    Mr. Visclosky of Indiana, from the Committee on Appropriations, 
                        submitted the following

                          SUPPLEMENTAL REPORT

                        [To accompany H.R. 2641]

    The Committee on Appropriations submits the following 
additional report in explanation of H.R. 2641, making 
appropriations for Energy and Water Development, and Related 
Agencies for the fiscal year ending September 30, 2008. This 
report augments, but does not replace, instructions and 
guidance provided in House Report 110-185, the initial report 
filed by the Committee on this bill on June 11, 2007. With this 
new report, the Committee has updated its recommendations to 
give direction to agencies regarding funding for specific 
projects and to comply with clause 9 of rule XXI as it relates 
to transparency requirements when projects have been requested 
by Members of Congress. It also includes Committee 
recommendations related to projects requested by the executive 
branch as part of the Administration's fiscal year 2008 budget.
    In allocating the funds made available by this bill for 
various agencies and appropriations accounts, the Committee 
directs that the following projects be funded:
                                TITLE I

                      DEPARTMENT OF DEFENSE--CIVIL

                         Department of the Army

                       Corps of Engineers--Civil



    Louisiana Coastal Area Ecosystem Restoration, Louisiana.--
The budget request includes $13,000,000 for this study. The 
Committee remains supportive of the effort; however, due to 
large unobligated balances the Committee recommends $3,000,000.
    National Programs, Flood Plain Management Services.--For 
fiscal year 2008, the Committee has recommended $11,000,000 for 
flood plain management services, $5,375,000 above the budget 
request. With the funds provided, the Corps is directed to 
undertake the following studies with the amounts allocated 
below:

Bucks County, Pennsylvania....................................  $250,000
City of Albany, Georgia.......................................   250,000
Whitehall, Mason Run, Ohio....................................   800,000
Will County, Illinois.........................................   500,000

    National Programs, Planning Assistance to States.--For 
fiscal year 2008, the Committee has recommended $9,624,000 for 
planning assistance to states, $5,074,000 above the budget 
request. With the funds provided, the Corps is directed to 
undertake the following studies with the amounts allocated 
below:

City of Perry, Iowa...........................................   $23,000
Guist Creek Lake, Kentucky....................................   160,000
La Mirada, California.........................................   150,000
Lake Rogers, Creekmoor, North Carolina........................    60,000
Lehigh River Basin, Pennsylvania..............................   175,000
McHenry County, Illinois......................................   300,000
Memphis, Tennesse.............................................   200,000
Southington Water Supply Study, Connecticut...................   100,000



    Santa Ana River mainstem, California.--The Committee has 
recommended an increase of $4,000,000 above the 
Administration's request of $17,000,000 to continue studies to 
ascertain the nature and extent of water quality degradation in 
the Santa Ana River resulting from the construction and 
operation of Seven Oaks Dam and to amend the Seven Oaks Dam 
water control plan in light of current conditions and 
requirements.
    Chicago sanitary and ship canal, Illinois.--For fiscal year 
2008, the Committee has recommended $750,000 for the Chicago 
sanitary and ship canal for the operation and maintenance of 
barrier I; an additional $6,900,000 is provided subject to 
authorization for the completion of barrier II. The Committee 
fully supports this critical project to prevent the movement of 
invasive fish species into the Great Lakes.
    Ohio environmental infrastructure.--For fiscal year 2008, 
the Committee has recommended $19,500,000 for Ohio 
environmental infrastructure. These funds shall be distributed 
as follows:

Airpark, Ohio...........................................      $1,600,000
Arbaugh-Hope, Ohio............................................   200,000
Bloomingburg, Ohio............................................   500,000
Brookfield, Ohio..............................................   850,000
Brown Street, Campus West, Ohio............................... 1,800,000
City of Stowe, Ohio...........................................   250,000
Culpepper Area Water System, Ohio............................. 1,600,000
Defiance County, Auglaize River, Ohio.........................   600,000
Elyria, Ohio..................................................   350,000
Euclid Creek, Ohio............................................ 3,600,000
Louisville, Ohio..............................................   800,000
Marysville, Ohio..............................................   800,000
Mayfield Heights, Ohio........................................   500,000
Orrville, Ohio................................................   650,000
Painsville, Ohio..............................................   800,000
Perry Township, Ohio..........................................   550,000
Put-in-Bay, Ohio..............................................   950,000
Struthers, Ohio............................................... 1,300,000
Timberlake, Ohio..............................................   400,000
Williamsburg Water Treatment Plant, Ohio......................   400,000
Windam, Ohio.................................................. 1,000,000

    Northeast Pennsylvania, Pennsylvania.--The Committee has 
recommended $2,000,000, of which $1,000,000 is for Nicholson 
Borough and $1,000,000 is for Towanda, Pennsylvania.
    Southeastern Pennsylvania, Pennsylvania.--Within the funds 
provided, $1,000,000 is for Tacony Creek, Philadelphia, $50,000 
for Whitpain Township, and $240,000 for the Borough of 
Hatfield, Pennsylvania.
    Levisa and Tug Forks & Upper Cumberland River, West 
Virginia, Virginia, & Kentucky.--For fiscal year 2008, the 
Committee recommends a total of $l0,000,000. Within the amounts 
provided, $7,000,000 shall be for elements of the project in 
the Commonwealth of Kentucky and the remaining $3,000,000 shall 
be available for the Commonwealth of Virginia elements of the 
project.
    National Programs, Abandoned Mine Restoration.--For fiscal 
year 2008, the Committee has recommended $525,000 for Mt. 
Diablo, California.
    Continuing Authorities Programs, Emergency Streambank 
Restoration.--For fiscal year 2008, the Committee has 
recommended $10,000,000 for this program and recommends no 
congressionally directed projects. This program provides 
authority for the Corps to design and construct emergency 
streambank and shoreline protection works to protect public 
highways and bridges, and other public works, and nonprofit 
services such as hospitals and schools. The Committee is 
concerned that by directing specific projects, there may be 
instances where true emergencies are not addressed. However, 
should the Corps fail to properly manage this program, the 
Committee will reconsider this position. The Corps is reminded 
that this authority is for emergency situations where imminent 
failure of the streambank or shoreline would adversely impact 
public facilities.



    Mississippi River Levees, AR, IL, KY, LA, MS, MO.--The 
Committee has recommended $35,476,000 for this project. Within 
the funds provided, $6,800,000 shall be available for the New 
Madrid Levee Closure and Box Culvert.
    Wolf River, Tennessee.--The Committee has recommended 
$200,000 for this project to complete plans and specifications 
and fully fund construction of the hiking trails within the 
2,100 acre wildlife corridor.
    Wappapello Lake, Missouri.--The Committee has recommended 
$6,000,000 for this project within Region 8 Lower Mississippi, 
in addition to the amount requested, to address required 
actions related to the relocation of U.S. Highway 67 necessary 
as a result of changes to the operation of the project. The 
Committee directs the Corps to properly budget for the 
remaining cost of relocations that have resulted from changes 
to the operation of the project.



Region 01

    Aunt Lydia's Cove, Massachusetts.--The Committee has 
recommended $400,000 for this project.
    Block Island Harbor, Rhode Island.--The Committee has 
recommended $150,000 for this project.
    Boston Harbor (Inner harbor), Massachusetts.--The Committee 
has recommended $1,000,000 for this project, in addition to the 
budget request.
    Bridgeport Harbor, Connecticut.--The Committee has 
recommended $750,000 for this project.
    Green Harbor Marshfield, Massachusetts.--The Committee has 
recommended $2,000,000 for this project.
    Hampton Harbor, New Hampshire.--The Committee has 
recommended $120,000 for this project.
    Mystic River, Connecticut.--The Committee has recommended 
$400,000 for this project.
    Newburyport Harbor, Massachusetts.--The Committee has 
recommended $1,400,000 for this project.
    Norwalk Harbor, Connecticut.--The Committee has recommended 
$8,000,000 for this project.
    Sesuit Harbor, Massachusetts.--The Committee has 
recommended $250,000 for this project.
    Westport River, Massachusetts.--The Committee has 
recommended $120,000 for this project.

Region 02

    AIWW; Dismal Swamp Canal, Virginia.--The Committee has 
recommended $339,000 for this project, in addition to the 
budget request.
    Appomattox River, Virginia.--The Committee has recommended 
$1,500,000 for this project.
    Baltimore Harbor and Channels, Maryland.--The Committee has 
recommended $2,845,000 for this project, in addition to the 
budget request.
    Barnegat Inlet, New Jersey.--The Committee has recommended 
$2,000,000 for this project, in addition to the budget request.
    Boston Harbor (Inner harbor), Massachusetts.--The Committee 
has recommended $1,000,000 for this project, in addition to the 
budget request.
    Broad Creek, Virginia.--The Committee has recommended 
$700,000 for this project.
    Cocheco River, Dover, New Hampshire.--The Committee has 
recommended $1,800,000 for this project.
    Cowanesque Lake, Pennsylvania.--The Committee has 
recommended $380,000 for this project, in addition to the 
budget request.
    East Branch Clarion River Lake, Pennsylvania.--The 
Committee has recommended $100,000 for this project, in 
addition to the budget request.
    Glen Cove Creek, New York.--The Committee has recommended 
$350,000 for this project.
    Jamaica Bay, New York.--The Committee has recommended 
$1,000,000 for this project.
    James River Channel, Virginia.--The Committee has 
recommended $1,410,000 for this project, in addition to the 
budget request.
    Jones Inlet, New York.--The Committee has recommended 
$4,900,000 for this project, in addition to the budget request.
    Long Island Sound Dredge Material Management Plan (DMMP), 
Connecticut and New York.--The Committee has recommended 
$2,000,000 for the Long Island Sound DMMP, in addition to the 
budget request.
    Newark Bay, Hackensack & Passaic Rivers, New Jersey.--The 
Committee has recommended $500,000 for this project, in 
addition to the budget request.
    Norfolk Harbor, Virginia.--The Committee has recommended 
$4,000,000 for this project, in addition to the budget request.
    Parish Creek, Maryland.--The Committee has recommended 
$60,000 for the Parish Creek project.
    Poplar Island, Maryland.--The Committee has recommended 
$3,780,000 for this project, in addition to the budget request.
    Schuylkill River at Girard Point, Pennsylvania.--The 
Committee has recommended $100,000 for this project.
    Shark River, New Jersey.--The Committee has recommended 
$225,000 for this project, in addition to the budget request.
    Tioga-Hammond Lakes, Pennsylvania.--The Committee has 
recommended $401,000 for this project, in addition to the 
amount requested.
    Tyler's Beach, Virginia.--The Committee has recommended 
$870,000 for this project, in addition to the budget request.
    Wicomico River, Wicomico County, Maryland.--The Committee 
has recommended $700,000 for this project, in addition to the 
budget request.
    Wilmington Harbor, New Castle County, Delaware.--The 
Committee has recommended $2,950,000 for this project, in 
addition to the budget request.

Region 03

    Alabama-Coosa Rivers, Alabama.--The Committee has 
recommended $2,200,000 for this project, in addition to the 
budget request.
    Allatoona Lake, Georgia.--The Committee has recommended 
$1,170,000 for this project, in addition to the budget request.
    Atlantic Intracoastal Waterway (AIWW), Georgia.--The 
Committee has recommended $2,543,000 for the portion of the 
AIWW in Georgia, in addition to the budget request.
    Buford Dam and Lake Sidney Lanier, Georgia.--The Committee 
has recommended $500,000 for this project, in addition to the 
budget request.
    Canaveral Harbor, Florida.--The Committee has recommended 
$1,000,000 for this project, in addition to the budget request.
    Carolina Beach Inlet, North Carolina.--The Committee has 
recommended $1,230,000 for this project.
    Escambia and Conecuh Rivers, Florida.--The Committee has 
recommended $320,000 for this project, in addition to the 
budget request.
    Everglades and South Florida, Seminole Big Cypress, 
Florida.--The Committee has recommended $300,000 for this 
project, in addition to the budget request.
    Georgetown Harbor, South Carolina.--The Committee has 
recommended $3,890,000 for this project, in addition to the 
budget request.
    Horseshoe Cove, Florida.--The Committee has recommended 
$2,700,000 for this project.
    Intracoastal Waterway (IWW), Jacksonville to Miami, 
Florida.--The Committee has recommended $2,000,000 for this 
project, in addition to the budget request.
    Intracoastal Waterway, Caloosahatchee River to Anclote 
River, Florida.--The Committee has recommended $1,350,000 for 
this project, in addition to the budget request.
    Manatee Harbor, Florida.--The Committee has recommended 
$1,500,000 for this project, in addition to the budget request.
    Millers Ferry Lock and Dam, Alabama.--The Committee has 
recommended $217,000 for this project, in addition to the 
budget request.
    Naples to Big Marco Pass, Florida.--The Committee has 
recommended $1,500,000 for this project.
    New Topsail Inlet and Connecting channels, North 
Carolina.--The Committee has recommended $670,000 for this 
project.
    Palm Beach Harbor, Florida.--The Committee has recommended 
$1,830,000 for this project, in addition to the budget request.
    Robert F. Henry Lock and Dam, Alabama.--The Committee has 
recommended $1,500,000 for this project, in addition to the 
budget request.
    Tennessee-Tombigbee Waterway, Alabama & Mississippi.--The 
Committee has recommended $1,200,000 for this project, in 
addition to the budget request.

Region 04

    Great Lakes Navigation.--The Committee has recommended 
$10,000,000 for navigation improvements on the Great Lakes 
Region, in addition to the budget request.
    Arcadia Harbor, Michigan.--The Committee has recommended 
$160,000 for this project.
    Ashtabula Harbor, Ohio.--The Committee has recommended 
$2,000,000 for this project, in addition to the budget request.
    Buffalo Harbor, New York.--The Committee has recommended 
$200,000 for this project, in addition to the budget request.
    Burns Waterway harbor, Indiana.--The Committee has 
recommended $1,800,000 for the Burns Waterway harbor, in 
addition to the amount requested in the budget. Dredging 
activities should place priority on the Bailly intake pipe 
area.
    Burns Waterway small boat harbor, Indiana.--The Committee 
has recommended $61,000 for this project.
    Clinton River, Michigan.--The Committee has recommended 
$660,000 for this project.
    Duluth-Superior Harbor, Minnesota & Wisconsin.--The 
Committee has recommended $300,000 for the Duluth-Superior 
Harbor project, in addition to the budget request.
    Green Bay Harbor, Wisconsin.--The Committee has recommended 
$1,460,000 for this project, in addition to the budget request.
    Huron Harbor, Ohio.--The Committee has recommended 
$1,000,000 for this project.
    Irondequoit Harbor, New York.--The Committee has 
recommended $400,000 for this project.
    Kewaunee Harbor, Wisconsin.--The Committee has recommended 
$430,000 for this project, in addition to the budget request.
    Lake Superior Small Harbor Dredging, Wisconsin.--The 
Committee has recommended $1,589,000 to respond to maintenance 
needs of small harbors on Lake Superior.
    Leland Harbor, Michigan.--The Committee has recommended 
$190,000 for this project.
    Lexington Harbor, Michigan.--The Committee has recommended 
$175,000 for this project.
    Menominee, Michigan.--The Committee has recommended 
$1,000,000 for this project.
    Michigan City Harbor, Indiana.--The Committee has 
recommended $2,000,000 for this project.
    Monroe Harbor, Michigan.--The Committee has recommended 
$550,000 for this project.
    Pentwater Harbor, Michigan.--The Committee has recommended 
$163,000 for this project.
    Port Sanilac Harbor, Michigan.--The Committee has 
recommended $150,000 for this project
    Portage Lake, Michigan.--The Committee has recommended 
$245,000 for this project.
    Rieck's Lake, Wisconsin.--The Committee has recommended 
$65,000 for this project.
    Rochester Harbor, New York.--The Committee has recommended 
$1,600,000 for this project.
    Saginaw River, Michigan.--The Committee has recommended 
$1,752,000 for this project, in addition to the budget request.
    Saugatuck Harbor, Michigan.--The Committee has recommended 
$315,000 for this project.
    South Haven Harbor, Michigan.--The Committee has 
recommended $302,000 for this project.
    St. Joseph Harbor, Michigan.--The Committee has recommended 
$400,000 for this project, in addition to the budget request.
    Sturgeon Bay Harbor & Lake Michigan Ship Canal, 
Wisconsin.--The Committee has recommended $630,000 for this 
project, in addition to budget request.
    White Lake Harbor, Michigan.--The Committee has recommended 
$125,000 for this project.

Region 05

    Ohio River Navigation.--The Committee has recommended 
$5,000,000 for Ohio River Navigation Improvements, in addition 
to the budget request to implement improvements identified in 
the five-year plan.
    Dale Hollow Lake, Tennessee.--The Committee has recommended 
$350,000 for this project, in addition to the budget request.
    Elvis Stahr (Hickman) Harbor, Kentucky.--The Committee has 
recommended $1,830,000 for this project, in addition to the 
budget request.
    J. Percy Priest Dam and Reservoir, Tennessee.--The 
Committee has recommended $500,000 for this project, in 
addition to the budget request for recreation upgrades.
    Ohio River Locks & Dams, West Virginia, Kentucky & Ohio.--
The Committee has recommended $1,000,000 for the Ohio River 
Locks and Dams for recreation improvements at Parkersburg, in 
addition to the budget request.
    Paintsville Lake, Kentucky.--The Committee has recommended 
$150,000 for this project, in addition to the budget request.
    Tionesta Lake, Pennsylvania.--The Committee has recommended 
$225,000 for this project, in addition to the budget request.
    Upper Monongahela River Automation Project, West 
Virginia.--The Committee has recommended $350,000 for this 
project.

Region 07

    St. Paul Lower Harbor, Minnesota.--The Committee has 
recommended $100,000 for this project.
    Sunset boat basin, Illinois.--The Committee has recommended 
$100,000 for this project
    Waukegan Harbor, Illinois.--The Committee has recommended 
$582,000 for the Waukegan Harbor, in addition to the budget 
request.

Region 08

    Houma Navigation Canal, Louisiana.--The Committee has 
recommended $4,065,000 for this project, in addition to the 
budget request.
    Mississippi River Project (MVR).--The Committee has 
recommended $150,000 for Mill Creek South Slough, Illinois, in 
addition to the budget request for the Mississippi River 
project.
    Ouachita and Black Rivers, Arkansas and Louisiana.--The 
Committee has recommended $5,400,000 for this project, in 
addition to the budget request.
    Wolf River, Tennessee.--The Committee has recommended 
$400,000 for this project, in addition to the budget request.

Region 10

    Clinton Lake, Kansas.--The Committee has recommended 
$1,125,000, to be used for the dam toe road access and dam road 
repairs, in addition to the budget request.

Region 11

    El Dorado Lake, Kansas.--The Committee has recommended 
$150,000 for this project, in addition to the budget request.
    McClellan-Kerr Arkansas River Navigation System, 
Oklahoma.--The Committee has recommended $1,549,000 for this 
project, in addition to the budget request.
    Table Rock Lake, Missouri.--The Committee has recommended 
$1,500,000 for the operation and maintenance of this project, 
in addition to the budget request.
    White River, Arkansas.--The Committee has recommended 
$4,700,000 for maintenance of the navigation channel, in 
addition to the budget request.

Region 12

    Benbrook Lake, Texas.--In addition to the amount requested, 
$502,000 is recommended for this project.
    Brazos Island Harbor, Texas.--The Committee has recommended 
$3,000,000 for this project.
    Houston Ship Channel, Texas.--The Committee has recommended 
$1,000,000 for this project, in addition to the budget request.
    Lake Waco, Texas.--The Committee has recommended $1,500,000 
for this project, in addition to the amount requested for the 
replacement of failing water delivery systems and for necessary 
repairs resulting from recent flooding.
    Lake Whitney, Texas.--In addition to the amount requested, 
$2,000,000 is recommended for Ham Creek and $1,000,000 is 
recommended for necessary repairs resulting from recent 
flooding.
    Lewisville Dam, Texas.--The Committee has recommended 
$2,000,000 for this project, in addition to the budget request.
    Town Bluff Dam, Texas.--The Committee has recommended 
$1,345,000 for this project, in addition to the budget request 
for improvements at Campers Cove, Sandy Creek, and East End.

Region 13

    Rio Grande Bosque Rehabilitation, New Mexico.--The 
Committee has recommended $2,000,000 for this project.

Region 17

    Columbia River at Baker Bay, Washington.--The Committee has 
recommended $640,000 for this project.
    Coos Bay, Oregon.--The Committee has recommended $3,000,000 
for this project, in addition to the budget request.
    Grays Harbor, Washington.--The Committee has recommended 
$3,095,000 for the operation and maintenance of this project, 
in addition to the budget request.
    Siuslaw River, Oregon.--The Committee has recommended 
$219,000 for this project, in addition to the budget request.
    Tillamook Bay & Bar, Oregon.--The Committee has recommended 
$2,000,000 for this project.
    Umpqua River, Oregon.--The Committee has recommended 
$1,244,000 for this project, in addition to the budget request.
    Yaquina River, Oregon.--The Committee has recommended 
$848,000 for this project.

Region 18

    Dry Creek (Warm Springs) lake and channel, California.--The 
Committee has recommended $657,000 for this project in addition 
to the budget request. Of the funds provided, $104,000 shall be 
available to update the inundation maps for the project.
    Jack D. Maltester Channel (San Leandro), California.--The 
Committee has recommended $2,500,000 for this project.
    Moss Landing Harbor, California.--The Committee has 
recommended $2,530,000 for this project, in addition to the 
budget request.
    Noyo Harbor, California.--The Committee has recommended 
$1,475,000 for this project.
    Oakland Harbor, California.--The Committee has recommended 
$2,690,000 for the Oakland Harbor, in addition to the amount 
requested.
    Pillar Point Harbor, California.--The Committee has 
recommended $2,580,000 for this project.
    Pinole Shoal management study, California.--The Committee 
has recommended $500,000 for the Pinole Shoal management study.
    San Francisco Bay Harbor & Bay (Drift Removal), 
California.--The Committee has recommended $1,195,000 for the 
San Francisco Bay Harbor & Bay Drift Removal, in addition to 
the amount requested.
    San Francisco Bay Harbor, California.--The Committee has 
recommended $400,000 for the San Francisco Bay Harbor to 
advance the Ocean Beach Nourishment project, in addition to the 
budget request.
    San Francisco Bay Long Term Management Strategy, 
California.--The Committee has recommended $2,500,000 for this 
project.
    San Pablo Bay and Mare Island Strait, California.--The 
Committee has recommended $2,650,000 for the San Pablo Bay and 
Mare Island Strait project.
    San Rafael Channel, California.--The Committee has 
recommended $2,175,000 for this project.
    Suisun Bay Channel, California.--The Committee has 
recommended $518,000 for the Suisun Bay Channel, in addition to 
the budget request.

National Programs

    Beneficial Uses of Dredged Material.--Within the funds 
provided, $250,000 shall be available for the Wynn Road, 
Oregon, Ohio project.
    Navigation Mitigation Projects.--Within the funds provided, 
$250,000 shall be available for the Camp Ellis, Saco, Maine 
project and $300,000 shall be available for the Mattituck 
Harbor, New York project.
                                TITLE II

                       DEPARTMENT OF THE INTERIOR

                         Bureau of Reclamation



    Salton Sea Research Project, California.--The Committee 
recommendation provides $2,000,000 for the Salton Sea research 
project, including $1,000,000 to continue environmental 
restoration efforts at the Alamo and New Rivers, and for other 
authorized pilot projects.
    Southern California investigations program.--The Committee 
recommendation provides $1,090,000 for the Southern California 
investigations program, including $400,000 for the Water 
Replenishment District regional groundwater monitoring program 
and $500,000 is provided to assist the Lake Arrowhead Community 
Services District to develop an integrated water resource plan.
    Southern Utah investigations program.--The Committee 
recommendation provides $414,000 for the Southern Utah 
investigations program, including $300,000 for the San Juan 
River water pipeline study.
    Title XVI water reclamation and reuse program.--The 
Committee recommendation provides $2,800,000 for the Title XVI 
water reclamation and reuse program, of which $2,000,000 shall 
be for the WateReuse Foundation.
    Central Valley project, American River Division.--Within 
funds provided, $1,300,000 shall be available for the El Dorado 
Temperature control device.
    Central Valley project, Friant Division.--Within funds 
provided, $1,000,000 shall be available for the Friant-Kern and 
Madera canals.

                    California Bay-Delta Restoration

    California Bay-Delta Restoration.--The Committee 
recommendation provides $40,750,000 for California Bay-Delta 
Restoration. Within the funds provided, $2,000,000 shall be 
available for the Inland Empire regional water recycling 
project. In addition, $1,000,000 is provided, instead of 
$500,000 as requested in the Administration's budget, for the 
Contra Costa Water District alternative intake project.

                Central Valley Project Restoration Fund

    Central Valley Project Restoration Fund.--Within the funds 
provided, not less than $7,432,000 shall be available for 
Sacramento Fish Screen Projects, instead of $4,432,000 as 
requested in the Administration's budget.
                               TITLE III

                          DEPARTMENT OF ENERGY



                                TITLE IV

                          INDEPENDENT AGENCIES



               EXECUTIVE AND LEGISLATIVE BRANCH PROJECTS

    Compliance with Rules of the House.--The list of projects 
which follows is submitted in compliance with clause 9 of rule 
XXI of the Rules of the House of Representatives, which 
requires publication of a complete list of projects included in 
the bill which result principally from requests of Members of 
the House of Representatives. In addition, the list includes 
projects of a similar character which are funded in the bill 
and report and which have been requested in the Administration 
Budget for fiscal year 2008. Programmatic increases that impact 
spacific projects are also noted.