
these borrowing requirements. For fiscal year 1998, the 
Committee recommends an additional increment of $253,000,000 in 
new borrowing authority, the same as the budget request, for 
transmission system construction, system replacement, energy 
resources, fish and wildlife, and capitol equipment programs.
    Repayment.--During fiscal year 1998, Bonneville will pay 
the Treasury $805,000,000, of which $205,000,000 is to repay 
principal on the Federal investment in these facilities.
    Limitation on direct loans.--The Committee recommends that 
no new direct loans be made in fiscal year 1998.
    Budget revisions and notification.--The Committee expects 
Bonneville to adhere to the borrowing authority estimates 
recommended by the Congress and promptly inform the Committee 
of any exceptional circumstances which would necessitate the 
need for Bonneville to obligate borrowing authority in excess 
of such amounts.
    Cost control.--The Committee commends BPA for its actions 
in the last 3 years to reduce spending by approximately 
$600,000,000 annually and to reduce staffing by 1,000 
positions. The Committee believes there is an opportunity to 
further reduce costs. The Committee understands that BPA and 
the Northwest Governor's Regional Review Transition Board are 
reviewing BPA's budget in order to recommend ways for BPA to 
further control discretionary programs costs. The Committee 
supports the efforts of BPA to aggressively review costs to 
assure that limited ratepayer dollars are prudently spent. In 
order to keep pace with a competitive wholesale power market, 
discretionary program expenditures that require ratepayers to 
assume financial risk must be carefully reviewed by BPA to 
determine where additional reductions can be made to minimize 
the potential for stranded cost and to at least achieve BPA's 
goal of 2 cents in 2000. Concurrent with this review, BPA 
staffing levels should continue to be reviewed and adjusted to 
match changing program needs. The Committee directs that BPA 
and the transition board provide a report to the Committee by 
March 1, 1998, identifying specific recommendations for cost 
reductions in all discretionary spending for which BPA is 
responsible.
    Fish and wildlife agreement.--Last fall, four cabinet level 
Secretaries (Energy, Commerce, Interior, and the Army) signed a 
memorandum of agreement which committed Bonneville to a fixed 
budget for its fish and wildlife expenditures for fiscal years 
1996 through 2001 that will provide $252,000,000 per year in 
program funding, plus $90,000,000 to $280,000,000 per year for 
hydrosystem operating expenditures on fish and wildlife 
projects, reimbursement to other Federal agencies and the 
Federal Treasury, the cost of purchase replacement power, and 
forgone hydrosystem revenues. In fiscal year 1998, the direct 
expenditure portion of the budget is expected to be 
$127,000,000. The Administrator shall use the funding available 
under the direct program portion of the fish and wildlife 
budget during fiscal year 1998 first to fund those measures, 
including reasonable and prudent alternatives, that are 
identified as mandatory Bonneville responsibilities for that 
fiscal year pursuant to the biological opinions on salmon and 
sturgeon issued in 1995 under the Endangered Species Act. The 
remainder of the funding available under the direct program 
portion shall be used in a manner consistent with the Northwest 
Power Planning Council's Columbia River Basin Fish and Wildlife 
Program and section 4(h)(10)(D) of the Northwest Power Planning 
and Conservation Act.
    Independent scientific review panel.--The Committee 
understands that the Northwest Power Planning Council's 
Independent Scientific Advisory Review Panel, created by the 
Fiscal Year 1997 Energy and Water Development Act, has 
carefully reviewed proposals for funding from BPA's annual fish 
and wildlife program. The Committee urges the ISRP to continue 
its aggressive, independent review of projects proposed for 
funding to ensure that Northwest ratepayer dollars are spent 
wisely and to maximum benefit of regional fish and wildlife 
populations.
    Hatchery review report.--Due to budgetary constraints it is 
critical that federally funded programs, such as the hatchery 
programs for the Columbia River basin, spend limited Federal 
dollars wisely and in a cost-effective manner that maximizes 
the benefits to the fish resource. The Committee directs the 
Northwest Power Planning Council with assistance from its 
independent Scientific Advisory Board to conduct a thorough 
review of all federally funded hatchery programs operating in 
the Columbia River basin, including an assessment of the 
hatchery operation goals and principles of State, tribal, and 
Federal hatcheries, and produce a formal recommendation for a 
coordinated policy for the future operation of federally funded 
hatcheries in the basin and how to obtain such a coordinated 
policy. National Marine Fisheries and the States of Oregon, 
Washington, and Idaho and Indian tribes in the basin should 
assist the Council in its review by providing information 
necessary to conduct a thorough review of federally funded 
hatchery programs. An independent, comprehensive review that 
examines all federally funded hatcheries and their roles in 
fishery restoration is long overdue, and the Committee directs 
the Northwest Power Planning Council, to provide a final report 
to the Committee on the subject by October 1998. The Committee 
directs BPA to provide the necessary funding based on the 
Council's scope of work for the hatchery review.

      operation and maintenance, southeastern power administration

Appropriations, 1997....................................     $16,359,000
Budget estimate, 1998...................................      14,222,000
Committee recommendation................................      12,222,000

    The Southeastern Power Administration markets hydroelectric 
power produced at Corps of Engineers projects in 10 
Southeastern States. There are 23 projects now in operation 
with an installed capacity of 3,092 megawatts. Southeastern 
does not own or operate any transmission facilities and carries 
out its marketing program by utilizing the existing 
transmission systems of the power utilities in the area. This 
is accomplished through wheeling arrangements between 
Southeastern and each of the area utilities with transmission 
lines connected to the projects. The utility agrees to deliver 
specified amounts of Federal power to customers of the 
Government, and Southeastern agrees to compensate the utility 
for the wheeling service performed.

      operation and maintenance, southwestern power administration

Appropriations, 1997....................................     $25,210,000
Budget estimate, 1998...................................      26,500,000
Committee recommendation................................      26,500,000

    The Southwestern Power Administration is the marketing 
agent for the power generated at Corps of Engineers' 
hydroelectric plants in the six-State area of Kansas, Oklahoma, 
Texas, Missouri, Arkansas, and Louisiana with a total installed 
capacity of 2,158 megawatts. It operates and maintains some 
1,380 miles of transmission lines, 24 generating projects, and 
24 substations, and sells its power at wholesale primarily to 
publicly and cooperatively owned electric distribution 
utilities.

 construction, rehabilitation, operation and maintenance western area 
                          power administration

Appropriations, 1997....................................    $182,230,000
Budget estimate, 1998...................................     194,334,000
Committee recommendation................................     180,334,000

    The Western Area Power Administration is responsible for 
marketing electric power generated by the Bureau of 
Reclamation, the Corps of Engineers, and the International 
Boundary and Water Commission which operate hydropower 
generating plants in 15 Central and Western States encompassing 
a 1.3-million-square-mile geographic area. Western is also 
responsible for the operation and maintenance of 16,727 miles 
of high-voltage transmission lines with 257 substations. 
Western distributes power generated by 55 plants with a maximum 
operating capacity of 10,576 megawatts.
    Western, through its power marketing program, must secure 
revenues sufficient to meet the annual costs of operation and 
maintenance of the generating and transmission facilities, 
purchased power, wheeling, and other expenses, in order to 
repay all of the power investment with interest, and to repay 
that portion of the Government's irrigation and other nonpower 
investments which are beyond the water users' repayment 
capability. Under the Colorado River Basin power marketing 
fund, which encompasses the Colorado River Basin, Fort Peck, 
and Colorado River storage facilities, all operation and 
maintenance and power marketing expenses are financed from 
revenues.
    The Committee recommendation for Western for fiscal year 
1998 is $180,334,000, a decrease of $14,000,000 from the budget 
request of $194,334,000.
    The amount to be deposited in the ``Utah reclamation 
mitigation and conservation'' account is $5,592,000, the same 
amount as the request.

           falcon and amistad operating and maintenance fund

    Creation of the Falcon and Amistad operating and 
maintenance fund was directed by the Foreign Relations 
Authorization Act, Fiscal Years 1994-95. This legislation also 
directed that the fund be administered by the Administrator of 
the Western Area Power Administration for use by the 
Commissioner of the United States Section of the International 
Boundary and Water Commission to defray operation, maintenance, 
and emergency costs for the hydroelectric facilities at the 
Falcon and Amistad Dams in Texas.
    The Committee recommendation is $1,065,000, the same as the 
budget request.

                        recommendation summaries

    Details of the Committee's recommendations are included in 
the table at the end of this title.

                  Federal Energy Regulatory Commission

                         salaries and expenses

Appropriations, 1997....................................    $156,290,000
Budget estimate, 1998...................................     167,577,000
Committee recommendation................................     162,141,000

                salaries and expenses--revenues applied

Appropriations, 1997....................................    $146,290,000
Budget estimate, 1998...................................     167,577,000
Committee recommendation................................     162,141,000

    The Committee recommendation provides $162,141,000 for the 
Federal Energy Regulatory Commission. Revenues are established 
at a rate equal to the amount provided for program activities, 
resulting in a net appropriation of zero.
    The Committee recommends that the FERC give high priority 
to the renewal of hydroelectric licenses for which there are 
competing applications. In particular, the Committee urges the 
FERC to decide these cases as their licenses expire.

                                              DEPARTMENT OF ENERGY                                              
                                            [In thousands of dollars]                                           
----------------------------------------------------------------------------------------------------------------
                                                              Current year                          Committee   
                       Project title                             enacted       Budget estimate   recommendation 
----------------------------------------------------------------------------------------------------------------
                      ENERGY RESEARCH                                                                           
SOLAR AND RENEWABLE ENERGY:                                                                                     
    Solar energy:                                                                                               
        Solar building technology research................            2,307             4,000             2,500 
        Photovoltaic energy systems.......................           59,921            77,000            69,921 
        Solar thermal energy systems......................           22,187            19,800            14,350 
        Biomass and Biofuels:                                                                                   
            Power systems.................................           27,488            36,500            27,500 
            Transportation................................           27,487            40,040            32,500 
        Wind energy systems...............................           28,986            42,858            34,640 
        Renewable energy production incentive program.....            2,000             4,000             2,000 
        International solar energy program................              661             7,000             2,000 
        Solar technology transfer.........................  ................            1,360   ................
        National renewable energy laboratory..............              500             2,800             1,500 
            Construction: 96-E-100 FTLB renovation and                                                          
             expansion, Golden, CO........................            2,800             2,200             2,200 
                                                           -----------------------------------------------------
              Subtotal, National renewable energy                                                               
               laboratory.................................            3,300             5,000             3,700 
                                                           -----------------------------------------------------
              Subtotal, Solar Energy......................          174,337           237,558           189,111 
                                                           -----------------------------------------------------
              Total, Solar Energy.........................          174,337           237,558           189,111 
                                                           =====================================================
    Geothermal:                                                                                                 
        Geothermal technology development.................           29,982            30,000            30,000 
    Hydrogen research.....................................           14,987            15,000            19,000 
    Hydropower development................................              984             1,000             1,000 
    Renewable Indian energy resources.....................            4,000   ................            4,000 
                                                           =====================================================
    Electric energy systems and storage:                                                                        
        Electric and magnetic fields R&D..................;            8,000             8,000             8,000 
        High temperature superconducting R&D..............;           19,750            32,500            32,500 
        Energy storage systems............................            4,000             4,000             4,000 
        Climate challenge.................................  ................            1,000   ................
                                                           -----------------------------------------------------
          Total, Electric energy systems and storage......           31,750            45,500            44,500 
                                                           =====================================================
    Program direction.....................................           11,728            15,642            13,811 
    Prior year projects...................................           -1,424   ................  ................
                                                           =====================================================
      TOTAL, SOLAR AND RENEWABLE ENERGY...................          266,344           344,700           301,422 
                                                           =====================================================
    NUCLEAR ENERGY:                                                                                             
        Nuclear energy R&D;:                                                                                     
            Light water reactor...........................           37,992   ................  ................
            Advanced radioisotope power system............           38,262            47,000            45,000 
            Nuclear technology R&D........................;           20,000   ................  ................
            Oak Ridge landlord............................           11,484             9,500             9,500 
            Test reactor area landlord....................            2,000             3,217             3,217 
                Construction: 95-E-201 Test reactor area                                                        
                 fire and life safety improvements, Idaho                                                       
                 National Engineering Laboratory, ID......            1,000             4,425             4,425 
                                                           -----------------------------------------------------
                    Subtotal, Test reactor area landlord..            3,000             7,642             7,642 
            Advanced test reactor fusion irradiation......              777             2,000   ................
            University reactor fuel assistance and support            4,000             6,000             4,500 
            Nuclear energy security.......................  ................           39,761   ................
                                                           -----------------------------------------------------
                Total, Nuclear energy R&D.................;          115,515           111,903            66,642 
                                                           =====================================================
        Termination costs.................................           76,889            76,035            72,035 
            Construction:                                                                                       
                97-E-200 Modifications to reactors, sodium                                                      
                 system drain and closure, Argonne                                                              
                 National Lab--West,  ID..................            1,200   ................  ................
                97-E-201 Modifications to reactors, hot                                                         
                 fuel examination facility equipment                                                            
                 upgrades, ANL-W..........................            1,000   ................  ................
                                                           -----------------------------------------------------
                  Subtotal, Construction..................            2,200   ................  ................
                                                           -----------------------------------------------------
                  Total, Termination costs................           79,089            76,035            72,035 
                                                           =====================================================
    Uranium programs......................................  ................           79,135            65,000 
        Construction:                                                                                           
            98-U-200 depleted UF6 cylinder storage yards,                                                       
             Paducah, KY..................................  ................              400               400 
            96-U-201 depleted UF6 cylinder storage yards,                                                       
             Paducah, KY..................................  ................            6,000             6,000 
                                                           -----------------------------------------------------
              Subtotal, Construction......................  ................            6,400             6,400 
                                                           -----------------------------------------------------
              Total, Uranium programs.....................  ................           85,535            71,400 
                                                           =====================================================
    Isotope support.......................................           12,704            21,704            17,504 
    Program direction.....................................           13,502            16,700            16,700 
    Prior year projects...................................             -920   ................  ................
                                                           =====================================================
      TOTAL, NUCLEAR ENERGY...............................          219,890           311,877           244,281 
                                                           =====================================================
ENVIRONMENT, SAFETY AND HEALTH:                                                                                 
    Environment, safety and health........................           46,703            62,731            41,944 
    Program direction.....................................           37,300            46,185            45,835 
                                                           =====================================================
      TOTAL, ENVIRONMENT, SAFETY AND HEALTH...............           84,003           108,916            87,779 
                                                           =====================================================
MAGNETIC FUSION:                                                                                                
    Fusion energy.........................................          232,436           225,000           240,000 
    Prior year projects...................................              -99   ................  ................
                                                           =====================================================
      TOTAL, MAGNETIC FUSION..............................          232,337           225,000           240,000 
                                                           =====================================================
ENERGY SUPPORT ACTIVITIES:                                                                                      
    Technical information management program..............            2,200             2,427             2,200 
        Program direction.................................            8,700             8,560             8,560 
        Construction......................................            1,000             1,000             1,000 
                                                           -----------------------------------------------------
          Total, Technical information management program.           11,900            11,987            11,760 
                                                           =====================================================
    Field offices and management..........................           98,400           100,233           100,233 
                                                           =====================================================
      TOTAL, ENERGY SUPPORT ACTIVITIES....................          110,300           112,220           111,993 
                                                           =====================================================
      SUBTOTAL, ENERGY RESEARCH...........................          912,874         1,102,713           985,475 
                                                           =====================================================
    Renewable energy research program.....................  ................  ................  ................
    Use of prior year balances............................          -48,177           -18,535           -18,535 
    General reduction for contractor training.............  ................  ................  ................
    Prior year projects...................................             -197   ................  ................
                                                           =====================================================
      TOTAL, ENERGY RESEARCH..............................          864,500         1,084,178           966,940 
                                                           =====================================================
         URANIUM SUPPLY AND ENRICHMENT ACTIVITIES                                                               
                                                                                                                
Uranium program activities................................           52,466   ................  ................
    Program direction.....................................            4,000   ................  ................
    Construction: 96-U-201 depleted UF6 cylinder storage                                                        
     yards, Paducah, Kentucky gaseous diffusion plant.....            4,000   ................  ................
                                                           -----------------------------------------------------
      Subtotal, Construction..............................            4,000   ................  ................
                                                           -----------------------------------------------------
      Subtotal, Uranium supply & enrichment activities....           60,466   ................  ................
                                                           =====================================================
Revenues--Sales...........................................          -42,200   ................  ................
Use of prior year balances................................          -17,266   ................  ................
                                                           =====================================================
      TOTAL, URANIUM SUPPLY AND ENRICHMENT ACTIVITIES.....            1,000   ................  ................
                                                           =====================================================
           NON-DEFENSE ENVIRONMENTAL MANAGEMENT                                                                 
                                                                                                                
Environmental restoration.................................          328,000           457,625           437,625 
Waste management..........................................          177,862           153,004           153,004 
    Construction:                                                                                               
        97-E-600 ANL waste handling facility, CH..........              360   ................  ................
        94-E-602 Bethel Valley federal facility agreement                                                       
         upgrades, ORNL...................................            1,106             1,900             1,900 
        93-E-900 Long-term storage of TMI-2 fuel, INEL....  ................              397               397 
        91-E-600 Rehabilitation of waste management                                                             
         building 306, ANL................................            2,066   ................  ................
        88-R-830 Liquid low-level waste collection and                                                          
         transfer system upgrade, ORNL....................            2,692   ................  ................
                                                           -----------------------------------------------------
          Subtotal, Construction..........................            6,224             2,297             2,297 
                                                           -----------------------------------------------------
          Total, Waste management.........................          184,086           155,301           155,301 
                                                           =====================================================
Nuclear materials and facilities stabilization............           73,054            71,758            71,758 
    Construction: 93-E-900 Long-term storage of TMI-2                                                           
     fuel, INEL...........................................            6,571   ................  ................
                                                           -----------------------------------------------------
      Total, Nuclear materials and fac stabilization......           79,625            71,758            71,758 
                                                           =====================================================
      TOTAL, NON-DEFENSE ENVIRONMENTAL MANAGEMENT.........          591,711           684,684           664,684 
                                                           =====================================================
  URANIUM ENRICHMENT DECONTAMINATION AND DECOMMISSIONING                                                        
                           FUND                                                                                 
                                                                                                                
Decontamination and Decommissioning Fund..................          200,200           248,788           230,000 
                                                           =====================================================
                NUCLEAR WASTE DISPOSAL FUND                                                                     
                                                                                                                
Discretionary funding.....................................          182,000           190,000           160,000 
                                                           =====================================================
                          SCIENCE                                                                               
                                                                                                                
High energy physics:                                                                                            
    Research and technology...............................          210,000           205,240           205,240 
    Facility operations...................................          360,075           418,945           418,945 
        Construction:                                                                                           
            98-G-304 Neutrinos at the main injector,                                                            
             Fermilab.....................................  ................            5,500             5,500 
            98-G-305 C-Zero area experimental hall,                                                             
             Fermilab.....................................  ................            5,000             5,000 
            97-G-303 Master substation upgrade, SLAC......            3,000             9,400             9,400 
            94-G-304 B-Factory, SLAC......................           45,000   ................  ................
            92-G-302 Fermilab main injector, Fermilab.....           52,000            30,950            30,950 
                                                           -----------------------------------------------------
              Subtotal, Construction......................          100,000            50,850            50,850 
                                                           -----------------------------------------------------
              Subtotal, Facility operations...............          460,075           469,795           469,795 
                                                           -----------------------------------------------------
              Total, High energy physics..................          670,075           675,035           675,035 
                                                           =====================================================
Nuclear physics...........................................          250,925           256,525           256,525 
    Construction: 91-G-300 Relativistic heavy ion                                                               
     collider, BNL........................................           65,000            59,400            59,400 
                                                           -----------------------------------------------------
      Total, Nuclear physics..............................          315,925           315,925           315,925 
                                                           =====================================================
Biological and environmental research:                                                                          
    Biological and environmental research R&D.............;          352,962           376,710           376,710 
        Construction:                                                                                           
            94-E-339 Human genome lab, LBL................            1,000   ................  ................
            91-EM-100 Environmental & molecular sciences                                                        
             laboratory, PNL, Richland, WA................           35,113   ................  ................
                                                           -----------------------------------------------------
              Subtotal, Construction......................           36,113   ................  ................
                                                           -----------------------------------------------------
              Total, Biological and environmental research          389,075           376,710           376,710 
                                                           =====================================================
Basic energy sciences:                                                                                          
    Materials sciences....................................          332,051           392,475           392,475 
    Chemical sciences.....................................          171,601           199,933           199,933 
    Engineering and geosciences...........................           41,225            41,371            41,371 
    Energy biosciences....................................           28,161            27,461            27,461 
    Capital equipment.....................................           45,695   ................  ................
    Construction:                                                                                               
        GPE-400 General plant projects....................            9,275   ................  ................
        97-E-305 Accelerator and reactor improvements and                                                       
         modifications, various locations.................            2,500   ................  ................
        95-E-305 Accelerator improvement projects.........            9,840   ................  ................
        96-E-300 Combustion research facility, Phase II,                                                        
         SNL/L............................................            9,000             7,000             7,000 
                                                           -----------------------------------------------------
          Subtotal, Construction..........................           30,615             7,000             7,000 
                                                           -----------------------------------------------------
          Total, Basic energy sciences....................          649,348           668,240           668,240 
                                                           =====================================================
Other energy research:                                                                                          
    Computational and technology research.................          153,500           175,907           150,907 
    Energy research analyses..............................            1,834             1,500             1,500 
    University and Science Education......................  ................  ................           10,000 
    Program direction.....................................           28,500            30,600            28,500 
    Multiprogram energy labs--facility support:                                                                 
        Multiprogram general purpose facilities:                                                                
            Construction:                                                                                       
                MEL-001 Multiprogram energy laboratory                                                          
                 infrastructure projects, various                                                               
                 locations \1\............................  ................            7,259             7,259 
                95-E-301 Central heating plant                                                                  
                 rehabilitation, Phase I (ANL)............            2,500             3,442             3,442 
                95-E-303 Electrical safety rehab (PNL)....            1,500   ................  ................
                95-E-310 Multiprogram laboratory                                                                
                 rehabilitation, phase I (PNL)............            2,960   ................  ................
                94-E-363 Roofing improvements (ORNL)......  ................            4,000             4,000 
                                                           -----------------------------------------------------
                  Subtotal, Multiprogram gen. purpose                                                           
                   facilities.............................            6,960            14,701            14,701 
            Construction:                                                                                       
                96-E-333 Multiprogram energy laboratories                                                       
                 upgrades, various locations..............            7,424             5,273             5,273 
                95-E-307 Fire safety imp. III (ANL).......            1,000               718               718 
                95-E-308 Sanitary system mods. II (BNL)...            1,032               568               568 
                95-E-309 Loss prevention upgrades (BNL)...            4,620   ................  ................
                93-E-320 Fire and safety improvements,                                                          
                 phase II (ANL)...........................              224   ................  ................
                                                           -----------------------------------------------------
                  Subtotal, Construction..................           14,300             6,559             6,559 
                                                           -----------------------------------------------------
                  Subtotal, Multiprogram energy labs--fac.                                                      
                   suppor.................................           21,260            21,260            21,260 
                                                           -----------------------------------------------------
                  Total, Other energy research............          205,094           229,267           212,167 
                                                           =====================================================
Science program direction.................................           10,000            10,200            10,000 
Use of prior year SSC balances............................  ................          -15,000           -35,000 
                                                           =====================================================
      TOTAL, SCIENCE......................................        2,239,517         2,260,377         2,223,077 
                                                           =====================================================
                DEPARTMENTAL ADMINISTRATION                                                                     
                                                                                                                
Administrative operations:                                                                                      
    Office of the Secretary--salaries and expenses........            2,000             2,850             2,500 
    General management--personnel compensation and                                                              
     benefits.............................................          100,695           104,530           101,695 
    Severance, termination and related cost...............            6,000   ................  ................
    General management--other expenses....................           74,900            77,356            73,000 
    Program support:                                                                                            
        Minority economic impact..........................            1,500             2,320             2,000 
        Policy analysis and system studies................              500             2,096               500 
        Consumer affairs..................................               40                40                40 
        Public affairs....................................               50                50                50 
        Environmental policy studies......................            2,500             2,500             2,500 
        Scientific and technical training.................              500               800               500 
        Information management............................  ................            8,000             6,000 
                                                           -----------------------------------------------------
          Subtotal, Program support.......................            5,090            15,806            11,590 
                                                           -----------------------------------------------------
          Total, Administrative operations................          188,685           200,542           188,785 
                                                           =====================================================
Cost of work for others...................................           26,336            32,062            32,062 
Use of prior year balances and other adjustments..........  ................  ................  ................
                                                           -----------------------------------------------------
      Total, Departmental administration (gross)..........          215,021           232,604           220,847 
Miscellaneous revenues....................................         -125,388          -131,330          -131,330 
                                                           =====================================================
      TOTAL, DEPARTMENTAL ADMINISTRATION (net)............           89,633           101,274            89,517 
                                                           =====================================================
                OFFICE OF INSPECTOR GENERAL                                                                     
                                                                                                                
Office of Inspector General...............................           24,750            29,499            27,500 
Use of prior year balances................................             -897   ................  ................
                                                           =====================================================
      TOTAL, OFFICE OF INSPECTOR GENERAL..................           23,853            29,499            27,500 
                                                           =====================================================
             ATOMIC ENERGY DEFENSE ACTIVITIES                                                                   
                                                                                                                
WEAPONS ACTIVITIES:                                                                                             
    Stockpile stewardship:                                                                                      
        Core stockpile stewardship........................        1,132,570         1,158,290         1,333,290 
            Construction:                                                                                       
                97-D-102 Dual-axis radiographic hydrotest                                                       
                 facility, LANL, Los Alamos, NM...........  ................           46,300            46,300 
                96-D-102 Stockpile stewardship facilities                                                       
                 revitalization, Phase VI, various                                                              
                 locations \1\............................           19,250            51,106            19,810 
                96-D-103 ATLAS, Los Alamos National                                                             
                 Laboratory \1\...........................           15,100            19,800            13,400 
                96-D-104 Process and environmental                                                              
                 technology laboratory, SNL \1\...........           14,100            29,820   ................
                96-D-105 Contained firing facility                                                              
                 addition, LLNL \1\.......................           17,100            26,000            19,300 
                94-D-102 Nuclear Weapons Research,                                                              
                 development and testing facilities                                                             
                 revitalization, Phase V, various                                                               
                 locations................................            7,787   ................  ................
                                                           -----------------------------------------------------
                    Subtotal, Construction................           73,337           173,026            98,810 
                                                           -----------------------------------------------------
                    Subtotal, Core stockpile stewardship..        1,205,907         1,331,316         1,432,100 
        Inertial fusion...................................          234,560           217,000           227,000 
            Construction: 96-D-111 National ignition                                                            
             facility, TBD \1\............................          131,900           876,400           197,800 
                                                           -----------------------------------------------------
              Subtotal, Inertial fusion...................          366,460         1,093,400           424,800 
        Technology transfer/education:                                                                          
            Technology transfer...........................           59,400            60,000            60,000 
            Education.....................................           10,000             9,000             9,000 
                                                           -----------------------------------------------------
              Subtotal, Technology transfer/education.....           69,400            69,000            69,000 
                                                           -----------------------------------------------------
              Total, Stockpile stewardship................        1,641,767         2,493,716         1,925,900 
                                                           =====================================================
Stockpile management......................................        1,834,470         1,828,465         1,936,465 
    Construction:                                                                                               
        98-D-123 Stockpile mgmt. restructuring init                                                             
         Tritium factory modernization and consolidation,                                                       
         Savannah River, SR \1\...........................  ................           14,343            11,000 
        98-D-124 Stockpile mgmt. restructuring init Y-12                                                        
         consolidation, Oak Ridge, TN \1\.................  ................            7,311             6,450 
        98-D-125 Tritium extraction facility, SR \1\......  ................           39,453             9,650 
        98-D-126 Acceleration prod. of tritium, VL \1\....  ................          168,590            67,865 
        97-D-121 Consolidated pit packaging system, Pantex                                                      
         plant, Amarillo, TX..............................              870   ................  ................
        97-D-122 Nuclear materials storage facility                                                             
         renovation, LANL, Los Alamos, NM \1\.............            4,000            41,292             9,200 
        97-D-123 Structural upgrades, Kansas City plant,                                                        
         Kansas City, KS \1\..............................            1,400            16,600   ................
        97-D-124 Steam plant waste water treatment                                                              
         facility, upgrade, Y-12 plant, Oak Ridge, TN.....              600             1,900             1,900 
        96-D-122 Sewage treatment quality upgrade (STQU)                                                        
         Pantex plant \1\.................................              100            10,600             6,900 
        96-D-123 Retrofit HVAC and chillers, for Ozone                                                          
         protection Y-12 plant............................            7,000             2,700             2,700 
        96-D-125 Washington measurement operations                                                              
         facility, Andrews Air Force Base, MD.............            3,825   ................  ................
        95-D-102 Chemistry and metallurgy research (CMR)                                                        
         upgrades project, LANL \1\.......................           15,000           106,360            15,700 
        95-D-122 Sanitary sewer upgrade, Y-12 plant.......           10,900            12,600            12,600 
        94-D-124 Hydrogen fluoride supply system, Y-12                                                          
         plant............................................            4,900             1,400             1,400 
        94-D-125 Upgrade life safety, Kansas City plant...            5,200             2,000             2,000 
        94-D-127 Emergency notification system, Pantex                                                          
         plant............................................            2,200   ................  ................
        94-D-128 Environmental safety and health                                                                
         analytical laboratory, Pantex plant \1\..........  ................            3,000   ................
        93-D-122 Life safety upgrades, Y-12 plant.........            7,200             2,100             2,100 
        93-D-123 Non-nuclear reconfiguration, various                                                           
         locations........................................           14,487   ................  ................
        92-D-126 replace emergency notification system, VL  ................            3,200             3,200 
        88-D-122 Facilities capability assurance program                                                        
         (FCAP), various locations........................           21,940            19,520            18,920 
        88-D-123 Security enhancement, Pantex plant.......            9,739   ................  ................
                                                           -----------------------------------------------------
          Subtotal, Construction..........................          109,361           452,969           171,585 
                                                           -----------------------------------------------------
          Total, Stockpile management.....................        1,943,831         2,281,434         2,108,050 
                                                           =====================================================
Program direction.........................................          325,600           303,500           268,500 
Use of prior year balances................................  ................  ................  ................
General reduction for contractor training.................  ................  ................  ................
                                                           =====================================================
      TOTAL, WEAPONS ACTIVITIES...........................        3,911,198         5,078,650         4,302,450 
                                                           =====================================================
     DEFENSE ENVIRONMENTAL RESTORATION AND WASTE MGMT.                                                          
                                                                                                                
Environmental restoration.................................        1,385,546         1,356,573         1,367,073 
Uranium enrichment D&D; fund contribution..................          376,648           388,000           388,000 
                                                           -----------------------------------------------------
      Total, Environmental restoration....................        1,762,194         1,744,573         1,755,073 
                                                           =====================================================
Closure projects..........................................           15,000            15,000            65,000 
Waste management..........................................        1,490,320         1,455,576         1,490,876 
    Construction:                                                                                               
        98-D-401 H-tank farm storm water systems upgrade,                                                       
         Savannah River Site, Aiken, SC \1\...............  ................           12,000             1,000 
        97-D-402 Tank farm restoration and safe                                                                 
         operations, Richland, WA \1\.....................            7,584            41,530            13,961 
        96-D-408 Waste mgmt upgrades, various locations                                                         
         \1\..............................................           11,246            12,709             8,200 
        95-D-402 Install permanent electrical service                                                           
         WIPP, AL.........................................              752               176               176 
        95-D-405 Industrial landfill V and construction/                                                        
         demolition landfill VII, Y-12 Plant, Oak Ridge,                                                        
         TN...............................................              200             3,800             3,800 
        95-D-407 219-S Secondary containment upgrade,                                                           
         Richland, WA.....................................  ................            2,500             2,500 
        94-D-404 Melton Valley storage tank capacity                                                            
         increase, ORNL...................................            6,345             1,219             1,219 
        94-D-407 Initial tank retrieval systems, Richland,                                                      
         WA \1\...........................................           12,600           182,800            15,100 
        93-D-182 Replacement of cross-site transfer                                                             
         system, Richland, WA.............................            8,100   ................  ................
        93-D-187 High level waste removal from filled                                                           
         waste tanks, Savannah River, SC \1\..............           20,000           171,969            17,520 
        92-D-172 Hazardous waste treatment and processing                                                       
         facility, Pantex Plant...........................  ................            5,000             5,000 
        89-D-174 Replacement high level waste evaporator,                                                       
         Savannah River, SC...............................           11,500             1,042             1,042 
        86-D-103 Decontamination and waste treatment                                                            
         facility, LLNL, Livermore, CA \1\................           10,000            23,573            11,250 
                                                           -----------------------------------------------------
          Subtotal, Construction..........................           88,327           458,318            80,768 
                                                           -----------------------------------------------------
          Total, Waste management.........................        1,578,647         1,913,894         1,571,644 
                                                           =====================================================
Nuclear materials and facilities stabilization............        1,173,718         1,118,114         1,181,114 
    Construction:                                                                                               
        98-D-453 Plutonium stabilization and handling                                                           
         system for PFP, Richland, WA \1\.................  ................           13,636             8,136 
        98-D-700 INEL road rehabilitation, INEL, ID \1\...  ................           10,800               500 
        97-D-450 Actinide packaging and storage facility,                                                       
         Savannah River Site, Aiken, SC...................            7,900            18,000            18,000 
        97-D-451 B-Plant safety class ventilation                                                               
         upgrades, Richland, WA...........................            1,500             2,000             2,000 
        97-D-470 Environment monitoring laboratory,                                                             
         Savannah River, Aiken, SC \1\....................            2,500            27,780             5,600 
        97-D-473 Health physics site support facility,                                                          
         Savannah River, Aiken, SC \1\....................            2,000            15,200             4,200 
        96-D-406 Spent nuclear fuels canister storage and                                                       
         stabilization facility, Richland, WA.............           60,672            16,744            16,744 
        96-D-461 Electrical distribution upgrade, Idaho                                                         
         National Engineering Laboratory, ID..............            6,790             2,927             2,927 
        96-D-464 Electrical & utility systems upgrade,                                                          
         Idaho Chemical Processing Plant, Idaho National                                                        
         Engineering Laboratory, ID \1\...................           10,440            38,500            14,985 
        96-D-471 CFC HVAC/chiller retrofit, Savannah River                                                      
         Site, Aiken, SC \1\..............................            8,541            34,959             8,500 
        95-E-600 Hazardous materials training center,                                                           
         Richland, WA.....................................            7,900   ................  ................
        95-D-155 Upgrade site road infrastructure,                                                              
         Savannah River, SC...............................            4,137             2,713             2,713 
        95-D-456 Security facilities consolidation, Idaho                                                       
         Chemical Processing Plant, INEL, ID \1\..........            4,645             1,087               602 
        94-D-401 Emergency response facility, INEL, ID....              547   ................  ................
                                                           -----------------------------------------------------
          Subtotal, Construction..........................          117,572           184,346            84,907 
                                                           -----------------------------------------------------
          Total, Nuclear materials & fac. stabilization...        1,291,290         1,302,460         1,266,021 
                                                           =====================================================
Technology development....................................          303,771           257,881           232,881 
Policy and management.....................................           23,155            23,104            18,104 
Environmental science program.............................           62,136            50,000            50,000 
Hanford tank waste vitrification project..................          170,000   ................  ................
Program direction.........................................          411,511           388,251           373,251 
                                                           -----------------------------------------------------
      Subtotal, Defense environmental management..........        5,617,704         5,695,163         5,331,974 
                                                           =====================================================
Savannah river pension refund.............................           -8,000   ................  ................
Use of prior year balances................................         -150,400   ................          -20,000 
General reduction for contractor training.................  ................  ................  ................
                                                           =====================================================
      TOTAL, DEFENSE ENVIRON. RESTORATION AND WASTE MGMT..        5,459,304         5,695,163         5,311,974 
                                                           =====================================================
      DEFENSE ENVIRONMENTAL MANAGEMENT PRIVATIZATION                                                            
                                                                                                                
Privatization initiatives, various locations..............          160,000         1,006,000           343,000 
                                                           =====================================================
                 OTHER DEFENSE ACTIVITIES                                                                       
                                                                                                                
Other national security programs:                                                                               
    Nonproliferation and national security:                                                                     
        Verification and control technology:                                                                    
            Nonproliferation and verification, R&D........;          211,919           210,000           210,000 
            Arms control..................................          216,244           234,600           234,600 
            Intelligence..................................           34,185            33,600            33,600 
                                                           -----------------------------------------------------
              Subtotal, Verification and control                                                                
               technology.................................          462,348           478,200           478,200 
        Emergency management..............................           16,794            27,700            27,700 
        Nuclear safeguards and security...................           47,208            47,200            47,200 
        Security investigations...........................           20,000            20,000            20,000 
        Program direction--NN.............................           88,122            94,900            88,900 
                                                           -----------------------------------------------------
          Subtotal, Nonproliferation and national security          634,472           668,000           662,000 
    Environment, safety and health (Defense)..............           68,094            54,000            74,000 
        Program direction--EH.............................           10,706   ................  ................
                                                           -----------------------------------------------------
          Subtotal, Environment, safety & health (Defense)           78,800            54,000            74,000 
    Worker and community transition.......................           57,659            65,800            57,659 
        Program direction--WT.............................            4,341             4,700             4,341 
                                                           -----------------------------------------------------
          Subtotal, Worker and community transition.......           62,000            70,500            62,000 
    Fissile materials disposition.........................           83,163            99,451            91,451 
        Program direction--MD.............................            3,633             4,345             4,345 
        Construction: 97-D-140 Consolidated special                                                             
         nuclear materials storage plant, site TBD........           17,000   ................  ................
                                                           -----------------------------------------------------
          Subtotal, Fissile materials control/disposition.          103,796           103,796            95,796 
    Nuclear energy (Defense):                                                                                   
        Nuclear technology research and development:                                                            
         Electrometallurgical program.....................  ................           25,000            25,000 
        International nuclear safety: Soviet designed                                                           
         reactors.........................................           45,000            50,000            50,000 
        Nuclear security: Spent fuel management...........  ................            4,000             4,000 
        Chornobyl shutdown initiative.....................  ................            2,000             2,000 
        Russian plutonium reactor core conversion.........            3,500   ................  ................
                                                           -----------------------------------------------------
          Subtotal, Nuclear energy (Defense)..............           48,500            81,000            81,000 
    Office of hearings and appeals........................  ................            2,685             2,685 
                                                           -----------------------------------------------------
      Total, Other national security programs.............          927,568           979,981           977,481 
                                                           =====================================================
Independent assessment of DOE projects....................  ................  ................  ................
Naval reactors:                                                                                                 
    Naval reactors development............................          641,130           605,920           625,920 
        Construction:                                                                                           
            GPN-101 General plant projects, various                                                             
             locations....................................            8,200   ................  ................
            98-D-200 Site laboratory facility upgrade,                                                          
             various locations \1\........................  ................            1,200             5,700 
            97-D-201 Advanced test reactor secondary                                                            
             coolant system refurbishment, INEL, ID \1\...              400             4,600             4,600 
            95-D-200 Laboratory systems and hot cell                                                            
             upgrades, various locations \1\..............            4,800             1,100             1,100 
            95-D-201 Advanced test reactor radioactive                                                          
             waste system upgrades, Idaho National                                                              
             Engineering Laboratory, ID...................              500   ................  ................
            90-N-102 Expended core facility dry cell                                                            
             project, Naval Reactors Facility, ID \1\.....            8,000            14,900             3,100 
                                                           -----------------------------------------------------
              Subtotal, Construction......................           21,900            21,800            14,500 
                                                           -----------------------------------------------------
              Subtotal, Naval reactors development........          663,030           627,720           640,420 
    Program direction.....................................           18,902            20,080            20,080 
                                                           -----------------------------------------------------
      Total, Naval reactors...............................          681,932           647,800           660,500 
                                                           =====================================================
      Subtotal, Other defense activities..................        1,609,500         1,627,781         1,637,981 
                                                           =====================================================
Use of prior year balances................................           -3,767   ................  ................
                                                           =====================================================
      TOTAL, OTHER DEFENSE ACTIVITIES.....................        1,605,733         1,627,781         1,637,981 
                                                                                                                
              DEFENSE NUCLEAR WASTE DISPOSAL                                                                    
                                                                                                                
Defense nuclear waste disposal............................          200,000           190,000           190,000 
                                                           =====================================================
      TOTAL, ATOMIC ENERGY DEFENSE ACTIVITIES.............       11,336,235        13,597,594        11,785,405 
                                                           =====================================================
              POWER MARKETING ADMINISTRATIONS                                                                   
                                                                                                                
                ALASKA POWER ADMINISTRATION                                                                     
                                                                                                                
Operation and maintenance/program direction...............            4,000             1,000             3,500 
Capital assets acquisition................................  ................  ................           20,000 
                                                           =====================================================
             SOUTHEASTERN POWER ADMINISTRATION                                                                  
                                                                                                                
Operation and maintenance:                                                                                      
    Operation and maintenance/program direction...........            3,989             4,313             4,313 
    Purchase power and wheeling...........................           23,456            11,909             9,909 
                                                           -----------------------------------------------------
      Subtotal, Operation and maintenance.................           27,445            16,222            14,222 
Use of prior year balances................................          -11,086            -2,000            -2,000 
                                                           -----------------------------------------------------
      TOTAL, SOUTHEASTERN POWER ADMINISTRATION............           16,359            14,222            12,222 
                                                           =====================================================
             SOUTHWESTERN POWER ADMINISTRATION                                                                  
Operation and maintenance:                                                                                      
    Operating expenses....................................            2,793             2,382             2,382 
    Purchase power and wheeling...........................            1,095                57                57 
    Program direction.....................................           17,862            17,309            17,309 
    Construction..........................................            6,054             6,752             6,752 
                                                           -----------------------------------------------------
      Subtotal, Operation and maintenance.................           27,804            26,500            26,500 
Use of prior year balances................................           -2,594   ................  ................
                                                           -----------------------------------------------------
      TOTAL, SOUTHWESTERN POWER ADMINISTRATION............           25,210            26,500            26,500 
                                                           =====================================================
             WESTERN AREA POWER ADMINISTRATION                                                                  
                                                                                                                
Operation and maintenance:                                                                                      
    Construction and rehabilitation.......................           29,764            24,243            24,243 
    System operation and maintenance......................           33,453            39,246            39,246 
    Purchase power and wheeling...........................           74,235            54,886            44,886 
    Program direction.....................................          105,807           106,157           102,157 
    Utah mitigation and conservation......................            5,432             5,432             5,432 
                                                           -----------------------------------------------------
      Subtotal, Operation and maintenance.................          248,691           229,964           215,964 
Use of prior year balances................................          -66,461           -35,630           -35,630 
Transfer of authority from Department of Interior.........           (3,774)  ................  ................
                                                           -----------------------------------------------------
      TOTAL, WESTERN AREA POWER ADMINISTRATION............          182,230           194,334           180,334 
                                                           =====================================================
     FALCON AND AMISTAD OPERATING AND MAINTENANCE FUND                                                          
                                                                                                                
Operation and maintenance.................................              970             1,065             1,065 
                                                           =====================================================
      TOTAL, POWER MARKETING ADMINISTRATIONS..............          228,769           237,121           243,621 
                                                           =====================================================
           FEDERAL ENERGY REGULATORY COMMISSION                                                                 
                                                                                                                
Federal energy regulatory commission......................          156,290           167,577           162,141 
Use of prior year balances (FERC).........................          -10,000   ................  ................
FERC revenues.............................................         -146,290          -167,577          -162,141 
                                                           -----------------------------------------------------
      TOTAL, FEDERAL ENERGY REGULATORY COMMISSION.........  ................  ................  ................
----------------------------------------------------------------------------------------------------------------
\1\ This request for this account was $2,999,497. The lower totals shown for the request and prior years reflect
  Committee recommendation to combine certain functions of the Office of Energy Research with General Science   
  and Research in a new account, General Science and Other Research Activities, and to create a separate account
  for Non-Defense Environmental Management.                                                                     

                     TITLE IV--INDEPENDENT AGENCIES

                    Appalachian Regional Commission

Appropriations, 1997....................................    $160,000,000
Budget estimate, 1998...................................     165,000,000
Committee recommendation................................     160,000,000

    The Appalachian Regional Commission [ARC] is a regional 
economic development agency established in 1965. It is composed 
of the Governors of the 13 Appalachian States and a Federal 
cochairman who is appointed by the President.
    The Committee recommendation for the Appalachian Regional 
Commission totals $160,000,000, which is the same as the 
current fiscal year. An appropriation of $99,500,000 is 
recommended for ARC highways.

                Defense Nuclear Facilities Safety Board

                         salaries and expenses

Appropriations, 1997....................................     $16,000,000
Budget estimate, 1998...................................      17,500,000
Committee recommendation................................      17,500,000

    An appropriation of $17,500,000 is recommended for fiscal 
year 1998. This is the same as the budget request.
    The Defense Nuclear Facilities Safety Board was created by 
the Fiscal Year 1989 National Defense Authorization Act. The 
Board, composed of five members appointed by the President, 
provides advice and recommendations to the Secretary of Energy 
regarding public health and safety issues at the Department's 
defense nuclear facilities. The Board is responsible for 
reviewing and evaluating the content and implementation of the 
standards relating to the design, construction, operation, and 
decommissioning of defense nuclear facilities of the Department 
of Energy.

                     Nuclear Regulatory Commission

                         salaries and expenses

                          gross appropriation

Appropriations, 1997....................................    $471,800,000
Budget estimate, 1998...................................     476,500,000
Committee recommendation................................     476,500,000

                                revenues

Appropriations, 1997....................................    $457,300,000
Budget estimate, 1998...................................     457,500,000
Committee recommendation................................     457,500,000

                           net appropriation

Appropriations, 1997....................................     $14,500,000
Budget estimate, 1998...................................      19,000,000
Committee recommendation................................      19,000,000

    The Omnibus Reconciliation Act of 1990, as amended, 
requires that the Nuclear Regulatory Commission recover 100 
percent of its budget authority, less the appropriation from 
the nuclear waste fund, by assessing licenses and annual fees.
    The Committee encourages the NRC to continue to give 
special attention to replacing unnecessary prescriptive 
requirements and guidance with performance-based requirements 
and guidance. The Committee believes that a performance-based 
regulatory approach can substantially improve the regulatory 
process and result in a more effective and efficient use of 
both the NRC and licensee resources.

                      Office of Inspector General

                          gross appropriation

Appropriations, 1997....................................      $5,000,000
Budget estimate.........................................       4,800,000
Committee recommendation................................       4,800,000

                                revenues

Appropriations, 1997....................................      $5,000,000
Budget estimate, 1998...................................       4,800,000
Committee recommendation................................       4,800,000

    This appropriation provides for the Office of Inspector 
General of the Nuclear Regulatory Commission. Pursuant to law, 
budget authority appropriated to the inspector general must be 
recovered through the assessment of license and annual fees. 
The Committee recommends an appropriation of $4,800,000 for 
fiscal year 1997.

                  Nuclear Waste Technical Review Board

Appropriations, 1997....................................      $2,531,000
Budget estimate, 1998...................................       3,200,000
Committee recommendation................................       3,200,000

    The Committee recommends an appropriation of $3,200,000 for 
the Nuclear Waste Technical Review Board. The Nuclear Waste 
Policy Amendments Act of 1987 directed the Board to evaluate 
the technical and scientific validity of the activities of the 
Department of Energy's nuclear waste disposal program. The 
Board must report its findings not less than two times a year 
to the Congress and the Secretary of Energy.

                       Tennessee Valley Authority

Appropriations, 1997....................................    $106,000,000
Budget estimate, 1998...................................     106,000,000
Committee recommendation................................      86,000,000

    The Committee recommends an appropriation of $86,000,000 
for the Tennessee Valley Authority. This is $20,000,000 below 
the budget request for fiscal year 1998.
    The budget for fiscal year 1998 for the Tennessee Valley 
Authority contemplated the development of a plan that would 
eliminate Federal funding for the agency's appropriated 
programs by fiscal year 1999. It was felt that such action 
would allow TVA to focus more on generating low-cost, 
dependable electricity. TVA's efforts to develop such a plan 
have not produced consensus on a way to achieve a significant 
shift away from appropriations. In addition, the Committee is 
aware of several legislative proposals which fundamentally 
change the mission or future of the Tennessee Valley Authority.
    The Committee recommendation for fiscal year 1998 continues 
the phase down of TVA while allowing the region and Congress 
time to consider the future of TVA's activities and 
responsibilities. The amount recommended by the Committee 
includes $78,000,000 for general stewardship of the water and 
land resources of the Tennessee River basin, including 
$7,900,000 for the Land Between the Lakes National Recreation 
Area and $5,000,000 to continue environmental cleanup work at 
the Environmental Research Center.
    The Committee urges the TVA to work with local sponsors in 
Union County, MS, in its efforts to establish a new water 
supply lake, and to work cooperatively to resolve the need to 
relocate TVA power lines that may lie within the project area 
and assist in the preparation of the environmental impact 
statement on the project where appropriate.
                      TITLE V--GENERAL PROVISIONS

    Section 502. Albuquerque metropolitan area water 
reclamation and reuse, New Mexico.--The Committee has included 
language in the bill to clarify that the project is eligible 
for construction under title XVI of Reclamation Wastewater and 
Groundwater Act, Public Law 104-266, as amended.
    Section 503. Chandler pumping plant, Arizona.--Language is 
included which amends the Yavapai-Prescott Indian Treaty 
Settlement Act of 1994 (Public Law 103-434) to increase the 
appropriation ceiling to $13,000,000, at 1997 prices, plus or 
minus such amounts that may result from ordinary fluctuations 
of applicable cost indexes. The increase is needed as the 
result of unforeseen design changes, including the need to 
provide protection to the existing discharge pipe from pressure 
surges. The modifications are expected to result in up to 420 
ft\3\/s, additional flow in an 11 mile stretch of the Yakima 
River that is critical to the movement of anadromous fish.

  COMPLIANCE WITH PARAGRAPH 7, RULE XVI, OF THE STANDING RULES OF THE 
                                 SENATE

    Paragraph 7 of rule XVI requires that Committee reports on 
general appropriations bills identify each Committee amendment 
to the House bill ``which proposes an item of appropriation 
which is not made to carry out the provisions of an existing 
law, a treaty stipulation, or an act or resolution previously 
passed by the Senate during that session.''
    The recommended appropriations in title III, Department of 
Energy, generally are subject to annual authorization. However, 
the Congress has not enacted an annual Department of Energy 
authorization bill for several years, with the exception of the 
programs funded within the atomic energy defense activities 
which are authorized in annual defense authorization acts. The 
authorization for the atomic energy defense activities, 
contained in the National Defense Authorization Act of Fiscal 
Year 1998, is currently being considered by the Senate.
    Also, contained in title III, Department of Energy, in 
connection with the appropriation under the heading ``Nuclear 
Waste Disposal Fund,'' the recommended item of appropriation is 
brought to the attention of the Senate.
    In title IV, independent agencies, the recommended 
appropriation for the Appalachian Regional Commission is 
$160,000,000.

COMPLIANCE WITH PARAGRAPH 7(C), RULE XXVI, OF THE STANDING RULES OF THE 
                                 SENATE

    Pursuant to paragraph 7(c) of rule XXVI, the Committee en 
bloc ordered reported S. 1005, an original DOD appropriations 
bill and S. 1004, an original Energy and Water Development 
appropriations bill, 1998, subject to amendment and subject to 
their budget allocations, by a recorded vote of 28-0, a quorum 
being present. The vote was as follows:
        Yeas                          Nays
Chairman Stevens
Mr. Cochran
Mr. Specter
Mr. Domenici
Mr. Bond
Mr. Gorton
Mr. McConnell
Mr. Burns
Mr. Shelby
Mr. Gregg
Mr. Bennett
Mr. Campbell
Mr. Craig
Mr. Faircloth
Mrs. Hutchison
Mr. Byrd
Mr. Inouye
Mr. Hollings
Mr. Leahy
Mr. Bumpers
Mr. Lautenberg
Mr. Harkin
Ms. Mikulski
Mr. Reid
Mr. Kohl
Mrs. Murray
Mr. Dorgan
Mrs. Boxer

 COMPLIANCE WITH PARAGRAPH 12, RULE XXVI, OF THE STANDING RULES OF THE 
                                 SENATE

    Paragraph 12 of rule XXVI requires that Committee reports 
on a bill or joint resolution repealing or amending any statute 
or part of any statute include ``(a) the text of the statute or 
part thereof which is proposed to be repealed; and (b) a 
comparative print of that part of the bill or joint resolution 
making the amendment and of the statute or part thereof 
proposed to be amended, showing by stricken-through type and 
italics, parallel columns, or other appropriate typographical 
devices the omissions and insertions which would be made by the 
bill or joint resolution if enacted in the form recommended by 
the committee.''
    In compliance with this rule, changes in existing law 
proposed to be made by the bill are shown as follows: existing 
law to be omitted is enclosed in black brackets; new matter is 
printed in italic; and existing law in which no change is 
proposed is shown in roman.

 Reclamation Projects Authorization and Adjustment Act of 1992 (Public 
                              Law 102-575)

          * * * * * * *

SEC. 1701. IRRIGATION ON STANDING ROCK INDIAN RESERVATION.

    (a) * * *
    (b) Section 10 of Public Law 89-108, as amended by section 
8 of Public Law 99-294, is further amended by adding subsection 
(e) as follows:
          ``(e) The portion of the [$61,000,000] $62,300,000 
        authorized for Indian municipal, rural, and industrial 
        water features shall be indexed as necessary to allow 
        for ordinary fluctuations of construction costs 
        incurred after October 1, 1986, as indicated by 
        engineering costs indices applicable for the type of 
        construction involved. All other authorized cost 
        ceilings shall remain unchanged.''
          * * * * * * *

 Yavapai-Prescott Indian Tribe Water Rights Settlement Act (Public Law 
                                103-434)

SEC. 1208. CHANDLER PUMPING PLANT AND POWERPLANT-OPERATIONS AT PROSSER 
                    DIVERSION DAM.

    (a) * * *
          (1) * * *
          (2) [$4,000,000 for construction] $13,000,000, at 
        1997 prices, for construction plus or minus such 
        amounts as may be justified by reason of ordinary 
        fluctuations of applicable cost indexes; and
          * * * * * * *

 Reclamation Recycling and Water Conservation Act of 1996 (Public Law 
                                104-266)

``SEC. 1621. ALBUQUERQUE METROPOLITAN AREA WATER RECLAMATION AND REUSE 
                    [STUDY] PROJECT.

    ``(a) Authorization.--The Secretary, in cooperation with 
the city of Albuquerque, New Mexico, is authorized to 
participate in the planning, design, and construction of the 
Albuquerque Metropolitan Area Water Reclamation and Reuse Study 
to reclaim and reuse industrial and municipal wastewater and 
reclaim and use naturally impaired ground water and nonpotable 
surface water in the Albuquerque metropolitan area.

                                            BUDGETARY IMPACT OF BILL                                            
  PREPARED IN CONSULTATION WITH THE CONGRESSIONAL BUDGET OFFICE PURSUANT TO SEC. 308(a), PUBLIC LAW 93-344, AS  
                                                     AMENDED                                                    
                                            [In millions of dollars]                                            
----------------------------------------------------------------------------------------------------------------
                                                                  Budget authority               Outlays        
                                                             ---------------------------------------------------
                                                               Committee    Amount  of   Committee    Amount  of
                                                               allocation      bill      allocation      bill   
----------------------------------------------------------------------------------------------------------------
Comparison of amounts in the bill with Committee allocations                                                    
 to its subcommittees of amounts in the First Concurrent                                                        
 Resolution for 1998: Subcommittee on Energy and Water                                                          
 Development:                                                                                                   
    Defense discretionary...................................       11,803       11,803       11,997   \1\ 11,995
    Nondefense discretionary................................        9,039        8,993        8,886        8,865
    Violent crime reduction fund............................  ...........  ...........  ...........  ...........
    Mandatory...............................................  ...........  ...........  ...........  ...........
Projections of outlays associated with the recommendation:                                                      
    1998....................................................  ...........  ...........  ...........   \2\ 13,533
    1999....................................................  ...........  ...........  ...........        6,065
    2000....................................................  ...........  ...........  ...........          909
    2001....................................................  ...........  ...........  ...........          117
    2002 and future year....................................  ...........  ...........  ...........          172
Financial assistance to State and local governments for 1998                                                    
 in bill....................................................           NA          163           NA           15
----------------------------------------------------------------------------------------------------------------
\1\ Includes outlays from prior-year budget authority.                                                          
\2\ Excludes outlays from prior-year budget authority.                                                          
                                                                                                                
NA: Not applicable.                                                                                             


  COMPARATIVE STATEMENT OF NEW BUDGET (OBLIGATIONAL) AUTHORITY FOR FISCAL YEAR 1997 AND BUDGET ESTIMATES AND AMOUNTS RECOMMENDED IN THE BILL FOR FISCAL 
                                                                        YEAR 1998                                                                       
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                       Senate Committee recommendation  
                                                                                                                           compared with (+ or -)       
                           Item                                   1997         Budget estimate       Committee     -------------------------------------
                                                             appropriation                         recommendation          1997                         
                                                                                                                      appropriation     Budget estimate 
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                        
          TITLE I--DEPARTMENT OF DEFENSE--CIVIL                                                                                                         
                                                                                                                                                        
                  DEPARTMENT OF THE ARMY                                                                                                                
                                                                                                                                                        
                Corps of Engineers--Civil                                                                                                               
                                                                                                                                                        
General investigations...................................      $153,872,000       $150,000,000       $164,065,000       +$10,193,000       +$14,065,000 
Construction, general....................................     1,081,942,000      1,062,470,000      1,284,266,000       +202,324,000       +221,796,000 
    (By transfer)........................................        (1,000,000)  .................  .................       (-1,000,000)  .................
Flood control, Mississippi River and tributaries,                                                                                                       
 Arkansas, Illinois, Kentucky, Louisiana, Mississippi,                                                                                                  
 Missouri, and Tennessee.................................       310,374,000        266,000,000        289,000,000        -21,374,000        +23,000,000 
    Emergency appropriations (Public Law 105-18).........        20,000,000   .................  .................       -20,000,000   .................
Operation and maintenance, general.......................     1,697,015,000      1,618,000,000      1,661,203,000        -35,812,000        +43,203,000 
    Emergency appropriations (Public Law 104-208)........        19,000,000   .................  .................       -19,000,000   .................
    Emergency appropriations (Public Law 105-18).........       150,000,000   .................  .................      -150,000,000   .................
Regulatory program.......................................       101,000,000        112,000,000        106,000,000         +5,000,000         -6,000,000 
Flood control and coastal emergencies....................        10,000,000         14,000,000         10,000,000   .................        -4,000,000 
    Emergency appropriations (Public Law 105-18).........       415,000,000   .................  .................      -415,000,000   .................
General expenses.........................................       149,000,000        148,000,000        148,000,000         -1,000,000   .................
                                                          ----------------------------------------------------------------------------------------------
      Total, title I, Department of Defense--Civil.......     4,107,203,000      3,370,470,000      3,662,534,000       -444,669,000       +292,064,000 
                                                          ==============================================================================================
           TITLE II--DEPARTMENT OF THE INTERIOR                                                                                                         
                                                                                                                                                        
         Central Utah Project Completion Account                                                                                                        
                                                                                                                                                        
Central Utah project construction........................        25,827,000         23,743,000         23,743,000         -2,084,000   .................
Fish, wildlife, and recreation mitigation and                                                                                                           
 conservation............................................        11,700,000         11,610,000         11,610,000            -90,000   .................
Utah reclamation mitigation and conservation account.....         5,000,000          5,000,000          5,000,000   .................  .................
Program oversight and administration.....................         1,100,000            800,000            800,000           -300,000   .................
                                                          ----------------------------------------------------------------------------------------------
      Total, Central Utah project completion account.....        43,627,000         41,153,000         41,153,000         -2,474,000   .................
                                                                                                                                                        
                  Bureau of Reclamation                                                                                                                 
                                                                                                                                                        
General investigations...................................        16,650,000   .................  .................       -16,650,000   .................
Construction program.....................................       394,056,000   .................  .................      -394,056,000   .................
Operation and maintenance................................       267,876,000   .................  .................      -267,876,000   .................
    Emergency appropriations (Public Law 105-18).........         7,355,000   .................  .................        -7,355,000   .................
Water and related resources..............................  .................       651,552,000        688,379,000       +688,379,000        +36,827,000 
California Bay-Delta ecosystem restoration...............  .................       143,300,000         50,000,000        +50,000,000        -93,300,000 
Loan program.............................................        12,715,000         10,425,000         10,425,000         -2,290,000   .................
    (Limitation on direct loans).........................       (37,000,000)       (31,000,000)       (31,000,000)       (-6,000,000)  .................
Policy and administration................................        46,000,000         47,658,000         47,558,000         +1,558,000           -100,000 
Colorado River Dam fund (by transfer, permanent                                                                                                         
 authority)..............................................       (-3,774,000)  .................       (-5,592,000)       (-1,818,000)       (-5,592,000)
Central Valley project restoration fund..................        38,096,000         39,130,000         33,130,000         -4,966,000         -6,000,000 
                                                          ----------------------------------------------------------------------------------------------
      Total, Bureau of Reclamation.......................       782,748,000        892,065,000        829,492,000        +46,744,000        -62,573,000 
                                                          ==============================================================================================
      Total, title II, Department of the Interior........       826,375,000        933,218,000        870,645,000        +44,270,000        -62,573,000 
          (By transfer)..................................       (-3,774,000)  .................       (-5,592,000)       (-1,818,000)       (-5,592,000)
                                                          ==============================================================================================
             TITLE III--DEPARTMENT OF ENERGY                                                                                                            
                                                                                                                                                        
Energy Research..........................................     2,699,728,000      2,999,497,000        953,915,000     -1,745,813,000     -2,045,582,000 
Energy assets acquisition................................  .................        43,582,000         13,025,000        +13,025,000        -30,557,000 
Non-defense environmental management.....................  .................  .................       664,684,000       +664,684,000       +664,684,000 
Uranium Supply and Enrichment Activities.................        43,200,000   .................  .................       -43,200,000   .................
    Gross revenues.......................................       -42,200,000   .................  .................       +42,200,000   .................
                                                          ----------------------------------------------------------------------------------------------
      Net appropriation..................................         1,000,000   .................  .................        -1,000,000   .................
Uranium enrichment decontamination and decommissioning                                                                                                  
 fund....................................................       200,200,000        248,788,000        230,000,000        +29,800,000        -18,788,000 
Nuclear Waste Disposal Fund..............................       182,000,000        190,000,000        160,000,000        -22,000,000        -30,000,000 
Science..................................................       996,000,000        875,910,000      2,084,567,000     +1,088,567,000     +1,208,657,000 
Science assets acquisition...............................  .................       110,250,000        138,510,000       +138,510,000        +28,260,000 
Departmental Administration..............................       215,021,000        232,604,000        220,847,000         +5,826,000        -11,757,000 
    Miscellaneous revenues...............................      -125,388,000       -131,330,000       -131,330,000         -5,942,000   .................
                                                          ----------------------------------------------------------------------------------------------
      Net appropriation..................................        89,633,000        101,274,000         89,517,000           -116,000        -11,757,000 
Office of the Inspector General..........................        23,853,000         29,499,000         27,500,000         +3,647,000         -1,999,000 
Environmental Restoration and Waste Management:                                                                                                         
    Defense function.....................................    (5,619,304,000)    (6,058,499,000)    (6,058,499,000)     (+439,195,000)  .................
    Non-defense function.................................      (791,911,000)      (933,472,000)      (684,684,000)     (-107,227,000)     (-248,788,000)
                                                          ----------------------------------------------------------------------------------------------
      Total..............................................    (6,411,215,000)    (6,991,971,000)    (6,743,183,000)     (+331,968,000)     (-248,788,000)
                                                                                                                                                        
             Atomic Energy Defense Activities                                                                                                           
                                                                                                                                                        
Weapons Activities.......................................     3,911,198,000      3,576,255,000      4,302,450,000       +391,252,000       +726,195,000 
Defense Environmental Restoration and Waste Management...     5,459,304,000      5,052,499,000      5,311,974,000       -147,330,000       +259,475,000 
Defense environmental management privatization...........       160,000,000      1,006,000,000        343,000,000       +183,000,000       -663,000,000 
Other Defense Activities.................................     1,605,733,000      1,605,981,000      1,637,981,000        +32,248,000        +32,000,000 
Defense Nuclear Waste Disposal...........................       200,000,000        190,000,000        190,000,000        -10,000,000   .................
Defense asset acquisition................................  .................     2,166,859,000   .................  .................    -2,166,859,000 
                                                          ----------------------------------------------------------------------------------------------
      Total, Atomic Energy Defense Activities............    11,336,235,000     13,597,594,000     11,785,405,000       +449,170,000     -1,812,189,000 
                                                                                                                                                        
             Power Marketing Administrations                                                                                                            
                                                                                                                                                        
Operation and maintenance, Alaska Power Administration...         4,000,000          1,000,000          3,500,000           -500,000         +2,500,000 
    Capital assets acquisition...........................  .................  .................        20,000,000        +20,000,000        +20,000,000 
Operation and maintenance, Southeastern Power                                                                                                           
 Administration..........................................        16,359,000         14,222,000         12,222,000         -4,137,000         -2,000,000 
Operation and maintenance, Southwestern Power                                                                                                           
 Administration..........................................        25,210,000         26,500,000         26,500,000         +1,290,000   .................
Construction, rehabilitation, operation and maintenance,                                                                                                
 Western Area Power Administration.......................       182,230,000        194,334,000        180,334,000         -1,896,000        -14,000,000 
    (By transfer, permanent authority)...................        (3,774,000)  .................        (5,592,000)       (+1,818,000)       (+5,592,000)
Falcon and Amistad operating and maintenance fund........           970,000          1,065,000          1,065,000            +95,000   .................
                                                          ----------------------------------------------------------------------------------------------
      Total, Power Marketing Administrations.............       228,769,000        237,121,000        243,621,000        +14,852,000         +6,500,000 
                                                                                                                                                        
           Federal Energy Regulatory Commission                                                                                                         
                                                                                                                                                        
Salaries and expenses....................................       146,290,000        167,577,000        162,141,000        +15,851,000         -5,436,000 
    Revenues applied.....................................      -146,290,000       -167,577,000       -162,141,000        -15,851,000         +5,436,000 
                                                          ==============================================================================================
      Total, title III, Department of Energy.............    15,757,418,000     18,433,515,000     16,390,744,000       +633,326,000     -2,042,771,000 
          (By transfer)..................................        (3,774,000)  .................        (5,592,000)       (+1,818,000)       (+5,592,000)
                                                          ==============================================================================================
              TITLE IV--INDEPENDENT AGENCIES                                                                                                            
                                                                                                                                                        
Appalachian Regional Commission..........................       160,000,000        165,000,000        160,000,000   .................        -5,000,000 
Defense Nuclear Facilities Safety Board..................        16,000,000         17,500,000         17,500,000         +1,500,000   .................
Nuclear Regulatory Commission:                                                                                                                          
    Salaries and expenses................................       471,800,000        476,500,000        476,500,000         +4,700,000   .................
    Revenues.............................................      -457,300,000       -457,500,000       -457,500,000           -200,000   .................
                                                          ----------------------------------------------------------------------------------------------
      Subtotal...........................................        14,500,000         19,000,000         19,000,000         +4,500,000   .................
    Office of Inspector General..........................         5,000,000          4,800,000          4,800,000           -200,000   .................
    Revenues.............................................        -5,000,000         -4,800,000         -4,800,000           +200,000   .................
                                                          ----------------------------------------------------------------------------------------------
      Subtotal...........................................  .................  .................  .................  .................  .................
                                                          ----------------------------------------------------------------------------------------------
      Total..............................................        14,500,000         19,000,000         19,000,000         +4,500,000   .................
Nuclear Waste Technical Review Board.....................         2,531,000          3,200,000          3,200,000           +669,000   .................
Tennessee Valley Authority: Tennessee Valley Authority                                                                                                  
 Fund....................................................       106,000,000        106,000,000         86,000,000        -20,000,000        -20,000,000 
                                                          ==============================================================================================
      Total, title IV, Independent agencies..............       299,031,000        310,700,000        285,700,000        -13,331,000        -25,000,000 
                                                          ==============================================================================================
      Grand total:                                                                                                                                      
          New budget (obligational) authority............    20,990,027,000     23,047,903,000     21,209,623,000       +219,596,000     -1,838,280,000 
              Appropriations.............................   (20,378,672,000)   (23,047,903,000)   (21,209,623,000)     (+830,951,000)   (-1,838,280,000)
              Emergency appropriations...................      (611,355,000)  .................  .................     (-611,355,000)  .................
          (By transfer)..................................        (1,000,000)  .................  .................       (-1,000,000)  .................
--------------------------------------------------------------------------------------------------------------------------------------------------------