House Report 111-278 - ENERGY AND WATER DEVELOPMENT AND RELATED AGENCIES APPROPRIATIONS ACT, 2010

[House Report 111-278]
[From the U.S. Government Publishing Office]


   111th Congress 1st 
         Session                                        Report
                        HOUSE OF REPRESENTATIVES       111-278
_______________________________________________________________________

                                     


 ENERGY AND WATER DEVELOPMENT AND RELATED AGENCIES APPROPRIATIONS ACT, 
                                  2010

                               ----------                              

                           CONFERENCE REPORT

                              To accompany

                               H.R. 3183




               September 30, 2009.--Ordered to be printed


 ENERGY AND WATER DEVELOPMENT AND RELATED AGENCIES APPROPRIATIONS ACT, 
                                  2010
For Sale by the Superintendent of Documents, U.S. Government Printing Office
Internet: bookstore.gpo.gov  Phone: toll free (866) 512-1800; (202) 512�091800  
Fax: (202) 512�092104 Mail: Stop IDCC, Washington, DC 20402�090001


111th Congress 
 1st Session                                                     Report
                        HOUSE OF REPRESENTATIVES                111-278
_______________________________________________________________________

                                     


 ENERGY AND WATER DEVELOPMENT AND RELATED AGENCIES APPROPRIATIONS ACT, 
                                  2010

                               __________

                           CONFERENCE REPORT

                              To accompany

                               H.R. 3183




               September 30, 2009.--Ordered to be printed


111th Congress                                                   Report
                        HOUSE OF REPRESENTATIVES
 1st Session                                                    111-278

======================================================================



 
 ENERGY AND WATER DEVELOPMENT AND RELATED AGENCIES APPROPRIATIONS ACT, 
                                  2010

                                _______
                                

               September 30, 2009.--Ordered to be printed

                                _______
                                

Mr. Pastor of Arizona, from the Committee of Conference, submitted the 
                               following

                           CONFERENCE REPORT

                        [To accompany H.R. 3183]

    The committee of conference on the disagreeing votes of the 
two Houses on the amendment of the Senate to the bill (H.R. 
3183), making appropriations for energy and water development 
and related agencies for the fiscal year ending September 30, 
2010, and for other purposes, having met, after full and free 
conference, have agreed to recommend and do recommend to their 
respective Houses as follows:
    That the House recede from its disagreement to the 
amendment of the Senate and agree to the same with an amendment 
as follows:
    In lieu of the matter proposed to be inserted by the Senate 
amendment, insert the following:

That the following sums are appropriated, out of any money in 
the Treasury not otherwise appropriated, for energy and water 
development and related agencies for the fiscal year ending 
September 30, 2010, and for other purposes, namely:

                                TITLE I

                       CORPS OF ENGINEERS--CIVIL

                         DEPARTMENT OF THE ARMY

                       Corps of Engineers--civil

    The following appropriations shall be expended under the 
direction of the Secretary of the Army and the supervision of 
the Chief of Engineers for authorized civil functions of the 
Department of the Army pertaining to rivers and harbors, flood 
and storm damage reduction, shore protection, aquatic ecosystem 
restoration, and related efforts.

                             investigations

    For expenses necessary where authorized by law for the 
collection and study of basic information pertaining to river 
and harbor, flood and storm damage reduction, shore protection, 
aquatic ecosystem restoration, and related needs; for surveys 
and detailed studies, and plans and specifications of proposed 
river and harbor, flood and storm damage reduction, shore 
protection, and aquatic ecosystem restoration projects and 
related efforts prior to construction; for restudy of 
authorized projects; and for miscellaneous investigations and, 
when authorized by law, surveys and detailed studies, and plans 
and specifications of projects prior to construction, 
$160,000,000, to remain available until expended.

                              construction

                     (including transfer of funds)

    For expenses necessary for the construction of river and 
harbor, flood and storm damage reduction, shore protection, 
aquatic ecosystem restoration, and related projects authorized 
by law; for conducting detailed studies, and plans and 
specifications, of such projects (including those involving 
participation by States, local governments, or private groups) 
authorized or made eligible for selection by law (but such 
detailed studies, and plans and specifications, shall not 
constitute a commitment of the Government to construction); 
$2,031,000,000, to remain available until expended; of which 
such sums as are necessary to cover the Federal share of 
construction costs for facilities under the Dredged Material 
Disposal Facilities program shall be derived from the Harbor 
Maintenance Trust Fund as authorized by Public Law 104-303; and 
of which such sums as are necessary to cover one-half of the 
costs of construction, replacement, rehabilitation, and 
expansion of inland waterways projects (including only 
Chickamauga Lock, Tennessee; Kentucky Lock and Dam, Tennessee 
River, Kentucky; Lock and Dams 2, 3, and 4 Monongahela River, 
Pennsylvania; Markland Locks and Dam, Kentucky and Indiana; 
Olmsted Lock and Dam, Illinois and Kentucky; and Emsworth Locks 
and Dam, Ohio River, Pennsylvania) shall be derived from the 
Inland Waterways Trust Fund: Provided, That $1,500,000 of the 
funds appropriated under this heading in title I of division C 
of the Omnibus Appropriations Act, 2009 (Public Law 111-8; 123 
Stat. 601-609) is transferred to the Investigations account 
and, in addition to funds appropriated by this Act, applied 
toward the cost of carrying out the Seven Oaks Water 
Conservation Study, California: Provided further, That the 
Chief of Engineers is directed to use $12,594,000 of the funds 
appropriated herein for the Dallas Floodway Extension, Texas, 
project, including the Cadillac Heights feature, generally in 
accordance with the Chief of Engineers report dated December 7, 
1999: Provided further, That the Chief of Engineers is directed 
to use $1,417,000 of funds available for the Greenbrier Basin, 
Marlinton, West Virginia, Local Protection Project to continue 
engineering and design efforts, execute a project partnership 
agreement, and initiate construction of the project 
substantially in accordance with Alternative 1 as described in 
the Corps of Engineers Final Detailed Project Report and 
Environmental Impact Statement for Marlinton, West Virginia 
Local Protection Project dated September 2008: Provided 
further, That the Federal and non-Federal shares shall be 
determined in accordance with the ability-to-pay provisions 
prescribed in section 103(m) of the Water Resources Development 
Act of 1986, as amended: Provided further, That the Chief of 
Engineers is directed to use $4,000,000 of the funds 
appropriated herein for planning, engineering, design or 
construction of the Grundy, Buchanan County, and Dickenson 
County, Virginia, elements of the Levisa and Tug Forks of the 
Big Sandy River and Upper Cumberland River Project: Provided 
further, That the Chief of Engineers is directed to use 
$2,750,000 of the funds appropriated herein to continue 
planning, engineering, design or construction of the Lower 
Mingo County, Upper Mingo County, Wayne County, McDowell 
County, West Virginia, elements of the Levisa and Tug Forks of 
the Big Sandy River and Upper Cumberland River Project: 
Provided further, That the Secretary of the Army, acting 
through the Chief of Engineers, is directed to use $9,500,000 
of the funds appropriated herein for the Clover Fork, City of 
Cumberland, Town of Martin, Pike County (including Levisa Fork 
and Tug Fork Tributaries), Bell County, Harlan County in 
accordance with the Draft Detailed Project Report dated January 
2002, Floyd County, Martin County, Johnson County, and Knox 
County, Kentucky, detailed project report, elements of the 
Levisa and Tug Forks of the Big Sandy River and Upper 
Cumberland River: Provided further, That not less than 
$3,000,000 of the funds provided for the Levisa and Tug Forks 
in Kentucky shall be used for the project in the Town of 
Martin, Kentucky.

                   mississippi river and tributaries

    For expenses necessary for flood damage reduction projects 
and related efforts in the Mississippi River alluvial valley 
below Cape Girardeau, Missouri, as authorized by law, 
$340,000,000, to remain available until expended, of which such 
sums as are necessary to cover the Federal share of eligible 
operation and maintenance costs for inland harbors shall be 
derived from the Harbor Maintenance Trust Fund: Provided, That 
the Secretary of the Army, acting through the Chief of 
Engineers is directed to use $9,661,000 appropriated herein for 
construction of water withdrawal features of the Grand Prairie, 
Arkansas, project.

                       operation and maintenance

    For expenses necessary for the operation, maintenance, and 
care of existing river and harbor, flood and storm damage 
reduction, aquatic ecosystem restoration, and related projects 
authorized by law; providing security for infrastructure owned 
or operated by the Corps, including administrative buildings 
and laboratories; maintaining harbor channels provided by a 
State, municipality, or other public agency that serve 
essential navigation needs of general commerce, where 
authorized by law; surveying and charting northern and 
northwestern lakes and connecting waters; clearing and 
straightening channels; and removing obstructions to 
navigation, $2,400,000,000, to remain available until expended, 
of which such sums as are necessary to cover the Federal share 
of eligible operation and maintenance costs for coastal harbors 
and channels, and for inland harbors shall be derived from the 
Harbor Maintenance Trust Fund; of which such sums as become 
available from the special account for the Corps established by 
the Land and Water Conservation Act of 1965 (16 U.S.C. 460l-
6a(i)), shall be derived from that account for resource 
protection, research, interpretation, and maintenance 
activities related to resource protection in the areas at which 
outdoor recreation is available; and of which such sums as 
become available from fees collected under section 217 of the 
Water Resources Development Act of 1996 (Public Law 104-303) 
shall be used to cover the cost of operation and maintenance of 
the dredged material disposal facilities for which such fees 
have been collected: Provided, That 1 percent of the total 
amount of funds provided for each of the programs, projects or 
activities funded under this heading shall not be allocated to 
a field operating activity prior to the beginning of the fourth 
quarter of the fiscal year and shall be available for use by 
the Chief of Engineers to fund such emergency activities as the 
Chief of Engineers determines to be necessary and appropriate; 
and that the Chief of Engineers shall allocate during the 
fourth quarter any remaining funds which have not been used for 
emergency activities proportionally in accordance with the 
amounts provided for the programs, projects or activities.

                           regulatory program

    For expenses necessary for administration of laws 
pertaining to regulation of navigable waters and wetlands, 
$190,000,000, to remain available until expended.

            formerly utilized sites remedial action program

    For expenses necessary to clean up contamination from sites 
in the United States resulting from work performed as part of 
the Nation's early atomic energy program, $134,000,000, to 
remain available until expended.

                                expenses

    For expenses necessary for the supervision and general 
administration of the civil works program in the headquarters 
of the United States Army Corps of Engineers and the offices of 
the Division Engineers; and for the management and operation of 
the Humphreys Engineer Center Support Activity, the Institute 
for Water Resources, the United States Army Engineer Research 
and Development Center, and the United States Army Corps of 
Engineers Finance Center, $185,000,000, to remain available 
until expended, of which not to exceed $5,000 may be used for 
official reception and representation purposes and only during 
the current fiscal year: Provided, That no part of any other 
appropriation provided in title I of this Act shall be 
available to fund the civil works activities of the Office of 
the Chief of Engineers or the civil works executive direction 
and management activities of the division offices: Provided 
further, That any Flood Control and Coastal Emergencies 
appropriation may be used to fund the supervision and general 
administration of emergency operations, repairs, and other 
activities in response to any flood, hurricane, or other 
natural disaster.

        office of assistant secretary of the army (civil works)

    For the Office of Assistant Secretary of the Army (Civil 
Works) as authorized by 10 U.S.C. 3016(b)(3), $5,000,000, to 
remain available until expended.

                        administrative provision

    The Revolving Fund, Corps of Engineers, shall be available 
during the current fiscal year for purchase (not to exceed 100 
for replacement only) and hire of passenger motor vehicles for 
the civil works program.

             general provisions, corps of engineers--civil

    Sec. 101. (a) None of the funds provided in title I of this 
Act, or provided by previous appropriations Acts to the 
agencies or entities funded in title I of this Act that remain 
available for obligation or expenditure in fiscal year 2010, 
shall be available for obligation or expenditure through a 
reprogramming of funds that:
            (1) creates or initiates a new program, project, or 
        activity;
            (2) eliminates a program, project, or activity;
            (3) increases funds or personnel for any program, 
        project, or activity for which funds have been denied 
        or restricted by this Act, unless prior approval is 
        received from the House and Senate Committees on 
        Appropriations;
            (4) proposes to use funds directed for a specific 
        activity for a different purpose, unless prior approval 
        is received from the House and Senate Committees on 
        Appropriations;
            (5) augments or reduces existing programs, projects 
        or activities in excess of the amounts contained in 
        subsections 6 through 10, unless prior approval is 
        received from the House and Senate Committees on 
        Appropriations;
            (6) Investigations.--For a base level over 
        $100,000, reprogramming of 25 percent of the base 
        amount up to a limit of $150,000 per project, study or 
        activity is allowed: Provided, That for a base level 
        less than $100,000, the reprogramming limit is $25,000: 
        Provided further, That up to $25,000 may be 
        reprogrammed into any continuing study or activity that 
        did not receive an appropriation for existing 
        obligations and concomitant administrative expenses;
            (7) Construction.--For a base level over 
        $2,000,000, reprogramming of 15 percent of the base 
        amount up to a limit of $3,000,000 per project, study 
        or activity is allowed: Provided, That for a base level 
        less than $2,000,000, the reprogramming limit is 
        $300,000: Provided further, That up to $3,000,000 may 
        be reprogrammed for settled contractor claims, changed 
        conditions, or real estate deficiency judgments: 
        Provided further, That up to $300,000 may be 
        reprogrammed into any continuing study or activity that 
        did not receive an appropriation for existing 
        obligations and concomitant administrative expenses;
            (8) Operation and maintenance.--Unlimited 
        reprogramming authority is granted in order for the 
        Corps to be able to respond to emergencies: Provided, 
        That the Chief of Engineers must notify the House and 
        Senate Committees on Appropriations of these emergency 
        actions as soon thereafter as practicable: Provided 
        further, That for a base level over $1,000,000, 
        reprogramming of 15 percent of the base amount a limit 
        of $5,000,000 per project, study or activity is 
        allowed: Provided further, That for a base level less 
        than $1,000,000, the reprogramming limit is $150,000: 
        Provided further, That $150,000 may be reprogrammed 
        into any continuing study or activity that did not 
        receive an appropriation;
            (9) Mississippi river and tributaries.--The same 
        reprogramming guidelines for the Investigations, 
        Construction, and Operation and Maintenance portions of 
        the Mississippi River and Tributaries Account as listed 
        above; and
            (10) Formerly utilized sites remedial action 
        program.--Reprogramming of up to 15 percent of the base 
        of the receiving project is permitted.
    (b) Diminimus Reprogrammings.--In no case should a 
reprogramming for less than $50,000 be submitted to the House 
and Senate Committees on Appropriations.
    (c) Continuing Authorities Program.--Subsection (a)(1) 
shall not apply to any project or activity funded under the 
continuing authorities program.
    (d) Not later than 60 days after the date of enactment of 
this Act, the Corps of Engineers shall submit a report to the 
House and Senate Committees on Appropriations to establish the 
baseline for application of reprogramming and transfer 
authorities for the current fiscal year: Provided, That the 
report shall include:
            (1) A table for each appropriation with a separate 
        column to display the President's budget request, 
        adjustments made by Congress, adjustments due to 
        enacted rescissions, if appropriate, and the fiscal 
        year enacted level;
            (2) A delineation in the table for each 
        appropriation both by object class and program, project 
        and activity as detailed in the budget appendix for the 
        respective appropriations; and
            (3) An identification of items of special 
        congressional interest.
    Sec. 102.  None of the funds in this Act, or previous Acts, 
making funds available for Energy and Water Development, shall 
be used to implement any pending or future competitive sourcing 
actions under OMB Circular A-76 or High Performing 
Organizations for the U.S. Army Corps of Engineers.
    Sec. 103.  None of the funds made available in this title 
may be used to award or modify any contract that commits funds 
beyond the amounts appropriated for that program, project, or 
activity that remain unobligated, except that such amounts may 
include any funds that have been made available through 
reprogramming pursuant to section 101.
    Sec. 104.  None of the funds in this Act, or previous Acts 
making funds available for Energy and Water Development, shall 
be used to award any continuing contract that commits 
additional funding from the Inland Waterways Trust Fund unless 
or until such time that a long-term mechanism to enhance 
revenues in the Fund sufficient to meet the cost-sharing 
authorized in the Water Resources Development Act of 1986 
(Public Law 99-662) is enacted.
    Sec. 105.  The project for navigation, Two Harbors, 
Minnesota, being carried out under section 107 of the River and 
Harbor Act of 1960 (33 U.S.C. 577), and modified by section 
3101 of the Water Resources Development Act of 2007 (121 Stat. 
1133), is further modified to direct the Secretary to credit, 
in accordance with section 221 of the Flood Control Act of 1970 
(42 U.S.C. 1962d-5b), toward the non-Federal share of the 
project the cost of planning, design, and construction work 
carried out by the non-Federal interest for the project before 
the date of execution of a partnership agreement for the 
project.
    Sec. 106.  Section 154(h) of title I of division B of the 
Miscellaneous Appropriations Act, 2001 (114 Stat. 2763A-254) 
(as enacted into law by Public Law 106-554) is amended by 
striking ``$40,000,000'' and inserting ``$60,000,000''.
    Sec. 107.  The Secretary is directed to use such funds as 
are necessary, from amounts made available in this Act under 
the heading ``Construction'', to expedite acquisition of those 
properties located in the vicinity of Martin, Kentucky, that 
were damaged by the floodwaters in the May 2009 flood event and 
that fall within Phases 3 and 4 of the mandatory and voluntary 
acquisition elements identified in Plan A of the Chief of 
Engineers, Town of Martin Nonstructural Project Detailed 
Project Report, Appendix T, Section 202 General Plan, dated 
March 2000.
    Sec. 108.  Within 90 days of the date of the Chief of 
Engineers Report on a water resource matter, the Assistant 
Secretary of the Army (Civil Works) shall submit the report to 
the appropriate authorizing and appropriating committees of the 
Congress.
    Sec. 109. (a) In General.--Subject to subsection (b), none 
of the funds made available by this Act may be used to carry 
out any water reallocation project or component under the Wolf 
Creek Project, Lake Cumberland, Kentucky, authorized under the 
Act of June 28, 1938 (52 Stat. 1215, ch. 795) and the Act of 
July 24, 1946 (60 Stat. 636, ch. 595).
    (b) Existing Reallocations.--Subsection (a) shall not apply 
to any water reallocation for Lake Cumberland, Kentucky, that 
is carried out subject to an agreement or payment schedule in 
effect on the date of enactment of this Act.
    Sec. 110.  Section 592(g) of Public Law 106-53 (113 Stat. 
380), as amended by section 120 of Public Law 108-137 (117 
Stat. 1837) and section 5097 of Public Law 110-114 (121 Stat. 
1233), is further amended by striking ``$110,000,000'' and 
inserting ``$200,000,000'' in lieu thereof.
    Sec. 111.  The project for flood control, Big Sioux River 
and Skunk Creek, Sioux Falls, South Dakota authorized by 
section 101(a)(28) of the Water Resources Development Act of 
1996 (Public Law 104-303; 110 Stat. 3666), is modified to 
authorize the Secretary to construct the project at an 
estimated total cost of $53,500,000, with an estimated Federal 
cost of $37,700,000 and an estimated non-Federal cost of 
$15,800,000.
    Sec. 112.  Section 595(h) of Public Law 106-53 (113 Stat. 
384), as amended by section 5067 of Public Law 110-114 (121 
Stat. 1219), is further amended by--
            (1) striking the phrase ``$25,000,000 for each of 
        Montana and New Mexico'' and inserting the following 
        language in lieu thereof: ``$75,000,000 for Montana, 
        $25,000,000 for New Mexico''; and
            (2) striking ``$50,000,000'' and inserting 
        ``$100,000,000'' in lieu thereof.
    Sec. 113.  The project for flood damage reduction, Des 
Moines and Raccoon Rivers, Des Moines Iowa, authorized by 
section 1001(21) of the Water Resources Development Act of 2007 
(121 Stat. 1053), is modified to authorize the Secretary to 
construct the project at a total cost of $16,500,000 with an 
estimated Federal cost of $10,725,000 and an estimated non-
Federal cost of $5,775,000.
    Sec. 114.  The project for flood damage reduction, 
Breckenridge, Minnesota, authorized by section 320 of the Water 
Resources Development Act of 2000 (Public Law 106-541; 114 
Stat. 2605), is modified to authorize the Secretary to 
construct the project at a total cost of $39,360,000 with an 
estimated Federal cost of $25,000,000 and an estimated non-
Federal cost of $14,360,000.
    Sec. 115.  Section 122 of title I of division D of the 
Consolidated Appropriations Resolution, 2003 (Public Law 108-7; 
117 Stat. 141) is amended by striking ``$10,000,000'' and 
inserting ``$27,000,000'' in lieu thereof.
    Sec. 116.  The Secretary of the Army is authorized to carry 
out structural and non-structural projects for storm damage 
prevention and reduction, coastal erosion, and ice and glacial 
damage in Alaska, including relocation of affected communities 
and construction of replacement facilities: Provided, That the 
non-Federal share of any project carried out pursuant to this 
section shall be no more than 35 percent of the total cost of 
the project and shall be subject to the ability of the non-
Federal interest to pay, as determined in accordance with 33 
U.S.C. 2213(m).
    Sec. 117.  Section 3111(1) of the Water Resources 
Development Act, 2007 (Public Law 110-114; 121 Stat. 1041) is 
amended by inserting after the word ``before'', the following: 
``, on and after''.
    Sec. 118.  The flood control project for West Sacramento, 
California, authorized by section 101(4), Water Resources 
Development Act, 1992, Public Law 102-580; Energy and Water 
Development Appropriations Act, 1999, Public Law 105-245, is 
modified to authorize the Secretary of Army, acting through the 
Chief of Engineers, to construct the project at a total cost of 
$53,040,000 with an estimated first Federal cost of $38,355,000 
and an estimated non-Federal first cost of $14,685,000.
    Sec. 119.  Section 528(b)(3)(C)(ii) of the Water Resources 
Development Act of 1996 (110 Stat. 3769; 121 Stat. 1270) is 
amended--
            (1) in subclause (I), by striking ``subclause 
        (II)'' and inserting ``subclauses (II) and (III)''; and
            (2) by adding at the end the following:
                                    ``(III) Ten mile creek 
                                water preserve area.--The 
                                Federal share of the cost of 
                                the Ten Mile Creek Water 
                                Preserve Area may exceed 
                                $25,000,000 by an amount equal 
                                to not more than $3,500,000, 
                                which shall be used to pay the 
                                Federal share of the cost of--
                                            ``(aa) the 
                                        completion of a post 
                                        authorization change 
                                        report; and
                                            ``(bb) the 
                                        maintenance of the Ten 
                                        Mile Creek Water 
                                        Preserve Area in 
                                        caretaker status 
                                        through fiscal year 
                                        2013.''.
    Sec. 120.  As soon as practicable after the date of 
enactment of this Act, from funds made available before the 
date of enactment of this Act for the Tampa Harbor Big Bend 
Channel project, the Secretary of the Army shall reimburse the 
non-Federal sponsor of the Tampa Harbor Big Bend Channel 
project for the Federal share of the dredging work carried out 
for the project.
    Sec. 121.  Notwithstanding any other provision of law, 
including section 103(c)(4) of Public Law 99-662 (33 U.S.C. 
2213(c)(4)), the cost of any work carried out heretofore or 
hereafter on construction of the trail system authorized for 
the J. Percy Priest Dam and Reservoir, Tennessee by section 
5132 of Public Law 110-114 (121 Stat. 1249) shall be a Federal 
cost, the total of which may not exceed $10,300,000.
    Sec. 122.  Section 3112(1) of the Water Resources 
Development Act, 2007 (Public Law 110-114; 121 Stat. 1041) is 
amended by inserting after the word ``before'', the following: 
``, on and after''.
    Sec. 123.  Section 805(a)(2) of Public Law 106-541 (114 
Stat. 2704) is amended by striking ``2010'' each place it 
appears and inserting ``2013''.
    Sec. 124. The Secretary of the Army is authorized to carry 
out the project for storm damage reduction, Kahuku, Oahu, 
Hawaii, at a total cost of $6,700,000, with an estimated 
Federal cost of $4,360,000 and an estimated non-Federal cost of 
$2,340,000.
    Sec. 125. The Secretary of the Army is authorized to 
acquire 24 parcels of land consisting of approximately 235 
acres located within Township 21 South, Range 28 East, Sections 
25, 26, 27, 34, 35 and 36, and Township 22 South, Range 28 
East, Section 3 in Tulare County, for the Dam Safety Seismic 
Remediation project at Success Dam on the Tule River in the 
State of California, authorized by section 10 of the Flood 
Control Act of December 22, 1944 (58 Stat. 901); Provided, That 
the lands shall be available for use in connection with any 
activity carried out at the Success Dam and Reservoir.
    Sec. 126. During the 1-year period beginning on the date of 
enactment of this Act, the Secretary of the Army shall 
implement measures recommended in the efficacy study, or 
provided in interim reports, authorized under section 3061 of 
the Water Resources Development Act of 2007 (121 Stat. 1121), 
with such modifications or emergency measures as the Secretary 
of the Army determines to be appropriate, to prevent aquatic 
nuisance species from bypassing the Chicago Sanitary and Ship 
Canal Dispersal Barrier Project referred to in that section and 
to prevent aquatic nuisance species from dispersing into the 
Great Lakes.

                                TITLE II

                       DEPARTMENT OF THE INTERIOR

                          Central Utah Project

                central utah project completion account

    For carrying out activities authorized by the Central Utah 
Project Completion Act, $40,300,000, to remain available until 
expended, of which $1,500,000 shall be deposited into the Utah 
Reclamation Mitigation and Conservation Account for use by the 
Utah Reclamation Mitigation and Conservation Commission. In 
addition, for necessary expenses incurred in carrying out 
related responsibilities of the Secretary of the Interior, 
$1,704,000, to remain available until expended. For fiscal year 
2010, the Commission may use an amount not to exceed $1,500,000 
for administrative expenses.

                         Bureau of Reclamation

    The following appropriations shall be expended to execute 
authorized functions of the Bureau of Reclamation:

                      water and related resources

                     (including transfers of funds)

    For management, development, and restoration of water and 
related natural resources and for related activities, including 
the operation, maintenance, and rehabilitation of reclamation 
and other facilities, participation in fulfilling related 
Federal responsibilities to Native Americans, and related 
grants to, and cooperative and other agreements with, State and 
local governments, federally recognized Indian tribes, and 
others, $951,158,000, to remain available until expended, of 
which $48,740,000 shall be available for transfer to the Upper 
Colorado River Basin Fund and $17,256,000 shall be available 
for transfer to the Lower Colorado River Basin Development 
Fund; of which such amounts as may be necessary may be advanced 
to the Colorado River Dam Fund; of which not more than $500,000 
is for high priority projects which shall be carried out by the 
Youth Conservation Corps, as authorized by 16 U.S.C. 1706: 
Provided, That such transfers may be increased or decreased 
within the overall appropriation under this heading: Provided 
further, That of the total appropriated, the amount for program 
activities that can be financed by the Reclamation Fund or the 
Bureau of Reclamation special fee account established by 16 
U.S.C. 460l-6a(i) shall be derived from that Fund or account: 
Provided further, That funds contributed under 43 U.S.C. 395 
are available until expended for the purposes for which 
contributed: Provided further, That funds advanced under 43 
U.S.C. 397a shall be credited to this account and are available 
until expended for the same purposes as the sums appropriated 
under this heading: Provided further, That $4,000,000 of the 
funds appropriated under this heading shall be deposited in the 
San Gabriel Basin Restoration Fund established by section 110 
of title I of appendix D of Public Law 106-554: Provided 
further, That $3,500,000 of the funds appropriated under this 
heading shall be available for the ``Power Program Services'' 
to implement the Bureau of Reclamation's hydropower facilities 
installations identified under section 1834 of the Energy 
Policy Act of 2005: Provided further, That the funds provided 
herein for the St. Mary Storage Unit facilities, Milk River 
Project, Montana, shall be used on a nonreimbursible basis: 
Provided further, That funds available for expenditure for the 
Departmental Irrigation Drainage Program may be expended by the 
Bureau of Reclamation for site remediation on a nonreimbursable 
basis.

                central valley project restoration fund

    For carrying out the programs, projects, plans, habitat 
restoration, improvement, and acquisition provisions of the 
Central Valley Project Improvement Act, $35,358,000, to be 
derived from such sums as may be collected in the Central 
Valley Project Restoration Fund pursuant to sections 3407(d), 
3404(c)(3), and 3405(f) of Public Law 102-575, to remain 
available until expended: Provided, That the Bureau of 
Reclamation is directed to assess and collect the full amount 
of the additional mitigation and restoration payments 
authorized by section 3407(d) of Public Law 102-575: Provided 
further, That none of the funds made available under this 
heading may be used for the acquisition or leasing of water for 
in-stream purposes if the water is already committed to in-
stream purposes by a court adopted decree or order.

                    california bay-delta restoration

                     (including transfers of funds)

    For carrying out activities authorized by the Water Supply, 
Reliability, and Environmental Improvement Act, consistent with 
plans to be approved by the Secretary of the Interior, 
$40,000,000, to remain available until expended, of which such 
amounts as may be necessary to carry out such activities may be 
transferred to appropriate accounts of other participating 
Federal agencies to carry out authorized purposes: Provided, 
That funds appropriated herein may be used for the Federal 
share of the costs of CALFED Program management: Provided 
further, That the use of any funds provided to the California 
Bay-Delta Authority for program-wide management and oversight 
activities shall be subject to the approval of the Secretary of 
the Interior: Provided further, That CALFED implementation 
shall be carried out in a balanced manner with clear 
performance measures demonstrating concurrent progress in 
achieving the goals and objectives of the Program.

                       policy and administration

    For necessary expenses of policy, administration, and 
related functions in the Office of the Commissioner, the Denver 
office, and offices in the five regions of the Bureau of 
Reclamation, to remain available until expended, $61,200,000, 
to be derived from the Reclamation Fund and be nonreimbursable 
as provided in 43 U.S.C. 377: Provided, That no part of any 
other appropriation in this Act shall be available for 
activities or functions budgeted as policy and administration 
expenses.

                        administrative provision

    Appropriations for the Bureau of Reclamation shall be 
available for purchase of not to exceed seven passenger motor 
vehicles, which are for replacement only.

             General Provisions--Department of the Interior

    Sec. 201. (a) None of the funds provided in title II of 
this Act for Water and Related Resources, or provided by 
previous appropriations Acts to the agencies or entities funded 
in title II of this Act for Water and Related Resources that 
remain available for obligation or expenditure in fiscal year 
2010, shall be available for obligation or expenditure through 
a reprogramming of funds that--
            (1) initiates or creates a new program, project, or 
        activity;
            (2) eliminates a program, project, or activity;
            (3) increases funds for any program, project, or 
        activity for which funds have been denied or restricted 
        by this Act, unless prior approval is received from the 
        Committees on Appropriations of the House of 
        Representatives and the Senate;
            (4) restarts or resumes any program, project or 
        activity for which funds are not provided in this Act, 
        unless prior approval is received from the Committees 
        on Appropriations of the House of Representatives and 
        the Senate;
            (5) transfers funds in excess of the following 
        limits, unless prior approval is received from the 
        Committees on Appropriations of the House of 
        Representatives and the Senate:
                    (A) 15 percent for any program, project or 
                activity for which $2,000,000 or more is 
                available at the beginning of the fiscal year; 
                or
                    (B) $300,000 for any program, project or 
                activity for which less than $2,000,000 is 
                available at the beginning of the fiscal year;
            (6) transfers more than $500,000 from either the 
        Facilities Operation, Maintenance, and Rehabilitation 
        category or the Resources Management and Development 
        category to any program, project, or activity in the 
        other category, unless prior approval is received from 
        the Committees on Appropriations of the House of 
        Representatives and the Senate; or
            (7) transfers, where necessary to discharge legal 
        obligations of the Bureau of Reclamation, more than 
        $5,000,000 to provide adequate funds for settled 
        contractor claims, increased contractor earnings due to 
        accelerated rates of operations, and real estate 
        deficiency judgments, unless prior approval is received 
        from the Committees on Appropriations of the House of 
        Representatives and the Senate.
    (b) Subsection (a)(5) shall not apply to any transfer of 
funds within the Facilities Operation, Maintenance, and 
Rehabilitation category.
    (c) For purposes of this section, the term ``transfer'' 
means any movement of funds into or out of a program, project, 
or activity.
    (d) The Bureau of Reclamation shall submit reports on a 
quarterly basis to the Committees on Appropriations of the 
House of Representatives and the Senate detailing all the funds 
reprogrammed between programs, projects, activities, or 
categories of funding. The first quarterly report shall be 
submitted not later than 60 days after the date of enactment of 
this Act.
    Sec. 202. (a) None of the funds appropriated or otherwise 
made available by this Act may be used to determine the final 
point of discharge for the interceptor drain for the San Luis 
Unit until development by the Secretary of the Interior and the 
State of California of a plan, which shall conform to the water 
quality standards of the State of California as approved by the 
Administrator of the Environmental Protection Agency, to 
minimize any detrimental effect of the San Luis drainage 
waters.
    (b) The costs of the Kesterson Reservoir Cleanup Program 
and the costs of the San Joaquin Valley Drainage Program shall 
be classified by the Secretary of the Interior as reimbursable 
or nonreimbursable and collected until fully repaid pursuant to 
the ``Cleanup Program-Alternative Repayment Plan'' and the 
``SJVDP-Alternative Repayment Plan'' described in the report 
entitled ``Repayment Report, Kesterson Reservoir Cleanup 
Program and San Joaquin Valley Drainage Program, February 
1995'', prepared by the Department of the Interior, Bureau of 
Reclamation. Any future obligations of funds by the United 
States relating to, or providing for, drainage service or 
drainage studies for the San Luis Unit shall be fully 
reimbursable by San Luis Unit beneficiaries of such service or 
studies pursuant to Federal reclamation law.
    Sec. 203.  None of the funds appropriated or otherwise made 
available by this or any other Act may be used to pay the 
salaries and expenses of personnel to purchase or lease water 
in the Middle Rio Grande or the Carlsbad Projects in New Mexico 
unless said purchase or lease is in compliance with the 
purchase requirements of section 202 of Public Law 106-60.
    Sec. 204.  Funds under this title for Drought Emergency 
Assistance shall be made available primarily for leasing of 
water for specified drought related purposes from willing 
lessors, in compliance with existing State laws and 
administered under State water priority allocation.
    Sec. 205.  Section 9 of the Fort Peck Reservation Rural 
Water System Act of 2000 (Public Law 106-382; 114 Stat. 1457) 
is amended by striking ``over a period of 10 fiscal years'' 
each place it appears in subsections (a)(1) and (b) and 
inserting ``through fiscal year 2015''.
    Sec. 206.  Section 208(a) of the Energy and Water 
Development Appropriations Act, 2006 (Public Law 109-103; 119 
Stat. 2268), is amended--
            (1) in paragraph (1)--
                    (A) by redesignating clauses (i) through 
                (iv) of subparagraph (B) as subclauses (I) 
                through (IV), respectively, and indenting the 
                subclauses appropriately;
                    (B) by redesignating subparagraphs (A) and 
                (B) as clauses (i) and (ii), respectively, and 
                indenting the clauses appropriately;
                    (C) by striking ``(a)(1) Using'' and 
                inserting the following:
    ``(a) Action by Secretary.--
            ``(1) Provision of funds.--
                    ``(A) In general.--Using'';
                    (D) in subparagraph (A) (as so 
                redesignated)--
                            (i) in the matter preceding clause 
                        (i) (as so redesignated), by inserting 
                        ``or the National Fish and Wildlife 
                        Foundation'' after ``University of 
                        Nevada'';
                            (ii) in clause (ii)(IV) (as so 
                        redesignated), by striking the period 
                        at the end and inserting ``; and''; and
                            (iii) by adding at the end the 
                        following:
                            ``(iii) to design and implement 
                        conservation and stewardship measures 
                        to address impacts from activities 
                        carried out--
                                    ``(I) under clause (i); and
                                    ``(II) in conjunction with 
                                willing landowners.''; and
                    (E) by adding at the end the following:
                    ``(B) National fish and wildlife 
                foundation.--
                            ``(i) Date of provision.--The 
                        Secretary shall provide funds to the 
                        National Fish and Wildlife Foundation 
                        pursuant to subparagraph (A) in an 
                        advance payment of the available 
                        amount--
                                    ``(I) on the date of 
                                enactment of the Energy and 
                                Water Development and Related 
                                Agencies Appropriations Act, 
                                2010; or
                                    ``(II) as soon as 
                                practicable after that date of 
                                enactment.
                            ``(ii) Requirements.--
                                    ``(I) In general.--Except 
                                as provided in subclause (II), 
                                the funds provided under clause 
                                (i) shall be subject to the 
                                National Fish and Wildlife 
                                Foundation Establishment Act 
                                (16 U.S.C. 3701 et seq.), in 
                                accordance with section 
                                10(b)(1) of that Act (16 U.S.C. 
                                3709(b)(1)).
                                    ``(II) Exceptions.--
                                Sections 4(e) and 10(b)(2) of 
                                the National Fish and Wildlife 
                                Foundation Establishment Act 
                                (16 U.S.C. 3703(e), 
                                3709(b)(2)), and the provision 
                                of subsection (c)(2) of section 
                                4 of that Act (16 U.S.C. 3703) 
                                relating to subsection (e) of 
                                that section, shall not apply 
                                to the funds provided under 
                                clause (i).''; and
            (2) in paragraph (2)--
                    (A) in the matter preceding subparagraph 
                (A), by striking ``paragraph (1)(A)'' and all 
                that follows through ``beneficial to--'' and 
                inserting ``paragraph (1)(A)(i), the University 
                of Nevada or the National Fish and Wildlife 
                Foundation shall make acquisitions that the 
                University or the Foundation determines to be 
                the most beneficial to--''; and
                    (B) in subparagraph (A), by striking 
                ``paragraph (1)(B)'' and inserting ``paragraph 
                (1)(A)(ii)''.
    Sec. 207.  Section 2507(b) of the Farm Security and Rural 
Investment Act of 2002 (43 U.S.C. 2211 note; Public Law 107-
171) is amended--
            (1) in paragraph (1), by striking ``or'' at the 
        end;
            (2) in paragraph (2), by striking the period at the 
        end and inserting ``; and''; and
            (3) by adding at the end the following:
            ``(3) for efforts consistent with researching, 
        supporting, and conserving fish, wildlife, plant, and 
        habitat resources in the Walker River Basin.''.
    Sec. 208. (a) Of the amounts made available under section 
2507 of the Farm Security and Rural Investment Act of 2002 (43 
U.S.C. 2211 note; Public Law 107-171), the Secretary of the 
Interior, acting through the Commissioner of Reclamation, 
shall--
            (1) provide, subject to subsection (b), $66,200,000 
        to establish the Walker Basin Restoration Program for 
        the primary purpose of restoring and maintaining Walker 
        Lake, a natural desert terminal lake in the State of 
        Nevada, consistent with protection of the ecological 
        health of the Walker River and the riparian and 
        watershed resources of the West, East, and Main Walker 
        Rivers; and
            (2) allocate--
                    (A) acting through a nonprofit conservation 
                organization that is acting in consultation 
                with the Truckee Meadows Water Authority, 
                $2,000,000, to remain available until expended, 
                for--
                            (i) the acquisition of land 
                        surrounding Independence Lake; and
                            (ii) protection of the native 
                        fishery and water quality of 
                        Independence Lake, as determined by the 
                        nonprofit conservation organization;
                    (B) $5,000,000 to provide grants of equal 
                amounts to the State of Nevada, the State of 
                California, the Truckee Meadows Water 
                Authority, the Pyramid Lake Paiute Tribe, and 
                the Federal Watermaster of the Truckee River to 
                implement the Truckee-Carson-Pyramid Lake Water 
                Rights Settlement Act (Public Law 101-618; 104 
                Stat. 3294);
                    (C) $1,500,000, to be divided equally by 
                the city of Fernley, Nevada, and the Pyramid 
                Lake Paiute Tribe, for joint planning and 
                development activities for water, wastewater, 
                and sewer facilities;
                    (D) $1,000,000 to the United States 
                Geological Survey to design and implement, in 
                consultation and cooperation with other Federal 
                departments and agencies, State and tribal 
                governments, and other water management and 
                conservation organizations, a water monitoring 
                program for the Walker River Basin; and
                    (E) $45,000,000 to implement the 1996 
                Truckee River Water Quality Settlement 
                Agreement by acquiring water rights for the 
                benefit of the Truckee River and Pyramid Lake.
    (b)(1) The amount made available under subsection (a)(1) 
shall be--
            (A) used, consistent with the primary purpose set 
        forth in subsection (a)(1), to support efforts to 
        preserve Walker Lake while protecting agricultural, 
        environmental, and habitat interests in the Walker 
        River Basin; and
            (B) allocated as follows:
                    (i) $25,000,000 to the Walker River 
                Irrigation District, acting in accordance with 
                an agreement between that District and the 
                National Fish and Wildlife Foundation--
                            (I) to administer and manage a 3-
                        year water leasing demonstration 
                        program in the Walker River Basin to 
                        increase Walker Lake inflows; and
                            (II) for use in obtaining 
                        information regarding the 
                        establishment, budget, and scope of a 
                        longer-term leasing program.
                    (ii) $25,000,000 to advance the acquisition 
                of water and related interests from willing 
                sellers authorized by section 208(a)(1)(A)(i) 
                of the Energy and Water Development 
                Appropriations Act, 2006 (Public Law 109-103; 
                119 Stat. 2268).
                    (iii) $1,000,000 for activities relating to 
                the exercise of acquired option agreements and 
                implementation of the water leasing 
                demonstration program, including but not 
                limited to the pursuit of change applications, 
                approvals, and agreements pertaining to the 
                exercise of water rights and leases acquired 
                under the program.
                    (iv) $10,000,000 for associated 
                conservation and stewardship activities, 
                including water conservation and management, 
                watershed planning, land stewardship, habitat 
                restoration, and the establishment of a local, 
                nonprofit entity to hold and exercise water 
                rights acquired by, and to achieve the purposes 
                of, the Walker Basin Restoration Program.
                    (v) $5,000,000 to the University of Nevada, 
                Reno, and the Desert Research Institute--
                            (I) for additional research to 
                        supplement the water rights research 
                        conducted under section 
                        208(a)(1)(A)(ii) of the Energy and 
                        Water Development Appropriations Act, 
                        2006 (Public Law 109-103; 119 Stat. 
                        2268);
                            (II) to conduct an annual 
                        evaluation of the results of the 
                        activities carried out under clauses 
                        (i) and (ii); and
                            (III) to support and provide 
                        information to the programs described 
                        in this subparagraph and related 
                        acquisition and stewardship initiatives 
                        to preserve Walker Lake and protect 
                        agricultural, environmental, and 
                        habitat interests in the Walker River 
                        Basin.
                    (vi) $200,000 to support alternative crops 
                and alternative agricultural cooperatives 
                programs in Lyon and Mineral Counties, Nevada, 
                that promote water conservation in the Walker 
                River Basin.
    (2)(A) The amount made available under subsection (a)(1) 
shall be provided to the National Fish and Wildlife 
Foundation--
            (i) in an advance payment of the entire amount--
                    (I) on the date of enactment of this Act; 
                or
                    (II) as soon as practicable after that date 
                of enactment; and
            (ii) except as provided in subparagraph (B), 
        subject to the National Fish and Wildlife Foundation 
        Establishment Act (16 U.S.C. 3701 et seq.), in 
        accordance with section 10(b)(1) of that Act (16 U.S.C. 
        3709(b)(1)).
    (B) Sections 4(e) and 10(b)(2) of the National Fish and 
Wildlife Foundation Establishment Act (16 U.S.C. 3703(e), 
3709(b)(2)), and the provision of subsection (c)(2) of section 
4 of that Act (16 U.S.C. 3703) relating to subsection (e) of 
that section, shall not apply to the amount made available 
under subsection (a)(1).
    Sec. 209.  Notwithstanding the provisions of section 11(c) 
of Public Law 89-108, as amended by section 9 of Public Law 99-
294, the Commissioner is directed to modify the April 9, 2002, 
Grant Agreement Between Bureau of Reclamation and North Dakota 
Natural Resources Trust to provide funding for the Trust to 
continue its investment program/Agreement No. 02FG601633 to 
authorize the North Dakota Natural Resources Trust Board of 
Directors to expend all or any portion of the funding 
allocation received pursuant to section 11(a)(2)(B) of the 
Dakota Water Resources Act of 2000 for the purpose of 
operations of the Natural Resource Trust whether such amounts 
are principal or received as investment income: Provided, That 
operational expenses that may be funded from the principal 
allocation shall not exceed 105 percent of the previous fiscal 
year's operating costs: Provided further, That the Commissioner 
of Reclamation is authorized to include in such modified 
agreement with the Trust authorized under this section 
appropriate provisions regarding the repayment of any funds 
that constitute principal from the Trust Funds.
    Sec. 210.  Title I of Public Law 108-361 is amended by 
striking ``2010'' wherever it appears and inserting ``2014'' in 
lieu thereof.
    Sec. 211. (a) Section 3405(a)(1)(M) of Public Law 102-575 
(106 Stat. 4709) is amended by striking ``countries'' and 
inserting ``counties''.
    (b) A transfer of water between a Friant Division 
contractor and a south-of-Delta CVP agricultural water service 
contractor, approved during a two-year period beginning on the 
date of enactment of this Act shall, be deemed to meet the 
conditions set forth in subparagraphs (A) and (I) of section 
3405(a)(1) of Public Law 102-575 (106 Stat. 4709) if the 
transfer under this clause--
            (1) does not interfere with the San Joaquin River 
        Restoration Settlement Act (part I of subtitle A of 
        title X of Public Law 111-11; 123 Stat. 1349) 
        (including the priorities described in section 
        10004(a)(4)(B) of that Act relating to implementation 
        of paragraph 16 of the Settlement), and the Settlement 
        (as defined in section 10003 of that Act); and
            (2) is completed by September 30, 2012.
    (c) As soon as practicable after the date of enactment of 
this Act, the Secretary of the Interior, acting through the 
Director of the United States Fish and Wildlife Service, shall 
revise, finalize, and implement the applicable draft recovery 
plan for the Giant Garter Snake (Thamnophis gigas).

                               TITLE III

                          DEPARTMENT OF ENERGY

                            ENERGY PROGRAMS

                 Energy Efficiency and Renewable Energy

    For Department of Energy expenses including the purchase, 
construction, and acquisition of plant and capital equipment, 
and other expenses necessary for energy efficiency and 
renewable energy activities in carrying out the purposes of the 
Department of Energy Organization Act (42 U.S.C. 7101 et seq.), 
including the acquisition or condemnation of any real property 
or any facility or for plant or facility acquisition, 
construction, or expansion, $2,242,500,000, to remain available 
until expended: Provided, That funds provided under this 
heading in this and prior appropriation Acts are available for 
on-site and off-site improvements for the Ingress/Egress and 
Traffic Capacity Upgrades project at the National Renewable 
Energy Laboratory: Provided further, That, of the $80,000,000 
provided under the wind energy subaccount under Energy 
Efficiency and Renewable Energy, up to $8,000,000 may be 
competitively awarded to universities for turbine and equipment 
purchases for the purposes of studying turbine to turbine wake 
interaction, wind farm interaction, and wind energy 
efficiencies, provided that such equipment shall not be used 
for merchant power production: Provided further, That, of the 
amount appropriated in this paragraph, $292,135,000 shall be 
used for the projects specified in the table that appears under 
the heading ``Congressionally Directed Energy Efficiency and 
Renewable Energy Projects'' in the joint explanatory statement 
accompanying the conference report on this Act.

              Electricity Delivery and Energy Reliability

    For Department of Energy expenses including the purchase, 
construction, and acquisition of plant and capital equipment, 
and other expenses necessary for electricity delivery and 
energy reliability activities in carrying out the purposes of 
the Department of Energy Organization Act (42 U.S.C. 7101 et 
seq.), including the acquisition or condemnation of any real 
property or any facility or for plant or facility acquisition, 
construction, or expansion, $171,982,000, to remain available 
until expended: Provided, That, within the funding available 
funding the Secretary shall establish an independent national 
energy sector cyber security organization to institute 
research, development and deployment priorities, including 
policies and protocol to ensure the effective deployment of 
tested and validated technology and software controls to 
protect the bulk power electric grid and integration of smart 
grid technology to enhance the security of the electricity 
grid: Provided further, That within 60 days of enactment, the 
Secretary shall invite applications from qualified entities for 
the purpose of forming and governing a national energy sector 
cyber organization that have the knowledge and capacity to 
focus cyber security research and development and to identify 
and disseminate best practices; organize the collection, 
analysis and dissemination of infrastructure vulnerabilities 
and threats; work cooperatively with the Department of Energy 
and other Federal agencies to identify areas where Federal 
agencies with jurisdiction may best support efforts to enhance 
security of the bulk power electric grid: Provided further, 
That, of the amount appropriated in this paragraph, $13,075,000 
shall be used for projects specified in the table that appears 
under the heading ``Congressionally Directed Electricity 
Delivery and Energy Reliability Projects'' in the joint 
explanatory statement accompanying the conference report on 
this Act.

                             Nuclear Energy

    For Department of Energy expenses including the purchase, 
construction, and acquisition of plant and capital equipment, 
and other expenses necessary for nuclear energy activities in 
carrying out the purposes of the Department of Energy 
Organization Act (42 U.S.C. 7101 et seq.), including the 
acquisition or condemnation of any real property or any 
facility or for plant or facility acquisition, construction, or 
expansion, and the purchase of not more than 36 passenger motor 
vehicles, including one ambulance, all for replacement only, 
$786,637,000, to remain available until expended: Provided, 
That, of the amount appropriated in this paragraph, $2,500,000 
shall be used for projects specified in the table that appears 
under the heading ``Congressionally Directed Nuclear Energy 
Projects'' in the joint explanatory statement accompanying the 
conference report on this Act.

                 Fossil Energy Research and Development

    For necessary expenses in carrying out fossil energy 
research and development activities, under the authority of the 
Department of Energy Organization Act (Public Law 95-91), 
including the acquisition of interest, including defeasible and 
equitable interests in any real property or any facility or for 
plant or facility acquisition or expansion, and for conducting 
inquiries, technological investigations and research concerning 
the extraction, processing, use, and disposal of mineral 
substances without objectionable social and environmental costs 
(30 U.S.C. 3, 1602, and 1603), $672,383,000, to remain 
available until expended: Provided, That for all programs 
funded under Fossil Energy appropriations in this Act or any 
other Act, the Secretary may vest fee title or other property 
interests acquired under projects in any entity, including the 
United States: Provided further, That, of the amount 
appropriated in this paragraph, $36,850,000 shall be used for 
projects specified in the table that appears under the heading 
``Congressionally Directed Fossil Energy Projects'' in the 
joint explanatory statement accompanying the conference report 
on this Act.

                 Naval Petroleum and Oil Shale Reserves

    For expenses necessary to carry out naval petroleum and oil 
shale reserve activities, including the hire of passenger motor 
vehicles, $23,627,000, to remain available until expended: 
Provided, That, notwithstanding any other provision of law, 
unobligated funds remaining from prior years shall be available 
for all naval petroleum and oil shale reserve activities.

                      Strategic Petroleum Reserve

    For necessary expenses for Strategic Petroleum Reserve 
facility development and operations and program management 
activities pursuant to the Energy Policy and Conservation Act 
of 1975, as amended (42 U.S.C. 6201 et seq.), $243,823,000, to 
remain available until expended.

                   Northeast Home Heating Oil Reserve

    For necessary expenses for Northeast Home Heating Oil 
Reserve storage, operation, and management activities pursuant 
to the Energy Policy and Conservation Act, $11,300,000, to 
remain available until expended.

                   Energy Information Administration

    For necessary expenses in carrying out the activities of 
the Energy Information Administration, $110,595,000, to remain 
available until expended.

                   Non-Defense Environmental Cleanup

    For Department of Energy expenses, including the purchase, 
construction, and acquisition of plant and capital equipment 
and other expenses necessary for non-defense environmental 
cleanup activities in carrying out the purposes of the 
Department of Energy Organization Act (42 U.S.C. 7101 et seq.), 
including the acquisition or condemnation of any real property 
or any facility or for plant or facility acquisition, 
construction, or expansion, $244,673,000, to remain available 
until expended.

      Uranium Enrichment Decontamination and Decommissioning Fund

    For necessary expenses in carrying out uranium enrichment 
facility decontamination and decommissioning, remedial actions, 
and other activities of title II of the Atomic Energy Act of 
1954, and title X, subtitle A, of the Energy Policy Act of 
1992, $573,850,000, to be derived from the Uranium Enrichment 
Decontamination and Decommissioning Fund, to remain available 
until expended.

                                Science

                     (including transfer of funds)

    For Department of Energy expenses including the purchase, 
construction, and acquisition of plant and capital equipment, 
and other expenses necessary for science activities in carrying 
out the purposes of the Department of Energy Organization Act 
(42 U.S.C. 7101 et seq.), including the acquisition or 
condemnation of any real property or facility or for plant or 
facility acquisition, construction, or expansion, and purchase 
of not more than 50 passenger motor vehicles for replacement 
only, including one law enforcement vehicle, two ambulances, 
and three buses, $4,903,710,000, to remain available until 
expended: Provided, That $15,000,000 appropriated under this 
heading under prior appropriation Acts for the Advanced 
Research Projects Agency--Energy is hereby transferred to the 
``Advanced Research Projects Agency--Energy'' account: Provided 
further, That, of the amount appropriated in this paragraph, 
$76,890,000 shall be used for the projects specified in the 
table that appears under the heading ``Congressionally Directed 
Science Projects'' in the joint explanatory statement 
accompanying the conference report on this Act.

                         Nuclear Waste Disposal

    For nuclear waste disposal activities to carry out the 
purposes of the Nuclear Waste Policy Act of 1982, Public Law 
97-425, as amended (the ``NWPA''), $98,400,000, to remain 
available until expended, and to be derived from the Nuclear 
Waste Fund: Provided, That of the funds made available in this 
Act for nuclear waste disposal and defense nuclear waste 
disposal activities, 2.54 percent shall be provided to the 
Office of the Attorney General of the State of Nevada solely 
for expenditures, other than salaries and expenses of State 
employees, to conduct scientific oversight responsibilities and 
participate in licensing activities pursuant to the NWPA: 
Provided further, That notwithstanding the lack of a written 
agreement with the State of Nevada under section 117(c) of the 
NWPA, 0.51 percent shall be provided to Nye County, Nevada, for 
on-site oversight activities under section 117(d) of the NWPA: 
Provided further, That of the funds made available in this Act 
for nuclear waste disposal and defense nuclear waste disposal 
activities, 4.57 percent shall be provided to affected units of 
local government, as defined in the NWPA, to conduct 
appropriate activities and participate in licensing activities 
under Section 116(c) of the NWPA: Provided further, That of the 
amounts provided to affected units of local government, 7.5 
percent of the funds provided for the affected units of local 
government shall be made available to affected units of local 
government in California with the balance made available to 
affected units of local government in Nevada for distribution 
as determined by the Nevada affected units of local government: 
Provided further, That of the funds made available in this Act 
for nuclear waste disposal and defense nuclear waste disposal 
activities, 0.25 percent shall be provided to the affected 
federally-recognized Indian tribes, as defined in the NWPA, 
solely for expenditures, other than salaries and expenses of 
tribal employees, to conduct appropriate activities and 
participate in licensing activities under section 118(b) of the 
NWPA: Provided further, That notwithstanding the provisions of 
chapters 65 and 75 of title 31, United States Code, the 
Department shall have no monitoring, auditing or other 
oversight rights or responsibilities over amounts provided to 
affected units of local government: Provided further, That the 
funds for the State of Nevada shall be made available solely to 
the Office of the Attorney General by direct payment and to 
units of local government by direct payment: Provided further, 
That 4.57 percent of the funds made available in this Act for 
nuclear waste disposal and defense nuclear waste disposal 
activities shall be provided to Nye County, Nevada, as payment 
equal to taxes under section 116(c)(3) of the NWPA: Provided 
further, That within 90 days of the completion of each Federal 
fiscal year, the Office of the Attorney General of the State of 
Nevada, each affected federally-recognized Indian tribe, and 
each of the affected units of local government shall provide 
certification to the Department of Energy that all funds 
expended from such payments have been expended for activities 
authorized by the NWPA and this Act: Provided further, That 
failure to provide such certification shall cause such entity 
to be prohibited from any further funding provided for similar 
activities: Provided further, That none of the funds herein 
appropriated may be: (1) used directly or indirectly to 
influence legislative action, except for normal and recognized 
executive-legislative communications, on any matter pending 
before Congress or a State legislature or for lobbying activity 
as provided in 18 U.S.C. 1913; (2) used for litigation 
expenses; or (3) used to support multi-State efforts or other 
coalition building activities inconsistent with the 
restrictions contained in this Act: Provided further, That all 
proceeds and recoveries realized by the Secretary in carrying 
out activities authorized by the NWPA, including but not 
limited to, any proceeds from the sale of assets, shall be 
available without further appropriation and shall remain 
available until expended: Provided further, That of the funds 
made available in this Act for Nuclear Waste Disposal, 
$5,000,000 shall be provided to create a Blue Ribbon Commission 
to consider all alternatives for nuclear waste disposal: 
Provided further, That no funds provided in this Act or any 
previous Act may be used to pursue repayment or collection of 
funds provided in any fiscal year to affected units of local 
government for oversight activities that had been previously 
approved by the Department of Energy, or to withhold payment of 
any such funds.

         Title 17 Innovative Technology Loan Guarantee Program

    Such sums as are derived from amounts received from 
borrowers pursuant to section 1702(b)(2) of the Energy Policy 
Act of 2005 under this heading in prior Acts, shall be 
collected in accordance with section 502(7) of the 
Congressional Budget Act of 1974: Provided,, That for necessary 
administrative expenses to carry out this Loan Guarantee 
program, $43,000,000 is appropriated, to remain available until 
expended: Provided further, That $43,000,000 of the fees 
collected pursuant to section 1702(h) of the Energy Policy Act 
of 2005 shall be credited as offsetting collections to this 
account to cover administrative expenses and shall remain 
available until expended, so as to result in a final fiscal 
year 2010 appropriations from the general fund estimated at not 
more than $0: Provided further, That fees collected under 
section 1702(h) in excess of the amount appropriated for 
administrative expenses shall not be available until 
appropriated.

        Advanced Technology Vehicles Manufacturing Loan Program

    For administrative expenses in carrying out the Advanced 
Technology Vehicles Manufacturing Loan Program, $20,000,000, to 
remain available until expended.

                      Departmental Administration

    For salaries and expenses of the Department of Energy 
necessary for departmental administration in carrying out the 
purposes of the Department of Energy Organization Act (42 
U.S.C. 7101 et seq.), including the hire of passenger motor 
vehicles and official reception and representation expenses not 
to exceed $30,000, $288,684,000, to remain available until 
expended, plus such additional amounts as necessary to cover 
increases in the estimated amount of cost of work for others 
notwithstanding the provisions of the Anti-Deficiency Act (31 
U.S.C. 1511 et seq.): Provided, That such increases in cost of 
work are offset by revenue increases of the same or greater 
amount, to remain available until expended: Provided further, 
That moneys received by the Department for miscellaneous 
revenues estimated to total $119,740,000 in fiscal year 2010 
may be retained and used for operating expenses within this 
account, and may remain available until expended, as authorized 
by section 201 of Public Law 95-238, notwithstanding the 
provisions of 31 U.S.C. 3302: Provided further, That the sum 
herein appropriated shall be reduced by the amount of 
miscellaneous revenues received during 2010, and any related 
appropriated receipt account balances remaining from prior 
years' miscellaneous revenues, so as to result in a final 
fiscal year 2010 appropriation from the general fund estimated 
at not more than $168,944,000.

                    Office of the Inspector General

    For necessary expenses of the Office of the Inspector 
General in carrying out the provisions of the Inspector General 
Act of 1978, as amended, $51,927,000, to remain available until 
expended.

                    ATOMIC ENERGY DEFENSE ACTIVITIES

                NATIONAL NUCLEAR SECURITY ADMINISTRATION

                           Weapons Activities

    For Department of Energy expenses, including the purchase, 
construction, and acquisition of plant and capital equipment 
and other incidental expenses necessary for atomic energy 
defense weapons activities in carrying out the purposes of the 
Department of Energy Organization Act (42 U.S.C. 7101 et seq.), 
including the acquisition or condemnation of any real property 
or any facility or for plant or facility acquisition, 
construction, or expansion, the purchase of not to exceed one 
ambulance; $6,384,431,000, to remain available until expended: 
Provided, That $357,800,000 is provided to Stockpile Systems 
activities including $91,956,000 for the B61 Stockpile Systems 
activities: Provided further, That upon completion of the 
Nuclear Posture Review and confirmation of the requirement for 
the B61-12, the NNSA is authorized to reallocate an additional 
$15,000,000 within the Stockpile Systems activities to support 
the continuation of the B61-12 non-nuclear upgrade study, with 
notification to cognizant congressional committees within 15 
days of the implementation of this action: Provided further, 
That no funds may be obligated or expended for B61-12 nuclear 
components without prior approval by the Appropriations 
Committees of the House and Senate: Provided further, That, of 
the amount appropriated in this paragraph, $3,000,000 shall be 
used for the projects specified under the heading 
``Congressionally Directed Weapons Activities Projects'' in the 
joint explanatory statement accompanying the conference report 
on this Act.

                    Defense Nuclear Nonproliferation

    For Department of Energy expenses, including the purchase, 
construction, and acquisition of plant and capital equipment 
and other incidental expenses necessary for defense nuclear 
nonproliferation activities, in carrying out the purposes of 
the Department of Energy Organization Act (42 U.S.C. 7101 et 
seq.), including the acquisition or condemnation of any real 
property or any facility or for plant or facility acquisition, 
construction, or expansion, and the purchase of not to exceed 
one passenger motor vehicle for replacement only, 
$2,136,709,000, to remain available until expended: Provided, 
That, of the amount appropriated in this paragraph, $250,000 
shall be used for the projects specified under the heading 
``Congressionally Directed Defense Nuclear Nonproliferation 
Projects'' in the joint explanatory statement accompanying the 
conference report on this Act.

                             Naval Reactors

    For Department of Energy expenses necessary for naval 
reactors activities to carry out the Department of Energy 
Organization Act (42 U.S.C. 7101 et seq.), including the 
acquisition (by purchase, condemnation, construction, or 
otherwise) of real property, plant, and capital equipment, 
facilities, and facility expansion, $945,133,000, to remain 
available until expended.

                      Office of the Administrator

                     (including transfer of funds)

    For necessary expenses of the Office of the Administrator 
in the National Nuclear Security Administration, including 
official reception and representation expenses not to exceed 
$12,000, $420,754,000, to remain available until expended: 
Provided, That $10,000,000 previously appropriated for cleanup 
efforts at Argonne National Lab shall be transferred to ``Non-
Defense Environmental Cleanup'': Provided further, That, of the 
amount appropriated in this paragraph, $13,000,000 shall be 
used for the projects specified in the table that appears under 
the heading ``Congressionally Directed Office of the 
Administrator (NNSA) Projects'' in the joint explanatory 
statement accompanying the conference report on this Act.

               ENVIRONMENTAL AND OTHER DEFENSE ACTIVITIES

                     Defense Environmental Cleanup

                     (including transfer of funds)

    For Department of Energy expenses, including the purchase, 
construction, and acquisition of plant and capital equipment 
and other expenses necessary for atomic energy defense 
environmental cleanup activities in carrying out the purposes 
of the Department of Energy Organization Act (42 U.S.C. 7101 et 
seq.), including the acquisition or condemnation of any real 
property or any facility or for plant or facility acquisition, 
construction, or expansion, and the purchase of not to exceed 
four ambulances and three passenger motor vehicles for 
replacement only, $5,642,331,000, to remain available until 
expended, of which $463,000,000 shall be transferred to the 
``Uranium Enrichment Decontamination and Decommissioning 
Fund'': Provided, That, of the amount appropriated in this 
paragraph, $4,000,000 shall be used for projects specified in 
the table that appears under the heading ``Congressionally 
Directed Defense Environmental Cleanup Projects'' in the joint 
explanatory statement accompanying the conference report on 
this Act.

                        Other Defense Activities

    For Department of Energy expenses, including the purchase, 
construction, and acquisition of plant and capital equipment 
and other expenses, necessary for atomic energy defense, other 
defense activities, and classified activities, in carrying out 
the purposes of the Department of Energy Organization Act (42 
U.S.C. 7101 et seq.), including the acquisition or condemnation 
of any real property or any facility or for plant or facility 
acquisition, construction, or expansion, and the purchase of 
not to exceed 12 passenger motor vehicles for replacement only, 
$847,468,000, to remain available until expended: Provided, 
That of the amount appropriated in this paragraph, $3,000,000 
shall be used for projects specified in the table that appears 
under the heading ``Congressionally Directed Other Defense 
Activities Projects'' in the joint explanatory statement 
accompanying the conference report on this Act.

                     Defense Nuclear Waste Disposal

    For nuclear waste disposal activities to carry out the 
purposes of Public Law 97-425, as amended, including the 
acquisition of real property or facility construction or 
expansion, $98,400,000, to remain available until expended.

                    POWER MARKETING ADMINISTRATIONS

                  Bonneville Power Administration Fund

    Expenditures from the Bonneville Power Administration Fund, 
established pursuant to Public Law 93-454, are approved for the 
Leaburg Fish Sorter, the Okanogan Basin Locally Adapted 
Steelhead Supplementation Program, and the Crystal Springs 
Hatchery Facilities, and, in addition, for official reception 
and representation expenses in an amount not to exceed $1,500. 
During fiscal year 2010, no new direct loan obligations may be 
made.

      Operation and Maintenance, Southeastern Power Administration

    For necessary expenses of operation and maintenance of 
power transmission facilities and of marketing electric power 
and energy, including transmission wheeling and ancillary 
services pursuant to section 5 of the Flood Control Act of 1944 
(16 U.S.C. 825s), as applied to the southeastern power area, 
$7,638,000, to remain available until expended: Provided, That 
notwithstanding 31 U.S.C. 3302 and section 5 of the Flood 
Control Act of 1944, up to $7,638,000 collected by the 
Southeastern Power Administration from the sale of power and 
related services shall be credited to this account as 
discretionary offsetting collections, to remain available until 
expended for the sole purpose of funding the annual expenses of 
the Southeastern Power Administration: Provided further, That 
the sum herein appropriated for annual expenses shall be 
reduced as collections are received during the fiscal year so 
as to result in a final fiscal year 2010 appropriation 
estimated at not more than $0: Provided further, That, 
notwithstanding 31 U.S.C. 3302, up to $70,806,000 collected by 
the Southeastern Power Administration pursuant to the Flood 
Control Act of 1944 to recover purchase power and wheeling 
expenses shall be credited to this account as offsetting 
collections, to remain available until expended for the sole 
purpose of making purchase power and wheeling expenditures: 
Provided further, That notwithstanding the provisions of 31 
U.S.C. 3302 and section 5 of the Flood Control Act of 1944, all 
funds collected by the Southeastern Power Administration that 
are applicable to the repayment of the annual expenses of this 
account in this and subsequent fiscal years shall be credited 
to this account as discretionary offsetting collections for the 
sole purpose of funding such expenses, with such funds 
remaining available until expended: Provided further, That for 
purposes of this appropriation, annual expenses means 
expenditures that are generally recovered in the same year that 
they are incurred (excluding purchase power and wheeling 
expenses).

      Operation and Maintenance, Southwestern Power Administration

    For necessary expenses of operation and maintenance of 
power transmission facilities and of marketing electric power 
and energy, for construction and acquisition of transmission 
lines, substations and appurtenant facilities, and for 
administrative expenses, including official reception and 
representation expenses in an amount not to exceed $1,500 in 
carrying out section 5 of the Flood Control Act of 1944 (16 
U.S.C. 825s), as applied to the Southwestern Power 
Administration, $44,944,000, to remain available until 
expended: Provided, That notwithstanding 31 U.S.C. 3302 and 
section 5 of the Flood Control Act of 1944 (16 U.S.C. 825s), up 
to $31,868,000 collected by the Southwestern Power 
Administration from the sale of power and related services 
shall be credited to this account as discretionary offsetting 
collections, to remain available until expended, for the sole 
purpose of funding the annual expenses of the Southwestern 
Power Administration: Provided further, That the sum herein 
appropriated for annual expenses shall be reduced as 
collections are received during the fiscal year so as to result 
in a final fiscal year 2010 appropriation estimated at not more 
than $13,076,000: Provided further, That, notwithstanding 31 
U.S.C. 3302, up to $38,000,000 collected by the Southwestern 
Power Administration pursuant to the Flood Control Act of 1944 
to recover purchase power and wheeling expenses shall be 
credited to this account as offsetting collections, to remain 
available until expended for the sole purpose of making 
purchase power and wheeling expenditures: Provided further, 
That notwithstanding 31 U.S.C. 3302 and section 5 of the Flood 
Control Act of 1944, all funds collected by the Southwestern 
Power Administration that are applicable to the repayment of 
the annual expenses of this account in this and subsequent 
fiscal years shall be credited to this account as discretionary 
offsetting collections for the sole purpose of funding such 
expenses, with such funds remaining available until expended: 
Provided further, That for purposes of this appropriation, 
annual expenses means expenditures that are generally recovered 
in the same year that they are incurred (excluding purchase 
power and wheeling expenses).

 Construction, Rehabilitation, Operation and Maintenance, Western Area 
                          Power Administration

    For carrying out the functions authorized by title III, 
section 302(a)(1)(E) of the Act of August 4, 1977 (42 U.S.C. 
7152), and other related activities including conservation and 
renewable resources programs as authorized, including official 
reception and representation expenses in an amount not to 
exceed $1,500; $256,711,000 to remain available until expended, 
of which $245,216,000 shall be derived from the Department of 
the Interior Reclamation Fund: Provided, That notwithstanding 
31 U.S.C. 3302, section 5 of the Flood Control Act of 1944 (16 
U.S.C. 825s), and section 1 of the Interior Department 
Appropriation Act, 1939 (43 U.S.C. 392a), up to $147,530,000 
collected by the Western Area Power Administration from the 
sale of power and related services shall be credited to this 
account as discretionary offsetting collections, to remain 
available until expended, for the sole purpose of funding the 
annual expenses of the Western Area Power Administration: 
Provided further, That the sum herein appropriated for annual 
expenses shall be reduced as collections are received during 
the fiscal year so as to result in a final fiscal year 2010 
appropriation estimated at not more than $109,181,000, of which 
$97,686,000 is derived from the Reclamation Fund: Provided 
further, That of the amount herein appropriated, $7,584,000 is 
for deposit into the Utah Reclamation Mitigation and 
Conservation Account pursuant to title IV of the Reclamation 
Projects Authorization and Adjustment Act of 1992: Provided 
further, That notwithstanding 31 U.S.C. 3302, up to 
$349,807,000 collected by the Western Area Power Administration 
pursuant to the Flood Control Act of 1944 and the Reclamation 
Project Act of 1939 to recover purchase power and wheeling 
expenses shall be credited to this account as offsetting 
collections, to remain available until expended for the sole 
purpose of making purchase power and wheeling expenditures: 
Provided further, That of the amount herein appropriated, up to 
$18,612,000 is provided on a nonreimbursable basis for 
environmental remediation at the Basic Substation site in 
Henderson, Nevada: Provided further, That notwithstanding 31 
U.S.C. 3302, section 5 of the Flood Control Act of 1944 (16 
U.S.C. 825s), and section 1 of the Interior Department 
Appropriation Act, 1939 (43 U.S.C. 392a), funds collected by 
the Western Area Power Administration from the sale of power 
and related services that are applicable to the repayment of 
the annual expenses of this account in this and subsequent 
fiscal years shall be credited to this account as discretionary 
offsetting collections for the sole purpose of funding such 
expenses, with such funds remaining available until expended: 
Provided further, That for purposes of this appropriation, 
annual expenses means expenditures that are generally recovered 
in the same year that they are incurred (excluding purchase 
power and wheeling expenses).

           Falcon and Amistad Operating and Maintenance Fund

    For operation, maintenance, and emergency costs for the 
hydroelectric facilities at the Falcon and Amistad Dams, 
$2,568,000, to remain available until expended, and to be 
derived from the Falcon and Amistad Operating and Maintenance 
Fund of the Western Area Power Administration, as provided in 
section 2 of the Act of June 18, 1954 (68 Stat. 255) as 
amended: Provided, That notwithstanding the provisions of that 
Act and of 31 U.S.C. 3302, up to $2,348,000 collected by the 
Western Area Power Administration from the sale of power and 
related services from the Falcon and Amistad Dams shall be 
credited to this account as discretionary offsetting 
collections, to remain available until expended for the sole 
purpose of funding the annual expenses of the hydroelectric 
facilities of these Dams and associated Western Area Power 
Administration activities: Provided further, That the sum 
herein appropriated for annual expenses shall be reduced as 
collections are received during the fiscal year so as to result 
in a final fiscal year 2010 appropriation estimated at not more 
than $220,000: Provided further, That notwithstanding the 
provisions of section 2 of the Act of June 18, 1954 (68 Stat. 
255) as amended, and 31 U.S.C. 3302, all funds collected by the 
Western Area Power Administration from the sale of power and 
related services from the Falcon and Amistad Dams that are 
applicable to the repayment of the annual expenses of the 
hydroelectric facilities of these Dams and associated Western 
Area Power Administration activities in this and subsequent 
fiscal years shall be credited to this account as discretionary 
offsetting collections for the sole purpose of funding such 
expenses, with such funds remaining available until expended: 
Provided further, That for purposes of this appropriation, 
annual expenses means expenditures that are generally recovered 
in the same year that they are incurred.

                  Federal Energy Regulatory Commission

                         salaries and expenses

    For necessary expenses of the Federal Energy Regulatory 
Commission to carry out the provisions of the Department of 
Energy Organization Act (42 U.S.C. 7101 et seq.), including 
services as authorized by 5 U.S.C. 3109, the hire of passenger 
motor vehicles, and official reception and representation 
expenses not to exceed $3,000, $298,000,000, to remain 
available until expended: Provided, That notwithstanding any 
other provision of law, not to exceed $298,000,000 of revenues 
from fees and annual charges, and other services and 
collections in fiscal year 2010 shall be retained and used for 
necessary expenses in this account, and shall remain available 
until expended: Provided further, That the sum herein 
appropriated from the general fund shall be reduced as revenues 
are received during fiscal year 2010 so as to result in a final 
fiscal year 2010 appropriation from the general fund estimated 
at not more than $0.

                GENERAL PROVISIONS--DEPARTMENT OF ENERGY

    Sec. 301.  None of the funds appropriated by this Act may 
be used to prepare or initiate Requests For Proposals (RFPs) 
for a program if the program has not been funded by Congress.
    Sec. 302.  None of the funds appropriated by this Act may 
be used--
            (1) to augment the funds made available for 
        obligation by this Act for severance payments and other 
        benefits and community assistance grants under section 
        4604 of the Atomic Energy Defense Act (50 U.S.C. 2704) 
        unless the Department of Energy submits a reprogramming 
        request to the appropriate congressional committees; or
            (2) to provide enhanced severance payments or other 
        benefits for employees of the Department of Energy 
        under such section; or
            (3) develop or implement a workforce restructuring 
        plan that covers employees of the Department of Energy.
    Sec. 303.  The unexpended balances of prior appropriations 
provided for activities in this Act may be available to the 
same appropriation accounts for such activities established 
pursuant to this title. Available balances may be merged with 
funds in the applicable established accounts and thereafter may 
be accounted for as one fund for the same time period as 
originally enacted.
    Sec. 304.  None of the funds in this or any other Act for 
the Administrator of the Bonneville Power Administration may be 
used to enter into any agreement to perform energy efficiency 
services outside the legally defined Bonneville service 
territory, with the exception of services provided 
internationally, including services provided on a reimbursable 
basis, unless the Administrator certifies in advance that such 
services are not available from private sector businesses.
    Sec. 305.  When the Department of Energy makes a user 
facility available to universities or other potential users, or 
seeks input from universities or other potential users 
regarding significant characteristics or equipment in a user 
facility or a proposed user facility, the Department shall 
ensure broad public notice of such availability or such need 
for input to universities and other potential users. When the 
Department of Energy considers the participation of a 
university or other potential user as a formal partner in the 
establishment or operation of a user facility, the Department 
shall employ full and open competition in selecting such a 
partner. For purposes of this section, the term ``user 
facility'' includes, but is not limited to: (1) a user facility 
as described in section 2203(a)(2) of the Energy Policy Act of 
1992 (42 U.S.C. 13503(a)(2)); (2) a National Nuclear Security 
Administration Defense Programs Technology Deployment Center/
User Facility; and (3) any other Departmental facility 
designated by the Department as a user facility.
    Sec. 306.  Funds appropriated by this or any other Act, or 
made available by the transfer of funds in this Act, for 
intelligence activities are deemed to be specifically 
authorized by the Congress for purposes of section 504 of the 
National Security Act of 1947 (50 U.S.C. 414) during fiscal 
year 2010 until the enactment of the Intelligence Authorization 
Act for fiscal year 2010.
    Sec. 307.  Of the funds made available by the Department of 
Energy for activities at Government-owned, contractor-operated 
laboratories funded in this Act or subsequent Energy and Water 
Development Appropriations Acts, the Secretary may authorize a 
specific amount, not to exceed 8 percent of such funds, to be 
used by such laboratories for laboratory directed research and 
development: Provided, That the Secretary may also authorize a 
specific amount not to exceed 4 percent of such funds, to be 
used by the plant manager of a covered nuclear weapons 
production plant or the manager of the Nevada Site Office for 
plant or site directed research and development.
    Sec. 308.  (a) In any fiscal year in which the Secretary of 
Energy determines that additional funds are needed to reimburse 
the costs of defined benefit pension plans for contractor 
employees, the Secretary may transfer not more than 1 percent 
from each appropriation made available in this and subsequent 
Energy and Water Development Appropriation Acts to any other 
appropriation available to the Secretary in the same Act for 
such reimbursements.
    (b) Where the Secretary recovers the costs of defined 
benefit pension plans for contractor employees through charges 
for the indirect costs of research and activities at facilities 
of the Department of Energy, if the indirect costs attributable 
to defined benefit pension plan costs in a fiscal year are more 
than charges in fiscal year 2008, the Secretary shall carry out 
a transfer of funds under this section.
    (c) In carrying out a transfer under this section, the 
Secretary shall use each appropriation made available to the 
Department in that fiscal year as a source for the transfer, 
and shall reduce each appropriation by an equal percentage, 
except that appropriations for which the Secretary determines 
there exists a need for additional funds for pension plan costs 
in that fiscal year, as well as appropriations made available 
for the Power Marketing Administrations, the title XVII loan 
guarantee program, and the Federal Energy Regulatory 
Commission, shall not be subject to this requirement.
    (d) Each January, the Secretary shall report to the 
Committees on Appropriations of the House of Representatives 
and the Senate on the state of defined benefit pension plan 
liabilities in the Department for the preceding year.
    (e) This transfer authority does not apply to supplemental 
appropriations, and is in addition to any other transfer 
authority provided in this or any other Act. The authority 
provided under this section shall expire on September 30, 2015.
    (f) The Secretary shall notify the Committees on 
Appropriations of the House of Representatives and the Senate 
in writing not less than 30 days in advance of each transfer 
authorized by this section.
    Sec. 309. (a) Subject to subsection (b), no funds 
appropriated or otherwise made available by this Act or any 
other Act may be used to record transactions relating to the 
increase in borrowing authority or bonds outstanding at any 
time under the Federal Columbia River Transmission System Act 
(16 U.S.C. 838 et seq.) referred to in section 401 of division 
A of the American Recovery and Reinvestment Act of 2009 (Public 
Law 111-5; 123 Stat. 140) under a funding account, subaccount, 
or fund symbol other than the Bonneville Power Administration 
Fund Treasury account fund symbol.
    (b) Funds appropriated or otherwise made available by this 
Act or any other Act may be used to ensure, for purposes of 
meeting any applicable reporting provisions of the American 
Recovery and Reinvestment Act of 2009 (Public Law 111-5; 123 
Stat. 115), that the Bonneville Power Administration uses a 
fund symbol other than the Bonneville Power Administration Fund 
Treasury account fund symbol solely to report accrued 
expenditures of projects attributed by the Administrator of the 
Bonneville Power Administration to the increased borrowing 
authority.
    (c) This section is effective for fiscal year 2010 and 
subsequent fiscal years.
    Sec. 310.  Section 1702 of the Energy Policy Act of 2005 
(42 U.S.C. 16512) is amended by adding at the end the following 
new subsection:
    ``(k) Wage Rate Requirements.--All laborers and mechanics 
employed by contractors and subcontractors in the performance 
of construction work financed in whole or in part by a loan 
guaranteed under this title shall be paid wages at rates not 
less than those prevailing on projects of a character similar 
in the locality as determined by the Secretary of Labor in 
accordance with subchapter IV of chapter 31 of title 40, United 
States Code. With respect to the labor standards in this 
subsection, the Secretary of Labor shall have the authority and 
functions set forth in Reorganization Plan Numbered 14 of 1950 
(64 Stat. 1267; 5 U.S.C. App.) and section 3145 of title 40, 
United States Code.''.
    Sec. 311.  None of the funds made available by this Act may 
be used to make a grant allocation, discretionary grant award, 
discretionary contract award, Other Transaction Agreement, or 
to issue a letter of intent totaling in excess of $1,000,000, 
or to announce publicly the intention to make such an award, 
including a contract covered by the Federal Acquisition 
Regulation, unless the Secretary of Energy notifies the 
Committees on Appropriations of the Senate and the House of 
Representatives at least 3 full business days in advance of 
making such an award or issuing such a letter: Provided, That 
if the Secretary of the Department of Energy determines that 
compliance with this section would pose a substantial risk to 
human life, health, or safety, an award may be made without 
notification and the Committees on Appropriations of the Senate 
and the House of Representatives shall be notified not later 
than 5 full business days after such an award is made or letter 
issued.
    Sec. 312.  (a) Ultra Efficient Vehicles.--Section 136 of 
the Energy Independence and Security Act of 2007 (42 U.S.C. 
17013) is amended--
            (1) in subsection (a)--
                    (A) in paragraph (1), by inserting ``an 
                ultra efficient vehicle or'' after ``means''; 
                and
                    (B) by adding at the end the following new 
                paragraph:
            ``(5) Ultra efficient vehicle.--The term `ultra 
        efficient vehicle' means a fully closed compartment 
        vehicle designed to carry at least 2 adult passengers 
        that achieves--
                    ``(A) at least 75 miles per gallon while 
                operating on gasoline or diesel fuel;
                    ``(B) at least 75 miles per gallon 
                equivalent while operating as a hybrid 
                electric-gasoline or electric-diesel vehicle; 
                or
                    ``(C) at least 75 miles per gallon 
                equivalent while operating as a fully electric 
                vehicle.'';
            (2) in subsection (b)--
                    (A) by inserting ``, ultra efficient 
                vehicle manufacturers,'' after ``automobile 
                manufacturers'';
                    (B) in paragraph (1)--
                            (i) by striking ``or'' at the end 
                        of subparagraph (A);
                            (ii) by striking ``and'' at the end 
                        of subparagraph (B) and inserting 
                        ``or''; and
                            (iii) by adding at the end the 
                        following new subparagraph:
                    ``(C) ultra efficient vehicles; and''; and
                    (C) in paragraph (2), by inserting ``, 
                ultra efficient vehicles,'' after ``qualifying 
                vehicles'';
            (3) in subsection (g), by inserting ``or are 
        utilized primarily for the manufacture of ultra 
        efficient vehicles'' after ``20 years''; and
            (4) in subsection (h)(1)(B), by striking 
        ``automobiles'' the first place it appears and 
        inserting ``ultra efficient vehicles, automobiles,''.
    (b) Reconsideration of Prior Applications.--The Secretary 
of Energy shall reconsider applications for assistance under 
section 136 of the Energy Independence and Security Act of 2007 
(42 U.S.C. 17013) that were--
            (1) timely filed under that section before January 
        1, 2009;
            (2) rejected on the basis that the vehicles to 
        which the proposal related were not advanced technology 
        vehicles; and
            (3) related to ultra efficient vehicles.
    Sec. 313. (a) Except as provided in subsection (b), none of 
the funds appropriated or otherwise made available by this 
title for the Strategic Petroleum Reserve may be made available 
to any person that as of the enactment of this Act--
            (1) is selling refined petroleum products valued at 
        $1,000,000 or more to the Islamic Republic of Iran;
            (2) is engaged in an activity valued at $1,000,000 
        or more that could contribute to enhancing the ability 
        of the Islamic Republic of Iran to import refined 
        petroleum products, including--
                    (A) providing ships or shipping services to 
                deliver refined petroleum products to the 
                Islamic Republic of Iran;
                    (B) underwriting or otherwise providing 
                insurance or reinsurance for such an activity; 
                or
                    (C) financing or brokering such an 
                activity; or
            (3) is selling, leasing, or otherwise providing to 
        the Islamic Republic of Iran any goods, services, or 
        technology valued at $1,000,000 or more that could 
        contribute to the maintenance or expansion of the 
        capacity of the Islamic Republic of Iran to produce 
        refined petroleum products.
    (b) The prohibition on the use of funds under subsection 
(a) shall not apply with respect to any contract entered into 
by the United States Government before the date of the 
enactment of this Act.
    (c) If the Secretary determines a person made ineligible by 
this section has ceased the activities enumerated in (a)(1)-
(3), that person shall no longer be ineligible under this 
section.
    Sec. 314.  Section 132 of the Energy and Water Development 
Appropriations Act of 2006 (119 Stat 2261) is amended--
            (1) in subsection (a)(3), by striking ``Corps of 
        Engineers'' and inserting ``Southwestern Power 
        Administration'';
            (2) by adding at the end of subsection (a) the 
        following new paragraph:
            ``(5) Payment to non-federal licensee.--
        Southwestern Power Administration shall compensate the 
        licensee of Federal Energy Regulatory Commission 
        Project No. 2221 pursuant to paragraph (3) using 
        receipts collected from the sale of Federal power and 
        energy related services. Pursuant to paragraph (6), 
        Southwestern Power Administration will begin collecting 
        receipts in the Special Receipts and Disbursement 
        account upon the date of enactment of this paragraph. 
        Payment to the licensee of Federal Energy Regulatory 
        Commission Project No. 2221 shall be paid as soon as 
        adequate receipts are collected in the Special Receipts 
        and Disbursement Account to fully compensate the 
        licensee, and in accordance with paragraph (2), such 
        payment shall be considered non-reimbursable.'';
            (3) by adding at the end of subsection (a) the 
        following new paragraph:
            ``(6) The Southwestern Power Administration shall 
        compensate the licensee of Federal Energy Regulatory 
        Commission Project No. 2221 in annual payments of not 
        less than $5,000,000, until the licensee of Federal 
        Energy Regulatory Commission Project No. 2221 is fully 
        compensated pursuant to paragraph (3). At the end of 
        each fiscal year subsequent to implementation, any 
        remaining balance to be paid to the licensee of Project 
        No. 2221 shall accrue interest at the 30-year U.S. 
        Treasury bond rate in effect at the time of 
        implementation of the White River Minimum Flows 
        project.'';
            (4) by adding at the end of subsection (a) the 
        following new paragraph:
            ``(7) Establishment of special receipt and 
        disbursement accounts.--There is established in the 
        Treasury of the United States a special receipt account 
        and corresponding disbursement account to be made 
        available to the Administrator of the Southwestern 
        Power Administration to disburse pre-collected receipts 
        from the sale of federal power and energy and related 
        services. The accounts are authorized for the following 
        uses:
                    ``(A) Collect and disburse receipts for 
                purchase power and wheeling expenses incurred 
                by Southwestern Power Administration to 
                purchase replacement power and energy as a 
                result of implementation of the White River 
                Minimum Flows project.
                    ``(B) Collect and disburse receipts related 
                to compensation of the licensee of Federal 
                Energy Regulatory Commission Project No. 2221.
                    ``(C) Said special receipt and disbursement 
                account shall remain available for not more 
                than 12 months after the date of full 
                compensation of the licensee of Federal Energy 
                Regulatory Commission Project No. 2221.''; and
            (5) by adding at the end of subsection (a) the 
        following new paragraph:
            ``(8) Time of implementation.--For purposes of 
        paragraphs (3) and (4), `time of implementation' shall 
        mean the authorization of the special receipt account 
        and corresponding disbursement account described in 
        paragraph (7).''.

                                TITLE IV

                          INDEPENDENT AGENCIES

                    Appalachian Regional Commission

    For expenses necessary to carry out the programs authorized 
by the Appalachian Regional Development Act of 1965, as 
amended, for necessary expenses for the Federal Co-Chairman and 
the Alternate on the Appalachian Regional Commission, for 
payment of the Federal share of the administrative expenses of 
the Commission, including services as authorized by 5 U.S.C. 
3109, and hire of passenger motor vehicles, $76,000,000, to 
remain available until expended.

                Defense Nuclear Facilities Safety Board

                         salaries and expenses

    For necessary expenses of the Defense Nuclear Facilities 
Safety Board in carrying out activities authorized by the 
Atomic Energy Act of 1954, as amended by Public Law 100-456, 
section 1441, $26,086,000, to remain available until expended.

                        Delta Regional Authority

                         salaries and expenses

    For necessary expenses of the Delta Regional Authority and 
to carry out its activities, as authorized by the Delta 
Regional Authority Act of 2000, as amended, notwithstanding 
sections 382C(b)(2), 382F(d), 382M, and 382N of said Act, 
$13,000,000, to remain available until expended: Provided, That 
no funds in this Act shall be expended for the relocation of 
the Delta Regional Commission headquarters.

                           Denali Commission

    For expenses of the Denali Commission including the 
purchase, construction, and acquisition of plant and capital 
equipment as necessary and other expenses, $11,965,000, to 
remain available until expended, notwithstanding the 
limitations contained in section 306(g) of the Denali 
Commission Act of 1998.

                  Northern Border Regional Commission

    For necessary expenses of the Northern Border Regional 
Commission in carrying out activities authorized by subtitle V 
of title 40, United States Code, $1,500,000, to remain 
available until expended.

                 Southeast Crescent Regional Commission

    For necessary expenses of the Southeast Crescent Regional 
Commission in carrying out activities authorized by subtitle V 
of title 40, United States Code, $250,000, to remain available 
until expended.

                     Nuclear Regulatory Commission

                         salaries and expenses

    For necessary expenses of the Commission in carrying out 
the purposes of the Energy Reorganization Act of 1974, as 
amended, and the Atomic Energy Act of 1954, as amended, 
including official representation expenses (not to exceed 
$25,000), $1,056,000,000, to remain available until expended: 
Provided, That of the amount appropriated herein, $29,000,000 
shall be derived from the Nuclear Waste Fund: Provided further, 
That revenues from licensing fees, inspection services, and 
other services and collections estimated at $902,402,000 in 
fiscal year 2010 shall be retained and used for necessary 
salaries and expenses in this account, notwithstanding 31 
U.S.C. 3302, and shall remain available until expended: 
Provided further, That the sum herein appropriated shall be 
reduced by the amount of revenues received during fiscal year 
2010 so as to result in a final fiscal year 2010 appropriation 
estimated at not more than $153,598,000: Provided further, That 
of the amounts appropriated, $10,000,000 is provided to support 
university research and development in areas relevant to their 
respective organization's mission, and $5,000,000 is to support 
a Nuclear Science and Engineering Grant Program that will 
support multiyear projects that do not align with programmatic 
missions but are critical to maintaining the discipline of 
nuclear science and engineering.

                      office of inspector general

    For necessary expenses of the Office of Inspector General 
in carrying out the provisions of the Inspector General Act of 
1978, as amended, $10,860,000, to remain available until 
expended: Provided, That revenues from licensing fees, 
inspection services, and other services and collections 
estimated at $9,774,000 in fiscal year 2010 shall be retained 
and be available until expended, for necessary salaries and 
expenses in this account, notwithstanding 31 U.S.C. 3302: 
Provided further, That the sum herein appropriated shall be 
reduced by the amount of revenues received during fiscal year 
2010 so as to result in a final fiscal year 2010 appropriation 
estimated at not more than $1,086,000.

                  Nuclear Waste Technical Review Board

                         salaries and expenses

    For necessary expenses of the Nuclear Waste Technical 
Review Board, as authorized by Public Law 100-203, section 
5051, $3,891,000, to be derived from the Nuclear Waste Fund, 
and to remain available until expended.

Office of the Federal Coordinator for Alaska Natural Gas Transportation 
                                Projects

    For necessary expenses for the Office of the Federal 
Coordinator for Alaska Natural Gas Transportation Projects 
pursuant to the Alaska Natural Gas Pipeline Act of 2004, 
$4,466,000 until expended: Provided, That any fees, charges, or 
commissions received pursuant to section 802 of Public Law 110-
140 in fiscal year 2010 in excess of $4,683,000 shall not be 
available for obligation until appropriated in a subsequent Act 
of Congress.

                           General Provisions

          nuclear regulatory commission reporting requirement

    Sec. 401.  The Nuclear Regulatory Commission shall, not 
later than 60 days after the date of enactment of this Act, 
provide a report to the Committees on Appropriations of the 
House of Representatives and the Senate identifying barriers to 
and its recommendations for streamlining the issuance of a 
Combined Construction and Operating License for qualified new 
nuclear reactors.
    Sec. 402.  Section 382B of the Delta Regional Authority Act 
of 2000 is amended by deleting (c)(1) and inserting in lieu 
thereof the following: ```(1) In general--voting.--A decision 
by the Authority shall require the affirmative vote of the 
Federal cochairperson and a majority of the State members (not 
including any member representing a State that is delinquent 
under subsection (g)(2)(C)) to be effective.''.
    Sec. 403.  The Nuclear Regulatory Commission may use funds 
made available for the necessary expenses of the Nuclear 
Regulatory Commission for the acquisition and lease of 
additional office space provided by the General Services 
Administration in accordance with the fourth and fifth provisos 
in the matter under the heading ``Salaries and expenses'' under 
the heading ``Nuclear Regulatory Commission'' under the heading 
``Independent agencies'' of title IV of division C of the 
Omnibus Appropriations Act, 2009 (Public Law 111-8; 123 Stat. 
629).

                                TITLE V

                           GENERAL PROVISIONS

    Sec. 501.  None of the funds appropriated by this Act may 
be used in any way, directly or indirectly, to influence 
congressional action on any legislation or appropriation 
matters pending before Congress, other than to communicate to 
Members of Congress as described in 18 U.S.C. 1913.
    Sec. 502.  To the extent practicable funds made available 
in this Act should be used to purchase light bulbs that are 
``Energy Star'' qualified or have the ``Federal Energy 
Management Program'' designation.
    Sec. 503.  Title IV of division A of the American Recovery 
and Reinvestment Act of 2009 (Public Law 111-5) is amended by 
adding at the end of the title, the following new section 411:
    ``Sec. 411.  Up to 0.5 percent of each amount appropriated 
to the Department of the Army and the Bureau of Reclamation in 
this title may be used for the expenses of management and 
oversight of the programs, grants, and activities funded by 
such appropriation, and may be transferred by the Head of the 
Federal Agency involved to any other appropriate account within 
the department for that purpose: Provided, That the Secretary 
will provide a report to the Committees on Appropriations of 
the House of Representatives and the Senate 30 days prior to 
the transfer: Provided further, That funds set aside under this 
section shall remain available for obligation until September 
30, 2012.''.
    Sec. 504. (a) Definitions.--In this section:
            (1) Administrative expenses.--The term 
        ``administrative expenses'' has the meaning as 
        determined by the Director under subsection (b)(2).
            (2) Agency.--The term ``agency''--
                    (A) means an agency as defined under 
                section 1101 of title 31, United States Code, 
                that is established in the executive branch and 
                receives funding under this Act; and
                    (B) shall not include the District of 
                Columbia government.
            (3) Director.--The term ``Director'' means the 
        Director of the Office of Management and Budget.
    (b) Administrative Expenses.--
            (1) In general.--All agencies shall include a 
        separate category for administrative expenses when 
        submitting their appropriation requests to the Office 
        of Management and Budget for fiscal year 2011 and each 
        fiscal year thereafter.
            (2) Administrative expenses determined.--In 
        consultation with the agencies, the Director shall 
        establish and revise as necessary a definition of 
        administration expenses for the purposes of this 
        section. All questions regarding the definition of 
        administrative expenses shall be resolved by the 
        Director.
    (c) Budget Submission.--Each budget of the United States 
Government submitted under section 1105 of title 31, United 
States Code, for fiscal year 2011 and each fiscal year 
thereafter shall include the amount requested for each agency 
for administrative expenses.
    Sec. 505.  None of the funds made available in this Act may 
be transferred to any department, agency, or instrumentality of 
the United States Government, except pursuant to a transfer 
made by, or transfer authority provided in this Act or any 
other appropriation Act.
    Sec. 506.  Specific projects contained in the report of the 
Committee on Appropriations of the House of Representatives 
accompanying this Act (H. Rept. 111-203) that are considered 
congressional earmarks for purposes of clause 9 of rule XXI of 
the Rules of the House of Representatives, when intended to be 
awarded to a for-profit entity, shall be awarded under a full 
and open competition.
    Sec. 507. (a) The Continuing Appropriations Resolution, 
2010 is amended--
            (1) in subsections (a) and (b) of section 158, by 
        striking ``section 158'' each place it appears and 
        inserting ``section 157''; and
            (2) in section 162, by striking ``sections 158 
        through 162'' and inserting ``sections 157 through 
        161''.
    (b) The amendments made by subsection (a) shall take effect 
as if included in the enactment of the Continuing 
Appropriations Resolution, 2010.
    This Act may be cited as the ``Energy and Water Development 
and Related Agencies Appropriations Act, 2010''.
    And the Senate agree to the same.

                                   David R. Obey,
                                   Peter J. Visclosky,
                                   Chet Edwards,
                                   Ed Pastor,
                                   Marion Berry,
                                   Chaka Fattah,
                                   Steve Israel,
                                   Tim Ryan,
                                   John W. Olver,
                                   Lincoln Davis,
                                   John T. Salazar,
                                   Rodney P. Frelinghuysen,
                                   Zach Wamp,
                                   Michael K. Simpson,
                                   Rodney Alexander,
                                 Managers on the Part of the House.

                                   Byron L. Dorgan,
                                   Robert C. Byrd,
                                   Patty Murray,
                                   Dianne Feinstein,
                                   Jack Reed,
                                   Frank R. Lautenberg,
                                   Tom Harkin,
                                   Jon Tester,
                                   Daniel K. Inouye,
                                   Robert F. Bennett,
                                   Thad Cochran,
                                   Mitch McConnell,
                                   Richard C. Shelby,
                                   Lamar Alexander,
                                   George V. Voinovich,
                                Managers on the Part of the Senate.
       JOINT EXPLANATORY STATEMENT OF THE COMMITTEE OF CONFERENCE

      The managers on the part of the House and the Senate at 
the conference on the disagreeing votes of the two Houses on 
the amendment of the Senate to the bill (H.R. 3183) making 
appropriations for energy and water development for the fiscal 
year ending September 30, 2010, and for other purposes, submit 
the following joint statement to the House and Senate in 
explanation of the action agreed upon by the managers and 
recommended in the accompanying conference report.
      The language and allocations set forth in House Report 
111-203 and Senate Report 111-45 should be complied with unless 
specifically addressed to the contrary in the conference report 
and statement of managers. Report language included by the 
House which is not contradicted by the report of the Senate or 
the conference, and Senate report language which is not 
contradicted by the report of the House or the conference is 
approved by the committee of conference. The statement of 
managers, while repeating some report language for emphasis, 
does not intend to negate the language referred to above unless 
expressly provided herein. In cases where both the House report 
and Senate report address a particular issue not specifically 
addressed in the conference report or joint statement of 
managers, the conferees have determined that the House report 
and Senate report are not inconsistent and are to be 
interpreted accordingly. In cases in which the House or Senate 
have directed the submission of a report, such report is to be 
submitted to both the House and Senate Committees on 
Appropriations. Senate amendment: The Senate deleted the entire 
House bill after the enacting clause and inserted the Senate 
amendment. The conference agreement includes a revised bill.
      Funds for the individual programs and activities within 
the accounts in this Act are displayed in the detailed table at 
the end of the explanatory statement for this Act. Funding 
levels that are not displayed in the detailed table are 
identified in this explanatory statement.

                                TITLE I

                       CORPS OF ENGINEERS--CIVIL

                         DEPARTMENT OF THE ARMY

                       Corps of Engineers--Civil

      The summary tables included in this title set forth the 
dispositions with respect to the individual appropriations, 
projects, and activities of the Corps of Engineers. Additional 
items of the Act are discussed below.

                             INVESTIGATIONS

      The conference agreement provides $160,000,000 for 
Investigations, instead of $142,000,000 as proposed by the 
House and $170,000,000 as proposed by the Senate.
      The allocation for projects and activities within the 
Investigations account is shown in the following table:


      Red River of the North Basin, Minnesota, North Dakota, 
and South Dakota.--The conference agreement includes $3,000,000 
to continue various flood damage reduction studies in North 
Dakota and Minnesota. Studies are ongoing under this authority 
in the Fargo, North Dakota-Moorhead, Minnesota Metro area, 
Pembina, North Dakota, and the area upstream of Fargo, North 
Dakota. Additional studies of the Sheyenne River are to be 
undertaken to evaluate solutions to the 2009 spring flood.
      Coastal Field Data Collection.--The conference agreement 
includes $4,483,000 for this nationwide program. The Wave Data 
Study should also be continued within this overall funding 
amount. The conferees have included a portion of the climate 
change funding requested in the Operation and Maintenance 
account in this line item to ensure that this data collection 
effort continues.
      Flood Plain Management Services Program.--The conference 
agreement includes $8,059,000 for this nationwide program. The 
conferees have provided a listing in the table of projects that 
should be given priority if cost-sharing funds are available 
from the local sponsors. However, the Corps should view these 
amounts as guides and reprogram funds within this line item as 
appropriate to move these studies forward as rapidly as 
possible.
      Planning Assistance to States.--The conference agreement 
includes $7,161,000 for this nationwide cost-shared program. 
The conferees have provided a listing in the table of projects 
that should be given priority if cost-sharing funds are 
available from the local sponsors. However, the Corps should 
view these amounts as guides and reprogram funds within this 
line item as appropriate to move these studies forward as 
rapidly as possible.
      Research and Development.--The conference agreement 
includes $20,508,000 for the Corps' nationwide research and 
development programs. Some of the additional funds provided 
should be utilized for climate change research to be conducted 
in concert with the Coastal Data Information Program.

                              CONSTRUCTION

                     (INCLUDING TRANSFER OF FUNDS)

      The conference agreement provides $2,031,000,000 for 
Construction, instead of $2,143,679,000 as proposed by the 
House and $1,924,000,000 as proposed by the Senate.
      The conferees direct the Administration to report, not 
later than March 31, 2010, on an updated detailed accounting of 
receipts into and obligations and expenditures from the Inland 
Waterways Trust Fund. The report shall include a list of 
priority projects eligible for additional funding, including 
the cost-benefit ratio, life-safety information, total 
lifecycle cost remaining, and incremental information for each 
project.
      The allocation for projects and activities within the 
Construction account is shown in the following table:


      Delaware Main Channel Deepening, Pennsylvania, New Jersey 
and Delaware.--The conference agreement provides $4,844,000 for 
the Delaware River Main Channel Deepening project. None of the 
funds provided for this project are to be used in the State of 
Delaware during fiscal year 2010 for any construction 
activities. During fiscal year 2010, the Corps is urged to work 
with the State of Delaware on any State of Delaware permits 
necessary for project construction.
      Palm Beach County, Florida.--Within the funds provided, 
$50,000 is provided for the Delray Beach segment. The balance 
of the funding is provided for the Boca Raton segment.
      South Florida Ecosystem Restoration, Florida.--The 
conference agreement provides $180,064,000 for this important 
restoration project. Within the funds provided, $100,000 is 
provided each for Site 1 and the Indian River Lagoon elements 
of the project, consistent with the treatment of all other new 
start construction projects. No funds are provided for the 
Modified Waters Delivery project. This project should remain 
funded within the Interior Department.
      Chicago Sanitary and Ship Canal, Illinois.--The conferees 
are concerned about the threat that harmful invasive species, 
such as the Asian carp, pose to the Great Lakes ecosystem. The 
conferees are aware that the Chicago Sanitary and Ship Canal 
second dispersal barrier recently went to higher operating 
parameters. The Corps is encouraged to continue working in 
conjunction with the Coast Guard on any safety testing of the 
electrical parameters deemed necessary.
      Olmsted Locks and Dam, Ohio River, Illinois, and 
Kentucky.--The conference agreement includes $101,521,000 to 
continue construction of this project. None of the funds 
provided for the Olmsted Locks and Dam Project or any other 
construction funds are to be used to reimburse the Claims and 
Judgment Fund.
      Missouri Fish and Wildlife Recovery, Iowa, Kansas, 
Missouri, Montana, Nebraska, North Dakota, and South Dakota.--
Within the funds provided, $18,000,000 is to be used for 
modifications to the Intake Dam to provide additional habitat 
for the pallid sturgeon.
      Muddy River, Boston and Brookline, Massachusetts.--
Funding is included to continue project design and 
construction, including ecosystem restoration features.
      Sault Ste. Marie (Replacement Lock), Michigan.--The Corps 
has identified billions of dollars in annual savings from 
commerce on the Great Lakes transiting the St. Lawrence Seaway, 
commerce that would be devastated if a failure of the existing, 
aging infrastructure were to occur. The Omnibus Appropriations 
Act of 2009 included $17,000,000 to begin construction of a 
second Poe-sized lock at Sault Ste. Marie, Michigan. The 
conferees are deeply concerned that despite congressional 
support for the project, the support of the states in the 
region, and the fact that the Army Corps of Engineers 
recognizes the Soo Locks as the `single point of failure' that 
can cripple Great Lakes shipping, the Administration has failed 
to include funding for a second large lock, either under the 
authority provided in the American Recovery and Reinvestment 
Act (ARRA) or in its budget request for fiscal year 2010.
      Rural Nevada, Nevada.--The conference agreement includes 
$15,000,000 for this project. Within the funds provided, the 
Corps should give consideration to projects at North Lemmon 
Valley, Spanish Springs, Indian Springs, Moapa Valley, 
Searchlight, Huffaker Hills Water Conservation, Lawton-Verdi, 
Boulder City, Lyon County, Gerlach, Incline Village, Esmeralda 
County, Cold Springs, Fallon, Goldfield, Churchill County, West 
Wendover, Yearington, Virginia Valley Water District, Lovelock, 
Truckee Meadows Water Authority, McGill-Ruth Consolidated Sewer 
and Water District, Carlin, Eldorado Valley, Ely, Pahrump, 
Carson City, and City of Fernley. Other communities that meet 
the program criteria should be considered as funding allows.
      North Dakota [EI], North Dakota.--The conference 
agreement includes $15,000,000 for this program. $7,900,000 is 
for the Traill Rural Water District; $3,000,000 is for the 
North Central Rural Water District; $950,000 is for the Barnes 
Rural Water District; $750,000 is for the Williams Rural Water 
District; $600,000 is for the Langdon Rural Water District; 
$425,000 is for the North Prairie Rural Water District; and 
$375,000 is for the Greater Ramsey Water District.
      Levisa and Tug Forks and Upper Cumberland River, West 
Virginia, Kentucky, and Virginia.--The conference agreement 
includes $16,250,000 for the continuation of the project. 
Within the funds provided, $4,000,000 is included for the 
Buchanan County, Dickenson County, and Grundy, Virginia 
elements. Further, the conferees include $2,750,000 for Kermit, 
Lower Mingo County, McDowell County, Upper Mingo, and Wayne 
County, West Virginia. Within the funds, $9,500,000 is provided 
for the State of Kentucky, including not less than $3,000,000 
for the Town of Martin.
      Continuing Authorities Program.--The Corps shall give 
first priority to the projects listed in the tables in this 
report. The management of the program should continue 
consistent with the guidelines outlined in the Omnibus 
Appropriations Act of 2009.

                   MISSISSIPPI RIVER AND TRIBUTARIES

      The conference agreement provides $340,000,000 for 
Mississippi River and Tributaries, as proposed by the Senate, 
instead of $251,375,000 as proposed by the House.
      The allocation for projects and activities within the 
Mississippi River and Tributaries account is shown in the 
following table:


      Yazoo Basin, Big Sunflower Basin, Mississippi.--The 
conference agreement includes $2,319,000 for the continued 
construction of the Yazoo Basin, Big Sunflower River Project, 
of which $2,000,000 is provided to continue bank stabilization 
erosion repairs at selected sites in the Sunflower Basin.

                       OPERATION AND MAINTENANCE

      The conference agreement provides $2,400,000,000 for 
Operation and Maintenance, instead of $2,510,971,000 as 
proposed by the House and $2,450,000,000 as proposed by the 
Senate. The Act includes legislative language proposed by the 
Senate directing the Corps to allocate no more than 99 percent 
of the funds provided in this Act for Operation and Maintenance 
prior to the fourth quarter. This measure is intended to allow 
Headquarters flexibility to respond to national emergencies.
      The allocation for projects and activities within the 
Operation and Maintenance account is shown in the following 
table:


      Michigan Harbor Dredging, Michigan.--The conference 
agreement includes $6,000,000 for this line item to provide for 
the dredging needs of the State as well as several individual 
projects. All of the harbors and waterways that are eligible 
for this funding are listed in the table under this heading, 
including those for which a specific amount is provided. The 
Corps is directed to propose a dredging program for fiscal year 
2010 that would most effectively utilize the scarce funds 
available for these harbors.
      Cheyenne River Sioux Tribe, Lower Brule Sioux, South 
Dakota.--The conference agreement includes $3,000,000 in 
accordance with the requirements of title VI of the Water 
Resources Development Act of 1999 to protect cultural resource 
sites and provide funding to the State and tribes for approved 
restoration and stewardship plans. The Corps is directed to 
contract with or reimburse the State of South Dakota and 
affected tribes for performance of these duties.
      Chinook, Head of Sand Island, and Baker Bay, 
Washington.--The conferees note the proximity of Corps 
navigation facilities on the Columbia River between Chinook and 
the Head of Sand Island, Washington, and at Baker Bay, 
Washington. The conferees encourage the Corps of Engineers to 
seek ways to achieve cost savings and efficiency, such as by 
utilizing appropriate contracting methods while having these 
two projects considered together when seeking bids and awarding 
contracts. $1,445,000 is included for dredging at these 
harbors.
      National Coastal Mapping.--$10,000,000 is included for 
this program. $5,000,000 of these funds are for LIDAR 
bathymetry for use in regional sediment management and for 
Coastal Zone Mapping and Imaging LIDAR/LASER to be conducted 
with the University of Southern Mississippi.
      Reserve for Key Emergency Maintenance/Repairs.--The 
conference agreement includes no funding for this item. The 
conferees believe it is critical for Corps Headquarters to 
retain a maintenance reserve. Therefore, a proviso in the 
Operation and Maintenance section of the Act is included to 
address this need.

                           REGULATORY PROGRAM

      The conference agreement provides $190,000,000 for the 
Regulatory Program as proposed by the Senate, instead of 
$191,800,000 as proposed by the House.

            FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM

      The conference agreement provides $134,000,000 for the 
Formerly Utilized Sites Remedial Action Program as proposed by 
the House, instead of $140,000,000 as proposed by the Senate. 
The Corps is directed to prioritize sites that are nearing 
completion. The Corps is urged to expeditiously complete the 
Remedial Investigation/Feasibility Study of the former Sylvania 
nuclear fuel site in Hicksville, New York and to proceed 
expeditiously to a Record of Decision and, if appropriate, 
initiate any necessary remediation in accordance with CERCLA. 
The Secretary of the Army shall submit a report to the House 
and Senate Committees on Appropriations detailing the progress 
not later than 120 days after enactment of this Act.

                                EXPENSES

      The conference agreement provides $185,000,000 for 
Expenses, instead of $152,200,000 as proposed by the House and 
$186,000,000 as proposed by the Senate.

        OFFICE OF ASSISTANT SECRETARY OF THE ARMY (CIVIL WORKS)

      The conference agreement provides $5,000,000 for the 
Office of Assistant Secretary of the Army (Civil Works) as 
proposed by the Senate, instead of $6,000,000 as proposed by 
the House.

                        ADMINISTRATIVE PROVISION

      The conference agreement includes a provision relating to 
the replacement and hire of passenger motor vehicles as 
proposed by the House and Senate.

             GENERAL PROVISIONS, CORPS OF ENGINEERS--CIVIL

      The conference agreement modifies a provision proposed by 
the Senate relating to reprogramming. The House proposed a 
similar provision.
      The conference agreement includes a provision proposed by 
the Senate prohibiting implementation of competitive sourcing 
or High Performance Organizations. The House proposed a similar 
provision.
      The conference agreement includes a provision proposed by 
the House prohibiting the use of funds to carry out any 
contract that commits funds beyond the amounts appropriated for 
that program, project, or activity. The Senate proposed no 
similar provision.
      The conference agreement includes a provision proposed by 
the House relating to continuing contracts and the Inland 
Waterway Trust Fund. The Senate proposed a similar provision.
      The conference agreement includes a provision proposed by 
the House clarifying cost-sharing requirements for the Two 
Harbors, Minnesota, project. The Senate proposed no similar 
provision.
      The conference agreement includes a provision proposed by 
the House relating to the total project limit for the Northern 
Wisconsin Environmental Assistance, Wisconsin, project. The 
Senate proposed no similar provision.
      The conference agreement includes a provision proposed by 
the House relating to the acquisition of flood damage reduction 
efforts under the Town of Martin Nonstructural Project Detailed 
Project Report, dated March 2000. The Senate proposed no 
similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to report notifications. The House proposed 
no similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to reallocations in Lake Cumberland, 
Kentucky. The House proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to the total project limit for the 
Mississippi Environmental Infrastructure Program. The House 
proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to the Big Sioux River and Skunk Creek, 
Sioux Falls, South Dakota project. The House proposed no 
similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to section 595(h) of the Water Resource 
Development Act of 1999. The House proposed no similar 
provision.
      The conference agreement includes a provision proposed by 
the Senate relating to the Des Moines and Raccoon Rivers, Iowa 
project. The House proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to the Breckenridge, Minnesota project. The 
House proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to the Des Moines Recreational River and 
Greenbelt, Iowa project. The House proposed no similar 
provision.
      The conference agreement includes a provision proposed by 
the Senate relating to the Alaska coastal erosion project. The 
House proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to a technical correction for the Antelope 
Creek, Lincoln, Nebraska project. The House proposed no similar 
provision.
      The conference agreement includes a provision proposed by 
the Senate relating to the West Sacramento, California, 
project. The House proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to the Ten Mile Creek Water Preserve Area. 
The House proposed no similar provision.
      The conference agreement modifies a provision proposed by 
the Senate relating to the Tampa Harbor Big Bend Channel, 
Florida project. The House proposed no similar provision.
      The conference agreement includes new language relating 
to a technical correction to the authorization for the J. Percy 
Priest Dam and Reservoir, Tennessee, project.
      The conference agreement includes new language relating 
to a technical correction to the authorization for the Sand 
Creek, Nebraska, project.
      The conference agreement includes a provision proposed by 
the Senate in title II relating to the Fort Peck, Montana, 
project. The House proposed no similar provision.
      The conference agreement includes language relating to 
the Kahuku, Oahu, Hawaii, project.
      The conference agreement includes language regarding the 
Success Dam, Tule River, California project.
      The conference agreement includes language providing the 
Corps of Engineers authorization for emergency measures to 
exclude Asian Carp from the Great Lakes.
      The conference agreement does not include a provision 
proposed by the Senate relating to a rescission of Mississippi 
River and Tributaries funds. The House proposed no similar 
provision.
      The conference agreement does not include a provision 
proposed by the Senate relating to a rescission of Construction 
funds. The House proposed no similar provision.
      The conference agreement does not include a provision 
proposed by the Senate relating to the Lake Pontchartrain, 
Louisiana, project. The House proposed no similar provision.
      The conference agreement does not include a provision 
proposed by the House regarding White River Minimum Flow, 
Arkansas. This provision is addressed in title III.

                                TITLE II

                       DEPARTMENT OF THE INTERIOR

                          Central Utah Project

                CENTRAL UTAH PROJECT COMPLETION ACCOUNT

      The conference agreement provides a total of $42,004,000 
for the Central Utah Project as proposed by the House and 
Senate.

                         Bureau of Reclamation

                      WATER AND RELATED RESOURCES

                     (INCLUDING TRANSFERS OF FUNDS)

      The conference agreement provides $951,158,000 for Water 
and Related Resources, instead of $910,247,000 as proposed by 
the House and $993,125,000 as proposed by the Senate.
      Reprogramming.--To ensure that the expenditure of funds 
in fiscal year 2010 is consistent with congressional direction, 
to minimize the movement of funds, and to improve overall 
budget execution, the conference report carries a legislative 
provision outlining the circumstances under which the Bureau of 
Reclamation may reprogram funds.
      The conference agreement for Water and Related Resources 
is shown in the following table:


      Glen Canyon Dam.--The conference agreement does not 
include language on the Glen Canyon Dam, as proposed by the 
House.
      Central Valley Project, San Joaquin Division.--The 
conference agreement of $5,300,000 includes $5,000,000 for the 
San Joaquin River Restoration. These funds should be utilized 
in conjunction with and in advance of those funds available 
from the San Joaquin River Restoration Fund.
      Mokelumne River Regional Water Storage, California.--The 
Secretary of the Interior is directed to continue the 
feasibility study authorized in title V of Public Law 109-338. 
In carrying out this study, the Secretary shall include the 
entire Mokelumne River drainage as the study area and shall 
also consider regional projects that include recommendations 
for expansion of reservoir storage capacities. This study shall 
include an analysis of the project currently under 
consideration by the Mokelumne River Forum as described in both 
the Northeastern San Joaquin County Groundwater Banking 
Authority and the Mokelumne-Amador-Calaveras Integrated 
Regional Water Management Plans. As authorized, this study is 
intended to be regional in scope and shall examine the 
feasibility of providing additional water supply and improved 
water management reliability to Mokelumne River Forum member 
agencies through the development of new storage and conjunctive 
use programs and projects, including, but not limited to, the 
Eastern San Joaquin Ground Water Basin, Pardee Reservoir, Lower 
Bear Reservoir, and Duck Creek.
      Milk River/St. Mary's Diversion Project, Montana.--The 
conferees urge the Bureau of Reclamation to combine National 
Environmental Policy Act compliance activities and preparation 
of design, specifications, and contract documents for the 
entire St. Mary's project including the diversion dam, fish 
passage structure, drop structures, siphon, and canal as a 
single activity.
      Pick-Sloan Missouri Basin, Garrison Diversion Unit, North 
Dakota.--The conference agreement includes $52,000,000 for 
rural water projects. Of this amount, $26,000,000 shall be 
expended for the following projects: $8,000,000 for the 
Northwest Area Water Supply; $9,000,000 for the South Central 
Regional Water District; and $9,000,000 for the Southwest 
Pipeline. Additionally, the conference agreement includes 
$3,000,000 for the Standing Rock Sioux Tribe Irrigation 
Project.
      Northern Utah Investigations Program, Utah.--The 
conference agreement includes $500,000 for the Rural Water 
Technology Alliance.
      Drought Emergency Assistance.--Within the funds provided, 
the conferees urge the Bureau of Reclamation to provide full 
and fair consideration for drought assistance to the State of 
Hawaii.
      Lower Colorado River Operations Program.--The conference 
agreement does not include language as proposed by the Senate 
for this project.
      Research and Development, Science and Technology 
Program.--The conference agreement includes $500,000 for Quagga 
and Zebra Mussel research activities. The conferees are 
concerned about the impacts to western waters of these two 
invasive species. Reclamation efforts to date have necessarily 
focused on addressing the problems caused by the mussels at 
Reclamation facilities. The conferees believe that Reclamation 
should establish a research program geared toward eradicating 
or controlling these invasive species.
      Title XVI, Water Reclamation, and Reuse.--The conference 
agreement includes $2,500,000 for the WateReuse Foundation. 
These funds are available to support the Foundation's research 
priorities.
      Water Conservation Initiative.--The conferees encourage 
Reclamation to work with Water Research Laboratory at Utah 
State University to expand water quality monitoring in the 
Cache Valley, Utah, to provide the necessary data to reduce the 
uncertainty of water quality management decisions pertaining to 
Cutler Reservoir and to reduce the cost of maintaining and 
improving water quality in the region.

                CENTRAL VALLEY PROJECT RESTORATION FUND

      The conference agreement provides $35,358,000 for the 
Central Valley Project Restoration Fund, as proposed by the 
House and Senate.

                   CALIFORNIA BAY--DELTA RESTORATION

                     (INCLUDING TRANSFERS OF FUNDS)

      The conference agreement provides $40,000,000 for the 
California Bay-Delta Restoration program, instead of 
$41,000,000 as proposed by the House and Senate.
      Within available funds, the conference agreement provides 
$10,000,000 for construction of infrastructure projects that 
will add flexibility to water delivery systems, such as the 
proposed ``Two Gates'' project and the Delta-Mendota Canal/
California Aqueduct Intertie project. If the additional funding 
cannot be used for infrastructure construction, the conferees 
recommend that it be used for other efforts to reduce conflict 
over water supplies in the Bay-Delta region.
      The conferees also intend that funding within CALFED 
Program Management be used for consultation and coordination on 
Delta governance with the State of California, including any 
new governance or conservancy body that may be authorized by 
the State Legislature.
      The funds provided are intended to support the following 
activities, as delineated below:

Water use efficiency....................................      $3,500,000
    Water conservation pilot studies....................       (500,000)
    Bay Area regional water recycling...................     (3,000,000)
Water Quality...........................................       4,750,000
    San Joaquin River salinity management...............     (4,000,000)
    Contra Costa Water District alternative intake 
      project...........................................       (750,000)
Storage.................................................       3,600,000
    Shasta enlargement study............................     (1,500,000)
    Los Vaqueros........................................       (300,000)
    Sites Reservoir.....................................     (1,000,000)
    San Joaquin River basin study.......................       (800,000)
Conveyance..............................................      14,450,000
    DMC Intertie w/Cal Aqueduct and Two Gates Activities    (10,000,000)
    San Luis lowpoint feasibility study.................     (1,500,000)
    Frank's Tract feasibility study.....................     (1,500,000)
    DMC Recirculation feasibility study.................       (250,000)
    South Delta improvements program....................       (200,000)
    Supplemental conveyance feasibility.................     (1,000,000)
Ecosystem restoration...................................       7,500,000
    Bay Delta conservation plan.........................     (7,500,000)
Science Program.........................................       4,500,000
    Interagency ecological program......................     (1,500,000)
    CALFED science activities...........................     (3,000,000)
Planning and management activities......................       1,700,000
    CALFED program management...........................     (1,700,000)
                    --------------------------------------------------------
                    ____________________________________________________
        Total, California Bay-Delta Restoration.........      40,000,000

                       POLICY AND ADMINISTRATION

      The conference agreement provides $61,200,000 for Policy 
and Administration as proposed by the Senate, instead of 
$51,200,000 as proposed by the House.

                        ADMINISTRATIVE PROVISION

      The conference agreement includes a provision limiting 
the Bureau of Reclamation to purchase not more than seven 
passenger vehicles for replacement only, as proposed by the 
House and Senate.

             General Provisions--Department of the Interior

      The conference agreement includes a provision proposed by 
the Senate outlining the circumstances under which the Bureau 
of Reclamation may reprogram funds. The House proposed a 
similar provision.
      The conference agreement includes a provision proposed by 
the House and Senate regarding the San Luis Unit and the 
Kesterson Reservoir in California.
      The conference agreement includes a provision proposed by 
the Senate that states requirements for purchase or lease of 
water from the Middle Rio Grande or Carlsbad Projects in New 
Mexico. The House proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate regarding Drought Emergency Assistance. The House 
proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate extending a project authorization in the Fort Peck 
Reservation Rural Water System Act of 2000. The House proposed 
no similar provision.
      The conference agreement includes a provision proposed by 
the Senate regarding the administration of the Desert Terminal 
Lakes Program. The House proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate regarding the Desert Terminal Lakes that amends the 
Farm Security and Rural Investment Act of 2002. The House 
proposed no similar provision.
      The conference agreement modifies a provision proposed by 
the Senate expending funds from the Desert Terminal Lakes 
Program. The House proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate regarding the North Dakota Natural Resources Trust. 
The House proposed no similar provision.
      The conference agreement modifies a provision proposed by 
the Senate regarding the CALFED Bay-Delta Authorization Act. 
The House proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate regarding water transfers in California and the 
Draft Recovery Plan for the Giant Garter Snake. The House 
proposed two similar provisions.
      The conference agreement does not include a provision 
proposed by the Senate relating to the Fort Peck, Montana, 
project. This provision is addressed in title I.

                               TITLE III

                          DEPARTMENT OF ENERGY

      The summary tables at the end of this title set forth the 
Act with respect to the individual appropriations, programs, 
and activities of the Department of Energy. Additional items in 
the Act are discussed below.
      The conference agreement provides $27,111,438,000 for the 
Department of Energy, instead of $26,876,350,000 as proposed by 
the House and $27,398,221,000 as proposed by the Senate, to 
fund programs in its five primary mission areas: science, 
energy, environment, nuclear non-proliferation and national 
security.
      The conferees direct the Department to submit to the 
House and Senate Committees on Appropriations, within 60 days 
of enactment of this Act, a report included in the House report 
detailing an implementation and progress measurement plan for 
each funded Energy Innovation Hub. The conference agreement 
does not include the subsequent progress report proposed by the 
House for each Energy Innovation Hub.
      The conferees direct the department to submit to the 
House and Senate Committees on Appropriations an annual report 
on the status of work for others activities in each of the 
national laboratories, instead of the quarterly report included 
in the House bill. The conferees recognize the value of the 
scientific capability that resides at our nation's laboratories 
and the importance of work for others at the national 
laboratories, particularly in light of the National Nuclear 
Security Administration's intention of moving to a National 
Security Enterprises business model. Work for others can be a 
mechanism to both maintain expertise and refine technical 
capabilities, and this work could be leveraged more effectively 
if performed in a strategic context rather than an ad hoc 
fashion. Given the importance of work for others in a time of 
tight budgetary constraints, the conferees believe the 
Department should critically examine how and when work for 
others is in the long-term interests of the national 
laboratories. The Department should outline a strategy and 
procedures to maximize the utilization of the unique scientific 
expertise of the laboratories while providing a rational 
financial basis for the acceptance of such work.
      The Department is directed to submit an annual Financial 
Balance report by May 30, 2010, instead of the semi-annual 
report included in the House bill.

                       REPROGRAMMING REQUIREMENTS

      The Department of Energy is directed to operate in a 
manner fully consistent with the following reprogramming 
guidelines. A reprogramming request must be submitted to the 
House and Senate Committees on Appropriations for consideration 
before any implementation of a reorganization proposal which 
includes moving previous appropriations between appropriation 
accounts. The Department is directed to inform the Committees 
promptly and fully when a change in program execution and 
funding is required during the fiscal year. To assist the 
Department in this effort, the following guidance is provided 
for programs and activities funded in the Energy and Water 
Development and Related Agencies Appropriations Act. The 
Department is directed to follow this guidance for all programs 
and activities unless specific reprogramming guidance is 
provided for a program or activity.
      Definition.--A reprogramming includes the reallocation of 
funds from one activity to another within an appropriation, or 
any significant departure from a program, project, activity, or 
organization described in the agency's budget justification as 
presented to and approved by Congress. For construction 
projects, a reprogramming constitutes the reallocation of funds 
from one construction project identified in the justifications 
to another project or a significant change in the scope of an 
approved project.
      Any reallocation of new or prior year budget authority or 
prior year de-obligations must be submitted to the House and 
Senate Committees on Appropriations in writing and may not be 
implemented prior to approval by the Committees.

                            ENERGY PROGRAMS

                 Energy Efficiency and Renewable Energy

      The conference agreement provides $2,242,500,000 for 
Energy Efficiency and Renewable Energy (EERE) programs, instead 
of $2,310,000,000 as proposed by the House and $2,233,967,000 
as proposed by the Senate.
      Reporting Requirements.--The conference agreement does 
not include a reporting requirement proposed by the House to 
quantify and track the progress and impact of investments made 
in the energy efficiency and renewable energy portfolio.
      Hydrogen Technology.--The conference agreement provides 
$174,000,000 for Hydrogen Technology, instead of $190,000,000 
as proposed by the Senate. The House proposed $153,213,000 for 
hydrogen and fuel cell technologies under the Fuel Cell 
Technology and Vehicle Technologies program areas.
      These funds shall be used to further program goals with 
new contracts and continue funding 190 contracts the Department 
placed at risk in fiscal year 2010 by requesting zero funding 
for this program. Additionally, fuel cell technology can 
continue to be pursued under the Hydrogen Technology program in 
fiscal year 2010 as it has been in the past.
      Fuel Cell Technology.--The conference agreement provides 
no funding for Fuel Cell Technology.
      Biomass and Biorefinery Systems Research and 
Development.--The conference agreement provides $220,000,000.
      Within available funds, the conferees continue to support 
grants for the production of advanced biofuels as authorized 
under section 207 of the Energy Independence and Security Act 
of 2007 (EISA 2007). The conferees do not specify a funding 
level.
      Within available funds, the conferees direct the 
Department to provide not less than $35,000,000 for a 
comprehensive research, development and deployment strategy 
focused on algae biofuels.
      The conference agreement provides up to $7,500,000 for 
coordination with the Vehicle Technologies program to expand 
and accelerate testing of intermediate fuel blends of ethanol 
and gasoline, as proposed by the Senate.
      Solar Energy.--The conference agreement provides 
$225,000,000 for solar energy systems. The conferees support 
the Department's continued investment in the demonstration and 
deployment of concentrating solar technology. No funding is 
provided for the Solar Electricity Energy Innovation Hub.
      Wind Energy.--The conference agreement provides 
$80,000,000 for wind energy systems, instead of $70,000,000 as 
proposed by the House and $85,000,000 as proposed by the 
Senate.
      Geothermal Technology.--The conference agreement provides 
$44,000,000 for geothermal systems.
      Water Power.--The conference agreement provides 
$50,000,000 for Water Power. The conferees direct the 
Department to apply all of the available increase over the 
request to expand marine and hydrokinetic research, 
development, and deployment. Within available funds, the 
conferees further direct the Department to validate economic 
and technical viability of a variety of technologies and to 
provide a written report to the House and Senate Committees on 
Appropriations on the prospect of each of the technologies. 
This report shall include the Department's research and 
development priorities and goals for this program for the next 
five years.
      The conferees direct the Department to utilize its only 
marine sciences laboratory to undertake a research and 
development program to expand marine and hydrokinetic renewable 
energy programs consistent with section 633 of EISA 2007.
      The conferees provide not more than $3,500,000 from 
within available funds to identify opportunities to increase 
power generation at conventional hydropower sites. The 
conferees encourage the Department to focus the assessment on 
sites not owned by Federal entities.
      Vehicle Technologies.--The conference agreement provides 
$311,365,000 for Vehicle Technologies.
      The conference agreement does not include $40,000,000 for 
hydrogen transportation systems in the Vehicle Technologies 
program, as proposed by the House.
      Within available funds, $2,200,000 is provided to the 
vehicles program for the Department to contract with the 
National Academy of Sciences to conduct a comprehensive 
analysis of energy use within the light-duty vehicle 
transportation sector, and use the analysis to conduct an 
integrated study of the technology and fuel options that could 
reduce petroleum consumption and greenhouse gas emissions.
      The conferees provide up to $7,500,000 for coordination 
with the Biomass program to expand and accelerate testing of 
intermediate fuel blends of ethanol and gasoline, as proposed 
by the Senate.
      The conference agreement does not include a study on the 
variety and density of recharging infrastructure options, as 
proposed by the Senate.
      The conference agreement includes $5,000,000 for natural 
gas vehicle research and development.
      Building Technologies.--The conference agreement provides 
$200,000,000 for Building Technologies. No funds are provided 
under this heading for the Energy Efficient Building Systems 
Design Energy Innovation Hub. From within available funds, the 
conferees provide $27,000,000 for solid state lighting research 
and development.
      Industrial Technologies.--The conference agreement 
includes $96,000,000 for Industrial Technologies. From within 
available funds, the conferees provide $500,000 for a 
comprehensive awareness campaign and training program on how 
mechanical insulation can improve energy efficiency.
      Federal Energy Management Program.--The conference 
agreement provides $32,000,000 for the Federal Energy 
Management Program.
      RE-ENERGYSE.--The conference agreement provides no 
funding for RE-ENERGYSE.
      Facilities and Infrastructure.--The conference agreement 
provides $63,000,000 for facilities and infrastructure, of 
which $44,000,000 is provided for the South Table Mountain 
Ingress/Egress and Traffic Capacity Upgrades project at the 
National Renewable Energy Laboratory. The conferees agree with 
and restate Senate language supporting the use of American 
Recovery and Reinvestment Act (ARRA) funding for these traffic 
capacity upgrades. If the Department uses ARRA funds for this 
project, the conferees support the use of this $44,000,000 to 
fund the proposed Fuels from Sunlight and Energy Efficient 
Building Systems Design Energy Innovation Hubs at $22,000,000 
each.
      Program Direction.--The conference agreement provides 
$140,000,000 for Program Direction.
      Program Support.--The conference agreement provides 
$45,000,000 for Program Support. Within these funds, the 
Department is directed to provide $10,000,000 for the 
International Renewable Energy Program, to include $2,000,000 
for the U.S.-Israeli energy cooperation agreement.
      While the conferees support strategic and policy analysis 
capabilities within the Department to guide investment 
decisions and support policymaker decisions, these capabilities 
should be located in the Department-wide policy office rather 
than within each program office.
      The conferees also agree with the importance of 
commercialization efforts to ensure that innovations within 
national and other research laboratories enter the marketplace. 
Therefore, the conferees encourage the Department to develop an 
agency-wide commercialization strategy and capability rather 
than developing piece-meal solutions within individual program 
offices.
      Weatherization Assistance.--The conference agreement 
provides $210,000,000 for weatherization assistance program 
grants, of which $3,300,000 shall be for training and technical 
assistance.
      The conference agreement provides $30,000,000 from within 
available funds for the development of a pilot project that 
would increase the leverage of Federal funding through the 
formation of partnerships between the Department and 
traditional and/or non-traditional weatherization providers.
      The conference agreement does not include funding to 
develop a pilot program demonstrating energy savings through 
use of improved insulating and sealing in homes built prior to 
1980.
      State Energy Program.--The conference agreement provides 
$50,000,000 for the State Energy Program.
      Tribal Energy Activities.--The conference agreement 
provides $10,000,000 for Tribal Energy Activities.
      Congressionally Directed Projects.--The conference 
agreement provides $292,135,000 for the following 
congressionally directed projects and activities. The agency 
should remind recipients that statutory cost-sharing 
requirements may apply to these projects.


              Electricity Delivery and Energy Reliability

      The conference agreement provides $171,982,000 for 
Electricity Delivery and Energy Reliability, instead of 
$193,008,000 as proposed by the House and $179,483,000 as 
proposed by the Senate. The conference agreement provides 
$124,900,000 for electricity delivery and energy reliability 
research and development. No funds are provided for the Grid 
Materials, Devices, and Systems Energy Innovation Hub.
      The conference agreement includes the establishment of a 
private sector organization to coordinate and conduct cyber 
security research and development activities, as proposed by 
the Senate.
      Congressionally Directed Projects.--The conference 
agreement provides $13,075,000 for the following 
congressionally directed projects and activities. The agency 
should remind recipients that statutory cost-sharing 
requirements may apply to these projects.


                             Nuclear Energy

      The conference agreement provides $786,637,000 for 
nuclear energy activities, instead of $812,000,000 as proposed 
by the House and $761,274,000 as proposed by the Senate.
      Nuclear Power 2010.--The conference agreement provides 
$105,000,000, which shall be available only for the Nuclear 
Power 2010 program. The conferees include this funding as the 
final installment to complete the Department's commitment to 
this effort to advance combined operating licenses of reactor 
designs.
      Generation IV (Gen IV) Nuclear Energy Systems.--The 
conference agreement provides $220,137,000 for Gen IV Nuclear 
Energy systems, of which $51,137,000 is for Gen IV research and 
development. Included within this amount is $10,000,000 to 
support light water reactor life extension research, 
$22,000,000 for the Modeling and Simulation Hub, and 
$17,764,000 for technology research and development of Gen IV 
advanced reactor concepts, which is not intended to supplement 
the Next Generation Nuclear Plant efforts. The conference 
agreement does not provide funds for gas centrifuge enrichment 
technology.
      The conferees provide $169,000,000 for the Next 
Generation Nuclear Plant (NGNP), of which $7,000,000 is for 
deep burn research. To date, Congress has provided 
approximately $360,000,000 for research into a very-high-
temperature, gas-cooled reactor (VHTR) design. The Department 
is directed to report to the House and Senate Committees on 
Appropriations, within 90 days of enactment of this Act, on the 
research conducted and a detailed accounting of the funds 
appropriated to date. This report shall also include a program 
execution plan, including the $169,000,000 appropriated in this 
Act. The execution plan shall detail the scope and schedule of 
activities, milestones or critical decision points, total 
project cost estimates including anticipated cost-share 
requirements, and any necessary updates to the NGNP licensing 
strategy that was delivered to Congress in August of 2008. This 
plan shall also include a review of the range of technology 
options under consideration and the technical and commercial 
challenges facing each option. The conferees further direct the 
Secretary of Energy to require industry cost-sharing 
requirements consistent with the terms and conditions of 
section 988 of the Energy Policy Act of 2005 for funds provided 
for the NGNP program.
      Fuel Cycle Research and Development.--The conference 
agreement provides $136,000,000 for fuel cycle research and 
development. No funding is provided for the Extreme Materials 
Energy Innovation Hub.
      Space and Defense Infrastructure.--The conference 
agreement provides $42,000,000 for space and defense 
infrastructure.
      Research Reactor Infrastructure.--For research reactor 
infrastructure, the House proposed $6,000,000 in Idaho 
Facilities Management while the Senate proposed $15,000,000 in 
Radiological Facilities Management (RFM). The conference 
agreement provides $10,000,000 in RFM for fresh reactor fuel, 
disposal of spent fuel for university reactors, and improved 
reactor instrumentation and equipment upgrades.
      Oak Ridge Nuclear Infrastructure.--For nuclear 
infrastructure at Oak Ridge, the House proposed $15,000,000 in 
RFM while the Senate proposed $10,000,000 in Gen IV Nuclear 
Energy systems. The conference agreement provides $10,000,000 
in RFM for hot cells at the Oak Ridge Radiochemical Engineering 
Development Center.
      Los Alamos Nuclear Infrastructure.--For nuclear 
infrastructure at Los Alamos, the Senate proposed $10,000,000 
in Gen IV Nuclear Energy systems. The conference agreement 
provides $10,000,000 in RFM for Los Alamos radiological 
facilities.
      Pu-238 Production Restart Project.--The conference 
agreement provides no funding for the Pu-238 Restart Project. 
The conferees agree with language proposed by the House 
regarding a start-up plan which shall include the role and 
contribution of major users of Pu-238, such as the National 
Aeronautics and Space Administration, and shall be submitted 
with the fiscal year 2011 budget submission.
      Idaho National Laboratory (INL) Facilities Management.--
The conference agreement provides $173,000,000 for INL 
facilities management, including not less than $12,000,000 for 
the Advanced Test Reactor life extension program.
      Program Direction.--The conference agreement provides 
$73,000,000 for Program Direction.
      Congressionally Directed Projects.--The conference 
agreement provides $2,500,000 for the following congressionally 
directed projects and activities. The agency should remind 
recipients that statutory cost-sharing requirements may apply 
to these projects.


                 Fossil Energy Research and Development

      The conference agreement provides $672,383,000 for Fossil 
Energy Research and Development programs instead of 
$617,565,000 as proposed by the House and $699,200,000 proposed 
by the Senate. The conferees believe that increased utilization 
of advanced computing and visualization capabilities will 
enhance our capacity to improve domestic energy production and 
improve the design and operation of advanced generation 
technologies. The conferees direct the Department to integrate 
Office of Science and National Nuclear Security Administration 
capabilities and collaborate with universities and industry to 
improve computational applications in the development of 
unconventional fossil resources. The conferees direct the 
Department to follow both House and Senate language regarding 
advanced computing applications. The conferees also direct the 
Department to continue work on the Risk Based Management System 
and the stripper well program.
      Fuels and Power Systems.--The conference agreement 
includes $404,000,000 for Fuels and Power Systems. This 
includes $52,000,000 for Innovations for Existing Plants. The 
conferees provide $63,000,000 for Advanced Integrated 
Gasification Combined Cycle. The conferees provide $32,000,000 
for Advanced Turbines. The conference agreement provides 
$154,000,000 for Carbon Sequestration. No funds are provided 
for the Carbon Capture and Storage Energy Innovation Hub. The 
conference agreement provides $25,000,000 for Fuels and 
$50,000,000 for Fuel Cells research. The conferees provide 
$28,000,000 for Advanced Research. Fossil energy modeling and 
simulation research is supported elsewhere in the conference 
agreement.
      Natural Gas Technologies.--The conference agreement 
provides $17,833,000 to fund research into production of 
methane hydrates, remediation treatment technologies, and 
unconventional natural gas production from basins that contain 
tight gas sands, shale gas and coal bed methane resources.
      Unconventional Fossil Energy Technologies.--The 
conference agreement provides $20,000,000 to establish a 
comprehensive research, development and deployment (RD&D) 
strategy for the development of unconventional oil, gas and 
coal resources as proposed by the Senate. In developing its 
RD&D strategy, the conferees direct the Department to develop a 
report outlining the domestic resource opportunities as well as 
technology applications that will be the focus of this effort. 
Further, the Department shall include input from academia and 
industry in the report.
      Program Direction.--The conference agreement provides 
$158,000,000 for Program Direction.
      Other.--The conference agreement provides funds for the 
following activities: $20,000,000 for Plant and Capital 
Equipment; $10,000,000 for Fossil Energy Environmental 
Restoration; $700,000 for Special Recruitment; and $5,000,000 
for Cooperative Research and Development.
      Congressionally Directed Projects.--The conference 
agreement provides $36,850,000 for the following 
congressionally directed projects and activities. The 
Department should remind recipients that statutory cost-sharing 
requirements may apply to these projects.


                 Naval Petroleum and Oil Shale Reserves

      The conference agreement provides $23,627,000 for the 
operation of the Naval Petroleum and Oil Shale Reserves as 
proposed by the House and Senate.

                      Strategic Petroleum Reserve

      The conference agreement provides $243,823,000 for the 
Strategic Petroleum Reserve, including $25,000,000 for 
expansion activities at the Richton, Mississippi, site.

                   Northeast Home Heating Oil Reserve

      The conference agreement provides $11,300,000 for the 
Northeast Home Heating Oil Reserve as proposed by the House and 
Senate.

                   Energy Information Administration

      The conference agreement provides $110,595,000 for the 
Energy Information Administration as proposed by the Senate, 
instead of $121,858,000 as proposed by the House.

                   Non-Defense Environmental Cleanup

      The conference agreement provides $244,673,000 for Non-
Defense Environmental Cleanup, instead of $237,517,000 as 
proposed by the House and $259,829,000 as proposed by the 
Senate.
      Gaseous Diffusion Plants.--The conference agreement 
provides $100,885,000 for the Gaseous Diffusion Plants. The 
conferees are aware that the Department intends to complete 
testing and initiate full operations on both facilities in this 
fiscal year. The conferees expect the Department to utilize its 
reprogramming authority as necessary to maintain this schedule.
      Internal Reprogramming Authority.--In fiscal year 2010, 
the Department may transfer up to $2,000,000 between programs 
within the Non-Defense Environmental Cleanup accounts to reduce 
health or safety risks or to gain cost savings, as long as no 
program or project is increased or decreased by more than 
$2,000,000 during the fiscal year. The House and Senate 
Committees on Appropriations must be notified within thirty 
days of the use of this reprogramming authority. The account 
control points for reprogramming are the Fast Flux Test Reactor 
Facility, West Valley Demonstration Project, Gaseous Diffusion 
Plants, Small Sites, and construction line-items.

      Uranium Enrichment Decontamination and Decommissioning Fund

      The conference agreement provides $573,850,000 for 
activities funded from the Uranium Enrichment Decontamination 
and Decommissioning Fund, instead of $559,377,000 as proposed 
by the House and $588,322,000 as proposed by the Senate. The 
conference agreement includes $225,000,000 for Oak Ridge, 
Tennessee, $116,446,000 for Paducah, Kentucky, and $232,404,000 
for Portsmouth, Ohio. The conferees have adjusted the funding 
levels in response to the Department's decision to expand 
ongoing cleanup activities at Portsmouth, despite the fact that 
this work was not proposed in the President's budget request. 
The Department has proposed that this expanded cleanup work is 
to be financed with an off-budget barter strategy for federal 
uranium assets. Based on the Department's limited experience 
with such transactions and the fact that the Congressional 
Budget Office estimates the Department will only achieve 55 
percent of its deficit reduction targets from uranium sales in 
fiscal year 2010, the conferees have serious concerns regarding 
the Department's ability to successfully implement this 
proposal. The conferees direct the Government Accountability 
Office (GAO) to undertake a review of the Department's 
oversight and implementation strategy to ensure that the 
Department executes this program consistent with section 3112 
of the USEC Privatization Act (42 U.S.C. section 2297h-10). In 
addition, the conferees request that GAO's review include an 
evaluation of the Department's overall uranium management plan 
and an assessment of the Department's success or failure in 
meeting its existing deficit reduction targets utilizing asset 
sales, including sales of Departmental stockpiles of uranium, 
nickel, and other materials surplus to its needs.

                                Science

                     (INCLUDING TRANSFER OF FUNDS)

      The conference agreement provides $4,903,710,000, instead 
of $4,943,587,000 as proposed by the House and $4,898,832,000 
as proposed by the Senate.
      High Energy Physics.--The conference agreement provides 
$810,483,000 for High Energy Physics research. Within these 
funds, the conference agreement provides $434,471,000 for 
Proton Accelerator-Based Physics. The control level is at the 
High Energy Physics level.
      Nuclear Physics.--The conference agreement provides 
$535,000,000 for Nuclear Physics. Within these funds, the 
conference agreement provides $12,000,000 for the Facility for 
Rare Isotope Beams, and $20,000,000 for the 12 GeV upgrade of 
the Continuous Electron Beam Accelerator Facility at the Thomas 
Jefferson National Laboratory. The conference agreement 
includes funding for nuclear medicine application research in 
Biological and Environmental Research.
      The conference agreement includes not less than 
$19,200,000 for Isotope Development and Production for Research 
and Applications, University Operations. The conferees have 
concerns regarding the state of isotope production in the 
United States for medical and industrial applications. The 
conferees support the House and Senate language regarding cost-
effectively improving the supply of these isotopes, including 
through utilizing existing sources and upgrading existing 
research reactors or accelerators.
      Biological and Environmental Research.--The conference 
agreement provides $604,182,000 for Biological and 
Environmental Research. Within these funds, the conferees 
direct the Department to provide $17,500,000 for nuclear 
medicine application research.
      Basic Energy Sciences.--The conference agreement provides 
$1,636,500,000 for Basic Energy Sciences. Within these funds, 
the conference agreement provides $22,000,000 for EPSCOR, and 
directs the limit of one Implementation Grant per EPSCOR state 
be removed and the cap on the maximum allowable award be 
increased to $2,500,000. The conference agreement provides no 
funds for an Energy Innovation Hub within the Office of 
Science. Further, the conferees include funding as requested 
for the Spallation Neutron Source and the High Flux Isotope 
Reactor.
      Advanced Scientific Computing Research.--The conference 
agreement provides $394,000,000 for Advanced Scientific 
Computing Research.
      Fusion Energy Sciences.--The conference agreement 
provides $426,000,000 for Fusion Energy Sciences.
      The House proposed $20,000,000 for the laser fusion 
program at the Naval Research Laboratory (NRL). It also 
directed the Department of Energy to report to the House and 
Senate Committees on Appropriations on the potential of the KrF 
laser for commercial fusion. The Senate provided no comparable 
direction. The conference agreement includes no explicit 
funding for NRL and supports the House reporting requirement. 
This report is due not later than 60 days following enactment 
of this Act. The conferees encourage the Secretary to explore 
all possible opportunities to ensure that this program, which 
offers unique potential for long-term energy independence, is 
not abandoned for lack of a bureaucratic home.
      Science Laboratories Infrastructure.--The conference 
agreement provides $127,600,000 for Science Laboratories 
Infrastructure.
      Safeguards and Security.--The conference agreement 
provides $83,000,000 for Safeguards and Security.
      Science Program Direction.--The conference agreement 
provides $189,377,000 for Science Program Direction. The 
control level is at the Science Program Direction level.
      Science Workforce Development.--The conference agreement 
provides $20,678,000 for Science Workforce Development.
      Congressionally Directed Projects.--The conference 
agreement provides $76,890,000 for the following 
congressionally directed projects and activities. The agency 
should remind recipients that statutory cost-sharing 
requirements may apply to these projects.


                         Nuclear Waste Disposal

      The conference agreement provides $98,400,000 for nuclear 
waste disposal, the same as proposed by the House and the 
Senate. The conferees provide $5,000,000 for the Secretary of 
Energy to establish the Blue Ribbon Commission. All guidance 
provided by the House and Senate reports is superseded by the 
conference agreement. The conference agreement also includes 
funds for technical and construction site management, business 
support, and other activities to carry out the Administration's 
fiscal year 2010 plan.

         Title 17 Innovative Technology Loan Guarantee Program

      The conference agreement provides $43,000,000 for 
administrative expenses for the Title 17 Innovative Loan 
Guarantee Program as proposed by the House and Senate. This 
appropriation is fully offset by revenue, resulting in a $0 net 
appropriation.

        Advanced Technology Vehicles Manufacturing Loan Program

      The conference agreement provides $20,000,000 for 
Advanced Technology Vehicles Manufacturing Loan Program as 
proposed by the House and Senate.

                      Departmental Administration

      The conference agreement provides $168,944,000 for 
Departmental Administration, instead of $124,944,000 as 
proposed by the House and $173,944,000 as proposed by the 
Senate. The conferees recognize the importance of adequately 
staffing the Department of Energy and express concern with the 
performance of the Office of the Human Capital Officer, as 
described in a recent study by the National Academy of Public 
Administration. The conferees strongly encourage the Department 
to explore alternative organizational arrangements and business 
processes, such as using an outside hiring organization, to 
improve this performance. The conferees support the study 
requested by the Senate on RFS and expect the Department to 
undertake the requested economic review.

                    Office of the Inspector General

      The conference agreement provides $51,927,000 for the 
Office of the Inspector General as proposed by the House and 
Senate.

                    ATOMIC ENERGY DEFENSE ACTIVITIES

                NATIONAL NUCLEAR SECURITY ADMINISTRATION

      The National Nuclear Security Administration (NNSA), a 
semi-autonomous agency within the Department of Energy, manages 
the nation's nuclear weapons programs, nuclear nonproliferation 
programs, and naval reactors activities.
      The conference agreement provides $9,887,027,000 for the 
National Nuclear Security Administration.

                           Weapons Activities

      The conference agreement provides $6,384,431,000 for 
Weapons Activities, instead of $6,320,000,000 as proposed by 
the House and $6,468,267,000 as proposed by the Senate.
      Report on Non-Deterrable Threats.--The conference 
agreement does not include the House study on non-deterrable 
threats, and does not include the direction on the expenditure 
of LDRD funding. In its place, the conference agreement directs 
the NNSA to prepare a report to the House and Senate Committees 
on Appropriations, within six months of enactment, delineating 
NNSA's activities and achievements in countering non-deterrable 
threats.
      Reprogramming Authority.--The conference agreement 
concurs with the House report language on reprogramming 
authority, but inserts ``Plutonium Infrastructure Sustainment'' 
in place of ``Pit Manufacturing and Certification''.

                        DIRECTED STOCKPILE WORK

      The conference agreement provides $1,505,859,000 for 
Directed Stockpile Work.
      Life Extension Programs.--The conference agreement 
provides $223,196,000 for Life Extension Program activities, 
all of which is provided for W76 Life Extension program.
      Stockpile Systems.--The conference agreement provides 
$357,800,000 for Stockpile Systems activities. Within these 
funds, the conference agreement provides $91,956,000 for the 
B61 bomb, including $32,500,000 for Phase 2/2A study of non-
nuclear components for the proposed B61-12. No request was made 
for funds for Phase 2/2A study of the nuclear components of the 
B61-12, and the conference agreement provides that no funds may 
be obligated or expended for this purpose without prior 
approval by the House and Senate Committees on Appropriations.
      The conference agreement directs the Nuclear Weapons 
Council in cooperation with the Secretary of Energy to, within 
60 days of release of the Nuclear Posture Review, enter into an 
agreement with the National Academy of Sciences to execute a 
study addressing the national security and extended deterrence 
value of the B61 for both strategic and tactical purposes in 
light of nuclear terrorism risks and military threats. The 
conference agreement directs the Nuclear Weapons Council in 
cooperation with the Secretary of Energy to, within 90 days of 
release of the Nuclear Posture Review, commission a further 
study by the JASON Defense Advisory Group examining whether the 
planned B61-12 can be expected, without nuclear testing, to 
offer sufficient margin and other advantages as to constitute a 
long-term 21st Century weapon, or whether it is more likely to 
be an interim weapon leading to near-term replacement or 
retirement, and to recommend any additional research that may 
be needed to make an informed decision on this matter. The 
conference agreement directs the Secretary of Energy to submit 
each study to the House and Senate Committees on Appropriations 
not later than 180 days after commissioning the study.
      Weapons Dismantlement and Disposition.--The conference 
agreement provides $96,100,000 for Weapons Dismantlement and 
Disposition.
      Stockpile Services.--The conference agreement provides 
$828,763,000 for Stockpile Services. Within these funds, the 
conference agreement provides $165,076,000 for Research and 
Development Certification and Safety, $183,223,000 for 
Management, Technology, and Production, and $141,909,000 for 
Plutonium Infrastructure Sustainment. The conference agreement 
provides that $22,000,000 is made available above the request 
to support experimental activities at the Nevada Test Site. The 
conferees support Senate language regarding the tritium 
mission.

                               CAMPAIGNS

      The conference agreement provides $1,571,186,000 for 
Campaigns.
      Science Campaign.--The conference agreement provides 
$295,646,000 for the Science Campaign. The conferees direct 
that academic programs shall be funded in the same lines as 
they were during fiscal year 2009.
      Engineering Campaign.--The conference agreement provides 
$150,000,000 for the Engineering Campaign. Within these funds, 
the conference agreement provides $42,000,000 to be available 
only for Enhanced Surety, of which $21,104,000 is provided only 
for enhanced surety intrinsic to the weapon.
      Inertial Confinement Fusion Ignition and High Yield 
Campaign.--The conference agreement provides $457,915,000 for 
the Inertial Confinement Fusion and High Yield Campaign. The 
conference agreement provides $16,500,000 above the request for 
the operation of Z machine and the Omega facility to restore 
each facility to fiscal year 2009 levels.
      Further, $4,500,000 above the budget request is provided 
for the Laboratory for Laser Energetics.
      Advanced Simulation and Computing Campaign.--The 
conference agreement provides $567,625,000 for Advanced 
Simulation and Computing Campaign. Within these funds, the 
conference provides $5,000,000 for National Security Science, 
Technology and Engineering Activities for the purpose of 
technology assessments of nuclear weapons that could be 
employed by sub-state actors or potentially hostile minor 
nuclear powers, $5,000,000 for a joint program with the Office 
of Fossil Energy and the Office of Science to work in 
collaboration with universities and industry to improve U.S. 
capacity to produce domestic unconventional oil and gas 
resources and minimize environmental impact by use of high 
performance computing capabilities, and $5,000,000 to explore 
cost-effective, power-efficient storage systems.
      Readiness Campaign.--The conference agreement provides 
$100,000,000 for the Readiness Campaign.

               READINESS IN TECHNICAL BASE AND FACILITIES

      The conference agreement provides $1,842,870,000 for 
Readiness in Technical Base and Facilities. The conferees 
direct the Department to use carryover balances for project 06-
D-140, if necessary.

                      SECURE TRANSPORTATION ASSET

      The conference agreement provides $234,915,000 for Secure 
Transportation Asset.

                   NUCLEAR WEAPONS INCIDENT RESPONSE

      The conference agreement provides $221,936,000 for 
Nuclear Weapons Incident Response.

         FACILITIES AND INFRASTRUCTURE RECAPITALIZATION PROGRAM

      The conference agreement provides $93,922,000 for the 
Facilities and Infrastructure Recapitalization Program.

                            SITE STEWARDSHIP

      The conference agreement provides $61,288,000 for Site 
Stewardship. The conferees direct that the NNSA submit Site 
Stewardship as a single line in future requests.

                        SAFEGUARDS AND SECURITY

      The conference agreement provides $891,555,000 for 
Safeguards and Security. The conference agreement includes 
$10,000,000 above the request for security upgrades promulgated 
in the April 2004 special annex letter and incorporated into 
the 2008 Graded Security Protection Policy. Additionally, the 
conference agreement includes $10,000,000 above the request for 
improved training and equipment.

                   CONGRESSIONALLY DIRECTED PROJECTS

      The conference agreement provides $3,000,000 for the 
following congressionally directed projects and activities. The 
agency should remind recipients that statutory cost-sharing 
requirements may apply to these projects.


                              ADJUSTMENTS

      The conference agreement includes the use of $42,100,000 
in prior year balances from the canceled High Explosive 
Pressing Facility at Pantex and directs their application to 
meet fiscal year 2010 needs as described above.

                    DEFENSE NUCLEAR NONPROLIFERATION

      The conference agreement provides $2,136,709,000 for 
Defense Nuclear Nonproliferation as proposed by the Senate, 
instead of $1,471,175,000 as proposed by the House.

       NONPROLIFERATION AND VERIFICATION RESEARCH AND DEVELOPMENT

      The conference agreement provides $317,300,000 for 
Nonproliferation and Verification Research and Development.

              NONPROLIFERATION AND INTERNATIONAL SECURITY

      The conference agreement provides $187,202,000 for 
Nonproliferation and International Security of which 
$72,763,000 is available for Dismantlement and Transparency.

       INTERNATIONAL NUCLEAR MATERIALS PROTECTION AND COOPERATION

      The conference agreement provides $572,050,000 for 
International Nuclear Materials Protection and Cooperation of 
which $63,481,000 is provided for Civilian Nuclear Sites and 
$78,432,000 is provided for the Core Program of Second Line of 
Defense.

                 ELIMINATION OF WEAPONS GRADE PLUTONIUM

      The conferees provide $24,507,000 for the Elimination of 
Weapons Grade Plutonium Program.

                     FISSILE MATERIALS DISPOSITION

      The conference agreement provides $701,900,000 for 
Fissile Materials Disposition. The conferees express concern 
that future cost increases in the construction of the Mixed 
Oxide Fuel Fabrication Facility, Waste Solidification Building, 
and supporting activities could divert resources from high-
priority overseas nonproliferation activities. All efforts 
should be made to ensure this does not occur. Additionally, the 
conferees support the House report language expressing concerns 
about the Department's management of the surplus plutonium 
disposition program.

                   GLOBAL THREAT REDUCTION INITIATIVE

      The conference agreement provides $333,500,000 for the 
Global Threat Reduction Initiative. From within available 
resources, $20,000,000 shall be provided to accelerate the 
conversion of research reactors to support the domestic 
production of molybdenum-99. The conferees support the Senate 
reporting requirement for the Global Threat Reduction 
Initiative to conduct a full inventory of U.S. materials to 
determine other uses.

                   CONGRESSIONALLY DIRECTED PROJECTS

      The conference agreement provides $250,000 for the 
following congressionally directed projects and activities. The 
agency should remind recipients that statutory cost-sharing 
requirements may apply to these projects.


                             Naval Reactors

      The conference agreement provides $945,133,000 for Naval 
Reactors, instead of $1,003,133,000 as proposed by the House 
and $973,133,000 as proposed by the Senate.

                      Office of the Administrator

                     (INCLUDING TRANSFER OF FUNDS)

      The conference agreement provides $420,754,000 for the 
Office of the Administrator, as proposed by the House and 
Senate.
      Congressionally Directed Projects.--The conference 
agreement provides $13,000,000 for the following 
congressionally directed projects and activities. The agency 
should remind recipients that statutory cost-sharing 
requirements may apply to these projects.


               ENVIRONMENTAL AND OTHER DEFENSE ACTIVITIES

                     Defense Environmental Cleanup

                     (INCLUDING TRANSFER OF FUNDS)

      The conference agreement provides $5,642,331,000 for the 
Defense Environmental Cleanup program, instead of 
$5,381,842,000 as proposed by the House and $5,763,856,000 as 
proposed by the Senate.
      Internal Reprogramming Authority.--In fiscal year 2010, 
the Department may transfer up to $5,000,000 between accounts, 
as noted in the table below, to reduce health or safety risks 
or to gain cost savings as long as no program or project is 
increased or decreased by more than $5,000,000 in total during 
the fiscal year. This reprogramming authority may not be used 
to initiate new programs or to change funding for programs 
specifically denied, limited, or increased by Congress in the 
Act or explanatory statement. The House and Senate Committees 
on Appropriations must be notified within thirty days of the 
use of this reprogramming authority.
      Account Control Points:
      Closure Sites
      Savannah River site, nuclear material stabilization and 
disposition
      Savannah River site, 2012 accelerations
      Savannah River site, 2035 accelerations
      Savannah River Tank Farm
      Waste Isolation Pilot Plant
      Idaho National Laboratory
      Oak Ridge Reservation
      Hanford site 2012 accelerated completions
      Hanford site 2035 accelerated completions
      National Nuclear Security Administration Sites
      Office of River Protection (ORP) Waste Treatment & 
Immobilization Plant (WTP)--Waste Treatment Facilities A 
through D
      ORP WTP Pretreatment facility
      Program Direction
      Program Support
      Safeguards and Security
      Uranium Enrichment D&D Fund contribution
      Technology Development and Deployment
      Construction line-items
      Closure Sites.--The conference agreement includes 
$41,468,000 for Closure Sites environmental cleanup activities.
      Hanford Site.--The conference agreement provides 
$990,080,000 for the Hanford Site.
      Idaho National Laboratory.--The conference agreement 
provides $464,168,000 for Idaho National Laboratory cleanup 
activities. The conference agreement does not include House 
language regarding the transfer of radioactive cleanup 
liabilities. The conferees are encouraged that the Office of 
Environmental Management (EM) has begun the process of 
accepting excess facilities and materials from the Nuclear 
Energy program, and urge the Department to assign disposition 
responsibility for remaining spent fuel, special nuclear 
material, and irradiated beryllium blocks. The conferees 
include $34,268,000 for Spent Nuclear Fuel Stabilization and 
Disposition--2012, of which $19,500,000 is included to prepare 
and treat sodium-bonded fuel within the EM portfolio.
      NNSA Sites.--The conference agreement provides 
$284,124,000 for cleanup activities at NNSA sites.
      Oak Ridge Reservation.--The conference agreement provides 
$178,768,000 for the Oak Ridge Reservation.
      Office of River Protection.--The conference agreement 
provides $1,098,000,000 for the Office of River Protection, to 
include $690,000,000 for the Waste Treatment Plant.
      Savannah River Site.--The conference agreement provides 
$1,209,949,000 for cleanup activities at the Savannah River 
Site.
      Waste Isolation Pilot Plant.--The conference agreement 
provides $230,337,000 for the Waste Isolation Pilot Plant.
      Program Direction.--The conference agreement provides 
$345,000,000 for Program Direction.
      Program Support.--The conference agreement provides 
$34,000,000 for Program Support.
      Safeguards and Security.--The conference agreement 
provides $279,437,000 for Safeguards and Security.
      Technology Development and Deployment.--The conference 
agreement provides $20,000,000 for the Technology Development 
and Deployment program. The conferees encourage the Department 
to provide competitively awarded funding within available funds 
to take advantage of international technology transfer 
opportunities. The conferees encourage the National Tank Waste 
Program to work with the Office of River Protection to conduct 
scientific applied research and technology development 
activities that advance solutions for the treatment of tank 
wastes as described in the Technology Development and 
Deployment budget request.
      Federal Contribution to Uranium Enrichment 
Decontamination and Decommissioning Fund.--The conference 
agreement provides $463,000,000 for the Federal contribution to 
the Uranium Enrichment Decontamination and Decommissioning Fund 
as authorized in Public Law 102-486.
      Congressionally Directed Projects.--The conference 
agreement provides $4,000,000 for the following congressionally 
directed projects and activities. The agency should remind 
recipients that statutory cost-sharing requirements may apply 
to these projects.


                        Other Defense Activities

      The conference agreement provides $847,468,000 for Other 
Defense Activities, instead of $1,515,502,000 as proposed by 
the House and $854,468,000 as proposed by the Senate.

                 OFFICE OF HEALTH, SAFETY, AND SECURITY

      The conference agreement provides $441,882,000 for the 
Office of Health, Safety, and Security.

                           LEGACY MANAGEMENT

      The conference agreement provides $189,802,000 for the 
Office of Legacy Management.

                       DEFENSE-RELATED ACTIVITIES

      The conference agreement provides $83,358,000 for site-
wide safeguards and security at Idaho National Laboratory.

                 DEFENSE-RELATED ADMINISTRATIVE SUPPORT

      The conference agreement includes $122,982,000 to provide 
administrative support for programs funded in the atomic energy 
defense activities accounts.

                     OFFICE OF HEARINGS AND APPEALS

      The conference agreement provides $6,444,000 for the 
Office of Hearings and Appeals.

                   CONGRESSIONALLY DIRECTED PROJECTS

      The conference agreement provides $3,000,000 for the 
following congressionally directed projects and activities. The 
agency should remind recipients that statutory cost-sharing 
requirements may apply to these projects.


                     Defense Nuclear Waste Disposal

      The conference agreement provides $98,400,000 for Defense 
Nuclear Waste Disposal activities, as proposed by the House and 
Senate.

                    POWER MARKETING ADMINISTRATIONS

                  Bonneville Power Administration Fund

      The conference agreement provides no appropriation for 
the Bonneville Power Administration, which derives its funding 
from revenues deposited into the Bonneville Power 
Administration Fund.

      Operation and Maintenance, Southeastern Power Administration

      The conference agreement provides a net appropriation of 
$7,638,000 for the Southeastern Power Administration as 
proposed by the House, instead of $8,638,000 as proposed by the 
Senate. As proposed by the House, an additional $1,000,000 is 
recorded separately as a scorekeeping adjustment.

      Operation and Maintenance, Southwestern Power Administration

      The conference agreement provides a net appropriation of 
$44,944,000 for the Southwestern Power Administration, as 
proposed by the House and Senate.

 Construction, Rehabilitation, Operation and Maintenance, Western Area 
                          Power Administration

      The conference agreement provides a net appropriation of 
$256,711,000 for the Western Area Power Administration, as 
proposed by the House and Senate.

           Falcon and Amistad Operating and Maintenance Fund

      The conference agreement provides a net appropriation of 
$2,568,000 for the Falcon and Amistad Operating and Maintenance 
Fund, as proposed by the House and Senate.

                  FEDERAL ENERGY REGULATORY COMMISSION

                         SALARIES AND EXPENSES

      The conference agreement provides $298,000,000 for the 
Federal Energy Regulatory Commission (FERC), as proposed by the 
House and Senate. Revenues for FERC are set to an amount equal 
to the budget authority, resulting in a net appropriation of 
$0.

                GENERAL PROVISIONS--DEPARTMENT OF ENERGY

      The conference agreement includes a provision proposed by 
the House and Senate relating to unfunded proposals.
      The conference agreement includes a provision proposed by 
the House and Senate relating to workforce restructuring.
      The conference agreement includes a provision proposed by 
the House and Senate relating to unexpended balances.
      The conference agreement includes a provision proposed by 
the House and Senate relating to Bonneville Power 
Administration service territory.
      The conference agreement includes a provision proposed by 
the Senate relating to user facilities. The House proposed a 
similar provision.
      The conference agreement includes a provision proposed by 
the House and Senate relating to intelligence activities.
      The conference agreement includes a provision proposed by 
the Senate relating to laboratory directed research. The House 
proposed a similar provision.
      The conference agreement modifies a provision proposed by 
the Senate relating to pensions. The House proposed a similar 
provision.
      The conference agreement includes a provision proposed by 
the House and Senate relating to the Bonneville Power 
Administration Fund.
      The conference agreement includes a provision proposed by 
the House relating to wage rate requirements. The Senate 
proposed no similar provision.
      The conference agreement includes a provision proposed by 
the House and Senate relating to congressional notifications.
      The conference agreement includes a provision proposed by 
the House relating to the Advanced Technology Vehicle 
Manufacturing Loan Program. The Senate proposed no similar 
provision.
      The conference agreement includes a provision proposed by 
the Senate relating to the Strategic Petroleum Reserve. The 
House proposed no similar provision.
      The conference agreement modifies a provision proposed by 
the House in title I relating to the White River Minimum Flow, 
Arkansas, Project. The Senate proposed no similar provision.
      The conference agreement does not include a provision 
proposed by the Senate relating to the Nuclear Regulatory 
Commission. This item is addressed in title IV.
      The conference agreement does not include a provision 
proposed by the Senate relating to contracting. The House 
proposed no similar provision.
      The conference agreement does not include a provision 
proposed by the Senate relating to transfer authority. The 
House proposed no similar provision.


                                TITLE IV

                          INDEPENDENT AGENCIES

                    Appalachian Regional Commission

      The conference agreement provides $76,000,000 for the 
Appalachian Regional Commission, as proposed by the House and 
Senate.

                Defense Nuclear Facilities Safety Board

                         SALARIES AND EXPENSES

      The conference agreement provides $26,086,000 for the 
Defense Nuclear Facilities Safety Board, as proposed by the 
House and Senate.

                        Delta Regional Authority

                         SALARIES AND EXPENSES

      The conference agreement provides $13,000,000 for the 
Delta Regional Authority, as proposed by the House and Senate.

                           Denali Commission

      The conference agreement provides $11,965,000 for the 
Denali Commission, as proposed by the House and Senate.

                  Northern Border Regional Commission

      The conference agreement provides $1,500,000 for the 
Northern Border Regional Commission, instead of $3,000,000 as 
proposed by the House. The Senate bill provided no funds for 
this Commission. These funds shall be available for any 
authorized activities of the Commission.

                 Southeast Crescent Regional Commission

      The conference agreement provides $250,000 for the 
Southeast Crescent Regional Commission, instead of $500,000 as 
proposed by the House. The Senate bill provided no funds for 
this Commission. These funds shall be available for any 
authorized activities of the Commission.

                     Nuclear Regulatory Commission

                         SALARIES AND EXPENSES

      The conference agreement provides $1,056,000,000 for the 
Nuclear Regulatory Commission (NRC) salaries and expenses. This 
amount is offset by estimated revenues of $902,402,000, 
resulting in a net appropriation of $153,598,000. The fee 
recovery is consistent with that authorized by section 637 of 
the Energy Policy Act of 2005. The recommendation includes 
$29,000,000 to be made available from the Nuclear Waste Fund to 
support the geological repository for nuclear fuel and waste.
      The conferees direct the Commission to report on the 
status of its licensing and regulatory activities on a semi-
annual basis. The conferees support House language regarding a 
joint NRC/NNSA report on international activities, and include 
$10,000,000 to continue the academic scholarships and 
fellowships program and $5,000,000 for grants for research 
projects, both as proposed by the Senate.

                      OFFICE OF INSPECTOR GENERAL

      The conference agreement includes $10,860,000 for the 
Office of Inspector General in the Nuclear Regulatory 
Commission. This amount is offset by revenues of $9,774,000, 
for a net appropriation of $1,086,000.

                  Nuclear Waste Technical Review Board

                         SALARIES AND EXPENSES

      The conference agreement provides $3,891,000 for the 
Nuclear Waste Technical Review Board, as proposed by the House 
and Senate.

Office of the Federal Coordinator for Alaska Natural Gas Transportation 
                                Projects

      The conference agreement provides $4,466,000 for the 
Office of the Federal Coordinator for Alaska Natural Gas 
Transportation Projects, as proposed by the House and Senate.

                           General Provisions

      The conference agreement includes a provision proposed by 
the House relating to the Nuclear Regulatory Commission. The 
Senate proposed no similar provision.
      The conference agreement modifies a provision proposed by 
the Senate relating to the Delta Regional Authority. The House 
proposed a similar provision in title V.
      The conference agreement includes a provision proposed by 
the Senate relating to the Nuclear Regulatory Commission in 
title III. The House proposed no similar provision.

                                TITLE V

                           GENERAL PROVISIONS

      The conference agreement includes a provision proposed by 
the House and Senate relating to lobbying restrictions.
      The conference agreement modifies a provision proposed by 
the House relating to energy efficient light bulbs. The Senate 
proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to the Corps of Engineers and the Bureau of 
Reclamation administrative expenses. The House proposed no 
similar provision.
      The conference agreement modifies a provision proposed by 
the Senate relating to administrative expenses. The House 
proposed no similar provision.
      The conference agreement includes a provision proposed by 
the Senate relating to transfer authority. The House proposed 
no similar provision.
      The conference agreement does not include a provision 
proposed by the Senate relating to the posting of reports. The 
House proposed no similar provision.
      The conference agreement does not include a provision 
proposed by the House relating to the Delta Regional Authority. 
This provision is addressed in title IV.
      The conference agreement does not include a provision 
proposed by the House relating to the purchase of motor 
vehicles. The Senate proposed no similar provision.
      The conference agreement includes new language requiring 
full and open competition for specific projects contained in 
the report of the Committee on Appropriations of the House of 
Representatives accompanying this Act that are considered 
congressional earmarks for purposes of clause 9 of rule XXI of 
the Rules of the House of Representatives when intended to be 
awarded to a for-profit entity.
      The conference agreement includes new language providing 
for technical corrections to Division B of the conference 
report to accompany H.R. 2918.

   DISCLOSURE OF EARMARKS AND CONGRESSIONALLY DIRECTED SPENDING ITEMS

      Following is a list of congressional earmarks and 
congressionally directed spending items (as defined in clause 9 
of rule XXI of the Rules of the House of Representatives and 
rule XLIV of the Standing Rules of the Senate, respectively) 
included in the conference report or the accompanying joint 
statement of managers, along with the name of each Senator, 
House Member, Delegate, or Resident Commissioner who submitted 
a request to the Committee of jurisdiction for each item so 
identified. Neither the conference report nor the joint 
statement of managers contains any limited tax benefits or 
limited tariff benefits as defined in the applicable House or 
Senate rules. Pursuant to clause 9(b) of rule XXI of the Rules 
of the House of Representatives, neither the conference report 
nor the joint statement of managers contain any congressional 
earmarks, limited tax benefits, or limited tariff benefits that 
were not (1) committed to the conference committee by either 
House or (2) in a report of a committee of either House on this 
bill or on a companion measure.

                                                                                  ENERGY AND WATER DEVELOPMENT
                                                                            [Presidentially Directed Spending Items]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                      Requester(s)
           Agency                   Account                              Project                            Amount     -------------------------------------------------------------------------
                                                                                                                             Administration               House                   Senate
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       ALA WAI CANAL, OAHU, HI                                    $408,000  The President            Abercrombie              Inouye; Akaka
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       AUGUSTA, GA                                                $157,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       BAYOU SORREL LOCK, LA                                      $986,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       BOSTON HARBOR (45-FOOT CHANNEL), MA                        $426,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       BRAZOS ISLAND HARBOR, BROWNSVILLE CHANNEL, TX              $538,000  The President            Edwards (TX); Ortiz
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       BUFFALO RIVER ENVIRONMENTAL DREDGING, NY                   $197,000  The President            Higgins
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       CALCASIEU LOCK, LA                                         $852,000  The President            Boustany
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       CALIFORNIA COASTAL SEDIMENT MASTER PLAN, CA                $762,000  The President            Harman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       COLLECTION AND STUDY OF BASIC DATA: COASTAL FIELD          $897,000  The President            Bilbray; Woolsey         Wyden; Merkley
                                                    DATA COLLECTION (COASTAL DATA INFORMATION PROGRAM
                                                    & SOUTHERN CA BEACH PROCESSES STUDY, CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       COLLECTION AND STUDY OF BASIC DATA: COASTAL FIELD          $897,000  The President            Hirono                   Inouye
                                                    DATA COLLECTION (PACIFIC ISLAND LAND OCEAN TYPHOON
                                                    EXPERIMENT)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       COLLECTION AND STUDY OF BASIC DATA: COASTAL FIELD        $1,121,000  The President            Hirono                   Inouye
                                                    DATA COLLECTION (SURGE AND WAVE ISLAND MODELING
                                                    STUDIES, HI)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       COORDINATION WITH OTHER AGENCIES: OTHER                    $448,000  The President                                     Reid; Feinstein
                                                    COORDINATION PROGRAMS (LAKE TAHOE)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       COYOTE AND BERRYESSA CREEKS, CA                            $540,000  The President            Honda
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       CURRITUCK SOUND, NC                                        $126,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       DELAWARE RIVER BASIN COMPREHENSIVE, NJ                     $296,000  The President            Holt; Smith (NJ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       DES PLAINES RIVER, IL (PHASE II)                           $421,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       EASTERN SHORE, MID-CHESAPEAKE BAY ISLAND, MD               $314,000  The President            Cummings; Kratovil;      Mikulski; Cardin
                                                                                                                                                  Ruppersberger;
                                                                                                                                                  Sarbanes
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       EDISTO ISLAND, SC                                           $67,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       FREEPORT HARBOR, TX                                        $574,000  The President            Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       GIWW, HIGH ISLAND TO BRAZOS RIVER REALIGNMENTS, TX         $170,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       GREAT LAKES NAVIGATION SYSTEM STUDY, MI, IL, IN,           $341,000  The President
                                                    MN, NY, OH, PA & WI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       GUADALUPE AND SAN ANTONIO RIVER BASINS, TX                 $359,000  The President            Rodriguez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       HAMILTON CITY, CA                                          $341,000  The President            Herger
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       HUDSON-RARITAN ESTUARY, HACKENSACK MEADOWLANDS, NJ         $224,000  The President            Rothman (NJ); Sires      Lautenberg; Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       HUDSON-RARITAN ESTUARY, LOWER PASSAIC RIVER, NJ            $170,000  The President            Pascrell; Rothman (NJ);
                                                                                                                                                  Sires
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       HUDSON-RARITAN ESTUARY, NY & NJ                            $157,000  The President            Crowley; Sires
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       ILLINOIS RIVER BASIN RESTORATION, IL                       $336,000  The President            Halvorson; Schock
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       INDIAN RIVER LAGOON NORTH, FL                              $126,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       INDIANA HARBOR, IN                                         $500,000  The President            Visclosky
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       INTERBASIN CONTROL OF GREAT LAKES-MISSISSIPPI RIVER        $269,000  The President
                                                    AQUATIC NUISANCE SPECIES, IL, IN, OH, WI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       JAMAICA BAY, MARINE PARK AND PLUMB BEACH, NY               $170,000  The President            Sires; Weiner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       JOHN H. KERR DAM & RESERVOIR, VA & NC (SEC 216)            $251,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       KANSAS CITYS, MO & KS                                      $386,000  The President            Cleaver; Moore (KS)      Bond; Roberts
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       LOUISIANA COASTAL AREA ECOSYSTEM RESTORATION, LA        $17,930,000  The President            Boustany; Cao
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       LOUISIANA COASTAL PROTECTION AND RESTORATION, LA         $2,510,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       LOWER COLORADO RIVER BASIN, TX                             $484,000  The President            Conaway; Edwards (TX);   Hutchison
                                                                                                                                                  Smith (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       LOWER COLUMBIA RIVER ECOSYSTEM RESTORATION, OR & WA        $251,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       LYNNHAVEN RIVER BASIN, VIRGINIA BEACH, VA                   $95,000  The President            Nye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       MATANUSKA RIVER WATERSHED, AK                               $90,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       MERRIMACK RIVER WATERSHED STUDY, NH & MA                   $170,000  The President            Hodes
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       MILL CREEK WATERSHED, DAVIDSON COUNTY, TN                   $45,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       MINNESOTA RIVER WATERSHED STUDY, MN & SD                   $296,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       MISSOURI RIVER DEGRADATION, MO & KS                        $556,000  The President            Cleaver; Graves; Moore
                                                                                                                                                  (KS)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       NEUSE RIVER BASIN, NC                                      $170,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       NUECES RIVER AND TRIBUTARIES, TX                           $368,000  The President            Gonzalez; Ortiz;         Hutchison
                                                                                                                                                  Rodriguez; Smith (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       PILGRIM LAKE, TRURO & PROVINCETOWN, MA                      $90,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       PIMA COUNTY (TRES RIOS DEL NORTE), AZ                      $233,000  The President            Giffords; Grijalva
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       PORT EVERGLADES HARBOR, FL                                 $341,000  The President            Wasserman Schultz
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       PUGET SOUND NEARSHORE MARINE HABITAT RESTORATION,          $341,000  The President            Baird; Dicks; Inslee;
                                                    WA                                                                                            Larsen (WA);
                                                                                                                                                  McDermott; Smith (WA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       PUYALLUP RIVER, WA                                         $368,000  The President            Dicks; Smith (WA)        Murray; Cantwell
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       RED RIVER OF THE NORTH BASIN, ND, MN, SD &               $3,000,000  The President            Pomeroy                  Dorgan; Klobuchar;
                                                    MANITOBA, CANADA                                                                                                       Conrad
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       RIO GRANDE BASIN, TX                                       $260,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       SABINE PASS TO GALVESTON BAY, TX                           $170,000  The President            Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       SAC-SAN JOAQUIN DELTA, DELTA ISLANDS AND LEVEES, CA        $394,000  The President            McNerney
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       SHREWSBURY RIVER BASIN AND TRIBUTARIES, NJ                 $458,000  The President            Pallone
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       SOLANA-ENCINITAS SHORELINE, CA                             $305,000  The President            Bilbray                  Feinstein; Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       SUTTER COUNTY, CA                                          $628,000  The President            Herger                   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       TOPEKA, KS                                                 $143,000  The President                                     Roberts
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       TYBEE ISLAND, GA                                           $179,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       UPPER PENITENCIA CREEK, CA                                 $323,000  The President            Honda
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       VA SHLY'AY AKIMEL SALT RIVER RESTORATION, AZ               $363,000  The President            Mitchell; Pastor (AZ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       WALLA WALLA WATERSHED, OR & WA                             $170,000  The President            McMorris Rodgers;
                                                                                                                                                  Walden
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       WILD RICE RIVER, MN (RED RIVER OF THE NORTH BASIN)         $243,000  The President            Peterson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       WILLAMETTE RIVER FLOODPLAIN RESTORATION, OR                $137,000  The President            Wu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       YAKUTAT HARBOR, AK                                          $90,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations       YELLOWSTONE RIVER CORRIDOR, MT                             $179,000  The President            Rehberg
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations--PAS  WILLOW CREEK/BOYER RIVER BASIN, MISSOURI VALLEY, IA         $81,000  The President                                     Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Investigations--R&D  RESEARCH AND DEVELOPMENT                                $20,508,000  The President                                     Cochran
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         ALTON TO GALE ORGANIZED LEVEE DISTRICT, IL & MO            $283,000  The President            Costello
                                                    (DEF CORR)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         AMERICAN RIVER WATERSHED (COMMON FEATURES), CA           $6,330,000  The President            Lungren, Dan; Matsui
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         AMERICAN RIVER WATERSHED (FOLSOM DAM                    $63,016,000  The President            Lungren, Dan; Matsui
                                                    MODIFICATIONS), CA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         AMERICAN RIVER WATERSHED (FOLSOM DAM RAISE &               $567,000  The President            Lungren, Dan; Matsui
                                                    BRIDGE), CA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         ANTELOPE CREEK, LINCOLN, NE                              $5,382,000  The President            Fortenberry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         ASSATEAGUE ISLAND, MD                                      $500,000  The President            Kratovil
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST         $904,000  The President            King (NY)                Schumer
                                                    ROCKAWAY INLET, LONG BEACH ISLAND, NY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         ATLANTIC COAST OF NYC, ROCKAWAY INLET TO NORTON          $3,000,000  The President            Nadler (NY)
                                                    POINT, NY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         ATLANTIC INTRACOASTAL WATERWAY BRIDGE REPLACEMENT          $100,000  The President            Forbes
                                                    AT DEEP CREEK, CHESAPEAKE, VA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         BLUE RIVER CHANNEL, KANSAS CITY, MO                      $5,291,000  The President            Cleaver
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         BLUESTONE LAKE, WV (DAM SAFETY ASSURANCE)               $81,911,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         BRAYS BAYOU, HOUSTON, TX                                 $7,777,000  The President            Culberson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CANTON LAKE, OK (DAM SAFETY)                            $22,911,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CAPE MAY INLET TO LOWER TOWNSHIP, NJ                       $189,000  The President            LoBiondo
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CAROLINA BEACH AND VICINITY, NC                          $1,417,000  The President            McIntyre
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CEDAR HAMMOCK, WARES CREEK, FL                           $5,565,000  The President            Buchanan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CENTER HILL DAM, TN (SEEPAGE CONTROL)                   $52,907,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CHAIN OF ROCKS CANAL, MISSISSIPPI RIVER, IL (DEF         $6,141,000  The President            Costello; Shimkus
                                                    CORR)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CHESTERFIELD, MO                                         $3,147,000  The President            Akin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CHICAGO SANITARY AND SHIP CANAL, DISPERSAL BARRIER,      $5,826,000  The President            Dahlkemper; Davis (IL);  Durbin; Levin;
                                                    IL                                                                                            Ehlers; Kucinich;        Stabenow
                                                                                                                                                  Oberstar; Petri;
                                                                                                                                                  Roskam; Slaughter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CHICKAMAUGA LOCK, TENNESSEE RIVER, TN                    $1,000,000  The President            Davis (TN); Wamp
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CHIEF JOSEPH DAM GAS ABATEMENT, WA                         $945,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         CLEARWATER LAKE, MO (SEEPAGE CONTROL)                   $37,791,000  The President            Emerson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         COLUMBIA RIVER FISH MITIGATION, WA, OR & ID             $80,693,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         COLUMBIA RIVER TREATY FISHING ACCESS SITES, OR & WA        $472,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         DELAWARE BAY COASTLINE, ROOSEVELT INLET TO LEWES           $331,000  The President            Castle
                                                    BEACH, DE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         DES PLAINES RIVER, IL                                    $4,729,000  The President            Roskam; Schakowsky       Durbin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         DOVER DAM, MUSKINGUM RIVER, OH                          $17,478,000  The President            Space
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         DREDGED MATERIAL DISPOSAL FACILITIES PROGRAM:              $900,000  The President
                                                    SAVANNAH HARBOR DMDF, GA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         DREDGED MATERIAL DISPOSAL FACILITIES PROGRAM:            $1,000,000  The President            Brown, Corrine;
                                                    JACKSONVILLE HARBOR, FL                                                                       Crenshaw
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         DUWAMISH AND GREEN RIVER BASIN, WA                       $2,456,000  The President            Dicks; McDermott;
                                                                                                                                                  Reichert; Smith (WA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         EAST ST. LOUIS, IL                                         $500,000  The President            Costello; Shimkus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         ELK CREEK LAKE, OR                                         $472,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         EMSWORTH LOCKS & DAM, OHIO RIVER, PA (STATIC            $23,619,000  The President            Altmire; Doyle
                                                    INSTABILITY CORRECTION)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         FIRE ISLAND INLET TO MONTAUK POINT, NY                   $5,480,000  The President            King (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         GARRISON DAM AND POWER PLANT, ND (REPLACEMENT)           $8,144,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         GREAT EGG HARBOR INLET AND PECK BEACH, NJ                $6,141,000  The President            LoBiondo
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         HAMILTON AIRFIELD WETLANDS RESTORATION, CA              $14,250,000  The President            Pelosi; Woolsey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         HERBERT HOOVER DIKE, FL (SEEPAGE CONTROL)              $122,819,000  The President            Rooney
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         HOWARD HANSON DAM, WA                                   $12,282,000  The President            Dicks
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         INDIANA HARBOR, CONFINED DISPOSAL FACILITY, IN          $13,500,000  The President            Visclosky
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         J. BENNETT JOHNSTON WATERWAY, LA                         $6,613,000  The President            Alexander; Fleming
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         JOHN H. KERR DAM AND RESERVOIR, VA & NC                 $15,981,000  The President
                                                    (REPLACEMENT)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         KANSAS CITYS, MO & KS                                      $100,000  The President            Graves
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         KAWEAH RIVER, CA                                           $605,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         KENTUCKY LOCK AND DAM, TENNESSEE RIVER, KY                 $945,000  The President            Whitfield
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         LAROSE TO GOLDEN MEADOW, LA (HURRICANE PROTECTION)       $5,800,000  The President            Melancon                 Landrieu; Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         LITTLE CALUMET RIVER, IN                                $20,000,000  The President            Visclosky
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         LOCKS AND DAMS 2, 3 AND 4, MONONGAHELA RIVER, PA         $6,210,000  The President            Doyle; Murphy, Tim;
                                                                                                                                                  Murtha
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         LOS ANGELES HARBOR MAIN CHANNEL DEEPENING, CA              $836,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         LOWER CAPE MAY MEADOWS, CAPE MAY POINT, NJ                 $378,000  The President            LoBiondo
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         LOWER COLUMBIA RIVER ECOSYSTEM RESTORATION, OR & WA      $1,559,000  The President            Baird; Blumenauer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         LOWER SNAKE RIVER FISH AND WILDLIFE COMPENSATION,        $1,417,000  The President
                                                    WA, OR & ID
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         MARKLAND LOCKS AND DAM, KY (MAJOR REHAB)                   $945,000  The President            Davis (KY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         MARTIN COUNTY, FL                                          $331,000  The President            Rooney
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         MCCOOK AND THORNTON RESERVOIRS, IL                      $19,376,000  The President            Bean; Davis (IL);
                                                                                                                                                  Gutierrez; Jackson
                                                                                                                                                  (IL); Quigley; Roskam;
                                                                                                                                                  Schakowsky
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         MISSISSIPPI RIVER BETWEEN THE OHIO AND MISSOURI            $548,000  The President
                                                    RIVERS (REG WORKS), MO & IL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         MISSOURI RIVER FISH MITIGATION, IA, KS, MO, MT, NE,     $56,686,000  The President            Rehberg
                                                    ND & SD
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         MT. ST. HELENS SEDIMENT CONTROL, WA                      $1,417,000  The President            Baird
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         MUD MOUNTAIN DAM, WA (FISH PASSAGE)                        $378,000  The President            Dicks; Reichert; Smith
                                                                                                                                                  (WA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         MUDDY RIVER, MA                                          $5,208,000  The President            Frank (MA)               Kennedy; Kerry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         NAPA RIVER, CA                                           $1,000,000  The President            Thompson (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         NAPA RIVER, SALT MARSH RESTORATION, CA                     $100,000  The President            Miller, George;
                                                                                                                                                  Thompson (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         NEW YORK AND NEW JERSEY HARBOR, NY & NJ                 $90,000,000  The President            Sires                    Lautenberg; Menendez;
                                                                                                                                                                           Schumer; Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         NORFOLK HARBOR, CRANEY ISLAND, VA                          $100,000  The President            Nye; Scott (VA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         OAKLAND HARBOR (50 FOOT PROJECT), CA                     $1,000,000  The President            Lee (CA); Pelosi
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         OLMSTED LOCKS AND DAM, OHIO RIVER, IL & KY             $101,521,000  The President            Whitfield
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         PINELLAS COUNTY, FL                                     $10,657,000  The President            Young (FL)               Bill Nelson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         POPLAR ISLAND, MD                                        $8,078,000  The President            Cummings; Kratovil;      Mikulski; Cardin
                                                                                                                                                  Ruppersberger;
                                                                                                                                                  Sarbanes
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         PORTUGUES AND BUCANA RIVERS, PR                         $39,680,000  The President            Pierluisi
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         PRESQUE ISLE PENINSULA, PA (PERMANENT)                     $945,000  The President            Dahlkemper
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         RARITAN RIVER BASIN, GREEN BROOK SUB-BASIN, NJ           $6,613,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         RICHARD B. RUSSEL DAM & LAKE, GA & SC                    $1,526,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL              $756,000  The President            Teague
                                                    APACHE, NM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         RIO PUERTO NUEVO, PR                                     $4,239,000  The President            Pierluisi
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         ROANOKE RIVER UPPER BASIN, HEADWATERS AREA, VA           $1,016,000  The President            Goodlatte
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         SACRAMENTO DEEPWATER SHIP CHANNEL, CA                    $2,000,000  The President            Tauscher; Thompson (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         SACRAMENTO RIVER BANK PROTECTION PROJECT, CA            $14,171,000  The President            Herger; Matsui;
                                                                                                                                                  McNerney
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         SANTA ANA RIVER MAINSTEM, CA                            $49,310,000  The President            Calvert; Miller, Gary;
                                                                                                                                                  Rohrabacher; Sanchez,
                                                                                                                                                  Loretta
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         SAVANNAH HARBOR EXPANSION, GA                            $1,429,000  The President            Barrow; Bishop (GA);
                                                                                                                                                  Deal; Gingrey (GA);
                                                                                                                                                  Kingston; Linder;
                                                                                                                                                  Scott (GA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         SIMS BAYOU, HOUSTON, TX                                 $20,736,000  The President            Green, Al
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         SOUTH FLORIDA EVERGLADES ECOSYSTEM RESTORATION, FL     $180,064,000  The President            Diaz-Balart, Lincoln;
                                                                                                                                                  Diaz-Balart, Mario;
                                                                                                                                                  Hastings (FL); Klein
                                                                                                                                                  (FL); Rooney;
                                                                                                                                                  Wasserman Schultz;
                                                                                                                                                  Wexler
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         SOUTH SACRAMENTO COUNTY STREAMS, CA                      $2,500,000  The President            Lungren, Dan; Matsui     Feinstein; Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         ST. LOUIS FLOOD PROTECTION, MO                             $535,000  The President            Carnahan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         ST. PAUL HARBOR, ST. PAUL, AK                            $2,834,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         SUCCESS DAM AND RESERVOIR, CA (DAM SAFETY)               $2,500,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         TEXAS CITY CHANNEL, TX                                   $6,637,000  The President            Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         TURKEY CREEK BASIN, KANSAS CITY, KS & MO                 $2,822,000  The President            Cleaver; Moore (KS)      Roberts; Brownback;
                                                                                                                                                                           Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         UPPER MISSISSIPPI RIVER RESTORATION, IL, IA, MN, MO     $16,470,000  The President            Akin; Boswell;
                                                    & WI                                                                                          Carnahan; Ellison;
                                                                                                                                                  Halvorson; Hare;
                                                                                                                                                  Jackson (IL);
                                                                                                                                                  Loebsack; McCollum;
                                                                                                                                                  Oberstar; Schock;
                                                                                                                                                  Shimkus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         WASHINGTON, DC & VICINITY                                  $100,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         WEST ONSLOW BEACH AND NEW RIVER INLET TOPSAIL              $378,000  The President            McIntyre
                                                    BEACH, NC
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         WILLAMETTE RIVER TEMPERATURE CONTROL, OR                $10,392,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         WILMINGTON HARBOR, NC                                    $1,701,000  The President            McIntyre
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         WOLF CREEK DAM, LAKE CUMBERLAND, KY (SEEPAGE           $116,206,000  The President            Rogers (KY); Whitfield
                                                    CONTROL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Construction         WOOD RIVER LEVEE, IL                                     $1,105,000  The President            Costello; Shimkus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          CAMP CREEK, ZUMWALT PRAIRIE PRESERVE, OR             ..............  The President            Walden
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          CARPENTER CREEK, WA                                  ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          CHARITON RIVER/RATHBUN LAKE WATERSHED, IA            ..............  The President            Boswell; Loebsack        Harkin; Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          DRAYTON DAM, ND                                      ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          EMIQUON FLOODPLAIN RESTORATION, IL                   ..............  The President            Hare; Schock
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          EUGENE DELTA PONDS, OR                               ..............  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          GOOSE CREEK, CO                                      ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          JACKSON CREEK, GWINETT COUNTY, GA                    ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          KELLOGG CREEK, OR                                    ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          LITTLE RIVER WATERSHED, HALL COUNTY, GA              ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          MALDEN RIVER ECOSYSTEM, MA                           ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          MOSES LAKE, TX                                       ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          OAKS BOTTOM, OR                                      ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          ORLAND PARK, IL                                      ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          RIO GRANDE, LAREDO, TX                               ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          SPRING LAKE, SAN MARCOS, TX                          ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          SPRINGFIELD MILLRACE, OR                             ..............  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          STORM LAKE, IA                                       ..............  The President            King (IA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          VENTURA MARSH, CLEAR LAKE, IA                        ..............  The President            Latham
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          WILSON BAY RESTORATION, JACKSONVILLE, NC             ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 206          WWTP, STEPHENVILLE, TX                               ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          ATACHAFALAYA RIVER, SHELL ISLAND PASS, ST. MARY      ..............  The President
                                                    PARISH, LA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          BARATARIA BAY WATERWAY, MILE 6.0--0.0, PLAQUEMINES   ..............  The President
                                                    PH, LA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          BLACKHAWK BOTTOMS, DES MOINES COUNTY, IA             ..............  The President            Loebsack
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          BUFFALO RIVER REGIONAL SEDIMENT MANAGEMENT, NY       ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          CALCASIEU RIVER, MILE 5.0--14.0, CAMERON PARISH, LA  ..............  The President            Boustany
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          CAPE COD CANAL, SANDWICH, MA                         ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          MANTEO, OLD HOUSE CHANNEL, NC                        ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          MAUMEE BAY HABITAT RESTORATION, OH                   ..............  The President            Kaptur
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          NEWBURYPORT HARBOR, MA                               ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          NJIWW BENEFICIAL USE, NJ                             ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 204          WYNN ROAD, OREGON, OH                                ..............  The President            Kaptur
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          BEAVER CREEK & TRIBS, BRISTOL, TN                    ..............  The President            Boucher
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          BLANCHARD RIVER, FINDLAY, OH                         ..............  The President            Jordan (OH); Latta
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          BLANCHARD RIVER, OTTAWA, OH                          ..............  The President            Latta
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          DUCK CREEK, OH (FLOOD WARNING SYSTEM)                ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          EUREKA CREEK, MANHATTAN, KS                          ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          LITTLE RIVER DIVERSION, DUTCHTOWN, MO                ..............  The President            Emerson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          LIVINGSTON, MT                                       ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          MAD CREEK, MUSCATINE, IA                             ..............  The President            Loebsack
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          PLATTE RIVER, FREMONT, NE                            ..............  The President            Fortenberry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          PLATTE RIVER, SCHUYLER, NE                           ..............  The President            Fortenberry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          RIO DESCALABRADO, SANTA ISABEL, PR                   ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          RIO GUAMANI, GUAYAMA, PR                             ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          SUN VALLEY, EL PASO, TX                              ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          WEST VIRGINIA STATEWIDE FLOOD WARNING SYSTEM, WV     ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 205          WYNNE, AR                                            ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 111          BRUNSWICK HARBOR/JEKYLL ISLAND, GA                   ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 111          CAMP ELLIS, SACO, ME                                 ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 111          EAST PASS CHANNEL, PANAMA CITY, FL                   ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 111          FAIRPORT HARBOR, OH                                  ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 111          MANISTEE HARBOR & RIVER CHANNEL, MI                  ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 111          MOBILE PASS, AL                                      ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 111          VERMILLION, OH                                       ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 111          WHITCOMB FLATS, WA                                   ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 107          BUCKS HARBOR, MACHIASPORT, ME                        ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 107          MACKINAC ISLAND HARBOR BREAKWATER, MI                ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 107          SAVOONGA HARBOR, ST LAWRENCE, AK                     ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         AQUATIC HABITAT RESTORATION AT PUEBLO OF SANTA ANA,  ..............  The President
                                                    NM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         BENNINGTON LAKE DIVERSION DAM, WA                    ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         BLOOMINGTON STATE PARK, MO                           ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         BLUE VALLEY WETLANDS, JACKSON COUNTY, MO             ..............  The President            Cleaver
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         BRAIDED REACH, ID                                    ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         DUCK CREEK, STODDARD COUNTY, MO                      ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         GREEN RIVER DAM MOD, KY                              ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         LOWER COLUMBIA SLOUGH, OR                            ..............  The President            Blumenauer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         LOWER KINGMAN ISLAND, DC                             ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         PRISON FARM SHORELINE HABITAT, ND                    ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         SHORTY'S ISLAND, ID                                  ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         TAPPAN LAKE, OH                                      ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 1135         WALLA WALLA RIVER, OR                                ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 103          COASTAL AREAS, MARSHFIELD, MA                        ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 103          FORT SAN GERONIMO, PR                                ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            Section 103          LINCOLN PARK BEACH, SEATTLE, WA                      ..............  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Investigations  COLDWATER RIVER BASIN BELOW ARKABUTLA LAKE, MS             $338,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Investigations  COLLECTION AND STUDY OF BASIC DATA, AR, IL, KY, LA,      $1,608,000  The President                                     Cochran; Landrieu;
                                                    MS, MO & TN                                                                                                            Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Investigations  DONALDSONVILLE TO THE GULF, LA                             $386,000  The President            Melancon
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Investigations  MEMPHIS METRO AREA, STORM WATER MANAGEMENT STUDY,           $97,000  The President
                                                    TN
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Construction    ATCHAFALAYA BASIN FLOODWAY SYSTEM, LA                    $2,898,000  The President                                     Landrieu; Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Construction    ATCHAFALAYA BASIN, LA                                   $14,491,000  The President            Melancon                 Landrieu; Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Construction    CHANNEL IMPROVEMENT, AR, IL, KY, LA, MS, MO & TN        $46,102,000  The President            Berry; Taylor
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Construction    MISSISSIPPI DELTA REGION, LA                             $2,174,000  The President            Cao
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Construction    MISSISSIPPI RIVER LEVEES, AR, IL, KY, LA, MS, MO &      $44,702,000  The President            Berry; Cao; Emerson      Cochran; Pryor;
                                                    TN                                                                                                                     Landrieu; Bond;
                                                                                                                                                                           Lincoln; Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  ATCHAFALAYA BASIN FLOODWAY SYSTEM, LA                    $2,446,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  ATCHAFALAYA BASIN, LA                                   $11,954,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  BATON ROUGE HARBOR, DEVIL SWAMP, LA                         $42,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  BAYOU COCODRIE AND TRIBUTARIES, LA                          $52,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  BONNET CARRE, LA                                         $3,381,000  The President                                     Landrieu; Vitter
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  CHANNEL IMPROVEMENT, AR, IL, KY, LA, MS, MO & TN        $65,065,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  GREENVILLE HARBOR, MS                                      $516,000  The President            Thompson (MS)            Cochran; Wicker
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  HELENA HARBOR, PHILLIPS COUNTY, AR                         $211,000  The President            Berry
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  INSPECTION OF COMPLETED WORKS, AR                          $411,000  The President            Boozman
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  INSPECTION OF COMPLETED WORKS, IL                          $185,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  INSPECTION OF COMPLETED WORKS, KY                           $97,000  The President            Yarmuth
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  INSPECTION OF COMPLETED WORKS, LA                        $1,658,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  INSPECTION OF COMPLETED WORKS, MO                          $145,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  INSPECTION OF COMPLETED WORKS, MS                           $24,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  INSPECTION OF COMPLETED WORKS, TN                           $43,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  LOWER ARKANSAS RIVER, NORTH BANK, AR                       $215,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  LOWER ARKANSAS RIVER, SOUTH BANK, AR                       $169,000  The President                                     Pryor; Lincoln
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  LOWER RED RIVER, SOUTH BANK LEVEES, LA                      $97,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  MEMPHIS HARBOR, MCKELLAR LAKE, TN                        $1,369,000  The President            Cohen
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  MISSISSIPPI DELTA REGION--CAERNARVON, LA                 $1,739,000  The President                                     Landrieu
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  MISSISSIPPI RIVER LEVEES, AR, IL, KY, LA, MS, MO &      $11,311,000  The President            Berry; Cao; Emerson      Cochran; Landrieu;
                               Maintenance          TN                                                                                                                     Pryor; Lincoln;
                                                                                                                                                                           Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  OLD RIVER, LA                                            $9,854,000  The President                                     Landrieu
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  ST. FRANCIS RIVER AND TRIBUTARIES, AR & MO               $9,509,000  The President            Berry; Emerson           Pryor; Bond; Lincoln
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  TENSAS BASIN, BOEUF AND TENSAS RIVERS, AR & LA           $2,401,000  The President            Ross
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  TENSAS BASIN, RED RIVER BACKWATER, LA                    $3,536,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  VICKSBURG HARBOR, MS                                       $519,000  The President                                     Cochran; Wicker
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  WAPPAPELLO LAKE, MO                                      $5,232,000  The President            Emerson
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  WHITE RIVER BACKWATER, AR                                $1,176,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, ARKABUTLA LAKE, MS                          $6,637,000  The President                                     Cochran; Wicker
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, BIG SUNFLOWER RIVER, MS                     $2,319,000  The President                                     Cochran; Wicker
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, ENID LAKE, MS                               $7,381,000  The President                                     Cochran; Wicker
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, GREENWOOD, MS                                 $780,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, GRENADA LAKE, MS                            $7,131,000  The President                                     Cochran; Wicker
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, MAIN STEM, MS                               $2,705,000  The President                                     Cochran; Wicker
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, SARDIS LAKE, MS                             $8,871,380  The President                                     Cochran; Wicker
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, TRIBUTARIES, MS                               $797,004  The President                                     Cochran; Wicker
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, WILL M WHITTINGTON AUX CHAN, MS               $386,000  The President                                     Cochran; Wicker
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, YAZOO BACKWATER AREA, MS                      $526,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            MRT--Operations and  YAZOO BASIN, YAZOO CITY, MS                                $706,000  The President
                               Maintenance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ABIQUIU DAM, NM                                          $3,141,000  The President            Lujan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ALABAMA--COOSA COMPREHENSIVE WATER STUDY, AL               $240,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ALABAMA RIVER LAKES, AL                                 $15,951,000  The President            Bonner; Davis (AL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ALAMO LAKE, AZ                                           $1,465,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ALBENI FALLS DAM, ID                                     $1,468,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ALLATOONA LAKE, GA                                       $6,725,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ALLEGHENY RIVER, PA                                      $8,590,000  The President            Doyle
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ALMOND LAKE, NY                                            $498,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ALUM CREEK LAKE, OH                                      $1,468,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ALVIN R. RUSH DAM, PA                                      $626,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ANCHORAGE HARBOR, AK                                    $17,732,000  The President            Young (AK)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  APALACHICOLA, CHATTAHOOCHEE AND FLINT RIVERS, GA,        $2,316,000  The President
                                                    AL & FL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  APPLEGATE LAKE, OR                                       $1,237,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  AQUILLA LAKE, TX                                         $1,564,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ARCADIA LAKE, OK                                           $495,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ARKANSAS-RED RIVER BASINS CHLORIDE CONTROL-AREA          $1,481,000  The President
                                                    VIII, TX
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ARKPORT DAM, NY                                            $283,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ASHTABULA HARBOR, OH                                     $1,267,000  The President                                     Voinovich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ATCHAFALAYA RIVER AND BAYOUS CHENE, BOEUF & BLACK,      $11,062,000  The President            Alexander; Melancon
                                                    LA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ATLANTIC INTRACOASTAL WATERWAY--ACC, VA                  $2,490,000  The President            Forbes
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ATLANTIC INTRACOASTAL WATERWAY--DSC, NC & VA             $1,311,000  The President                                     Webb; Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ATLANTIC INTRACOASTAL WATERWAY, GA                         $885,000  The President            Kingston                 Chambliss
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ATLANTIC INTRACOASTAL WATERWAY, NC                       $4,086,000  The President            McIntyre
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ATLANTIC INTRACOASTAL WATERWAY, SC                       $1,811,000  The President            Brown (SC); Wilson (SC)  Graham
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  AYLESWORTH CREEK LAKE, PA                                  $204,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  B. EVERETT JORDAN DAM AND LAKE, NC                       $1,804,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BALL MOUNTAIN, VT                                          $815,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BALTIMORE HARBOR AND CHANNELS (50 FOOT), MD             $17,500,000  The President            Cummings;                Mikulski; Cardin
                                                                                                                                                  Ruppersberger;
                                                                                                                                                  Sarbanes
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BALTIMORE HARBOR, MD (DRIFT REMOVAL)                       $342,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BARATARIA BAY WATERWAY, LA                                 $157,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BARBERS POINT HARBOR, HI                                   $191,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BARDWELL LAKE, TX                                        $2,118,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BARKLEY DAM AND LAKE, BARKLEY, KY & TN                   $9,877,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BARNEGAT INLET, NJ                                         $334,000  The President            Adler (NJ)               Lautenberg; Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BARRE FALLS DAM, MA                                        $716,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BARREN RIVER LAKE, KY                                    $2,389,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BAYOU BODCAU RESERVOIR, LA                                 $907,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BAYOU LAFOURCHE AND LAFOURCHE-JUMP WATERWAY, LA          $1,151,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BAYOU PIERRE, LA                                            $24,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BAYOU SEGNETTE WATERWAY, LA                                 $49,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BAYOU TECHE & VERMILLION RIVER, LA                          $15,000  The President            Boustany
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BAYOU TECHE, LA                                            $190,000  The President            Boustany
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BAYPORT SHIP CHANNEL, TX                                 $4,721,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BEAR CREEK DAM & LAKE, CO                                  $375,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BEAVER LAKE, AR                                          $8,424,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BEECH FORK LAKE, WV                                      $1,335,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BELTON LAKE, TX                                          $3,117,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BELTZVILLE LAKE, PA                                      $1,141,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BENBROOK LAKE, TX                                        $2,447,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BERLIN LAKE, OH                                          $2,089,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BIG BEND DAM, LAKE SHARPE, SD                            $9,383,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BIG SANDY HARBOR, KY                                     $1,625,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BIGSTONE LAKE AND WHETSTONE RIVER, MN & SD                 $262,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BILOXI HARBOR, MS                                        $1,188,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BIRCH HILL DAM, MA                                       $1,143,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BIRCH LAKE, OK                                             $857,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BLACK BUTTE LAKE, CA                                     $2,123,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BLACK ROCK CHANNEL AND TONAWANDA HARBOR, NY              $1,428,000  The President            Higgins
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BLACK ROCK LAKE, CT                                      $1,365,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BLACK WARRIOR AND TOMBIGBEE RIVERS, AL                  $22,979,000  The President            Aderholt; Bachus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BLACKWATER DAM, NH                                         $580,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BLAKLEY MT DAM, LAKE OUACHITA, AR                        $6,743,000  The President            Ross                     Pryor; Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BLUE MARSH LAKE, PA                                      $2,562,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BLUE MOUNTAIN LAKE, AR                                   $1,819,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BLUE RIVER LAKE, OR                                        $893,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BLUESTONE LAKE, WV                                       $1,579,000  The President            Rahall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BONNEVILLE LOCK & DAM, OR & WA                          $13,220,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BOSTON HARBOR, MA                                        $6,652,000  The President            Lynch
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BOWMAN HALEY, ND                                           $333,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BRAZOS ISLAND HARBOR, TX                                 $4,959,000  The President            Edwards (TX); Ortiz      Cornyn
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BROKEN BOW LAKE, OK                                      $3,043,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BROOKVILLE LAKE, IN                                        $819,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BRUNSWICK HARBOR, GA                                     $6,801,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BUCHANAN DAM, HV EASTMAN LAKE, CA                        $1,940,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BUCKHORN LAKE, KY                                        $1,506,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BUFFALO BAYOU & TRIBUTARIES, TX                          $2,811,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BUFFALO HARBOR, NY                                       $1,548,000  The President            Higgins                  Schumer; Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BUFFUMVILLE LAKE, MA                                       $794,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BUFORD DAM AND LAKE SIDNEY LANIER, GA                    $8,481,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BULL SHOALS LAKE, AR                                    $13,644,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BURNS WATERWAY HARBOR, IN                                  $157,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BURNSVILLE LAKE, WV                                      $2,134,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  BUTTERMILK CHANNEL, NY                                   $1,673,000  The President            Nadler (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CADDO LAKE, LA                                             $213,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CAESAR CREEK LAKE, OH                                    $1,425,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CAGLES MILL LAKE, IN                                       $848,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CALCASIEU RIVER AND PASS, LA                            $19,888,000  The President            Boustany                 Landrieu; Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CALUMET HARBOR AND RIVER, IL & IN                        $4,621,000  The President            Jackson (IL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CANAVERAL HARBOR, FL                                     $4,372,000  The President            Posey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CANTON LAKE, OK                                          $2,107,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CANYON LAKE, TX                                          $3,806,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CAPE COD CANAL, MA                                      $12,604,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CAPE FEAR RIVER ABOVE WILMINGTON, NC                       $939,000  The President            McIntyre
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CARLYLE LAKE, IL                                         $4,914,000  The President            Shimkus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CARR CREEK LAKE, KY                                      $1,651,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CARTERS DAM AND LAKE, GA                                 $7,905,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CARUTHERSVILLE HARBOR, MO                                  $482,000  The President            Emerson                  Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CAVE RUN LAKE, KY                                          $880,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CECIL M. HARDEN LAKE, IN                                   $976,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CEDAR BAYOU, TX                                          $1,701,000  The President            Edwards (TX); Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CENTER HILL LAKE, TN                                     $5,838,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CENTRAL & SOUTHERN FLORIDA, FL                          $22,967,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CENTRAL AND SOUTHERN FLORIDA, FL: EVERGLADES AND           $575,000  The President            Wasserman Schultz
                                                    SOUTH FLORIDA ECOSYSTEM RESTORATION, FL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHANNEL TO HARLINGEN, TX                                 $2,054,000  The President            Edwards (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHANNEL TO PORT BOLIVAR, TX                                $364,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHANNELS IN LAKE ST. CLAIR, MI                           $1,555,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHARLES RIVER NATURAL VALLEY STORAGE AREA, MA              $261,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHARLESTON HARBOR, SC                                   $10,163,000  The President            Brown (SC)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHARLEVOIX HARBOR, MI                                      $193,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHATFIELD DAM & LAKE, CO                                 $1,370,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHEATHAM LOCK AND DAM, TN                                $6,133,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHENA RIVER LAKES, AK                                    $2,676,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHERRY CREEK DAM & LAKE, CO                              $1,900,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHETCO RIVER, OR                                           $864,000  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHICAGO HARBOR, IL                                       $3,696,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHICAGO RIVER, IL                                          $469,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHICKAMAUGA LOCK, TENNESSEE RIVER, TN                    $3,775,000  The President            Wamp
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHIEF JOSEPH DAM, WA                                       $751,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CHINCOTEAGUE INLET, VA                                     $868,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CLAIRBORNE COUNTY PORT, MS                                  $74,000  The President                                     Cochran; Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CLARENCE CANNON DAM AND MARK TWAIN LAKE, MO              $6,475,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CLARENCE J BROWN DAM, OH                                 $1,088,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CLEARWATER LAKE, MO                                      $2,827,000  The President            Emerson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CLEVELAND HARBOR, OH                                     $7,460,000  The President                                     Voinovich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CLINTON LAKE, KS                                         $1,970,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COCHITI LAKE, NM                                         $6,534,000  The President            Lujan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COLD BROOK LAKE, SD                                        $414,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COLD SPRING INLET, NJ                                      $238,000  The President            LoBiondo
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COLEBROOK RIVER LAKE, CT                                   $584,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COLUMBIA & LWR WILLAMETTE R BLW VANCOUVER, WA AND       $23,278,000  The President            Baird
                                                    PORTLAND, OR
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COLUMBIA RIVER AT BAKER BAY, WA & OR                       $674,000  The President            Baird                    Murray; Cantwell
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COLUMBIA RIVER AT THE MOUTH, OR & WA                    $12,302,000  The President            Baird
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COLUMBIA RIVER BETWEEN CHINOOK AND SAND ISLAND, WA         $771,000  The President            Baird                    Murray
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COLUMBIA RIVER BETWEEN VANCOUVER, WA & THE DALLES,         $655,000  The President
                                                    OR
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CONANT BROOK LAKE, MA                                      $200,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CONCHAS LAKE, NM                                         $1,707,000  The President            Lujan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CONEMAUGH RIVER LAKE, PA                                 $1,191,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CONNEAUT HARBOR, OH                                      $1,132,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COOPER RIVER, CHARLESTON HARBOR, SC                      $4,452,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COOS BAY, OR                                             $4,904,000  The President            DeFazio                  Wyden; Merkley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COPAN LAKE, OK                                             $984,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COQUILLE RIVER, OR                                         $437,000  The President            DeFazio                  Wyden; Merkley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CORALVILLE LAKE, IA                                      $3,213,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CORDELL HULL DAM AND RESERVOIR, TN                       $6,475,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CORPUS CHRISTI SHIP CHANNEL, TX                          $4,298,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COTTAGE GROVE LAKE, OR                                   $1,074,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COTTONWOOD SPRINGS LAKE, SD                                $258,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COUGAR LAKE, OR                                          $1,503,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COUNCIL GROVE LAKE, KS                                   $1,653,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COWANESQUE LAKE, PA                                      $1,795,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  COYOTE VALLEY DAM, LAKE MENDOCINO, CA                    $3,639,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CROOKED CREEK LAKE, PA                                   $1,599,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CUMBERLAND, MD AND RIDGELEY, WV                            $168,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  CURWENSVILLE LAKE, PA                                      $719,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DALE HOLLOW LAKE, TN                                     $6,069,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DARDANELLE LOCK & DAM, AR                                $9,270,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DEER CREEK LAKE, OH                                      $1,407,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DEGRAY LAKE, AR                                          $6,743,000  The President            Ross                     Pryor; Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DELAWARE LAKE, OH                                        $1,256,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DELAWARE RIVER AT CAMDEN, NJ                                $15,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DELAWARE RIVER, PHILADELPHIA TO THE SEA, NJ, PA &       $18,626,000  The President
                                                    DE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DELAWARE RIVER, PHILADELPHIA, PA TO TRENTON, NJ            $779,000  The President            Smith (NJ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DENISON DAM, LAKE TEXOMA, TX & OK                        $8,740,000  The President            Cole                     Inhofe
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DEQUEEN LAKE, AR                                         $1,665,000  The President            Ross
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DETROIT LAKE, OR                                           $902,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DETROIT RIVER, MI                                        $5,146,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DEWEY LAKE, KY                                           $1,687,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DIERKS LAKE, AR                                          $1,292,000  The President            Ross
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DILLINGHAM HARBOR, AK                                      $841,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DILLON LAKE, OH                                          $1,298,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DISPOSAL AREA MONITORING, ME                               $950,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DORENA LAKE, OR                                          $1,102,000  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DRY CREEK (WARM SPRINGS) LAKE & CHANNEL, CA              $4,884,000  The President            Woolsey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DULUTH-SUPERIOR HARBOR, MN & WI                          $8,613,000  The President            Obey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  DWORKSHAK DAM AND RESERVOIR, ID                          $2,732,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EAST BRANCH CLARION RIVER LAKE, PA                       $1,448,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EAST BRIMFIELD LAKE, MA                                    $903,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EAST FORK, TOMBIGBEE RIVER, MS                             $178,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EAST LYNN LAKE, WV                                       $2,059,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EAST RIVER, NY                                             $285,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EAST ROCKAWAY INLET, NY                                  $2,803,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EAST SIDNEY LAKE, NY                                       $559,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EASTCHESTER CREEK, NY                                    $3,887,000  The President            Crowley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EAU GALLE RIVER LAKE, WI                                   $844,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EDIZ HOOK, WA                                              $694,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EDWARD MACDOWELL LAKE, NH                                  $532,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EL DORADO LAKE, KS                                       $1,132,000  The President            Tiahrt
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ELK CITY LAKE, KS                                          $682,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ELKINS, WV                                                  $15,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ELVIS STAHR (HICKMAN) HARBOR, KY                            $40,000  The President            Whitfield
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ERIE HARBOR, PA                                            $527,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ESCAMBIA AND CONECUH RIVERS, FL                             $56,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ESTELLINE SPRINGS EXPERIMENTAL PROJECT, TX                  $43,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EUFAULA LAKE, OK                                         $6,291,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  EVERETT HARBOR AND SNOHOMISH RIVER, WA                   $1,678,000  The President            Larsen (WA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FALL CREEK LAKE, OR                                      $1,771,000  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FALL RIVER LAKE, KS                                      $1,219,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FALLS LAKE, NC                                           $1,767,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FARM CREEK RESERVOIRS, IL                                  $335,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FARMINGTON DAM, CA                                         $457,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FERN RIDGE LAKE, OR                                      $2,245,000  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FERNANDINA HARBOR, FL                                    $1,544,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FERRELLS BRIDGE DAM, LAKE O' THE PINES, TX               $3,312,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FIRE ISLAND INLET TO JONES INLET, NY                       $143,000  The President            King (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FISHTRAP LAKE, KY                                        $2,063,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FLUSHING BAY AND CREEK, NY                                  $60,000  The President            Crowley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FORT GIBSON LAKE, OK                                    $11,183,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FORT RANDALL DAM, LAKE FRANCIS CASE, SD                 $11,604,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FORT SUPPLY LAKE, OK                                     $1,049,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FOSTER JOSEPH SAYERS DAM, PA                               $641,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FOX POINT HURRICANE BARRIER, PROVIDENCE, RI                $475,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FOX RIVER, WI                                            $4,421,000  The President                                     Kohl
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FRANCIS E WALTER DAM, PA                                   $921,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FRANKLIN FALLS DAM, NH                                   $1,826,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FREEPORT HARBOR, TX                                      $3,151,000  The President            Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FRESHWATER BAYOU, LA                                     $2,124,000  The President            Boustany
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FRIDAY HARBOR, WA                                          $105,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  FT. PECK DAM AND LAKE, MT                                $6,045,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GALISTEO DAM, NM                                           $562,000  The President            Lujan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GALVESTON HARBOR AND CHANNEL, TX                        $12,445,000  The President            Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GARRISON DAM, LAKE SAKAKAWEA, ND                        $14,946,000  The President            Pomeroy                  Dorgan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GATHRIGHT DAM AND LAKE MOOMAW, VA                        $2,208,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GAVINS POINT DAM, NE & SD                                $7,759,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GENERAL EDGAR JADWIN DAM AND RESERVOIR, PA                 $213,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GEORGETOWN HARBOR, SC                                    $1,103,000  The President            Brown (SC)               Graham
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GILLHAM LAKE, AR                                         $1,298,000  The President            Ross
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GIWW, CHANNEL TO VICTORIA, TX                            $2,152,000  The President            Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GIWW, CHOCOLATE BAYOU, TX                                $1,647,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GRAND HAVEN HARBOR, MI                                     $779,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GRANGER DAM AND LAKE, TX                                 $2,459,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GRAPEVINE LAKE, TX                                       $2,599,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GRAYS HARBOR AND CHEHALIS RIVER, WA                     $10,587,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GRAYSON LAKE, KY                                         $1,624,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GREAT KILLS HARBOR, STATEN ISLAND, NY                       $60,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GREAT SALT PLAINS LAKE, OK                                 $330,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GREAT SALT POND, BLOCK ISLAND, RI                          $200,000  The President                                     Reed
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GREAT SOUTH BAY, NY                                         $60,000  The President            Bishop (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GREEN AND BARREN RIVERS, KY                              $1,787,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GREEN BAY HARBOR, WI                                     $6,222,000  The President            Kagen                    Kohl
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GREEN PETER--FOSTER LAKES, OR                            $3,469,000  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GREEN RIVER LAKE, KY                                     $2,093,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GREERS FERRY LAKE, AR                                    $7,374,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GULF INTRACOASTAL WATERWAY, AL                           $5,450,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GULF INTRACOASTAL WATERWAY, LA                          $23,546,000  The President            Cao
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GULF INTRACOASTAL WATERWAY, TX                          $24,752,000  The President            Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  GULFPORT HARBOR, MS                                      $4,500,000  The President                                     Cochran; Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HAMPTON ROADS, NORFOLK & NEWPORT NEWS HARBOR, VA           $838,000  The President
                                                    (DRIFT REMOVAL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HANCOCK BROOK LAKE, CT                                     $420,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HARLAN COUNTY LAKE, NE                                   $2,197,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HARRY S. TRUMAN DAM AND RESERVOIR, MO                    $8,926,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HARTWELL LAKE, GA & SC                                  $11,403,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HELENA HARBOR, AR                                           $40,000  The President            Berry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HEYBURN LAKE, OK                                           $711,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HIDDEN DAM, HENSLEY LAKE, CA                             $2,062,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HILLS CREEK LAKE, OR                                       $801,000  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HILLSDALE LAKE, KS                                         $817,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HODGES VILLAGE DAM, MA                                     $539,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HOLLAND HARBOR, MI                                       $2,044,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HOMER HARBOR, AK                                           $380,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HOMME LAKE, ND                                             $239,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HOP BROOK LAKE, CT                                         $871,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HOPKINTON-EVERETT LAKES, NH                              $1,091,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HORDS CREEK LAKE, TX                                     $1,525,000  The President            Conaway
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HOUMA NAVIGATION CANAL, LA                               $2,441,000  The President            Melancon
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HOUSTON SHIP CHANNEL, TX                                $14,315,000  The President            Culberson; Edwards
                                                                                                                                                  (TX); Green, Al;
                                                                                                                                                  Green, Gene; Jackson-
                                                                                                                                                  Lee (TX); Olson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HOWARD HANSON DAM, WA                                    $3,511,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HUDSON RIVER CHANNEL, NY                                    $60,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HUDSON RIVER, NY (MAINT)                                 $1,207,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HUDSON RIVER, NY (O & C)                                 $1,473,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HUGO LAKE, OK                                            $1,652,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HULAH LAKE, OK                                           $1,993,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  HUMBOLDT HARBOR AND BAY, CA                              $2,860,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ICE HARBOR LOCK & DAM, WA                                $5,539,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ILLINOIS WATERWAY, IL & IN (MVR PORTION)                $30,160,000  The President            Hare
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ILLINOIS WATERWAY, IL & IN (MVS PORTION)                 $1,661,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INDIANA HARBOR, IN                                       $2,214,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED ENVIRONMENTAL PROJECTS, GA          $48,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED ENVIRONMENTAL PROJECTS, IL          $65,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED ENVIRONMENTAL PROJECTS, OR          $34,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED ENVIRONMENTAL PROJECTS, WA          $74,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED ENVIRONMENTAL PROJECTS, WY          $10,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, AK                          $160,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, AR                          $640,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, AZ                          $189,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, CA                        $6,369,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, CO                          $735,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, CT                          $373,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, DC                          $133,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, FL                        $1,140,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, GA                          $103,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, HI                          $670,000  The President            Hirono
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, IA                          $459,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, ID                          $308,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, IL                        $1,234,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, IN                          $674,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, KS                          $209,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, KY                          $632,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, LA                        $1,413,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, MA                          $393,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, MD                          $147,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, ME                          $204,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, MI                          $150,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, MN                          $602,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, MO                        $1,417,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, MS                          $174,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, MT                          $109,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, NC                          $232,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, ND                          $430,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, NE                          $679,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, NH                          $120,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, NJ                          $195,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, NM                          $607,000  The President            Heinrich; Lujan; Teague
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, NV                           $63,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, NY                          $853,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, OH                          $527,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, OK                          $242,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, OR                          $604,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, PA                          $836,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, RI                           $48,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, SC                           $70,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, SD                           $75,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, TN                           $50,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, TX                        $1,445,000  The President            Reyes
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, UT                           $84,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, VA                          $351,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, VT                          $104,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, WA                          $689,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, WI                           $91,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, WV                          $319,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INSPECTION OF COMPLETED WORKS, WY                           $25,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INTERNATIONAL WATER STUDIES, ME                             $17,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INTRACOASTAL WATERWAY CALOOSAHATCHEE RIVER TO            $1,313,000  The President            Buchanan; Mack; Young    Bill Nelson; Martinez
                                                    ANCLOTE RIVER, FL                                                                             (FL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INTRACOASTAL WATERWAY, DELAWARE RIVER TO CHESAPEAKE     $26,980,000  The President            Castle; Cummings;
                                                    BAY, DE & MD                                                                                  Ruppersberger;
                                                                                                                                                  Sarbanes
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INTRACOASTAL WATERWAY, JACKSONVILLE TO MIAMI, FL         $2,490,000  The President            Crenshaw; Hastings       Bill Nelson; Martinez
                                                                                                                                                  (FL); Klein (FL);
                                                                                                                                                  Kosmas; Meek (FL);
                                                                                                                                                  Mica; Ros-Lehtinen;
                                                                                                                                                  Wasserman Schultz;
                                                                                                                                                  Wexler
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  INTRACOASTAL WATERWAY, REHOBOTH BAY TO DELAWARE             $70,000  The President
                                                    BAY, DE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ISABELLA LAKE, CA                                        $1,712,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  J. BENNETT JOHNSTON WATERWAY, LA                        $11,478,000  The President            Alexander; Fleming       Landrieu; Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  J. EDWARD ROUSH LAKE, IN                                   $897,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  J. PERCY PRIEST DAM AND RESERVOIR, TN                    $4,579,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  J. STROM THURMOND LAKE, GA & SC                          $9,804,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JACKSON HOLE LEVEES, WY                                    $833,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JACKSONVILLE HARBOR, FL                                  $5,735,000  The President            Brown, Corrine;
                                                                                                                                                  Crenshaw
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JAMAICA BAY, NY                                            $209,000  The President            Meeks (NY); Sires
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JAMES RIVER CHANNEL, VA                                  $4,257,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JEMEZ CANYON DAM, NM                                       $718,000  The President            Lujan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JENNINGS RANDOLPH LAKE, MD & WV                          $1,691,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JIM CHAPMAN LAKE, TX                                     $1,633,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JIM WOODRUFF LOCK AND DAM, LAKE SEMINOLE, FL, AL &       $9,249,000  The President
                                                    GA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JOE POOL LAKE, TX                                        $1,042,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JOHN DAY LOCK AND DAM, OR & WA                           $8,459,000  The President            Baird
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JOHN H. KERR LAKE, VA & NC                              $11,010,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JOHN MARTIN RESERVOIR, CO                                $2,427,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JOHN REDMOND DAM AND RESERVOIR, KS                       $3,502,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JOHN W. FLANNAGAN DAM AND RESERVOIR, VA                  $1,999,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JOHNSTOWN, PA                                               $34,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  JONES INLET, NY                                            $143,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  KANAWHA RIVER LOCKS & DAM, WV                           $13,389,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  KANOPOLIS, KS                                            $2,174,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  KASKASKIA RIVER NAVIGATION, IL                           $2,041,000  The President            Costello
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  KAW LAKE, OK                                             $2,614,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  KENTUCKY RIVER, KY                                          $10,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  KEWAUNEE HARBOR, WI                                        $424,000  The President            Kagen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  KEWEENAW WATERWAY, MI                                       $37,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  KEYSTONE LAKE, OK                                        $6,602,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  KINZUA DAM AND ALLEGHANY RESERVOIR, PA                   $1,272,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  KNIGHTVILLE DAM, MA                                      $1,350,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAC QUI PARLE LAKES, MINNESOTA RIVER, MN                   $596,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAKE ASHTABULA AND BALDHILL DAM, ND                      $1,284,000  The President            Pomeroy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAKE KEMP, TX                                              $311,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAKE MICHIGAN DIVERSION, IL                                $649,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAKE MONTAUK HARBOR, NY                                    $100,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAKE PROVIDENCE HARBOR, LA                                 $572,000  The President            Alexander                Landrieu; Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAKE SHELBYVILLE, IL                                     $5,183,000  The President            Shimkus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAKE TRAVERSE, SD & MN                                     $568,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAKE WASHINGTON SHIP CANAL, WA                           $8,787,000  The President            Dicks
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAUREL RIVER LAKE, KY                                    $1,831,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LAVON LAKE, TX                                           $3,323,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LEWISVILLE DAM, TX                                       $3,373,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LIBBY DAM, MT                                            $1,851,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LITTLE BLUE RIVER LAKES, MO                                $803,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LITTLE GOOSE LOCK & DAM, WA                              $2,424,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LITTLE SODUS BAY HARBOR, NY                                  $5,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LITTLEVILLE LAKE, MA                                       $845,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LONG BRANCH LAKE, MO                                       $902,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LONG ISLAND INTRACOASTAL WATERWAY, NY                      $100,000  The President            Bishop (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LONG ISLAND SOUND, DMMP, CT                              $2,890,000  The President            Courtney; DeLauro;
                                                                                                                                                  Murphy (CT)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LOOKOUT POINT LAKE, OR                                   $2,629,000  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LORAIN HARBOR, OH                                          $836,000  The President            Sutton
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LOS ANGELES COUNTY DRAINAGE AREA, CA                     $4,369,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LOST CREEK LAKE, OR                                      $3,455,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LOWER GRANITE LOCK & DAM, WA                             $7,271,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LOWER MONUMENT LOCK & DAM, WA                            $2,599,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LOYALHANNA LAKE, PA                                      $1,279,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LUCKY PEAK LAKE, ID                                      $2,468,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  LYNNHAVEN INLET, VA                                        $263,000  The President            Nye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MADISON PARISH PORT, LA                                     $99,000  The President                                     Landrieu; Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MAHONING CREEK LAKE, PA                                  $1,222,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MANASQUAN RIVER, NJ                                        $152,000  The President            Smith (NJ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MANSFIELD HOLLOW LAKE, CT                                  $818,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MANTEO (SHALLOWBAG) BAY, NC                              $3,749,000  The President            Jones; Price (NC)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MARION LAKE, KS                                          $1,730,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MARTINS FORK LAKE, KY                                      $774,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MARTIS CREEK LAKE, NV & CA                               $1,133,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MASONBORO INLET AND CONNECTING CHANNELS, NC              $2,186,000  The President            McIntyre
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MASSILLON LOCAL PROTECTION PROJECT, OH                      $37,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MATAGORDA SHIP CHANNEL, TX                               $4,397,000  The President            Edwards (TX); Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MATTITUCK HARBOR, NY                                        $60,000  The President            Bishop (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MCCLELLAN-KERR ARKANSAS RIVER NAVIGATION SYSTEM, AR     $39,027,000  The President            Berry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MCCLELLAN-KERR ARKANSAS RIVER NAVIGATION SYSTEM, OK      $5,866,000  The President            Boren
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MCNARY LOCK & DAM, OR & WA                               $6,783,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MELVERN LAKE, KS                                         $2,044,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MERCED COUNTY STREAMS, CA                                  $429,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MERMENTAU RIVER, LA                                      $1,818,000  The President            Boustany
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MICHAEL J KIRWAN DAM AND RESERVOIR, OH                   $1,035,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MIDDLE RIO GRANDE ENDANGERED SPECIES COLLABORATIVE       $2,994,000  The President            Heinrich; Lujan; Teague
                                                    PROGRAM, NM (MRGESCP)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MIDDLESBORO CUMBERLAND RIVER BASIN, KY                     $107,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MILFORD LAKE, KS                                         $1,955,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MILL CREEK LAKE, WA                                      $3,644,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MILLWOOD LAKE, AR                                        $4,868,000  The President            Ross
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MINNESOTA RIVER, MN                                        $243,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISPILLION RIVER, DE                                        $30,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSISSINEWA LAKE, IN                                      $926,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSISSIPPI FLOOD CONTROL, OH                            $1,641,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND            $41,938,000  The President
                                                    MINNEAPOLIS (MVP PORTION), MN
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND            $56,220,000  The President            Hare
                                                    MINNEAPOLIS (MVR PORTION), IL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND            $21,123,000  The President            Akin; Hare; Shimkus
                                                    MINNEAPOLIS (MVS PORTION), IL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSISSIPPI RIVER BETWEEN THE OHIO AND MISSOURI         $22,241,000  The President
                                                    RIVERS (REG WORKS), MO & IL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSISSIPPI RIVER OUTLETS AT VENICE, LA                  $2,697,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF           $52,263,000  The President            Cao
                                                    MEXICO, LA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSOURI RIVER--KENSLERS BEND, NE TO SOIUX CITY, IA        $123,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSOURI RIVER--RULO TO MOUTH, IA, NE, KS & MO           $6,500,000  The President            Cleaver                  Harkin; Bond; Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MISSOURI RIVER--SOUIX CITY TO RULO, IA, NE, KS & MO      $2,480,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MOBILE HARBOR, AL                                       $22,804,000  The President            Bonner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MOJAVE RIVER DAM, CA                                       $274,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MONONGAHELA RIVER, PA                                   $15,926,000  The President            Doyle
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MONROE LAKE, IN                                          $1,046,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MOREHEAD CITY HARBOR, NC                                 $9,028,000  The President            Jones
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MORICHES INLET, NY                                         $100,000  The President            Bishop (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MORRO BAY HARBOR, CA                                     $3,136,000  The President            Capps
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MOSQUITO CREEK LAKE, OH                                    $946,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MOUNT MORRIS DAM, NY                                     $2,562,000  The President            Lee (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MOUTH OF YAZOO RIVER, MS                                   $100,000  The President                                     Cochran; Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MT. ST. HELENS SEDIMENT CONTROL, WA                        $265,000  The President            Baird
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MUD MOUNTAIN DAM, WA                                     $2,904,000  The President            Reichert; Smith (WA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MURDERKILL RIVER, DE                                        $30,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MUSKINGUM RIVER LAKES, OH                                $6,943,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  MYSTIC RIVER, CT                                           $238,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NARROWS DAM, LAKE GREESON, AR                            $4,816,000  The President            Ross                     Pryor; Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NARROWS OF LAKE CHAMPLAIN, VT & NY                          $85,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NATIONAL COASTAL MAPPING PROGRAM                        $10,000,000  The President                                     Cochran; Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NAVARRO MILLS LAKE, TX                                   $3,961,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEAH BAY, WA                                                $67,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW BEDFORD AND FAIRHAVEN HARBOR, MA                       $475,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW BEDFORD, FAIRHAVEN AND ACUSHNET HURRICANE              $588,000  The President
                                                    BARRIER, MA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW HOGAN LAKE, CA                                       $2,390,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW JERSEY INTRACOASTAL WATERWAY, NJ                       $385,000  The President            Adler (NJ); LoBiondo;
                                                                                                                                                  Smith (NJ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW MADRID HARBOR, MILE 889, MO                            $240,000  The President            Emerson                  Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW MADRID HARBOR, MO                                      $400,000  The President            Emerson                  Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW MELONES LAKE, DOWNSTREAM CHANNEL, CA                 $1,804,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW RIVER INLET, NC                                        $665,000  The President            Jones
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW YORK AND NEW JERSEY CHANNELS, NY                     $3,896,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW YORK HARBOR, NY                                      $3,514,000  The President            Sires
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW YORK HARBOR, NY & NJ (DRIFT REMOVAL)                 $6,652,000  The President            Pallone
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEW YORK HARBOR, NY & NJ (PREVENTION OF OBSTRUCTIVE        $993,000  The President            Pallone
                                                    DEPOSITS)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEWARK BAY, HACKENSACK AND PASSAIC RIVERS, NJ              $143,000  The President            Payne; Rothman (NJ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEWPORT BAY HARBOR, CA                                   $1,692,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NEWTOWN CREEK, NY                                          $143,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NIMROD LAKE, AR                                          $2,175,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NOLIN LAKE, KY                                           $2,354,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NOME HARBOR, AK                                            $779,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NORFOLK HARBOR, VA                                      $10,780,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NORFORK LAKE, AR                                         $5,433,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NORTH BRANCH KOKOSING RIVER LAKE, OH                       $260,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NORTH FORK OF POUND RIVER LAKE, VA                         $599,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NORTH HARTLAND LAKE, VT                                    $734,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NORTH SAN GABRIEL DAM AND LAKE GEORGETOWN, TX            $2,264,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NORTH SPRINGFIELD LAKE, VT                                 $812,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  NORTHFIELD BROOK LAKE, CT                                  $580,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  O.C. FISHER DAM AND LAKE, TX                             $1,106,000  The President            Conaway
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OAHE DAM, LAKE OAHE, SD & ND                            $11,229,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OAKLAND HARBOR, CA                                       $9,154,000  The President            Lee (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OCEANSIDE HARBOR, CA                                     $1,425,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OHIO RIVER LOCKS AND DAMS, KY, IL, IN & OH              $38,724,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OHIO RIVER LOCKS AND DAMS, PA, OH & WV                  $20,404,000  The President            Doyle
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OHIO RIVER LOCKS AND DAMS, WV, KY & OH                  $33,524,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OHIO RIVER OPEN CHANNEL WORK, KY, IL, IN & OH            $5,546,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OHIO RIVER OPEN CHANNEL WORK, PA, OH & WV                  $490,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OHIO RIVER OPEN CHANNEL WORK, WV, KY & OH                $2,847,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OKATIBBEE LAKE, MS                                       $1,618,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OKEECHOBEE WATERWAY, FL                                  $2,240,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OLD HICKORY LOCK AND DAM, TN                            $11,693,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ONTONAGON HARBOR, MI                                     $1,066,000  The President            Stupak
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OOLOGAH LAKE, OK                                         $3,902,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OPTIMA LAKE, OK                                            $208,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ORWELL LAKE, MN                                            $507,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OSCEOLA HARBOR, AR                                         $800,000  The President            Berry                    Pryor; Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OTTER BROOK LAKE, NH                                       $526,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OUACHITA AND BLACK RIVERS, AR & LA                       $9,128,000  The President            Ross
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  OZARK-JETA TAYLOR LOCK & DAM, AR                         $5,441,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PAINT CREEK LAKE, OH                                     $1,156,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PAINTED ROCK DAM, AZ                                     $1,254,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PAINTSVILLE LAKE, KY                                     $1,170,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PALM BEACH HARBOR, FL                                    $3,065,000  The President            Klein (FL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PANAMA CITY HARBOR, FL                                   $1,953,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PAPILLION CREEK, NE                                        $805,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PASCAGOULA HARBOR, MS                                    $9,500,000  The President                                     Cochran; Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PASSAIC RIVER FLOOD WARNING SYSTEM, NJ                     $526,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PAT MAYSE LAKE, TX                                       $1,148,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PATOKA LAKE, IN                                            $843,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PEARL RIVER, MS & LA                                       $183,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PEARSON-SKUBITZ BIG HILL LAKE, KS                        $1,399,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PENSACOLA HARBOR, FL                                        $67,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PENSACOLA RESERVOIR, LAKE OF THE CHEROKEES, OK             $108,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PERRY LAKE, KS                                           $1,915,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PHILPOTT LAKE, VA & NC                                   $5,358,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PINE AND MATHEWS CANYONS LAKES, NV                         $324,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PINE CREEK LAKE, OK                                      $1,213,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PINE FLAT LAKE, CA                                       $3,042,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PIPESTEM LAKE, ND                                          $471,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PLYMOUTH HARBOR, PLYMOUTH, MA                              $190,000  The President            Delahunt
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  POINT JUDITH HARBOR OF REFUGE, RI                          $285,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  POMME DE TERRE LAKE, MO                                  $2,120,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  POMONA LAKE, KS                                          $1,945,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PONCE DE LEON INLET, FL                                    $570,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PORT ORFORD, OR                                             $38,000  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PORTCHESTER HARBOR, NY                                      $60,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PORTSMOUTH HARBOR AND PISCATAQUA RIVER, NH                 $475,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  POTOMAC AND ANACOSTIA RIVER, DC (DRIFT REMOVAL)            $765,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PRESQUE ISLE HARBOR, MI                                    $318,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROCTOR DAM AND LAKE, TX                                 $2,209,000  The President            Conaway
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, AK                              $884,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, AL                              $100,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, CA                            $2,321,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, CT                              $998,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, DC                               $30,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, DE                              $100,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, FL                            $1,235,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, GA                              $144,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, HI                              $542,000  The President            Hirono
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, IL                               $99,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, IN                              $176,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, LA                               $65,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, MA                            $1,140,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, MD                              $380,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, ME                              $713,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, MI                              $390,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, MN                               $82,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, MS                               $75,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, NC                              $280,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, NH                              $261,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, NJ                            $1,571,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, NY                            $2,018,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, OH                              $280,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, OR                              $190,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, PA                              $114,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, RI                              $475,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, SC                              $442,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, TX                              $212,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, VA                              $808,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, WA                              $498,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROJECT CONDITION SURVEYS, WI                              $269,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PROMPTON LAKE, PA                                          $412,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PUGET SOUND AND TRIBUTARY WATERS, WA                       $961,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  PUNXSUTAWNEY, PA                                            $22,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  QUILLAYUTE RIVER, WA                                       $253,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  R. D. BAILEY LAKE, WV                                    $1,831,000  The President            Rahall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RARITAN RIVER TO ARTHUR KILL CUT-OFF, NJ                   $190,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RARITAN RIVER, NJ                                          $292,000  The President            Pallone                  Lautenberg; Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RATHBUN LAKE, IA                                         $2,869,000  The President            Loebsack
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RAY ROBERTS LAKE, TX                                     $1,258,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RAYSTOWN LAKE, PA                                        $3,656,000  The President            Shuster
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RED LAKE RESERVOIR, MN                                     $143,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RED ROCK DAM AND LAKE, RED ROCK, IA                      $4,056,000  The President                                     Harkin; Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  REDWOOD CITY HARBOR, CA                                  $6,410,000  The President            Eshoo
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  REMOVAL OF AQUATIC GROWTH, FL                            $4,224,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  REMOVAL OF AQUATIC GROWTH, LA                            $1,340,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  REMOVAL OF AQUATIC GROWTH, VA                               $50,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  REND LAKE, IL                                            $5,118,000  The President            Costello; Shimkus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RESERVOIRS AT HEADWATERS OF MISSISSIPPI RIVER, MN        $3,229,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RICHARD B. RUSSEL DAM & LAKE, GA & SC                    $3,550,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RICHMOND HARBOR, CA                                      $9,113,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ROBERT S. KERR LOCK AND DAM AND RESERVOIR, OK            $8,022,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ROCHESTER HARBOR, NY                                       $963,000  The President            Slaughter                Schumer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ROGUE RIVER AT GOLD BEACH, OR                              $736,000  The President            DeFazio                  Wyden; Merkley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ROLLINSON CHANNEL, NC                                       $50,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ROSEDALE HARBOR, MS                                        $590,000  The President            Thompson (MS)            Cochran; Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ROSEVILLE LOCAL PROTECTION PROJECT, OH                      $35,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ROUGH RIVER LAKE, KY                                     $2,606,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  RUDEE INLET, VA                                            $756,000  The President            Nye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SABINE-NECHES WATERWAY, TX                              $12,733,000  The President            Poe (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SACRAMENTO RIVER (30 FOOT PROJECT), CA                   $3,185,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SACRAMENTO RIVER AND TRIBUTARIES (DEBRIS CONTROL),       $1,627,000  The President
                                                    CA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SACRAMENTO RIVER SHALLOW DRAFT CHANNEL, CA                 $222,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAGINAW RIVER, MI                                        $3,444,000  The President            Kildee
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SALAMONIE LAKE, IN                                         $859,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SALEM RIVER, NJ                                            $100,000  The President            LoBiondo
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SALT CREEK AND TRIBUTARIES, NE                           $1,025,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAM RAYBURN DAM AND RESERVOIR, TX                        $5,937,000  The President            Brady (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAN FRANCISCO BAY, DELTA MODEL STRUCTURE, CA             $1,062,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAN FRANCISCO HARBOR AND BAY, CA (DRIFT REMOVAL)         $2,945,000  The President            Pelosi
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAN FRANCISCO HARBOR, CA                                 $3,237,000  The President            Pelosi
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAN JOAQUIN RIVER, PORT OF STOCKTON, CA                  $3,377,000  The President            Cardoza; McNerney
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAN JUAN HARBOR, PR                                      $1,140,000  The President            Pierluisi
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAN PABLO BAY AND MARE ISLAND STRAIT, CA                 $2,518,000  The President            McNerney
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SANDUSKY HARBOR, OH                                      $1,392,000  The President            Kaptur
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SANTA ANA RIVER BASIN, CA                                $2,940,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SANTA BARBARA HARBOR, CA                                 $1,606,000  The President            Capps
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SANTA ROSA DAM AND LAKE, NM                              $1,044,000  The President            Teague
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SARDIS LAKE, OK                                          $1,192,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAVANNAH HARBOR, GA                                     $13,482,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAVANNAH RIVER BELOW AUGUSTA, GA                           $401,000  The President                                     Isakson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SAYLORVILLE LAKE, IA                                     $4,615,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, AZ                         $31,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, CA                      $1,820,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, CO                        $582,000  The President            Salazar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, FL                         $30,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, ID                        $460,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, KS                        $100,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, MD                        $103,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, MO                        $311,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, MT                        $138,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, ND                        $131,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, NM                        $453,000  The President            Lujan; Teague
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, OK                        $855,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, OR                         $69,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, PA                         $59,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, SD                         $81,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, TX                        $142,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, UT                        $564,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, WA                        $510,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHEDULING RESERVOIR OPERATIONS, WY                        $112,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SCHUYLKILL RIVER, PA                                       $190,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SEATTLE HARBOR, WA                                         $163,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SEBEWAING RIVER, MI                                      $1,140,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SHARK RIVER, NJ                                            $380,000  The President            Pallone
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SHENANGO RIVER LAKE, PA                                  $6,645,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SHINNECOCK INLET, NY                                       $100,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SHOAL HARBOR AND COMPTON CREEK, NJ                          $80,000  The President            Pallone
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SILVER LAKE HARBOR, NC                                     $238,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SIUSLAW RIVER , OR                                         $647,000  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SKIATOOK LAKE, OK                                        $1,344,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SKIPANON CHANNEL, OR                                         $6,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SMITHVILLE LAKE, MO                                      $1,758,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SOMERVILLE LAKE, TX                                      $3,199,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SOURIS RIVER, ND                                           $272,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SOUTHERN NEW YORK FLOOD CONTROL PROJECTS, NY               $767,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ST. CLAIR RIVER, MI                                        $507,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ST. JOSEPH HARBOR, MI                                      $718,000  The President            Upton
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ST. LUCIE INLET, FL                                        $333,000  The President            Rooney
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  ST. MARYS RIVER, MI                                     $21,867,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  STAMFORD HURRICANE BARRIER, CT                             $412,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  STILLAGUAMISH RIVER, WA                                    $157,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  STILLHOUSE HOLLOW DAM, TX                                $1,992,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  STILLWATER LAKE, PA                                        $430,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  STOCKTON LAKE, MO                                        $4,153,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  STONEWALL JACKSON LAKE, WV                               $1,091,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  STURGEON BAY HARBOR AND LAKE MICHIGAN SHIP CANAL,          $550,000  The President            Kagen
                                                    WI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SUCCESS LAKE, CA                                         $1,890,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SUISUN BAY CHANNEL, CA                                   $3,819,000  The President            McNerney; Tauscher
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SUMMERSVILLE LAKE, WV                                    $3,073,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURRY MOUNTAIN LAKE, NH                                    $722,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, IL               $651,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, IN               $120,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, MI             $2,482,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, MN               $341,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, ND                $35,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, NY               $550,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, OH               $222,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, OR             $9,883,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, PA                $98,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, WA                $50,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SURVEILLANCE OF NORTHERN BOUNDARY WATERS, WI               $369,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  SUTTON LAKE, WV                                          $2,293,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TABLE ROCK LAKE, MO & AR                                 $7,175,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TACOMA, PUYALLUP RIVER, WA                                 $124,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TAMPA HARBOR, FL                                         $5,341,000  The President            Bilirakis; Castor (FL);
                                                                                                                                                  Putnam
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TAYLORSVILLE LAKE, KY                                    $1,049,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TENKILLER FERRY LAKE, OK                                 $6,296,000  The President            Boren
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TENNESSEE RIVER, TN                                     $15,997,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TENNESSEE-TOMBIGBEE WATERWAY WILDLIFE MITIGATION,        $2,500,000  The President            Childers; Davis (AL)     Cochran; Wicker
                                                    AL & MS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TENNESSEE-TOMBIGBEE WATERWAY, AL & MS                   $24,081,000  The President            Childers; Davis (AL)     Cochran; Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TERMINUS DAM, LAKE KAWEAH, CA                            $1,936,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TEXAS CITY SHIP CHANNEL, TX                              $3,801,000  The President            Edwards (TX); Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TEXAS WATER ALLOCATION ASSESSMENT, TX                    $1,000,000  The President                                     Hutchison; Cornyn
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  THE DALLES LOCK & DAM, WA & OR                           $8,333,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  THOMASTON DAM, CT                                        $1,080,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TILLAMOOK BAY AND BAR, OR                                   $48,000  The President            Schrader
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TIOGA HAMMOND LAKES, PA                                  $2,334,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TIONESTA LAKE, PA                                        $1,722,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TOLEDO HARBOR, OH                                        $5,253,000  The President            Kaptur                   Voinovich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TOM JENKINS DAM, OH                                        $850,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TORONTO LAKE, KS                                         $3,347,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TOWN BLUFF DAM, B. A. STEINHAGEN LAKE, TX                $2,381,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TOWNSHEND LAKE, VT                                         $774,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TRINIDAD LAKE, CO                                          $912,000  The President            Salazar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TULLY LAKE, MA                                             $633,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TUTTLE CREEK LAKE, KS                                    $1,960,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TWO HARBORS, MN                                            $333,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TWO RIVERS DAM, NM                                         $384,000  The President            Teague
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  TYGART LAKE, WV                                          $1,405,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  UMPQUA RIVER, OR                                         $1,116,000  The President            DeFazio
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  UNION CITY LAKE, PA                                        $418,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  UNION LAKE, MO                                               $6,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  UNION VILLAGE DAM, VT                                      $596,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  UPPER RIO GRANDE WATER OPERATIONS MODEL STUDY, CO,       $2,053,000  The President            Heinrich; Lujan; Teague
                                                    NM, TX
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  VENTURA HARBOR, CA                                       $6,107,000  The President            Capps
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  W. KERR SCOTT DAM AND RESERVOIR, NC                      $3,251,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WACO LAKE, TX                                            $3,711,000  The President            Edwards (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WALLACE LAKE, LA                                           $232,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WALLISVILLE LAKE, TX                                     $2,009,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WALTER F. GEORGE LOCK AND DAM, AL & GA                   $8,526,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WASHINGTON HARBOR, DC                                       $25,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WATER/ENVIRONMENTAL CERTIFICATION, AL                       $76,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WATER/ENVIRONMENTAL CERTIFICATION, FL                      $361,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WATER/ENVIRONMENTAL CERTIFICATION, MS                       $66,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WATER/ENVIRONMENTAL CERTIFICATION, VA                       $99,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WATERWAY FROM EMPIRE TO THE GULF, LA                        $47,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WATERWAY FROM INTRACOASTAL WATERWAY TO BAYOU DULAC,         $48,000  The President
                                                    LA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WATERWAY ON THE COAST OF VIRGINIA, VA                      $191,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WAUKEGAN HARBOR, IL                                        $468,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WAURIKA LAKE, OK                                         $1,360,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WEBBERS FALLS LOCK & DAM, OK                             $5,610,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WEST FORK OF MILL CREEK LAKE, OH                           $708,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WEST HILL DAM, MA                                          $544,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WEST POINT DAM AND LAKE, GA & AL                         $9,115,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WEST THOMPSON LAKE, CT                                     $541,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WESTCHESTER CREEK, NY                                      $100,000  The President            Crowley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WESTVILLE LAKE, MA                                         $745,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WHITE RIVER, AR                                             $40,000  The President            Berry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WHITLOW RANCH DAM, AZ                                      $285,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WHITNEY LAKE, TX                                         $8,891,000  The President            Edwards (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WHITNEY POINT LAKE, NY                                     $651,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WICOMICO RIVER, MD                                       $1,593,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WILLAMETTE RIVER AT WILLAMETTE FALLS, OR                   $918,000  The President            Schrader                 Wyden; Merkley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WILLAMETTE RIVER BANK PROTECTION, OR                        $41,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WILLAPA RIVER AND HARBOR, WA                                $40,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WILLIAM H. HARSHA LAKE, OH                                 $978,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WILLOW CREEK LAKE, OR                                      $598,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WILMINGTON HARBOR, DE                                    $1,445,000  The President            Castle                   Carper; Kaufman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WILMINGTON HARBOR, NC                                   $11,551,000  The President            McIntyre
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WILSON LAKE, KS                                          $1,772,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WISTER LAKE, OK                                            $813,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WOLF CREEK DAM, LAKE CUMBERLAND, KY                      $8,500,000  The President            Rogers (KY)              Bunning
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WOLF RIVER HARBOR, TN                                      $354,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WOODCOCK CREEK LAKE, PA                                    $989,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WOONSOCKET, RI                                             $190,000  The President            Kennedy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  WRIGHT PATMAN DAM AND LAKE, TX                           $3,342,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  YAQUINA BAY AND HARBOR, OR                               $1,701,000  The President            Schrader
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  YATESVILLE LAKE, KY                                      $1,086,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  YAZOO RIVER, MS                                            $100,000  The President                                     Cochran
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  YELLOW BEND PORT, AR                                       $100,000  The President            Ross                     Pryor; Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  YORK INDIAN ROCK DAM, PA                                   $454,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  YOUGHIOGHENY RIVER LAKE, PA & MD                         $2,219,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers            O&M                  YUBA RIVER, CA                                             $139,000  The President
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    AK CHIN INDIAN WATER RIGHTS SETTLEMENT ACT PROJECT      $10,178,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    ANIMAS-LA PLATA PROJECT                                 $49,608,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    ARBUCKLE PROJECT                                           $224,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    ARIZONA WATER SETTLEMENT ACT                             $1,328,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    BALMORHEA PROJECT                                           $55,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    BOISE AREA PROJECTS                                      $5,150,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CACHUMA PROJECT                                          $1,598,000  The President            Capps
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CALIFORNIA INVESTIGATIONS PROGRAM                          $474,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CANADIAN RIVER PROJECT                                     $208,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CARLSBAD PROJECT                                         $3,541,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: AMERICAN RIVER DIVISION         $9,175,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: AUBURN-FOLSOM SOUTH UNIT        $1,578,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: DELTA DIVISION                 $19,419,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: EAST SIDE DIVISION              $4,230,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: FRIANT DIVISION                 $6,352,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: MISCELLANEOUS PROJECT          $11,201,000  The President
                               Resources            PROGRAMS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: REPLACEMENTS, ADDITIONS, &     $24,004,000  The President
                               Resources            EXTRAORDINARY MAINT. PROG.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: SACRAMENTO RIVER DIVISION      $15,795,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: SAN FELIPE DIVISION             $1,566,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: SAN JOAQUIN DIVISION            $5,300,000  The President                                     Feinstein
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: SHASTA DIVISION                 $7,731,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: TRINITY RIVER DIVISION          $9,993,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: WATER AND POWER OPERATIONS      $8,899,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: WEST SAN JOAQUIN DIVISION,      $8,150,000  The President
                               Resources            SAN LUIS UNIT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CENTRAL VALLEY PROJECTS: YIELD FEASIBILITY                 $427,000  The President
                               Resources            INVESTIGATION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    COLLBRAN PROJECT                                         $3,728,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    COLORADO INVESTIGATIONS PROGRAM                            $285,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    COLORADO RIVER BASIN, CENTRAL ARIZONA PROJECT`          $17,417,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    COLORADO RIVER FRONT WORK AND LEVEE SYSTEM               $2,229,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    COLORADO-BIG THOMPSON PROJECT                           $13,246,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    COLUMBIA AND SNAKE RIVER FCRPS ESA IMP.                 $16,980,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    COLUMBIA BASIN PROJECT                                  $15,733,000  The President            Hastings (WA)
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    CROOKED RIVER PROJECT                                      $801,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    DESCHUTES PROJECT                                          $692,000  The President            Walden                   Wyden; Merkley
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    EASTERN NEW MEXICO INVESTIGATIONS PROGRAMS                  $47,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    EASTERN OREGON PROJECTS                                    $805,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    FORT PECK RESERVATION/DRY PRAIRIE RURAL WATER            $8,000,000  The President            Rehberg                  Tester; Baucus
                               Resources            SYSTEM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    FRUITGROWERS DAM PROJECT                                   $247,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    FRYINGPAN-ARKANSAS PROJECT                               $8,303,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    FRYINGPAN-ARKANSAS PROJECT: LAKE PUEBLO STATE PARK          $54,000  The President            Salazar
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    GRAND VALLEY UNIT, CRBSCP, TITLE II                      $1,417,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    HALFWAY WASH PROJECT STUDY                                 $119,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    HUNGRY HORSE PROJECT                                     $1,791,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    HUNTLEY PROJECT                                             $83,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    HYRUM PROJECT                                              $188,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    IDAHO INVESTIGATIONS PROGRAM                               $285,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    JICARILLA APACHE RESERVATION RURAL WATER SYSTEM          $3,000,000  The President            Lujan                    Bingaman; T. Udall
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    KANSAS INVESTIGATIONS PROGRAM                               $24,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    KENDRICK PROJECT                                         $3,127,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    KLAMATH DAM REMOVAL STUDY                                $1,897,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    KLAMATH PROJECT                                         $23,767,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LAHONTAN BASIN PROJECT                                   $6,931,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LAKE MEAD/LAS VEGAS WASH PROGRAM                         $2,300,000  The President            Berkley; Titus           Reid; Ensign
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LAKE TAHOE REGIONAL DEVELOPMENT PROGRAM                  $2,500,000  The President                                     Reid; Feinstein
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LEADVILLE/ ARKANSAS RIVER RECOVERY PROJECT               $2,847,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LEWIS AND CLARK RURAL WATER SYSTEM                      $10,000,000  The President            Herseth Sandlin; King    Harkin; Johnson;
                               Resources                                                                                                          (IA); Walz               Grassley; Klobuchar;
                                                                                                                                                                           Thune
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LEWISTON ORCHARDS PROJECT                                $1,200,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LONG BEACH AREA WATER RECLAMATION PROJECT                  $634,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LONG BEACH DESALINATION RESEARCH AND DEVELOPMENT           $670,000  The President            Richardson; Rohrabacher
                               Resources            PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LOWER COLORADO RIVER INVESTIGATIONS PROGRAM                $237,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LOWER RIO GRANDE WATER RESOURCES CONSERVATION            $2,000,000  The President            Hinojosa; Reyes          Hutchison
                               Resources            PROGRAM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    LOWER YELLOWSTONE PROJECT                                  $519,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MANCOS PROJECT                                             $170,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MCGEE CREEK PROJECT                                        $638,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MID-DAKOTA RURAL WATER PROJECT                              $14,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MIDDLE RIO GRANDE PROJECT                               $22,684,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MILK RIVER PROJECT                                       $1,725,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MILK RIVER/ST. MARY DIVERSION REHABILITATION             $3,500,000  The President            Rehberg                  Tester
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MINIDOKA AREA PROJECTS                                   $6,851,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MIRAGE FLATS PROJECT                                       $130,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MNI WICONI PROJECT                                      $32,200,000  The President            Herseth Sandlin          Johnson; Thune
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MONTANA INVESTIGATIONS PROGRAM                             $133,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MOON LAKE PROJECT                                           $77,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    MOUNTAIN PARK PROJECT                                      $504,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    NAVAJO NATION INVESTIGATIONS PROGRAM                       $190,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    NEWTON PROJECT                                              $94,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    NORMAN PROJECT                                             $458,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    NORTH PLATTE PROJECT                                     $1,549,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    NORTHERN ARIZONA INVESTIGATIONS PROGRAM                    $332,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    NORTHERN UTAH INVESTIGATIONS PROGRAM                       $700,000  The President                                     Bennett
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    NUECES RIVER PROJECT                                       $711,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    OGDEN RIVER PROJECT                                        $372,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    OKLAHOMA INVESTIGATIONS PROGRAM                            $142,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    OREGON INVESTIGATIONS PROGRAM                              $400,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    ORLAND PROJECT                                             $675,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    PARADOX VALLEY UNIT, CRBSCP, TITLE II                    $2,251,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    PECOS RIVER BASIN WATER SALVAGE PROJECT                    $201,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    PERKINS COUNTY RURAL WATER SYSTEM                        $1,000,000  The President            Herseth Sandlin
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    PICK-SLOAN MISSOURI BASIN PROGRAM--GARRISON             $70,000,000  The President            Pomeroy                  Dorgan; Conrad
                               Resources            DIVERSION UNIT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    PINE RIVER PROJECT                                         $330,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    PROVO RIVER PROJECT                                      $1,366,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    RAPID VALLEY/DEERFIELD PROJECT                              $76,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    RIO GRANDE PROJECT                                       $4,791,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    ROCKY BOYS/NORTH CENTRAL MONTANA RURAL WATER SYSTEM      $9,000,000  The President            Rehberg                  Tester; Baucus
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    ROGUE RIVER BASIN PROJECT, TALENT DIVISION               $1,183,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SALT RIVER PROJECT                                         $618,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SALTON SEA RESEARCH PROJECT                                $379,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SAN ANGELO PROJECT                                         $418,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SAN CARLOS APACHE TRIBE WATER SETTLEMENT ACT               $308,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SAN DIEGO AREA WATER RECLAMATION PROGRAM                 $2,000,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SAN GABRIEL BASIN PROJECT                                   $89,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SAN JOSE AREA WATER RECLAMATION/REUSE PROGRAM--            $200,000  The President            Honda; Lofgren, Zoe
                               Resources            TITLE XVI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SAN JUAN RIVER BASIN INVESTIGATIONS PROGRAM                $142,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SAN LUIS VALLEY PROJECT                                  $5,200,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SAN LUIS VALLEY PROJECT: CONEJOS, CO                       $600,000  The President            Salazar
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SAVAGE RAPIDS DAM REMOVAL                                $1,100,000  The President            DeFazio; Walden
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SCOFIELD PROJECT                                           $178,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SHOSHONE PROJECT                                         $1,109,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SOBOBA WATER RIGHTS SETTLEMENT PROJECT                   $6,000,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SOLANO PROJECT                                           $3,927,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SOUTH/CENTRAL ARIZONA INVESTIGATIONS PROGRAM             $1,000,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SOUTH/CENTRAL ARIZONA INVESTIGATIONS PROGRAM:               $80,000  The President            Pastor (AZ)
                               Resources            CENTRAL ARIZONA SALINITY STUDY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SOUTHERN ARIZONA WATER RIGHTS SETTLEMENT ACT             $1,616,000  The President
                               Resources            PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SOUTHERN CALIFORNIA INVESTIGATIONS PROGRAM                 $493,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SOUTHERN NEVADA/UTAH INVESTIGATIONS PROGRAM                 $24,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SOUTHERN NEW MEXICO/WEST TEXAS INVESTIGATIONS              $142,000  The President
                               Resources            PROGRAM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SOUTHERN UTAH INVESTIGATIONS PROGRAM                       $213,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    STRAWBERRY VALLEY PROJECT                                  $255,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    SUN RIVER PROJECT                                          $362,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    TEXAS INVESTIGATIONS PROGRAM                                $43,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    TUALATIN PROJECT                                           $325,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    TUCUMCARI PROJECT                                           $39,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    UMATILLA PROJECT                                         $4,128,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    UNCOMPAHGRE PROJECT                                        $351,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    UPPER RIO GRANDE BASIN INVESTIGATIONS                       $71,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    VENTURA RIVER PROJECT                                      $564,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    W.C. AUSTIN PROJECT                                        $439,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    WASHINGTON AREA PROJECTS                                   $197,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    WASHINGTON INVESTIGATIONS PROGRAM                          $142,000  The President            Hastings (WA)
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    WASHITA BASIN PROJECT                                    $1,013,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    WEBER BASIN PROJECT                                      $2,492,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    WEBER RIVER PROJECT                                        $152,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    WICHITA PROJECT-CHENEY DIVISION                            $389,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    WICHITA PROJECT-EQUUS BEDS DIVISION                      $1,500,000  The President            Tiahrt                   Roberts; Brownback
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    YAKIMA PROJECT                                           $8,145,000  The President            Hastings (WA)
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT             $9,700,000  The President            Hastings (WA)
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         Water and Related    YUMA AREA PROJECTS                                      $23,508,000  The President
                               Resources
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation         California Bay-      CALFED                                                  $40,000,000  The President                                     Feinstein
                               Delta Restoration
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------


                                                                                  ENERGY AND WATER DEVELOPMENT
                                                                            [Congressionally Directed Spending Items]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                          Requester(s)
            Agency                       Account                                   Project                            Amount   -----------------------------------------------------------------
                                                                                                                                             House                            Senate
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ABILENE, TX (BRAZOS RIVER BASIN-ELM CREEK)                $175,000  Neugebauer                       Cornyn
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               AMAZON CREEK, OR                                          $134,000  DeFazio                          Wyden, Merkley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ANACOSTIA RIVER AND TRIBUTARIES, MD & DC                  $288,000  Edwards (MD); Hoyer; Van Hollen  Mikulski, Cardin
                                                             (COMPREHENSIVE PLAN)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ARKANSAS RIVER CORRIDOR, OK                                $90,000  Sullivan                         Inhofe
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ARROYO SECO WATERSHED, CA                                 $224,000  Becerra; Dreier; Roybal-Allard;
                                                                                                                                 Schiff
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BALLONA CREEK RESTORATION, CA                             $224,000  Harman; Roybal-Allard
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BARBERS POINT HARBOR MODIFICATIONS, OAHU, HI               $13,000                                   Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BLOOMSBURG, PA                                             $90,000  Kanjorski                        Specter, Casey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BOGUE BANKS, NC                                            $24,000                                   Burr, Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BOLINAS LAGOON ECOSYSTEM RESTORATION, CA                   $90,000  Woolsey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BOSSIER PARISH, LA                                        $278,000  Fleming                          Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BOULDER CREEK, CO (SOUTH BOULDER CREEK FLOODPLAIN          $74,000                                   Bennet
                                                             PROJECT)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BRONX RIVER BASIN, NY                                     $269,000  Crowley; Lowey; Serrano; Sires   Schumer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BRUSH CREEK BASIN, KS & MO                                $217,000  Cleaver; Moore (KS)              Bond, Brownback, Roberts
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BUFFALO BAYOU AND TRIBUTARIES, MAIN STEM, TX               $90,000  Culberson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               BUFFALO BAYOU AND TRIBUTARIES, WHITE OAK BAYOU, TX         $90,000  Culberson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CACHE LA POUDRE RIVER BASIN, GREELEY, CO                   $45,000                                   M. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CALCASIEU RIVER AND PASS NAVIGATION, LA                   $269,000  Boustany                         Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CALCASIEU RIVER BASIN, LA                                  $90,000  Boustany                         Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CARPINTERIA SHORELINE STUDY, CA                           $202,000  Capps
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CENTRAL VALLEY INTEGRATED FLOOD MANAGEMENT STUDY, CA      $314,000  McNerney                         Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CENTRALIA, CHEHALIS RIVER, LEWIS COUNTY, WA               $672,000  Baird; Dicks                     Murray
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CHARLESTON HARBOR, SC                                      $90,000  Brown (SC)                       Graham
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CHEHALIS RIVER BASIN, WA                                  $672,000  Baird; Dicks                     Murray
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CHERRY RIVER BASIN, WV                                    $538,000                                   Byrd
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CHESAPEAKE BAY SHORELINE EROSION, MARYLAND COASTAL         $90,000  Kratovil                         Cardin
                                                             MANAGEMENT, MD
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CHESAPEAKE BAY SUSQUEHANNA RESERVOIR SEDIMENT              $90,000                                   Mikulski, Cardin
                                                             MANAGEMENT, PA, MD & VA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CHOWAN RIVER BASIN, VA & NC                               $130,000  Forbes                           Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CLINCH RIVER WATERSHED, VA                                 $90,000  Boucher                          Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CONNECTICUT RIVER ECOSYSTEM RESTORATION, CT, MA, NH &     $359,000  Courtney; Hodes; Murphy (CT)     Dodd, Lieberman, Kennedy, Kerry
                                                             VT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               COYOTE DAM, CA                                             $90,000                                   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CROSS LAKE, LA                                             $90,000  Fleming                          Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               CYPRESS VALLEY WATERSHED, TX                               $90,000  Gohmert
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               DALLAS FLOODWAY, DALLAS, TX                             $1,345,000  Edwards (TX); Johnson, Eddie     Hutchison, Cornyn
                                                                                                                                 Bernice
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               DELAWARE RIVER BASIN, PINE KNOT, PA                        $90,000                                   Specter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               DELAWARE RIVER DREDGED MATERIAL UTILIZATION, PA, DE &      $90,000  Smith (NJ)                       Lautenberg, Specter, Kaufman,
                                                             NJ                                                                                                   Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               DELAWARE RIVER WATERFRONT, PA                              $90,000  Schwartz
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               DESERT HOT SPRINGS, CA                                    $100,000  Lewis (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               DISMAL SWAMP & DISMAL SWAMP CANAL, VA                      $70,000  Forbes                           Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ELLIOTT BAY SEAWALL, WA                                   $462,000  Dicks; Larsen (WA); McDermott    Murray, Cantwell
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ESPANOLA VALLEY, RIO GRANDE AND TRIBUTARIES, NM           $224,000  Lujan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ESTUDILLO CANAL, CA                                       $112,000  Stark
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               FLAGLER COUNTY, FL                                        $209,000  Mica                             Bill Nelson, Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               FORGE RIVER WATERSHED, NY                                 $117,000  Bishop (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               FOUR MILE RUN, VA                                         $112,000  Moran (VA)                       Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               GATHRIGHT DAM AND LAKE MOOMAW, VA                         $233,000  Goodlatte                        Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               GRAND (NEOSHO) RIVER BASIN WATERSHED, OK, KS, MO & AR      $90,000  Boren                            Roberts
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               GRAND LAKE COMPREHENSIVE STUDY, OK                         $90,000  Boren
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               GRAYS HARBOR, WA                                          $269,000  Dicks
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               GRAYSON AND MURDERER'S CREEKS, CA                          $90,000  Tauscher                         Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               GREAT LAKES REMEDIAL ACTION PLANS & SEDIMENT            $3,407,000  Dahlkemper; Ehlers; Kaptur;      Voinovich, Stabenow
                                                             REMEDIATION, MI, IL, IN, MN, NY, OH, PA & WI                        Kucinich; Oberstar; Petri;
                                                                                                                                 Slaughter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               GREENUP LOCKS AND DAM, KY & OH                            $448,000  Davis (KY); Wilson (OH)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               GREENWOOD LAKE, NY & NJ                                    $90,000  Garrett (NJ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               HARRIS RIVERFRONT, HUNTINGTON, WV                          $90,000  Rahall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               HASHAMOMUCK COVE, SOUTHOLD, NY                             $90,000  Bishop (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               HOCKING RIVER BASIN, MONDAY CREEK, OH                      $56,000                                   Voinovich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               HOMER HARBOR NAVIGATION IMPROVEMENTS, AK                  $134,000                                   Murkowski, Begich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               HUDSON-RARITAN ESTUARY, GOWANUS CANAL, NY                 $134,000  Sires; Velazquez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               HUMBOLDT BAY LONG TERM SHOAL MANAGEMENT, CA                $90,000                                   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               HUMBOLDT, IA                                              $121,000  Latham                           Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               JAMES RIVER, SD                                           $150,000                                   Dorgan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               KOTZEBUE SMALL BOAT HARBOR, AK                             $90,000                                   Murkowski, Begich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LAKE MONTAUK HARBOR, NY                                   $269,000  Bishop (NY)                      Schumer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LAKE WORTH INLET, FL                                       $90,000                                   Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LANSING GRAND RIVER WATERFRONT RESTORATION, MI             $90,000                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LITTLE COLORADO RIVER, WINSLOW, AZ                        $224,000  Kirkpatrick (AZ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LONG BEACH BREAKWATER STUDY, CA                            $90,000  Richardson                       Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LOS ANGELES COUNTY DRAINAGE AREA (LACDA) WATER            $134,000  Napolitano; Roybal-Allard;
                                                             CONSERVATION AND SUPPLY, WHITTIER NARROWS DAM, CA                   Schiff
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LOS ANGELES RIVER ECOSYSTEM RESTORATION, CA               $717,000  Becerra; Berman; Harman; Roybal- Boxer
                                                                                                                                 Allard; Sherman; Watson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LOS ANGELES RIVER WATERCOURSE IMPROVEMENT, HEADWORKS,     $332,000  Roybal-Allard; Schiff            Boxer
                                                             CA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LOWER CACHE CREEK, YOLO COUNTY, WOODLAND AND              $117,000  Herger; Thompson (CA)            Feinstein, Boxer
                                                             VICINITY, CA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LOWER MISSION CREEK, CA                                    $99,000  Capps                            Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LOWER MISSISSIPPI RIVER RESOURCE ASSESSMENT, AR, IL,      $112,000                                   Pryor, Lincoln
                                                             KY, LA, MS, MO, & TN
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               LOWER SADDLE RIVER, NJ                                    $327,000  Rothman (NJ)                     Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MAALAEA HARBOR, MAUI, HI                                  $181,000                                   Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MALIBU CREEK WATERSHED, CA                                 $90,000                                   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MANHATTAN, KS                                             $134,000                                   Roberts, Brownback
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MAY BRANCH, FORT SMITH, AR                                $179,000  Boozman                          Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               METROPOLITAN LOUISVILLE, MILL CREEK BASIN, KY             $103,000  Yarmuth
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MIAMI HARBOR CHANNEL, FL                                  $475,000  Diaz-Balart, Lincoln; Diaz-      Bill Nelson, Martinez
                                                                                                                                 Balart, Mario; Ros-Lehtinen;
                                                                                                                                 Wasserman Schultz
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MIDDLE BRAZOS RIVER, TX                                   $224,000  Carter; Edwards (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MIDDLE CREEK, CA                                           $99,000  Thompson (CA)                    Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MIDDLE POTOMAC COMPREHENSIVE PLAN, MD, VA, PA, WV &       $585,000  Connolly (VA); Moran (VA);       Cardin
                                                             DC                                                                  Norton; Van Hollen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MIDDLE POTOMAC RIVER--CAMERON RUN/HOLMES RUN, VA          $291,000  Moran (VA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MIDDLE POTOMAC RIVER, GREAT SENECA/MUDDY BRANCH, MD       $269,000  Edwards (MD); Van Hollen         Cardin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MILE POINT, FL                                             $90,000  Brown, Corrine; Crenshaw         Bill Nelson, Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MINNEHAHA CREEK WATERSHED, MN                             $305,000  Ellison                          Klobuchar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MISSOURI RIVER LEVEE SYSTEM, UNITS L-455 & R 460-471,     $291,000  Graves                           Bond, Roberts
                                                             MO & KS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MISSOURI RIVER, ND, MT, SD, NE, IA, KS & MO             $4,483,000  Pomeroy                          Dorgan, Conrad
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               MONTAUK POINT, NY                                         $193,000  Bishop (NY)                      Schumer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               NEW JERSEY SHORE PROTECTION, HEREFORD INLET TO CAPE        $90,000  LoBiondo                         Lautenberg, Menendez
                                                             MAY INLET, NJ
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               NEW JERSEY SHORELINE ALTERNATIVE LONG-TERM                 $90,000  LoBiondo; Smith (NJ)             Lautenberg, Menendez
                                                             NOURISHMENT, NJ
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               NEW RIVER, CLAYTOR LAKE, VA                                $81,000  Boucher                          Webb
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               NIAGARA RIVER WATERSHED, NY                                $90,000                                   Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               NORTH CAROLINA INTERNATIONAL TERMINAL, NC                  $93,000  McIntyre                         Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               NORTH SHORE OF LONG ISLAND, ASHAROKEN, NY                 $121,000  Israel
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               NORTHERN KENTUCKY RIVERFRONT COMMONS, KY                  $112,000  Davis (KY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               OHIO RIVER BASIN COMPREHENSIVE STUDY, WV, KY, OH, PA,   $1,793,000  Davis (KY)                       Byrd
                                                             IL, IN, VA, AL, TN, NY, MD, NC, MS & GA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               OHIO RIVER SHORELINE, PADUCAH, KY                          $39,000  Whitfield
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ONONDAGA LAKE, NY                                         $197,000  Maffei                           Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               OOLOGAH LAKE WATERSHED, OK & KS                            $90,000  Boren                            Inhofe
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               OTHER: TRIBAL PARTNERSHIP PROGRAM (NEW MEXICO)            $179,000  Heinrich; Lujan; Teague
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               PAJARO RIVER, CA                                          $583,000  Farr; Honda                      Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               PASSAIC RIVER MAIN STEM, NJ & NY                           $90,000                                   Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               PASSAIC RIVER, HARRISON, NJ                                $90,000                                   Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               PEARL RIVER WATERSHED, MS                                 $100,000                                   Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               PECKMAN RIVER AND TRIBUTARIES, NJ                         $314,000  Pascrell                         Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               PEORIA RIVERFRONT DEVELOPMENT, IL                          $45,000  Schock                           Durbin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               PINE MOUNTAIN DAM, AR                                     $381,000  Boozman                          Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               PORT OF IBERIA, LA                                        $538,000  Melancon                         Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               PRAIRIE DUPONT LEVEE AND SANITARY DISTRICT AND FISH       $628,000  Costello; Shimkus                Durbin
                                                             LAKE DRAINAGE AND LEVEE DISTRICT, IL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               RAHWAY RIVER BASIN, NJ                                    $238,000  Lance                            Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               RARITAN BAY AND SANDY HOOK BAY, HIGHLANDS, NJ             $238,000  Pallone                          Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               RARITAN BAY AND SANDY HOOK BAY, LEONARDO, NJ               $22,000  Pallone                          Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               RARITAN BAY AND SANDY HOOK BAY, UNION BEACH, NJ            $90,000  Pallone                          Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               RED CLAY CREEK, CHRISTINA RIVER WATERSHED, DE             $237,000  Castle                           Carper, Kaufman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               REDWOOD CITY HARBOR, CA                                    $90,000  Eshoo                            Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               REEDY RIVER, SC                                            $90,000  Inglis                           Graham
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               RIO GRANDE BASIN, NM, CO AND TX (SECTION 729)             $103,000  Heinrich; Lujan; Reyes; Teague   Bingaman, T. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               RIO SALADO OESTE, SALT RIVER, AZ                        $1,500,000  Pastor (AZ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               RIVER DES PERES, MO                                        $40,000  Carnahan; Clay                   Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               RIVERSIDE COUNTY SPECIAL AREA MANAGEMENT PLAN, CA         $198,000  Calvert                          Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SABINE-NECHES WATERWAY, TX                                 $90,000                                   Cornyn
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SACRAMENTO RIVER FLOOD CONTROL (GRR), CA (SYSTEM          $314,000                                   Feinstein
                                                             EVALUATION)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SAN CLEMENTE SHORELINE, CA                                 $90,000  Calvert
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SAN DIEGO COUNTY SHORELINE, CA                            $134,000                                   Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SAN DIEGO COUNTY SPECIAL AREA MANAGEMENT PLAN, CA         $152,000  Filner                           Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SAN FRANCISQUITO CREEK, CA                                $179,000  Eshoo; Honda                     Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SAN JOAQUIN RIVER BASIN, FRAZIER CREEK, CA                 $90,000                                   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SAN JOAQUIN RIVER BASIN, LOWER SAN JOAQUIN RIVER, CA      $897,000  Cardoza; McNerney                Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SAN JOAQUIN RIVER BASIN, WEST STANISLAUS COUNTY,          $341,000  Cardoza                          Feinstein
                                                             ORESTIMBA CREEK, CA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SAN JOAQUIN RIVER BASIN, WHITE RIVER AND DRY CREEK,        $90,000                                   Feinstein
                                                             CA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SAN JUAN CREEK, SOUTH ORANGE COUNTY, CA                   $269,000  Calvert
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SANTA ANA RIVER AND TRIBUTARIES ECOSYSTEM                 $550,000  Lewis (CA)
                                                             RESTORATION, CA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SANTA ANA RIVER AND TRIBUTARIES, BIG BEAR LAKE, CA        $577,000  Lewis (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SANTA ANA RIVER, PRADO BASIN ECOSYSTEM RESTORATION,        $39,000  Baca
                                                             ORANGE COUNTY, CA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SANTA CLARA RIVER WATERSHED, CA                           $381,000  Capps; Gallegly                  Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SANTA FE, NM                                              $134,000  Lujan                            Bingaman, T. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SARASOTA, LIDO KEY BEACH, FL                              $305,000  Buchanan                         Bill Nelson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SAVANNAH RIVER BASIN COMPREHENSIVE STUDY, GA & SC         $493,000  Barrett (SC)                     Chambliss, Graham
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SCHUYLKILL RIVER BASIN, WISSAHICKON WATERSHED, PA          $90,000  Schwartz                         Specter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SEVEN OAKS DAM WATER CONSERVATION STUDY, CA               $672,000  Baca; Calvert; Lewis (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SKAGIT RIVER, WA                                          $359,000  Larsen (WA)                      Murray, Cantwell
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SKOKOMISH RIVER BASIN, WA                                 $430,000  Dicks                            Murray, Cantwell
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SOUTH FORK, SOUTH BRANCH, CHICAGO RIVER (BUBBLY            $90,000  Lipinski                         Durbin
                                                             CREEK), IL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SOUTH RIVER, RARITAN RIVER BASIN, NJ                      $314,000  Holt; Pallone                    Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SOUTH SAN FRANCISCO SHORELINE, CA                       $2,800,000  Eshoo; Honda; Lofgren, Zoe;      Feinstein
                                                                                                                                 Pelosi; Stark
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SOUTHEAST OKLAHOMA WATER RESOURCE STUDY, OK               $233,000  Boren; Cole                      Inhofe
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SOUTHWEST ARKANSAS, AR                                    $170,000  Ross                             Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SOUTHWEST COASTAL LOUISIANA HURRICANE PROTECTION, LA      $628,000  Boustany; Cao                    Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SPARKS ARROYO COLONIA, EL PASO COUNTY, TX                  $90,000  Reyes                            Hutchison, Cornyn
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ST. CHARLES PARISH URBAN FLOOD CONTROL, LA                $157,000  Melancon                         Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ST. CROIX RIVER BASIN, MN & WI                            $154,000  Obey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ST. CROIX RIVER RELOCATION OF ENDANGERED MUSSELS, MN      $350,000  Obey
                                                             & WI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ST. HELENA-NAPA RIVER, CA                                  $90,000  Thompson (CA)                    Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               ST. LUCIE COUNTY, FL                                      $448,000  Hastings (FL); Rooney
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               STILLAGUAMISH RIVER BASIN, WA                              $90,000                                   Murray
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               STONY BROOK, MILLSTONE RIVER BASIN, NJ                    $152,000  Lance                            Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SUN VALLEY WATERSHED, CA                                  $314,000  Berman; Roybal-Allard; Sherman   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SURF CITY AND NORTH TOPSAIL BEACH, NC                      $90,000  McIntyre                         Burr, Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               SUSQUEHANNA RIVER BASIN ENVIRONMENTAL RESTORATION AND      $90,000                                   Mikulski
                                                             LOW FLOW MANAGEMENT, NY, PA & MD
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               TRUCKEE MEADOWS, NV                                     $6,724,000                                   Reid, Ensign
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               UPPER DELAWARE RIVER WATERSHED, FLOODPLAIN                 $90,000                                   Schumer, Gillibrand
                                                             RECONNECTION, NY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               UPPER DELAWARE RIVER WATERSHED, LIVINGSTON MANOR, NY       $90,000                                   Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               UPPER GUYANDOTTE RIVER, WV                                $269,000  Rahall                           Byrd
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               UPPER MISS RIVER COMPREHENSIVE PLAN IL, IA, MO, MN &      $269,000  Loebsack; Schock                 Durbin, Harkin, Grassley
                                                             WI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               UPPER MISSISSIPPI RIVER--ILLINOIS WW SYSTEM, IL, IA,    $6,276,000  Akin; Boswell; Carnahan;         Durbin, Harkin, Bond, Grassley,
                                                             MN, MO & WI                                                         Ellison; Halvorson; Hare;        Klobuchar
                                                                                                                                 Loebsack; Oberstar; Schock;
                                                                                                                                 Shimkus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               UPPER OHIO NAVIGATION SYSTEM STUDY, PA                  $1,255,000  Altmire; Doyle; Murphy, Tim      Specter, Casey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               UPPER RAPPAHANNOCK RIVER BASIN, VA                         $90,000                                   Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               UPPER SUSQUEHANNA RIVER BASIN COMPREHENSIVE FLOOD          $90,000  Hinchey                          Schumer
                                                             DAMAGE REDUCTION, NY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               UPPER TRINITY RIVER BASIN, TX                             $269,000  Barton (TX); Burgess; Granger
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               UPPER TURKEY CREEK, KS                                     $90,000  Moore (KS)                       Roberts, Brownback
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               VALDEZ NAVIGATION IMPROVEMENTS, AK                        $157,000  Young (AK)                       Murkowski
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               VICINITY AND WILLOUGHBY SPIT, NORFOLK, VA                 $218,000  Nye; Scott (VA)                  Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WAIAKEA-PALAI STREAMS FLOOD DAMAGE REDUCTION, HAWAII,      $45,000  Abercrombie; Hirono              Inouye, Akaka
                                                             HI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WAILUPE STREAM, OAHU, HI                                  $157,000  Abercrombie                      Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WALTON COUNTY, FL                                          $90,000                                   Bill Nelson, Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WASHITA RIVER BASIN, OK                                   $171,000  Cole                             Inhofe
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WATERTOWN AND VICINITY, SD                                $359,000  Herseth Sandlin                  Johnson, Thune
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WELLS LOCK AND DAM, LITTLE KANAWHA RIVER, WV               $36,000                                   Byrd
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WEST MAUI WATERSHED, MAUI, HI                              $90,000  Hirono                           Inouye, Akaka
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WEST SACRAMENTO, CA                                       $448,000  Thompson (CA)                    Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WEST SHORE--LAKE PONTCHARTRAIN, LA                        $170,000  Melancon                         Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WESTERN LAKE ERIE BASIN, OH, IN, & MI                     $134,000                                   Voinovich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WESTMINSTER, EAST GARDEN GROVE, CA                        $426,000  Rohrabacher; Sanchez, Loretta    Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WHITE RIVER BASIN COMPREHENSIVE, AR & MO                  $103,000  Berry                            Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WHITE RIVER NAVIGATION TO NEWPORT, AR                     $359,000  Berry                            Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WHITTIER HARBOR, WHITTIER, AK                             $134,000                                   Murkowski
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WILLAMETTE RIVER ENVIRONMENTAL DREDGING, OR               $381,000  Blumenauer; Wu                   Wyden, Merkley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WINOOSKI RIVER, MONTPELIER, VT                            $179,000                                   Leahy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations               WRECK POND, MONMOUTH COUNTY, NJ                            $90,000  Smith (NJ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         BUCKS COUNTY, PA                                          $250,000  Murphy, Patrick
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         CHITIMACHA TRIBE OF LOUISIANA, LA [GIS]                   $250,000                                   Landrieu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         CITY OF ALEXANDRIA, LA [GIS]                              $200,000                                   Landrieu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         EAST BATON ROUGE PARISH, LA [GIS]                         $600,000                                   Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         FLOODPLAIN MAPS FOR MANALAPAN AND MATCHAPON, NJ           $500,000                                   Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         HAWAII TECHNICAL SERVICES, HI                              $40,000                                   Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         HURRICANE EVACUATION STUDIES, HI                        $1,000,000  Hirono                           Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         IOWA RESERVOIRS DAM SAFETY STUDY, IA                       $37,000  Loebsack                         Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         LITTLE SIOUX WATERSHED, IA                                 $50,000                                   Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         LIVINGSTON PARISH, LA [GIS]                               $175,000                                   Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         MON-MAQ DAM REMOVAL STUDY & LOCAL FLOODPLAIN MASTER       $250,000  Braley (IA)                      Harkin, Grassley
                                                             PLANNING, MONTICELLO, IA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         WHITE CLAY CREEK, NEW CASTLE, DE                          $200,000                                   Carper, Kaufman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--FPMS         WICHITA AREA DRAINAGE MASTER PLAN, KS                     $550,000  Tiahrt
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          CEDAR LAKE WATER QUALITY STUDY, WI                         $65,000  Obey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          CHOCTAW COUNTY RESERVOIR, MS                              $100,000                                   Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          DELAWARE ESTUARY SALINITY MONITORING STUDY, NJ, DE &      $200,000                                   Lautenberg, Kaufman, Menendez
                                                             PA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          HAWAII DOT GIS, HI                                        $100,000                                   Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          HAWAII WATER RESOURCES MANAGEMENT, HI                     $270,000                                   Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          LAKE COUNTY WETLAND PRESERVATION, PROTECTION AND          $200,000  Bean                             Durbin
                                                             RESTORATION PLAN, IL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          OKLAHOMA COMPREHENSIVE WATER PLAN, OK                     $500,000  Boren; Fallin                    Inhofe
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          SOUTH MAUI WATERSHED, HI                                  $300,000  Abercrombie; Hirono
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          STATE OF HAWAII GENERAL FLOOD CONTROL PLAN UPDATE,      $1,000,000  Hirono                           Inouye, Akaka
                                                             STATE OF HAWAII AND PACIFIC TERRITORIES, HI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          STATE OF HAWAII RAINFALL ANALYSIS, HI                     $100,000  Hirono                           Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          STORM WATER MANAGEMENT PLAN FOR COASTAL COMMUNITIES,      $220,000                                   Webb, Warner
                                                             VA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--PAS          WAIMANALO WASTEWATER EFFLUENT REUSE PLAN, STATE OF         $67,000  Hirono                           Inouye
                                                             HAWAII AND PACIFIC TERRITORIES, HI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--R&D          RESEARCH AND DEVELOPMENT: SUBMERGED AQUATIC               $897,000                                   Cardin
                                                             VEGETATION, MD & VA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Investigations--R&D          RESEARCH AND DEVELOPMENT: URBAN FLOOD DEMONSTRATION     $1,793,000                                   Reid
                                                             PROGRAM, DRI, NV
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ACEQUIAS IRRIGATION SYSTEM, NM                          $2,422,000  Lujan; Teague                    Bingaman, T. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ALAMOGORDO, NM                                          $2,902,000  Teague                           Bingaman, T. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ALASKA COASTAL EROSION, AK                                $921,000                                   Murkowski
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 AQUATIC PLANT CONTROL: BLACK LAKE, OGDENSBURG, NY         $100,000                                   Schumer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 AQUATIC PLANT CONTROL: GUNTERSVILLE LAKE HYDRILLA/        $150,000                                   Sessions
                                                             MILFOIL, AL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 AQUATIC PLANT CONTROL: LAKE CHAMPLAIN, VT                 $500,000                                   Leahy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 AQUATIC PLANT CONTROL: LAKE CHAUTAUQUA, JAMESTOWN, NY      $50,000                                   Schumer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 AQUATIC PLANT CONTROL: LAKES GRANBURY AND WITNEY, TX      $500,000  Edwards (TX)
                                                             WATER QUALITY PROGRAM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 AQUATIC PLANT CONTROL: SODUS BAY, SODUS POINT, NY         $100,000                                   Schumer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ASCENSION PARISH ENVIRONMENTAL INFRASTRUCTURE, LA         $460,000                                   Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ATLANTA ENVIRONMENTAL INFRASTRUCTURE, GA                $1,429,000  Bishop (GA); Kingston; Lewis     Chambliss, Isakson
                                                                                                                                 (GA); Scott (GA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ATLANTIC COAST OF MARYLAND, MD                          $2,906,000  Kratovil                         Mikulski, Cardin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BARNEGAT INLET TO LITTLE EGG HARBOR INLET, NJ           $4,844,000  Adler (NJ); Rothman (NJ)         Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BEAVER CREEK RESERVOIR, BEAVER AND SALEM TOWNSHIPS,       $100,000  Thompson (PA)
                                                             PA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BIG SIOUX RIVER, SIOUX FALLS, SD                        $1,841,000  Herseth Sandlin                  Johnson, Thune
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BLUE RIVER BASIN, KANSAS CITY, MO                         $709,000  Cleaver                          Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BOIS BRULE DRAINAGE AND LEVEE DISTRICT, MO              $1,938,000  Emerson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BOSQUE RIVER WATERSHED, TX                                $100,000  Edwards (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BRECKENRIDGE, MN                                        $5,000,000  Peterson; Pomeroy                Klobuchar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BREVARD COUNTY, FL                                        $521,000  Posey                            Bill Nelson, Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BRIGANTINE INLET TO GREAT EGG HARBOR INLET, ABSECON     $1,890,000  LoBiondo                         Lautenberg, Menendez
                                                             ISLAND, NJ
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BRIGANTINE INLET TO GREAT EGG HARBOR INLET,                $80,000  LoBiondo                         Lautenberg, Menendez
                                                             BRIGANTINE ISLAND, NJ
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BRUNSWICK COUNTY BEACHES, NC                              $947,000  McIntyre                         Burr, Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 BURLINGTON HARBOR OIL BOLLARD REMOVAL, VT                 $460,000                                   Leahy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CALFED LEVEE STABILITY PROGRAM, CA                      $4,844,000  McNerney                         Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CALUMET REGION, IN                                      $4,000,000  Visclosky
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CAPE GIRARDEAU (FLOODWALL), MO                            $183,000  Emerson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CENTRAL CITY, FORT WORTH, UPPER TRINITY RIVER BASIN,    $6,782,000  Edwards (TX); Granger            Hutchison, Cornyn
                                                             TX
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CENTRAL WEST VIRGINIA, WV                                 $727,000  Capito
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CHESAPEAKE BAY ENVIRONMENTAL RESTORATION AND              $630,000  Sarbanes                         Cardin
                                                             PROTECTION, MD, VA & PA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CHESAPEAKE BAY OYSTER RECOVERY, MD & VA                 $2,000,000  Connolly (VA); Edwards (MD);     Mikulski, Cardin, Webb, Warner
                                                                                                                                 Hoyer; Kratovil; Moran (VA);
                                                                                                                                 Norton; Ruppersberger;
                                                                                                                                 Sarbanes; Scott (VA); Van
                                                                                                                                 Hollen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CITY OF INGLEWOOD, CA                                     $100,000  Waters
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CITY OF SANTA CLARITA, CA                                 $533,000  McKeon
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CLEAR CREEK, TX                                         $1,211,000  Olson; Paul                      Cornyn
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 COMITE RIVER, LA                                        $4,844,000                                   Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CONTRA COSTA CANAL, OAKLEY AND KNIGHTSEN, CA              $100,000  McNerney; Miller, George;        Feinstein
                                                                                                                                 Tauscher
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 COOK COUNTY, IL                                           $194,000  Jackson (IL); Lipinski; Quigley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CORPUS CHRISTI SHIP CHANNEL, TX                           $921,000  Ortiz                            Hutchison, Cornyn
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CORTE MADERA CREEK, CA                                    $472,000  Woolsey                          Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 CUMBERLAND COUNTY WATER SUPPLY, TN                         $50,000  Davis (TN)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 DALLAS FLOODWAY EXTENSION, TRINITY RIVER PROJECT, TX   $12,594,000  Edwards (TX); Johnson, Eddie     Hutchison, Cornyn
                                                                                                                                 Bernice
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 DELAWARE COAST PROTECTION, DE                             $368,000  Castle                           Carper, Kaufman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 DELAWARE COAST, CAPE HENLOPEN TO FENWICK ISLAND,          $969,000  Castle                           Carper, Kaufman
                                                             BETHANY BEACH TO SOUTH BETHANY, DE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 DELAWARE COAST, CAPE HENLOPEN TO FENWICK ISLAND,          $969,000  Castle                           Carper, Kaufman
                                                             REHOBOTH BEACH AND DEWEY BEACH, DE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 DELAWARE RIVER MAINSTEM AND CHANNEL DEEPENING, DE, NJ   $4,844,000  Brady (PA)                       Specter, Casey
                                                             & PA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 DES MOINES AND RACCOON RIVERS, IA                       $2,701,000  Boswell                          Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 DES MOINES RECREATIONAL RIVER AND GREENBELT, IA         $4,062,000  Boswell; Latham                  Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 DESOTO COUNTY, MS                                       $8,000,000  Childers                         Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 EAST BATON ROUGE PARISH ENVIRONMENTAL INFRASTRUCTURE,     $230,000                                   Landrieu, Vitter
                                                             LA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 EAST BATON ROUGE PARISH, LA                             $1,381,000                                   Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 EAST ROCKAWAY INLET TO ROCKAWAY INLET AND JAMAICA         $242,000  Weiner                           Schumer, Gillibrand
                                                             BAY, NY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 EAST ST. LOUIS AND VICINITY, IL                           $249,000                                   Durbin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 EL PASO COUNTY, TX                                        $100,000  Reyes                            Cornyn
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 FARMINGTON RECHARGE DEMONSTRATION PROGRAM, CA             $484,000  McNerney                         Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 FLORIDA KEYS WATER QUALITY IMPROVEMENTS, FL               $242,000  Ros-Lehtinen                     Bill Nelson, Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 FORT PECK CABIN CONVEYANCE, MT                            $969,000                                   Tester, Baucus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 GENESEE COUNTY, MI                                        $518,000  Kildee                           Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 GRAHAM, TX (BRAZOS RIVER BASIN)                           $484,000  Neugebauer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 GRAND FORKS, ND--EAST GRAND FORKS, MN                   $2,535,000  Pomeroy                          Dorgan, Klobuchar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 GREAT EGG HARBOR INLET TO TOWNSEND INLET, NJ            $1,853,000  LoBiondo                         Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 GREAT LAKES FISHERY AND ECOSYSTEM RESTORATION, MI       $2,471,000  Dahlkemper; Ehlers; Kildee;      Voinovich, Levin, Stabenow
                                                                                                                                 Kucinich; Oberstar; Petri;
                                                                                                                                 Slaughter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 GREENBRIER RIVER BASIN, WV                              $1,417,000  Rahall                           Byrd
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 GUADALUPE RIVER, CA                                       $140,000  Honda                            Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 HACKENSACK MEADOWLANDS, NJ                                $230,000  Rothman (NJ)                     Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 HAMILTON DAM, FLINT RIVER, FLINT, MI                      $242,000  Kildee                           Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 HARBOR/SOUTH BAY WATER RECYCLING PROJECT, LOS             $484,000  Harman; Richardson; Roybal-      Feinstein
                                                             ANGELES, CA                                                         Allard; Waters
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 HAWAII WATER MANAGEMENT, HI                             $2,000,000  Hirono                           Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 HOLES CREEK, WEST CARROLLTON, OH                        $1,005,000  Turner                           Voinovich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 HOUSTON-GALVESTON NAVIGATION CHANNELS, TX                 $242,000  Culberson; Edwards (TX); Green,  Hutchison, Cornyn
                                                                                                                                 Al; Green, Gene; Jackson-Lee
                                                                                                                                 (TX); Olson; Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 HUNTING BAYOU, HOUSTON, TX                                $100,000  Green, Gene
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 IAO STREAM FLOOD CONTROL, MAUI, HI                        $250,000  Hirono                           Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 INDIANA SHORELINE, IN                                     $800,000  Visclosky
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 INDIANAPOLIS, WHITE RIVER (NORTH), IN                   $3,875,000  Carson (IN)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ISLAND CREEK, LOGAN, WV                                $21,750,000  Rahall                           Byrd
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 JACKSONVILLE HARBOR, FL                                   $922,000  Brown, Corrine; Crenshaw;        Bill Nelson
                                                                                                                                 Stearns
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 JAMES RIVER, DEEP WATER TURNING BASIN, VA               $2,234,000  Scott (VA)                       Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 JOHNSON CREEK, UPPER TRINITY BASIN, ARLINGTON, TX       $1,417,000  Barton (TX)                      Hutchison, Cornyn
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 JOSEPH G. MINISH PASSAIC RIVER WATERFRONT, NJ           $2,350,000  Payne; Sires                     Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 KAHUKU, HI                                                $100,000  Hirono                           Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LACKAWANNA RIVER, SCRANTON, PA                            $484,000  Kanjorski                        Specter, Casey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LAKE CHAMPLAIN WATERSHED INITIATE,VT                      $920,000                                   Leahy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LAKE MICHIGAN WATERFRONT, IN                            $3,000,000  Visclosky
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LAKES MARION AND MOULTRIE, SC                           $4,170,000  Clyburn                          Graham
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LEE COUNTY, FL (REIMBURSEMENT)                            $645,000  Mack                             Bill Nelson, Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LEVISA AND TUG FORKS AND UPPER CUMBERLAND RIVER, WV,    $9,500,000  Rogers (KY)
                                                             VA & KY (KENTUCKY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LEVISA AND TUG FORKS AND UPPER CUMBERLAND RIVER, WV,    $4,000,000  Boucher                          Webb, Warner
                                                             VA & KY (VIRGINIA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LEVISA AND TUG FORKS AND UPPER CUMBERLAND RIVER, WV,    $2,750,000                                   Byrd
                                                             VA & KY (WEST VIRGINIA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LITTLE WOOD RIVER, GOODING, ID                            $100,000  Simpson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LIVINGSTON PARISH ENVIRONMENTAL INFRASTRUCTURE, LA        $230,000                                   Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LLAGAS CREEK, CA                                          $242,000  Honda; Lofgren, Zoe; McNerney    Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LOS ANGELES RIVER DEMONSTRATION PROJECTS, CA              $100,000  Becerra; Berman; Harman; Roybal-
                                                                                                                                 Allard; Schiff; Sherman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 LOWER MUD RIVER, MILTON, WV                             $1,384,000  Rahall                           Byrd
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MADISON AND ST. CLAIR COUNTIES, IL                        $165,000  Costello; Shimkus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MANATEE COUNTY, FL                                        $100,000  Buchanan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MANATEE HARBOR, FL                                        $100,000  Buchanan; Castor (FL)            Bill Nelson, Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MERAMEC RIVER BASIN, VALLEY PARK LEVEE, MO                $993,000  Akin                             Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MID-VALLEY AREA LEVEE RECONSTRUCTION, CA                $1,211,000  Herger                           Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MIDDLE RIO GRANDE FLOOD PROTECTION, BERNALILLO TO         $756,000  Heinrich                         Bingaman, T. Udall
                                                             BELEN, NM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MISSISSIPPI ENVIRONMENTAL INFRASTRUCTURE, MS           $10,000,000  Taylor                           Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MISSOURI AND MIDDLE MISSISSIPPI RIVERS ENHANCEMENT,       $460,000                                   Harkin, Grassley
                                                             MO
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MISSOURI RIVER LEVEE SYSTEM (UNIT L-385), IA, NE, KS,   $1,151,000                                   Bond
                                                             MO
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MISSOURI RIVER RESTORATION, ND                            $138,000                                   Conrad
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MT. ZION DAM, FULTON COUNTY, IN                           $374,000  Donnelly (IN)                    Lugar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 MURRIETA CREEK, CA                                      $1,890,000  Bono Mack; Calvert               Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 NEGAUNEE, MI                                              $727,000  Stupak                           Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 NEW YORK CITY WATERSHED, NY                               $945,000  Engel; Hall (NY)                 Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 NEW YORK STATE CANAL SYSTEM, NY                           $460,000                                   Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 NOGALES WASH, AZ                                        $1,502,000  Grijalva
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 NORFOLK HARBOR AND CHANNELS (DEEPENING), VA               $460,000                                   Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 NORTH DAKOTA ENVIRONMENTAL INFRASTRUCTURE, ND          $15,000,000  Pomeroy                          Dorgan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 NORTHEASTERN MINNESOTA, MN                                $969,000  Oberstar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 NORTHERN WEST VIRGINIA ENVIRONMENTAL INFRASTRUCTURE,      $100,000  Mollohan
                                                             WV
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 NORTHERN WISCONSIN ENVIRONMENTAL ASSISTANCE, WI         $4,000,000  Obey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 NUTWOOD DRAINAGE AND LEVEE DISTRICT, IL                   $138,000                                   Durbin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: CITY OF            $200,000  Turner
                                                             HILLSBORO, HIGHLAND COUNTY, OH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: CITY OF            $250,000  Wilson (OH)                      Voinovich, Brown
                                                             MARIETTA, OH (WWTP)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: CITY OF MENTOR-    $250,000  LaTourette
                                                             ON-THE-LAKE, OH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: CITY OF PARMA,     $200,000  Kucinich
                                                             OH (BRADENTON BLVD)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: CITY OF PARMA,     $200,000  Kucinich
                                                             OH (PARKHAVEN DRIVE)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: FRESNO,            $200,000  Space
                                                             COSHOCTON, OH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: LAKE COUNTY,       $250,000  LaTourette
                                                             OH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: NILES, OH        $1,600,000  Ryan (OH)
                                                             (LAWNVIEW SEWER OVERFLOW DETENTION BASIN)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: TOLEDO, OH         $600,000  Kaptur
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: VILLAGE OF         $200,000  Turner
                                                             BLANCHESTER, CLINTON COUNTY, OH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: VILLAGE OF         $250,000  Space                            Voinovich
                                                             COALTON, JACKSON COUNTY, OH (WATER LINE)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: VILLAGE OF         $200,000  Boccieri
                                                             DALTON, OH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: VILLAGE OF OAK     $200,000  Space
                                                             HILL, JACKSON COUNTY, OH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: VILLAGE OF         $200,000  Latta
                                                             POLK, ASHLAND COUNTY, OH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO ENVIRONMENTAL INFRASTRUCTURE, OH: VILLAGE OF         $200,000  Latta
                                                             RISINGSUN, WOOD COUNTY, OH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO RIVER GREENWAY PUBLIC ACCESS, IN                     $969,000  Hill
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 OHIO RIVERFRONT, CINCINNATI, OH                         $2,374,000  Driehaus; Schmidt
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ORCHARD BEACH, BRONX, NY                                  $945,000  Crowley; Serrano                 Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 PALM BEACH COUNTY, FL (REIMBURSEMENT)                     $581,000  Klein (FL); Wexler               Bill Nelson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 PANAMA CITY BEACHES, FL                                   $230,000                                   Bill Nelson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 PASSAIC RIVER BASIN FLOOD MANAGEMENT, NJ                $5,000,000  Frelinghuysen; Pascrell          Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 PETALUMA RIVER, CA                                        $727,000  Woolsey                          Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 PINHOOK CREEK, HUNTSVILLE, AL                             $100,000  Griffith
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 PLACER COUNTY, CA                                         $921,000                                   Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 PONCE DE LEON INLET, FL                                   $969,000  Kosmas                           Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 PORT EVERGLADES HARBOR, FL                                $727,000  Wexler
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 PUGET SOUND AND ADJACENT WATERS RESTORATION, WA           $100,000  Baird; Dicks; Inslee; Larsen     Murray, Cantwell
                                                                                                                                 (WA); McDermott; Smith (WA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RAMAPO RIVER AT MAHWAH, NJ AND SUFFERN, NY                $100,000                                   Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RARITAN & SANDY HOOK BAY, PORT MONMOUTH, NJ               $921,000  Pallone                          Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RARITAN BAY AND SANDY HOOK BAY, NJ                        $921,000  Pallone                          Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RED RIVER BASIN CHLORIDE CONTROL, TX & OK               $1,332,000  Boren; Hall (TX)                 Inhofe
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RED RIVER BASIN CHLORIDE CONTROL, TX & OK: ELM FORK,      $388,000  Lucas
                                                             AREA VI ELEMENT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RED RIVER BELOW DENISON DAM, AR, LA & TX                $2,035,000  Alexander; Fleming               Landrieu, Lincoln, Pryor
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RED RIVER EMERGENCY BANK PROTECTION, AR, LA, OK, & TX   $1,986,000  Alexander; Boren; Fleming; Ross  Landrieu, Lincoln, Pryor
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RICHMOND, VA (COMBINED SEWER OVERFLOW)                    $100,000                                   Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RIO DE FLAG, FLAGSTAFF, AZ                              $3,003,000  Kirkpatrick (AZ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ROSEAU, MN (RED RIVER OF THE NORTH BASIN)               $1,938,000  Peterson                         Klobuchar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RURAL IDAHO, ID                                         $3,875,000  Simpson                          Crapo, Risch
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RURAL MONTANA, MT                                       $4,844,000  Rehberg                          Tester, Baucus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RURAL NEVADA, NV                                       $15,000,000  Heller                           Reid, Ensign
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 RURAL UTAH, UT                                         $20,000,000  Matheson                         Bennett
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SACRAMENTO RIVER, GLENN-COLUSA IRRIGATION DISTRICT,       $230,000  Herger                           Feinstein
                                                             CA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SAN ANTONIO CHANNEL IMPROVEMENT, TX                     $3,028,000  Cuellar; Edwards (TX);           Hutchison, Cornyn
                                                                                                                                 Gonzalez; Rodriguez; Smith
                                                                                                                                 (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SAN FRANCISCO, CA                                       $4,700,000  Pelosi
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SAN LORENZO RIVER, CA                                     $242,000  Farr
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SAN LUIS REY RIVER, CA                                  $1,453,000                                   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SAN RAMON VALLEY RECYCLED WATER, CA                       $170,000  McNerney; Tauscher               Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SANDY HOOK TO BARNEGAT INLET, NJ                        $1,890,000  Pallone; Smith (NJ)              Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SAULT STE. MARIE (REPLACEMENT LOCK), MI                   $969,000  Obey; Stupak                     Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SHOALWATER BAY, WA                                      $2,906,000  Baird                            Murray
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SHORELINE EROSION CONTROL DEVELOPMENT AND                 $969,000                                   Feinstein
                                                             DEMONSTRATION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SOUTH CENTRAL PENNSYLVANIA ENVIRONMENTAL IMPROVEMENT,   $3,888,000  Shuster
                                                             PA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SOUTH CENTRAL PENNSYLVANIA ENVIRONMENTAL IMPROVEMENT,   $6,900,000  Murtha
                                                             PA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SOUTHEASTERN PENNSYLVANIA ENVIRONMENTAL                   $242,000  Schwartz
                                                             INFRASTRUCTURE, PA: SANDYFORD RUN WETLAND CREATION,
                                                             PA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SOUTHEASTERN PENNSYLVANIA ENVIRONMENTAL                   $388,000  Fattah; Schwartz
                                                             INFRASTRUCTURE, PA: TACONY CREEK, PHILADELPHIA, PA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SOUTHERN AND EASTERN KENTUCKY, KY                         $969,000  Rogers (KY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SOUTHERN WEST VIRGINIA ENVIRONMENTAL INFRASTRUCTURE     $1,000,000  Rahall
                                                             PROGRAM, WV
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SOUTHWEST VALLEY, FLOOD DAMAGE REDUCTION,               $2,810,000  Heinrich                         Bingaman, T. Udall
                                                             ALBUQUERQUE, NM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ST. CLAIR RIVER AND LAKE ST. CLAIR MANAGEMENT PLAN,       $100,000  Levin; Miller (MI)               Levin, Stabenow
                                                             MI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 ST. JOHNS COUNTY, FL                                      $339,000  Mica                             Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 STE. GENEVIEVE, MO                                        $242,000  Carnahan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 STOCKTON METROPOLITAN FLOOD CONTROL REIMBURSEMENT, CA     $484,000  Cardoza; McNerney
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 SWOPE PARK INDUSTRIAL AREA, KANSAS CITY, MO             $1,938,000  Cleaver                          Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 TAHOE BASIN RESTORATION, CA & NV                        $3,000,000                                   Reid, Feinstein, Ensign
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 TAMPA HARBOR, FL                                          $472,000  Buchanan; Castor (FL); Putnam;   Bill Nelson, Martinez
                                                                                                                                 Young (FL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 THREE RIVERS WET WEATHER DEMONSTRATION PROGRAM,           $969,000  Doyle
                                                             ALLEGHENY COUNTY, PA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 TOWNSEND INLET TO CAPE MAY INLET, NJ                    $1,066,000  LoBiondo                         Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 TRES RIOS, AZ                                          $15,000,000  Mitchell; Pastor (AZ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 TUCSON DRAINAGE AREA, AZ                                $5,000,000  Giffords; Grijalva; Pastor (AZ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 TUSCALOOSA, AL                                          $7,500,000                                   Shelby
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 UNALASKA HARBOR, AK                                     $1,453,000                                   Murkowski, Begich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 UPPER GUADALUPE RIVER, CA                                 $921,000  Honda; Lofgren, Zoe              Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 VIRGINIA BEACH, VA (HURRICANE PROTECTION)                 $727,000  Nye                              Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 WEST VIRGINIA AND PENNSYLVANIA FLOOD CONTROL, PA & WV   $1,500,000  Mollohan; Murtha
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 WYOMING VALLEY, PA (LEVEE RAISING)                      $1,134,000  Carney; Kanjorski                Specter, Casey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Construction                 YUBA RIVER BASIN, CA                                    $1,938,000  Herger                           Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  BEARGRASS CREEK WETLANDS, KY                           ...........  Yarmuth
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  BEAVER CREEK, OR                                       ...........  Blumenauer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  BIG FISHWEIR CREEK, FL                                 ...........  Crenshaw
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  BLUE HOLE LAKE, SANTA ROSA, NM                         ...........  Teague                           Bingaman, T. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  BLUE RIVER, CO                                         ...........  Salazar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  BOTTOMLESS LAKES STATE PARK, NM                        ...........  Teague
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  BURAS MARINA WETLAND RESTORATION, PLAQUEMINES PARISH,  ...........                                   Landrieu
                                                             LA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  BURNHAM PRAIRIE, IL                                    ...........  Jackson (IL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  CANONSBURG LAKE, PA                                    ...........  Murphy, Tim
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  CENTERVILLE, TN                                        ...........  Davis (TN)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  CHATTAHOOCHEE FALL LINE ECOSYSTEM RESTORATION,         ...........  Bishop (GA); Rogers (AL)         Chambliss
                                                             COLUMBUS, GA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  CODORUS CREEK, PA                                      ...........                                   Casey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  CONCORD STREAMS RESTORTION, CONCORD, NC                ...........  Kissell                          Burr, Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  CYPRESS CREEK, MONTGOMERY, AL                             $100,000  Bright
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  DEEP RUN/TIBER HUDSON, MD                              ...........                                   Cardin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  DOG ISLAND SHOALS, MD                                  ...........  Kratovil                         Cardin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  DUCK CREEK/FAIRMOUNT PARK WETLAND RESTORATION, SCOTT   ...........                                   Harkin, Grassley
                                                             COUNTY, IA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  FALSE RIVER RESTORATION, POINTE COUPEE PARISH, LA      ...........                                   Landrieu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  GREENBURY POINT, MD                                    ...........                                   Cardin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  HIGHWAY 47, VERNONIA, OR                               ...........  Wu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  HOFFMAN DAM, IL                                        ...........  Lipinski
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  HOGAN'S CREEK, FL                                      ...........  Brown, Corrine
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  HOMER LAKE, ST JOSEPH RIVER, MI                        ...........  Schauer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  IA RVR/CLEAR CREEK, JOHNSON COUNTY, IA                 ...........  Loebsack                         Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  JANES-WALLACE MEMORIAL DAM, SANTA ROSA, NM             ...........  Teague                           Bingaman, T. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  KINGS PARK, NY                                         ...........                                   Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  LA STATE PEN, LAKE KILLARNEY RESTORATION, W FELICIANA  ...........                                   Landrieu
                                                             PARISH, LA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  LAKE LOU YAEGER RESTORATION, IL                        ...........  Shimkus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  LOCKPORT PRAIRIE NATURE PRESERVE, WILL COUNTY, IL      ...........  Biggert
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  MILFORD POND, MILFORD, MA                              ...........                                   Kennedy, Kerry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  MILL RIVER, STAMFORD, CT                               ...........  Himes                            Lieberman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  MUD CREEK,GREAT SOUTH BAY, PATCHOGUE, NY               ...........  Bishop (NY)                      Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  MUSCONETCONG RIVER DAM REMOVALS, NJ                    ...........                                   Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  NARROWS RIVER, NARRAGANSETT, RI                        ...........                                   Reed
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  NORTH BEACH, MD                                        ...........  Hoyer                            Mikulski
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  NORTH FORK GUNNISON, CO                                ...........  Salazar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  NORTH PARK, ALLEGHENY COUNTY, PA                       ...........  Altmire
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  NORTHWEST BRANCH, ANACOSTIA RIVER, MD                  ...........  Edwards (MD); Van Hollen         Cardin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  OLENTANGY 5TH AVENUE DAM, OH                           ...........  Kilroy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  OSGOOD POND, MILFORD, NH                               ...........  Hodes
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  PAINT BRANCH FISH PASSAGE, MD                          ...........  Edwards (MD)                     Cardin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  PAINTER CREEK, MN                                      ...........  Paulsen                          Klobuchar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  PARADISE CREEK, CITY OF MOSCOW, ID                     ...........                                   Crapo, Risch
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  PING TOM PARK, IL                                      ...........  Davis (IL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  SALT RIVER RESTORATON, CA                              ...........  Thompson (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  SHERADEN PARK & CHARTIERS CREEK, PA                    ...........  Doyle
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  SOUNDVIEW PARK, CITY OF BRONX, NY                      ...........  Crowley; Serrano; Sires          Schumer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  SPRING CREEK, NY                                       ...........  Meeks (NY); Sires                Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  SWEET ARROW LAKE, PA                                   ...........  Holden
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  TAMARISK ERADICATION, CO                               ...........  Salazar                          M. Udall, Bennet
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  TEN MILE RIVER, RI                                     ...........  Kennedy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  UPPER YORK CREEK DAM REMOVAL, CA                       ...........  Thompson (CA)                    Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  URIEVILLE LAKE, MD                                     ...........  Kratovil
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  WALNUT BRANCH, SEGUIN, TX                              ...........  Cuellar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  WESTERN CARY STREAMS RESTORATION, CARY, NC             ...........  Miller (NC)                      Burr, Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  WHITEBREAST WATERSHED ECOSYSTEM RESTORATION, IA        ...........                                   Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  WINNAPAUG POND, WESTERLY, RI                           ...........                                   Reed
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 206                  ZEMUARRY PARK LAKE RESTORATION, TANGIPAHOA PARISH, LA  ...........                                   Landrieu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 204                  HOUMA NAVIGATION CANAL BARRIER ISLAND RESTORATION, LA  ...........                                   Landrieu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 204                  NJIWW, DREDGED HOLE 35, NJ                             ...........                                   Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  BEPJ POPLAR BROOK, NJ                                  ...........  Pallone
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  BLACK ROCKS CREEK, SALISBURY, MA                       ...........  Tierney
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  BLACKSNAKE CREEK, ST. JOSEPH, MO                       ...........  Graves                           Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  CASS RIVER, SPAULDING TOWNSHIP, MI                     ...........  Camp
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  CIENEGAS CREEK, DEL RIO, TX                            ...........  Rodriguez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  CITY OF INDEPENDENCE, OH                               ...........  Kucinich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  CONCORDIA, KS                                          ...........  Moran (KS)                       Roberts
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  COSGROVE CREEK FLOOD CONTROL, CALAVERAS COUNTY, CA     ...........                                   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  FARMERS BRANCH, TARRANT COUNTY, TX                     ...........  Granger
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  HAMILTON TOWNSHIP, NJ                                  ...........  Smith (NJ)                       Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  HATCH, NM                                              ...........  Teague                           Bingaman, T. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  INDIAN BAYOU, AR                                       ...........                                   Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  INDIAN CREEK, CEDAR RVR, CEDAR RAPIDS, IA              ...........  Loebsack                         Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  JACKSON BROOK, MORRIS CITY, NJ                         ...........  Frelinghuysen                    Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  LAGRANGE GUT, FREDERIKSTED, VI                         ...........  Christensen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  LAS GALLIANAS CREEK, MARIN COUNTY, CA                  ...........  Woolsey                          Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  LIMESTONE CREEK, FAYETTEVILLE, NY                      ...........  Maffei
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  LITTLE RIVER, HOPKINSVILLE, KY                         ...........  Whitfield                        McConnell, Bunning
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  MCKINNEY BAYOU, TUNICA COUNTY, MS                      ...........                                   Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  MINNESOTA RIVER, GRANITE FALLS, MN                     ...........  Peterson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  NORTH RIVER, PEABODY, MA                               ...........  Tierney                          Kennedy, Kerry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  PENNSVILLE, NJ                                         ...........  LoBiondo                         Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  PENNSYLVANIA AVENUE IMPROVEMENT, BETHANY BEACH, DE     ...........                                   Carper, Kaufman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  PHILADELPHIA SHIPYARD FLOOD DAMAGE REDUCTION,          ...........  Brady (PA)                       Specter, Casey
                                                             PHILADELPHIA, PA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  PORT JERVIS, NY                                        ...........                                   Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  RIO GRANDE AND UNNAMED TRIBUTARY, EAGLE PASS, TX       ...........  Rodriguez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  SWANNANOA RIVER WATERSHED, NC                          ...........  Shuler
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  VALLEY VIEW, OH                                        ...........  Kucinich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 205                  WINNEBAGO RVR, MASON CITY, IA                          ...........  Latham                           Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 111                  MATTITUCK HARBOR,NY                                    ...........  Bishop (NY)                      Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  APRA SMALL BOAT HARBOR, GUAM                           ...........  Bordallo
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  BASS HARBOR, TREMONT, ME                               ...........  Michaud                          Collins
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  CHARLESTOWN BREACHWAY & NINIGRET POND, CHARLESTOWN,    ...........                                   Reed
                                                             RI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  FAIRLESS HILLS, PA (TURNING BASIN DEEPENING)           ...........  Murphy, Patrick                  Specter, Casey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  HAMPTON HARBOR, NH                                     ...........  Shea-Porter                      Gregg, Shaheen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  NAPOLEON AVENUE CONTAINER TERMINAL ACCESS, NEW            $100,000  Scalise                          Landrieu
                                                             ORLEANS, LA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  NORTHWEST TENNESSEE REGIONAL HARBOR, LAKE COUNTY, TN   ...........                                   Alexander, Corker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  NORTHWESTERN MICHIGAN COLLEGE, TRAVERSE CITY, MI       ...........  Stupak                           Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  OYSTER POINT MARINA, CA                                ...........                                   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  POINT JUDITH HARBOR AND POND, NARRAGANSETT, RI         ...........                                   Reed
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  RHODES POINT, MD                                       ...........                                   Cardin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  ST. JEROME CREEK, ST. MARY'S COUNTY, MD                ...........  Hoyer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 107                  WOODS HOLE GREAT HARBOR, FALMOUTH, MA                  ...........                                   Kennedy, Kerry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 ASSUNPINK CREEK, NJ                                    ...........  Holt; Smith (NJ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 BAYOU DESIARD, MONROE, LA                              ...........                                   Landrieu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 HNC MILE 12-31.4 RESTORATION, TERREBONNE PARISH, LA    ...........                                   Landrieu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 INDIAN RIDGE MARSH, CHICAGO, IL                        ...........  Jackson (IL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 LAKE CHAMPLAIN SEA LAMPREY BARRIERS, VT                ...........                                   Leahy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 LAKE POYGAN, WI                                        ...........  Petri
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 LAS CRUCES DAM ENVIRONMENTAL RESTORATION, DONA ANA     ...........  Teague                           Bingaman, T. Udall
                                                             COUNTY, NM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 LINCOLN PARK WEST, JERSEY CITY, NJ                     ...........  Sires                            Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 LOWER CACHE RIVER, AR                                  ...........                                   Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 MILLWOOD, GRASSY LAKE, AR                              ...........  Ross                             Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 MORGANZA FOREBAY RESTORATION, POINTE COUPEE PARISH,    ...........                                   Landrieu
                                                             LA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 NORTHPORT HARBOR, TOWN OF HUNTINGTON, NY               ...........                                   Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 RATHBUN LAKE HABITAT RESTORATION PROJECT, IA           ...........  Boswell; Loebsack                Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 SARASOTA BAY RESTORATION, SARASOTA COUNTY, FL          ...........  Buchanan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 SMOKES CREEK, ERIE COUNTY, NY                          ...........  Higgins                          Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 SPUNKY BOTTOMS RESTORATION, BROWN COUNTY, IL           ...........  Schock
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 1135                 TUJUNGA WASH ENVIRONMENTAL RESTORATION, CA             ...........  Berman; Roybal-Allard
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 103                  BAY FARM ISLAND DIKE, CA                               ...........  Stark                            Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 103                  CHESAPEAKE BAY SHORELINE, HAMPTON, VA                  ...........  Nye; Scott (VA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 103                  GOLETA BEACH, CITY OF GOLETA, CA                       ...........  Capps                            Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 103                  PISMO BEACH, CA                                        ...........  Capps                            Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 103                  PROSPECT BEACH, WEST HAVEN, CT                         ...........                                   Lieberman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             Section 103                  SEASIDE PARK, OCEAN COUNTY, NJ                         ...........                                   Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Investigations          QUIVER RIVER, MS                                          $155,000                                   Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Investigations          SOUTHEAST ARKANSAS, AR                                    $290,000  Ross                             Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Investigations          SPRING BAYOU, LA                                          $338,000  Alexander                        Landrieu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            BAYOU METO BASIN, AR                                      $100,000  Berry                            Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            GRAND PRAIRIE REGION, AR                                $9,661,000  Berry                            Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            ST. FRANCIS BASIN, AR & MO                              $3,574,000  Berry                            Pryor, Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            ST. JOHNS BAYOU & NEW MADRID FLOODWAY, MO                 $200,000  Emerson                          Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            YAZOO BASIN, BIG SUNFLOWER RIVER, MS                    $3,091,000                                   Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            YAZOO BASIN, MAIN STEM, MS                                 $24,000                                   Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            YAZOO BASIN, MISSISSIPPI DELTA HEADWATERS PROJECT, MS  $22,413,000                                   Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            YAZOO BASIN, REFORMULATION, MS                          $1,449,000                                   Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            YAZOO BASIN, UPPER YAZOO PROJECTS, MS                  $12,559,000                                   Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            YAZOO BASIN, YAZOO BACKWATER LESS ROCKY BAYOU, MS          $72,000                                   Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             MRT--Construction            YAZOO BASIN, YAZOO BACKWATER, MS                          $608,000                                   Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          ABSECON INLET, NJ                                         $117,000  LoBiondo                         Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          APPOMATTOX RIVER, VA                                      $523,000  Forbes                           Webb, Warner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          ASHLAND HARBOR, WI                                        $913,000  Obey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          BASS HARBOR, TREMONT, ME                                   $60,000                                   Collins
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          BEAUFORT HARBOR, NC                                       $238,000  Jones                            Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          BLOCK ISLAND HARBOR OF REFUGE, RI                       $1,204,000  Langevin                         Reed
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          BOGUE INLET AND CHANNEL, NC                               $461,000  Jones                            Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          BUCKS HARBOR, MACHIASPORT, ME                             $750,000                                   Collins
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          BULL SHOALS LAKE, AR (WATER SUPPLY)                       $250,000                                   Pryor, Lincoln
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          CAROLINA BEACH INLET, NC                                  $234,000  McIntyre                         Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          CEDAR ISLAND KEATON BEACH CHANNEL, FL                     $144,000  Boyd
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          CHEYENNE RIVER SIOUX TRIBE, LOWER BRULE SIOUX, SD       $3,000,000                                   Johnson, Thune
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          COCHECO RIVER, NH                                       $2,000,000  Shea-Porter                      Gregg, Shaheen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          CORNUCOPIA HARBOR, WI                                     $173,000  Obey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          CRESCENT CITY HARBOR, CA                                $1,878,000  Thompson (CA)                    Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          DEPOE BAY, OR                                             $112,000  Schrader                         Wyden, Merkley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          FISHING CREEK, CALVERT COUNTY, MD                         $160,000  Hoyer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          GRAYS HARBOR AND CHEHALIS RIVER, WA: COASTAL MODELING     $300,000  Dicks
                                                             SYSTEM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          GREENWICH HARBOR, CT                                      $100,000  Himes
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          HAMPTON HARBOR, HAMPTON, NH                               $130,000  Shea-Porter                      Gregg, Shaheen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          HARBOR OF REFUGE, LEWES, DE                               $100,000  Castle                           Carper, Kaufman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          J. PERCY PRIEST GREENWAY, TN                            $3,500,000  Gordon (TN)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          KODIAK HARBORS, AK                                        $240,000  Young (AK)                       Murkowski
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          LAKE SUPERIOR SMALL HARBOR MAINTENANCE, WI              $1,924,000  Obey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          LOCKWOODS FOLLY RIVER, NC                                 $281,000  McIntyre                         Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MARINA DEL REY, CA                                      $1,406,000  Harman                           Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MIAMI RIVER, FL                                           $374,000  Diaz-Balart, Mario; Ros-         Bill Nelson, Martinez
                                                                                                                                 Lehtinen; Wasserman Schultz
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI                            $6,000,000                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: ALPENA HARBOR, MI        ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: ARCADIA HARBOR, MI          $100,000  Hoekstra                         Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: AU SABLE HARBOR, MI      ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: BAY PORT HARBOR, MI      ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: BIG BAY HARBOR, MI       ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: BLACK RIVER HARBOR,      ...........                                   Levin, Stabenow
                                                             GOGEBIC CO-UP, MI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: BOLLES HARBOR, MI        ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: CLINTON RIVER, MI        ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: EAGLE HARBOR, MI         ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: FRANKFORT HARBOR, MI     ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: GRAND MARAIS HARBOR, MI  ...........  Stupak
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: INLAND ROUTE, MI         ...........  Stupak                           Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: LAC LA BELLE HARBOR, MI  ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: LELAND HARBOR, MI        ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: LES CHENEAUX ISLANDS     ...........  Stupak                           Levin, Stabenow
                                                             CHANNELS, MI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: LEXINGTON HARBOR, MI     ...........
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: LITTLE LAKE HARBOR, MI   ...........  Stupak                           Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: LUDINGTON HARBOR, MI     ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: MANISTEE HARBOR AND      ...........                                   Levin, Stabenow
                                                             RIVER CHANNEL, MI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: MANISTIQUE HARBOR, MI    ...........  Stupak                           Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: MARQUETTE HARBOR, MI     ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: MENOMINEE HARBOR, MI &      $117,000  Kagen                            Levin, Stabenow
                                                             WI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: NEW BUFFALO HARBOR, MI      $100,000  Upton                            Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: PENTWATER HARBOR, MI        $100,000  Hoekstra                         Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: POINT LOOKOUT HARBOR,    ...........  Stupak                           Levin, Stabenow
                                                             MI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: PORT AUSTIN HARBOR, MI   ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: PORT SANILAC HARBOR, MI  ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: PORTAGE LAKE HARBOR, MI  ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: ROUGE RIVER, MI          ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: SAUGATUCK HARBOR,        ...........  Hoekstra                         Levin, Stabenow
                                                             KALAMAZOO RIVER, MI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: SOUTH HAVEN HARBOR, MI   ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MICHIGAN HARBOR DREDGING, MI: WHITE LAKE HARBOR, MI    ...........                                   Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MILL CREEK AND SOUTH SLOUGH, IL                           $482,000  Hare                             Burris
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND              $500,000  Hare
                                                             MINNEAPOLIS (MVR PORTION), IL: SUNSET MARINA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND              $900,000                                   Durbin
                                                             MINNEAPOLIS (MVR PORTION), IL: WESTERN ILLINOIS
                                                             SMALL BOAT HARBORS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          NAPLES TO BIG MARCO PASS, FL                              $722,000  Mack
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          NEW TOPSAIL INLET AND CONNECTING CHANNELS, NC             $281,000  McIntyre                         Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          NEWBURYPORT HARBOR, MA                                    $500,000  Tierney                          Kennedy, Kerry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          NORWALK HARBOR, CT                                      $1,432,000  Himes                            Dodd, Lieberman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          OCEAN CITY HARBOR AND INLET AND SINEPUXENT BAY, MD        $656,000                                   Mikulski
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          OGDENSBURG HARBOR, NY                                      $70,000                                   Schumer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          OHIO RIVER LOCKS AND DAMS, WV, KY & OH: PARKERSBURG/    $2,786,000  Mollohan
                                                             VIENNA, WV
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          OLCOTT HARBOR, NY                                         $197,000  Slaughter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          OSWEGO HARBOR, NY                                         $300,000                                   Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          PAWCATUCK RIVER, LITTLE NARRAGANSETT BAY & WATCH HILL     $193,000  Langevin                         Reed
                                                             COVE, CT & RI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          PETERSBURG HARBOR, AK                                     $482,000                                   Murkowski, Begich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          PINOLE SHOAL MANAGEMENT STUDY, CA                         $100,000  Cardoza; McNerney; Miller,       Feinstein, Boxer
                                                                                                                                 George; Tauscher
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          PORT ST. JOE HARBOR, FL                                   $475,000  Boyd                             Bill Nelson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          PROVIDENCE HARBOR SHIPPING CHANNEL, RI                    $144,000  Kennedy; Langevin                Reed, Whitehouse
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          REGIONAL SEDIMENT MANAGEMENT DEMONSTRATION PROGRAM:       $350,000  Wittman                          Webb, Warner
                                                             CHESAPEAKE BAY, NEWPOINT COMFORT, MATHEWS COUNTY, VA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          REGIONAL SEDIMENT MANAGEMENT DEMONSTRATION PROGRAM:       $200,000                                   Lautenberg, Kaufman, Menendez
                                                             DELAWARE ESTUARY RSM, NJ
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          REGIONAL SEDIMENT MANAGEMENT DEMONSTRATION PROGRAM:       $500,000                                   Inouye, Akaka
                                                             HAWAII RSM, HI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          REGIONAL SEDIMENT MANAGEMENT DEMONSTRATION PROGRAM:       $600,000                                   Burr, Hagan
                                                             NORTH CAROLINA RSM, NC
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          REGIONAL SEDIMENT MANAGEMENT DEMONSTRATION PROGRAM:       $750,000                                   Reed
                                                             SOUTH COASTAL RHODE ISLAND RSM, RI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          REGIONAL SEDIMENT MANAGEMENT DEMONSTRATION PROGRAM:       $500,000  Hirono                           Inouye
                                                             SOUTHEAST OAHU RSM, HI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          SAN FRANCISCO BAY, LONG TERM MANAGEMENT STRATEGY, CA    $3,500,000  Pelosi
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          SOMERSET COUNTY CHANNELS, MD                            $1,000,000                                   Mikulski
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          TRINITY RIVER AND TRIBUTARIES, TX                         $963,000  Poe (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             O&M                          WILSON LAKE, KS (REALLOCATION)                            $200,000                                   Roberts
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 105--TWO HARBORS, MN                           ...........  Oberstar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 106--NORTHERN WISCONSIN ENVIRONMENTAL          ...........  Obey
                                                             ASSISTANCE, WI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 107--MARTIN, KY                                ...........  Rogers (KY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 110--MISSISSIPPI ENVIRONMENTAL                 ...........                                   Cochran
                                                             INFRASTRUCTURE, MS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 111--BIG SIOUX RIVER AND SKUNK CREEK, SIOUX    ...........  Herseth Sandlin                  Johnson, Thune
                                                             FALLS, SD
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 112--IDAHO, MONTANA, RURAL NEVADA, NEW         ...........                                   Bennett, Tester
                                                             MEXICO, RURALUTAH, AND WYOMING
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 113--DES MOINES AND RACCOON RIVERS, DES        ...........                                   Harkin, Grassley
                                                             MOINES, IA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 114--BRECKENRIDGE, MN                          ...........  Peterson                         Klobuchar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 115--DES MOINES RECREATIONAL RIVER AND         ...........  Boswell                          Harkin, Grassley
                                                             GREENBELT, IA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 116--ALASKA COASTAL EROSION                    ...........                                   Murkowski
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 117--ANTELOPE CREEK, LINCOLN, NE               ...........                                   Ben Nelson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 118--WEST SACRAMENTO, CA                       ...........                                   Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 119--TEN MILE CREEK WATER PRESERVE AREA        ...........                                   Bill Nelson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 120--TAMPA HARBOR, BIG BEND CHANNEL, FL        ...........                                   Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 121--J. PERCY PRIEST DAM AND RESERVOIR, TN     ...........  Gordon (TN)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 122--SAND CREEK, NEBRASKA                      ...........                                   Ben Nelson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 123--FORT PECK LAKE, MT                        ...........                                   Tester
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Corps of Engineers             General Provisions           SECTION 124--KAHUKU, HI                                ...........                                   Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  ALBUQUERQUE METRO AREA WATER & RECLAMATION REUSE          $250,000  Heinrich                         Bingaman, T. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  ARKANSAS VALLEY CONDUIT                                 $5,000,000  Markey (CO); Salazar             Bennet, M. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  BAY AREA REGIONAL WATER RECYCLING PROJECT               $1,215,000  Eshoo; Lofgren, Zoe; McNerney;   Feinstein, Boxer
                                                                                                                                 Miller, George; Stark;
                                                                                                                                 Tauscher
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  CENTRAL VALLEY PROJECTS: FRIANT DIVISION (SEMITROPIC      $642,000  Costa                            Feinstein
                                                             PHASE II GROUNDWATER BANKING)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  CHIMAYO WATER SUPPLY SYSTEM                               $233,000                                   Bingaman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  CITY OF CORONA WATER RECYCLING AND REUSE PROJECT          $500,000  Calvert
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  EASTERN NEW MEXICO WATER SUPPLY                         $1,000,000                                   Bingaman, T. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  HI DESERT WATER DISTRICT WASTEWATER COLLECTION AND      $1,000,000  Baca; Lewis (CA)
                                                             REUSE PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  IRVINE BASIN GROUNDWATER AND SURFACE WATER                $487,000  Calvert                          Feinstein
                                                             IMPROVEMENT PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  LAKE TAHOE REGIONAL DEVELOPMENT PROGRAM: ROSEWOOD       $2,000,000                                   Reid
                                                             CREEK AREA A PROJECT, NEVADA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  LOAN FOR WHITE MOUNTAIN APACHE TRIBE, AZ                $3,209,000                                   Kyl
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  MANCOS PROJECT: JACKSON GULCH REHABILITATION PROJECT    $1,750,000  Salazar                          Bennet, M. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  MOKELUMNE RIVER REGIONAL WATER STORAGE PROJECT            $233,000  McNerney                         Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  NATIVE AMERICAN AFFAIRS PROGRAM: SID YATES                $210,000  Pastor (AZ)
                                                             SCHOLARSHIP PROGRAM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  NAVAJO-GALLUP WATER SUPPLY                              $3,000,000                                   Bingaman, T. Udall
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  NORTH BAY WATER REUSE PROJECT                             $200,000  Thompson (CA); Woolsey           Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  NORTH LAS VEGAS WATER REUSE                             $2,000,000  Berkley                          Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  ODESSA SUBAREA SPECIAL STUDY                            $2,846,000  Hastings (WA); McMorris Rodgers  Murray, Cantwell
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  OREGON INVESTIGATIONS PROGRAM: UMATILLA ON-               $100,000  Walden                           Wyden, Merkley
                                                             RESERVATION DISTRIBUTION SYSTEMS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  RESEARCH AND DEVELOPMENT: SCIENCE AND TECHNOLOGY          $500,000                                   Feinstein, Bennet
                                                             PROGRAM (QUAGGA & ZEBRA MUSSEL RESEARCH ACTIVITIES)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  RIVERSIDE-CORONA FEEDER                                 $1,000,000  Baca; Calvert                    Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  ROGUE RIVER BASIN PROJECT, TALENT DIVISION: WATER FOR     $100,000  Walden                           Wyden, Merkley
                                                             IRRIGATION STREAMS AND ECONOMY FEASIBILITY STUDY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  SAN BERNARDINO MWD, CA                                  $1,000,000  Baca; Lewis (CA)                 Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  SAN DIEGO FOUR-RESERVOIR INTERTIE                         $120,000  Filner; Hunter                   Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  SAN GABRIEL BASIN RESTORATION FUND                      $3,500,000  Dreier; Napolitano; Roybal-
                                                                                                                                 Allard
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  SIERRA VISTA SUBWATERSHED FEASIBILITY STUDY               $289,000  Giffords
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  SOUTHERN CALIFORNIA INVESTIGATIONS PROGRAM: LAKE        $1,000,000  Lewis (CA)
                                                             ARROWHEAD
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  TITLE XVI, WATER RECLAMATION & REUSE PROGRAM            $2,500,000  Moran (VA)                       Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  TUALATIN VALLEY WATER SUPPLY FEASIBILITY STUDY            $236,000  Wu                               Wyden, Merkley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  UPPER MOJAVE RIVER WELL FIELD                             $100,000  Lewis (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  WATSONVILLE AREA WATER RECYCLING PROJECT                  $750,000  Farr                             Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  WEBER BASIN PROJECT: ARTHUR V. WATKINS DAM              $1,000,000  Bishop (UT)                      Bennett, Hatch
                                                             FEASIBILITY STUDY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT: YAKIMA    $1,500,000  Hastings (WA)                    Murray
                                                             RIVER BASIN WATER STORAGE PLAN
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          Water and Related Resources  YUMA EAST WETLANDS                                      $2,000,000  Grijalva; Pastor (AZ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          General Provisions           SECTION 205--FORT PECK RESERVATION RURAL WATER SYSTEM  ...........                                   Tester
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          General Provisions           SECTION 206--DESERT TERMINAL LAKES PROGRAM             ...........                                   Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          General Provisions           SECTION 207--DESERT TERMINAL LAKES PROGRAM             ...........                                   Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          General Provisions           SECTION 208--DESERT TERMINAL LAKES PROGRAM             ...........                                   Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          General Provisions           SECTION 209--NORTH DAKOTA NATURAL RESOURCES TRUST      ...........                                   Dorgan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          General Provisions           SECTION 210--CALFED BAY-DELTA                          ...........                                   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bureau of Reclamation          General Provisions           SECTION 211--CALIFORNIA WATER TRANSFERS                ...........                                   Feinstein, Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         21ST CENTURY RENEWABLE FUELS, ENERGY, AND MATERIALS     $1,250,000  Kildee                           Levin, Stabenow
                                                             INITIATIVE (MI)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         A123 SYSTEMS LARGE FORMAT NANOPHOSPHATE BATTERIES FOR   $1,000,000                                   Levin, Stabenow
                                                             SOLAR ENERGY STORAGE (MI)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ADVANCED AUTOMOTIVE FUELS RESEARCH, DEVELOPMENT, &      $1,000,000  Ryan (OH)
                                                             COMMERCIALIZATION CLUSTER
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ADVANCED BATTERY MANUFACTURING                            $200,000  Perriello
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ADVANCED POWER CUBE FOR WIND POWER AND GRID               $500,000  Dent; Holden                     Specter
                                                             REGULATION SERVICES
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         AGRI-BUSINESS ENERGY INDEPENDENCE DEMONSTRATION, NY        $80,000  Arcuri
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ALABAMA INSTITUTE FOR DEAF AND BLIND BIODIESEL            $300,000  Rogers (AL)
                                                             PROJECT GREEN
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ALGAE BIOFUELS RESEARCH (WA)                            $2,000,000  Inslee                           Murray, Cantwell
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ALGAE TO ETHANOL RESEARCH AND EVALUATION (NJ)             $750,000                                   Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ALGAL-BASED RENEWABLE ENERGY FOR NEVADA (NV)              $800,000                                   Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ALTERNATIVE AND UNCONVENTIONAL ENERGY RESEARCH AND     $10,000,000                                   Bennett
                                                             DEVELOPMENT (UT)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ALTERNATIVE ENERGY SCHOOL OF THE FUTURE                 $1,200,000  Berkley; Titus                   Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ALTERNATIVE ENERGY TRAINING INSTITUTE                     $500,000  McKeon
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ALTERNATIVE FUEL BUS PROJECT, SCHAGHTICOKE, NY            $300,000  Murphy (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         AUBURN UNIVERSITY, BIOMASS TO LIQUID FUELS AND          $1,500,000  Bonner; Rogers (AL)              Sessions
                                                             ELECTRIC POWER RESEARCH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BAYVIEW GAS TO ENERGY PROJECT (UT)                      $1,000,000                                   Bennett
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BEN FRANKLIN TECHNOLOGY PARTNERS--CLEAN TECHNOLOGY        $500,000  Brady (PA)                       Spector, Casey
                                                             COMMERCIALIZATION INITIATIVE (PA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BEXAR COUNTY SOLAR COLLECTION FARM AND DISTRIBUTION     $1,000,000  Gonzalez; Smith (TX)
                                                             SYSTEM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIO ENERGY INITIATIVE FOR CONNECTICUT                   $1,500,000  DeLauro                          Lieberman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIODIESEL BLENDING (WI)                                   $600,000                                   Kohl
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIODIESEL FEEDSTOCK DEVELOPMENT INITIATIVE (MO)         $1,000,000                                   Bond
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIODIESEL PRODUCTION FROM GREASE WASTE                    $250,000  Bono Mack
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIOENERGY/BIONANOTECHNOLOGY PROJECTS                      $500,000  Alexander
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIOFUEL MICRO-REFINERIES FOR LOCAL SUSTAINABILITY         $500,000  Cohen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIOFUELS CAMPUS FOR ACCELERATED DEVELOPMENT               $500,000  Butterfield
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIOFUELS RESEARCH LABORATORY                            $1,000,000  Guthrie
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIOFUELS, BIOPOWER AND BIOMATERIALS INITIATIVE          $1,250,000  Kingston; Scott (GA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIOMASS ENERGY RESOURCES CENTER (VT)                    $1,000,000                                   Leahy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BIOPROCESSES RESEARCH AND DEVELOPMENT, MICHIGAN           $500,000  Rogers (MI)
                                                             BIOTECHNOLOGY INSTITUTE, LANSING, MI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BLACK HILLS STATE HEATING AND COOLING PLANT (SD)        $1,000,000  Herseth Sandlin                  Johnson, Thune
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BOULDER SMARTGRIDCITY--PLUG-IN ELECTRIC HYBRID            $500,000  Polis
                                                             VEHICLES
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BRIDGE HYDRO-TURBINE STUDY                                $150,000  Blumenauer; Wu                   Merkley, Wyden
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         BROOKSTON WIND TURBINES STUDY, BROOKSTON, IN               $75,000  Buyer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CALIFORNIA POLYTECHNIC STATE UNIVERSITY CENTER FOR        $250,000  McCarthy (CA)                    Boxer
                                                             RENEWABLE ENERGY AND ALTERNATIVE ELECTRIC
                                                             TRANSPORTATION TECHNOLOGIES EQUIPMENT ACQUISITION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CELLULOSIC DIESEL BIOREFINERY (NJ)                      $1,000,000  Holt; Rothman (NJ)               Lautenberg, Menedez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CENTER FOR APPLIED ALTERNATIVE ENERGY, SUSTAINABLE &      $500,000  Buchanan
                                                             PRACTICES
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CENTER FOR BIOMASS UTILIZATION (ND)                     $7,000,000  Pomeroy                          Dorgan, Conrad
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CENTER FOR ENERGY STORAGE RESEARCH                      $1,000,000  Johnson, Sam
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CENTER FOR ENVIROMENTAL AND ENERGY RESEARCH               $250,000  Massa
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CENTER FOR NANOSCALE ENERGY (ND)                        $5,000,000  Pomeroy                          Dorgan, Conrad
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CENTER FOR OCEAN RENEWABLE ENERGY (NH)                    $750,000                                   Shaheen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CENTRAL CORRIDOR ENERGY DISTRICT INTEGRATION STUDY        $500,000  McCollum                         Klobuchar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CENTRAL PIEDMONT COMMUNITY COLLEGE                        $525,000  Kissell; Watt                    Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CENTRAL VERMONT RECOVERED BIOMASS FACILITY (VT)           $500,000                                   Leahy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CHRISTMAS VALLEY RENEWABLE ENERGY DEVELOPMENT             $410,000  Walden
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CITY HALL LEADERSHIP IN ENERGY AND ENVIRONMENTAL          $500,000  Diaz-Balart, Mario
                                                             DESIGN (LEED) CERTIFICATION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CITY OF BOISE GEOTHERMAL EXPANSION TO BOISE STATE       $1,000,000  Simpson                          Crapo, Risch
                                                             UNIVERSITY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CITY OF GRAND RAPIDS SOLAR ROOF DEMONSTRATION PROJECT     $250,000  Ehlers                           Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CITY OF NORCO WASTE-TO-ENERGY FACILITY                    $750,000  Calvert
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CITY OF OAKDALE ENERGY EFFICIENCY UPGRADES                $400,000  McCollum                         Klobuchar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CITY OF REDLANDS FACILITIES UPGRADES TO IMPROVE           $900,000  Lewis (CA)
                                                             ENERGY EFFICIENCY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CITY OF TALLAHASSEE INNOVATIVE ENERGY INITIATIVES         $250,000  Crenshaw
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CITY OF WINTER GARDEN WEATHERIZATION DEMONSTRATION        $200,000  Grayson
                                                             PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CLEAN POWER ENERGY RESEARCH CONSORTIUM (CPERC)          $1,000,000  Cao; Melancon                    Landrieu
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CLEMSON UNIVERSITY CELLULOSIC BIOFUEL PILOT PLANT       $1,000,000  Barrett (SC); Inglis
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CLOUD COUNTY COMMUNITY COLLEGE RENEWABLE ENERGY           $750,000  Moran (KS)
                                                             CENTER OF EXCELLENCE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         COASTAL OHIO WIND PROJECT: REMOVING BARRIERS TO GREAK   $1,000,000  Kaptur; Latta
                                                             LAKES OFFSHORE WIND ENERGY DEVELOPMENT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         COMMERCIAL BUILDING ENERGY EFFICIENCY DEMONSTRATION       $500,000                                   Durbin
                                                             (IL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         COMPREHENSIVE WIND ENERGY PROGRAM, PURDUE UNIVERSITY-     $500,000  Visclosky
                                                             CALUMET, IN
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         COMPRESSED NATURAL GAS FUELING FACILITY                   $700,000  Blunt
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CONCENTRATOR PHOTOVOLTAIC TECHNOLOGY                      $900,000  Giffords
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CONSOLIDATED ALTERNATIVE FUELS RESEARCH                   $250,000  Lucas                            Inhofe
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CONSORTIUM FOR PLANT BIOTECHNOLOGY RESEARCH             $3,000,000  Abercrombie; Bishop (GA);        Hagen, Lautenberg, Levin,
                                                                                                                                 Conyers; Etheridge; Lewis        Lugar, Stabenow
                                                                                                                                 (GA); Miller (NC); Price (NC);
                                                                                                                                 Rogers (KY); Rogers (MI);
                                                                                                                                 Rothman (NJ); Stupak
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CONTROLLED ENVIRONMENTAL AGRICULTURE AND ENERGY           $200,000  McHugh
                                                             PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         COOLING, HEATING AND POWER (MICRO-CHP) AND BIO-FUEL     $2,000,000                                   Cochran, Wicker
                                                             APPLICATION CENTER (MS)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         CREIGHTON UNIVERSITY TRAINING & RESEARCH IN SOLAR       $1,200,000  Terry                            Ben Nelson
                                                             POWER
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         DAEMEN COLLEGE ALTERNATIVE ENERGY/GEOTHERMAL              $950,000  Lee (NY)                         Gillibrand, Schumer
                                                             TECHNOLOGIES DEMONSTRATION PROGRAM, ERIE COUNTY, NY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         DEDHAM MUNICIPAL SOLAR PROJECT                            $500,000  Lynch
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         DEMONSTRATION PLANT FOR BIODIESEL FUELS FROM LOW-         $500,000  Schock
                                                             IMPACT CROPS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         DESIGN AND IMPLEMENTATION OF GEOTHERMAL ENERGY            $300,000  Sestak
                                                             SYSTEMS AT WEST CHESTER UNIVERSITY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         DEVELOPMENT OF AN ECONOMIC AND EFFICIENT BIODIESEL        $750,000  McIntyre                         Hagan
                                                             PRODUCTION PROCESS (NC)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         DEVELOPMENT OF BIOFUELS USING IONIC TRANSFER            $1,500,000                                   Reid
                                                             MEMBRANES (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         DEVELOPMENT OF HIGH YIELD FEEDSTOCK AND BIOMASS         $6,000,000  Hirono                           Inouye
                                                             CONVERSION TECHNOLOGY FOR DEVELOPMENT OF HIGH YIELD
                                                             TROPICAL FEEDSTOCKS AND BIOMASS CONVERSION (HI)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         DEVELOPMENT OF POLLUTION PREVENTION TECHNOLOGIES          $900,000  Clarke; Meeks (NY); Towns;       Gillibrand, Schumer
                                                                                                                                 Weiner
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         DRI RENEWABLE ENERGY CENTER (REC) (NV)                    $500,000  Berkley                          Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         EAST KENTUCKY BIOENERGY CAPACITY ASSESSMENT PROJECT       $250,000  Rogers (KY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         EASTERN ILLINOIS UNIVERSITY BIOMASS PLANT               $1,000,000  Johnson (IL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENERGY AUDIT, EFFICIENCY IMPROVEMENTS, AND RENEWABLE    $1,000,000  Lance
                                                             ENERGY INSTALLATIONS, TOWNSHIP OF BRANCHBURG, NJ
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENERGY CONSERVATION AND EFFICIENCY UPGRADE OF HVAC        $500,000  Maloney
                                                             CONTROLS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENERGY CONSERVATION UPGRADES, INGHAM REGIONAL MEDICAL     $250,000  Rogers (MI)
                                                             CENTER, LANSING, MI
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENERGY EFFICIENCY ENHANCEMENTS                            $250,000  Aderholt
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENERGY EFFICIENCY REPAIRS AND AIR QUALITY                 $500,000  McHugh
                                                             IMPROVEMENTS AT LYONSDALE BIOMASS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENERGY EFFICIENCY UPGRADES, NEW ROCHELLE, NY            $1,000,000  Lowey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENERGY REDUCTION AND EFFICIENCY IMPROVEMENT THROUGH       $120,000  Dent
                                                             LIGHTING CONTROL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENERGY SAVING RETROFITTING FOR THE CFCC MAIN CAMPUS       $300,000  Stearns
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENERGY STORAGE/CONSERVATION AND CARBON EMISSIONS          $400,000                                   Kennedy, Kerry
                                                             REDUCTION DEMONSTRATION PROJECT (MA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENERGY-EFFICIENT INNOVATIONS FOR HEALTHY BUILDINGS        $500,000  Maffei
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENGENUITYSC COMMERCIALIZATION AND ENTREPRENEURIAL         $500,000                                   Graham
                                                             TRAINING PROJECT (SC)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ENVIRONMENTAL IMPACT PROTOCOLS FOR TIDAL POWER          $1,000,000  Michaud; Pingree (ME)            Collins, Snowe
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ETHANOL FROM AGRICULTURE                                  $500,000  Berry                            Lincoln, Pryor
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         FAIRBANKS GEOTHERMAL ENERGY PROJECT                     $1,000,000  Young (AK)                       Murkowski, Begich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         FAIRVIEW DEPARTMENT OF PUBLIC WORKS BUILDING AND SITE     $500,000  Rothman (NJ)
                                                             IMPROVEMENTS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         FALLON PAIUTE-SHOSHONE TRIBE DEMONSTRATION ENERGY         $200,000                                   Reid
                                                             PARK (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         FARM DEPLOYABLE MICROBIAL BIOREACTOR FOR FUEL ETHANOL     $800,000  Aderholt; Bright                 Sessions
                                                             PRODUCTION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         FAST CHARGING ELECTRIC VEHICLE DEMONSTRATION PROJECT      $500,000  Perriello
                                                             IN CHARLOTTESVILLE, VIRGINIA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         FEASABILITY STUDY AND DESIGN OF BRIGHTFIELD SOLAR         $200,000  Sestak
                                                             FARM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         FLORIDA RENEWABLE ENERGY PROGRAM                        $1,000,000  Putnam
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         FLUID FLOW OPTIMIZATION OF AEROGEL BLANKET PROCESS        $300,000  McGovern                         Kennedy, Kerry
                                                             PROJECT (MA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         FORT MASON CENTER PIER 2 PROJECT                        $2,000,000  Pelosi
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GADSDEN STATE COMMUNITY COLLEGE GREEN OPERATIONS PLAN      $75,000  Aderholt
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GAS HEAT PUMP COOPERATIVE TRAINING PROGRAM (NV)           $250,000                                   Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GENETIC IMPROVEMENT OF SWITCHGRASS (RI)                 $1,500,000                                   Reed
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GEORGETOWN SOUTH COMMERCIAL PARK, PHOTOVOLTAIC            $100,000  Carter
                                                             GENERATION FACILITY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GEORGIA SOUTHERN UNIVERSITY BIODIESEL RESEARCH            $250,000  Kingston                         Chambliss
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GEOTHERMAL DEVELOPMENT IN HOT SPRINGS VALLEY              $491,000  Rehberg
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GEOTHERMAL POWER GENERATION PLANT AT OREGON INSTITUTE   $1,000,000  Walden; Wu                       Merkley, Wyden
                                                             OF TECHNOLOGY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GLOBAL GREEN NEW ORLEANS--HOLY CROSS PROJECT              $550,000  Cao                              Landrieu, Vitter
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GOGEBIC COMMUNITY COLLEGE (GCC), CAMPUS ENERGY            $300,000  Stupak
                                                             EFFICIENT AND WEATHERIZATION UPGRADE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GREAT BASIN COLLEGE DIRECT-USE GEOTHERMAL               $1,000,000                                   Reid
                                                             DEMONSTRATION PROJECT (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GREAT LAKES INSTITUTE FOR ENERGY INNOVATION             $1,000,000  Fudge; LaTourette                Voinovich, Brown
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GREAT PLAINS WIND POWER TEST FACILITY, TEXAS TECH       $2,000,000  Neugebauer                       Hutchison, Cornyn
                                                             UNIVERSITY, LUBBOCK, TX (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GREEN BUILDING RESEARCH LABORATORY                      $1,000,000  Wu                               Merkley, Wyden
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GREEN BUILDINGS/RETROFITTING                              $350,000  Forbes
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GREEN FUELS DEPOT                                       $1,500,000  Biggert
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GREEN ROOF DEMONSTRATION PROJECT                          $600,000  Souder
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GREEN ROOF FOR THE DUPAGE COUNTY ADMINISTRATION           $250,000  Roskam
                                                             BUILDING
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         GREENFIELD COMMUNITY COLLEGE HYBRID GEO-THERMAL           $525,000  Olver
                                                             PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HARDIN COUNTY GENERAL HOSPITAL ENERGY EFFICIENCY          $500,000  Shimkus
                                                             UPGRADES
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HAWAII ENERGY SUSTAINABILITY PROGRAM (HI)               $6,000,000  Hirono                           Inouye, Akaka
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HAWAII RENEWABLE ENERGY DEVELOPMENT VENTURE (HI)        $6,000,000                                   Inouye
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HENDERSON, SOLAR ENERGY PROJECT                           $500,000  Titus                            Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HIGH PENETRATION WIND POWER IN TATITLEK                   $900,000  Young (AK)                       Begich
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HIGH SPEED WIND TURBINE NOISE MODEL WITH SUPPRESSION    $1,000,000                                   Cochran, Wicker
                                                             (MS)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HIGH TEMPERATURE HYDROGEN GENERATION SYSTEMS              $300,000  Inglis
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HOSPITAL LIGHTING RETROFIT                                $500,000  Rush
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HOUSATONIC RIVER NET-ZERO-ENERGY BUILDING               $1,000,000  Olver
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HULL MUNCIPAL LIGHT PLANT OFFSHORE WIND PROJECT           $750,000  Delahunt
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HYDROGEN PRODUCTION AND DELIVERY TECHNOLOGY (CT)          $500,000                                   Dodd, Lieberman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         HYPERCAST R&D FUNDING FOR VEHICLE ENERGY EFFICIENCY       $750,000                                   Bennet
                                                             (CO)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ILLINOIS COMMUNITY COLLEGE SUSTAINABILITY NETWORK         $250,000  Costello; Halvorson; Jackson
                                                                                                                                 (IL); Johnson (IL);
                                                                                                                                 Schakowsky; Schock
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ILLINOIS ENERGY RESOURCES CENTER AT THE UNIVERSITY OF     $400,000  Lipinski
                                                             ILLINOIS AT CHICAGO
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         IMPROVING FUEL CELL DURABILITY AND RELIABILITY          $2,500,000  Courtney; Larson (CT)            Dodd
                                                             INITIATIVE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         INDEPENDENT ENERGY COMMUNITY RENEWABLE POWER SYSTEM     $1,000,000                                   Bennett
                                                             (UT)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         INSTALLATION OF A SOLAR CANOPY                            $534,000  Olver
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         INSTITUTE FOR SUSTAINABLE ENERGY                        $1,000,000  Bachus; Davis (AL)               Sessions
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         INTEGRATED BIOMASS REFINING INSTITUTE                   $1,000,000  Etheridge; Price (NC)            Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         INTEGRATED POWER FOR MICROSYSTEMS                         $250,000  Lee (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         INTEGRATED RENEWABLE ENERGY & CAMPUS SUSTAINABILITY       $750,000  Latham                           Grassley
                                                             INITIATIVE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         IOWA CENTRAL RENEWABLE FUEL TESTING LABORATORY            $750,000  Latham                           Harkin, Grassley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ISSAQUAH HIGHLANDS ZERO ENERGY AFFORDABLE HOUSING         $500,000  Reichert
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         JENKS ENERGY MANAGEMENT EQUIPMENT                         $250,000  Sullivan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         JUNIATA HYBRID LOCOMOTIVE                               $1,000,000  Shuster
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         KANSAS STATE UNIVERSITY CENTER FOR SUSTAINABLE ENERGY     $500,000  Moran (KS)                       Brownback
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         LA FERIA SOLAR LIGHTING INITIATIVE                        $500,000  Hinojosa
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         LANCASTER LANDFILL SOLAR FACILITY                         $500,000  Tsongas
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         LANE COMMUNITY COLLEGE ENERGY DEMONSTRATION BUILDING      $550,000                                   Wyden, Merkley
                                                             (OR)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         LARGE-SCALE WIND TRAINING PROGRAM, HUDSON VALLEY          $300,000  Murphy (NY)                      Schumer
                                                             COMMUNITY COLLEGE, TROY, NY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         LIGNOCELLULOSIC BIOFUELS FROM NEW BIOENERGY CROPS       $1,000,000  Edwards (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         LONG ISLAND 50 MW SOLAR INITIATIVE                      $1,750,000  Israel
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         LONG ISLAND BIOFUELS ALLIANCE                           $2,750,000  Israel
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         LOW COST PRODUCTION OF THIN-FILM PHOTOVOLTAIC (PV)      $1,200,000  Platts                           Specter
                                                             CELLS (PA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MARET CENTER                                            $1,500,000  Blunt
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MARINE ENERGY TECHNOLOGY (WA)                           $1,750,000  Dicks                            Murray
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MARINE RENEWABLE ENERGY CENTER                            $750,000  Delahunt; Frank (MA); McGovern
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MIAMI CHILDREN'S MUSEUM GOING GREEN INITIATIVE          $1,000,000  Ros-Lehtinen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MIDSOUTH/SOUTHEAST BIOENERGY CONSORTIUM (AR)            $1,000,000  Berry; Boozman                   Lincoln, Pryor
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MILL SEAT LANDFILL BIOREACTOR RENEWABLE GREEN POWER     $1,000,000  Lee (NY)                         Gillibrand
                                                             PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MONTANA ALGAL BIODIESEL INITIATIVE (MT)                   $500,000  Rehberg                          Baucus, Tester
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MONTANA BIO-ENERGY CENTER OF EXCELLENCE (MT)            $2,250,000                                   Baucus, Tester
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MORRIS COUNTY RENEWABLE ENERGY INITIATIVE               $2,000,000  Frelinghuysen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MOVING TOWARD AN ENERGY EFFICIENT CAMPUS AT WHEELOCK      $400,000  Capuano
                                                             COLLEGE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MT. WACHUSETT COMMUNITY COLLEGE WIND PROJECT            $1,000,000  Olver
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MULTI-HYBRID POWER VEHICLES WITH COST EFFECTIVE AND       $600,000  Wilson (OH)
                                                             DURABLE POLYMER ELECTROLYTE MEMBRANE FUEL CELL AND
                                                             LITHIUM ION BATTERY FOR OHIO UNIVERSITY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MUNICIPAL BUILDING ENERGY EFFICIENT WINDOW                $180,000  Lance                            Lautenberg, Menendez
                                                             REPLACEMENT PROGRAM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         MUNICIPAL COMPLEX SOLAR POWER PROJECT                     $200,000  Sires
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NANOSTRUCTURED MATERIALS FOR ENERGY                     $1,000,000  Miller (NC)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NANOSTRUCTURED MATERIALS FOR IMPROVED PHOTOVOLTAICS     $1,000,000                                   Cochran
                                                             (MS)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NATIONAL CENTER OF EXCELLENCE IN ENERGY STORAGE         $1,000,000  Kilroy                           Voinovich
                                                             TECHNOLOGY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NATIONAL OFFSHORE WIND ENERGY CENTER                    $2,000,000  Green, Al; Green, Gene; Jackson- Hutchison
                                                                                                                                 Lee (TX)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NATIONAL OPEN-OCEAN ENERGY LABORATORY                   $2,000,000  Klein (FL); Wasserman Schultz;   Bill Nelson, Martinez
                                                                                                                                 Wexler
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NCMS                                                      $900,000  Dingell
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NEAR ZERO CARBON FOOTPRINT ENERGY CREATION THROUGH      $1,000,000                                   Specter
                                                             THERMAL OXIDATION (PA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NEIGHBORHOOD WEATHERIZATION COLLABORATIVE                 $500,000  DeGette
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NEVADA RENEWABLE ENERGY INTEGRATION AND DEVELOPMENT     $3,000,000                                   Reid
                                                             CONSORTIUM (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NEWARK MUSEUM ALTERNATIVE ENERGY ENHANCEMENT PROGRAM      $500,000  Frelinghuysen; Payne
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NEXT GENERATION COMPOSITE WIND BLADE MANUFACTURING        $250,000  Michaud; Pingree (ME)            Collins, Snowe
                                                             TECHNOLOGIES
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NEXT GENERATION WIND TURBINE                            $1,000,000  Neal                             Kennedy, Kerry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NIREC--NEVADA INSTITUTE FOR RENEWABLE ENERGY            $1,000,000                                   Reid
                                                             COMMERCIALIZATION (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NORTHERN ILLINOIS UNIVERSITY TRANSPORTATION ENERGY      $1,000,000  Lipinski
                                                             PROGRAM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NORTHERN NEVADA RENEWABLE ENERGY TRAINING PROJECT         $500,000                                   Reid
                                                             (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NORWICH COGENERATION INITIATIVE (CT)                      $750,000                                   Dodd, Lieberman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NOVEL PHOTOCATALYTIC METAL OXIDES (NE)                    $250,000                                   Ben Nelson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NTRCI LEGACY ENGINE DEMONSTRATION PROJECT                 $500,000  Duncan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         NY STATE CENTER FOR ADVANCED FERRITE PRODUCTION           $300,000  McHugh
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         OAKLAND UNIVERSITY ALTERNATIVE ENERGY EDUCATION           $500,000  Peters                           Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         OFFSHORE WIND INITIATIVE (ME)                           $5,000,000  Michaud; Pingree (ME)            Collins, Snowe
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         OFFSHORE WIND PROJECT STUDY                               $500,000  Ackerman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         OHIO ADVANCED ENERGY MANUFACTURING CENTER (OH)            $500,000  Kilroy                           Brown
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ORANGE COUNTY SOLAR DEMONSTRATION & RESEARCH FACILITY     $300,000  Grayson                          Martinez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         OREGON SOLAR HIGHWAY--INNOVATIVE USE OF SOLAR           $1,000,000                                   Wyden, Merkley
                                                             TECHNOLOGY (OR)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         OU CENTER FOR BIOMASS REFINING                            $500,000  Cole
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PASSIVE NOX REMOVAL CATALYST RESEARCH, NOTRE DAME         $900,000  Visclosky
                                                             UNIVERSITY, IN
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PERU ELECTRICAL DEPARTMENT WIND TURBINE GENERATION      $1,000,000  Halvorson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PHIPPS CONSERVATORY CTI WASTE-TO-ENERGY PROJECT           $500,000  Murphy, Tim
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PHOENIX CHILDREN'S HOSPITAL CENTRAL ENERGY PLANT        $2,000,000  Pastor (AZ)
                                                             EXPANSION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PHOTOVOLTAIC POWER ELECTRONICS RESEARCH INITIATIVE        $700,000  Brown, Corrine; Kosmas
                                                             (PERI)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PITTSBURGH GREEN INNOVATORS                             $1,500,000  Doyle
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PLACER COUNTY BIOMASS UTILIZATION PILOT PROJECT (CA)    $1,000,000                                   Feinstein
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PLUG-IN HYBRID INITIATIVE                                 $750,000  Schauer                          Levin, Stabenow
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PORT OF GALVESTON SOLAR ENERGY PROJECT                    $250,000  Paul
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PROTOTYPING AND DEVELOPMENT OF COMMERCIAL NANO-           $500,000  Tonko                            Gillibrand
                                                             CRYSTALLINE THIN FILM SILICON FOR PHOTOVOLTAIC
                                                             MANUFACTURING
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         PURDUE SOLAR ENERGY UTILIZATION LABORATORY, WEST          $425,000  Buyer
                                                             LAFAYETTE, IN
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         R & D OF CLEAN VEHICLE TECHNOLOGY                       $1,000,000  Ryan (OH); Sutton
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RENEWABLE ENERGY CENTER                                   $750,000  Butterfield; Watt                Hagan
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RENEWABLE ENERGY CLEAN AIR PROJECT (RECAP) (MN)         $1,000,000                                   Klobuchar
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RENEWABLE ENERGY DEMONSTRATION (IL)                       $500,000                                   Durbin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RENEWABLE ENERGY FEASIBILITY STUDY AND RESOURCES          $500,000                                   Reid
                                                             ASSESSMENT (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RENEWABLE ENERGY INITIATIVE (IL)                          $500,000                                   Durbin
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RENEWABLE ENERGY INITIATIVES FOR CLARK COUNTY, NEVADA   $1,000,000                                   Reid
                                                             PARKS AND RECREATION (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RENEWABLE ENERGY/DISASTER BACKUP SYSTEM FOR HAWAII        $240,000  Abercrombie; Hirono              Akaka
                                                             RED CROSS HEADQUARTERS BUILDING
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RESEARCH AND DEVELOPMENT OF LIQUID CARRIERS FOR           $500,000  Reichert
                                                             HYDROGEN ENERGY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RESEARCH ON FUEL CELL POWERED BY HYDROGEN PRODUCTION      $675,000                                   Schumer, Gillibrand
                                                             FROM BIOMASS TO PROVIDE CLEAN ENERGY FOR REMOTE
                                                             FARMS AWAY FROM ELECTRIC GRIDS (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RICHLAND COMMUNITY COLLEGE BIOENERGY PROGRAM              $500,000  Johnson (IL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         RUNNING SPRINGS RETREAT CENTER SOLAR UPGRADE            $1,000,000  Lewis (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SAINT JOSEPH'S UNIVERSITY INSTITUTE FOR ENVIRONMENTAL   $1,000,000  Brady (PA); Fattah
                                                             STEWARDSHIP
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SAN DIEGO CENTER FOR ALGAE BIOTECHNOLOGY (SD-CAB)         $750,000  Bilbray; Davis (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SAN FRANCISCO ELECTRIC VEHICLE INITIATIVE               $1,000,000  Pelosi                           Boxer
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SHENANDOAH VALLEY AS A NATIONAL DEMONSTRATION PROJECT     $750,000                                   Webb, Warner
                                                             ACHIEVING 25 PERCENT RENEWABLE ENERGY BY THE YEAR
                                                             2025 (VA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SHOW ME ENERGY COOPERATIVE BIOMASS DEVELOPMENT            $900,000  Skelton
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SMART ENERGY PROGRAM (CT)                                 $500,000  Larson (CT)                      Dodd, Lieberman
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR COMPACTOR ENERGY EFFICIENCY RESEARCH                $300,000                                   Kennedy, Kerry
                                                             DEMONSTRATION PROJECT (MA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR ELECTRIC POWER FOR NONSECTARIAN EDUCATIONAL AND     $500,000                                   Reid
                                                             SOCIAL SERVICES FACILITIES (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR ENERGY DEVELOPMENT (ME)                             $800,000                                   Collins
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR ENERGY PARKING CANOPY DEMONSTRATION PROJECT       $3,000,000  Lewis (CA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR ENERGY PROGRAM                                      $800,000  Wasserman Schultz
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR ENERGY RESEARCH CENTER INSTRUMENTATION            $1,000,000  Price (NC)                       Hagan
                                                             FACILITY, UNIVERSITY OF NORTH CAROLINA AT CHAPEL
                                                             HILL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR ENERGY ZONE PLANNING AND INFRASTRUCTURE FOR THE   $1,000,000                                   Reid
                                                             NEVADA TEST SITE AND ADJACENT LANDS (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR FURNACE RESEARCH PROGRAM, VALPARAISO                $500,000  Visclosky                        Lugar
                                                             UNIVERSITY, IN
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR HOT WATER PROJECT IN GREENBURGH, NY                 $169,000  Lowey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR LIGHTING FOR ARTESIA PARKS                          $250,000  Sanchez, Linda
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR PANEL EXPANSION INITIATIVE                          $500,000  Rodriguez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR PANELS IN MUNICIPAL OWNED BUILDINGS (NJ)          $1,000,000                                   Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR PANELS ON HUDSON COUNTY FACILITIES                  $500,000  Sires                            Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR PIONEER AND SOLAR ENTREPRENEUR PROGRAMS (NY)        $500,000                                   Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR POWER FOR MAYWOOD                                   $300,000  Rothman (NJ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR POWERED COMPRESSED NATURAL GAS REFUELING            $500,000  McCarthy (NY)
                                                             STATION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLAR POWERED LIGHTING FOR FOREST PRESERVE DISTRICT       $300,000  Roskam
                                                             OF DUPAGE COUNTY, IL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOLID OXIDE FUEL CELL SYSTEMS PVL PILOT LINE            $1,000,000  Boccieri; Sutton                 Brown
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOMERSET COUNTY RENEWABLE ENERGY INITIATIVE             $2,000,000  Frelinghuysen
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOUTH JERSEY WIND TURBINES                                $500,000  LoBiondo                         Lautenberg, Menendez
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOUTHERN PINE BASED BIOREFINERY CENTER                  $1,000,000  Lewis (GA); Marshall; Scott      Chambliss
                                                                                                                                 (GA)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOUTHERN REGIONAL CENTER FOR LIGHTWEIGHT INNOVATIVE     $4,000,000                                   Cochran, Wicker
                                                             DESIGNS (MS)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SOUTHWEST ALASKA REGIONAL GEOTHERMAL ENERGY PROJECT     $2,500,000                                   Murkowski, Begich
                                                             (AK)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ST. LUKE'S MINERS MEMORIAL HOSPITAL ENERGY EFFICIENCY     $525,000  Holden
                                                             IMPROVEMENT PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ST. MARKS REFINERY REDEVELOPMENT                          $350,000  Boyd
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ST. PETERSBURG SOLAR PILOT PROJECT                      $1,000,000  Young (FL)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         ST. PETERSBURG SUSTAINABLE BIOSOLIDS/RENEWABLE ENERGY   $2,500,000  Young (FL)                       Bill Nelson
                                                             PLANT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         STATE COLLEGES' (VSC) STATEWIDE ENERGY EFFICIENCY AND     $450,000  Welch                            Sanders
                                                             RENEWABLE ENERGY INITIATIVE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         STRATEGIC BIOMASS INITIATIVE (MS)                         $500,000                                   Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         STREET LIGHTING FIXTURE ENERGY EFFICIENCY RETROFIT        $500,000  Becerra; Harman; Sanchez,
                                                             PROJECT                                                             Linda; Watson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SUN GRANT INITIATIVE (SD)                               $2,750,000  Herseth Sandlin                  Johnson
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SUSTAINABLE ALGAL ENERGY PRODUCTION AND ENVIRONMENTAL     $500,000  Wittman
                                                             REMEDIATION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SUSTAINABLE ENERGY OPTIONS FOR RURAL NEBRASKA             $500,000  Fortenberry
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SUSTAINABLE ENERGY RESEARCH CENTER                     $10,000,000  Harper                           Cochran, Wicker
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SWEET SORGHUM ALTERNATIVE FUEL AND FEED PILOT PROJECT     $750,000  Grijalva
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SWITCHGRASS BIOFUEL RESEARCH: CARBON SEQUESTRATION        $500,000  Fortenberry                      Ben Nelson
                                                             AND LIFE CYCLE ANALYSIS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         SYNTHESIS OF RENEWABLE BIOFUELS FROM BIOMASS              $500,000  Rehberg                          Tester
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         THE BIOREFINERY IN NEW YORK-BIO BUTANOL FROM BIOMASS      $400,000  Maffei
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         THE BOSTON ARCHITECTURAL COLLEGE'S URBAN                $1,600,000  Capuano
                                                             SUSTAINABILITY INITIATIVE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         THE CUNY ENERGY INSTITUTE (NY)                          $1,550,000                                   Schumer, Gillibrand
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         THE JOHNSTON AVENUE SOLAR PROJECT                         $500,000  Smith (NJ)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         THE SOLAR ENERGY CONSORTIUM                             $2,250,000  Hall (NY); Hinchey
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         THIN FILM PHOTOVOLTAIC RESEARCH & DEVELOPMENT (VT)        $500,000                                   Leahy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         THURGOOD MARSHALL COLLEGE FUND MINORITY ENERGY          $3,000,000  Butterfield; Towns
                                                             SCIENCE INITIATIVE: NNSA
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         TODAY'S LEADERS FOR A SUSTAINABLE TOMORROW: A           $1,500,000  Oberstar
                                                             SUSTAINABLE ENERGY PROGRAM
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         TUCSON PUBLIC BUILDING SOLAR ARRAYS                       $450,000  Giffords
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNCONVENTIONAL AND RENEWABLE ENERGY RESEARCH            $3,500,000                                   Bennett
                                                             UTILIZING COMPUTER SIMULATIONS (UT)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNION TERMINAL                                            $500,000  Driehaus
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNITED WAY OF SOUTHEASTERN MICHIGAN                       $400,000  Conyers; Dingell; Kilpatrick     Levin, Stabenow
                                                                                                                                 (MI); Levin; Miller (MI)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNIVERSITY OF AKRON NATIONAL POLYMER INNOVATION         $1,000,000  Ryan (OH); Sutton                Voinovich
                                                             CENTER
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNIVERSITY OF ARKANSAS AT LITTLE ROCK NANOSTRUCTURED      $500,000  Snyder                           Lincoln, Pryor
                                                             SOLAR CELLS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNIVERSITY OF DETROIT MERCY ENERGY EFFICIENT              $800,000  Kilpatrick (MI)                  Levin, Stabenow
                                                             CHEMISTRY BUILDING RENOVATIONS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNIVERSITY OF LOUISVILLE RESEARCH AND ENERGY            $2,000,000                                   McConnell
                                                             INDEPENDENCE PROGRAM (KY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNIVERSITY OF NEW HAVEN SOLAR TESTING AND TRAINING        $500,000                                   Dodd, Lieberman
                                                             LAB (CT)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNIVERSITY OF NORTH ALABAMA GREEN CAMPUS INITIATIVE       $200,000  Aderholt
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNIVERSITY OF SOUTH CAROLINA AIKEN BIOFUELS               $456,000  Barrett (SC)
                                                             LABORATORY IN AIKEN, SC
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNIVERSITY OF WISCONSIN OSHKOSH'S ANAEROBIC DRY           $500,000  Petri
                                                             DIGESTION FACILITY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNIVERSITY OF WISCONSIN-BARABOO/SAUK COUNTY NET-ZERO      $500,000  Baldwin
                                                             ENERGY BUILDING
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNIVERSITY OF WISCONSIN-MILWAUKEE ADVANCED                $500,000  Moore (WI)
                                                             NANOMATERIALS FOR HIGH-EFFICIENCY SOLAR CELLS
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNR--BIODIESEL FROM FOOD WASTE (NV)                     $1,000,000                                   Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNR--GREAT BASIN CENTER FOR GEOTHERMAL ENERGY (NV)      $1,000,000                                   Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UNR--MASS EXCHANGER TECHNOLOGY FOR GEOTHERMAL AND       $1,200,000                                   Reid
                                                             SOLAR ENERGY SYSTEMS (NV)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         UW NORTHWEST NATIONAL MARINE RENEWABLE ENERGY CENTER      $880,000  Inslee; McDermott; Schrader; Wu  Murray, Cantwell
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         VERMONT BIOFUELS INITIATIVE (VT)                          $750,000                                   Leahy
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         VERMONT ENERGY INVESTMENT CORPORATION (VT)                $450,000                                   Sanders
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         WALLOWA COUNTY INTEGRATED BIOMASS ENERGY CENTER (OR)      $500,000                                   Wyden, Merkley
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         WARREN TECHNOLOGY AND BUSINESS CENTER FOR ENERGY        $2,700,000  Ryan (OH)
                                                             SUSTAINABILITY
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         WASHINGTON STATE BIOFUELS INDUSTRY DEVELOPMENT          $1,000,000  McDermott; Reichert; Smith (WA)  Murray
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         WASHOE WIND TURBINE DEMONSTRATION PROJECT (NV)             $50,000                                   Reid
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         WESTERN IOWA TECH COMMUNITY COLLEGE RENEWABLE ENERGY      $500,000  King (IA)                        Grassley
                                                             ECONOMY CORRIDOR
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         WESTERN KENTUCKY UNIVERSITY RESEARCH FOUNDATION           $500,000  Guthrie
                                                             BIODIESEL PROJECT
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         WIND TURBINE DEVELOPMENT (MT)                           $1,000,000  Rehberg                          Baucus, Tester
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         WIND TURBINE INFRASTRUCTURE FOR GREEN ENERGY AND        $1,000,000  Castle                           Carper, Kaufman
                                                             RESEARCH ON WIND POWER IN DELAWARE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         WSU, NATIONAL INSTITUTE FOR AVIATION RESEARCH,          $1,500,000  Tiahrt                           Brownback, Roberts
                                                             ADVANCED MATERIALS RESEARCH
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           EERE                         YPSI CIVIC CENTER                                       $1,000,000  Dingell
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     ADAPTIVE SUPERVISORY CONTROL AND DATA ACQUISITION         $750,000  Miller (FL); Stearns
                                Energy Reliability           (SCADA) TECHNOLOGY FOR INFRASTRUCTURE PROTECTION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     AUTOMATED REMOTE ELECTRIC AND WATER METERS IN SOUTH       $500,000  Holt
                                Energy Reliability           RIVER
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     DEVELOPMENT OF A SMART MICROGRID TESTBED                  $500,000  Barton (TX)
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     ENERGY DEVELOPMENT AND RELIABILITY (ND)                   $325,000                                   Dorgan
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     ENERGY TRANSMISSION AND INFRASTRUCTURE NORTHERN OHIO    $1,100,000  Kaptur
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     INSTITUTE FOR ENERGY AND THE ENVIRONMENT AT VERMONT       $450,000  Welch
                                Energy Reliability           LAW SCHOOL
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     MICROGRIDS AND RENEWABLE ENERGY AND TECHNOLOGIES          $750,000  Teague                           Bingaman, T. Udall
                                Energy Reliability           RESEARCH INITIATIVE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     NATIONAL CENTER FOR RELIABLE ELECTRIC TRANSMISSION        $500,000  Boozman                          Lincoln, Pryor
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     NAVAJO NATION ELECTRIFICATION PROGRAM (NM)              $1,750,000                                   Bingaman, T. Udall
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     NORTH DAKOTA ENERGY WORKFORCE DEVELOPMENT (ND)          $1,900,000                                   Dorgan
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     OSWEGO COUNTY BOCES WIND TURBINE MODEL PROJECT (NY)       $200,000  McHugh                           Schumer
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     POWER GRID RELIABILITY AND SECURITY (WA)                $1,000,000  McMorris Rodgers; Smith (WA)     Murray, Cantwell
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     POWER MICRO-GRIDS FOR COLONIAS ALONG THE TEXAS/MEXICO     $550,000  Cuellar
                                Energy Reliability           BORDER
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     SMART GRID INITIATIVE                                     $500,000  Schiff; Sherman
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     TECHNOLOGY DEVELOPMENT (ND)                               $300,000                                   Dorgan
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     UNIVERSITY OF ARIZONA COMPRESSED AIR ENERGY STORAGE       $500,000  Pastor (AZ)
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     UVM SMART ENERGY GRID RESEARCH (VT)                       $500,000                                   Leahy
                                Energy Reliability
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     WATKINS GLEN, SCHUYLER COUNTY GAS STORAGE PROJECT         $500,000  Massa                            Gillibrand
                                Energy Reliability           (NY)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Department of Energy           Electricity Delivery and     WESTERN BALDWIN COUNTY, AL GRID INTERCONNECTION           $500,000  Bonn