Report text available as:

  • TXT
  • PDF   (PDF provides a complete and accurate display of this text.) Tip ?
                                                       Calendar No. 500
                                                       
114th Congress     }                                        {    Report
                                 SENATE
 2d Session        }                                        {   114-263

======================================================================



 
            DEPARTMENT OF DEFENSE APPROPRIATIONS BILL, 2017

                                _______
                                

                  May 26, 2016.--Ordered to be printed

                                _______
                                

          Mr. Cochran, from the Committee on Appropriations, 
                        submitted the following

                                 REPORT

                         [To accompany S. 3000]

    The Committee on Appropriations reports the bill (S. 3000) 
making appropriations for the Department of Defense for the 
fiscal year ending September 30, 2017, and for other purposes, 
reports favorably thereon and recommends that the bill do pass.



New obligational authority

Total of bill as reported to the Senate.................$568,101,051,000
Amount of 2016 appropriations........................... 566,616,000,000
Amount of 2017 budget estimate.......................... 569,858,382,000
Bill as recommended to Senate compared to--
    2016 appropriations.................................  +1,485,051,000
    2017 budget estimate................................  -1,757,331,000




                                CONTENTS

                              ----------                              
Background:
                                                                   Page
    Purpose of the Bill..........................................     5
    Hearings.....................................................     5
    Summary of the Bill..........................................     5
    Definition of Program, Project and Activity..................     6
    Reprogramming Guidance.......................................     7
    Committee Initiatives........................................     7
Title I:
    Military Personnel:
        Reprogramming Guidance for Military Personnel Accounts...    13
        Military Personnel Special Interest Items................    13
        Military Personnel Overview..............................    14
        Military Personnel, Army.................................    15
        Military Personnel, Navy.................................    16
        Military Personnel, Marine Corps.........................    18
        Military Personnel, Air Force............................    20
        Reserve Personnel, Army..................................    21
        Reserve Personnel, Navy..................................    22
        Reserve Personnel, Marine Corps..........................    23
        Reserve Personnel, Air Force.............................    24
        National Guard Personnel, Army...........................    25
        National Guard Personnel, Air Force......................    26
Title II:
    Operation and Maintenance:
        Operation and Maintenance, Army..........................    35
        Operation and Maintenance, Navy..........................    38
        Operation and Maintenance, Marine Corps..................    41
        Operation and Maintenance, Air Force.....................    43
        Operation and Maintenance, Defense-Wide..................    46
        Operation and Maintenance, Army Reserve..................    50
        Operation and Maintenance, Navy Reserve..................    51
        Operation and Maintenance, Marine Corps Reserve..........    52
        Operation and Maintenance, Air Force Reserve.............    53
        Operation and Maintenance, Army National Guard...........    54
        Operation and Maintenance, Air National Guard............    55
        U.S. Court of Appeals for the Armed Forces...............    56
        Environmental Restoration, Army..........................    56
        Environmental Restoration, Navy..........................    56
        Environmental Restoration, Air Force.....................    56
        Environmental Restoration, Defense-Wide..................    56
        Environmental Restoration, Formerly Used Defense Sites...    57
        Overseas Humanitarian, Disaster, and Civic Aid...........    57
        Cooperative Threat Reduction Account.....................    57
Title III:
    Procurement:
        Aircraft Procurement, Army...............................    62
        Missile Procurement, Army................................    65
        Procurement of Weapons and Tracked Combat Vehicles, Army.    68
        Procurement of Ammunition, Army..........................    71
        Other Procurement, Army..................................    74
        Aircraft Procurement, Navy...............................    82
        Weapons Procurement, Navy................................    88
        Procurement of Ammunition, Navy and Marine Corps.........    92
        Shipbuilding and Conversion, Navy........................    95
        Other Procurement, Navy..................................    99
        Procurement, Marine Corps................................   107
        Aircraft Procurement, Air Force..........................   111
        Missile Procurement, Air Force...........................   119
        Space Procurement, Air Force.............................   122
        Procurement of Ammunition, Air Force.....................   125
        Other Procurement, Air Force.............................   127
        Procurement, Defense-Wide................................   131
        Defense Production Act Purchases.........................   135
Title IV:
    Research, Development, Test and Evaluation:
        Research, Development, Test and Evaluation, Army.........   140
        Research, Development, Test and Evaluation, Navy.........   150
        Research, Development, Test and Evaluation, Air Force....   162
        Research, Development, Test and Evaluation, Defense-Wide.   173
        Operational Test and Evaluation, Defense.................   186
Title V:
    Revolving and Management Funds:
        Defense Working Capital Funds............................   188
        National Defense Sealift Fund............................   189
Title VI:
    Other Department of Defense Programs:
        Defense Health Program...................................   190
        Chemical Agents and Munitions Destruction, Defense.......   202
        Drug Interdiction and Counter-Drug Activities, Defense...   204
        Joint Urgent Operational Needs Fund......................   205
        Office of the Inspector General..........................   205
Title VII:
    Related Agencies:
        Central Intelligence Agency Retirement and Disability 
          System 
          Fund...................................................   206
        Intelligence Community Management Account................   206
Title VIII: General Provisions...................................   207
Title IX: Overseas Contingency Operations/Global War on 
  Terrorism:
    Department of Defense--Military..............................   213
    Military Personnel:
        Military Personnel, Army.................................   214
        Military Personnel, Navy.................................   215
        Military Personnel, Marine Corps.........................   216
        Military Personnel, Air Force............................   217
        Reserve Personnel, Army..................................   218
        Reserve Personnel, Navy..................................   218
        Reserve Personnel, Marine Corps..........................   218
        Reserve Personnel, Air Force.............................   219
        National Guard Personnel, Army...........................   219
        National Guard Personnel, Air Force......................   220
    Operation and Maintenance:
        Operation and Maintenance, Army..........................   221
        Operation and Maintenance, Navy..........................   222
        Operation and Maintenance, Marine Corps..................   223
        Operation and Maintenance, Air Force.....................   223
        Operation and Maintenance, Defense-Wide..................   224
        Operation and Maintenance, Army Reserve..................   225
        Operation and Maintenance, Navy Reserve..................   225
        Operation and Maintenance, Marine Corps Reserve..........   225
        Operation and Maintenance, Air Force Reserve.............   226
        Operation and Maintenance, Army National Guard...........   226
        Operation and Maintenance, Air National Guard............   227
        Afghanistan Security Forces Fund.........................   228
        Iraq Train and Equip Fund................................   230
        Syria Train and Equip Fund...............................   230
    Procurement:
        Aircraft Procurement, Army...............................   231
        Missile Procurement, Army................................   231
        Procurement of Weapons and Tracked Combat Vehicles, Army.   232
        Procurement of Ammunition, Army..........................   232
        Other Procurement, Army..................................   233
        Aircraft Procurement, Navy...............................   234
        Weapons Procurement, Navy................................   234
        Procurement of Ammunition, Navy and Marine Corps.........   235
        Other Procurement, Navy..................................   235
        Procurement, Marine Corps................................   236
        Aircraft Procurement, Air Force..........................   236
        Missile Procurement, Air Force...........................   237
        Procurement of Ammunition, Air Force.....................   237
        Other Procurement, Air Force.............................   238
        Procurement, Defense-Wide................................   238
        National Guard and Reserve Equipment.....................   239
    Research, Development, Test and Evaluation:
        Research, Development, Test and Evaluation, Army.........   240
        Research, Development, Test and Evaluation, Navy.........   241
        Research, Development, Test and Evaluation, Air Force....   241
        Research, Development, Test and Evaluation, Defense-Wide.   241
    Revolving and Management Funds: Defense Working Capital Funds   242
    Other Department of Defense Programs:
        Defense Health Program...................................   242
        Drug Interdiction and Counter-Drug Activities, Defense...   243
        Joint Improvised Explosive Device Defeat Fund............   243
        Office of the Inspector General..........................   244
        General Provisions--This Title...........................   245
Compliance With Paragraph 7, Rule XVI of the Standing Rules of 
  the 
  Senate.........................................................   246
Compliance With Paragraph 7(c), Rule XXVI of the Standing Rules 
  of the Senate..................................................   248
Compliance With Paragraph 12, Rule XXVI of the Standing Rules of 
  the Senate.....................................................   248
Budgetary Impact of Bill.........................................   249
Comparative Statement of New Budget Authority....................   250

                               BACKGROUND

                          Purpose of the Bill

    This bill makes appropriations for the military functions 
of the Department of Defense for the period October 1, 2016, 
through September 30, 2017. Functional areas include the pay, 
allowances, and support of military personnel, operation and 
maintenance of the forces, procurement of equipment and 
systems, and research, development, test and evaluation. 
Appropriations for foreign military assistance, military 
construction, family housing, nuclear weapons programs, and 
civil defense are provided in other bills.

                                Hearings

    The Appropriations Subcommittee on Defense began hearings 
on February 10, 2016, and concluded them on April 27, 2016, 
after nine separate sessions. The subcommittee heard testimony 
from representatives of the Department of Defense.

                          Summary of the Bill

    The Committee recommendation of $568,101,051,000 includes 
funding to develop, maintain, and equip the military forces of 
the United States and for other purposes in nonemergency 
appropriations.
    The fiscal year 2017 budget request for activities funded 
in the Department of Defense appropriations bill totals 
$569,858,382,000 in new budget authority, including 
$58,625,551,000 in contingency funding for the Department of 
Defense and $514,000,000 in mandatory spending.
    In fiscal year 2016, the Congress appropriated 
$566,616,000,000 for activities funded in this bill. This 
amount includes $507,978,000,000 in base appropriations and 
$58,638,000,000 in Overseas Contingency Operations/Global War 
on Terrorism appropriations. The Committee recommends that 
funds requested for Coast Guard overseas contingency operations 
be appropriated directly to the Department of Homeland 
Security.
    The Committee recommendation in this bill is $1,485,051,000 
above the amount provided in fiscal year 2016 and 
$1,757,331,000 below the amount requested for fiscal year 2017.

                       COMMITTEE RECOMMENDATIONS

    The following table displays the recommendations for each 
title:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                            Fiscal year 2016  Fiscal year 2017      Committee
                                                                 enacted          estimate       recommendation
----------------------------------------------------------------------------------------------------------------
Title I--Military Personnel...............................       129,228,658       128,902,332       127,976,516
Title II--Operation and Maintenance.......................       167,485,170       171,318,488       170,698,913
Title III--Procurement....................................       110,841,627       101,916,357       105,253,833
Title IV--Research, development, test and evaluation......        69,784,665        71,391,771        70,800,794
Title V--Revolving and management funds...................         2,212,932         1,371,613         1,561,613
Title VI--Other Department of Defense Programs............        34,392,468        35,284,674        35,815,191
Title VII--Related agencies...............................         1,019,206         1,047,596         1,039,396
Title VIII--General provisions (net)......................        -6,986,726  ................        -3,680,209
Title IX--Overseas Contingency Operations/Global War on           58,638,000        58,625,551        58,635,004
 Terrorism................................................
                                                           -----------------------------------------------------
      Net grand total.....................................       566,616,000       569,858,382       568,101,051
                                                           -----------------------------------------------------
      Total discretionary (incl. scorekeeping adjustments)       572,774,000       576,342,382       574,585,051
----------------------------------------------------------------------------------------------------------------

    The Committee has displayed recommended adjustments in 
tables presented under each appropriation account.
    These adjustments reflect the following Committee actions: 
elimination of funds requested for programs which are lower 
priority, duplicative, or not supported by firm requirements in 
out-year development or procurement appropriations; deletion of 
excess funds based on program delays or slow execution; 
addition of funds to reflect congressional priorities and to 
rectify shortfalls in the budget estimate; and implementation 
of recommendations in S. 2943, the National Defense 
Authorization Act for Fiscal Year 2017, as reported.
    The Committee directs that the funding increases outlined 
in these tables shall be provided only for the specific 
purposes indicated in the table.

                     CLASSIFIED PROGRAM ADJUSTMENTS

    The Committee recommends adjustments to certain classified 
programs, as explained in the classified annex to the 
Committee's report.

              Definition of Program, Project and Activity

    For the purposes of the Balanced Budget and Emergency 
Deficit Control Act of 1985 (Public Law 99-177), as amended by 
the Balanced Budget and Emergency Deficit Control Reaffirmation 
Act of 1987 (Public Law 100-119), and by the Budget Enforcement 
Act of 1990 (Public Law 101-508), the terms ``program, project, 
and activity'' for appropriations contained in this act shall 
be defined as the most specific level of budget items 
identified in the Department of Defense Appropriations Act, 
2017, the related classified annexes and Committee reports, and 
P-1 and R-1 budget justification documents as subsequently 
modified by congressional action.
    The following exception to the above definition shall 
apply: the military personnel and the operation and maintenance 
accounts, for which the term ``program, project, and activity'' 
is defined as the appropriations accounts contained in the 
Department of Defense Appropriations Act.
    At the time the President submits the budget request for 
fiscal year 2018, the Secretary of Defense is directed to 
transmit to the congressional defense committees budget 
justification documents to be known as the ``M-1'' and ``O-1'' 
which shall identify, at the budget activity, activity group, 
and sub-activity group level, the amounts requested by the 
President to be appropriated to the Department of Defense for 
military personnel and operation and maintenance in any budget 
request, or amended budget request, for fiscal year 2018.

                         Reprogramming Guidance

    The Secretary of Defense is directed to continue to follow 
the reprogramming guidance for acquisition accounts as 
specified in the report accompanying the House version of the 
Department of Defense appropriations bill for fiscal year 2008 
(House Report 110-279). For operation and maintenance accounts, 
the Secretary of Defense shall continue to follow the 
reprogramming guidelines specified in the conference report 
accompanying H.R. 3222, the Department of Defense 
Appropriations Act for Fiscal Year 2008. The dollar threshold 
for reprogramming funds shall remain at $10,000,000 for 
military personnel; $15,000,000 for operation and maintenance; 
$20,000,000 for procurement; and $10,000,000 for research, 
development, test and evaluation.
    Also, the Under Secretary of Defense (Comptroller) is 
directed to continue to provide the congressional defense 
committees annual DD Form 1416 reports for titles I and II and 
quarterly, spreadsheet-based DD Form 1416 reports for service 
and defense-wide accounts in titles III and IV of this act. 
Reports for titles III and IV shall comply with guidance 
specified in the explanatory statement accompanying the 
Department of Defense Appropriations Act for Fiscal Year 2006. 
The Department shall continue to follow the limitation that 
prior approval reprogrammings are set at either the specified 
dollar threshold or 20 percent of the procurement or research, 
development, test and evaluation line, whichever is less. These 
thresholds are cumulative from the base for reprogramming value 
as modified by any adjustments. Therefore, if the combined 
value of transfers into or out of a military personnel (M-1), 
an operation and maintenance (O-1), a procurement (P-1), or a 
research, development, test and evaluation (R-1) line exceeds 
the identified threshold, the Secretary of Defense must submit 
a prior approval reprogramming to the congressional defense 
committees. In addition, guidelines on the application of prior 
approval reprogramming procedures for congressional special 
interest items are established elsewhere in this report.

                         Committee Initiatives

    The Committee has included funding above the President's 
budget request for several programmatic initiatives which the 
Committee believes are of inherent value for national defense. 
In several cases, funds are restored for programs which were 
included in previous Department of Defense budget requests, and 
for programs that the Committee believes are necessary to 
improve the U.S. defense posture even though they have not been 
included under the request formulated by the Department of 
Defense.
    For instance, the Committee's hearings with the military 
services and the Department's leadership highlighted the risk 
to maintaining the U.S. technological edge under sequester-
level budgets. Therefore, the Committee recommends increases to 
sustain U.S. technological superiority such as fifth generation 
aircraft, various shipbuilding programs, battlefield 
intelligence programs, and space programs. In addition, the 
Committee recommends funding to increase readiness, sustain 
U.S. force structure and maintain our industrial base. Finally, 
the Committee recommends increases in basic research, 
alternative energy and science and technology funding, which 
are the foundation for enhancing future technological 
superiority. The Committee also recommends funding for programs 
that are chronically underfunded, such as the Defense 
Production Act and National Guard and Reserve equipment 
purchases.
    The Committee directs that funds for these initiatives are 
to be competitively awarded or provided to programs that have 
received competitive awards in the past.

                       JOINT STRIKE FIGHTER [JSF]

    Joint Strike Fighter [JSF] Production.--The fiscal year 
2017 budget request includes 63 F-35 Joint Strike Fighters, six 
fewer than were provided in the Department of Defense 
Appropriations Act, 2016 (Public Law 114-113). In comparison to 
quantities planned in the fiscal year 2016 budget request, the 
Air Force's fiscal year 2017 request includes five fewer 
aircraft in fiscal year 2017 and 45 fewer aircraft from fiscal 
years 2017 to 2021. The Committee is concerned that the current 
programmed quantities will not support the fielding of F-35 
squadrons, as initially planned. As a result, the Committee 
recommends an additional $100,000,000 in advance procurement 
for the F-35A and encourages the Air Force to revisit F-35A 
procurement quantities in the fiscal year 2018 budget request.
    The Committee notes that the Navy continues to delay 
previously planned production increases of the F-35C carrier 
variant and has budgeted for no more than four F-35C aircraft 
since fiscal year 2014, even though prior budget requests 
planned for more aircraft. The fiscal year 2017 budget request 
again includes only four F-35Cs, two fewer than were provided 
in the Department of Defense Appropriations Act, 2016 (Public 
Law 114-113). The Committee notes that it is challenging to 
efficiently manufacture a small number of F-35C aircraft on the 
same production line as the F-35A and F-35B aircraft, given the 
unique items associated with the carrier variant. Therefore, 
the Committee encourages the Navy to maintain, at a minimum, 
the current procurement plan in the fiscal year 2018 budget 
request.
    The Committee notes that the Marine Corps has maintained a 
consistent funding profile for the F-35B variant over recent 
years. To support the Marine Corps initial operational 
capability and enable the transition from 4th generation 
fighters, the Committee recommends additional funding for two 
Marine Corps F-35B and two Marine Corps F-35C aircraft.
    Finally, the Committee understands that the Joint Strike 
Fighter Program Executive Officer is considering formally 
requesting JSF block buy authority from the congressional 
defense committees. The Committee notes that block buy 
authority differs from multi-year procurement authority. The 
Committee supports acquisition cost savings, however, there is 
concern that the Department of Defense has not completed a 
formal review of such a strategy. Therefore, the Committee 
encourages the Under Secretary of Defense (Acquisition, 
Technology, Logistics) to review a block buy strategy prior to 
the submission of such a request to the congressional defense 
committees.
    Joint Strike Fighter Follow-on Modernization [JSF FoM].--
The fiscal year 2017 budget request includes $264,900,000 in 
Research, Development, Test and Evaluation, Navy and Research, 
Development, Test and Evaluation, Air Force for Joint Strike 
Fighter Follow-on Modernization, an increase of $173,900,000 
above fiscal year 2016 enacted amounts. The Committee notes the 
progress made by the JSF Program Executive Officer to define 
initial requirements and refine the JSF FoM acquisition 
strategy. However, the Committee further notes that cost 
estimates for the first two JSF FoM sub-blocks exceed 
$2,000,000,000, and that requirements and costs for the 
subsequent two JSF FoM sub-blocks are yet to be determined. In 
addition, the Committee notes that the JSF FoM acquisition 
strategy, the test and evaluation master plan, the contracting 
strategy, and the plan for management of infrastructure remain 
to be approved. Finally, the Committee notes that of funds 
requested for JSF FoM in fiscal year 2017, $158,900,000 is 
planned for obligation after the first quarter of fiscal year 
2018. Therefore, the Committee recommends $106,000,000 for JSF 
FoM, an increase of $15,000,000 above fiscal year 2016 enacted 
amounts, and the amount executable in fiscal year 2017. The JSF 
Program Executive Officer is directed to provide to the 
congressional defense committees, not later than the fiscal 
year 2018 budget submission, the approved JSF FoM acquisition 
strategy, and, for each JSF FoM sub-block, the systems 
engineering plan, the test and evaluation master plan, 
independent cost estimates, and an acquisition program 
baseline.

                    ISRAELI MISSILE DEFENSE PROGRAMS

    The fiscal year 2017 President's budget request includes 
$145,835,000 for Israeli missile defense programs, and the 
Committee has received a request from the Government of Israel 
which recommends $454,900,000 above the budget request for 
these programs. As previously stated in Senate Report 114-63, 
Congress has repeatedly, with strong bipartisan support, 
appropriated funds in excess of administration requests for 
Israeli missile defense programs to accelerate development of 
capabilities within a mutually agreed-upon U.S.-Israeli 
framework. However, these increases have historically been on a 
significantly smaller scale than the requests presented to the 
Committee in recent years, and accelerated capabilities covered 
by previously established cooperative development agreements. 
The Committee notes that in the last three fiscal years, 
Congress has appropriated more than $1,000,000,000 above the 
President's budget request for Israeli missile defense programs 
despite fiscal constraints imposed by the Budget Control Act. 
However, the establishment of U.S.-Israeli co-production 
agreements has yet to conclude, and funds appropriated in 
fiscal year 2016 have yet to be released. The Committee is 
aware of ongoing negotiations between the Government of the 
United States and the Government of Israel regarding Israel's 
future missile defense requirements and is hopeful that these 
requirements will be fully addressed.
    The Committee recommends an additional $454,900,000 for 
Israeli missile defense programs, as requested by the 
Government of Israel. The Committee directs that not more than 
$90,000,000 may be obligated or expended for long lead items in 
support of the David's Sling Weapons System, and not more than 
$70,000,000 may be obligated or expended for long lead items in 
support of the Arrow upper tier program until the Under 
Secretary of Defense (Acquisition, Technology and Logistics) 
provides to the congressional defense committees the joint 
U.S.--Israeli co-production agreements for each of these weapon 
systems that define: Israeli requirements, detail joint 
production plans, to include the transfer of technical data 
packages, if applicable, establish all up round production and 
delivery schedules, delineate U.S. and Israeli industry 
workshares for co-production, describe the proposed use of U.S. 
and Israeli funds based on a common cost model, and identify 
Israeli contributions. In addition, the Director, Missile 
Defense Agency is directed to certify to the congressional 
defense committees, not later than the fiscal year 2018 budget 
submission, that previously requested data has been provided to 
the Missile Defense Agency by the Israeli Missile Defense 
Organization.

          SHIP MODERNIZATION, OPERATIONS AND SUSTAINMENT FUND

    The Department of Defense Appropriations Act, 2013 (Public 
Law 112-175) established the Ship Modernization, Operations and 
Sustainment Fund [SMOSF] and provided full funding, as 
identified by the Navy, for the succeeding two fiscal years to 
man, operate, sustain, upgrade, equip, and modernize seven 
cruisers and two dock landing ships. At the time, the Congress 
was concerned with the Navy's proposal to prematurely retire 
capable and relevant ships and supported a temporary bridge 
fund for these ships until the Navy could budget for the 
routine costs to operate and modernize them in subsequent 
budgets. Congressional direction limited the $2,378,000,000 
provided in fiscal year 2013 to only those ships or hull 
numbers that the Navy proposed for premature retirement in the 
budget submission. According to the Navy, their retirement 
proposal was strictly driven by fiscal constraints. Despite the 
additional funding and strong congressional direction, the Navy 
failed to obligate within 2 years the majority of SMOSF 
resources provided in Public Law 112-175.
    With submission of the fiscal year 2015 budget request, the 
Navy included a new proposal to remove 11 Ticonderoga-class 
guided missile cruisers and three amphibious dock landing ships 
from the operational fleet and lay them up for several years 
under a phased modernization plan. The Department of Defense 
Appropriations Act, 2015 (Public Law 113-235) rejected this 
proposal and instead recommended a modified modernization plan 
that was consistent the Navy's proposal to expand application 
of unobligated SMOSF resources to four additional cruisers and 
an additional dock landing ship. In addition, the fiscal year 
2015 agreement included an increase of $540,000,000 in the 
SMOSF to support this new direction. The Committee notes, 
however, that the Navy continues to obligate funds at a slower 
than expected rate.
    The Navy's fiscal year 2017 budget submission, once again, 
deviates from congressional direction and proposes to change 
the modernization lay-up and phasing plan while continuing to 
utilize SMOSF resources. Given that the Navy has repeatedly 
ignored congressional direction over the past 4 years and 
continues to make changes to how SMOSF resources are applied, 
the Committee rescinds $1,317,300,000 from funds remaining 
available for obligation in the SMOSF account. The Committee 
recommends an increase of $183,000,000 in the Operation and 
Maintenance, Navy account and $101,500,000 in the Other 
Procurement, Navy account to support cruiser and dock landing 
ship modernization efforts in fiscal year 2017. The Committee 
expects the Navy to utilize these funds for their 
congressionally directed purpose during fiscal year 2017 and to 
fully fund for all manpower, readiness, and modernization 
activities associated with cruiser and dock landing ships in 
the traditional appropriations accounts with the fiscal year 
2018 budget request.

                                TITLE I

                           MILITARY PERSONNEL

    Funds appropriated under this title provide the resources 
required for basic pay, retired pay accrual, employers' 
contribution for Social Security taxes, basic allowance for 
subsistence, basic allowance for housing, special and incentive 
pays, permanent change of station travel, and other personnel 
costs for uniformed members of the Armed Forces.
    The President's fiscal year 2017 budget requests a total of 
$128,902,332,000 for military personnel appropriations. This 
request funds an Active component end strength of 1,281,900 and 
a Reserve component end strength of 801,200.

                      SUMMARY OF COMMITTEE ACTION

    The Committee recommends military personnel appropriations 
totaling $127,976,516,000 for fiscal year 2017. This is 
$925,816,000 below the budget estimate.
    Committee recommended military personnel appropriations for 
fiscal year 2017 are summarized below:

                                  SUMMARY OF MILITARY PERSONNEL APPROPRIATIONS
                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
                             Account                                2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
Military Personnel:
    Military Personnel, Army....................................      40,028,182      39,962,113         -66,069
    Military Personnel, Navy....................................      27,951,605      27,712,455        -239,150
    Military Personnel, Marine Corps............................      12,813,412      12,698,935        -114,477
    Military Personnel, Air Force...............................      27,944,615      27,706,468        -238,147
 
Reserve Personnel:
    Reserve Personnel, Army.....................................       4,561,703       4,466,763         -94,940
    Reserve Personnel, Navy.....................................       1,924,155       1,918,395          -5,760
    Reserve Personnel, Marine Corps.............................         744,995         743,265          -1,730
    Reserve Personnel, Air Force................................       1,742,906       1,715,360         -27,546
 
National Guard Personnel:
    National Guard Personnel, Army..............................       7,910,694       7,781,224        -129,470
    National Guard Personnel, Air Force.........................       3,280,065       3,271,538          -8,527
                                                                 -----------------------------------------------
      Total.....................................................     128,902,332     127,976,516        -925,816
----------------------------------------------------------------------------------------------------------------

    Committee recommended end strengths for fiscal year 2017 
are summarized below:

                                            RECOMMENDED END STRENGTH
----------------------------------------------------------------------------------------------------------------
                                                2016           2017 budget        Committee        Change from
                                            authorization       estimate       recommendation    budget estimate
----------------------------------------------------------------------------------------------------------------
Active:
    Army................................           475,000           460,000           460,000  ................
    Navy................................           329,200           322,900           322,900  ................
    Marine Corps........................           184,000           182,000           182,000  ................
    Air Force...........................           320,715           317,000           317,000  ................
                                         -----------------------------------------------------------------------
      Subtotal..........................         1,308,915         1,281,900         1,281,900  ................
                                         =======================================================================
 
Selected Reserve:
    Army Reserve........................           198,000           195,000           195,000  ................
    Navy Reserve........................            57,400            58,000            58,000  ................
    Marine Corps Reserve................            38,900            38,500            38,500  ................
    Air Force Reserve...................            69,200            69,000            69,000  ................
    Army National Guard.................           342,000           335,000           335,000  ................
    Air National Guard..................           105,500           105,700           105,700  ................
                                         -----------------------------------------------------------------------
      Subtotal..........................           811,000           801,200           801,200  ................
                                         =======================================================================
      Total.............................         2,119,915         2,083,100         2,083,100  ................
----------------------------------------------------------------------------------------------------------------

    Committee recommended end strengths for full-time support 
of the Reserve and Guard for fiscal year 2017 are summarized 
below:

                                RECOMMENDED ACTIVE GUARD AND RESERVE END STRENGTH
----------------------------------------------------------------------------------------------------------------
                                                2016           2017 budget        Committee        Change from
                                            authorization       estimate       recommendation    budget estimate
----------------------------------------------------------------------------------------------------------------
Active Guard and Reserve:
    Army Reserve........................            16,261            16,261            16,261  ................
    Navy Reserve........................             9,934             9,955             9,955  ................
    Marine Corps Reserve................             2,260             2,261             2,261  ................
    Air Force Reserve...................             3,032             2,955             2,955  ................
    Army National Guard.................            30,770            30,155            30,155  ................
    Air National Guard..................            14,748            14,764            14,764  ................
                                         -----------------------------------------------------------------------
      TOTAL.............................            77,005            76,351            76,351  ................
----------------------------------------------------------------------------------------------------------------

         Reprogramming Guidance for Military Personnel Accounts

    The Committee directs the Secretary of Defense to submit 
the Base for Reprogramming (DD Form 1414) for each of the 
fiscal year 2017 appropriation accounts not later than 60 days 
after the enactment of this act. The Secretary of Defense is 
prohibited from executing any reprogramming or transfer of 
funds for any purpose other than originally appropriated until 
the aforementioned report is submitted to the House and Senate 
Appropriations Committees. The Committee directs the Secretary 
of Defense to use the normal prior approval reprogramming 
procedures to transfer funds in the services' military 
personnel accounts between budget activities in excess of 
$10,000,000.

               Military Personnel Special Interest Items

    Items for which additional funds have been provided or have 
been specifically reduced as shown in the project level tables 
or in paragraphs using the phrase ``only for'' or ``only to'' 
in this report are congressional special interest items for the 
purpose of the Base for Reprogramming (DD Form 1414). Each of 
these items must be carried on the DD Form 1414 at the stated 
amount as specifically addressed in the Committee report. Below 
Threshold Reprogrammings may not be used to either restore or 
reduce funding from congressional special interest items as 
identified on the DD Form 1414.

                      Military Personnel Overview

    Reserve Component Budget Reporting.--The Committee 
continues its requirement for the Department to provide a semi-
annual detailed report to the congressional defense committees 
showing transfers between subactivities within the military 
personnel appropriation. Reports shall be submitted not later 
than 30 days following the end of the second quarter and 30 
days following the end of the fiscal year.
    Unobligated Balances.--A Government Accountability Office 
analysis of past year obligation rates shows that the services 
continue to underexecute their military personnel accounts. Due 
to excess unobligated balances, the Committee recommends a 
total reduction of $880,050,000 from the fiscal year 2017 
military personnel accounts.
    Advanced Trauma Training Program for National Guard and 
Reserve.--The Committee recognizes the valuable support 
universities, hospitals, and other military partners provide by 
offering civilian-based emergency response trauma training to 
sustain medics' and medical providers' capabilities of the 
National Guard Enhanced Response Forces Packages [CERFP], 
National Guard Homeland Response Forces [NGHRF], and the Army 
Reserve Consequence Management Response Forces [CCMRF]. The 
Committee encourages the National Guard and Reserve to continue 
pursuing state-of-the-art trauma training with these civilian 
partners, thus maintaining unit medical readiness postures at 
optimum levels as military healthcare providers in CERFPs, 
NGHRFs, and CCMRFs maintain their individual skills to respond 
effectively to emergency incidents on the homeland. 
Furthermore, in order to minimize the civilian-military 
operational gaps in the event of a catastrophic incident, the 
Committee also encourages the development of enhanced 
preparedness medical training programs focusing on mass 
casualty triage, advanced disaster life support, advanced 
hazardous material life support, emergency dental, and 
psychological health by increasing civilian-based advanced 
trauma expertise gained through day-to-day experiences and 
medical research programs.
    Remotely Piloted Aircraft Pilot Shortfall.--The Committee 
is deeply concerned with the continuing shortage of Remotely 
Piloted Aircraft [RPA] pilots. As a result of shortfalls in 
incentivizing, training, and retaining RPA pilots, the fiscal 
year 2017 budget request proposes contractors to fill in for 
RPA operators. Contractors are not authorized to operate on 
unmanned platforms in the same capacity as airmen, yet will be 
paid more for their work. This solution is not sustainable due 
to cost and the limits on missions performed by contractor 
pilots. To avoid this less than optimal temporary solution and 
improve retention, the Committee supports the use of critical 
skill bonus payments in order to direct and incentivize talent 
specifically for the RPA platform. The Committee believes skill 
bonus payments are not meant to support parity among platforms 
or services but to acknowledge the scarcity of an indispensable 
skill. The critical need for RPA pilots will continue to be an 
enduring requirement for the Air Force, and the Committee 
directs the Secretary of the Air Force to provide additional 
solutions.

                        Military Personnel, Army

Appropriations, 2016.................................... $41,045,562,000
Budget estimate, 2017...................................  40,028,182,000
Committee recommendation................................  39,962,113,000

    The Committee recommends an appropriation of 
$39,962,113,000. This is $66,069,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                      MILITARY PERSONNEL, ARMY
 
     ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS
   5 BASIC PAY                                                       6,846,876       6,846,876  ..............
  10 RETIRED PAY ACCRUAL                                             2,015,554       2,015,554  ..............
  25 BASIC ALLOWANCE FOR HOUSING                                     2,241,563       2,241,563  ..............
  30 BASIC ALLOWANCE FOR SUBSISTENCE                                   285,488         285,488  ..............
  35 INCENTIVE PAYS                                                     85,542          83,542          -2,000
  40 SPECIAL PAYS                                                      367,175         367,175  ..............
  45 ALLOWANCES                                                        212,392         212,392  ..............
  50 SEPARATION PAY                                                    201,125         201,125  ..............
  55 SOCIAL SECURITY TAX                                               521,218         521,218  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                 12,776,933      12,774,933          -2,000
 
     ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL
  60 BASIC PAY                                                      12,429,886      12,429,886  ..............
  65 RETIRED PAY ACCRUAL                                             3,663,328       3,663,328  ..............
  80 BASIC ALLOWANCE FOR HOUSING                                     4,701,364       4,701,364  ..............
  85 INCENTIVE PAYS                                                     90,342          90,342  ..............
  90 SPECIAL PAYS                                                      395,840         395,840  ..............
  95 ALLOWANCES                                                        707,120         707,120  ..............
 100 SEPARATION PAY                                                    523,385         523,385  ..............
 105 SOCIAL SECURITY TAX                                               950,887         950,887  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                 23,462,152      23,462,152  ..............
 
     ACTIVITY 3: PAY AND ALLOWANCES OF CADETS
 110 ACADEMY CADETS                                                     81,184          81,184  ..............
 
     ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL
 115 BASIC ALLOWANCE FOR SUBSISTENCE                                 1,240,112       1,240,112  ..............
 120 SUBSISTENCE-IN-KIND                                               594,481         574,481         -20,000
 121 FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE                             813             813  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                  1,835,406       1,815,406         -20,000
 
     ACTIVITY 5: PERMANENT CHANGE OF STATION
 125 ACCESSION TRAVEL                                                  155,211         155,211  ..............
 130 TRAINING TRAVEL                                                   149,240         149,240  ..............
 135 OPERATIONAL TRAVEL                                                428,891         428,891  ..............
 140 ROTATIONAL TRAVEL                                                 710,007         710,007  ..............
 145 SEPARATION TRAVEL                                                 302,576         302,576  ..............
 150 TRAVEL OF ORGANIZED UNITS                                           4,033           4,033  ..............
 155 NON-TEMPORARY STORAGE                                              14,073          13,073          -1,000
 160 TEMPORARY LODGING EXPENSE                                          47,766          43,766          -4,000
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 5                                  1,811,797       1,806,797          -5,000
 
     ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS
 170 APPREHENSION OF MILITARY DESERTERS                                    621             621  ..............
 175 INTEREST ON UNIFORMED SERVICES SAVINGS                                132             132  ..............
 180 DEATH GRATUITIES                                                   38,000          38,000  ..............
 185 UNEMPLOYMENT BENEFITS                                             168,656         168,656  ..............
 195 EDUCATION BENEFITS                                                    634             634  ..............
 200 ADOPTION EXPENSES                                                     576             576  ..............
 210 TRANSPORTATION SUBSIDY                                             11,284           9,435          -1,849
 215 PARTIAL DISLOCATION ALLOWANCE                                         251             251  ..............
 217 RESERVE OFFICER TRAINING CORPS (ROTC)                              97,362          97,362  ..............
 218 JUNIOR ROTC                                                        27,522          27,522  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 6                                    345,038         343,189          -1,849
 
     LESS REIMBURSABLES                                               -284,328        -284,328  ..............
 
     UNDISTRIBUTED ADJUSTMENT                                   ..............         -37,220         -37,220
                                                               =================================================
           TOTAL, ACTIVE FORCES, ARMY                               40,028,182      39,962,113         -66,069
                                                               -------------------------------------------------
           TOTAL, MILITARY PERSONNEL, ARMY                          40,028,182      39,962,113         -66,069
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
     BA 1: PAY AND
      ALLOWANCES OF
      OFFICERS
  35 Incentive Pays             85,542          83,542          -2,000
         Improving      ..............  ..............          -2,000
          funds
          management:
          Excess to
          requirement
 
     BA 4: SUBSISTENCE
      OF ENLISTED
      PERSONNEL
 120 Subsistence-In-           594,481         574,481         -20,000
      Kind
         Improving      ..............  ..............         -20,000
          funds
          management:
          Excess
          growth
 
     BA 5: PERMANENT
      CHANGE OF
      STATION TRAVEL
 155 Non-Temporary              14,073          13,073          -1,000
      Storage
         Improving      ..............  ..............          -1,000
          funds
          management:
          Excess
          growth
 160 Temporary Lodging          47,766          43,766          -4,000
      Expense
         Improving      ..............  ..............          -4,000
          funds
          management:
          Excess
          growth
 
     BA 6: OTHER
      MILITARY
      PERSONNEL COSTS
 210 Transportation             11,284           9,435          -1,849
      Subsidy
         Improving      ..............  ..............          -1,849
          funds
          management:
          Overestimati
          ng projected
          targets
 
     UNDISTRIBUTED
      ADJUSTMENT
         Improving      ..............         -37,220         -37,220
          funds
          management:
          Unobligated
          balances
------------------------------------------------------------------------

                        Military Personnel, Navy

Appropriations, 2016.................................... $27,835,183,000
Budget estimate, 2017...................................  27,951,605,000
Committee recommendation................................  27,712,455,000

    The Committee recommends an appropriation of 
$27,712,455,000. This is $239,150,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                      MILITARY PERSONNEL, NAVY
 
     ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS
   5 BASIC PAY                                                       4,120,767       4,120,767  ..............
  10 RETIRED PAY ACCRUAL                                             1,214,093       1,214,093  ..............
  25 BASIC ALLOWANCE FOR HOUSING                                     1,497,045       1,497,045  ..............
  30 BASIC ALLOWANCE FOR SUBSISTENCE                                   170,255         170,255  ..............
  35 INCENTIVE PAYS                                                    132,868         132,868  ..............
  40 SPECIAL PAYS                                                      428,731         428,731  ..............
  45 ALLOWANCES                                                        118,231         118,231  ..............
  50 SEPARATION PAY                                                     47,200          46,400            -800
  55 SOCIAL SECURITY TAX                                               313,964         313,964  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  8,043,154       8,042,354            -800
 
     ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL
  60 BASIC PAY                                                       8,940,145       8,940,145  ..............
  65 RETIRED PAY ACCRUAL                                             2,636,817       2,636,817  ..............
  80 BASIC ALLOWANCE FOR HOUSING                                     4,254,377       4,254,377  ..............
  85 INCENTIVE PAYS                                                    103,685         103,685  ..............
  90 SPECIAL PAYS                                                      752,380         752,380  ..............
  95 ALLOWANCES                                                        544,072         544,072  ..............
 100 SEPARATION PAY                                                    161,985         161,985  ..............
 105 SOCIAL SECURITY TAX                                               683,920         683,920  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                 18,077,381      18,077,381  ..............
 
     ACTIVITY 3: PAY AND ALLOWANCES OF MIDSHIPMEN
 110 MIDSHIPMEN                                                         81,580          81,580  ..............
 
     ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL
 115 BASIC ALLOWANCE FOR SUBSISTENCE                                   804,972         804,972  ..............
 120 SUBSISTENCE-IN-KIND                                               378,674         378,674  ..............
 121 FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE                              10              10  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                  1,183,656       1,183,656  ..............
 
     ACTIVITY 5: PERMANENT CHANGE OF STATION
 125 ACCESSION TRAVEL                                                   84,530          84,530  ..............
 130 TRAINING TRAVEL                                                    66,298          66,298  ..............
 135 OPERATIONAL TRAVEL                                                184,700         184,700  ..............
 140 ROTATIONAL TRAVEL                                                 228,489         228,489  ..............
 145 SEPARATION TRAVEL                                                 123,633         123,633  ..............
 150 TRAVEL OF ORGANIZED UNITS                                          24,746          24,746  ..............
 155 NON-TEMPORARY STORAGE                                              12,686          12,686  ..............
 160 TEMPORARY LODGING EXPENSE                                          16,225          16,225  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 5                                    741,307         741,307  ..............
 
     ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS
 170 APPREHENSION OF MILITARY DESERTERS                                     71              71  ..............
 175 INTEREST ON UNIFORMED SERVICES SAVINGS                              1,060           1,060  ..............
 180 DEATH GRATUITIES                                                   13,500          13,500  ..............
 185 UNEMPLOYMENT BENEFITS                                              78,956          78,956  ..............
 195 EDUCATION BENEFITS                                                 16,505          16,505  ..............
 200 ADOPTION EXPENSES                                                     250             250  ..............
 210 TRANSPORTATION SUBSIDY                                              8,434           8,434  ..............
 215 PARTIAL DISLOCATION ALLOWANCE                                          30              30  ..............
 217 RESERVE OFFICERS TRAINING CORPS (ROTC)                             20,234          20,234  ..............
 218  JUNIOR ROTC                                                       14,990          14,990  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 6                                    154,030         154,030  ..............
 
     LESS REIMBURSABLES                                               -329,503        -329,503  ..............
 
     UNDISTRIBUTED ADJUSTMENT                                   ..............        -238,350        -238,350
                                                               =================================================
           TOTAL, ACTIVE FORCES, NAVY                               27,951,605      27,712,455        -239,150
                                                               -------------------------------------------------
           TOTAL, MILITARY PERSONNEL, NAVY                          27,951,605      27,712,455        -239,150
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
     BA 1: PAY AND
      ALLOWANCES OF
      OFFICERS
  50 Separation Pay             47,200          46,400            -800
         Improving      ..............  ..............            -800
          funds
          management:
          Excess
          growth
 
     UNDISTRIBUTED
      ADJUSTMENT
         Improving      ..............        -238,350        -238,350
          funds
          management:
          Unobligated
          balances
------------------------------------------------------------------------

                    Military Personnel, Marine Corps

Appropriations, 2016.................................... $12,859,152,000
Budget estimate, 2017...................................  12,813,412,000
Committee recommendation................................  12,698,935,000

    The Committee recommends an appropriation of 
$12,698,935,000. This is $114,477,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                  MILITARY PERSONNEL, MARINE CORPS
 
     ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS
   5  BASIC PAY                                                      1,543,145       1,543,145  ..............
  10 RETIRED PAY ACCRUAL                                               454,866         454,866  ..............
  25 BASIC ALLOWANCE FOR HOUSING                                       511,997         511,997  ..............
  30 BASIC ALLOWANCE FOR SUBSISTENCE                                    65,927          65,927  ..............
  35 INCENTIVE PAYS                                                     31,661          31,661  ..............
  40 SPECIAL PAYS                                                        3,582           3,582  ..............
  45 ALLOWANCES                                                         35,359          35,359  ..............
  50 SEPARATION PAY                                                     13,077          13,077  ..............
  55 SOCIAL SECURITY TAX                                               117,478         117,478  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  2,777,092       2,777,092  ..............
 
     ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL
  60 BASIC PAY                                                       4,840,416       4,840,416  ..............
  65 RETIRED PAY ACCRUAL                                             1,425,856       1,425,856  ..............
  80 BASIC ALLOWANCE FOR HOUSING                                     1,557,367       1,557,367  ..............
  85 INCENTIVE PAYS                                                      9,137           9,137  ..............
  90 SPECIAL PAYS                                                      116,757         116,757  ..............
  95 ALLOWANCES                                                        289,349         289,349  ..............
 100 SEPARATION PAY                                                     97,926          97,926  ..............
 105 SOCIAL SECURITY TAX                                               369,924         369,924  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                  8,706,732       8,706,732  ..............
 
     ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL
 115 BASIC ALLOWANCE FOR SUBSISTENCE                                   440,800         440,800  ..............
 120 SUBSISTENCE-IN-KIND                                               386,455         386,455  ..............
 121 FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE                              10              10  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                    827,265         827,265  ..............
 
     ACTIVITY 5: PERMANENT CHANGE OF STATION
 125 ACCESSION TRAVEL                                                   64,291          64,291  ..............
 130 TRAINING TRAVEL                                                     7,185           7,185  ..............
 135 OPERATIONAL TRAVEL                                                130,620         130,620  ..............
 140 ROTATIONAL TRAVEL                                                 107,630         107,630  ..............
 145 SEPARATION TRAVEL                                                 109,224         106,777          -2,447
 150 TRAVEL OF ORGANIZED UNITS                                             380             380  ..............
 155 NON-TEMPORARY STORAGE                                               7,942           7,942  ..............
 160 TEMPORARY LODGING EXPENSE                                           5,473           5,473  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 5                                    432,745         430,298          -2,447
 
     ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS
 170 APPREHENSION OF MILITARY DESERTERS                                    395             395  ..............
 175 INTEREST ON UNIFORMED SERVICES SAVINGS                                 19              19  ..............
 180 DEATH GRATUITIES                                                   12,900          12,900  ..............
 185 UNEMPLOYMENT BENEFITS                                              77,928          77,928  ..............
 195 EDUCATION BENEFITS                                                  7,125           7,125  ..............
 200 ADOPTION EXPENSES                                                     116             116  ..............
 210 TRANSPORTATION SUBSIDY                                              2,122           2,122  ..............
 215 PARTIAL DISLOCATION ALLOWANCE                                         101             101  ..............
 218 JUNIOR ROTC                                                         3,589           3,589  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 6                                    104,295         104,295  ..............
 
     LESS REIMBURSABLES                                                -34,717         -34,717  ..............
 
     UNDISTRIBUTED ADJUSTMENT                                   ..............        -112,030        -112,030
                                                               =================================================
           TOTAL, ACTIVE FORCES, MARINE CORPS                       12,813,412      12,698,935        -114,477
                                                               -------------------------------------------------
           TOTAL, MILITARY PERSONNEL, MARINE CORPS                  12,813,412      12,698,935        -114,477
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
     BA 5: PERMANENT
      CHANGE OF
      STATION TRAVEL
 145 Separation Travel         109,224         106,777          -2,447
         Improving      ..............  ..............          -2,447
          funds
          management:
          Underexecuti
          ng
 
     UNDISTRIBUTED
      ADJUSTMENT
         Improving      ..............        -112,030        -112,030
          funds
          management:
          Unobligated
          balances
------------------------------------------------------------------------

                     Military Personnel, Air Force

Appropriations, 2016.................................... $27,679,066,000
Budget estimate, 2017...................................  27,944,615,000
Committee recommendation................................  27,706,468,000

    The Committee recommends an appropriation of 
$27,706,468,000. This is $238,147,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                   MILITARY PERSONNEL, AIR FORCE
 
     ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS
   5 BASIC PAY                                                       4,886,786       4,886,786  ..............
  10 RETIRED PAY ACCRUAL                                             1,433,571       1,433,571  ..............
  25 BASIC ALLOWANCE FOR HOUSING                                     1,507,570       1,507,570  ..............
  30 BASIC ALLOWANCE FOR SUBSISTENCE                                   199,210         199,210  ..............
  35 INCENTIVE PAYS                                                    230,325         228,325          -2,000
  40 SPECIAL PAYS                                                      303,925         303,925  ..............
  45 ALLOWANCES                                                        110,509         110,509  ..............
  50 SEPARATION PAY                                                     54,540          54,540  ..............
  55 SOCIAL SECURITY TAX                                               373,187         373,187  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  9,099,623       9,097,623          -2,000
 
     ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL
  60 BASIC PAY                                                       8,811,898       8,811,898  ..............
  65 RETIRED PAY ACCRUAL                                             2,591,637       2,591,637  ..............
  80 BASIC ALLOWANCE FOR HOUSING                                     3,674,509       3,674,509  ..............
  85 INCENTIVE PAYS                                                     35,601          35,601  ..............
  90 SPECIAL PAYS                                                      357,581         357,581  ..............
  95 ALLOWANCES                                                        503,008         503,008  ..............
 100 SEPARATION PAY                                                    109,908         109,908  ..............
 105 SOCIAL SECURITY TAX                                               674,109         674,109  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                 16,758,251      16,758,251  ..............
 
     ACTIVITY 3: PAY AND ALLOWANCES OF CADETS
 110 ACADEMY CADETS                                                     72,144          72,144  ..............
 
     ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL
 115 BASIC ALLOWANCE FOR SUBSISTENCE                                 1,007,662       1,007,662  ..............
 120 SUBSISTENCE-IN-KIND                                               131,986         131,986  ..............
 121 FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE                               8               8  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                  1,139,656       1,139,656  ..............
 
     ACTIVITY 5: PERMANENT CHANGE OF STATION
 125 ACCESSION TRAVEL                                                   90,791          90,791  ..............
 130 TRAINING TRAVEL                                                    71,207          71,207  ..............
 135 OPERATIONAL TRAVEL                                                265,682         265,682  ..............
 140 ROTATIONAL TRAVEL                                                 567,998         567,998  ..............
 145 SEPARATION TRAVEL                                                 147,938         147,938  ..............
 150 TRAVEL OF ORGANIZED UNITS                                           9,204           9,204  ..............
 155 NON-TEMPORARY STORAGE                                              23,664          23,664  ..............
 160 TEMPORARY LODGING EXPENSE                                          34,701          34,701  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 5                                  1,211,185       1,211,185  ..............
 
     ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS
 170  APPREHENSION OF MILITARY DESERTERS                                    16              16  ..............
 175 INTEREST ON UNIFORMED SERVICES SAVINGS                              2,691           2,691  ..............
 180 DEATH GRATUITIES                                                   16,000          16,000  ..............
 185 UNEMPLOYMENT BENEFITS                                              53,431          53,431  ..............
 195 EDUCATION BENEFITS                                                     79              79  ..............
 200 ADOPTION EXPENSES                                                     435             435  ..............
 210 TRANSPORTATION SUBSIDY                                              4,841           4,434            -407
 215 PARTIAL DISLOCATION ALLOWANCE                                         723             723  ..............
 217 RESERVE OFFICERS TRAINING CORPS (ROTC)                             29,445          29,445  ..............
 218 JUNIOR ROTC                                                        18,200          16,900          -1,300
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 6                                    125,861         124,154          -1,707
 
     LESS REIMBURSABLES                                               -462,105        -462,105  ..............
 
     UNDISTRIBUTED ADJUSTMENT                                   ..............        -234,440        -234,440
                                                               =================================================
           TOTAL, ACTIVE FORCES, AIR FORCE                          27,944,615      27,706,468        -238,147
                                                               -------------------------------------------------
           TOTAL, MILITARY PERSONNEL, AIR FORCE                     27,944,615      27,706,468        -238,147
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
       BA 1: PAY AND
        ALLOWANCES OF
        OFFICERS
    35 Incentive Pays          230,325         228,325          -2,000
           Improving    ..............  ..............          -2,000
            funds
            management
            : planned
            underexecu
            tion
 
       BA 6: OTHER
        MILITARY
        PERSONNEL
        COSTS
   210 Transportation            4,841           4,434            -407
        Subsidy
           Improving    ..............  ..............            -407
            funds
            management
            :
            Overestima
            ting
            projected
            targets
   218 Junior ROTC              18,200          16,900          -1,300
           Improving    ..............  ..............          -1,300
            funds
            management
            :
            Overestima
            ting
            projected
            targets
 
       UNDISTRIBUTED
        ADJUSTMENT
           Improving    ..............        -234,440        -234,440
            funds
            management
            :
            Unobligate
            d balances
------------------------------------------------------------------------

                        Reserve Personnel, Army

Appropriations, 2016....................................  $4,463,164,000
Budget estimate, 2017...................................   4,561,703,000
Committee recommendation................................   4,466,763,000

    The Committee recommends an appropriation of 
$4,466,763,000. This is $94,940,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                      RESERVE PERSONNEL, ARMY
 
     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
  10 PAY GROUP A TRAINING (15 DAYS & DRILLS 24/48)                   1,549,028       1,549,028  ..............
  20 PAY GROUP B TRAINING (BACKFILL FOR ACTIVE DUTY)                    41,018          41,018  ..............
  30 PAY GROUP F TRAINING (RECRUITS)                                   216,524         216,524  ..............
  40 PAY GROUP P TRAINING (PIPELINE RECRUITS)                           11,514          11,514  ..............
  60 MOBILIZATION TRAINING                                                 326             326  ..............
  70 SCHOOL TRAINING                                                   224,758         224,758  ..............
  80 SPECIAL TRAINING                                                  281,611         281,611  ..............
  90 ADMINISTRATION AND SUPPORT                                      2,120,835       2,115,835          -5,000
 100 EDUCATION BENEFITS                                                  4,124           4,124  ..............
 120 HEALTH PROFESSION SCHOLARSHIP                                      59,937          59,937  ..............
 130 OTHER PROGRAMS (ADMIN & SUPPORT)                                   52,028          52,028  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  4,561,703       4,556,703          -5,000
 
     UNDISTRIBUTED ADJUSTMENT                                   ..............         -89,940         -89,940
                                                               -------------------------------------------------
           TOTAL RESERVE PERSONNEL, ARMY                             4,561,703       4,466,763         -94,940
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
       BA 1: ARMY
        RESERVE
        TRAINING AND
        SUPPORT
    90 Administration        2,120,835       2,115,835          -5,000
        and Support
           Improving    ..............  ..............          -5,000
            funds
            management
            :
            Unjustifie
            d growth
 
       UNDISTRIBUTED
        ADJUSTMENT
           Improving    ..............         -89,940         -89,940
            funds
            management
            :
            Unobligate
            d balances
------------------------------------------------------------------------

                        Reserve Personnel, Navy

Appropriations, 2016....................................  $1,866,891,000
Budget estimate, 2017...................................   1,924,155,000
Committee recommendation................................   1,918,395,000

    The Committee recommends an appropriation of 
$1,918,395,000. This is $5,760,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                      RESERVE PERSONNEL, NAVY
 
     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
  10 PAY GROUP A TRAINING (15 DAYS & DRILLS 24/48)                     625,660         625,660  ..............
  20 PAY GROUP B TRAINING (BACKFILL FOR ACTIVE DUTY)                     7,369           7,369  ..............
  30 PAY GROUP F TRAINING (RECRUITS)                                    62,904          62,904  ..............
  60 MOBILIZATION TRAINING                                               8,732           8,732  ..............
  70 SCHOOL TRAINING                                                    50,441          50,441  ..............
  80 SPECIAL TRAINING                                                  112,504         112,504  ..............
  90 ADMINISTRATION AND SUPPORT                                      1,004,041       1,004,041  ..............
 100 EDUCATION BENEFITS                                                    105             105  ..............
 120 HEALTH PROFESSION SCHOLARSHIP                                      52,399          52,399  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  1,924,155       1,924,155  ..............
 
     UNDISTRIBUTED ADJUSTMENT                                   ..............          -5,760          -5,760
                                                               -------------------------------------------------
           TOTAL, RESERVE PERSONNEL, NAVY                            1,924,155       1,918,395          -5,760
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
     UNDISTRIBUTED
      ADJUSTMENT
         Improving      ..............          -5,760          -5,760
          funds
          management:
          Unobligated
          balances
------------------------------------------------------------------------

                    Reserve Personnel, Marine Corps

Appropriations, 2016....................................    $702,481,000
Budget estimate, 2017...................................     744,995,000
Committee recommendation................................     743,265,000

    The Committee recommends an appropriation of $743,265,000. 
This is $1,730,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                  RESERVE PERSONNEL, MARINE CORPS
 
     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
  10 PAY GROUP A TRAINING (15 DAYS & DRILLS 24/48)                     274,555         274,555  ..............
  20 PAY GROUP B TRAINING (BACKFILL FOR ACT DUTY)                       43,539          43,539  ..............
  30 PAY GROUP F TRAINING (RECRUITS)                                   124,902         124,902  ..............
  60 MOBILIZATION TRAINING                                               2,096           2,096  ..............
  70 SCHOOL TRAINING                                                    24,607          24,607  ..............
  80 SPECIAL TRAINING                                                   29,000          29,000  ..............
  90 ADMINISTRATION AND SUPPORT                                        237,484         237,484  ..............
  95 PLATOON LEADER CLASS                                                8,124           8,124  ..............
 100  EDUCATION BENEFITS                                                   688             688  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                    744,995         744,995  ..............
 
     UNDISTRIBUTED ADJUSTMENT                                   ..............          -1,730          -1,730
                                                               -------------------------------------------------
           TOTAL, RESERVE PERSONNEL, MARINE CORPS                      744,995         743,265          -1,730
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
     UNDISTRIBUTED
      ADJUSTMENT
         Improving      ..............          -1,730          -1,730
          funds
          management:
          Unobligated
          balances
------------------------------------------------------------------------

                      Reserve Personnel, Air Force

Appropriations, 2016....................................  $1,682,942,000
Budget estimate, 2017...................................   1,742,906,000
Committee recommendation................................   1,715,360,000

    The Committee recommends an appropriation of 
$1,715,360,000. This is $27,546,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                    RESERVE PERSONNEL, AIR FORCE
 
     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
  10 PAY GROUP A TRAINING (15 DAYS & DRILLS 24/48)                     696,068         696,068  ..............
  20 PAY GROUP B TRAINING (BACKFILL FOR ACTIVE DUTY)                    98,133          98,133  ..............
  30 PAY GROUP F TRAINING (RECRUITS)                                    55,568          53,832          -1,736
  40 PAY GROUP P TRAINING (PIPELINE RECRUITS)                            2,559           2,559  ..............
  60 MOBILIZATION TRAINING                                                 703             703  ..............
  70 SCHOOL TRAINING                                                   159,593         155,563          -4,030
  80 SPECIAL TRAINING                                                  244,844         244,844  ..............
  90 ADMINISTRATION AND SUPPORT                                        409,615         409,615  ..............
 100 EDUCATION BENEFITS                                                 12,533          12,533  ..............
 120 HEALTH PROFESSION SCHOLARSHIP                                      60,301          60,301  ..............
 130 OTHER PROGRAMS (ADMIN & SUPPORT)                                    2,989           2,989  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  1,742,906       1,737,140          -5,766
 
     UNDISTRIBUTED ADJUSTMENT                                   ..............         -21,780         -21,780
                                                               -------------------------------------------------
           TOTAL, RESERVE PERSONNEL, AIR FORCE                       1,742,906       1,715,360         -27,546
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
       BA 1: AIR FORCE
        RESERVE
        TRAINING AND
        SUPPORT
    30 Pay Group F              55,568          53,832          -1,736
        Training
        (Recruits)
           Improving    ..............  ..............          -1,736
            funds
            management
            :
            Unjustifie
            d growth
    70 School Training         159,593         155,563          -4,030
           Improving    ..............  ..............          -4,030
            funds
            management
            :
            Unjustifie
            d growth
 
       UNDISTRIBUTED
        ADJUSTMENT
           Improving    ..............         -21,780         -21,780
            funds
            management
            :
            Unobligate
            d balances
------------------------------------------------------------------------

                     National Guard Personnel, Army

Appropriations, 2016....................................  $7,892,327,000
Budget estimate, 2017...................................   7,910,694,000
Committee recommendation................................   7,781,224,000

    The Committee recommends an appropriation of 
$7,781,224,000. This is $129,470,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                   NATIONAL GUARD PERSONNEL, ARMY
 
     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
  10 PAY GROUP A TRAINING (15 DAYS & DRILLS 24/48)                   2,561,418       2,561,418  ..............
  30 PAY GROUP F TRAINING (RECRUITS)                                   551,868         550,868          -1,000
  40 PAY GROUP P TRAINING (PIPELINE RECRUITS)                           46,202          46,202  ..............
  70 SCHOOL TRAINING                                                   546,563         546,563  ..............
  80 SPECIAL TRAINING                                                  570,009         576,909          +6,900
  90 ADMINISTRATION AND SUPPORT                                      3,632,138       3,632,138  ..............
 100 EDUCATION BENEFITS                                                  2,496           2,496  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  7,910,694       7,916,594          +5,900
 
     UNDISTRIBUTED ADJUSTMENT                                   ..............        -135,370        -135,370
                                                               -------------------------------------------------
           TOTAL, NATIONAL GUARD PERSONNEL, ARMY                     7,910,694       7,781,224        -129,470
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
       BA 1: ARMY
        NATIONAL GUARD
        TRAINING AND
        SUPPORT
    30 Pay Group F             551,868         550,868          -1,000
        Training
        (Recruits)
           Improving    ..............  ..............          -1,000
            funds
            management
            :
            Unjustifie
            d growth
    80 Special                 570,009         576,909          +6,900
        Training
       Army National    ..............  ..............          +6,900
        Guard Cyber
        Protection
        Teams
 
       UNDISTRIBUTED
        ADJUSTMENT
           Improving    ..............        -136,960        -136,960
            funds
            management
            :
            Unobligate
            d balances
           Program      ..............           1,590          +1,590
            increase:
            Trauma
            training
------------------------------------------------------------------------

                  National Guard Personnel, Air Force

Appropriations, 2016....................................  $3,201,890,000
Budget estimate, 2017...................................   3,280,065,000
Committee recommendation................................   3,271,538,000

    The Committee recommends an appropriation of 
$3,271,538,000. This is $8,527,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                NATIONAL GUARD PERSONNEL, AIR FORCE
 
     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
  10 PAY GROUP A TRAINING (15 DAYS & DRILLS 24/48)                     934,650         934,650  ..............
  30 PAY GROUP F TRAINING (RECRUITS)                                   131,022         123,022          -8,000
  40 PAY GROUP P TRAINING (PIPELINE RECRUITS)                           10,555          10,555  ..............
  70 SCHOOL TRAINING                                                   349,904         349,904  ..............
  80 SPECIAL TRAINING                                                  167,077         167,077  ..............
  90 ADMINISTRATION AND SUPPORT                                      1,678,355       1,678,355  ..............
 100 EDUCATION BENEFITS                                                  8,502           8,502  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  3,280,065       3,272,065          -8,000
 
     UNDISTRIBUTED ADJUSTMENT                                   ..............            -527            -527
                                                               -------------------------------------------------
           TOTAL, NATIONAL GUARD PERSONNEL, AIR FORCE                3,280,065       3,271,538          -8,527
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 2017 budget       Committee       Change from
 Line                            Item                              estimate      recommendation  budget estimate
----------------------------------------------------------------------------------------------------------------
       BA 1: AIR NATIONAL GUARD TRAINING AND SUPPORT
    30 Pay Group F Training (Recruits)                               131,022          123,022           -8,000
           Improving funds management: Unjustified growth    ...............  ...............           -8,000
 
       UNDISTRIBUTED ADJUSTMENT
           Improving funds management: Unobligated balances  ...............           -1,840           -1,840
           Program increase: Trauma training                 ...............            1,313           +1,313
----------------------------------------------------------------------------------------------------------------


                                TITLE II

                       OPERATION AND MAINTENANCE

    Funds appropriated under this title provide the resources 
required to prepare for and conduct combat operations and other 
peace time missions. These funds are used to purchase fuel and 
spare parts for training operations, pay supporting civilian 
personnel, and purchase supplies, equipment, and service 
contracts for the repair of weapons and facilities.
    The President's fiscal year 2017 budget requests a total of 
$171,318,488,000 for operation and maintenance appropriations.

                      SUMMARY OF COMMITTEE ACTION

    The Committee recommends operation and maintenance 
appropriations totaling $170,698,913,000 for fiscal year 2017. 
This is $619,575,000 below the budget estimate.
    Committee recommended operation and maintenance 
appropriations for fiscal year 2017 are summarized below:

                               SUMMARY OF OPERATION AND MAINTENANCE APPROPRIATIONS
                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
                             Account                                2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
Operation and Maintenance:
    Operation and Maintenance, Army.............................      33,809,040      33,550,500        -258,540
    Operation and Maintenance, Navy.............................      39,483,581      39,590,181        +106,600
    Operation and Maintenance, Marine Corps.....................       5,954,258       6,000,258         +46,000
    Operation and Maintenance, Air Force........................      37,518,056      37,260,692        -257,364
    Operation and Maintenance, Defense-Wide.....................      32,571,590      32,478,682         -92,908
    Operation and Maintenance, Army Reserve.....................       2,712,331       2,704,531          -7,800
    Operation and Maintenance, Navy Reserve.....................         927,656         927,656  ..............
    Operation and Maintenance, Marine Corps Reserve.............         270,633         270,633  ..............
    Operation and Maintenance, Air Force Reserve................       3,067,929       3,050,929         -17,000
    Operation and Maintenance, Army National Guard..............       6,825,370       6,765,385         -59,985
    Operation and Maintenance, Air National Guard...............       6,703,578       6,600,000        -103,578
    United States Court of Appeals for the Armed Forces.........          14,194          14,194  ..............
    Environmental Restoration, Army.............................         170,167         170,167  ..............
    Environmental Restoration, Navy.............................         281,762         281,762  ..............
    Environmental Restoration, Air Force........................         371,521         371,521  ..............
    Environmental Restoration, Defense-Wide.....................           9,009           9,009  ..............
    Environmental Restoration, Formerly Used Defense Sites......         197,084         207,084         +10,000
    Overseas Humanitarian, Disaster, and Civic Aid..............         105,125         120,125         +15,000
    Cooperative Threat Reduction Account........................         325,604         325,604  ..............
                                                                 -----------------------------------------------
      Total.....................................................     171,318,488     170,698,913        -619,575
----------------------------------------------------------------------------------------------------------------

     REPROGRAMMING GUIDANCE FOR OPERATION AND MAINTENANCE ACCOUNTS

    The Committee directs the Secretary of Defense to submit 
the Base for Reprogramming (DD Form 1414) for each of the 
fiscal year 2017 appropriation accounts not later than 60 days 
after the enactment of this act. The Secretary of Defense is 
prohibited from executing any reprogramming or transfer of 
funds for any purpose other than originally appropriated until 
the aforementioned report is submitted to the House and Senate 
Appropriations Committees.
    The Committee directs the Secretary of Defense to use the 
normal prior approval reprogramming procedures to transfer 
funds in the services' operation and maintenance accounts 
between O-1 budget activities in excess of $15,000,000. In 
addition, the Secretary of Defense should follow prior approval 
reprogramming procedures for transfers in excess of $15,000,000 
out of the following budget sub-activities:
        Army:
                Maneuver units
                Modular support brigades
                Land forces operations support
                Force readiness operations support
                Land forces depot maintenance
                Base operations support
                Facilities Sustainment, Restoration, and 
                Modernization
        Navy:
                Aircraft depot maintenance
                Ship depot maintenance
                Facilities Sustainment, Restoration, and 
                Modernization
        Marine Corps:
                Depot maintenance
                Facilities Sustainment, Restoration, and 
                Modernization
        Air Force:
                Primary combat forces
                Combat enhancement forces
                Combat communications
                Facilities Sustainment, Restoration, and 
                Modernization
        Air Force Reserve:
                Depot maintenance
        Air National Guard:
                Depot maintenance
    Additionally, the Secretary of Defense should follow prior 
approval reprogramming procedures for transfers in excess of 
$15,000,000 into the following budget sub-activity:
        Operation and Maintenance, Army National Guard:
                Other personnel support/recruiting and 
                advertising
    With respect to Operation and Maintenance, Defense-Wide, 
proposed transfers of funds to or from the levels specified for 
defense agencies in excess of $15,000,000 shall be subject to 
prior approval reprogramming procedures.
    During fiscal year 2017, the Committee directs the Service 
Secretaries to submit written notification and justification to 
the congressional defense committees not later than 15 days 
prior to implementing transfers in excess of $15,000,000 out of 
the following budget sub-activities:
        Navy:
                Mission and other flight operations
                Mission and other ship operations
        Air Force:
                Operating forces depot maintenance
                Mobilization depot maintenance
                Training and recruiting depot maintenance
                Administration and service-wide depot 
                maintenance
    These transfers may be implemented 15 days after a 
congressional notification unless an objection is received from 
one of the congressional defense committees.

            OPERATION AND MAINTENANCE BUDGET EXECUTION DATA

    The Committee directs the Secretary of Defense to continue 
to provide the congressional defense committees with quarterly 
budget execution data. Such data should be provided not later 
than 45 days after the close of each quarter of the fiscal 
year, and should be provided for each O-1 budget activity, 
activity group, and sub-activity group for each of the active, 
defense-wide, reserve, and National Guard components. For each 
O-1 budget activity, activity group, and sub-activity group, 
these reports should include the budget request and actual 
obligation amount, the distribution of unallocated 
congressional adjustments to the budget request, all 
adjustments made by the Department in establishing the Base for 
Reprogramming (DD Form 1414) report, all adjustments resulting 
from below threshold reprogrammings, and all adjustments 
resulting from prior approval reprogramming requests.

            OPERATION AND MAINTENANCE SPECIAL INTEREST ITEMS

    Items for which additional funds have been provided or have 
been specifically reduced as shown in the project level tables 
or in paragraphs using the phrase ``only for'' or ``only to'' 
in the Committee report are congressional special interest 
items for the purpose of the Base for Reprogramming (DD Form 
1414). Each of these items must be carried on the DD Form 1414 
at the stated amount as specifically addressed in the Committee 
report. Below Threshold Reprogrammings may not be used to 
either restore or reduce funding from congressional special 
interest items as identified on the DD Form 1414.

                   OPERATION AND MAINTENANCE OVERVIEW

    Readiness.--The Committee recommends an additional 
$1,450,000,000 in title VIII and $1,000,000,000 in title IX of 
this act to be transferred to the operation and maintenance 
accounts and be divided proportionately among the services and 
the National Guard and reserve components. This funding shall 
be used only to improve military readiness, including increased 
training, depot maintenance, and base operations support. None 
of the funding provided may be used for recruiting, marketing, 
or advertising programs. The funding provided is a 
congressional special interest item. The Secretary of Defense 
and the Service Secretaries are directed to submit a detailed 
spending plan by sub-activity group to the House and Senate 
Appropriations Committees not less than 30 days prior to the 
obligation of these funds. These transfers may be implemented 
30 days after congressional notification unless an objection is 
received from either the House or Senate Appropriations 
Committees.
    Civilian Workforce.--The Committee expects the Department 
of Defense to maintain a stable, effective, right-sized 
civilian cadre. The Committee recognizes the critical role that 
the civilian workforce plays every day in ensuring the mission 
success of the Armed Forces and fully funds the 1.6 percent pay 
raise for civilian personnel as requested.
    Workforce Management.--The Committee supports a workforce 
management plan that is fair for all sectors of the workforce. 
Decisions on sourcing new work, expanding existing 
responsibilities, or transferring functions currently performed 
by civilian personnel or contractors to performance by military 
personnel must not proceed without comparing the costs 
according to the Department's own methodology. Therefore, 
decisions whether to assign new work which is not inherently 
governmental, closely associated with inherently governmental 
functions, or critical to military, civilian, or contractor 
personnel, shall be based on the results of the costing 
methodology laid out in Department of Defense Instruction 
[DODI] 7041.04. Additionally, before converting functions 
performed by civilian personnel or contractors to performance 
by military personnel that are not required by law or 
regulation to be performed by military personnel, the 
Department shall adhere to its own costing methodology laid out 
in DODI 7041.04.
    Contract Services Spending.--The Committee is concerned 
that the Department of Defense does not have adequate policies, 
procedures, and controls in place to enforce limitations on the 
annual amounts expended on contracted services. There is 
further concern that not all contracted services are being 
subjected to spending limitations because of the exclusion of 
contracted services involving Economy Act transfers between and 
within Department of Defense components. Additionally, because 
of the disparity between the levels of contracted services 
captured in the Inventory of Contracts for Services, required 
under section 2330a of title 10, United States Code, and what 
the Department budgets for contracted services, it appears as 
though the Department does not deliberately plan for most 
contracted services. The Committee urges the Under Secretary of 
Defense (Comptroller) to review the efforts of the financial 
management and acquisition communities to implement effective 
control mechanisms for contracted services spending.
    Operation and Maintenance Budget Justification.--The 
Committee commends the Department for the improvements in the 
Operation and Maintenance [O&M;] budget materials made over the 
past several years. To further inform the congressional review, 
the Committee directs the following actions:
  --The budget justification materials shall include the OP-8B: 
        Total Civilian Personnel Costs for every appropriation 
        as a part of the President's budget justification for 
        fiscal year 2018 and thereafter.
  --Every subactivity group in O&M; that funds recruiting and 
        advertising activities shall include the budget profile 
        broken out by recruiting and advertising for the prior 
        year, current year, and budget year as a part of the 
        performance criteria in the OP-5 exhibit. This shall be 
        provided with the President's budget justification for 
        fiscal year 2018 and thereafter.
  --Each OP-5 exhibit includes a personnel summary which 
        provides helpful information about the civilian 
        workforce. However, the way it is displayed includes 
        memo entries for military technicians and reimbursable 
        civilians, which makes it difficult to quickly analyze 
        direct hire full time equivalents [FTEs]. The Office of 
        the Under Secretary of Defense (Comptroller) is 
        directed to revise the personnel summary section of the 
        OP-5 exhibit to maintain the categories of information 
        provided (including military technicians and 
        reimbursable civilians) but to breakout the numbers 
        without using memo entries.
  --The Department's Financial Management Regulations [FMR] 
        directs the services and defense agencies to itemize 
        major program changes and provide the baseline in 
        dollars to which the increase or decrease applies on 
        the OP-5 exhibit. The Department of the Navy is 
        directed to use the most specific programmatic baseline 
        possible, regardless of whether or not the program 
        baseline is listed in the performance criteria.
  --The FMR provides specific instructions for the performance 
        criteria for base operations support (Exhibit OP-5 Base 
        Support Program (Attachment 8)). The Air Force is 
        directed to follow this outline; particularly the 
        instruction that says that the sum of amounts must 
        match the Base Support total in the O-1 exhibit.
  --The Department of the Air Force is encouraged to consider 
        consolidating the Base Support and Facilities 
        Sustainment, Restoration and Modernization budget line 
        items from four budget activities down to one budget 
        activity.
  --The Department of the Air Force and the Marine Corps are 
        encouraged to begin utilizing OP-32 line 990 
        Information Technology Contract Support Services.
  --The Office of Economic Adjustment's budget documentation in 
        O&M; Defense-wide shall include the budget profile of 
        each major program for the prior year, current year, 
        and budget year as a part of the performance criteria 
        in the OP-5 exhibit. Examples of major programs would 
        be Program Assistance, Defense Industry Adjustment, and 
        Guam.
    Tobacco Use in the Military.--Tobacco use is the leading 
cause of preventable death in the United States, with more than 
480,000 deaths attributable to cigarette smoking each year. The 
Department of Defense has affirmed the goal of a tobacco-free 
military, and has implemented a range of programs including 
public education campaigns, the banning of all tobacco use 
during basic training, and the prohibition of tobacco use by 
instructors in the presence of students. The Committee supports 
the Secretary of Defense's Policy Memorandum 16-001 from April 
8, 2016, directing the military services ``to ensure a 
comprehensive tobacco policy that assists with preventing 
initiation of tobacco use, helping those who want to quit using 
tobacco succeed, and decreasing exposure to second-hand smoke 
for all our people.'' As a result, the Committee retains a 
provision from the Department of Defense Appropriations Act, 
2016 (Public Law 114-113) directing the elimination of the 
price subsidy provided to tobacco products at military 
exchanges.
    Voluntary Military Education Programs--Tracking Outcomes.--
The Committee remains concerned about the lack of information 
available on the outcomes of students receiving Tuition 
Assistance and My Career Advancement Account [MyCAA] benefits. 
The Committee directed the Secretary of Defense to submit a 
report tracking such outcomes of each of these programs on or 
before June 1, 2016, as part of the Department of Defense 
Appropriations Act, 2016 (Public Law 114-113). The Committee 
looks forward to receiving this report as soon as possible, and 
it shall include, but not be limited to, the following data 
totals for the most recent calendar year available: an 
aggregate graduation rate, loan default rate, and average 
indebtedness. Additionally, the report shall then disaggregate 
the data to show these same metrics by sector: public, private 
for-profit, and private not-for-profit. Finally, the report 
shall include the percentage of servicemembers utilizing the 
Top-Up program for voluntary military education and the average 
dollar amount of usage. The Department is also encouraged to 
make an effort to gather data on the jobs attained after 
graduation, specifically whether those jobs can be reasonably 
said to be in the field of study identified in the students' 
education plans.
    Voluntary Military Education Programs--Enforcing Memorandum 
of Understanding.--The Committee supports the Department of 
Defense's commitment to enforcing the terms of the current 
Memorandum of Understanding [MOU] with all educational 
institutions providing educational programs through the 
Department of Defense tuition assistance program. The Committee 
is also supportive of the Department's efforts to increase 
participating institutions' understanding of their contractual 
obligations as MOU signatories and the procedures for 
enforcement as outlined in Department of Defense Instruction 
[DODI] 1322.25. The Committee urges the Department to maintain 
vigorous defense of these responsibilities in order to protect 
the integrity and quality of voluntary military education 
programs.
    Item Unique Identification Implementation.--The Committee 
supports the Department of Defense's goal of enhancing asset 
visibility through item-unique identification [IUID] and 
automatic identification technology/automatic identification 
and data capture [AIT/AIDC] processes, but remains concerned 
with the level of the compliance with its own IUID policy which 
was released on September 3, 2015. The Committee believes the 
Department of Defense must improve its efforts to capture 
meaningful data and mark, track and verify assets to enable 
life-cycle management, implement asset valuation/accountability 
for audit readiness, and support counterfeit part risk 
reduction. Any successful asset visibility or AIT/AIDC strategy 
requires continuous identification, integration, and monitoring 
of efforts. The committee urges the Department and the services 
to increase their oversight of the implementation of IUID and 
other AIT/AIDC policies.
    Counterfeit Parts.--The Department of Defense has taken 
significant steps since legislation was enacted in 2012 to 
reduce the risk of counterfeit electronic parts entering into 
Department of Defense weapon systems. Although responsibility 
for eliminating risk of counterfeit parts belongs to industry 
suppliers to the Department of Defense at all tiers, the 
Committee encourages the Secretary of Defense to be proactive 
about identifying, developing, and validating independent tools 
that suppliers could easily use to rapidly identify counterfeit 
electronics in the supply chain accurately and at low cost.
    Training Ranges.--The services rely on national air ranges 
and military operating areas to provide realistic combined-arms 
training for pilots against a variety of targets and simulated 
threats. The Committee is aware that the services augment the 
national ranges by maintaining a network of regional air 
training ranges with air to ground targeting areas that are 
essential to maintain the proficiency and readiness for pilots 
and aircrews who do not have consistent access to national 
ranges. Regional ranges and exercises have the potential to 
offer valuable cost savings measures and a means for flying 
units to satisfy training requirements in a limited fiscal 
environment. Therefore, the Committee encourages the Secretary 
of Defense to establish an investment strategy for the 
preservation and enhancement of regional ranges and exercises 
needed to provide live training for aircrews across the full 
spectrum of operations.
    Federal Fleet Management Transparency and Metrics.--The 
Committee encourages the Secretary of Defense to maintain 
supporting documentation on the methods the Department of 
Defense uses for determining optimal fleet inventories and 
justification for any deviation from the General Services 
Administration's Federal Property Management Regulations.
    Children's Advocacy Centers [CACs].--Children's Advocacy 
Centers [CACs] are a community-based, public-private 
partnership that brings together professionals from law 
enforcement, prosecution, medical, mental health, child 
protective services, and victim advocacy agencies to pursue the 
truth in child abuse investigations. The Committee applauds 
existing efforts undertaken by military bases to enter into 
voluntary memoranda of understanding with CACs in their 
communities, which allow CACs to provide their services to 
military families affected by child abuse. The Committee 
encourages the Department of Defense and military bases across 
the country to continue to voluntarily collaborate with CACs in 
their communities to serve the best interests of child abuse 
victims within military families.
    Cyber Kinetic Combat Environment.--The Committee is 
encouraged by current progress to address training shortfalls 
in the cyber kinetic combat environment. Particularly, the 
Committee supports the Air Force's efforts to identify a 
training environment where they can replicate combat conditions 
and perform simultaneous operations, cyber-enabled kinetic 
operations, or physically-enabled cyber operations. Adversaries 
continue to develop asymmetric and cyber capabilities which put 
U.S. and allied forces at risk. The Committee encourages 
developing this training as a priority for the Department of 
Defense.
    Transparency Requirement.--The Committee is aware that the 
Department of Defense does a variety of different types of 
advertising. The Committee directs the Secretary of Defense to 
clearly state within the text, audio or video used for 
advertising or educational purposes, including emails or 
advertising/posting on the Internet, that the communication is 
printed, published, or produced and disseminated at U.S. 
taxpayer expense.
    Resourcing the Arctic Strategy.--As previously expressed in 
Senate Report 114-63, the Committee requires greater budgetary 
detail on amounts included in the President's request for 
implementation of the Department of Defense 2013 Arctic 
Strategy. The Committee notes that contrary to previous 
direction, that information was not provided with the 
submission of the fiscal year 2017 President's budget. The 
Committee reiterates its direction contained in Senate Report 
114-63 for the fiscal year 2018 President's budget, and directs 
that not more than 50 percent of funds appropriated for the 
Office of Under Secretary of Defense (Policy) may be obligated 
or expended until the previously requested information has been 
provided to the congressional defense committees.
    Cyber Mission Force Training and Readiness.--The Committee 
supports efforts by the Department of Defense to grow a capable 
and trained cyber mission force, however, the Department is 
experiencing challenges in providing necessary training for 
military personnel in a timeframe that meets the demand. Given 
the urgent need to develop a capable cyber mission force, the 
Committee recommends that the Secretary of Defense, in 
coordination with the Service Secretaries and the Active and 
Reserve components, develop a strategy to address the current 
training delay, to include procedures and plans to increase 
training opportunities. The strategy should include an 
assessment of the feasibility of expanding training to sites 
with Active or Reserve components with secure infrastructure 
and qualified cyber personnel, including aggressor units and 
cyber red team units, capable of training military personnel in 
various cyber missions.
    Cyber Mission Force Training Curriculum.--The Committee 
recognizes the need for the U.S. military to have the most 
competitive cyber-security force in the world, both in offense 
and defense. The Committee also recognizes that hacking 
contests, such as the CyberStakes platform, offer a scalable 
platform that achieves an ever increasing level of competence 
among participants. The Committee directs the Director of Force 
Readiness and Training to develop, as part of the cyber 
training curriculum, a competitive hacking environment that 
includes the ability for participants to build novel working 
exploits and defend against them. The Director shall report 
back to the Committee within 120 days after enactment of this 
act on the training environment and steps that will be taken to 
measure participant capabilities.
    National Security Planning.--The Committee commends the 
Under Secretary of Defense for Policy on its steps to mitigate 
the national security implications of environmental impacts, as 
required by Senate Report 113-211 (July 17, 2014). The 
Committee supports the Under Secretary's continued direction to 
address the most serious risks for each of the geographic 
Combatant Commands, and how those commands are integrating 
mitigation of those risks into their planning processes. The 
Committee encourages the Under Secretary of Defense for Policy 
and the Chairman of the Joint Chiefs of Staff to continue to 
assess the risks to national security posed by environmental 
impacts as they plan and execute the National Security 
Strategy.

                    Operation and Maintenance, Army

Appropriations, 2016.................................... $32,399,440,000
Budget estimate, 2017...................................  33,809,040,000
Committee recommendation................................  33,550,500,000

    The Committee recommends an appropriation of 
$33,550,500,000. This is $258,540,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                  OPERATION AND MAINTENANCE, ARMY
 
     BUDGET ACTIVITY 1: OPERATING FORCES
 
     LAND FORCES
  10 MANEUVER UNITS                                                    791,450         791,450  ..............
  20 MODULAR SUPPORT BRIGADES                                           68,373          68,373  ..............
  30 ECHELONS ABOVE BRIGADES                                           438,823         438,823  ..............
  40 THEATER LEVEL ASSETS                                              660,258         650,258         -10,000
  50 LAND FORCES OPERATIONS SUPPORT                                    863,928         863,928  ..............
  60 AVIATION ASSETS                                                 1,360,597       1,360,597  ..............
 
     LAND FORCES READINESS
  70 FORCE READINESS OPERATIONS SUPPORT                              3,086,443       3,043,603         -42,840
  80 LAND FORCES SYSTEMS READINESS                                     439,488         439,488  ..............
  90 LAND FORCES DEPOT MAINTENANCE                                   1,013,452       1,013,452  ..............
 
     LAND FORCES READINESS SUPPORT
 100 BASE OPERATIONS SUPPORT                                         7,816,343       7,816,343  ..............
 110 FACILITIES SUSTAINMENT, RESTORATION, & MODERNIZATION            2,234,546       2,284,546         +50,000
 120 MANAGEMENT AND OPERATIONAL HEADQUARTERS                           452,105         452,105  ..............
 130 COMBATANT COMMANDER'S CORE OPERATIONS                             155,658         155,658  ..............
 170 COMBATANT COMMANDERS ANCILLARY MISSIONS                           441,143         441,143  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                 19,822,607      19,819,767          -2,840
 
     BUDGET ACTIVITY 2: MOBILIZATION
 
     MOBILITY OPERATIONS
 180 STRATEGIC MOBILITY                                                336,329         336,329  ..............
 190 ARMY PREPOSITIONED STOCKS                                         390,848         390,848  ..............
 200 INDUSTRIAL PREPAREDNESS                                             7,401           7,401  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                    734,578         734,578  ..............
 
     BUDGET ACTIVITY 3: TRAINING AND RECRUITING
 
     ACCESSION TRAINING
 210 OFFICER ACQUISITION                                               131,942         131,942  ..............
 220 RECRUIT TRAINING                                                   47,846          47,846  ..............
 230 ONE STATION UNIT TRAINING                                          45,419          45,419  ..............
 240 SENIOR RESERVE OFFICERS TRAINING CORPS                            482,747         482,747  ..............
 
     BASIC SKILL AND ADVANCED TRAINING
 250 SPECIALIZED SKILL TRAINING                                        921,025         921,025  ..............
 260 FLIGHT TRAINING                                                   902,845         902,845  ..............
 270 PROFESSIONAL DEVELOPMENT EDUCATION                                216,583         216,583  ..............
 280 TRAINING SUPPORT                                                  607,534         593,534         -14,000
 
     RECRUITING AND OTHER TRAINING AND EDUCATION
 290 RECRUITING AND ADVERTISING                                        550,599         550,599  ..............
 300 EXAMINING                                                         187,263         187,263  ..............
 310 OFF-DUTY AND VOLUNTARY EDUCATION                                  189,556         189,556  ..............
 320 CIVILIAN EDUCATION AND TRAINING                                   182,835         182,835  ..............
 330 JUNIOR RESERVE OFFICERS TRAINING CORPS                            171,167         176,667          +5,500
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 3                                  4,637,361       4,628,861          -8,500
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
 
     LOGISTICS OPERATIONS
 350 SERVICEWIDE TRANSPORTATION                                        230,739         230,739  ..............
 360 CENTRAL SUPPLY ACTIVITIES                                         850,060         850,060  ..............
 370 LOGISTICS SUPPORT ACTIVITIES                                      778,757         743,757         -35,000
 380 AMMUNITION MANAGEMENT                                             370,010         370,010  ..............
 
     SERVICEWIDE SUPPORT
 390 ADMINISTRATION                                                    451,556         451,556  ..............
 400 SERVICEWIDE COMMUNICATIONS                                      1,888,123       1,896,523          +8,400
 410 MANPOWER MANAGEMENT                                               276,403         276,403  ..............
 420 OTHER PERSONNEL SUPPORT                                           369,443         344,443         -25,000
 430 OTHER SERVICE SUPPORT                                           1,096,074       1,096,074  ..............
 440 ARMY CLAIMS ACTIVITIES                                            207,800         207,800  ..............
 450 REAL ESTATE MANAGEMENT                                            240,641         240,641  ..............
 460 FINANCIAL MANAGEMENT AND AUDIT READINESS                          250,612         250,612  ..............
 
     SUPPORT OF OTHER NATIONS
 470 INTERNATIONAL MILITARY HEADQUARTERS                               416,587         416,587  ..............
 480 MISC. SUPPORT OF OTHER NATIONS                                     36,666          36,666  ..............
     OTHER PROGRAMS                                                  1,151,023       1,120,423         -30,600
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                  8,614,494       8,532,294         -82,200
 
     EXCESS WORKING CAPITAL FUND CARRYOVER                      ..............        -150,000        -150,000
 
     PROGRAMMED SAVINGS UNACCOUNTED FOR                         ..............         -15,000         -15,000
                                                               =================================================
           TOTAL, OPERATION AND MAINTENANCE, ARMY                   33,809,040      33,550,500        -258,540
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   114 Theater Level           660,258         650,258         -10,000
        Assets
           Maintain     ..............  ..............         -10,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
   121 Force Readiness       3,086,443       3,043,603         -42,840
        Operations
        Support
           Improving    ..............  ..............         -43,000
            funds
            management
            : Program
            decrease
            unaccounte
            d for
           Program      ..............  ..............            +160
            Increase:
            Trauma
            training
   132 Facilities            2,234,546       2,284,546         +50,000
        Sustainment,
        Restoration &
        Modernization
           Program      ..............  ..............         +50,000
            Increase:
            Army
            unfunded
            requiremen
            ts
   324 Training                607,534         593,534         -14,000
        Support
           Maintain     ..............  ..............         -14,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
   335 Junior Reserve          171,167         176,667          +5,500
        Officer
        Training Corps
           Program      ..............  ..............          +5,500
            increase
   423 Logistic                778,757         743,757         -35,000
        Support
        Activities
           Improving    ..............  ..............         -35,000
            funds
            management
            : Program
            decrease
            unaccounte
            d for
   432 Servicewide           1,888,123       1,896,523          +8,400
        Communications
           Program      ..............  ..............          +8,400
            increase:
            Biometrics
            Indentity
            Management
            Activity
   434 Other Personnel         369,443         344,443         -25,000
        Support
           Improving    ..............  ..............         -25,000
            funds
            management
            : Program
            decrease
            unaccounte
            d for
   999 Classified            1,151,023       1,120,423         -30,600
        Programs
           Classified   ..............  ..............          -6,600
            adjustment
           Maintain     ..............  ..............         -24,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
            for OPM
            rates
UNDIST Improving funds  ..............        -150,000        -150,000
        management:
        Working
        Capital Fund
        carryover
UNDIST Improving funds  ..............         -15,000         -15,000
        management:
        Programmed
        savings
        unaccounted
        for
------------------------------------------------------------------------

    Excess Carryover in the Army Working Capital Fund.--The 
Committee recommends an adjustment to Operation and 
Maintenance, Army based on excess carryover in the Army Working 
Capital Fund. Carryover, or unfilled orders, represents the 
dollar value of the production orders (parts, labor, and 
overhead) that have been ordered and funded by customers but 
not completed by the industrial operations activities at the 
end of each fiscal year. Some carryover is necessary, as it 
provides lead time to assemble necessary workforce skill sets, 
to establish supply chains. Carryover also prevents production 
line stoppages and ensures the activities have funded work to 
provide a smooth transition between fiscal years. Therefore, 
for budgeting purposes, there are metrics that the services use 
to calculate an allowable amount of carryover. But the fiscal 
year 2017 President's budget request shows that the Army's 
projection for carryover will be above the allowable limit.
    The Committee urges Army leadership to continue monitoring 
carryover and production goals on a recurring basis. The 
Committee also encourages the Army to focus on further reducing 
carryover by leveraging new policy and process improvements 
aimed at increasing production, improving customer-provider 
communication, and strengthening controls over the acceptance 
of new orders. Finally, the Committee affirms that the key to 
reducing carryover below the allowable limit is for the Army to 
perform more work on orders than the amount of orders received 
in a year.
    Joint Base Elmendorf-Richardson.--The Committee is 
supportive of the Army's decision to delay the removal of 2,600 
Soldiers from the 4-25 Infantry Brigade Combat Team (Airborne) 
stationed at Joint Base Elmendorf-Richardson [JBER]. The 
decision to retain JBER's force structure signals that the Army 
remains dedicated to supporting the strategic balance to the 
Pacific, preserving a leading role in the Arctic, and 
preventing North Korean and Russian aggression by maintaining 
key assets in Alaska. However, the Committee questions the 
Army's decision to delay instead of reverse its plans for JBER 
and expects a continued effort by the Army to recognize the 
mission and strategic value of the 4-25 as the only airborne 
brigade in the Pacific.
    Productivity Enhancement Program.--The Department of 
Defense's organic depot maintenance capability is vital to our 
military's sustainment infrastructure. The Committee encourages 
the Secretary of the Army to modernize the organic depots' 
Electronic Test and Measurement Equipment [ET&ME;] and Product 
Lifecycle Management Software to allow cost savings in future 
maintenance and calibration expenditures.
    Army Training and Certification Tracking System [ATCTS].--
The Army Training and Certification Tracking System provides 
managers a capability to report and manage training and 
certification statistics for the Information Assurance [IA] 
workforce to ensure the security of information technology. The 
Committee recognizes the effectiveness of this program and 
encourages the Secretary of the Army to consider expanding it 
based on the growing threat of cyber-attacks and the need to 
ensure personnel have the proper training and certification to 
deal with appropriate sensitive material.
    Soldier for Life--Transition Assistance Program.--The 
Soldier for Life-Transition Assistance Program [SFL-TAP] 
provides transitioning and retiring soldiers, family members, 
and Army civilians job training assistance and helps develop 
skills they require to obtain appropriate employment and to 
maximize the use of benefits earned through new employment. 
SFL-TAP also provides outreach services to soldiers stationed 
in remote and isolated locations through the use of 24/7 
virtual counseling or Mobile Transition Teams. The Committee 
recognizes the need to successfully transition soldiers from 
military to civilian life and the requirement to transition 
them with the skills and certifications necessary to lead a 
productive civilian life and encourages the Army to continue 
robust support for this program.

                    Operation and Maintenance, Navy

Appropriations, 2016.................................... $39,600,172,000
Budget estimate, 2017...................................  39,483,581,000
Committee recommendation................................  39,590,181,000

    The Committee recommends an appropriation of 
$39,590,181,000. This is $106,600,000 above the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                  OPERATION AND MAINTENANCE, NAVY
 
     BUDGET ACTIVITY 1: OPERATING FORCES
 
     AIR OPERATIONS
  10 MISSION AND OTHER FLIGHT OPERATIONS                             4,094,765       4,073,965         -20,800
  20 FLEET AIR TRAINING                                              1,722,473       1,703,873         -18,600
  30 AVIATION TECHNICAL DATA AND ENGINEERING SERVICES                   52,670          52,670  ..............
  40 AIR OPERATIONS AND SAFETY SUPPORT                                  97,584          93,584          -4,000
  50 AIR SYSTEMS SUPPORT                                               446,733         446,733  ..............
  60 AIRCRAFT DEPOT MAINTENANCE                                      1,007,681         990,681         -17,000
  70 AIRCRAFT DEPOT OPERATIONS SUPPORT                                  38,248          38,248  ..............
  80 AVIATION LOGISTICS                                                564,720         564,720  ..............
 
     SHIP OPERATIONS
  90 MISSION AND OTHER SHIP OPERATIONS                               3,513,083       3,615,583        +102,500
 100 SHIP OPERATIONS SUPPORT AND TRAINING                              743,765         743,765  ..............
 110 SHIP DEPOT MAINTENANCE                                          5,168,273       5,248,773         +80,500
 120 SHIP DEPOT OPERATIONS SUPPORT                                   1,575,578       1,575,578  ..............
 
     COMBAT COMMUNICATIONS/SUPPORT
 130 COMBAT COMMUNICATIONS                                             558,727         558,727  ..............
 140 ELECTRONIC WARFARE                                                105,680         105,680  ..............
 150 SPACE SYSTEMS AND SURVEILLANCE                                    180,406         160,406         -20,000
 160 WARFARE TACTICS                                                   470,032         470,032  ..............
 170 OPERATIONAL METEOROLOGY AND OCEANOGRAPHY                          346,703         351,703          +5,000
 180 COMBAT SUPPORT FORCES                                           1,158,688       1,154,688          -4,000
 190 EQUIPMENT MAINTENANCE                                             113,692         113,692  ..............
 200 DEPOT OPERATIONS SUPPORT                                            2,509           2,509  ..............
 210 COMBATANT COMMANDERS CORE OPERATIONS                               91,019          91,019  ..............
 220 COMBATANT COMMANDERS DIRECT MISSION SUPPORT                        74,780          74,780  ..............
 
     WEAPONS SUPPORT
 230 CRUISE MISSILE                                                    106,030         106,030  ..............
 240 FLEET BALLISTIC MISSILE                                         1,233,805       1,233,805  ..............
 250 IN-SERVICE WEAPONS SYSTEMS SUPPORT                                163,025         163,025  ..............
 260 WEAPONS MAINTENANCE                                               553,269         553,269  ..............
 270 OTHER WEAPON SYSTEMS SUPPORT                                      350,010         350,010  ..............
 
     BASE SUPPORT
 280 ENTERPRISE INFORMATION TECHNOLOGY                                 790,685         790,685  ..............
 290 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION             1,642,742       1,692,742         +50,000
 300 BASE OPERATING SUPPORT                                          4,206,136       4,191,136         -15,000
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                 31,173,511      31,312,111        +138,600
 
     BUDGET ACTIVITY 2: MOBILIZATION
 
     READY RESERVE AND PREPOSITIONING FORCES
 310 SHIP PREPOSITIONING AND SURGE                                     893,517         893,517  ..............
 320 READY RESERVE FORCE                                               274,524         274,524  ..............
 
     ACTIVATIONS/INACTIVATIONS
 320 AIRCRAFT ACTIVATIONS/INACTIVATIONS                                  6,727           6,727  ..............
 330 SHIP ACTIVATIONS/INACTIVATIONS                                    288,154         288,154  ..............
 
     MOBILIZATION PREPAREDNESS
 340 EXPEDITIONARY HEALTH SERVICES SYSTEMS                              95,720          95,720  ..............
 360 INDUSTRIAL READINESS                                                2,109           2,109  ..............
 370 COAST GUARD SUPPORT                                                21,114          21,114  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                  1,581,865       1,581,865  ..............
 
     BUDGET ACTIVITY 3: TRAINING AND RECRUITING
 
     ACCESSION TRAINING
 380 OFFICER ACQUISITION                                               143,815         143,815  ..............
 390 RECRUIT TRAINING                                                    8,519           8,519  ..............
 400 RESERVE OFFICERS TRAINING CORPS                                   143,445         143,445  ..............
 
     BASIC SKILLS AND ADVANCED TRAINING
 410 SPECIALIZED SKILL TRAINING                                        699,214         699,214  ..............
 420 FLIGHT TRAINING                                                     5,310           5,310  ..............
 430 PROFESSIONAL DEVELOPMENT EDUCATION                                172,852         172,852  ..............
 440 TRAINING SUPPORT                                                  222,728         222,728  ..............
 
     RECRUITING, AND OTHER TRAINING AND EDUCATION
 450 RECRUITING AND ADVERTISING                                        225,647         227,647          +2,000
 460 OFF-DUTY AND VOLUNTARY EDUCATION                                  130,569         130,569  ..............
 470 CIVILIAN EDUCATION AND TRAINING                                    73,730          73,730  ..............
 480 JUNIOR ROTC                                                        50,400          50,400  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 3                                  1,876,229       1,878,229          +2,000
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
 
     SERVICEWIDE SUPPORT
 490 ADMINISTRATION                                                    917,453         893,453         -24,000
 500 EXTERNAL RELATIONS                                                 14,570          14,570  ..............
 510 CIVILIAN MANPOWER AND PERSONNEL MANAGEMENT                        124,070         124,070  ..............
 520 MILITARY MANPOWER AND PERSONNEL MANAGEMENT                        369,767         369,767  ..............
 530 OTHER PERSONNEL SUPPORT                                           285,927         285,927  ..............
 540 SERVICEWIDE COMMUNICATIONS                                        319,908         319,908  ..............
 
     LOGISTICS OPERATIONS AND TECHNICAL SUPPORT
 
 570 SERVICEWIDE TRANSPORTATION                                        171,659         171,659  ..............
 590 PLANNING, ENGINEERING AND DESIGN                                  270,863         270,863  ..............
 600 ACQUISITION AND PROGRAM MANAGEMENT                              1,112,766       1,112,766  ..............
 610 HULL, MECHANICAL AND ELECTRICAL SUPPORT                            49,078          49,078  ..............
 620 COMBAT/WEAPONS SYSTEMS                                             24,989          24,989  ..............
 630 SPACE AND ELECTRONIC WARFARE SYSTEMS                               72,966          72,966  ..............
 
     SECURITY PROGRAMS
 640 NAVAL INVESTIGATIVE SERVICE                                       595,711         595,711  ..............
 
     SUPPORT OF OTHER NATIONS
 700 INTERNATIONAL HEADQUARTERS AND AGENCIES                             4,809           4,809  ..............
 
     OTHER PROGRAMS
     OTHER PROGRAMS                                                    517,440         507,440         -10,000
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                  4,851,976       4,817,976         -34,000
                                                               =================================================
           TOTAL, OPERATION AND MAINTENANCE, NAVY                   39,483,581      39,590,181        +106,600
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                           2017 budget      Committee      Change from
 Line         Item          estimate     recommendation  budget estimate
------------------------------------------------------------------------
  1A1A Mission and          4,094,765       4,073,965         -20,800
        Other Flight
        Operations
           Maintain    ..............  ..............         -12,000
            program
            affordabi
            lity: MIP
            program
            unjustifi
            ed growth
           Maintain    ..............  ..............          -8,800
            program
            affordabi
            lity:
            Unjustifi
            ed growth
  1A2A Fleet Air            1,722,473       1,703,873         -18,600
        Training
           Maintain    ..............  ..............         -18,600
            program
            affordabi
            lity:
            Unjustifi
            ed growth
  1A4A Air Operations          97,584          93,584          -4,000
        and Safety
        Support
           Maintain    ..............  ..............          -4,000
            program
            affordabi
            lity: MIP
            program
            unjustifi
            ed growth
  1A5A Aircraft Depot       1,007,681         990,681         -17,000
        Maintenance
           Improving   ..............  ..............         -17,000
            funds
            managemen
            t: Remove
            one-time
            fiscal
            year 2016
            costs
  1B1B Mission and          3,513,083       3,615,583        +102,500
        Other Ship
        Operations
           Cruiser     ..............  ..............        +102,500
            Moderniza
            tion:
            Transfer
            from
            SMOSF for
            budget
            execution
  1B4B Ship Depot           5,168,273       5,248,773         +80,500
        Maintenance
           Cruiser     ..............  ..............         +80,500
            Moderniza
            tion:
            Transfer
            from
            SMOSF for
            budget
            execution
  1C3C Space Systems          180,406         160,406         -20,000
        and
        Surveillance
           Improving   ..............  ..............         -20,000
            funds
            managemen
            t: MIP
            program
            adjustmen
            ts
            unaccount
            ed for
  1C5C Operational            346,703         351,703          +5,000
        Meteorology
        and
        Oceanography
           Program     ..............  ..............          +5,000
            increase
  1C6C Combat Support       1,158,688       1,154,688          -4,000
        Forces
           Reduce      ..............  ..............          -4,000
            duplicati
            on
  BSM1 Sustainment,         1,642,742       1,692,742         +50,000
        Restoration
        and
        Modernization
           Program     ..............  ..............         +50,000
            increase:
            Navy
            unfunded
            requireme
            nts
  BSS1 Base Operating       4,206,136       4,191,136         -15,000
        Support
           Improving   ..............  ..............         -15,000
            funds
            managemen
            t: Remove
            one-time
            fiscal
            year 2016
            costs
  3C1L Recruiting and         225,647         227,647          +2,000
        Advertising
           Program     ..............  ..............          +2,000
            increase:
            Naval Sea
            Cadet
            Corps
  4A1M Administration         917,453         893,453         -24,000
           Maintain    ..............  ..............         -24,000
            program
            affordabi
            lity:
            Unjustifi
            ed growth
   999 Classified             517,440         507,440         -10,000
        Programs
           Classified  ..............  ..............         -10,000
            adjustmen
            t
------------------------------------------------------------------------

    Naval Shipyard Apprentice Program.--The Committee directs 
that during fiscal year 2017 the Navy shall induct classes of 
no fewer than 100 apprentices, respectively, at each of the 
naval shipyards. The Committee further directs the Navy to 
include the costs of the fiscal year 2018 class of apprentices 
in its budget request.
    U.S. Coast Guard.--The Committee is aware that Department 
of Defense [DOD] regulations currently restrict DOD mission 
appropriated funded activities from offering reimbursable rates 
to non-DOD agencies. This restriction forces the Navy to charge 
the U.S. Coast Guard fully burdened rates for drydocking 
services at Navy shipyards rather than reimbursable rates. 
Therefore, the Committee directs that funds appropriated under 
Operation and Maintenance, Navy may be used to pay overhead 
costs incurred by a Naval Shipyard when drydocking U.S. Coast 
Guard ships.
    Ship Overhaul Opportunistic Part-Marking Compliance.--The 
Committee supports the Navy's efforts to improve compliance 
with its Opportunistic Part-Marking policy during ship 
overhauls and repairs at shipyards across the country. 
Compliance with the policy will help the Navy produce clean 
financial audits, lower total life-cycle cost, identify 
counterfeit parts, and save taxpayer funding through improved 
productivity, efficiency, maintenance, and logistical planning.
    Advanced Skills Management Legacy System Upgrades.--The 
Committee is concerned that the Navy is not giving full 
consideration to commercial-off-the-shelf [COTS] software 
solutions. The Secretary of the Navy is encouraged to use the 
best value procurement methods when upgrading legacy software 
systems.
    Joint Interagency Task Force West [JIATF-West].--The 
Committee is concerned that the current organizational 
structure of the Joint Interagency Task Force West [JIATF-West] 
is impacting the resource allocation between headquarters 
activities and operational programs and tasks. The Committee 
recommends that JIATF-West continue to review its 
organizational structure to realign staff in support of 
missions associated with Pacific Command's Theatre Campaign 
Plan.

                Operation and Maintenance, Marine Corps

Appropriations, 2016....................................  $5,718,074,000
Budget estimate, 2017...................................   5,954,258,000
Committee recommendation................................   6,000,258,000

    The Committee recommends an appropriation of 
$6,000,258,000. This is $46,000,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
              OPERATION AND MAINTENANCE, MARINE CORPS
 
     BUDGET ACTIVITY 1: OPERATING FORCES
 
     EXPEDITIONARY FORCES
  10 OPERATIONAL FORCES                                                674,613         740,613         +66,000
  20 FIELD LOGISTICS                                                   947,424         941,424          -6,000
  30 DEPOT MAINTENANCE                                                 206,783         206,783  ..............
 
     USMC PREPOSITIONING
  40 MARITIME PREPOSITIONING                                            85,276          85,276  ..............
  50 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION               632,673         632,673  ..............
  60 BASE OPERATING SUPPORT                                          2,136,626       2,136,626  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  4,683,395       4,743,395         +60,000
 
     BUDGET ACTIVITY 3: TRAINING AND RECRUITING
 
     ACCESSION TRAINING
  70 RECRUIT TRAINING                                                   15,946          15,946  ..............
  80 OFFICER ACQUISITION                                                   935             935  ..............
 
     BASIC SKILLS AND ADVANCED TRAINING
  90 SPECIALIZED SKILLS TRAINING                                        99,305          99,305  ..............
 100 PROFESSIONAL DEVELOPMENT EDUCATION                                 45,495          45,495  ..............
 110 TRAINING SUPPORT                                                  369,979         369,979  ..............
 
     RECRUITING AND OTHER TRAINING EDUCATION
 120 RECRUITING AND ADVERTISING                                        165,566         165,566  ..............
 130 OFF-DUTY AND VOLUNTARY EDUCATION                                   35,133          35,133  ..............
 140 JUNIOR ROTC                                                        23,622          23,622  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 3                                    755,981         755,981  ..............
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
 
     SERVICEWIDE SUPPORT
 150 SERVICEWIDE TRANSPORTATION                                         34,534          34,534  ..............
 160 ADMINISTRATION                                                    355,932         341,932         -14,000
 180 ACQUISITION AND PROGRAM MANAGEMENT                                 76,896          76,896  ..............
 
     SECURITY PROGRAMS
     SECURITY PROGRAMS                                                  47,520          47,520  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                    514,882         500,882         -14,000
                                                               =================================================
           TOTAL, OPERATION AND MAINTENANCE, MARINE CORPS            5,954,258       6,000,258         +46,000
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  1A1A Operational             674,613         740,613         +66,000
        Forces
           Improving    ..............  ..............          -7,000
            funds
            management
            : Program
            decrease
            unaccounte
            d for
           Program      ..............  ..............         +58,000
            increase:
            Exercise
            program
            shortfalls
           Program      ..............  ..............         +15,000
            increase:
            Enhanced
            combat
            helmets
  1A2A Field Logistics         947,424         941,424          -6,000
           Maintain     ..............  ..............          -6,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
  4A4G Administration          355,932         341,932         -14,000
           Improving    ..............  ..............         -14,000
            funds
            management
            : Program
            decrease
            unaccounte
            d for
------------------------------------------------------------------------

                  Operation and Maintenance, Air Force

Appropriations, 2016.................................... $35,727,457,000
Budget estimate, 2017...................................  37,518,056,000
Committee recommendation................................  37,260,692,000

    The Committee recommends an appropriation of 
$37,260,692,000. This is $257,364,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
                OPERATION AND MAINTENANCE, AIR FORCE
 
     BUDGET ACTIVITY 1: OPERATING FORCES
 
     AIR OPERATIONS
  10 PRIMARY COMBAT FORCES                                           3,294,124       3,301,124          +7,000
  20 COMBAT ENHANCEMENT FORCES                                       1,682,045       1,634,045         -48,000
  30 AIR OPERATIONS TRAINING                                         1,730,757       1,730,757  ..............
  40 DEPOT MAINTENANCE                                               7,042,988       6,887,988        -155,000
  50 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION             1,657,019       1,707,019         +50,000
  60 BASE OPERATING SUPPORT                                          2,787,216       2,787,216  ..............
 
     COMBAT RELATED OPERATIONS
  70 GLOBAL C3I AND EARLY WARNING                                      887,831         890,831          +3,000
  80 OTHER COMBAT OPERATIONS SUPPORT PROGRAMS                        1,070,178       1,080,678         +10,500
 
     SPACE OPERATIONS
 100 LAUNCH FACILITIES                                                 208,582         208,582  ..............
 110 SPACE CONTROL SYSTEMS                                             362,250         362,250  ..............
 120 COMBATANT COMMANDERS DIRECT MISSION SUPPORT                       907,245         907,245  ..............
 130 COMBATANT COMMANDERS CORE OPERATIONS                              199,171         199,171  ..............
 
     OPERATING FORCES
     CLASSIFIED PROGRAMS                                               930,757         924,850          -5,907
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                 22,760,163      22,621,756        -138,407
 
     BUDGET ACTIVITY 2: MOBILIZATION
 
     MOBILITY OPERATIONS
 140 AIRLIFT OPERATIONS                                              1,703,059       1,673,059         -30,000
 150 MOBILIZATION PREPAREDNESS                                         138,899         138,899  ..............
 160 DEPOT MAINTENANCE                                               1,553,439       1,539,439         -14,000
 170 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION               258,328         258,328  ..............
 180 BASE SUPPORT                                                      722,756         722,756  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                  4,376,481       4,332,481         -44,000
 
     BUDGET ACTIVITY 3: TRAINING AND RECRUITING
 
     ACCESSION TRAINING
 190 OFFICER ACQUISITION                                               120,886         120,886  ..............
 200 RECRUIT TRAINING                                                   23,782          23,782  ..............
 210 RESERVE OFFICER TRAINING CORPS [ROTC]                              77,692          77,692  ..............
 220 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION               236,254         240,454          +4,200
 230 BASE SUPPORT (ACADEMIES ONLY)                                     819,915         831,615         +11,700
 
     BASIC SKILLS AND ADVANCED TRAINING
 240 SPECIALIZED SKILL TRAINING                                        387,446         395,246          +7,800
 250 FLIGHT TRAINING                                                   725,134         725,134  ..............
 260 PROFESSIONAL DEVELOPMENT EDUCATION                                264,213         264,213  ..............
 270 TRAINING SUPPORT                                                   86,681          86,681  ..............
 280 DEPOT MAINTENANCE                                                 305,004         305,004  ..............
 
     RECRUITING, AND OTHER TRAINING AND EDUCATION
 290 RECRUITING AND ADVERTISING                                        104,754         104,754  ..............
 300 EXAMINING                                                           3,944           3,944  ..............
 310 OFF DUTY AND VOLUNTARY EDUCATION                                  184,841         184,841  ..............
 320 CIVILIAN EDUCATION AND TRAINING                                   173,583         173,583  ..............
 330 JUNIOR ROTC                                                        58,877          58,877  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 3                                  3,573,006       3,596,706         +23,700
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
 
     LOGISTICS OPERATIONS
 340 LOGISTICS OPERATIONS                                            1,107,846       1,087,846         -20,000
 350 TECHNICAL SUPPORT ACTIVITIES                                      924,185         912,185         -12,000
 360 DEPOT MAINTENANCE                                                  48,778          48,778  ..............
 370 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION               321,013         321,013  ..............
 380 BASE SUPPORT                                                    1,115,910       1,115,910  ..............
 
     SERVICEWIDE ACTIVITIES
 390 ADMINISTRATION                                                    811,650         811,650  ..............
 400 SERVICEWIDE COMMUNICATIONS                                        269,809         269,809  ..............
 410 OTHER SERVICEWIDE ACTIVITIES                                      961,304         961,304  ..............
 420 CIVIL AIR PATROL CORPORATION                                       25,735          28,535          +2,800
 
     SUPPORT TO OTHER NATIONS
 450 INTERNATIONAL SUPPORT                                              90,573          90,573  ..............
 
     SECURITY PROGRAMS
     SECURITY PROGRAMS                                               1,131,603       1,119,146         -12,457
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                  6,808,406       6,766,749         -41,657
 
     UNJUSTIFIED GROWTH                                         ..............         -57,000         -57,000
                                                               =================================================
           TOTAL, OPERATION AND MAINTENANCE, AIR FORCE              37,518,056      37,260,692        -257,364
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                           2017 budget      Committee      Change from
 Line         Item          estimate     recommendation  budget estimate
------------------------------------------------------------------------
  011A Primary Combat       3,294,124       3,301,124          +7,000
        Forces
           Program     ..............  ..............          +7,000
            increase:
            Air Force
            unfunded
            requireme
            nt for
            RCS
            turntable
            modificat
            ion
  011C Combat               1,682,045       1,634,045         -48,000
        Enhancement
        Forces
           Improving   ..............  ..............         -33,000
            funds
            managemen
            t: MIP
            program
            adjustmen
            ts
            unaccount
            ed for
           Transfer:   ..............  ..............         -15,000
            Classifie
            d program
            adjustmen
            t
  011M Depot                7,042,988       6,887,988        -155,000
        Maintenance
           Maintain    ..............  ..............        -155,000
            program
            affordabi
            lity: MIP
            program
            unjustifi
            ed growth
  011R Facilities           1,657,019       1,707,019         +50,000
        Sustainment,
        Restoration &
        Modernization
           Program     ..............  ..............         +50,000
            increase
  012A Global C3I and         887,831         890,831          +3,000
        Early Warning
           Improving   ..............  ..............          -7,000
            funds
            managemen
            t:
            Removal
            of one-
            time
            fiscal
            year 2016
            costs
           Program     ..............  ..............         +10,000
            increase:
            Global
            C3I and
            Early
            Warning
  012C Other Combat         1,070,178       1,080,678         +10,500
        Ops Spt
        Programs
           Program     ..............  ..............         +10,500
            increase:
            Eagle
            Vision
            program
   999 Classified             930,757         924,850          -5,907
        Programs
           Classified  ..............  ..............          -5,907
            adjustmen
            t
  021A Airlift              1,703,059       1,673,059         -30,000
        Operations
           Improving   ..............  ..............         -30,000
            funds
            managemen
            t:
            Program
            decrease
            unaccount
            ed for
  021M Depot                1,553,439       1,539,439         -14,000
        Maintenance
           Improving   ..............  ..............         -14,000
            funds
            managemen
            t:
            Removal
            of one-
            time
            fiscal
            year 2016
            costs
  031R Facilities             236,254         240,454          +4,200
        Sustainment,
        Restoration &
        Modernization
           Program     ..............  ..............          +4,200
            increase:
            Cybersecu
            rity
            Training
  031Z Base Support           819,915         831,615         +11,700
           Program     ..............  ..............         +11,700
            increase:
            Cybersecu
            rity
            Training
  032A Specialized            387,446         395,246          +7,800
        Skill
        Training
           Program     ..............  ..............          +7,800
            increase:
            Cybersecu
            rity
            Training
  041A Logistics            1,107,846       1,087,846         -20,000
        Operations
           Maintain    ..............  ..............         -20,000
            program
            affordabi
            lity:
            Unjustifi
            ed growth
  041B Technical              924,185         912,185         -12,000
        Support
        Activities
           Improving   ..............  ..............         -12,000
            funds
            managemen
            t:
            Program
            transfer
            unaccount
            for
  042I Civil Air               25,735          28,535          +2,800
        Patrol
           Civil Air   ..............  ..............          +2,800
            Patrol
   999 Classified           1,131,603       1,119,146         -12,457
        Programs
           Classified  ..............  ..............         -12,457
            adjustmen
            t
UNDIST Maintain        ..............         -57,000         -57,000
        program
        affordability
        : Unjustified
        growth
------------------------------------------------------------------------

    Arctic Search and Rescue requirements.--The Committee notes 
the increased utilization of the Arctic region by commercial 
air and vessel traffic and believes that this requires an 
update of search and rescue requirements in the region. The 
Committee understands that the Alaska Air National Guard 176th 
Wing is the closest dedicated rescue force, but maintains only 
a single Arctic sustainment package for alerts and partial 
package for training. The Secretary of the Air Force is 
directed to review Arctic search and rescue requirements and to 
submit with the fiscal year 2018 President's budget a report 
detailing the results of this review.
    Air Force Weather Monitoring.--The Committee recognizes the 
importance of Air Force weather radars for the safety of 
military aircrews and for their contributions to weather 
forecasting in accordance with the interagency Next Generation 
Weather Radar [NEXRAD] network. The Secretary of the Air Force 
is directed to provide 30 days advance notification to the 
congressional defense committees of any proposed divestment of 
NEXRAD radars or associated support activities.
    Cyber Command Elevation.--The Committee understands that 
the Department of Defense and Congress are considering 
elevating Cyber Command to a full Combatant Command. The 
Committee recognizes that if such a transition takes place, it 
will take time to develop staffing plans, hire and clear needed 
personnel, and transfer military personnel to the new Command. 
The Committee believes that funds from within the fiscal year 
2017 budget for Cyber Command are sufficient to meet the 
Command's early needs. The Committee expects that additional 
funds will be needed in fiscal year 2018 to support an elevated 
Cyber Command and directs the Secretary of Defense to present 
its plan for necessary funding in the fiscal year 2018 budget 
request if Cyber Command elevation is approved.

                Operation and Maintenance, Defense-Wide

Appropriations, 2016.................................... $32,105,040,000
Budget estimate, 2017...................................  32,571,590,000
Committee recommendation................................  32,478,682,000

    The Committee recommends an appropriation of 
$32,478,682,000. This is $92,908,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
              OPERATION AND MAINTENANCE, DEFENSE-WIDE
 
     BUDGET ACTIVITY 1: OPERATING FORCES
  10 JOINT CHIEFS OF STAFF                                             506,113         506,113  ..............
  20 OFFICE OF THE SECRETARY OF DEFENSE                                524,439         524,439  ..............
  30 SPECIAL OPERATIONS COMMAND                                      4,898,159       4,868,759         -29,400
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  5,928,711       5,899,311         -29,400
 
     BUDGET ACTIVITY 3: TRAINING AND RECRUITING
  40 DEFENSE ACQUISITION UNIVERSITY                                    138,658         138,658  ..............
  50 JOINT CHIEFS OF STAFF RECRUITING, AND OTHER TRAINING AND           85,701          85,701  ..............
      EDUCATION
  70 SPECIAL OPERATIONS COMMAND                                        365,349         365,349  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 3                                    589,708         589,708  ..............
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
  80 CIVIL MILITARY PROGRAMS                                           160,480         199,480         +39,000
 100 DEFENSE CONTRACT AUDIT AGENCY                                     630,925         620,925         -10,000
 110 DEFENSE CONTRACT MANAGEMENT AGENCY                              1,356,380       1,346,380         -10,000
 120 DEFENSE HUMAN RESOURCES ACTIVITY                                  683,620         706,620         +23,000
 130 DEFENSE INFORMATION SYSTEMS AGENCY                              1,439,891       1,422,591         -17,300
 150 DEFENSE LEGAL SERVICES AGENCY                                      24,984          24,984  ..............
 160 DEFENSE LOGISTICS AGENCY                                          357,964         355,264          -2,700
 170 DEFENSE MEDIA ACTIVITY                                            223,422         227,122          +3,700
 180 DEFENSE PERSONNEL ACCOUNTING AGENCY                               112,681         112,681  ..............
 170 DEFENSE SECURITY COOPERATION AGENCY                               496,754         496,754  ..............
 180 DEFENSE SECURITY SERVICE                                          538,711         538,711  ..............
 200 DEFENSE TECHNOLOGY SECURITY AGENCY                                 35,417          35,417  ..............
 210 DEFENSE THREAT REDUCTION AGENCY                                   448,146         448,146  ..............
 230 DEPARTMENT OF DEFENSE EDUCATION ACTIVITY                        2,671,143       2,666,643          -4,500
 240 MISSILE DEFENSE AGENCY                                            446,975         446,975  ..............
 260 OFFICE OF ECONOMIC ADJUSTMENT                                     155,399         136,199         -19,200
 270 OFFICE OF THE SECRETARY OF DEFENSE                              1,481,643       1,490,493          +8,850
 280 SPECIAL OPERATIONS COMMAND                                         89,429          89,429  ..............
 290 WASHINGTON HEADQUARTERS SERVICES                                  629,874         629,874  ..............
     OTHER PROGRAMS                                                 14,069,333      13,954,975        -114,358
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                 26,053,171      25,949,663        -103,508
 
     IMPACT AID                                                 ..............          30,000         +30,000
     IMPACT AID FOR CHILDREN WITH DISABILITIES                  ..............           5,000          +5,000
     LONG-TERM TEMP DUTY WAVIERS                                ..............           5,000          +5,000
                                                               =================================================
           TOTAL, OPERATION AND MAINTENANCE, DEFENSE-WIDE           32,571,590      32,478,682         -92,908
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
       Special               4,898,159       4,868,759         -29,400
        Operations
        Command/
        Operating
        Forces
           Maintain     ..............  ..............          -8,800
            program
            affordabil
            ity:
            Overestima
            tion of
            civilian
            FTE
           Improving    ..............  ..............          -5,000
            funds
            management
            :
            Operationa
            l Support-
            program
            decrease
            unaccounte
            d for
           Improving    ..............  ..............          -7,600
            funds
            management
            :
            Maintenanc
            e-program
            decrease
            unaccounte
            d for
           Maintain     ..............  ..............          -8,000
            program
            affordabil
            ity:
            Management
            Headquarte
            rs-
            unjustifie
            d growth
       Civil Military          160,480         199,480         +39,000
        Programs
           Program      ..............  ..............         +30,000
            increase:
            STARBASE
           Program      ..............  ..............          +5,000
            increase:
            Innovative
            Readiness
            Training
           Program      ..............  ..............          +4,000
            increase:
            National
            Guard
            Youth
            Challenge
            Program
       Defense                 630,925         620,925         -10,000
        Contract Audit
        Agency
           Maintain     ..............  ..............         -10,000
            program
            affordabil
            ity:
            Reduce
            planned
            growth
       Defense               1,356,380       1,346,380         -10,000
        Contract
        Management
        Agency
           Maintain     ..............  ..............         -10,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
            and
            removal of
            one-time
            fiscal
            year 2016
            costs
       Defense Human           683,620         706,620         +23,000
        Resources
        Activity
           Armed Force  ..............  ..............         -22,000
            Retirement
            Home
            Addressed
            in the
            Military
            Constructi
            on &
            Veterans
            Affairs
            Appropriat
            ions Bill
           Program      ..............  ..............         +20,000
            increase:
            Beyond
            Yellow
            Ribbon
           Program      ..............  ..............         +25,000
            increase:
            Special
            Victims'
            Counsel
       Defense               1,439,891       1,422,591         -17,300
        Information
        Systems Agency
           Improving    ..............  ..............          -7,300
            funds
            management
            : Remove
            one-time
            fiscal
            year 2016
            costs
           Maintain     ..............  ..............         -10,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
       Defense                 357,964         355,264          -2,700
        Logistics
        Agency
           Improving    ..............  ..............         -11,000
            funds
            management
            : Remove
            one-time
            fiscal
            year 2016
            congressio
            nal
            increase
           Maintain     ..............  ..............          -3,400
            program
            affordabil
            ity:
            Unjustifie
            d program
            growth
           Program      ..............  ..............         +11,700
            increase:
            Procuremen
            t
            Technical
            Assistance
       Defense Media           223,422         227,122          +3,700
        Activity
           Improving    ..............  ..............          -1,300
            funds
            management
            : Remove
            one-time
            fiscal
            year 2016
            costs
           Program      ..............  ..............          +5,000
            increase:
            IP
            streaming
            upgrades
       Department of         2,671,143       2,666,643          -4,500
        Defense
        Education
        Activity
           Maintain     ..............  ..............          -6,500
            program
            affordabil
            ity:
            Unjustifie
            d program
            growth
           Improving    ..............  ..............          -3,000
            funds
            management
            : Remove
            one-time
            fiscal
            year 2016
            costs
           Program      ..............  ..............          +5,000
            increase:
            Youth
            serving
            organizati
            ons
       Office of               155,399         136,199         -19,200
        Economic
        Adjustment
           Authorizati  ..............  ..............         -19,200
            on
            adjustment
            : Public
            health
            laboratory
            funding
            ahead of
            need
       Office of the         1,481,643       1,490,493          +8,850
        Secretary of
        Defense
           Authorizati  ..............  ..............          -3,530
            on
            adjustment
            : OUSD
            (AT&L;)
            BRAC
            planning
           Improving    ..............  ..............          -7,000
            funds
            management
            : Program
            decrease
            unaccounte
            d for
           Maintain     ..............  ..............          -2,600
            program
            affordabil
            ity: OUSD
            (AT&L;)
            Unjustifie
            d growth
           Improving    ..............  ..............          -2,000
            funds
            management
            : OUSD (I)-
            Identifed
            Asset for
            one-time
            fiscal
            year 2016
            cost
           Maintain     ..............  ..............          -1,000
            program
            affordabil
            ity:
            Intelligen
            ce Mission
            Data
            request
            ahead of
            need
           Program      ..............  ..............         +14,980
            increase:
            Readiness
            and
            Environmen
            tal
            Protection
            Initiative
           Program      ..............  ..............          +3,000
            increase:
            Operation
            Live Well
           Program      ..............  ..............          +2,000
            increase:
            Fruit and
            Vegetable
            Prescripti
            on Plan
           Authorizati  ..............  ..............          +5,000
            on
            adjustment
            : Sec. 340
            of S. 2943
       Classified           14,069,333      13,954,975        -114,358
        Programs
           Classified   ..............  ..............        -114,358
            adjustment
UNDIST Program          ..............         +30,000         +30,000
        increase:
        Impact Aid
UNDIST Program          ..............          +5,000          +5,000
        increase:
        Impact Aid for
        children with
        severe
        disabilities
UNDIST Program          ..............          +5,000          +5,000
        increase: Long-
        term temporary
        duty waivers
------------------------------------------------------------------------

    Wargaming.--The Office of the Secretary of Defense's budget 
request included $35,000,000 for wargaming initiatives that 
will pursue innovative ways to sustain and advance military 
superiority and improve business operations throughout the 
Department of Defense. These resources will be allocated 
through a rigorous process, overseen by the Quad Chairs (Office 
of the Under Secretary of Defense for Policy, the Joint Staff, 
Cost Assessment and Program Evaluation [CAPE], and the Office 
of Net Assessment [ONA]) and reporting to the Deputy Secretary 
of Defense. The Wargaming Quad Chairs will evaluate funding 
proposals from the Combatant Commanders and military services, 
with the Joint Staff overseeing full execution of approved 
initiatives. The Committee is supportive of the Department of 
Defense's efforts to combat emerging threats and to challenge 
adversaries. Therefore, the Secretary of Defense is directed to 
submit a quarterly report on the wargaming initiatives that are 
funded in fiscal year 2017. The reports shall include the title 
of each initiative, the recipient, the amount funded and a 
short explanation of the objective. The reports shall be 
submitted to the congressional defense committees not later 
than 30 days after the close of each quarter of the fiscal 
year.
    Long-Term Temporary Per Diem.--In November, 2014, the 
Department of Defense [DOD] implemented a change to the Joint 
Travel Regulation [JTR] cutting per diem rates during long-term 
temporary duty travel. The Committee is concerned about the 
effect of the flat rate per diem policy on long-term temporary 
duty travelers. This policy has discouraged experienced 
employees of shipyards, depots, and arsenals from across the 
DOD from volunteering to fulfill mission critical requirements 
due to concerns of paying for expenses related to official 
travel out of pocket. The Committee is aware of legislative 
proposals and administrative policy that allow DOD to waive the 
flat rate per diem. However, the Committee is concerned that 
this waiver authority has generated greater uncertainty in the 
DOD workforce, particularly since the authority is split across 
proposed legislation and administrative policy, with meals and 
incidentals covered by pending legislation, and lodging by 
policy. Moreover, the Committee is concerned that these various 
waiver authorities create additional obstacles that discourage 
DOD's most experienced professionals from volunteering for 
mission essential work. The Committee worries that this affects 
the savings that accrue to DOD by adding maintenance days as a 
result of having less experienced workers volunteering for 
long-term missions.
    The Committee notes that section 623 of the National 
Defense Authorization Act for Fiscal Year 2016 (Public Law 114-
49) directed a review by the Comptroller General of the United 
States on the impact DOD's long-term temporary duty per diem 
policy has on affected employees. The Committee will carefully 
consider the findings of this review and will continue to work 
with stakeholders on potential policy changes, including a 
reversal of the flat rate per diem policy on long-term 
temporary duty travel if such a change becomes prudent. While 
the Committee awaits the results of that study, DOD is 
encouraged to allow the Service Secretaries to waive the per 
diem rates of long-term duty travelers up to the full amount 
based on actual costs incurred.
    Defense Language National Security Education Office.--The 
Committee recognizes that, in partnership with universities 
across the country, the National Security Education Program 
provides critical training for servicemembers and government 
officials in a number of languages and strategic cultures, 
including those of the Arab world, Afghanistan, China, and 
Iran. The Committee encourages the Department of Defense to 
continue placing a high priority on these programs to ensure 
warfighters receive the language and culture training needed to 
complete their missions effectively.
    Counter-Lord's Resistance Army.--The Department of Defense 
shall continue its support of Operation Observant Compass to 
enable regional partners to continue to conduct operations 
against Joseph Kony and the Lord's Resistance Army.
    African Standby Force.--The Committee recognizes that the 
rapid deployment capability envisioned for the African Standby 
Force [ASF] has the potential to counter emerging crises and 
provide greatly needed peacekeeping support in Africa. However, 
this capability has been slow to develop, faces inadequate 
troop contributions, and has yet to reach full operational 
capability more than a decade since its inception. As the 
combatant command overseeing U.S. military policy in Africa, 
Africa Command [AFRICOM] may have a constructive role in 
engaging the African Union's Regional Economic Communities who 
are tasked to provide the necessary capabilities to bring ASF 
to full operational capability.
    In the report accompanying the Senate version of the 
Department of Defense Appropriations Act, 2016 (Senate Report 
114-63), the Committee directed the Secretary of Defense to 
provide a report to the congressional defense committees not 
later than 120 days after enactment, on AFRICOM's capabilities 
to engage the Regional Economic Communities. The report was to 
include an assessment of the military capacity shortfalls, to 
include logistics and airlift that must be addressed as African 
nations stand up a capable response force. To date, the report 
has not been delivered to the committees. The Committee expects 
an expeditious response from the Secretary of Defense to last 
year's request and expects that future reports will be 
delivered in a more timely manner.
    Special Victims' Counsel Program.--The Committee remains 
concerned with the level of sexual assault in the military and 
supports the Department's continuing efforts to strengthen its 
sexual assault prevention and response program. The needs of 
victims of sexual assault for legal advice and guidance are 
particularly acute. To ensure that the Department continues to 
make progress protecting a victim's confidentiality and ending 
alienation during the investigation and prosecution of their 
case, the Committee recommends an additional $25,000,000 for 
implementation of the Special Victims' Counsel Program across 
the services.
    Youth Serving Organizations.--The Committee recognizes that 
the dependent children of uniformed servicemembers often 
experience turbulence and instability during their 
developmental years as a result of frequent deployments, 
permanent change of station moves, and training requirements 
borne by their parents in the service of the nation. The 
Committee further recognizes the importance of youth outreach 
programs that provide military children opportunity and 
mentorship as they cope with the turbulence that often 
accompanies military service. Therefore, the Committee 
recommends an additional $5,000,000 to support youth serving 
organizations and to expand efforts to support free memberships 
for military children who reside off base and wish to join off-
installation sponsored youth serving organizations.

                Operation and Maintenance, Army Reserve

Appropriations, 2016....................................  $2,646,911,000
Budget estimate, 2017...................................   2,712,331,000
Committee recommendation................................   2,704,531,000

    The Committee recommends an appropriation of 
$2,704,531,000. This is $7,800,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
              OPERATION AND MAINTENANCE, ARMY RESERVE
 
     BUDGET ACTIVITY 1: OPERATING FORCES
 
     LAND FORCES
  20 MODULAR SUPPORT BRIGADES                                           11,435          11,435  ..............
  30 ECHELONS ABOVE BRIGADES                                           491,772         491,772  ..............
  40 THEATER LEVEL ASSETS                                              116,163         116,163  ..............
  50 LAND FORCES OPERATIONS SUPPORT                                    563,524         563,524  ..............
  60 AVIATION ASSETS                                                    91,162          91,162  ..............
 
     LAND FORCES READINESS
  70 FORCES READINESS OPERATIONS SUPPORT                               347,459         347,459  ..............
  80 LAND FORCES SYSTEM READINESS                                      101,926         101,926  ..............
  90 DEPOT MAINTENANCE                                                  56,219          56,219  ..............
 
     LAND FORCES READINESS SUPPORT
 100 BASE OPERATIONS SUPPORT                                           573,843         566,043          -7,800
 110 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION               214,955         214,955  ..............
 120 MANAGEMENT AND OPERATIONS HEADQUARTERS                             37,620          37,620  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  2,606,078       2,598,278          -7,800
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
 
     ADMINISTRATION AND SERVICEWIDE ACTIVITIES
 130 SERVICEWIDE TRANSPORTATION                                         11,027          11,027  ..............
 140 ADMINISTRATION                                                     16,749          16,749  ..............
 150 SERVICEWIDE COMMUNICATIONS                                         17,825          17,825  ..............
 160 PERSONNEL/FINANCIAL ADMINISTRATION                                  6,177           6,177  ..............
 170 OTHER PERSONNEL SUPPORT                                            54,475          54,475  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                    106,253         106,253  ..............
                                                               =================================================
           TOTAL, OPERATION AND MAINTENANCE, ARMY RESERVE            2,712,331       2,704,531          -7,800
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   131 Base Operations         573,843         566,043          -7,800
        Support
           Improving    ..............  ..............          -7,800
            funds
            management
            : Program
            decrease
            unaccounte
            d for
------------------------------------------------------------------------

                Operation and Maintenance, Navy Reserve

Appropriations, 2016....................................    $998,481,000
Budget estimate, 2017...................................     927,656,000
Committee recommendation................................     927,656,000

    The Committee recommends an appropriation of $927,656,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
              OPERATION AND MAINTENANCE, NAVY RESERVE
 
     BUDGET ACTIVITY 1: OPERATING FORCES
 
     RESERVE AIR OPERATIONS
  10 MISSION AND OTHER FLIGHT OPERATIONS                               526,190         526,190  ..............
  20 INTERMEDIATE MAINTENANCE                                            6,714           6,714  ..............
  40 AIRCRAFT DEPOT MAINTENANCE                                         86,209          86,209  ..............
  50 AIRCRAFT DEPOT OPERATIONS SUPPORT                                     389             389  ..............
  60 AVIATION LOGISTICS                                                 10,189          10,189  ..............
 
     RESERVE SHIP OPERATIONS
  70 SHIP OPERATIONAL SUPPORT AND TRAINING                                 560             560  ..............
 
     RESERVE COMBAT OPERATIONS SUPPORT
  90 COMBAT COMMUNICATIONS                                              13,173          13,173  ..............
 100 COMBAT SUPPORT FORCES                                             109,053         109,053  ..............
 
     RESERVE WEAPONS SUPPORT
 120 ENTERPRISE INFORMATION TECHNOLOGY                                  27,226          27,226  ..............
 
     BASE OPERATING SUPPORT
 130 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                27,571          27,571  ..............
 140 BASE OPERATING SUPPORT                                             99,166          99,166  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                    906,440         906,440  ..............
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
 
     ADMINISTRATION AND SERVICEWIDE ACTIVITIES
 150 ADMINISTRATION                                                      1,351           1,351  ..............
 160 MILITARY MANPOWER & PERSONNEL                                      13,251          13,251  ..............
 170 SERVICEWIDE COMMUNICATIONS                                          3,445           3,445  ..............
 180 ACQUISITION AND PROGRAM MANAGEMENT                                  3,169           3,169  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                     21,216          21,216  ..............
                                                               =================================================
           TOTAL, OPERATION AND MAINTENANCE, NAVY RESERVE              927,656         927,656  ..............
----------------------------------------------------------------------------------------------------------------

            Operation and Maintenance, Marine Corps Reserve

Appropriations, 2016....................................    $274,526,000
Budget estimate, 2017...................................     270,633,000
Committee recommendation................................     270,633,000

    The Committee recommends an appropriation of $270,633,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
          OPERATION AND MAINTENANCE, MARINE CORPS RESERVE
 
     BUDGET ACTIVITY 1: OPERATING FORCES
 
     EXPEDITIONARY FORCES
  10 OPERATING FORCES                                                   94,154          94,154  ..............
  20 DEPOT MAINTENANCE                                                  18,594          18,594  ..............
  30 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                25,470          25,470  ..............
  40 BASE OPERATING SUPPORT                                            111,550         111,550  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                    249,768         249,768  ..............
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
 
     ADMINISTRATION AND SERVICEWIDE ACTIVITIES
  50 SERVICEWIDE TRANSPORTATION                                            902             902  ..............
  60 ADMINISTRATION                                                     11,130          11,130  ..............
  70 RECRUITING AND ADVERTISING                                          8,833           8,833  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                     20,865          20,865  ..............
                                                               =================================================
           TOTAL, OPERATION & MAINTENANCE, MARINE CORPS                270,633         270,633  ..............
            RESERVE
----------------------------------------------------------------------------------------------------------------

              Operation and Maintenance, Air Force Reserve

Appropriations, 2016....................................  $2,980,768,000
Budget estimate, 2017...................................   3,067,929,000
Committee recommendation................................   3,050,929,000

    The Committee recommends an appropriation of 
$3,050,929,000. This is $17,000,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
            OPERATION AND MAINTENANCE, AIR FORCE RESERVE
 
     BUDGET ACTIVITY 1: OPERATING FORCES
 
     AIR OPERATIONS
  10 PRIMARY COMBAT FORCES                                           1,707,882       1,690,882         -17,000
  20 MISSION SUPPORT OPERATIONS                                        230,016         230,016  ..............
  30 DEPOT MAINTENANCE                                                 541,743         541,743  ..............
  40 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION               113,470         113,470  ..............
  50 BASE OPERATING SUPPORT                                            384,832         384,832  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  2,977,943       2,960,943         -17,000
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
 
     ADMINISTRATION AND SERVICEWIDE ACTIVITIES
  60 ADMINISTRATION                                                     54,939          54,939  ..............
  70 RECRUITING AND ADVERTISING                                         14,754          14,754  ..............
  80 MILITARY MANPOWER AND PERSONNEL MANAGEMENT                         12,707          12,707  ..............
  90 OTHER PERSONNEL SUPPORT                                             7,210           7,210  ..............
 100 AUDIOVISUAL                                                           376             376  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                     89,986          89,986  ..............
                                                               =================================================
           TOTAL, OPERATION AND MAINTENANCE, AIR FORCE RESERVE       3,067,929       3,050,929         -17,000
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  011A Primary Combat        1,707,882       1,690,882         -17,000
        Forces
           Maintain     ..............  ..............         -17,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
------------------------------------------------------------------------

             Operation and Maintenance, Army National Guard

Appropriations, 2016....................................  $6,595,483,000
Budget estimate, 2017...................................   6,825,370,000
Committee recommendation................................   6,765,385,000

    The Committee recommends an appropriation of 
$6,765,385,000. This is $59,985,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
           OPERATION AND MAINTENANCE, ARMY NATIONAL GUARD
 
     BUDGET ACTIVITY 1: OPERATING FORCES
 
     LAND FORCES
  10 MANEUVER UNITS                                                    708,251         708,251  ..............
  20 MODULAR SUPPORT BRIGADES                                          197,251         197,251  ..............
  30 ECHELONS ABOVE BRIGADE                                            792,271         792,271  ..............
  40 THEATER LEVEL ASSETS                                               80,341          80,341  ..............
  50 LAND FORCES OPERATIONS SUPPORT                                     37,138          37,138  ..............
  60 AVIATION ASSETS                                                   887,625         867,625         -20,000
 
     LAND FORCES READINESS
  70 FORCE READINESS OPERATIONS SUPPORT                                696,267         669,782         -26,485
  80 LAND FORCES SYSTEMS READINESS                                      61,240          56,240          -5,000
  90 LAND FORCES DEPOT MAINTENANCE                                     219,948         219,948  ..............
 
     LAND FORCES READINESS SUPPORT
 100 BASE OPERATIONS SUPPORT                                         1,040,012       1,031,512          -8,500
 110 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION               676,715         676,715  ..............
 120 MANAGEMENT AND OPERATIONAL HEADQUARTERS                         1,021,144       1,021,144  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  6,418,203       6,358,218         -59,985
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
 
     ADMINISTRATION AND SERVICEWIDE ACTIVITIES
 130 SERVICEWIDE TRANSPORTATION                                          6,396           6,396  ..............
 140 ADMINISTRATION                                                     68,528          68,528  ..............
 150 SERVICEWIDE COMMUNICATIONS                                         76,524          76,524  ..............
 160 MANPOWER MANAGEMENT                                                 7,712           7,712  ..............
 170 OTHER PERSONNEL SUPPORT                                           245,046         245,046  ..............
 180 REAL ESTATE MANAGEMENT                                              2,961           2,961  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                    407,167         407,167  ..............
                                                               =================================================
           TOTAL, OPERATION & MAINTENANCE, ARMY NATIONAL GUARD       6,825,370       6,765,385         -59,985
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   116 Aviation Assets         887,625         867,625         -20,000
           Maintain     ..............  ..............         -20,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
   121 Force Readiness         696,267         669,782         -26,485
        Operations
        Support
           Maintain     ..............  ..............         -30,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
           Program      ..............  ..............          +3,000
            increase:
            Army
            National
            Guard
            Cyber
            Protection
            Teams
           Program      ..............  ..............            +515
            increase:
            Trauma
            training
   122 Land Forces              61,240          56,240          -5,000
        Systems
        Readiness
           Improving    ..............  ..............          -5,000
            funds
            management
            : Program
            decrease
            unaccounte
            d for
   131 Base Operations       1,040,012       1,031,512          -8,500
        Support
           Maintain     ..............  ..............          -8,500
            program
            affordabil
            ity:
            Unjustifie
            d growth
------------------------------------------------------------------------

    State Partnership Program.--The State Partnership Program 
[SPP] has been successfully building relationships for over 20 
years by linking a State's National Guard with the armed forces 
or equivalent of a partner country in a cooperative, mutually 
beneficial relationship. It includes 70 unique security 
partnerships involving 76 nations around the globe. The 
Committee recognizes the importance of SPP and encourages 
continued robust support of this important partnership program.

             Operation and Maintenance, Air National Guard

Appropriations, 2016....................................  $6,820,569,000
Budget estimate, 2017...................................   6,703,578,000
Committee recommendation................................   6,600,000,000

    The Committee recommends an appropriation of 
$6,600,000,000. This is $103,578,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
           OPERATION AND MAINTENANCE, AIR NATIONAL GUARD
 
     BUDGET ACTIVITY 1: OPERATING FORCES
 
     AIR OPERATIONS
  10 AIRCRAFT OPERATIONS                                             3,282,238       3,197,238         -85,000
  20 MISSION SUPPORT OPERATIONS                                        723,062         712,484         -10,578
  30 DEPOT MAINTENANCE                                               1,824,329       1,816,329          -8,000
  40 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION               245,840         245,840  ..............
  50 BASE OPERATING SUPPORT                                            575,548         575,548  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                  6,651,017       6,547,439        -103,578
 
     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES
 
     SERVICEWIDE ACTIVITIES
  60 ADMINISTRATION                                                     23,715          23,715  ..............
  70 RECRUITING AND ADVERTISING                                         28,846          28,846  ..............
                                                               -------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                     52,561          52,561  ..............
                                                               =================================================
           TOTAL, OPERATION & MAINTENANCE, AIR NATIONAL GUARD        6,703,578       6,600,000        -103,578
----------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  011F Aircraft              3,282,238       3,197,238         -85,000
        Operations
           Maintain     ..............  ..............         -70,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
           Improving    ..............  ..............         -15,000
            funds
            management
            : MIP
            program
            decrease
            unaccounte
            d for
  011G Mission Support         723,062         712,484         -10,578
        Operations
           Maintain     ..............  ..............         -12,000
            program
            affordabil
            ity:
            Unjustifie
            d growth
           Program      ..............  ..............          +1,422
            increase:
            Trauma
            training
  011M Depot                 1,824,329       1,816,329          -8,000
        Maintenance
           Maintain     ..............  ..............          -8,000
            program
            affordabil
            ity: MIP
            program
            unjustifie
            d growth
------------------------------------------------------------------------

               U.S. Court of Appeals for the Armed Forces

Appropriations, 2016....................................     $14,078,000
Budget estimate, 2017...................................      14,194,000
Committee recommendation................................      14,194,000

    The Committee recommends an appropriation of $14,194,000. 
This is equal to the budget estimate.

                    Environmental Restoration, Army

Appropriations, 2016....................................    $234,829,000
Budget estimate, 2017...................................     170,167,000
Committee recommendation................................     170,167,000

    The Committee recommends an appropriation of $170,167,000. 
This is equal to the budget estimate.

                    Environmental Restoration, Navy

Appropriations, 2016....................................    $300,000,000
Budget estimate, 2017...................................     281,762,000
Committee recommendation................................     281,762,000

    The Committee recommends an appropriation of $281,762,000. 
This is equal to the budget estimate.

                  Environmental Restoration, Air Force

Appropriations, 2016....................................     368,131,000
Budget estimate, 2017...................................     371,521,000
Committee recommendation................................     371,521,000

    The Committee recommends an appropriation of $371,521,000. 
This is equal to the budget estimate.

                Environmental Restoration, Defense-Wide

Appropriations, 2016....................................      $8,232,000
Budget estimate, 2017...................................       9,009,000
Committee recommendation................................       9,009,000

    The Committee recommends an appropriation of $9,009,000. 
This is equal to the budget estimate.

         Environmental Restoration, Formerly Used Defense Sites

Appropriations, 2016....................................    $231,217,000
Budget estimate, 2017...................................     197,084,000
Committee recommendation................................     207,084,000

    The Committee recommends an appropriation of $207,084,000. 
This is $10,000,000 above the budget estimate to help address 
unfunded needs.

             Overseas Humanitarian, Disaster, and Civic Aid

Appropriations, 2016....................................    $103,266,000
Budget estimate, 2017...................................     105,125,000
Committee recommendation................................     120,125,000

    The Committee recommends an appropriation of $120,125,000. 
This is $15,000,000 above the budget estimate for South China 
Sea regional engagement.

                  Cooperative Threat Reduction Account

Appropriations, 2016....................................    $358,496,000
Budget estimate, 2017...................................     325,604,000
Committee recommendation................................     325,604,000

    The Committee recommends an appropriation of $325,604,000. 
This is equal to the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
         COOPERATIVE
      THREAT REDUCTION
 
    1 Strategic                 11,791          11,791  ..............
       Offensive Arms
       Elimination
    2 Chemical Weapons           2,942           2,942  ..............
       Destruction
    3 Biological               213,984         213,984  ..............
       Threat
       Reduction
    4 Threat Reduction           2,000           2,000  ..............
       Engagement
    5 Other                     27,279          27,279  ..............
       Assessments/
       Admin Costs
    6 Global Nuclear            16,899          16,899  ..............
       Security
    7 WMD                       50,709          50,709  ..............
       Proliferation
       Prevention
                       -------------------------------------------------
            TOTAL,             325,604         325,604  ..............
             COOPERATI
             VE THREAT
             REDUCTION
------------------------------------------------------------------------


                               TITLE III

                              PROCUREMENT

    Funds appropriated under this title provide the resources 
required to purchase military equipment and hardware, including 
aircraft, ships, missiles, combat vehicles, ammunition, 
weapons, electronic sensors and communications equipment, and 
other procurement items.
    The President's fiscal year 2017 budget requests a total of 
$101,916,357,000 for procurement appropriations.

                      SUMMARY OF COMMITTEE ACTION

    The Committee recommends procurement appropriations 
totaling $105,253,833,000 for fiscal year 2017. This is 
$3,337,476,000 above the budget estimate.
    Committee recommended procurement appropriations for fiscal 
year 2017 are summarized below:

                                      SUMMARY OF PROCUREMENT APPROPRIATIONS
                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
                             Account                                2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
Procurement:
    Aircraft Procurement, Army..................................       3,614,787       4,088,298        +473,511
    Missile Procurement, Army...................................       1,519,966       1,501,289         -18,677
    Procurement of Weapons and Tracked Combat Vehicles, Army....       2,265,177       2,161,777        -103,400
    Procurement of Ammunition, Army.............................       1,513,157       1,467,066         -46,091
    Other Procurement, Army.....................................       5,873,949       5,862,299         -11,650
    Aircraft Procurement, Navy..................................      14,109,148      15,472,048      +1,362,900
    Weapons Procurement, Navy...................................       3,209,262       3,226,750         +17,488
    Procurement of Ammunition, Navy and Marine Corps............         664,368         662,968          -1,400
    Shipbuilding and Conversion, Navy...........................      18,354,874      20,460,724      +2,105,850
    Other Procurement, Navy.....................................       6,338,861       6,229,762        -109,099
    Procurement, Marine Corps...................................       1,362,769       1,362,769  ..............
    Aircraft Procurement, Air Force.............................      13,922,917      13,667,822        -255,095
    Missile Procurement, Air Force..............................       2,426,621       2,408,769         -17,852
    Space Procurement, Air Force................................       3,055,743       2,527,743        -528,000
    Procurement of Ammunition, Air Force........................       1,677,719       1,665,219         -12,500
    Other Procurement, Air Force................................      17,438,056      17,503,191         +65,135
    Procurement, Defense-Wide...................................       4,524,918       4,921,274        +396,356
    Defense Production Act Purchases............................          44,065          64,065         +20,000
                                                                 -----------------------------------------------
      Total.....................................................     101,916,357     105,253,833      +3,337,476
----------------------------------------------------------------------------------------------------------------

            reprogramming guidance for acquisition accounts

    The Secretary of Defense is directed to continue to follow 
the reprogramming guidance as specified in the report 
accompanying the House version of the Department of Defense 
appropriations bill for fiscal year 2008 (House Report 110-
279). Specifically, the dollar threshold for reprogramming 
funds will remain at $20,000,000 for procurement and 
$10,000,000 for research, development, test and evaluation.
    Also, the Under Secretary of Defense (Comptroller) is 
directed to continue to provide the congressional defense 
committees quarterly, spreadsheet-based DD Form 1416 reports 
for service and defense-wide accounts in titles III and IV of 
this act. Reports for titles III and IV shall comply with 
guidance specified in the explanatory statement accompanying 
the Department of Defense Appropriations Act for Fiscal Year 
2006. The Department shall continue to follow the limitation 
that prior approval reprogrammings are set at either the 
specified dollar threshold or 20 percent of the procurement or 
research, development, test and evaluation line, whichever is 
less. These thresholds are cumulative from the base for 
reprogramming value as modified by any adjustments. Therefore, 
if the combined value of transfers into or out of a procurement 
(P-1), or a research, development, test and evaluation (R-1) 
line exceeds the identified threshold, the Secretary of Defense 
must submit a prior approval reprogramming to the congressional 
defense committees. In addition, guidelines on the application 
of prior approval reprogramming procedures for congressional 
special interest items are established elsewhere in this 
report.

                          PROCUREMENT OVERVIEW

    Army Organic Industrial Base.--The Committee directs the 
Secretary of the Army to provide 45-day written notification to 
the congressional defense committees prior to the Secretary 
approving civilian reductions in force that will result in an 
employment loss of 50 or more full-time employees at any Army 
organic industrial base facility. The notification shall 
include the impact that the proposed reduction in force will 
have on the ability to maintain the organic industrial base 
critical manufacturing capabilities as delineated in the Army 
Organic Industrial Base Strategy Report, a detailed accounting 
of the costs of implementing the reduction in force, and an 
assessment of the cost of, and time necessary, to restore any 
lost capability to meet future organic wartime manufacturing 
needs.
    Arsenal Sustainment Initiative.--The Committee supports the 
ongoing efforts of the Department of the Army to develop the 
Army Organic Industrial Base Strategy. This process is 
identifying manufacturing capabilities at each organic 
industrial facility that are critical for the country to 
sustain in wartime and peacetime if the U.S. military is called 
to act. However, the Committee is concerned that while the Army 
Organic Industrial Base Strategy is identifying capabilities, 
it has not prioritized them in annual budget requests to 
Congress. In particular, the Nation's arsenals are at risk of 
not having the capacity to respond rapidly to meet the 
Department's needs. Addressing this concern, the Army in 
comments provided to the Government Accountability Office [GAO] 
in advance of its December 2015 report, Actions Needed to 
Identify and Sustain Critical Capabilities, the Army concurred 
with the GAO's recommendation that it must issue ``clear and 
detailed implementation guidance, such as an instruction or 
guidebook, on the process for conducting make-or-buy analysis 
in a consistent manner.'' The Committee directs the Secretary 
of the Army to issue such guidance as soon as possible. The 
Committee further directs the Secretary to assign the arsenals 
sufficient workload to maintain the critical capabilities 
identified in the Army Organic Industrial Base Strategy Report 
and ensure cost efficiency and technical competence in 
peacetime, while preserving the ability to provide an effective 
and timely response to mobilizations, national defense 
contingency situations, and other emergency requirements. 
Finally, the Committee notes that it has not yet received 
detailed recommendations from the Secretary of Defense on how 
the Air Force, Navy, and Marine Corps can better use the 
arsenals for their manufacturing needs, or what opportunities 
may exist for the arsenals to assist the services and the 
Defense Logistics Agency to procure for our spare parts 
inventory, as required by Senate Report 114-63.
    Physical Access Control Systems.--The Committee remains 
concerned with control systems at base access points and 
encourages the Department to continue efforts to standardize 
these systems across the services while finding the most 
affordable solutions.
    Equipment Modernization Reporting.--The Committee continues 
to support maintaining fully modernized reserve components. 
However, the methods used by the services to characterize and 
report the status of military equipment modernization hinder 
Congress' ability to determine relative levels of modernization 
across the active and reserve components. The services must 
establish and codify modernization principles that articulate 
the definition of the term ``modern equipment'' in such a way 
as to allow for transparent appropriation decisions. The 
Committee also notes that equipment listed on service divesture 
lists is not acceptable for characterization as ``modern'' if 
fielded to the reserve components. The Committee directs the 
Secretary of Defense to promulgate service standards for 
reporting modern equipment in time for those standards to be 
reflected in the National Guard and Reserve Equipment Report 
for Fiscal Year 2018.
    Equipment Transparency Report.--The Committee strongly 
supports the Department of Defense's policy of transparency and 
traceability of procurement funding for the reserve components. 
However, the Committee notes that the Department continues to 
have difficulty tracking funding requests for equipment for the 
reserve components. The Equipment Transparency Report, intended 
to provide such visibility, lacks the consistency and 
reliability needed to be definitive and is, by the Department's 
own admission, unreliable. The Committee supports the practice 
of including reserve component funding requests in parent 
service budgets, but seeks a clearer way to determine the 
impact of funding on actual equipment procurement. Therefore, 
the Committee directs the Secretary of Defense to provide a 
report to the congressional defense committees, not later than 
180 days after enactment of this act, outlining improvements or 
alternatives to the Equipment Transparency Report.
    MUOS.--The Committee has previously noted the lack of 
alignment between the space, ground, and user equipment 
segments on various space-based acquisition programs. The 
Mobile User Objective System [MUOS] program has a satellite 
constellation in orbit but few communications terminals 
carrying the MUOS waveform software. The Committee directs the 
Assistant Secretaries for Acquisition for both the Air Force 
and the Navy to provide to the congressional defense 
committees, not later than 180 days after enactment of this 
act, their respective plans to enable current and future 
communications systems with the MUOS capability, including a 
timeline for fielding of the capability.
    Renewables on Military Installations.--The Committee 
recognizes the importance of properly building, maintaining and 
monitoring renewable energy projects on Federal military 
installations. Further, the Committee encourages the Department 
to contract with private entities that operate North American 
Electric Reliability Corporation [NERC] compliant monitoring 
centers; offer training programs for governmental employees; 
and have an established Environment, Health and Safety 
standards program when procuring renewable energy.
    Buy American Compliance.--The Committee is concerned with 
two separate Inspector General reports, required by the 
National Defense Authorization Act for Fiscal Year 2014, that 
found both the Air Force and Navy were not in compliance with 
the Buy American Act and Berry Amendment. Ensuring appropriate 
domestic source requirements are included in contracts and 
strict adherence to these requirements are vital to the health 
of the Defense industrial base. Therefore, the Committee 
encourages the Secretary of Defense to dedicate resources to 
expand training and ensure compliance with the Buy American and 
Berry Amendment.
    Domestic Footwear.--The Committee acknowledges that S. 
2943, the National Defense Authorization Act for Fiscal Year 
2017, as reported, seeks to amend section 418 of title 37 
United States Code to address compliance with domestic source 
requirements for footwear furnished to enlisted members of the 
Armed Forces upon their initial entry into the Armed Forces.
    RQ-7 Shadow.--The Committee understands that the Department 
of the Army is requesting $71,169,000 to upgrade the RQ-7 
Shadow unmanned aerial vehicle. The Committee is supportive of 
the upgrade, but is concerned with the lack of competition. In 
previous budget requests, the new payload has been described as 
an alternative source. However, the Army has informed the 
Committee that the new payload is now being described as an 
upgraded capability to include high definition. As stated in 
the Department of Defense Appropriations Act, 2016 (Public Law 
114-113), the Committee directed the Secretary of the Army to 
review the acquisition strategy for this upgrade to validate 
sufficient competition exists before awarding the contract. The 
Committee looks forward to the results of this review.
    Technology Procurement.--The Committee is concerned about 
the procurement of sensitive technologies (hardware, software, 
and services) and the potential transfer to nation states of 
concern. Further, the Committee directs the Department of 
Defense to provide a briefing to the congressional defense 
committees on plans to mitigate risks posed by the procurement 
of sensitive technologies.

                       Aircraft Procurement, Army

Appropriations, 2016....................................  $5,866,367,000
Budget estimate, 2017...................................   3,614,787,000
Committee recommendation................................   4,088,298,000

    The Committee recommends an appropriation of 
$4,088,298,000. This is $473,511,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
                 AIRCRAFT PROCUREMENT, ARMY
 
     AIRCRAFT
 
     FIXED WING
   1 UTILITY F/W CARGO AIRCRAFT                                      3          57,529               3          41,342  ..............         -16,187
   3 MQ-1 UAV                                           ..............          55,388  ..............          55,388  ..............  ..............
 
     ROTARY
   5 HELICOPTER, LIGHT UTILITY [LUH]                    ..............  ..............  ..............         187,000  ..............        +187,000
   6 AH-64 APACHE BLOCK IIIA REMAN                                  48         803,084              48         774,072  ..............         -29,012
   7 AH-64 APACHE BLOCK IIIA REMAN [AP-CY]              ..............         185,160  ..............         185,160  ..............  ..............
   8 UH-60 BLACKHAWK [MYP]                                          36         755,146              36       1,112,646  ..............        +357,500
   9 UH-60 BLACKHAWK [MYP] [AP-CY]                      ..............         174,107  ..............         174,107  ..............  ..............
  10 UH-60 BLACKHAWK A AND L MODELS                                 38          46,173              38          46,173  ..............  ..............
  11 CH-47 HELICOPTER                                               22         556,257              22         556,257  ..............  ..............
  12 CH-47 HELICOPTER [AP-CY]                           ..............           8,707  ..............           8,707  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT                              ..............       2,641,551  ..............       3,140,852  ..............        +499,301
 
     MODIFICATION OF AIRCRAFT
  13 MQ-1 PAYLOAD--UAS                                  ..............          43,735  ..............          43,735  ..............  ..............
  15 ARL/MULTI SENSOR ABN RECON [MIP]                   ..............          94,527  ..............          94,527  ..............  ..............
  16 AH-64 MODS                                         ..............         137,883  ..............         122,883  ..............         -15,000
  17 CH-47 CARGO HELICOPTER MODS                        ..............         102,943  ..............         102,943  ..............  ..............
  18 GUARDRAIL SENSOR GRCS SEMA MODS [MIP]              ..............           4,055  ..............           3,055  ..............          -1,000
  19 ARL SEMA MODS [MIP]                                ..............           6,793  ..............           6,793  ..............  ..............
  20 EMARSS SEMA MODS [MIP]                             ..............          13,197  ..............          11,197  ..............          -2,000
  21 UTILITY/CARGO AIRPLANE MODS                        ..............          17,526  ..............          17,526  ..............  ..............
  22 UTILITY HELICOPTER MODS                            ..............          10,807  ..............          10,807  ..............  ..............
  23 NETWORK AND MISSION PLAN                           ..............          74,752  ..............          67,752  ..............          -7,000
  24 COMMS, NAV SURVEILLANCE                            ..............          69,960  ..............          69,960  ..............  ..............
  25 GATM ROLLUP                                        ..............          45,302  ..............          45,302  ..............  ..............
  26 RQ-7 UAV MODS                                      ..............          71,169  ..............          71,169  ..............  ..............
  27 UAS MODS                                           ..............          21,804  ..............          21,804  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, MODIFICATION OF AIRCRAFT              ..............         714,453  ..............         689,453  ..............         -25,000
 
     SUPPORT EQUIPMENT AND FACILITIES
 
     GROUND SUPPORT AVIONICS
  28 AIRCRAFT SURVIVABILITY EQUIPMENT                   ..............          67,377  ..............          67,377  ..............  ..............
  29 SURVIVABILITY CM                                   ..............           9,565  ..............           9,565  ..............  ..............
  30 CMWS                                               ..............          41,626  ..............          41,626  ..............  ..............
 
     OTHER SUPPORT
  32 AVIONICS SUPPORT EQUIPMENT                         ..............           7,007  ..............           6,217  ..............            -790
  33 COMMON GROUND EQUIPMENT                            ..............          48,234  ..............          48,234  ..............  ..............
  34 AIRCREW INTEGRATED SYSTEMS                         ..............          30,297  ..............          30,297  ..............  ..............
  35 AIR TRAFFIC CONTROL                                ..............          50,405  ..............          50,405  ..............  ..............
  36 INDUSTRIAL FACILITIES                              ..............           1,217  ..............           1,217  ..............  ..............
  37 LAUNCHER, 2.75 ROCKET                              ..............           3,055  ..............           3,055  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, SUPPORT EQUIPMENT AND FACILITIES      ..............         258,783  ..............         257,993  ..............            -790
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT PROCUREMENT, ARMY            ..............       3,614,787  ..............       4,088,298  ..............        +473,511
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   1Utility F/W                 57,529          41,342         -16,187
     Aircraft
        Restoring       ..............  ..............          -3,587
         acquisition
         accountabilit
         y: Excess
         program
         management
        Restoring       ..............  ..............         -12,600
         acquisition
         accountabilit
         y: Unit cost
         growth
   5Helicopter, Light   ..............         187,000        +187,000
     Utility [LUH]
        Additional      ..............  ..............        +187,000
         aircraft
   6AH-64 Apache Block         803,084         774,072         -29,012
     IIIA Reman
        Maintain        ..............  ..............          -9,600
         program
         affordability
         : Unit costs
         efficiencies
         from
         Multiyear
        Restoring       ..............  ..............         -19,412
         acquisition
         accountabilit
         y: Excess
         government
         furnished
         equipment
   8UH-60 Blackhawk M          755,146       1,112,646        +357,500
     Model (MYP)
        Restoring       ..............  ..............         -10,000
         acquisition
         accountabilit
         y: Excess
         tooling
        Additional      ..............  ..............        +367,500
         aircraft for
         the Army
         National
         Guard
  16AH-64 Mods                 137,883         122,883         -15,000
        Improving       ..............  ..............         -15,000
         funds
         management:
         Unobligated
         balances
  18Guardrail Sensor/            4,055           3,055          -1,000
     GRCS SEMA Mods
     (MIP)
        Restoring       ..............  ..............          -1,000
         acquisition
         accountabilit
         y: Contract
         award delay
         excess
         program
         management
  20EMARSS SEMA Mods            13,197          11,197          -2,000
     (MIP)
        Restoring       ..............  ..............          -2,000
         acquisition
         accountabilit
         y: Excess
         program
         management
  23Network and                 74,752          67,752          -7,000
     Mission Plan
        Restoring       ..............  ..............          -7,000
         acquisition
         accountabilit
         y: Aviation
         Mission
         Planning
         system delay
  32Avionics Support             7,007           6,217            -790
     Equipment
        Restoring       ..............  ..............            -790
         acquisition
         accountabilit
         y: ANVIS unit
         cost growth
------------------------------------------------------------------------

                       Missile Procurement, Army

Appropriations, 2016....................................  $1,600,957,000
Budget estimate, 2017...................................   1,519,966,000
Committee recommendation................................   1,501,289,000

    The Committee recommends an appropriation of 
$1,501,289,000. This is $18,677,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
                 MISSILE PROCUREMENT, ARMY
 
     OTHER MISSILES
 
     SURFACE-TO-AIR MISSILE SYSTEM
   1 LOWER TIER AIR AND MISSILE DEFENSE [AMD]           ..............         126,470  ..............         120,470  ..............          -6,000
   2 MSE MISSILE                                                    85         423,201              85         423,201  ..............  ..............
   3 INDIRECT FIRE PROTECTION CAPABILITY                ..............          19,319  ..............          19,319  ..............  ..............
 
     AIR-TO-SURFACE MISSILE SYSTEM
   4 HELLFIRE SYS SUMMARY                                          155          42,013             155          42,013  ..............  ..............
   5 JOINT AIR-TO-GROUND MSLS [JAGM]                               324          64,751             324          61,911  ..............          -2,840
   6 JOINT AIR-TO-GROUND MSLS [JAGM] [AP-CY]            ..............          37,100  ..............          37,100  ..............  ..............
 
     ANTI-TANK/ASSAULT MISSILE SYSTEM
   7 JAVELIN (AAWS-M) SYSTEM SUMMARY                               309          73,508             309          72,904  ..............            -604
   8 TOW 2 SYSTEM SUMMARY                                          595          64,922             595          64,922  ..............  ..............
   9 TOW 2 SYSTEM SUMMARY [AP-CY]                       ..............          19,949  ..............          10,716  ..............          -9,233
  10 GUIDED MLRS ROCKET [GMLRS]                                  1,068         172,088           1,068         172,088  ..............  ..............
  11 MLRS REDUCED RANGE PRACTICE ROCKETS [RRPR]                  1,704          18,004           1,704          18,004  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER MISSILES                        ..............       1,061,325  ..............       1,042,648  ..............         -18,677
 
     MODIFICATION OF MISSILES
 
     MODIFICATIONS
  13 PATRIOT MODS                                       ..............         197,107  ..............         197,107  ..............  ..............
  14 ATACMS MODS                                        ..............         150,043  ..............         150,043  ..............  ..............
  15 GMLRS MOD                                          ..............             395  ..............             395  ..............  ..............
  17 AVENGER MODS                                       ..............          33,606  ..............          33,606  ..............  ..............
  18 ITAS/TOW MODS                                      ..............             383  ..............             383  ..............  ..............
  19 MLRS MODS                                          ..............          34,704  ..............          34,704  ..............  ..............
  20 HIMARS MODIFICATIONS                               ..............           1,847  ..............           1,847  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, MODIFICATION OF MISSILES              ..............         418,085  ..............         418,085  ..............  ..............
 
     SPARES AND REPAIR PARTS
  21 SPARES AND REPAIR PARTS                            ..............          34,487  ..............          34,487  ..............  ..............
 
     SUPPORT EQUIPMENT AND FACILITIES
  22 AIR DEFENSE TARGETS                                ..............           4,915  ..............           4,915  ..............  ..............
  24 PRODUCTION BASE SUPPORT                            ..............           1,154  ..............           1,154  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, SUPPORT EQUIPMENT AND FACILITIES      ..............           6,069  ..............           6,069  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, MISSILE PROCUREMENT, ARMY             ..............       1,519,966  ..............       1,501,289  ..............         -18,677
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item         2017 budget      Committee         budget
                            estimate      recommendation     estimate
------------------------------------------------------------------------
     1 Lower Tier Air         126,470         120,470           -6,000
        and Missile
        Defense [AMD]
           Restoring   ..............  ...............          -6,000
            acquisiti
            on
            accountab
            ility:
            Recurring
            cost
            growth
     5 Joint Air-To-           64,751          61,911           -2,840
        Ground Msls
        [JAGM]
           Restoring   ..............  ...............          -2,840
            acquisiti
            on
            accountab
            ility:
            Unjustifi
            ed
            increase
     7 Javelin (Aaws-          73,508          72,904             -604
        M) System
        Summary
           Restoring   ..............  ...............            -604
            acquisiti
            on
            accountab
            ility:
            Engineeri
            ng
            services
            cost
            growth
     9 Tow 2 System            19,949          10,716           -9,233
        Summary--Adva
        nce
        Procurement
           Restoring   ..............  ...............          -9,233
            acquisiti
            on
            accountab
            ility: AP
            excess to
            need
------------------------------------------------------------------------

        Procurement of Weapons and Tracked Combat Vehicles, Army

Appropriations, 2016....................................  $1,951,646,000
Budget estimate, 2017...................................   2,265,177,000
Committee recommendation................................   2,161,777,000

    The Committee recommends an appropriation of 
$2,161,777,000. This is $103,400,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
         PROCUREMENT OF WEAPONS AND TRACKED COMBAT
                   VEHICLES (W&TCV;), ARMY
 
     TRACKED COMBAT VEHICLES
   1 STRYKER VEHICLE                                    ..............          71,680  ..............          71,680  ..............  ..............
 
     MODIFICATION OF TRACKED COMBAT VEHICLES
   2 STRYKER (MOD)                                      ..............          74,348  ..............          74,348  ..............  ..............
   3 STRYKER UPGRADE                                                62         444,561              62         410,461  ..............         -34,100
   5 BRADLEY PROGRAM (MOD)                              ..............         276,433  ..............         258,333  ..............         -18,100
   6 HOWITZER, MED SP FT 155MM M109A6 (MOD)             ..............          63,138  ..............          63,138  ..............  ..............
   7 PALADIN PIPM MOD IN SERVICE                                    36         469,305              36         445,805  ..............         -23,500
   8 IMPROVED RECOVERY VEHICLE (M88A2 HERCULES)                     22          91,963              22          91,963  ..............  ..............
   9 ASSAULT BRIDGE (MOD)                               ..............           3,465  ..............           3,465  ..............  ..............
  10 ARMORED BREACHER VEHICLE                           ..............           2,928  ..............           2,928  ..............  ..............
  11 M88 FOV MODS                                       ..............           8,685  ..............           8,685  ..............  ..............
  12 JOINT ASSAULT BRIDGE                                            9          64,752               9          64,752  ..............  ..............
  13 M1 ABRAMS TANK (MOD)                               ..............         480,166  ..............         480,166  ..............  ..............
 
     SUPPORT EQUIPMENT AND FACILITIES
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, TRACKED COMBAT VEHICLES               ..............       2,051,424  ..............       1,975,724  ..............         -75,700
 
     WEAPONS AND OTHER COMBAT VEHICLES
  16 INTEGRATED AIR BURST WEAPON SYSTEM FAMILY          ..............           9,764  ..............           7,064  ..............          -2,700
  17 MORTAR SYSTEMS                                     ..............           8,332  ..............           8,332  ..............  ..............
  18 XM320 GRENADE LAUNCHER MODULE [GLM]                ..............           3,062  ..............           3,062  ..............  ..............
  19 COMPACT SEMI-AUTOMATIC SNIPER SYSTEM               ..............             992  ..............  ..............  ..............            -992
  20 CARBINE                                            ..............          40,493  ..............          15,493  ..............         -25,000
  21 COMMON REMOTELY OPERATED WEAPONS STATION           ..............          25,164  ..............          25,164  ..............  ..............
 
     MOD OF WEAPONS AND OTHER COMBAT VEH
  22 MK-19 GRENADE MACHINE GUN MODS                     ..............           4,959  ..............           4,959  ..............  ..............
  23 M777 MODS                                          ..............          11,913  ..............          11,913  ..............  ..............
  24 M4 CARBINE MODS                                    ..............          29,752  ..............          29,752  ..............  ..............
  25 M250 CAL MACHINE GUN MODS                          ..............          48,582  ..............          48,582  ..............  ..............
  26 M249 SAW MACHINE GUN MODS                          ..............           1,179  ..............           1,179  ..............  ..............
  27 M240 MEDIUM MACHINE GUN MODS                       ..............           1,784  ..............           1,784  ..............  ..............
  28 SNIPER RIFLES MODIFICATIONS                        ..............             971  ..............           1,963  ..............            +992
  29 M119 MODIFICATIONS                                 ..............           6,045  ..............           6,045  ..............  ..............
  30 MORTAR MODIFICATION                                ..............          12,118  ..............          12,118  ..............  ..............
  31 MODIFICATIONS LESS THAN $5 MILLION (WOCV-WTCV)     ..............           3,157  ..............           3,157  ..............  ..............
 
     SUPPORT EQUIPMENT AND FACILITIES
  32 ITEMS LESS THAN $5 MILLION (WOCV-WTCV)             ..............           2,331  ..............           2,331  ..............  ..............
  35 SMALL ARMS EQUIPMENT (SOLDIER ENH PROG)            ..............           3,155  ..............           3,155  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, WEAPONS AND OTHER COMBAT VEHICLES     ..............         213,753  ..............         186,053  ..............         -27,700
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT OF W&TCV;, ARMY            ..............       2,265,177  ..............       2,161,777  ..............        -103,400
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                         2017 budget       Committee       Change from
Line        Item           estimate      recommendation  budget estimate
------------------------------------------------------------------------
   3Stryker Upgrade          444,561          410,461          -34,100
        Improving    ...............  ...............          -34,100
         funds
         management
         : Training
         and
         fielding
         early to
         need
   5Bradley Program          276,433          258,333          -18,100
     (MOD)
        Maintain     ...............  ...............          -15,000
         program
         affordabil
         ity:
         Unjustifie
         d growth--
         contractor
         support
        Improving    ...............  ...............           -3,100
         funds
         management
         : Excess
         to need,
         negotiated
         contract
         savings
   7Paladin                  469,305          445,805          -23,500
     Integrated
     Management
     [PIM]
        Restoring    ...............  ...............          -23,500
         acquisitio
         n
         accountabi
         lity:
         Estimated
         contract
         savings
  16Integrated Air             9,764            7,064           -2,700
     Burst Weapon
     System Family
        Restoring    ...............  ...............           -2,700
         acquisitio
         n
         accountabi
         lity:
         Program
         delay
  19Compact Semi-                992  ...............             -992
     Automatic
     Sniper System
        Transfer:    ...............  ...............             -992
         Army-
         requested
         to WTCV
         lines 28
  20Carbine                   40,493           15,493          -25,000
        Restoring    ...............  ...............          -25,000
         acquisitio
         n
         accountabi
         lity:
         Program
         delay
  28Sniper Rifles                971            1,963             +992
     Modifications
        Transfer:    ...............  ...............             +992
         Army-
         requested
         from WTCV
         lines 19
------------------------------------------------------------------------

    Crew-Served Weapons Industrial Base.--Crew-served weapons 
such as the M2 .50 caliber machine gun and the M240 7.62mm 
medium machine gun have been a primary means of firepower for a 
variety of Army combat service support forces. However, the 
Committee is concerned that the programmatic direction for 
these weapons is inconsistent with the Army's broader equipping 
objective, to reduce the soldier's load while increasing the 
capability and reliability of the weapons. The Committee 
directs the Secretary of the Army to submit a report to the 
congressional defense committees, not later than 90 days after 
enactment of this act that outlines the plan to sustain crew-
served weapons and support the individual weapons industrial 
base.

                    Procurement of Ammunition, Army

Appropriations, 2016....................................  $1,245,426,000
Budget estimate, 2017...................................   1,513,157,000
Committee recommendation................................   1,467,066,000

    The Committee recommends an appropriation of 
$1,467,066,000. This is $46,091,000 below the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
              PROCUREMENT OF AMMUNITION, ARMY
 
     AMMUNITION
 
     SMALL/MEDIUM CAL AMMUNITION
   1 CTG, 5.56MM, ALL TYPES                             ..............          40,296  ..............          40,296  ..............  ..............
   2 CTG, 7.62MM, ALL TYPES                             ..............          39,237  ..............          39,237  ..............  ..............
   3 CTG, HANDGUN, ALL TYPES                            ..............           5,193  ..............           5,193  ..............  ..............
   4 CTG, .50 CAL, ALL TYPES                            ..............          46,693  ..............          46,693  ..............  ..............
   5 CTG, 20MM, ALL TYPES                               ..............           7,000  ..............           7,000  ..............  ..............
   6 CTG, 25MM, ALL TYPES                               ..............           7,753  ..............           7,753  ..............  ..............
   7 CTG, 30MM, ALL TYPES                               ..............          47,000  ..............          47,000  ..............  ..............
   8 CTG, 40MM, ALL TYPES                               ..............         118,178  ..............         111,824  ..............          -6,354
 
                     MORTAR AMMUNITION
 
   9 60MM MORTAR, ALL TYPES                             ..............          69,784  ..............          69,784  ..............  ..............
  10 81MM MORTAR, ALL TYPES                             ..............          36,125  ..............          36,125  ..............  ..............
  11 120MM MORTAR, ALL TYPES                            ..............          69,133  ..............          69,133  ..............  ..............
 
     TANK AMMUNITION
  12 CTG TANK 105MM AND 120MM: ALL TYPES                ..............         120,668  ..............         117,853  ..............          -2,815
 
     ARTILLERY AMMUNITION
  13 CTG, ARTY, 75MM AND 105MM: ALL TYPES               ..............          64,800  ..............          61,300  ..............          -3,500
  14 ARTILLERY PROJECTILE, 155MM, ALL TYPES             ..............         109,515  ..............          89,515  ..............         -20,000
  15 PROJ 155MM EXTENDED RANGE XM982                    ..............          39,200  ..............          36,025  ..............          -3,175
  16 ARTILLERY PROPELLANTS, FUZES AND PRIMERS, ALL      ..............          70,881  ..............          66,881  ..............          -4,000
      TYPES
 
     ROCKETS
  19 SHOULDER LAUNCHED MUNITIONS, ALL TYPES             ..............          38,000  ..............          28,000  ..............         -10,000
  20 ROCKET, HYDRA 70, ALL TYPES                        ..............          87,213  ..............          87,213  ..............  ..............
 
     OTHER AMMUNITION
  21 CAD/PAD ALL TYPES                                  ..............           4,914  ..............           4,914  ..............  ..............
  22 DEMOLITION MUNITIONS, ALL TYPES                    ..............           6,380  ..............           2,380  ..............          -4,000
  23 GRENADES, ALL TYPES                                ..............          22,760  ..............          22,760  ..............  ..............
  24 SIGNALS, ALL TYPES                                 ..............          10,666  ..............           6,166  ..............          -4,500
  25 SIMULATORS, ALL TYPES                              ..............           7,412  ..............           7,412  ..............  ..............
 
     MISCELLANEOUS
  26 AMMO COMPONENTS, ALL TYPES                         ..............          12,726  ..............          12,726  ..............  ..............
  27 NON-LETHAL AMMUNITION, ALL TYPES                   ..............           6,100  ..............           4,100  ..............          -2,000
  28 ITEMS LESS THAN $5 MILLION                         ..............          10,006  ..............           8,006  ..............          -2,000
  29 AMMUNITION PECULIAR EQUIPMENT                      ..............          17,275  ..............          13,528  ..............          -3,747
  30 FIRST DESTINATION TRANSPORTATION (AMMO)            ..............          14,951  ..............          14,951  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AMMUNITION                            ..............       1,129,859  ..............       1,063,768  ..............         -66,091
 
     AMMUNITION PRODUCTION BASE SUPPORT
 
     PRODUCTION BASE SUPPORT
  32 PROVISION OF INDUSTRIAL FACILITIES                 ..............         222,269  ..............         242,269  ..............         +20,000
  33 CONVENTIONAL MUNITIONS DEMILITARIZATION, ALL       ..............         157,383  ..............         157,383  ..............  ..............
  34 ARMS INITIATIVE                                    ..............           3,646  ..............           3,646  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AMMUNITION PRODUCTION BASE SUPPORT    ..............         383,298  ..............         403,298  ..............         +20,000
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT OF AMMUNITION, ARMY       ..............       1,513,157  ..............       1,467,066  ..............         -46,091
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   8CTG, 40mm, All             118,178         111,824          -6,354
     Types
        Improving       ..............  ..............          -6,354
         funds
         management:
         Program
         delays
  12Cartridges, Tank,          120,668         117,853          -2,815
     105MM and 120MM,
     All Types
        Improving       ..............  ..............          -2,815
         funds
         management:
         Excess to
         requirement
  13Artillery                   64,800          61,300          -3,500
     Cartridges, 75MM
     & 105MM, All
     Types
        Restoring       ..............  ..............          -3,500
         acquisition
         accountabilit
         y:
         Acquisition
         strategy
         (75mm Blank)
  14Artillery                  109,515          89,515         -20,000
     Projectile,
     155MM, All Types
        Restoring       ..............  ..............         -20,000
         acquisition
         accountabilit
         y:
         Unjustified
         growth
  15Proj 155mm                  39,200          36,025          -3,175
     Extended Range
     M982
        Maintain        ..............  ..............          -3,175
         program
         affordability
         : Eliminate
         program
         growth
         (production
         engineering)
  16Artillery                   70,881          66,881          -4,000
     Propellants,
     Fuzes and
     Primers, All
        Maintain        ..............  ..............          -4,000
         program
         affordability
         : Maintain
         level of
         effort (PGK)
  19Shoulder Launched           38,000          28,000         -10,000
     Munitions, All
     Types
        Restoring       ..............  ..............         -10,000
         acquisition
         accountabilit
         y:
         Acquisition
         strategy
  22Demolition                   6,380           2,380          -4,000
     Munitions, All
     Types
        Improving       ..............  ..............          -4,000
         funds
         management:
         Unobligated
         balances
  24Signals, All Types          10,666           6,166          -4,500
        Improving       ..............  ..............          -4,500
         funds
         management:
         Excess to
         requirement
  27Non-Lethal                   6,100           4,100          -2,000
     Ammunition, All
     Types
        Improving       ..............  ..............          -2,000
         funds
         management:
         Unobligated
         balances
  28Items Less Than $5          10,006           8,006          -2,000
     Million (AMMO)
        Improving       ..............  ..............          -2,000
         funds
         management:
         Unobligated
         balances
  29Ammunition                  17,275          13,528          -3,747
     Peculiar
     Equipment
        Improving       ..............  ..............          -3,747
         funds
         management:
         Excess to
         requirement
  32Industrial                 222,269         242,269         +20,000
     Facilities
        Program         ..............  ..............         +20,000
         increase
------------------------------------------------------------------------

    Conventional Munitions Demilitarization.--The Committee 
notes that at current funding levels the stockpile of 
conventional munitions awaiting demilitarization is projected 
to grow over the Future Years Defense Program. In light of 
current budget constraints, the Committee encourages the 
Secretary of the Army to assess new options for reducing risk, 
enhance efficiencies to achieve cost reduction, and leverage 
expertise from industry and academia to advance affordable 
demilitarization technology.

                        Other Procurement, Army

Appropriations, 2016....................................  $5,718,811,000
Budget estimate, 2017...................................   5,873,949,000
Committee recommendation................................   5,862,299,000

    The Committee recommends an appropriation of 
$5,862,299,000. This is $11,650,000 below the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  OTHER PROCUREMENT, ARMY
 
     TACTICAL AND SUPPORT VEHICLES
 
     TACTICAL VEHICLES
   1 TACTICAL TRAILERS/DOLLY SETS                       ..............           3,733  ..............           2,578  ..............          -1,155
   2 SEMITRAILERS, FLATBED:                             ..............           3,716  ..............           3,716  ..............  ..............
   3 HI MOB MULTI-PURP WHLD VEH [HMMWV]                 ..............  ..............  ..............          50,000  ..............         +50,000
   4 GROUND MOBILITY VEHICLES [GMV]                     ..............           4,907  ..............           4,907  ..............  ..............
   5 ARNG HMMWV MODERNIZATION PROGRAM                   ..............  ..............  ..............          60,000  ..............         +60,000
   6 JOINT LIGHT TACTICAL VEHICLE                                1,828         587,514           1,828         587,514  ..............  ..............
   7 TRUCK, DUMP, 20t (CCE)                             ..............           3,927  ..............  ..............  ..............          -3,927
   8 FAMILY OF MEDIUM TACTICAL VEH [FMTV]                            8          53,293               8          53,293  ..............  ..............
   9 FIRETRUCKS & ASSOCIATED FIREFIGHTING EQUIPMENT     ..............           7,460  ..............           7,460  ..............  ..............
  10 FAMILY OF HEAVY TACTICAL VEHICLES [FHTV]                      430          39,564             430          39,564  ..............  ..............
  11 PLS ESP                                            ..............          11,856  ..............          11,856  ..............  ..............
  13 TACTICAL WHEELED VEHICLE PROTECTION KITS           ..............          49,751  ..............          49,751  ..............  ..............
  14 MODIFICATION OF IN SVC EQUIP                       ..............          64,000  ..............          64,000  ..............  ..............
  15 MINE-RESISTANT AMBUSH-PROTECTED MODS               ..............          10,611  ..............          10,611  ..............  ..............
 
     NON-TACTICAL VEHICLES
  16 HEAVY ARMORED SEDAN                                ..............             394  ..............             394  ..............  ..............
  18 NONTACTICAL VEHICLES, OTHER                        ..............           1,755  ..............           1,755  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, TACTICAL AND SUPPORT VEHICLES         ..............         842,481  ..............         947,399  ..............        +104,918
 
     COMMUNICATIONS AND ELECTRONICS EQUIPMENT
 
     COMM--JOINT COMMUNICATIONS
  19 WIN-T--GROUND FORCES TACTICAL NETWORK              ..............         427,598  ..............         427,598  ..............  ..............
  20 SIGNAL MODERNIZATION PROGRAM                       ..............          58,250  ..............          58,250  ..............  ..............
  21 JOINT INCIDENT SITE COMMUNICATIONS CAPABILITY      ..............           5,749  ..............           5,749  ..............  ..............
  22 JCSE EQUIPMENT (USREDCOM)                          ..............           5,068  ..............           5,068  ..............  ..............
 
     COMM--SATELLITE COMMUNICATIONS
  23 DEFENSE ENTERPRISE WIDEBAND SATCOM SYSTEMS         ..............         143,805  ..............         143,805  ..............  ..............
  24 TRANSPORTABLE TACTICAL COMMAND COMMUNICATIONS      ..............          36,580  ..............          36,580  ..............  ..............
  25 SHF TERM                                           ..............           1,985  ..............           1,985  ..............  ..............
  27 SMART-T (SPACE)                                    ..............           9,165  ..............           9,165  ..............  ..............
 
     COMM--C3 SYSTEM
  31 ARMY GLOBAL CMD & CONTROL SYS [AGCCS]              ..............           2,530  ..............           2,530  ..............  ..............
  33 HANDHELD MANPACK SMALL FORM FIT [HMS]                       5,656         273,645           5,656         273,645  ..............  ..............
  34 MID-TIER NETWORKING VEHICULAR RADIO [MNVR]         ..............          25,017  ..............          18,937  ..............          -6,080
  35 RADIO TERMINAL SET, MIDS LVT(2)                    ..............          12,326  ..............          12,326  ..............  ..............
  37 TRACTOR DESK                                       ..............           2,034  ..............           2,034  ..............  ..............
  38 TRACTOR RIDE                                       ..............           2,334  ..............           2,334  ..............  ..............
  39 SPIDER APLA REMOTE CONTROL UNIT                    ..............           1,985  ..............           1,428  ..............            -557
  40 SPIDER FAMILY OF NETWORKED MUNITIONS INCREASE      ..............          10,796  ..............           8,796  ..............          -2,000
  42 TACTICAL COMMUNICATIONS AND PROTECTIVE SYSTEM      ..............           3,607  ..............           3,607  ..............  ..............
  43 UNIFIED COMMAND SUITE                              ..............          14,295  ..............          14,295  ..............  ..............
  45 FAMILY OF MED COMM FOR COMBAT CASUALTY CARE        ..............          19,893  ..............          19,893  ..............  ..............
 
     COMM--INTELLIGENCE COMM
  47 CI AUTOMATION ARCHITECTURE [MIP]                   ..............           1,388  ..............           1,388  ..............  ..............
  48 ARMY CA/MISO GPF EQUIPMENT                         ..............           5,494  ..............           5,494  ..............  ..............
  49 FAMILY OF BIOMETRICS                               ..............           2,978  ..............           2,978  ..............  ..............
  51 COMMUNICATIONS SECURITY [COMSEC]                   ..............         131,356  ..............         131,356  ..............  ..............
  52 DEFENSIVE CYBER OPERATIONS                         ..............          15,132  ..............          19,132  ..............          +4,000
 
     COMM--LONG HAUL COMMUNICATIONS
  53 BASE SUPPORT COMMUNICATIONS                        ..............          27,452  ..............          27,452  ..............  ..............
 
     COMM--BASE COMMUNICATIONS
  54 INFORMATION SYSTEMS                                ..............         122,055  ..............         122,055  ..............  ..............
  55 EMERGENCY MANAGEMENT MODERNIZATION PROGRAM                      1           4,286               1           4,286  ..............  ..............
  56 INSTALLATION INFO INFRASTRUCTURE MOD PROGRAM       ..............         131,794  ..............         131,794  ..............  ..............
 
     ELECT EQUIP
 
     ELECT EQUIP--TACT INT REL ACT [TIARA]
  59 JTT/CIBS-M [MIP]                                   ..............           5,337  ..............           5,337  ..............  ..............
  62 DCGS-A [MIP]                                       ..............         242,514  ..............         217,814  ..............         -24,700
  63 JOINT TACTICAL GROUND STATION [JTAGS]              ..............           4,417  ..............           4,417  ..............  ..............
  64 TROJAN [MIP]                                       ..............          17,455  ..............          17,455  ..............  ..............
  65 MOD OF IN-SVC EQUIP (INTEL SPT) [MIP]              ..............          44,965  ..............          44,965  ..............  ..............
  66 CI HUMINT AUTO REPRTING AND COLL[CHARCS][MIP]      ..............           7,658  ..............           7,658  ..............  ..............
  67 CLOSE ACCESS TARGET RECONNAISSANCE [CATR]          ..............           7,970  ..............           7,970  ..............  ..............
  68 MACHINE FOREIGN LANGUAGE TRANSLATION SYSTEM        ..............             545  ..............             545  ..............  ..............
 
     ELECT EQUIP--ELECTRONIC WARFARE [EW]
  70 LIGHTWEIGHT COUNTER MORTAR RADAR                   ..............          74,038  ..............          68,453  ..............          -5,585
  71 EW PLANNING AND MANAGEMENT TOOLS                   ..............           3,235  ..............           3,235  ..............  ..............
  72 AIR VIGILANCE [AV]                                 ..............             733  ..............             733  ..............  ..............
  74 FAMILY OF PERSISTENT SURVEILLANCE CAPABILITIES     ..............           1,740  ..............           1,740  ..............  ..............
  75 COUNTERINTELLIGENCE/SECURITY COUNTERMEASURES       ..............             455  ..............             455  ..............  ..............
  76 CI MODERNIZATION [MIP]                             ..............             176  ..............             176  ..............  ..............
 
     ELECT EQUIP--TACTICAL SURV. [TAC SURV]
  77 SENTINEL MODS                                      ..............          40,171  ..............          40,171  ..............  ..............
  78 NIGHT VISION DEVICES                               ..............         163,029  ..............         143,029  ..............         -20,000
  79 SMALL TACTICAL OPTICAL RIFLE MOUNTED MLRF          ..............          15,885  ..............          15,885  ..............  ..............
  80 INDIRECT FIRE PROTECTION FAMILY OF SYSTEMS         ..............          48,427  ..............          48,427  ..............  ..............
  81 FAMILY OF WEAPON SIGHTS [FWS]                      ..............          55,536  ..............          55,536  ..............  ..............
  82 ARTILLERY ACCURACY EQUIP                           ..............           4,187  ..............           4,187  ..............  ..............
  85 JOINT BATTLE COMMAND--PLATFORM [JBC-P]             ..............         137,501  ..............         137,501  ..............  ..............
  86 JOINT EFFECTS TARGETING SYSTEM [JETS]              ..............          50,726  ..............          48,375  ..............          -2,351
  87 MOD OF IN-SERVICE EQUIPMENT (LLDR)                 ..............          28,058  ..............          28,058  ..............  ..............
  88 COMPUTER BALLISTICS: LHMBC XM32                    ..............           5,924  ..............           5,924  ..............  ..............
  89 MORTAR FIRE CONTROL SYSTEM                         ..............          22,331  ..............          22,331  ..............  ..............
  90 COUNTERFIRE RADARS                                 ..............         314,509  ..............         297,509  ..............         -17,000
 
     ELECT EQUIP--TACTICAL C2 SYSTEMS
  91 FIRE SUPPORT C2 FAMILY                             ..............           8,660  ..............           8,660  ..............  ..............
  92 AIR & MSL DEFENSE PLANNING & CONTROL SYS [AMD]     ..............          54,376  ..............          54,376  ..............  ..............
  93 IAMD BATTLE COMMAND SYSTEM                         ..............         204,969  ..............         174,502  ..............         -30,467
  94 LIFE CYCLE SOFTWARE SUPPORT [LCSS]                 ..............           4,718  ..............           4,718  ..............  ..............
  95 NETWORK MANAGEMENT INITIALIZATION AND SERVICE      ..............          11,063  ..............          11,063  ..............  ..............
  96 MANEUVER CONTROL SYSTEM [MCS]                      ..............         151,318  ..............         151,318  ..............  ..............
  97 GLOBAL COMBAT SUPPORT SYSTEM--ARMY                 ..............         155,660  ..............         155,660  ..............  ..............
  98 INTEGRATED PERSONNEL AND PAY SYSTEM--ARMY          ..............           4,214  ..............           4,214  ..............  ..............
  99 RECONNAISSANCE AND SURVEYING INSTRUMENT SET        ..............          16,185  ..............          16,185  ..............  ..............
 100 MOD OF IN-SERVICE EQUIPMENT (ENFIRE)               ..............           1,565  ..............           1,565  ..............  ..............
 
     ELECT EQUIP--AUTOMATION
 101 ARMY TRAINING MODERNIZATION                        ..............          17,693  ..............          17,693  ..............  ..............
 102 AUTOMATED DATA PROCESSING EQUIPMENT                ..............         107,960  ..............         107,960  ..............  ..............
 103 GENERAL FUND ENTERPRISE BUSINESS SYSTEM            ..............           6,416  ..............           6,416  ..............  ..............
 104 HIGH PERF COMPUTING MOD PROGRAM                    ..............          58,614  ..............          58,614  ..............  ..............
 105 CONTRACT WRITING SYSTEM                            ..............             986  ..............             986  ..............  ..............
 106 RESERVE COMPONENT AUTOMATION SYS [RCAS]            ..............          23,828  ..............          23,828  ..............  ..............
 
     ELECT EQUIP--AUDIO VISUAL SYS [A/V]
 107 TACTICAL DIGITAL MEDIA                             ..............           1,191  ..............           1,191  ..............  ..............
 108 ITEMS LESS THAN $5 MILLION (SURVEYING EQUIPMENT)   ..............           1,995  ..............           1,995  ..............  ..............
 
     ELECT EQUIP--SUPPORT
 109 PRODUCTION BASE SUPPORT [C-E]                      ..............             403  ..............             403  ..............  ..............
 999 CLASSIFIED PROGRAMS                                ..............           4,436  ..............           4,436  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, COMMUNICATIONS AND ELECTRONICS        ..............       3,632,369  ..............       3,527,629  ..............        -104,740
            EQUIPMENT
 
     OTHER SUPPORT EQUIPMENT
 
     CHEMICAL DEFENSIVE EQUIPMENT
 111 PROTECTIVE SYSTEMS                                 ..............           2,966  ..............           2,966  ..............  ..............
 112 FAMILY OF NON-LETHAL EQUIPMENT [FNLE]              ..............           9,795  ..............           9,490  ..............            -305
 114 CBRN DEFENSE                                       ..............          17,922  ..............          17,922  ..............  ..............
 
     BRIDGING EQUIPMENT
 115 TACTICAL BRIDGING                                  ..............          13,553  ..............          13,553  ..............  ..............
 116 TACTICAL BRIDGE, FLOAT-RIBBON                      ..............          25,244  ..............          25,244  ..............  ..............
 117 BRIDGE SUPPLEMENTAL SET                            ..............             983  ..............  ..............  ..............            -983
 118 COMMON BRIDGE TRANSPORTER RECAP                    ..............          25,176  ..............          25,176  ..............  ..............
 
     ENGINEER (NON-CONSTRUCTION) EQUIPMENT
 119 GROUND STANDOFF MINE DETECTION SYSTEM [GSTAMIDS]   ..............          39,350  ..............          39,350  ..............  ..............
 120 AREA MINE DETECTION SYSTEM [AMIDS]                 ..............          10,500  ..............          10,500  ..............  ..............
 121 HUSKY MOUNTED DETECTION SYSTEM [HMDS]              ..............             274  ..............             274  ..............  ..............
 122 ROBOTIC COMBAT SUPPORT SYSTEM                      ..............           2,951  ..............           2,951  ..............  ..............
 123 EOD ROBOTICS SYSTEMS RECAPITALIZATION              ..............           1,949  ..............           1,949  ..............  ..............
 124 ROBOTICS AND APPLIQUE SYSTEMS                      ..............           5,203  ..............           5,203  ..............  ..............
 125 EXPLOSIVE ORDNANCE DISPOSAL EQPMT [EOD EQPMT]      ..............           5,570  ..............           5,570  ..............  ..............
 126 REMOTE DEMOLITION SYSTEMS                          ..............           6,238  ..............           5,238  ..............          -1,000
 127 ITEMS LESS THAN $5 MILLION, COUNTERMINE EQUIPMENT  ..............             836  ..............             836  ..............  ..............
 128 FAMILY OF BOATS AND MOTORS                         ..............           3,171  ..............           3,171  ..............  ..............
 
     COMBAT SERVICE SUPPORT EQUIPMENT
 129 HEATERS AND ECU'S                                  ..............          18,707  ..............          18,707  ..............  ..............
 130 SOLDIER ENHANCEMENT                                ..............           2,112  ..............           2,112  ..............  ..............
 131 PERSONNEL RECOVERY SUPPORT SYSTEM [PRSS]           ..............          10,856  ..............          10,856  ..............  ..............
 132 GROUND SOLDIER SYSTEM                              ..............          32,419  ..............          32,419  ..............  ..............
 133 MOBILE SOLDIER POWER                               ..............          30,014  ..............          30,014  ..............  ..............
 135 FIELD FEEDING EQUIPMENT                            ..............          12,544  ..............          12,544  ..............  ..............
 136 CARGO AERIAL DEL & PERSONNEL PARACHUTE SYSTEM      ..............          18,509  ..............          18,509  ..............  ..............
 137 FAMILY OF ENGR COMBAT AND CONSTRUCTION SETS        ..............          29,384  ..............          29,384  ..............  ..............
 
     PETROLEUM EQUIPMENT
 139 QUALITY SURVEILLANCE EQUIPMENT                     ..............           4,487  ..............           4,487  ..............  ..............
 140 DISTRIBUTION SYSTEMS, PETROLEUM & WATER            ..............          42,656  ..............          35,656  ..............          -7,000
 
     MEDICAL EQUIPMENT
 141 COMBAT SUPPORT MEDICAL                             ..............          59,761  ..............          59,761  ..............  ..............
 
     MAINTENANCE EQUIPMENT
 142 MOBILE MAINTENANCE EQUIPMENT SYSTEMS               ..............          35,694  ..............          32,694  ..............          -3,000
 143 ITEMS LESS THAN $5 MILLION (MAINT EQ)              ..............           2,716  ..............           2,716  ..............  ..............
 
     CONSTRUCTION EQUIPMENT
 144 GRADER, ROAD MTZD, HVY, 6X4 (CCE)                  ..............           1,742  ..............           1,742  ..............  ..............
 145 SCRAPERS, EARTHMOVING                              ..............          26,233  ..............          26,233  ..............  ..............
 147 HYDRAULIC EXCAVATOR                                ..............           1,123  ..............           1,123  ..............  ..............
 149 ALL TERRAIN CRANES                                 ..............          65,285  ..............          65,285  ..............  ..............
 151 HIGH MOBILITY ENGINEER EXCAVATOR [HMEE] FOS        ..............           1,743  ..............           1,743  ..............  ..............
 152 ENHANCED RAPID AIRFIELD CONSTRUCTION CAPAP         ..............           2,779  ..............           2,779  ..............  ..............
 154 CONST EQUIP ESP                                    ..............          26,712  ..............          19,172  ..............          -7,540
 155 ITEMS LESS THAN $5 MILLION (CONST EQUIP)           ..............           6,649  ..............           6,649  ..............  ..............
 
     RAIL FLOAT CONTAINERIZATION EQUIPMENT
 156 ARMY WATERCRAFT ESP                                ..............          21,860  ..............          21,860  ..............  ..............
 157 ITEMS LESS THAN $5 MILLION (FLOAT/RAIL)            ..............           1,967  ..............           1,967  ..............  ..............
 
     GENERATORS
 158 GENERATORS AND ASSOCIATED EQUIPMENT                ..............         113,266  ..............         113,266  ..............  ..............
 
     MATERIAL HANDLING EQUIPMENT
 159 TACTICAL ELECTRIC POWER RECAPITALIZATION           ..............           7,867  ..............           7,867  ..............  ..............
 160 FAMILY OF FORKLIFTS                                ..............           2,307  ..............           2,307  ..............  ..............
 
     TRAINING EQUIPMENT
 161 COMBAT TRAINING CENTERS SUPPORT                    ..............          75,359  ..............          75,359  ..............  ..............
 162 TRAINING DEVICES, NONSYSTEM                        ..............         253,050  ..............         253,050  ..............  ..............
 163 CLOSE COMBAT TACTICAL TRAINER                      ..............          48,271  ..............          48,271  ..............  ..............
 164 AVIATION COMBINED ARMS TACTICAL TRAINER [AVCA]     ..............          40,000  ..............          40,000  ..............  ..............
 165 GAMING TECHNOLOGY IN SUPPORT OF ARMY TRAINING      ..............          11,543  ..............          11,543  ..............  ..............
 
     TEST MEASURE AND DIG EQUIPMENT [TMD]
 166 CALIBRATION SETS EQUIPMENT                         ..............           4,963  ..............           4,963  ..............  ..............
 167 INTEGRATED FAMILY OF TEST EQUIPMENT [IFTE]         ..............          29,781  ..............          29,781  ..............  ..............
 168 TEST EQUIPMENT MODERNIZATION [TEMOD]               ..............           6,342  ..............           6,342  ..............  ..............
 
     OTHER SUPPORT EQUIPMENT
 169 M25 STABILIZED BINOCULAR                           ..............           3,149  ..............           3,149  ..............  ..............
 170 RAPID EQUIPPING SOLDIER SUPPORT EQUIPMENT          ..............          18,003  ..............          20,003  ..............          +2,000
 171 PHYSICAL SECURITY SYSTEMS (OPA3)                   ..............          44,082  ..............          44,082  ..............  ..............
 172 BASE LEVEL COM'L EQUIPMENT                         ..............           2,168  ..............           2,168  ..............  ..............
 173 MODIFICATION OF IN-SVC EQUIPMENT (OPA-3)           ..............          67,367  ..............          67,367  ..............  ..............
 174 PRODUCTION BASE SUPPORT (OTH)                      ..............           1,528  ..............           1,528  ..............  ..............
 175 SPECIAL EQUIPMENT FOR USER TESTING                 ..............           8,289  ..............          14,289  ..............          +6,000
 177 TRACTOR YARD                                       ..............           6,888  ..............           6,888  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER SUPPORT EQUIPMENT               ..............       1,371,856  ..............       1,360,028  ..............         -11,828
 
     SPARE AND REPAIR PARTS
 179 INITIAL SPARES--C&E;                                ..............          27,243  ..............          27,243  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, SPARE AND REPAIR PARTS                ..............          27,243  ..............          27,243  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER PROCUREMENT, ARMY               ..............       5,873,949  ..............       5,862,299  ..............         -11,650
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                           2017 budget      Committee      Change from
Line         Item           estimate     recommendation  budget estimate
------------------------------------------------------------------------
   1Tactical Trailers/          3,733           2,578          -1,155
     Dolly Sets
        Restoring      ..............  ..............          -1,155
         acquisition
         accountabili
         ty: PVT
         early to
         need
   3Hi Mob Multi-Purp  ..............          50,000         +50,000
     Whld Veh [HMMWV]
        HMMWV          ..............  ..............         +50,000
         Ambulance
         Modernizatio
         n
   5ARNG HMMWV         ..............          60,000         +60,000
     Modernization
     Program
        HMMWV          ..............  ..............         +60,000
         Ambulances
         for Guard
         and Reserve
   7Truck, Dump, 20t            3,927  ..............          -3,927
     (CCE)
        Restoring      ..............  ..............          -3,927
         acquisition
         accountabili
         ty:
         Procurement
         early to
         need
  34Mid-Tier                   25,017          18,937          -6,080
     Networking
     Vehicular Radio
     [MNVR]
        Restoring      ..............  ..............          -6,080
         acquisition
         accountabili
         ty: Schedule
         slip
  39Spider Apla                 1,985           1,428            -557
     Remote Control
     Unit
        Restoring      ..............  ..............            -557
         acquisition
         accountabili
         ty: Fielding
         cost growth
  40Spider Family of           10,796           8,796          -2,000
     Networked
     Munitions Incr
        Restoring      ..............  ..............          -2,000
         acquisition
         accountabili
         ty:
         Engineering
         cost growth
  52Defensive CYBER            15,132          19,132          +4,000
     Operations
        Program        ..............  ..............          +4,000
         Increase
  62DCGS-A (MIP)              242,514         217,814         -24,700
        Restoring      ..............  ..............         -24,700
         acquisition
         accountabili
         ty: Tech
         refresh
         growth
  70Lightweight                74,038          68,453          -5,585
     Counter Mortar
     Radar
        Restoring      ..............  ..............          -5,585
         acquisition
         accountabili
         ty: Unit
         cost growth
  78Night Vision              163,029         143,029         -20,000
     Devices
        Maintain       ..............  ..............         -20,000
         program
         affordabilit
         y: Maintain
         level of
         effort
  86Joint Effects              50,726          48,375          -2,351
     Targeting System
     [JETS]
        Maintain       ..............  ..............          -2,351
         program
         affordabilit
         y: Non-
         recurring
         engineering
         previously
         funded
  90Counterfire               314,509         297,509         -17,000
     Radars
        Restoring      ..............  ..............         -17,000
         acquisition
         accountabili
         ty: Unit
         cost growth
  93IAMD Battle               204,969         174,502         -30,467
     Command System
        Restoring      ..............  ..............         -30,467
         acquisition
         accountabili
         ty:
         Concurrency
 112Family of Non-              9,795           9,490            -305
     Lethal Equipment
     [FNLE]
        Restoring      ..............  ..............            -305
         acquisition
         accountabili
         ty: Unit
         cost growth
 117Bridge                        983  ..............            -983
     Supplemental Set
        Restoring      ..............  ..............            -983
         acquisition
         accountabili
         ty:
         Procurement
         early to
         need
 126Remote Demolition           6,238           5,238          -1,000
     Systems
        Restoring      ..............  ..............          -1,000
         acquisition
         accountabili
         ty: Schedule
         slip
 140Distribution               42,656          35,656          -7,000
     Systems,
     Petroleum &
     Water
        Maintain       ..............  ..............          -7,000
         program
         affordabilit
         y: Maintain
         level of
         effort
 142Mobile                     35,694          32,694          -3,000
     Maintenance
     Equipment
     Systems
        Maintain       ..............  ..............          -3,000
         program
         affordabilit
         y: Maintain
         level of
         effort
 154Const Equip Esp            26,712          19,172          -7,540
        Restoring      ..............  ..............          -7,540
         acquisition
         accountabili
         ty: Unit
         cost growth
 170Rapid Equipping            18,003          20,003          +2,000
     Soldier Support
     Equipment
        Program        ..............  ..............          +2,000
         Increase
 175Special Equipment           8,289          14,289          +6,000
     for User Testing
        Program        ..............  ..............          +6,000
         Increase
------------------------------------------------------------------------

    HMMWV Modernization.--The Committee recognizes the critical 
role that technologies like antilock brakes and electronic 
stability control play in mitigating rollover accidents, 
although such technologies are not common on military tactical 
wheeled vehicles. The Army and Marine Corps recently completed 
a congressionally mandated study of potential up-armored High 
Mobility Multipurpose Wheeled Vehicle [HMMWV] automotive 
improvements, which included such technologies. As a result of 
the Modernization Expanded Capability Vehicle-Automotive study, 
the Committee understands that safety-improvement technologies 
exist which could be applied to today's HMMWV fleet. The 
Committee encourages the Army to initiate the necessary 
engineering and logistical analyses necessary to develop and 
compete an engineering proposal for Army up-armored HMMWV 
safety improvement kits as an element of future modernization 
efforts for HMMWVs in the Regular Army, Army National Guard, 
and Army Reserve fleets.
    HMMWV Ambulances.--The Committee notes that the average age 
of ground ambulance fleets within the active and reserve 
components of the Army is 28 years. At current levels of 
investment, these fleets will remain less than 25 percent 
modernized across the Future Years Defense Program, impairing 
the total Army's ability to execute its Federal and State 
missions. The Committee recommends an additional $110,000,000 
for High Mobility Multipurpose Wheeled Vehicle ambulances, of 
which $50,000,000 is intended for the Regular Army, $40,000,000 
for the Army National Guard and $20,000,000 for the Army 
Reserve.
    Family of Medium Tactical Vehicles.--The Committee supports 
the Army's plan to recompete the Family of Medium Tactical 
Vehicles [FMTV] program in light of the significant cost 
savings gained as a result of the 2010 competition. The 
Committee supports the Army's plan, as outlined in the fiscal 
year 2017 budget request, to continue to produce the current 
generation of FMTV through the beginning of production of the 
upgraded FMTV in 2020. This proposal will mitigate risk to the 
FMTV industrial base as the contract is recompeted.
    Tactical Bridging.--The Committee is aware that the Army is 
replacing its aging MK II Bridge Erection Boats [BEB] with a 
newly designed BEB upgraded to meet current survivability, 
transportability, and interoperability requirements. It will 
provide Regular Army, Army National Guard, and Army Reserve 
engineer bridge companies with enhanced capability to conduct 
bridging, dive support, rafting, and patrols. The program 
expects to transition to full rate production in fiscal year 
2017 and eventually procure 379 vessels. The Committee 
encourages the Army maintain close oversight of production to 
keep program costs low and meet planned acquisition objectives.
    Radiation Detection Devices.--The Committee notes that 
shortfalls continue to exist within the reserve components in 
fielding the most current radiation detection devices, 
specifically personal dosimeters. To ensure our troops and 
domestic homeland first responders are provided with the best 
possible protection to monitor against nuclear exposure, the 
Committee encourages the Secretary of the Army to expedite the 
fielding of modern radiation detection equipment across the 
force.

                       Aircraft Procurement, Navy

Appropriations, 2016.................................... $17,521,209,000
Budget estimate, 2017...................................  14,109,148,000
Committee recommendation................................  15,472,048,000

    The Committee recommends an appropriation of 
$15,472,048,000. This is $1,362,900,000 above the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
                 AIRCRAFT PROCUREMENT, NAVY
 
     COMBAT AIRCRAFT
   2 F/A-18E/F (FIGHTER) HORNET [MYP]                   ..............  ..............              12         979,000             +12        +979,000
   3 JOINT STRIKE FIGHTER                                            4         890,650               6         983,650              +2         +93,000
   4 JOINT STRIKE FIGHTER [AP-CY]                       ..............          80,908  ..............          80,908  ..............  ..............
   5 JSF STOVL                                                      16       2,037,768              18       2,114,568              +2         +76,800
   6 JSF STOVL [AP-CY]                                  ..............         233,648  ..............         233,648  ..............  ..............
   7 CH-53K (HEAVY LIFT)                                ..............         348,615  ..............         322,015  ..............         -26,600
   8 CH-53K (HEAVY LIFT) [AP-CY]                        ..............          88,365  ..............          88,365  ..............  ..............
   9 V-22 (MEDIUM LIFT)                                             16       1,264,134              18       1,399,134              +2        +135,000
  10 V-22 (MEDIUM LIFT) [AP-CY]                         ..............          19,674  ..............          19,674  ..............  ..............
  11 UH-1Y/AH-1Z                                                    24         759,778              24         747,778  ..............         -12,000
  12 UH-1Y/AH-1Z [AP-CY]                                ..............          57,232  ..............          57,232  ..............  ..............
  14 MH-60R                                             ..............          61,177  ..............          53,177  ..............          -8,000
  16 P-8A POSEIDON                                                  11       1,940,238              11       1,820,238  ..............        -120,000
  17 P-8A POSEIDON [AP-CY]                              ..............         123,140  ..............         123,140  ..............  ..............
  18 E-2D ADV HAWKEYE                                                6         916,483               6         916,483  ..............  ..............
  19 E-2D ADV HAWKEYE [AP-CY]                           ..............         125,042  ..............         125,042  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, COMBAT AIRCRAFT                       ..............       8,946,852  ..............      10,064,052  ..............      +1,117,200
 
     TRAINER AIRCRAFT
  20 JPATS                                              ..............           5,849  ..............           5,849  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, TRAINER AIRCRAFT                      ..............           5,849  ..............           5,849  ..............  ..............
 
     OTHER AIRCRAFT
  21 KC-130J                                                         2         128,870               2         128,870  ..............  ..............
  22 KC-130J [AP-CY]                                    ..............          24,848  ..............          24,848  ..............  ..............
  23 MQ-4 TRITON                                                     2         409,005               2         389,005  ..............         -20,000
  24 MQ-4 TRITON [AP-CY]                                ..............          55,652  ..............          55,652  ..............  ..............
  25 MQ-8 UAV                                                        1          72,435               1          72,435  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER AIRCRAFT                        ..............         690,810  ..............         670,810  ..............         -20,000
 
     MODIFICATION OF AIRCRAFT
  29 AEA SYSTEMS                                        ..............          51,900  ..............          51,900  ..............  ..............
  30 AV-8 SERIES                                        ..............          60,818  ..............          60,818  ..............  ..............
  31 ADVERSARY                                          ..............           5,191  ..............           5,191  ..............  ..............
  32 F-18 SERIES                                        ..............       1,023,492  ..............       1,018,792  ..............          -4,700
  34 H-53 SERIES                                        ..............          46,095  ..............          46,095  ..............  ..............
  35 SH-60 SERIES                                       ..............         108,328  ..............         108,328  ..............  ..............
  36 H-1 SERIES                                         ..............          46,333  ..............          46,333  ..............  ..............
  37 EP-3 SERIES                                        ..............          14,681  ..............          14,681  ..............  ..............
  38 P-3 SERIES                                         ..............           2,781  ..............           2,781  ..............  ..............
  39 E-2 SERIES                                         ..............          32,949  ..............          32,949  ..............  ..............
  40 TRAINER A/C SERIES                                 ..............          13,199  ..............          13,199  ..............  ..............
  41 C-2A                                               ..............          19,066  ..............          19,066  ..............  ..............
  42 C-130 SERIES                                       ..............          61,788  ..............          59,788  ..............          -2,000
  43 FEWSG                                              ..............             618  ..............             618  ..............  ..............
  44 CARGO/TRANSPORT A/C SERIES                         ..............           9,822  ..............           9,822  ..............  ..............
  45 E-6 SERIES                                         ..............         222,077  ..............         222,077  ..............  ..............
  46 EXECUTIVE HELICOPTERS SERIES                       ..............          66,835  ..............          66,835  ..............  ..............
  47 SPECIAL PROJECT AIRCRAFT                           ..............          16,497  ..............          16,497  ..............  ..............
  48 T-45 SERIES                                        ..............         114,887  ..............         114,887  ..............  ..............
  49 POWER PLANT CHANGES                                ..............          16,893  ..............          14,893  ..............          -2,000
  50 JPATS SERIES                                       ..............          17,401  ..............          17,401  ..............  ..............
  51 COMMON ECM EQUIPMENT                               ..............         143,773  ..............         143,773  ..............  ..............
  52 COMMON AVIONICS CHANGES                            ..............         164,839  ..............         164,839  ..............  ..............
  53 COMMON DEFENSIVE WEAPON SYSTEM                     ..............           4,403  ..............           4,403  ..............  ..............
  54 ID SYSTEMS                                         ..............          45,768  ..............          45,768  ..............  ..............
  55 P-8 SERIES                                         ..............          18,836  ..............          18,036  ..............            -800
  56 MAGTF EW FOR AVIATION                              ..............           5,676  ..............           5,676  ..............  ..............
  57 MQ-8 SERIES                                        ..............          19,003  ..............          19,003  ..............  ..............
  58 RQ-7 SERIES                                        ..............           3,534  ..............           1,534  ..............          -2,000
  59 V-22 (TILT/ROTOR ACFT) OSPREY                      ..............         141,545  ..............         141,545  ..............  ..............
  60 F-35 STOVL SERIES                                  ..............          34,928  ..............          34,928  ..............  ..............
  61 F-35 CV SERIES                                     ..............          26,004  ..............          26,004  ..............  ..............
  62 QUICK REACTION CAPABILITY [QRC]                    ..............           5,476  ..............           5,476  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, MODIFICATION OF AIRCRAFT              ..............       2,565,436  ..............       2,553,936  ..............         -11,500
 
     AIRCRAFT SPARES AND REPAIR PARTS
  63 SPARES AND REPAIR PARTS                            ..............       1,407,626  ..............       1,707,626  ..............        +300,000
 
     AIRCRAFT SUPPORT EQUIPMENT AND FACILITIES
  64 COMMON GROUND EQUIPMENT                            ..............         390,103  ..............         367,303  ..............         -22,800
  65 AIRCRAFT INDUSTRIAL FACILITIES                     ..............          23,194  ..............          23,194  ..............  ..............
  66 WAR CONSUMABLES                                    ..............          40,613  ..............          40,613  ..............  ..............
  67 OTHER PRODUCTION CHARGES                           ..............             860  ..............             860  ..............  ..............
  68 SPECIAL SUPPORT EQUIPMENT                          ..............          36,282  ..............          36,282  ..............  ..............
  69 FIRST DESTINATION TRANSPORTATION                   ..............           1,523  ..............           1,523  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT SUPPORT EQUIPMENT &          ..............         492,575  ..............         469,775  ..............         -22,800
            FACILITIES
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT PROCUREMENT, NAVY            ..............      14,109,148  ..............      15,472,048  ..............      +1,362,900
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   2F/A-18E/F           ..............         979,000        +979,000
     (Fighter) Hornet
        Additional 12   ..............  ..............        +979,000
         aircraft
   3Joint Strike               890,650         983,650         +93,000
     Fighter CV
        Improving       ..............  ..............        -177,000
         funds
         management:
         Prior year
         carryover
        Program         ..............  ..............        +270,000
         increase:
         Additional 2
         F-35Cs for
         the Marine
         Corps
   5JSF STOVL                2,037,768       2,114,568         +76,800
        Improving       ..............  ..............        -160,000
         funds
         management:
         Unit cost
         growth
        Program         ..............  ..............        +236,800
         increase:
         Additional 2
         F-35Bs for
         the Marine
         Corps
   7CH-53K (Heavy              348,615         322,015         -26,600
     Lift)
        Maintain        ..............  ..............         -12,600
         program
         affordability
         : Recurring
         costs excess
         to need
        Restoring       ..............  ..............         -14,000
         acquisition
         accountabilit
         y: Support
         equipment
         early to need
   9V-22 (Medium Lift)       1,264,134       1,399,134        +135,000
        Restoring       ..............  ..............         -15,000
         acquisition
         accountabilit
         y: Support
         cost growth
        Program         ..............  ..............        +150,000
         increase:
         Additional 2
         MV-22s for
         the Marine
         Corps
  11H-1 Upgrades (UH-          759,778         747,778         -12,000
     1Y/AH-1Z)
        Restoring       ..............  ..............         -12,000
         acquisition
         accountabilit
         y: Unit cost
         growth
  14MH-60R (MYP)                61,177          53,177          -8,000
        Maintain        ..............  ..............          -8,000
         program
         affordability
         : Field
         activity
         funding ahead
         of need
  16P-8A Poseidon            1,940,238       1,820,238        -120,000
        Restoring       ..............  ..............         -77,000
         acquisition
         accountabilit
         y: Unit cost
         growth
        Improving       ..............  ..............         -43,000
         funds
         management:
         Prior year
         carryover,
         organic depot
         standup
  23MQ-4 Triton                409,005         389,005         -20,000
        Maintain        ..............  ..............         -20,000
         program
         affordability
         : Contract
         savings
  32F-18 Series              1,023,492       1,018,792          -4,700
        Improving       ..............  ..............          -9,700
         funds
         management:
         Prior year
         carryover
        Program         ..............  ..............          +5,000
         increase:
         Electronic
         warfare
         upgrades
  42C-130 Series                61,788          59,788           -2000
        Improving       ..............  ..............          -2,000
         funds
         management:
         Prior year
         carryover
  49Power Plant                 16,893          14,893          -2,000
     Changes
        Improving       ..............  ..............          -2,000
         funds
         management:
         Prior year
         carryover
  55P-8 Series                  18,836          18,036            -800
        Improving       ..............  ..............            -800
         funds
         management:
         Prior year
         carryover
  58RQ-7 Series                  3,534           1,534          -2,000
        Improving       ..............  ..............          -2,000
         funds
         management:
         Prior year
         carryover
  63Spares and Repair        1,407,626       1,707,626        +300,000
     Parts
        Program         ..............  ..............        +300,000
         increase:
         Spares and
         repair parts
         for the
         Marine Corps
  64Common Ground              390,103         367,303         -22,800
     Equipment
        Improving       ..............  ..............         -22,800
         funds
         management:
         Prior year
         carryover
------------------------------------------------------------------------

    Marine Corps Aviation Readiness.--The Committee is 
concerned about the state of Marine Corps aviation readiness 
but recognizes that there is a 4-year recovery effort underway 
to get aviation back up to the goal of T-2.0 readiness. While 
the fiscal year 2017 budget request maximizes throughput at 
maintenance depots, recent incidents and press reports about 
spare parts shortages indicate continued attention is 
necessary. The Committee therefore recommends additional 
funding in Aircraft Procurement, Navy for spare parts and other 
needs. The Committee urges the Navy and Marine Corps to 
continue to prioritize restoring aviation readiness.
    Navy Reserve Tactical Aircraft.--The Committee notes that 
the Navy submitted a report to Congress in March 2016 titled, 
Navy Reserve Tactical Aviation Force Recapitalization and 
Modernization. The two Navy Reserve F/A-18 squadrons identified 
in the report provide the Navy's active combat force with 
adversary support and also fulfill the strategic reserve 
mission. The Committee remains concerned about the Navy's 
Strike Fighter Inventory Management strategy, including the 
plan to recapitalize the Navy Reserve's aircraft. The Navy 
Reserve is strained to accomplish its missions and, to make 
matters worse, the aircraft fleet will begin to exceed its 
service life in the next 5 years. Therefore, the Committee 
directs the Navy to provide an update on the implementation of 
the Strike Fighter Inventory Management strategy, to include a 
3-year recapitalization and funding plan for the Navy Reserve's 
two squadrons, with the submission of the fiscal year 2018 
budget request.

                       Weapons Procurement, Navy

Appropriations, 2016....................................  $3,049,542,000
Budget estimate, 2017...................................   3,209,262,000
Committee recommendation................................   3,226,750,000

    The Committee recommends an appropriation of 
$3,226,750,000. This is $17,488,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
                 WEAPONS PROCUREMENT, NAVY
 
     BALLISTIC MISSILES
 
     MODIFICATION OF MISSILES
   1 TRIDENT II MODS                                    ..............       1,103,086  ..............       1,103,086  ..............  ..............
 
     SUPPORT EQUIPMENT AND FACILITIES
   2 MISSILE INDUSTRIAL FACILITIES                      ..............           6,776  ..............           6,776  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, BALLISTIC MISSILES                    ..............       1,109,862  ..............       1,109,862  ..............  ..............
 
     OTHER MISSILES
 
     STRATEGIC MISSILES
   3 TOMAHAWK                                                      100         186,905             100         236,105  ..............         +49,200
 
     TACTICAL MISSILES
   4 AMRAAM                                                        163         204,697             163         197,263  ..............          -7,434
   5 SIDEWINDER                                                    152          70,912             152          70,912  ..............  ..............
   6 JSOW                                               ..............           2,232  ..............           2,232  ..............  ..............
   7 STANDARD MISSILE                                              125         501,212             125         481,212  ..............         -20,000
   8 RAM                                                            90          71,557              90          71,557  ..............  ..............
   9 JOINT AIR GROUND MISSILE [JAGM]                                96          26,200              96          21,922  ..............          -4,278
  12 STAND OFF PRECISION GUIDED MUNITION                            24           3,316              24           3,316  ..............  ..............
  13 AERIAL TARGETS                                     ..............         137,484  ..............         137,484  ..............  ..............
  14 OTHER MISSILE SUPPORT                              ..............           3,248  ..............           3,248  ..............  ..............
  15 LRASM                                                          10          29,643              10          29,643  ..............  ..............
 
     MODIFICATION OF MISSILES
  16 ESSM                                                           75          52,935              75          52,935  ..............  ..............
  18 HARM MODS                                          ..............         178,213  ..............         178,213  ..............  ..............
  19 STANDARD MISSILES MODS                             ..............           8,164  ..............           8,164  ..............  ..............
 
     SUPPORT EQUIPMENT AND FACILITIES
  20 WEAPONS INDUSTRIAL FACILITIES                      ..............           1,964  ..............           1,964  ..............  ..............
  21 FLEET SATELLITE COMM FOLLOW-ON                     ..............          36,723  ..............          36,723  ..............  ..............
 
     ORDNANCE SUPPORT EQUIPMENT
  22 ORDNANCE SUPPORT EQUIPMENT                         ..............          59,096  ..............          59,096  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER MISSILES                        ..............       1,574,501  ..............       1,591,989  ..............         +17,488
 
     TORPEDOES AND RELATED EQUIPMENT
 
     TORPEDOES AND RELATED EQUIP
  23 SSTD                                               ..............           5,910  ..............           5,910  ..............  ..............
  24 MK-48 TORPEDO                                                  11          44,537              11          44,537  ..............  ..............
  25 ASW TARGETS                                        ..............           9,302  ..............           9,302  ..............  ..............
  26 MK-54 TORPEDO MODS                                 ..............          98,092  ..............          98,092  ..............  ..............
  27 MK-48 TORPEDO ADCAP MODS                           ..............          46,139  ..............          46,139  ..............  ..............
  28 QUICKSTRIKE MINE                                   ..............           1,236  ..............           1,236  ..............  ..............
 
     SUPPORT EQUIPMENT
  29 TORPEDO SUPPORT EQUIPMENT                          ..............          60,061  ..............          60,061  ..............  ..............
  30 ASW RANGE SUPPORT                                  ..............           3,706  ..............           3,706  ..............  ..............
 
     DESTINATION TRANSPORTATION
  31 FIRST DESTINATION TRANSPORTATION                   ..............           3,804  ..............           3,804  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, TORPEDOES AND RELATED EQUIPMENT       ..............         272,787  ..............         272,787  ..............  ..............
 
     OTHER WEAPONS
 
     GUNS AND GUN MOUNTS
  32 SMALL ARMS AND WEAPONS                             ..............          18,002  ..............          18,002  ..............  ..............
 
     MODIFICATION OF GUNS AND GUN MOUNTS
  33 CIWS MODS                                          ..............          50,900  ..............          50,900  ..............  ..............
  34 COAST GUARD WEAPONS                                ..............          25,295  ..............          25,295  ..............  ..............
  35 GUN MOUNT MODS                                     ..............          77,003  ..............          77,003  ..............  ..............
  36 LCS MODULE WEAPONS                                             24           2,776              24           2,776  ..............  ..............
  38 AIRBORNE MINE NEUTRALIZATION SYSTEMS               ..............          15,753  ..............          15,753  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER WEAPONS                         ..............         189,729  ..............         189,729  ..............  ..............
 
  40 SPARES AND REPAIR PARTS                            ..............          62,383  ..............          62,383  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, WEAPONS PROCUREMENT, NAVY             ..............       3,209,262  ..............       3,226,750  ..............         +17,488
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    3 Tomahawk                 186,905         236,105         +49,200
          Program       ..............  ..............         +56,200
           Increase
          Restoring     ..............  ..............          -7,000
           acquisition
           accountabil
           ity: Unit
           cost growth
    4 AMRAAM                   204,697         197,263          -7,434
          Restoring     ..............  ..............          -7,434
           acquisition
           accountabil
           ity: Unit
           cost growth
    7 Standard Missile         501,212         481,212         -20,000
          Restoring     ..............  ..............         -20,000
           acquisition
           accountabil
           ity: ECP
           cost growth
    9 Joint Air Ground          26,200          21,922          -4,278
       Missile [JAGM]
          Restoring     ..............  ..............          -4,278
           acquisition
           accountabil
           ity: AUR
           unit cost
           variance
------------------------------------------------------------------------

            Procurement of Ammunition, Navy and Marine Corps

Appropriations, 2016....................................    $651,920,000
Budget estimate, 2017...................................     664,368,000
Committee recommendation................................     662,968,000

    The Committee recommends an appropriation of $662,968,000. 
This is $1,400,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
          PROCUREMENT OF AMMO, NAVY & MARINE CORPS
 
     PROC AMMO, NAVY
 
     NAVY AMMUNITION
   1 GENERAL PURPOSE BOMBS                              ..............          91,659  ..............          91,659  ..............  ..............
   2 AIRBORNE ROCKETS, ALL TYPES                        ..............          65,759  ..............          65,759  ..............  ..............
   3 MACHINE GUN AMMUNITION                             ..............           8,152  ..............           8,152  ..............  ..............
   4 PRACTICE BOMBS                                     ..............          41,873  ..............          41,873  ..............  ..............
   5 CARTRIDGES & CART ACTUATED DEVICES                 ..............          54,002  ..............          54,002  ..............  ..............
   6 AIR EXPENDABLE COUNTERMEASURES                     ..............          57,034  ..............          57,034  ..............  ..............
   7 JATOS                                              ..............           2,735  ..............           2,735  ..............  ..............
   9 5 INCH/54 GUN AMMUNITION                           ..............          19,220  ..............          19,220  ..............  ..............
  10 INTERMEDIATE CALIBER GUN AMMUNITION                ..............          30,196  ..............          30,196  ..............  ..............
  11 OTHER SHIP GUN AMMUNITION                          ..............          39,009  ..............          46,209  ..............          +7,200
  12 SMALL ARMS & LANDING PARTY AMMO                    ..............          46,727  ..............          46,727  ..............  ..............
  13 PYROTECHNIC AND DEMOLITION                         ..............           9,806  ..............           9,806  ..............  ..............
  14 AMMUNITION LESS THAN $5 MILLION                    ..............           2,900  ..............           2,900  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, PROC AMMO, NAVY                       ..............         469,072  ..............         476,272  ..............          +7,200
 
     PROC AMMO, MARINE CORPS
 
     MARINE CORPS AMMUNITION
  15 SMALL ARMS AMMUNITION                              ..............          27,958  ..............          27,958  ..............  ..............
  17 40 MM, ALL TYPES                                   ..............          14,758  ..............          14,758  ..............  ..............
  18 60MM, ALL TYPES                                    ..............             992  ..............             992  ..............  ..............
  20 120MM, ALL TYPES                                   ..............          16,757  ..............          12,157  ..............          -4,600
  21 GRENADES, ALL TYPES                                ..............             972  ..............             972  ..............  ..............
  22 ROCKETS, ALL TYPES                                 ..............          14,186  ..............          14,186  ..............  ..............
  23 ARTILLERY, ALL TYPES                               ..............          68,656  ..............          68,656  ..............  ..............
  24 DEMOLITION MUNITIONS, ALL TYPES                    ..............           1,700  ..............           1,700  ..............  ..............
  25 FUZE, ALL TYPES                                    ..............          26,088  ..............          26,088  ..............  ..............
  27 AMMO MODERNIZATION                                 ..............          14,660  ..............          14,660  ..............  ..............
  28 ITEMS LESS THAN $5 MILLION                         ..............           8,569  ..............           4,569  ..............          -4,000
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, PROC AMMO, MARINE CORPS               ..............         195,296  ..............         186,696  ..............          -8,600
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT OF AMMO, NAVY & MARINE    ..............         664,368  ..............         662,968  ..............          -1,400
            CORPS
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  11Other Ship Gun              39,009          46,209          +7,200
     Ammunition
        Program         ..............  ..............          +7,200
         increase
  20120mm, All Types            16,757          12,157          -4,600
        Improving       ..............  ..............          -4,600
         funds
         management:
         Forward
         financing
  28Items Less Than $5           8,569           4,569          -4,000
     Million
        Improving       ..............  ..............          -4,000
         funds
         management:
         Unobligated
         balances
------------------------------------------------------------------------

                   Shipbuilding and Conversion, Navy

Appropriations, 2016.................................... $18,704,539,000
Budget estimate, 2017...................................  18,354,874,000
Committee recommendation................................  20,460,724,000

    The Committee recommends an appropriation of 
$20,460,724,000. This is $2,105,850,000 above the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
              SHIPBUILDING & CONVERSION, NAVY
 
     FLEET BALLISTIC MISSILE SHIPS
   1 OHIO REPLACEMENT SUBMARINE (AP-CY)                 ..............         773,138  ..............         773,138  ..............  ..............
 
     OTHER WARSHIPS
   2 CARRIER REPLACEMENT PROGRAM                        ..............       1,291,783  ..............       1,275,783  ..............         -16,000
   3 CARRIER REPLACEMENT PROGRAM [AP-CY]                ..............       1,370,784  ..............       1,370,784  ..............  ..............
   4 VIRGINIA CLASS SUBMARINE                                        2       3,187,985               2       3,187,985  ..............  ..............
   5 VIRGINIA CLASS SUBMARINE [AP-CY]                   ..............       1,767,234  ..............       1,852,234  ..............         +85,000
   6 CVN REFUELING OVERHAUL                             ..............       1,743,220  ..............       1,743,220  ..............  ..............
   7 CVN REFUELING OVERHAULS [AP-CY]                    ..............         248,599  ..............         233,149  ..............         -15,450
   8 DDG 1000                                           ..............         271,756  ..............         271,756  ..............  ..............
   9 DDG-51                                                          2       3,211,292               3       3,614,792              +1        +403,500
  11 LITTORAL COMBAT SHIP                                            2       1,125,625               3       1,600,625              +1        +475,000
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER WARSHIPS                        ..............      14,218,278  ..............      15,150,328  ..............        +932,050
 
     AMPHIBIOUS SHIPS
  13 AMPHIBIOUS SHIP REPLACEMENT [AP-CY]                ..............  ..............  ..............         200,000  ..............        +200,000
  16 LHA REPLACEMENT                                                 1       1,623,024               1       1,623,024  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AMPHIBIOUS SHIPS                      ..............       1,623,024  ..............       1,823,024  ..............        +200,000
 
     AUXILIARIES, CRAFT, AND PRIOR-YEAR PROGRAM COSTS
  20 TAO FLEET OILER [AP-CY]                            ..............          73,079  ..............          73,079  ..............  ..............
  22 MOORED TRAINING SHIP                                            1         624,527               1         624,527  ..............  ..............
  25 OUTFITTING                                         ..............         666,158  ..............         639,958  ..............         -26,200
  26 SHIP TO SHORE CONNECTOR                                         2         128,067               2         128,067  ..............  ..............
  27 SERVICE CRAFT                                      ..............          65,192  ..............          65,192  ..............  ..............
  28 LCAC SLEP                                          ..............           1,774  ..............           1,774  ..............  ..............
  29 YP CRAFT MAINTENANCE/ROH/SLEP                      ..............          21,363  ..............          21,363  ..............  ..............
  30 COMPLETION OF PY SHIPBUILDING PROGRAMS             ..............         160,274  ..............         160,274  ..............  ..............
  31 POLAR ICEBREAKERS                                  ..............  ..............               1       1,000,000              +1      +1,000,000
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AUXILIARIES, CRAFT, AND PRIOR-YEAR    ..............       1,740,434  ..............       2,714,234  ..............        +973,800
            PROGRAM
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, SHIPBUILDING & CONVERSION, NAVY       ..............      18,354,874  ..............      20,460,724  ..............      +2,105,850
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                         2017 budget       Committee       Change from
Line        Item           estimate      recommendation  budget estimate
------------------------------------------------------------------------
   2Carrier                1,291,783        1,275,783          -16,000
     Replacement
     Program
        Restoring    ...............  ...............          -16,000
         acquisitio
         n
         accountabi
         lity:
         Reduction
         in change
         orders
         growth
   5Virginia Class         1,767,234        1,852,234          +85,000
     Submarine--AP
        Program      ...............  ...............          +85,000
         increase
   7CVN Refueling            248,599          233,149          -15,450
     Overhauls--AP
        Maintain     ...............  ...............           -7,500
         program
         affordabil
         ity: Other
         costs
         growth
        Maintain     ...............  ...............           -4,300
         program
         affordabil
         ity: Basic
         plans
         growth
        Maintain     ...............  ...............           -3,650
         program
         affordabil
         ity:
         Electronic
         s cost
         growth
   9DDG-51                 3,211,292        3,614,792         +403,500
        Final        ...............  ...............         +433,000
         increment
         of DDG 51
         partially
         funded in
         fiscal
         year 2016
        Budget       ...............  ...............          -29,500
         document
         disparity:
         Change
         orders
         reduction
         from two
         ships
         requested
         for fiscal
         year 2017
  11Littoral Combat        1,125,625        1,600,625         +475,000
     Ship
        Additional   ...............  ...............         +475,000
         ship
  13Amphibious Ship  ...............          200,000         +200,000
     Replacement--A
     P
        Additional   ...............  ...............         +200,000
         funding to
         support
         LPD 29 or
         LX(R)
         class of
         ships
  25Outfitting               666,158          639,958          -26,200
        Improving    ...............  ...............          -26,200
         funds
         management
         :
         Outfitting
         and post
         delivery
         funds
         early to
         need
  31Polar            ...............        1,000,000       +1,000,000
     Icebreakers
        One ship     ...............  ...............       +1,000,000
         for the
         polar
         icebreaker
         recapitali
         zation
         project
------------------------------------------------------------------------

    Polar Icebreaker Recapitalization Project.--As detailed in 
the report accompanying the Senate version of the fiscal year 
2015 Department of Defense Appropriations Bill (Senate Report 
113-211), the Committee is concerned that the United States is 
operating an icebreaker fleet consisting of only one heavy and 
one medium vessel. This falls short of U.S. requirements which 
independent analysis has determined requires three heavy and 
three medium icebreakers to cover our Nation's needs in the 
Arctic and Antarctic. Recognizing the strategic importance of 
polar operations to our Nation's future security and 
prosperity, the Committee strongly supports proposals to 
accelerate new construction of icebreaker ships.
    In August of last year, the President of the United States 
visited the Arctic and upon his return announced plans to 
accelerate planned icebreaker construction from 2022 to 2020. 
During this announcement, the President expressed his 
commitment to work with Congress to make sure the United States 
produces an icebreaker fleet sufficient to meet our economic, 
commercial, maritime and national security needs. The Committee 
believes this was an important step to ensuring year-round 
access to the Polar Regions and increasing U.S. Government's 
capability in these areas.
    Further, the current age and condition of the operational 
U.S. polar icebreaker fleet, the Polar Star and the Healy, 
validates the need to pursue an accelerated replacement 
timeline. The Polar Star entered service in 1976 and is now 
well beyond its original 30-year service life. The ship was 
refurbished and reentered service in 2012 for an intended 
additional service period of 7 to 10 years--ending between 2019 
and 2022. The Healy, the last icebreaker produced for the U.S. 
Government, was funded more than 25 years ago by the Department 
of Defense Appropriations Act, 1990 (Public Law 101-165).
    While the effort to speed polar icebreaker acquisition by 2 
years is commendable, the Committee believes more must be done 
now to expand our capabilities and to defend interests in the 
Polar Regions. In addition to concerns about our current fleet, 
the Committee notes that Russia has roughly 40 operational 
icebreakers and 11 icebreakers either planned or under 
construction. Therefore, to further accelerate production, the 
Committee recommends $1,000,000,000 in the ``Shipbuilding and 
Conversion, Navy'' account to construct domestically the first 
U.S. Coast Guard operated ship for the Polar Icebreaker 
Recapitalization Project. In order to achieve an earlier start 
on this project and to reduce cost and schedule risk, the 
Committee encourages the selection of an in-service U.S. hull 
design and the setting of limitations on overall ship 
specifications and requirements. The Committee directs the 
Secretary of Defense in coordination with the Secretary of 
Homeland Security to submit a report to the appropriate 
congressional committees not later than September 30, 2016 
which provides polar icebreaker requirements, preferred design, 
overall acquisition strategy, and a breakout of funds necessary 
to support the acquisition.
    Expeditionary Fast Transport [EFT].--The Department of 
Defense Appropriations Act, 2016 (Public Law 114-113) provided 
funds for a 12th Expeditionary Fast Transport ship, formerly 
known as the Joint High Speed Vessel. The Committee has 
supported the construction of additional EFTs and notes a 
previous requirement for 18 ships. The Department decided to 
assume risk with the overall ship requirement due to fiscal 
constraints and reduced the program procurement objective when 
it submitted its budget for fiscal year 2013. As these ships 
are deployed, the Committee understands that Combatant and 
Fleet Commanders are identifying additional missions for the 
ships since they provide a means for fast intra-theater 
transportation of troops, military vehicles and equipment which 
thereby free up the more limited high-end platforms for more 
appropriate missions. While the Committee does not recommend 
funding for an additional ship in fiscal year 2017, the 
Committee supports a Navy reassessment of the overall 
procurement objective to determine if there is a requirement 
for more ships to meet Fleet demand.

                        Other Procurement, Navy

Appropriations, 2016....................................  $6,484,257,000
Budget estimate, 2017...................................   6,338,861,000
Committee recommendation................................   6,229,762,000

    The Committee recommends an appropriation of 
$6,229,762,000. This is $109,099,000 below the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  OTHER PROCUREMENT, NAVY
 
     SHIPS SUPPORT EQUIPMENT
 
     SHIP PROPULSION EQUIPMENT
   3 SURFACE POWER EQUIPMENT                            ..............          15,514  ..............          15,514  ..............  ..............
   4 HYBRID ELECTRIC DRIVE [HED]                        ..............          40,132  ..............          35,933  ..............          -4,199
 
     GENERATORS
   5 SURFACE COMBATANT HM&E;                             ..............          29,974  ..............          29,974  ..............  ..............
 
     NAVIGATION EQUIPMENT
   6 OTHER NAVIGATION EQUIPMENT                         ..............          63,942  ..............          63,942  ..............  ..............
 
     PERISCOPES
   8 SUB PERISCOPES & IMAGING EQUIP                     ..............         136,421  ..............         136,421  ..............  ..............
 
     OTHER SHIPBOARD EQUIPMENT
   9 DDG MOD                                            ..............         367,766  ..............         367,766  ..............  ..............
  10 FIREFIGHTING EQUIPMENT                             ..............          14,743  ..............          14,743  ..............  ..............
  11 COMMAND AND CONTROL SWITCHBOARD                    ..............           2,140  ..............           2,140  ..............  ..............
  12 LHA/LHD MIDLIFE                                    ..............          24,939  ..............          24,939  ..............  ..............
  14 POLLUTION CONTROL EQUIPMENT                        ..............          20,191  ..............          19,342  ..............            -849
  15 SUBMARINE SUPPORT EQUIPMENT                        ..............           8,995  ..............           8,995  ..............  ..............
  16 VIRGINIA CLASS SUPPORT EQUIPMENT                   ..............          66,838  ..............          66,838  ..............  ..............
  17 LCS CLASS SUPPORT EQUIPMENT                        ..............          54,823  ..............          48,053  ..............          -6,770
  18 SUBMARINE BATTERIES                                ..............          23,359  ..............          23,359  ..............  ..............
  19 LPD CLASS SUPPORT EQUIPMENT                        ..............          40,321  ..............          35,455  ..............          -4,866
  20 DDG-1000 SUPPORT EQUIPMENT                         ..............          33,404  ..............          33,404  ..............  ..............
  21 STRATEGIC PLATFORM SUPPORT EQUIP                   ..............          15,836  ..............          15,836  ..............  ..............
  22 DSSP EQUIPMENT                                     ..............             806  ..............             806  ..............  ..............
  23 CRUISER MODERNIZATION                              ..............  ..............  ..............          55,800  ..............         +55,800
  24 LCAC                                               ..............           3,090  ..............           3,090  ..............  ..............
  25 UNDERWATER EOD PROGRAMS                            ..............          24,350  ..............          24,350  ..............  ..............
  26 ITEMS LESS THAN $5 MILLION                         ..............          88,719  ..............          79,582  ..............          -9,137
  27 CHEMICAL WARFARE DETECTORS                         ..............           2,873  ..............           2,873  ..............  ..............
  28 SUBMARINE LIFE SUPPORT SYSTEM                      ..............           6,043  ..............           2,329  ..............          -3,714
 
     REACTOR PLANT EQUIPMENT
  30 REACTOR COMPONENTS                                 ..............         342,158  ..............         342,158  ..............  ..............
 
     OCEAN ENGINEERING
  31 DIVING AND SALVAGE EQUIPMENT                       ..............           8,973  ..............           8,973  ..............  ..............
 
     SMALL BOATS
  32 STANDARD BOATS                                     ..............          43,684  ..............          55,684  ..............         +12,000
 
     TRAINING EQUIPMENT
 
     PRODUCTION FACILITIES EQUIPMENT
  34 OPERATING FORCES IPE                               ..............          75,421  ..............          75,421  ..............  ..............
 
     OTHER SHIP SUPPORT
  35 NUCLEAR ALTERATIONS                                ..............         172,718  ..............         172,718  ..............  ..............
  36 LCS COMMON MISSION MODULES EQUIPMENT               ..............          27,840  ..............          15,670  ..............         -12,170
  37 LCS MCM MISSION MODULES                            ..............          57,146  ..............          34,546  ..............         -22,600
  38 LCS ASW MISSION MODULES                            ..............          31,952  ..............  ..............  ..............         -31,952
  39 LCS SUW MISSION MODULES                            ..............          22,466  ..............          21,064  ..............          -1,402
 
     LOGISTICS SUPPORT
  41 LSD MIDLIFE                                        ..............          10,813  ..............          56,513  ..............         +45,700
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, SHIPS SUPPORT EQUIPMENT               ..............       1,878,390  ..............       1,894,231  ..............         +15,841
 
     COMMUNICATIONS AND ELECTRONICS EQUIPMENT
 
     SHIP SONARS
  42 SPQ-9B RADAR                                       ..............          14,363  ..............          14,363  ..............  ..............
  43 AN/SQQ-89 SURF ASW COMBAT SYSTEM                   ..............          90,029  ..............          87,824  ..............          -2,205
  45 SSN ACOUSTICS                                      ..............         248,765  ..............         268,765  ..............         +20,000
  46 UNDERSEA WARFARE SUPPORT EQUIPMENT                 ..............           7,163  ..............           7,163  ..............  ..............
 
     ASW ELECTRONIC EQUIPMENT
  48 SUBMARINE ACOUSTIC WARFARE SYSTEM                  ..............          21,291  ..............          21,291  ..............  ..............
  49 SSTD                                               ..............           6,893  ..............           6,893  ..............  ..............
  50 FIXED SURVEILLANCE SYSTEM                          ..............         145,701  ..............         145,701  ..............  ..............
  51 SURTASS                                            ..............          36,136  ..............          36,136  ..............  ..............
 
     ELECTRONIC WARFARE EQUIPMENT
  53 AN/SLQ-32                                          ..............         274,892  ..............         211,912  ..............         -62,980
 
     RECONNAISSANCE EQUIPMENT
  54 SHIPBOARD IW EXPLOIT                               ..............         170,733  ..............         170,733  ..............  ..............
  55 AUTOMATED IDENTIFICATION SYSTEM [AIS]              ..............             958  ..............             958  ..............  ..............
 
     SUBMARINE SURVEILLANCE EQUIPMENT
 
     OTHER SHIP ELECTRONIC EQUIPMENT
  57 COOPERATIVE ENGAGEMENT CAPABILITY                  ..............          22,034  ..............          22,034  ..............  ..............
  59 NAVAL TACTICAL COMMAND SUPPORT SYSTEM [NTCSS]      ..............          12,336  ..............          12,336  ..............  ..............
  60 ATDLS                                              ..............          30,105  ..............          27,921  ..............          -2,184
  61 NAVY COMMAND AND CONTROL SYSTEM [NCCS]             ..............           4,556  ..............           4,556  ..............  ..............
  62 MINESWEEPING SYSTEM REPLACEMENT                    ..............          56,675  ..............          32,198  ..............         -24,477
  63 SHALLOW WATER MCM                                  ..............           8,875  ..............           8,875  ..............  ..............
  64 NAVSTAR GPS RECEIVERS (SPACE)                      ..............          12,752  ..............          12,752  ..............  ..............
  65 ARMED FORCES RADIO AND TV                          ..............           4,577  ..............           4,577  ..............  ..............
  66 STRATEGIC PLATFORM SUPPORT EQUIP                   ..............           8,972  ..............           8,972  ..............  ..............
 
     TRAINING EQUIPMENT
 
     AVIATION ELECTRONIC EQUIPMENT
  69 ASHORE ATC EQUIPMENT                               ..............          75,068  ..............          75,068  ..............  ..............
  70 AFLOAT ATC EQUIPMENT                               ..............          33,484  ..............          33,484  ..............  ..............
  76 ID SYSTEMS                                         ..............          22,177  ..............          22,177  ..............  ..............
  77 NAVAL MISSION PLANNING SYSTEMS                     ..............          14,273  ..............          14,273  ..............  ..............
  80 TACTICAL/MOBILE C41 SYSTEMS                        ..............          27,927  ..............          27,927  ..............  ..............
 
     OTHER SHORE ELECTRONIC EQUIPMENT
  81 DCGS-N                                             ..............          12,676  ..............          12,676  ..............  ..............
  82 CANES                                              ..............         212,030  ..............         185,860  ..............         -26,170
  83 RADIAC                                             ..............           8,092  ..............           8,092  ..............  ..............
  84 CANES-INTELL                                       ..............          36,013  ..............          31,746  ..............          -4,267
  85 GPETE                                              ..............           6,428  ..............           6,428  ..............  ..............
  87 INTEG COMBAT SYSTEM TEST FACILITY                  ..............           8,376  ..............           8,376  ..............  ..............
  88 EMI CONTROL INSTRUMENTATION                        ..............           3,971  ..............           3,971  ..............  ..............
  89 ITEMS LESS THAN $5 MILLION                         ..............          58,721  ..............          58,721  ..............  ..............
 
     SHIPBOARD COMMUNICATIONS
  90 SHIPBOARD TACTICAL COMMUNICATIONS                  ..............          17,366  ..............          16,252  ..............          -1,114
  91 SHIP COMMUNICATIONS AUTOMATION                     ..............         102,479  ..............         102,479  ..............  ..............
  92 COMMUNICATIONS ITEMS UNDER $5M                     ..............          10,403  ..............          10,403  ..............  ..............
 
     SUBMARINE COMMUNICATIONS
  93 SUBMARINE BROADCAST SUPPORT                        ..............          34,151  ..............          34,151  ..............  ..............
  94 SUBMARINE COMMUNICATION EQUIPMENT                  ..............          64,529  ..............          64,529  ..............  ..............
 
     SATELLITE COMMUNICATIONS
  95 SATELLITE COMMUNICATIONS SYSTEMS                   ..............          14,414  ..............          14,414  ..............  ..............
  96 NAVY MULTIBAND TERMINAL [NMT]                      ..............          38,365  ..............          38,365  ..............  ..............
 
     SHORE COMMUNICATIONS
  97 JCS COMMUNICATIONS EQUIPMENT                       ..............           4,156  ..............           4,156  ..............  ..............
 
     CRYPTOGRAPHIC EQUIPMENT
  99 INFO SYSTEMS SECURITY PROGRAM [ISSP]               ..............          85,694  ..............          95,694  ..............         +10,000
 100 MIO INTEL EXPLOITATION TEAM                        ..............             920  ..............             920  ..............  ..............
 
     CRYPTOLOGIC EQUIPMENT
 101 CRYPTOLOGIC COMMUNICATIONS EQUIP                   ..............          21,098  ..............          21,098  ..............  ..............
 
     OTHER ELECTRONIC SUPPORT
 102 COAST GUARD EQUIPMENT                              ..............          32,291  ..............          32,291  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, COMMUNICATIONS AND ELECTRONICS        ..............       2,122,908  ..............       2,029,511  ..............         -93,397
            EQUIPMENT
 
     AVIATION SUPPORT EQUIPMENT
 
     SONOBUOYS
 103 SONOBUOYS--ALL TYPES                               ..............         162,588  ..............         159,541  ..............          -3,047
 
     AIRCRAFT SUPPORT EQUIPMENT
 104 WEAPONS RANGE SUPPORT EQUIPMENT                    ..............          58,116  ..............          58,116  ..............  ..............
 105 AIRCRAFT SUPPORT EQUIPMENT                         ..............         120,324  ..............         120,324  ..............  ..............
 106 METEOROLOGICAL EQUIPMENT                           ..............          29,253  ..............          29,253  ..............  ..............
 107 OTHER PHOTOGRAPHIC EQUIPMENT (DCRS/DPL)            ..............             632  ..............             632  ..............  ..............
 108 AIRBORNE MINE COUNTERMEASURES                      ..............          29,097  ..............          29,097  ..............  ..............
 109 AVIATION SUPPORT EQUIPMENT                         ..............          39,099  ..............          31,561  ..............          -7,538
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AVIATION SUPPORT EQUIPMENT            ..............         439,109  ..............         428,524  ..............         -10,585
 
     ORDNANCE SUPPORT EQUIPMENT
 
     SHIP GUN SYSTEM EQUIPMENT
 110 SHIP GUN SYSTEMS EQUIPMENT                         ..............           6,191  ..............           6,191  ..............  ..............
 
     SHIP MISSILE SYSTEMS EQUIPMENT
 111 SHIP MISSILE SUPPORT EQUIPMENT                     ..............         320,446  ..............         320,446  ..............  ..............
 112 TOMAHAWK SUPPORT EQUIPMENT                         ..............          71,046  ..............          71,046  ..............  ..............
 
     FBM SUPPORT EQUIPMENT
 113 STRATEGIC MISSILE SYSTEMS EQUIP                    ..............         215,138  ..............         215,138  ..............  ..............
 
     ASW SUPPORT EQUIPMENT
 114 SSN COMBAT CONTROL SYSTEMS                         ..............         130,715  ..............         130,715  ..............  ..............
 115 ASW SUPPORT EQUIPMENT                              ..............          26,431  ..............          26,431  ..............  ..............
 
     OTHER ORDNANCE SUPPORT EQUIPMENT
 116 EXPLOSIVE ORDNANCE DISPOSAL EQUIP                  ..............          11,821  ..............          11,821  ..............  ..............
 117 ITEMS LESS THAN $5 MILLION                         ..............           6,243  ..............           6,243  ..............  ..............
 
     OTHER EXPENDABLE ORDNANCE
 118 SUBMARINE TRAINING DEVICE MODS                     ..............          48,020  ..............          48,020  ..............  ..............
 120 SURFACE TRAINING EQUIPMENT                         ..............          97,514  ..............          94,979  ..............          -2,535
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, ORDNANCE SUPPORT EQUIPMENT            ..............         933,565  ..............         931,030  ..............          -2,535
 
     CIVIL ENGINEERING SUPPORT EQUIPMENT
 121 PASSENGER CARRYING VEHICLES                        ..............           8,853  ..............           8,853  ..............  ..............
 122 GENERAL PURPOSE TRUCKS                             ..............           4,928  ..............           4,928  ..............  ..............
 123 CONSTRUCTION & MAINTENANCE EQUIP                   ..............          18,527  ..............          18,527  ..............  ..............
 124 FIRE FIGHTING EQUIPMENT                            ..............          13,569  ..............          13,569  ..............  ..............
 125 TACTICAL VEHICLES                                  ..............          14,917  ..............          14,917  ..............  ..............
 126 AMPHIBIOUS EQUIPMENT                               ..............           7,676  ..............           7,676  ..............  ..............
 127 POLLUTION CONTROL EQUIPMENT                        ..............           2,321  ..............           2,321  ..............  ..............
 128 ITEMS UNDER $5 MILLION                             ..............          12,459  ..............           8,436  ..............          -4,023
 129 PHYSICAL SECURITY VEHICLES                         ..............           1,095  ..............           1,095  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, CIVIL ENGINEERING SUPPORT EQUIPMENT   ..............          84,345  ..............          80,322  ..............          -4,023
 
     SUPPLY SUPPORT EQUIPMENT
 131 SUPPLY EQUIPMENT                                   ..............          16,023  ..............          16,023  ..............  ..............
 133 FIRST DESTINATION TRANSPORTATION                   ..............           5,115  ..............           5,115  ..............  ..............
 134 SPECIAL PURPOSE SUPPLY SYSTEMS                     ..............         295,471  ..............         295,471  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, SUPPLY SUPPORT EQUIPMENT              ..............         316,609  ..............         316,609  ..............  ..............
 
     PERSONNEL AND COMMAND SUPPORT EQUIPMENT
 
     TRAINING DEVICES
 136 TRAINING AND EDUCATION EQUIPMENT                   ..............           9,504  ..............           9,504  ..............  ..............
 
     COMMAND SUPPORT EQUIPMENT
 137 COMMAND SUPPORT EQUIPMENT                          ..............          37,180  ..............          22,780  ..............         -14,400
 139 MEDICAL SUPPORT EQUIPMENT                          ..............           4,128  ..............           4,128  ..............  ..............
 141 NAVAL MIP SUPPORT EQUIPMENT                        ..............           1,925  ..............           1,925  ..............  ..............
 142 OPERATING FORCES SUPPORT EQUIPMENT                 ..............           4,777  ..............           4,777  ..............  ..............
 143 C4ISR EQUIPMENT                                    ..............           9,073  ..............           9,073  ..............  ..............
 144 ENVIRONMENTAL SUPPORT EQUIPMENT                    ..............          21,107  ..............          21,107  ..............  ..............
 145 PHYSICAL SECURITY EQUIPMENT                        ..............         100,906  ..............         100,906  ..............  ..............
 146 ENTERPRISE INFORMATION TECHNOLOGY                  ..............          67,544  ..............          67,544  ..............  ..............
 150 NEXT GENERATION ENTERPRISE SERVICE                 ..............          98,216  ..............          98,216  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, PERSONNEL AND COMMAND SUPPORT         ..............         354,360  ..............         339,960  ..............         -14,400
            EQUIPMENT
 
 151 SPARES AND REPAIR PARTS                            ..............         199,660  ..............         199,660  ..............  ..............
     CLASSIFIED PROGRAMS                                ..............           9,915  ..............           9,915  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER PROCUREMENT, NAVY               ..............       6,338,861  ..............       6,229,762  ..............        -109,099
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 2017 budget       Committee       Change from
 Line                           Item                               estimate      recommendation  budget estimate
----------------------------------------------------------------------------------------------------------------
    4 Hybrid Electric Drive [HED]                                     40,132           35,933           -4,199
          Improving funds management: Installation funding   ...............  ...............           -4,199
           ahead of need
   14 Pollution Control Equipment                                     20,191           19,342             -849
          Restoring acquisition accountability: Lightering   ...............  ...............             -849
           systems cost growth
   17 LCS Class Support Equipment                                     54,823           48,053           -6,770
          Improving funds management: Prior year carryover   ...............  ...............           -6,770
   19 LPD Class Support Equipment                                     40,321           35,455           -4,866
          Improving funds management: Installation funding   ...............  ...............           -4,866
           ahead of need due to contract delays
   23 CG Modernization                                       ...............           55,800          +55,800
          Cruiser modernization: Transfer from SMOSF for     ...............  ...............          +55,800
           budget execution
   26 Items Less Than $5 Million                                      88,719           79,582           -9,137
          Restoring acquisition accountability: Propellers   ...............  ...............             -849
           and shafts cost growth
          Improving funds management: Machinery plant        ...............  ...............           -6,135
           upgrades installation funding ahead of need due
           to contract delay
          Improving funds management: LSD boat davit         ...............  ...............           -2,153
           installation funding ahead of need due to
           contract delay
   28 Submarine Life Support System                                    6,043            2,329           -3,714
          Improving funds management: Prior year carryover   ...............  ...............           -3,714
   32 Standard Boats                                                  43,684           55,684          +12,000
          Program increase                                   ...............  ...............          +12,000
   36 LCS Common Mission Modules Equipment                            27,840           15,670          -12,170
          Restoring acquisition accountability: Mission bay  ...............  ...............          -12,170
           training devices--MCM
   37 LCS MCM Mission Modules                                         57,146           34,546          -22,600
          Restoring acquisition accountability: Unmanned     ...............  ...............          -11,800
           surface sweep system ahead of need
          Restoring acquisition accountability: Knifefish    ...............  ...............          -10,800
           ahead of need
   38 LCS ASW Mission Modules                                         31,952  ...............          -31,952
          Restoring acquisition accountability: ASW mission  ...............  ...............          -31,952
           module ahead of need
   39 LCS SUW Mission Modules                                         22,466           21,064           -1,402
          Restoring acquisition accountability: MK-46 gun    ...............  ...............           -1,402
           weapons system prior year contract savings
   41 LSD Midlife                                                     10,813           56,513          +45,700
          LSD modernization: Transfer from SMOSF for budget  ...............  ...............          +45,700
           execution
   43 AN/SQQ-89 Surf ASW Combat System                                90,029           87,824           -2,205
          Restoring acquisition accountability: FLT I/II     ...............  ...............           -2,205
           upgrade installation funding ahead of need
   45 SSN Acoustic Equipment                                         248,765          268,765          +20,000
          Program increase                                   ...............  ...............          +20,000
   53 AN/SLQ-32                                                      274,892          211,912          -62,980
          Restoring acquisition accountability: Block 2      ...............  ...............           -2,640
           unit cost growth
          Restoring acquistion accountability: Block 3       ...............  ...............          -50,675
           concurrency
          Restoring acquisition accountability: Block 3T     ...............  ...............           -9,665
           excess installation funding
   60 ATDLS                                                           30,105           27,921           -2,184
          Improving funds management: Installation funding   ...............  ...............           -2,184
           ahead of need
   62 Minesweeping System Replacement                                 56,675           32,198          -24,477
          Restoring acquisition accountability: Knifefish    ...............  ...............          -20,487
           ahead of need
          Restoring acquisition accountability: Unmanned     ...............  ...............           -3,990
           influence sweep system trainers ahead of need
   82 CANES                                                          212,030          185,860          -26,170
          Improving funds management: Installation funding   ...............  ...............          -26,170
           ahead of need
   84 CANES-Intell                                                    36,013           31,746           -4,267
          Improving funds management: Installation funding   ...............  ...............           -4,267
           ahead of need
   90 Shipboard Tactical Communications                               17,366           16,252           -1,114
          Improving funds management: Installation funding   ...............  ...............           -1,114
           ahead of need
   99 Info Systems Security Program [ISSP]                            85,694           95,694          +10,000
          Program increase                                   ...............  ...............          +10,000
  103 Sonobuoys--All Types                                           162,588          159,541           -3,047
          Restoring acquisition accountability: Excess unit  ...............  ...............           -3,047
           cost growth
  109 Aviation Support Equipment                                      39,099           31,561           -7,538
          Improving funds management: Program delay          ...............  ...............           -7,538
  120 Surface Training Equipment                                      97,514           94,979           -2,535
          Restoring acquisition accountability: BFTT         ...............  ...............           -2,535
           upgrade kits installation funding ahead of need
  128 Items Under $5 Million                                          12,459            8,436           -4,023
          Improving funds management: Prior year carryover   ...............  ...............           -4,023
  137 Command Support Equipment                                       37,180           22,780          -14,400
          Improving funds management: CNIC building control  ...............  ...............          -14,400
           system unjustified request
----------------------------------------------------------------------------------------------------------------

                       Procurement, Marine Corps

Appropriations, 2016....................................  $1,186,812,000
Budget estimate, 2017...................................   1,362,769,000
Committee recommendation................................   1,362,769,000

    The Committee recommends an appropriation of 
$1,362,769,000. This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
                 PROCUREMENT, MARINE CORPS
 
     WEAPONS AND COMBAT VEHICLES
 
     TRACKED COMBAT VEHICLES
   1 AAV7A1 PIP                                         ..............          73,785  ..............          71,785  ..............          -2,000
   2 LAV PIP                                            ..............          53,423  ..............          53,423  ..............  ..............
 
     ARTILLERY AND OTHER WEAPONS
   3 EXPEDITIONARY FIRE SUPPORT SYSTEM                  ..............           3,360  ..............           3,360  ..............  ..............
   4 155MM LIGHTWEIGHT TOWED HOWITZER                   ..............           3,318  ..............           3,318  ..............  ..............
   5 HIGH MOBILITY ARTILLERY ROCKET SYSTEM              ..............          33,725  ..............          33,725  ..............  ..............
   6 WEAPONS AND COMBAT VEHICLES UNDER $5 MILLION       ..............           8,181  ..............           8,181  ..............  ..............
 
     OTHER SUPPORT
   7 MODIFICATION KITS                                  ..............          15,250  ..............          15,250  ..............  ..............
   8 WEAPONS ENHANCEMENT PROGRAM                        ..............  ..............  ..............           1,000  ..............          +1,000
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, WEAPONS AND COMBAT VEHICLES           ..............         191,042  ..............         190,042  ..............          -1,000
 
     GUIDED MISSILES AND EQUIPMENT
 
     GUIDED MISSILES
   9 GROUND BASED AIR DEFENSE                           ..............           9,170  ..............           9,170  ..............  ..............
  10 JAVELIN                                            ..............           1,009  ..............           1,009  ..............  ..............
  11 FOLLOW ON TO SMAW                                  ..............          24,666  ..............          24,666  ..............  ..............
  12 ANTI-ARMOR WEAPONS SYSTEM-HEAVY (AAWS-H)           ..............          17,080  ..............          17,080  ..............  ..............
 
     OTHER SUPPORT
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, GUIDED MISSILES AND EQUIPMENT         ..............          51,925  ..............          51,925  ..............  ..............
 
     COMMUNICATIONS AND ELECTRONICS EQUIPMENT
 
     COMMAND AND CONTROL SYSTEMS
  15 COMMON AVIATION COMMAND AND CONTROL SYS            ..............          47,312  ..............          53,312  ..............          +6,000
 
     REPAIR AND TEST EQUIPMENT
  16 REPAIR AND TEST EQUIPMENT                          ..............          16,469  ..............          16,469  ..............  ..............
 
     COMMAND AND CONTROL
  19 ITEMS UNDER $5 MILLION (COMM & ELEC)               ..............           7,433  ..............           7,433  ..............  ..............
  20 AIR OPERATIONS C2 SYSTEMS                          ..............          15,917  ..............          15,917  ..............  ..............
 
     RADAR + EQUIPMENT (NON-TEL)
  21 RADAR SYSTEMS                                      ..............          17,772  ..............          17,772  ..............  ..............
  22 GROUND/AIR TASK ORIENTED RADAR                                  3         123,758               3         123,758  ..............  ..............
  23 RQ-21 UAS                                                       4          80,217               4          80,217  ..............  ..............
 
     INTELL/COMM EQUIPMENT (NON-TEL)
  24 GCSS-MC                                            ..............           1,089  ..............           1,089  ..............  ..............
  24 FIRE SUPPORT SYSTEM                                ..............          13,258  ..............          13,258  ..............  ..............
  25 INTELLIGENCE SUPPORT EQUIPMENT                     ..............          56,379  ..............          56,379  ..............  ..............
  27 RQ-11 UAV                                          ..............           1,976  ..............           1,976  ..............  ..............
  28 DCGS-MC                                            ..............           1,149  ..............           1,149  ..............  ..............
  32 UAS PAYLOADS                                       ..............           2,971  ..............           2,971  ..............  ..............
 
     OTHER COMM/ELEC EQUIPMENT (NON-TEL)
  34 NEXT GENERATION ENTERPRISE NETWORK (NGEN)          ..............          76,302  ..............          76,302  ..............  ..............
 
     OTHER SUPPORT (NON-TEL)
  35 COMMON COMPUTER RESOURCES                          ..............          41,802  ..............          38,802  ..............          -3,000
  36 COMMAND POST SYSTEMS                               ..............          90,924  ..............          90,924  ..............  ..............
  37 RADIO SYSTEMS                                      ..............          43,714  ..............          43,714  ..............  ..............
  38 COMM SWITCHING & CONTROL SYSTEMS                   ..............          66,383  ..............          66,383  ..............  ..............
  39 COMM & ELEC INFRASTRUCTURE SUPPORT                 ..............          30,229  ..............          30,229  ..............  ..............
     CLASSIFIED PROGRAMS                                ..............           2,738  ..............           2,738  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, COMMUNICATIONS AND ELECTRONICS        ..............         737,792  ..............         740,792  ..............          +3,000
            EQUIPMENT
 
     SUPPORT VEHICLES
 
     ADMINISTRATIVE VEHICLES
  41 COMMERCIAL CARGO VEHICLES                          ..............          88,312  ..............          86,312  ..............          -2,000
 
     TACTICAL VEHICLES
  43 MOTOR TRANSPORT MODIFICATIONS                      ..............          13,292  ..............          13,292  ..............  ..............
  45 JOINT LIGHT TACTICAL VEHICLE                                  192         113,230             192         113,230  ..............  ..............
  46 FAMILY OF TACTICAL TRAILERS                        ..............           2,691  ..............           2,691  ..............  ..............
 
     OTHER SUPPORT
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, SUPPORT VEHICLES                      ..............         217,525  ..............         215,525  ..............          -2,000
 
     ENGINEER AND OTHER EQUIPMENT
 
     ENGINEER AND OTHER EQUIPMENT
  48 ENVIRONMENTAL CONTROL EQUIP ASSORT                 ..............              18  ..............              18  ..............  ..............
  50 TACTICAL FUEL SYSTEMS                              ..............              78  ..............              78  ..............  ..............
  51 POWER EQUIPMENT ASSORTED                           ..............          17,973  ..............          17,973  ..............  ..............
  52 AMPHIBIOUS SUPPORT EQUIPMENT                       ..............           7,371  ..............           7,371  ..............  ..............
  53 EOD SYSTEMS                                        ..............          14,021  ..............          14,021  ..............  ..............
 
     MATERIALS HANDLING EQUIPMENT
  54 PHYSICAL SECURITY EQUIPMENT                        ..............          31,523  ..............          31,523  ..............  ..............
 
     GENERAL PROPERTY
  58 TRAINING DEVICES                                   ..............          33,658  ..............          33,658  ..............  ..............
  60 FAMILY OF CONSTRUCTION EQUIPMENT                   ..............          21,315  ..............          21,315  ..............  ..............
  61 FAMILY OF INTERNALLY TRANSPORTABLE VEHICLE (ITV)   ..............           9,654  ..............           9,654  ..............  ..............
 
     OTHER SUPPORT
  62 ITEMS LESS THAN $5 MILLION                         ..............           6,026  ..............           6,026  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, ENGINEER AND OTHER EQUIPMENT          ..............         141,637  ..............         141,637  ..............  ..............
 
  64 SPARES AND REPAIR PARTS                            ..............          22,848  ..............          22,848  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT, MARINE CORPS             ..............       1,362,769  ..............       1,362,769  ..............  ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
     1 AAV7A1 PIP               73,785          71,785          -2,000
           Restoring    ..............  ..............          -2,000
            acquisitio
            n
            accountabi
            lity:
            Engineerin
            g support
            growth
     8 Weapons          ..............           1,000          +1,000
        Enhancement
        Program
           Program      ..............  ..............          +1,000
            Increase
    15 Common Aviation          47,312          53,312          +6,000
        Command and
        Control System
        [CAC2S]
           Program      ..............  ..............          +6,000
            Increase
    35 Common Computer          41,802          38,802          -3,000
        Resources
           Improving    ..............  ..............          -3,000
            funds
            management
            : Prior
            year
            carryover
    41 Commercial               88,312          86,312          -2,000
        Cargo Vehicles
           Restoring    ..............  ..............          -2,000
            acquisitio
            n
            accountabi
            lity: ECP
            growth
------------------------------------------------------------------------

                    Aircraft Procurement, Air Force

Appropriations, 2016.................................... $15,756,853,000
Budget estimate, 2017...................................  13,922,917,000
Committee recommendation................................  13,667,822,000

    The Committee recommends an appropriation of 
$13,667,822,000. This is $255,095,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
              AIRCRAFT PROCUREMENT, AIR FORCE
 
     COMBAT AIRCRAFT
 
     TACTICAL FORCES
   1 F-35                                                           43       4,401,894              43       3,983,894  ..............        -418,000
   2 F-35 [AP-CY]                                       ..............         404,500  ..............         504,500  ..............        +100,000
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, COMBAT AIRCRAFT                       ..............       4,806,394  ..............       4,488,394  ..............        -318,000
 
     AIRLIFT AIRCRAFT
 
     OTHER AIRLIFT
   3 KC-46A TANKER                                                  15       2,884,591              15       2,884,591  ..............  ..............
   4 C-130J                                                          2         145,655               2         305,655  ..............        +160,000
   6 HC-130J                                                         3         317,576               3         317,576  ..............  ..............
   7 HC-130J                                            ..............          20,000  ..............          20,000  ..............  ..............
   8 MC-130J                                                         6         548,358               6         499,358  ..............         -49,000
   9 MC-130J (AP)                                       ..............          50,000  ..............          50,000  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AIRLIFT AIRCRAFT                      ..............       3,966,180  ..............       4,077,180  ..............        +111,000
 
     OTHER AIRCRAFT
 
     HELICOPTERS
  10 UUH-1N REPLACEMENT                                 ..............          18,337  ..............          93,337  ..............         +75,000
 
     MISSION SUPPORT AIRCRAFT
  12 CIVIL AIR PATROL A/C                                            6           2,637               6          10,400  ..............          +7,763
 
     OTHER AIRCRAFT
  13 TARGET DRONES                                                  41         114,656              41         114,656  ..............  ..............
  14 RQ-4 UAV                                           ..............          12,966  ..............           7,217  ..............          -5,749
  15 MQ-9                                               ..............         122,522  ..............         122,522  ..............  ..............
 15X COMPASS CALL                                       ..............  ..............  ..............         103,000  ..............        +103,000
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER AIRCRAFT                        ..............         271,118  ..............         451,132  ..............        +180,014
 
     MODIFICATION OF INSERVICE AIRCRAFT
 
     STRATEGIC AIRCRAFT
  16 B-2A                                               ..............          46,729  ..............          46,729  ..............  ..............
  17 B-1B                                               ..............         116,319  ..............         116,319  ..............  ..............
  18 B-52                                               ..............         109,020  ..............         109,020  ..............  ..............
  20 A-10                                               ..............           1,289  ..............           1,289  ..............  ..............
  21 F-15                                               ..............         105,685  ..............         145,405  ..............         +39,720
  22 F-16                                               ..............          97,331  ..............          97,331  ..............  ..............
  23 F-22A                                              ..............         163,008  ..............         127,008  ..............         -36,000
  24 F-35 MODIFICATIONS                                 ..............         175,811  ..............         115,811  ..............         -60,000
  25 INCREMENT 3.2b                                     ..............          76,410  ..............          70,410  ..............          -6,000
  26 INCREMENT 3.2b [AP-CY]                             ..............           2,000  ..............           2,000  ..............  ..............
 
     AIRLIFT AIRCRAFT
  27 C-5                                                ..............          24,192  ..............          24,192  ..............  ..............
  29 C-17A                                              ..............          21,555  ..............          17,455  ..............          -4,100
  30 C-21                                               ..............           5,439  ..............           5,439  ..............  ..............
  31 C-32A                                              ..............          35,235  ..............          30,235  ..............          -5,000
  32 C-37A                                              ..............           5,004  ..............           5,004  ..............  ..............
 
     TRAINER AIRCRAFT
  33 GLIDER MODS                                        ..............             394  ..............             394  ..............  ..............
  34 T6                                                 ..............          12,765  ..............          12,765  ..............  ..............
  35 T-1                                                ..............          25,073  ..............          17,073  ..............          -8,000
  36 T-38                                               ..............          45,090  ..............          45,090  ..............  ..............
 
     OTHER AIRCRAFT
  37 U-2 MODS                                           ..............          36,074  ..............          25,074  ..............         -11,000
  38 KC-10A [ATCA]                                      ..............           4,570  ..............           4,570  ..............  ..............
  39 C-12                                               ..............           1,995  ..............           1,995  ..............  ..............
  40 VC-25A MOD                                         ..............         102,670  ..............         102,670  ..............  ..............
  41 C-40                                               ..............          13,984  ..............          13,984  ..............  ..............
  42 C-130                                              ..............           9,168  ..............          34,168  ..............         +25,000
  43 C130J MODS                                         ..............          89,424  ..............          89,424  ..............  ..............
  44 C-135                                              ..............          64,161  ..............          64,161  ..............  ..............
  45 COMPASS CALL MODS                                  ..............         130,257  ..............         130,257  ..............  ..............
  46 RC-135                                             ..............         211,438  ..............         211,438  ..............  ..............
  47 E-3                                                ..............          82,786  ..............          82,786  ..............  ..............
  48 E-4                                                ..............          53,348  ..............          53,348  ..............  ..............
  49 E-8                                                ..............           6,244  ..............           6,244  ..............  ..............
  50 AIRBORNE WARNING AND CONTROL SYSTEM                ..............         223,427  ..............         223,427  ..............  ..............
  51 FAMILY OF BEYOND LINE-OF-SIGHT TERMINALS                        3           4,673               3           4,673  ..............  ..............
  52 H-1                                                ..............           9,007  ..............           9,007  ..............  ..............
  54 H-60                                               ..............          91,357  ..............          91,357  ..............  ..............
  55 RQ-4 UAV MODS                                      ..............          32,045  ..............          32,045  ..............  ..............
  56 HC/MC-130 MODIFICATIONS                            ..............          30,767  ..............          30,767  ..............  ..............
  57 OTHER AIRCRAFT                                     ..............          33,886  ..............          33,886  ..............  ..............
  59 MQ-9 MODS                                          ..............         141,929  ..............         137,300  ..............          -4,629
  60 CV-22 MODS                                         ..............          63,395  ..............          63,395  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, MODIFICATION OF INSERVICE AIRCRAFT    ..............       2,504,954  ..............       2,434,945  ..............         -70,009
 
     AIRCRAFT SPARES AND REPAIR PARTS
  61 INITIAL SPARES/REPAIR PARTS                        ..............         686,491  ..............         686,491  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT SPARES AND REPAIR PARTS      ..............         686,491  ..............         686,491  ..............  ..............
 
     AIRCRAFT SUPPORT EQUIPMENT AND FACILITIES
 
     COMMON SUPPORT EQUIPMENT
  62 AIRCRAFT REPLACEMENT SUPPORT EQUIP                 ..............         121,935  ..............          48,935  ..............         -73,000
 
     POST PRODUCTION SUPPORT
  63 B-2A                                               ..............             154  ..............             154  ..............  ..............
  64 B-2A                                               ..............          43,330  ..............          39,330  ..............          -4,000
  65 B-52                                               ..............          28,125  ..............          28,125  ..............  ..............
  66 C-17A                                              ..............          23,559  ..............           8,559  ..............         -15,000
  69 F-15 POST PRODUCTION SUPPORT                       ..............           2,980  ..............           2,980  ..............  ..............
  70 F-16 POST PRODUCTION SUPPORT                       ..............          15,155  ..............           2,955  ..............         -12,200
  71 F-22A                                              ..............          48,505  ..............          48,505  ..............  ..............
  74 RQ-4 POST PRODUCTION CHARGES                       ..............              99  ..............              99  ..............  ..............
 
     INDUSTRIAL PREPAREDNESS
  75 INDUSTRIAL PREPAREDNESS                            ..............          14,126  ..............          14,126  ..............  ..............
 
     WAR CONSUMABLES
  76 WAR CONSUMABLES                                    ..............         120,036  ..............         120,036  ..............  ..............
 
     OTHER PRODUCTION CHARGES
  77 OTHER PRODUCTION CHARGES                           ..............       1,252,824  ..............       1,198,924  ..............         -53,900
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT SUPPORT EQUIPMENT AND        ..............       1,670,828  ..............       1,512,728  ..............        -158,100
            FACILITIES
 
     CLASSIFIED PROGRAMS                                ..............          16,952  ..............          16,952  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT PROCUREMENT, AIR FORCE       ..............      13,922,917  ..............      13,667,822  ..............        -255,095
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
 Line                             Item                              2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
    1 F-35                                                           4,401,894       3,983,894        -418,000
          Improving funds management: Prior year carryover      ..............  ..............        -259,000
          Improving funds management: Unit cost growth          ..............  ..............        -159,000
    2 F-35--AP                                                         404,500         504,500        +100,000
          Program increase: Restore advance procurement for FY  ..............  ..............        +100,000
           2018 aircraft
    4 C-130J                                                           145,655         305,655        +160,000
          Program increase: Additional 2 aircraft               ..............  ..............        +160,000
    8 MC-130J                                                          548,358         499,358         -49,000
          Maintain program affordability: Excess due to         ..............  ..............         -49,000
           multiyear savings
   10 UUH-1N Replacement                                                18,337          93,337         +75,000
          Program increase                                      ..............  ..............         +75,000
   12 Civil Air Patrol A/C                                               2,637          10,400          +7,763
          Program increase                                      ..............  ..............          +7,763
   14 RQ-4                                                              12,966           7,217          -5,749
          Maintain program affordability: Excess other          ..............  ..............          -5,749
           production support
  15x Compass Call                                              ..............         103,000        +103,000
          Program increase                                      ..............  ..............        +103,000
   21 F-15                                                             105,685         145,405         +39,720
          Restoring acquisition accountability: Cost            ..............  ..............          -5,280
           efficiencies
          F-15E AESA radars                                     ..............  ..............         +45,000
   23 F-22A                                                            163,008         127,008         -36,000
          Restoring acquisition accountability: RAMMP kits      ..............  ..............         -36,000
           unit cost growth
   24 F-35 Modifications                                               175,811         115,811         -60,000
          Improving funds management: Prior year carryover      ..............  ..............         -60,000
   25 Increment 3.2b                                                    76,410          70,410          -6,000
          Maintain program affordability: Program management    ..............  ..............          -6,000
           growth
   29 C-17A                                                             21,555          17,455          -4,100
          Maintain program affordability: Program management    ..............  ..............          -4,100
           growth
   31 C-32A                                                             35,235          30,235          -5,000
          Improving funds management: Prior year carryover      ..............  ..............          -5,000
   35 T-1                                                               25,073          17,073          -8,000
          Restoring acquisition accountability: Contract award  ..............  ..............          -8,000
           delay
   37 U-2 Mods                                                          36,074          25,074         -11,000
          Restoring acquisition accountability: Unit cost       ..............  ..............         -11,000
           growth
   42 C-130                                                              9,168          34,168         +25,000
          Program increase: C-130H modernization                ..............  ..............         +25,000
   59 MQ-9 Mods                                                        141,929         137,300          -4,629
          Maintain program affordability: Unjustified request   ..............  ..............         -24,629
          Program increase: Wide-area sensors                   ..............  ..............         +20,000
   62 Aircraft Replacement Support Equip                               121,935          48,935         -73,000
          Maintain program affordability: Unjustified request   ..............  ..............         -73,000
   64 B-2a                                                              43,330          39,330          -4,000
          Maintain program affordability: Unjustified Interim   ..............  ..............          -4,000
           Contractor Support growth
   66 C-17A                                                             23,559           8,559         -15,000
          Improving funds management: Prior year carryover      ..............  ..............         -15,000
   70 F-16                                                              15,155           2,955         -12,200
          Maintain program affordability: Excess production     ..............  ..............         -12,200
           line shut down costs
   77 Other Production Charges                                       1,252,824       1,198,924         -53,900
          Improving funds management: Prior year carryover for  ..............  ..............         -34,000
           unclassified programs
          Transfer: To Research, Development, Test and          ..............  ..............         -19,900
           Evaluation, Air Force Classified Programs Line #999
----------------------------------------------------------------------------------------------------------------

    KC-46 Tanker.--The Committee supports the budget request of 
$2,884,591,000 to procure 15 KC-46 Tanker aircraft; however, 
the Committee is concerned with several aspects of the program.
    First, the fiscal year 2017 request was originally planned 
to be the first year of full rate production with a maximum 
production quantity of 15 aircraft per year, requiring approval 
from the Under Secretary of Defense for Acquisition, 
Technology, and Logistics [AT&L;]. Unfortunately, the full rate 
production decision has been delayed and the fiscal year 2017 
aircraft buy was downgraded to a low rate initial buy at the 
same quantity but without a formal review by AT&L.;
    Second, the program has only completed roughly 20 percent 
of development flight test and recently identified a critical 
issue with the refueling boom. The Air Force is still 
performing testing to determine if the solution requires 
software or hardware changes, or both.
    Third, the Committee is concerned with the numerous delays 
in key milestones. Specifically, the approval to begin 
production (milestone C) has slipped 10-11 months; initial 
operational test and evaluation has slipped 11 months; and 
delivery of the first aircraft has slipped 9 months. The 
current schedule indicates that all of these milestones are now 
projected to occur near the contractually established delivery 
dates leaving little schedule margin to meet the required 
assets availability requirement of August 2018.
    The Committee fully funds the fiscal year 2017 budget 
request to maintain the acquisition strategy, with concerns 
noted above, and directs Secretary of the Air Force to continue 
providing quarterly program updates.
    UH-1 Replacement.--The Committee recognizes the urgent need 
to replace the current Air Force fleet of UH-1N aircraft 
supporting the emergency response mission of the 
intercontinental ballistic missile [ICBM] sites. Therefore, the 
Committee recommends $75,000,000 for the Air Force and directs 
the Air Force to expedite procurement of replacement aircraft 
in compliance with 10 U.S.C. 2304.
    Additionally, the Committee directs the Commander of the 
United States Strategic Command [USSTRATCOM], not later than 30 
days after the date of enactment of this act, to submit a 
classified report to the congressional defense committees that 
includes (1) a description of potential threats to the security 
of ICBM sites as a result of the UH-1N not meeting current 
mission requirements; (2) a list of helicopter capabilities 
needed to meet current mission requirements; (3) the minimum 
number of aircraft needed for emergency response mission; and 
(4) an assessment of the security risks associated with any 
shortfalls identified.
    Therefore, until the UH-1N aircraft supporting the ICBM 
sites are replaced, the Committee directs the Secretary of 
Defense, in coordination with the Secretary of the Air Force, 
Secretary of the Army, and the Chairman of the Joint Chiefs of 
Staff, to mitigate the air support security risks with 
additional air support. Further, the Committee directs the 
Secretary of Defense, not later than 180 days after the date of 
enactment of this act, to submit a report, with certification 
from the Commander, USSTRATCOM, that the security risk 
mitigation actions taken do effectively address the shortfalls 
identified by the report from USSTRATCOM.
    Compass Call.--In fiscal year 2016, the Air Force requested 
to retire six Compass Call aircraft. Due to the unique and high 
demand capability that the Compass Call aircraft provide, the 
Committee directed the Air Force to maintain the entire fleet. 
Recently, the Air Force revised the operating requirements of 
the Compass Call aircraft and submitted a proposal that would 
begin procurement of new aircraft onto which the current 
equipment would be re-hosted. Because the Committee supports 
the Compass Call mission and acknowledges the fact that the 
current aircraft are expensive to operate and do not meet the 
revised operating requirements, in fiscal year 2017 the 
Committee recommends $103,000,000 and directs the Air Force to 
expedite procurement of new aircraft in compliance with 10 U.S. 
Code 2304.
    F-22 Modernization.--The Committee recognizes the increased 
operational use of the F-22 Raptor and notes that the Air Force 
is challenged to balance the operational demands and training 
needs for this platform. Currently, the Air Force retains 31 F-
22 Raptors at Tyndall Air Force for pilot training. The 
Committee believes that, if the need were to arise, these 
training aircraft could be used to supplement the combat fleet 
for operational missions. However, the Committee is concerned 
that the Air Force is not updating the training fleet with the 
same capability as the operational fleet. Therefore, the 
Committee directs the Secretary of the Air Force to provide to 
the congressional defense committees, not later than 120 days 
after enactment of this act, an analysis of the cost and 
schedule required to rapidly modernize the 31 remaining Block 
20 training F-22 Raptor aircraft based at Tyndall Air Force 
Base up to the full Increment 3.2B combat configuration.
    Joint Surveillance Target Attack Radar System [JSTARS].--
The Committee supports the JSTARS recapitalization program, an 
essential warfighting capability. The Committee expects the Air 
Force will take no action to prematurely retire E-8C aircraft 
until the new capability delivers. Accordingly, the Committee 
directs the Secretary of the Air Force to fund all necessary 
modifications of the E-8C fleet and maintain all E-8C aircraft 
in a common configuration to support world-wide missions, avoid 
the degradation of mission performance, and meet combatant 
commander requirements.
    National Guard Air Superiority Mission.--The Committee 
recognizes the benefit to the U.S. Northern Command combatant 
commander, responsible for homeland defense, to have access to 
lethal air superiority aircraft that are able to perform the 
air superiority mission for extended periods of time, with only 
limited air refueling assets. The Committee encourages the Air 
Force to review the benefits and costs of fully equipping Air 
National Guard F-15C/D aircraft with conformal fuel tanks and 
additional weapons stations to enhance homeland defense 
capability.

                     Missile Procurement, Air Force

Appropriations, 2016....................................  $2,912,131,000
Budget estimate, 2017...................................   2,426,621,000
Committee recommendation................................   2,408,769,000

    The Committee recommends an appropriation of 
$2,408,769,000. This is $17,852,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
               MISSILE PROCUREMENT, AIR FORCE
 
     BALLISTIC MISSILES
 
     MISSILE REPLACEMENT EQUIPMENT--BALLISTIC
   1 MISSILE REPLACEMENT EQ-BALLISTIC                   ..............          70,247  ..............          70,247  ..............  ..............
 
     OTHER MISSILES
 
     TACTICAL
   2 JOINT AIR-SURFACE STANDOFF MISSILE [JASSM]                    360         431,645             360         431,645  ..............  ..............
   3 LONG RANGE ANTI-SHIP MISSILE (LRASMO)                          20          59,511              20          59,511  ..............  ..............
   4 SIDEWINDER (AIM-9X)                                           287         127,438             287         127,438  ..............  ..............
   5 AMRAAM                                                        256         350,144             256         339,392  ..............         -10,752
   6 PREDATOR HELLFIRE MISSILE                                     284          33,955             284          33,955  ..............  ..............
   7 SMALL DIAMETER BOMB                                           312          92,361             312          92,361  ..............  ..............
 
     INDUSTRIAL FACILITIES
   8 INDUSTRIAL PREPAREDNESS/POLLUTION PREVENTION       ..............             977  ..............             977  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER MISSILES                        ..............       1,096,031  ..............       1,085,279  ..............         -10,752
 
     MODIFICATION OF INSERVICE MISSILES
 
     CLASS IV
   9 ICBM FUZE MOD                                      ..............          17,095  ..............          17,095  ..............  ..............
  10 MM III MODIFICATIONS                               ..............          68,692  ..............          68,692  ..............  ..............
  11 AGM-65D MAVERICK                                   ..............             282  ..............             282  ..............  ..............
  13 AIR LAUNCH CRUISE MISSILE                          ..............          21,762  ..............          21,762  ..............  ..............
  14 SMALL DIAMETER BOMB                                ..............          15,349  ..............          15,349  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, MODIFICATION OF INSERVICE MISSILES    ..............         123,180  ..............         123,180  ..............  ..............
 
     SPARES AND REPAIR PARTS
  15 INITIAL SPARES/REPAIR PARTS                        ..............          81,607  ..............          81,607  ..............  ..............
 
     SPECIAL PROGRAMS
  30 SPECIAL UPDATE PROGRAMS                            ..............          46,125  ..............          46,125  ..............  ..............
 999 CLASSIFIED PROGRAMS                                ..............       1,009,431  ..............       1,002,331  ..............          -7,100
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, MISSILE PROCUREMENT, AIR FORCE        ..............       2,426,621  ..............       2,408,769  ..............         -17,852
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
 Line                             Item                              2017 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
    5 AMRAAM                                                           350,144         339,392         -10,752
          Restoring acquisition accountability: Unit cost       ..............  ..............         -10,752
           growth
  999 Classified Programs                                            1,009,431       1,002,331          -7,100
          Classified adjustment                                 ..............  ..............          -7,100
----------------------------------------------------------------------------------------------------------------

                      Space Procurement, Air Force

Appropriations, 2016....................................  $2,812,159,000
Budget estimate, 2017...................................   3,055,743,000
Committee recommendation................................   2,527,743,000

    The Committee recommends an appropriation of 
$2,527,743,000. This is $528,000,000 below the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
                SPACE PROCUREMENT, AIR FORCE
 
     SPACE PROGRAMS
   1 ADVANCED EHF                                       ..............         645,569  ..............         645,569  ..............  ..............
   2 AF SATELLITE COMM SYSTEM                           ..............          42,375  ..............          42,375  ..............  ..............
   3 COUNTERSPACE SYSTEMS                               ..............          26,984  ..............          26,984  ..............  ..............
   4 FAMILY OF BEYOND LINE-OF-SIGHT TERMINALS                       16          88,963              16          88,963  ..............  ..............
   5 WIDEBAND GAPFILLER SATELLITES                      ..............          86,272  ..............          76,272  ..............         -10,000
   6 GPS III SPACE SEGMENT                              ..............          34,059  ..............          34,059  ..............  ..............
   7 GLOBAL POSITIONING (SPACE)                         ..............           2,169  ..............           2,169  ..............  ..............
   8 SPACEBORNE EQUIP (COMSEC)                          ..............          46,708  ..............          46,708  ..............  ..............
   9 GLOBAL POSITIONING (SPACE)                         ..............          13,171  ..............          10,171  ..............          -3,000
  10 MILSATCOM                                          ..............          41,799  ..............          41,799  ..............  ..............
  11 EVOLVED EXPENDABLE LAUNCH VEH INFRASTRUCTURE       ..............         768,586  ..............         568,586  ..............        -200,000
      (SPACE)
  12 EVOLVED EXPENDABLE LAUNCH VEH (SPACE)                           5         737,853               3         442,853              -2        -295,000
  13 SBIR HIGH (SPACE)                                  ..............         362,504  ..............         342,504  ..............         -20,000
  14 NUDET DETECTION SYSTEM SPACE                       ..............           4,395  ..............           4,395  ..............  ..............
  15 SPACE MODS SPACE                                   ..............           8,642  ..............           8,642  ..............  ..............
  16 SPACELIFT RANGE SYSTEM SPACE                       ..............         123,088  ..............         123,088  ..............  ..............
 
     SPARES AND REPAIR PARTS
  17 INITIAL SPARES/REPAIR PARTS                        ..............          22,606  ..............          22,606  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, SPACE PROCUREMENT, AIR FORCE          ..............       3,055,743  ..............       2,527,743  ..............        -528,000
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    5 Wideband                  86,272          76,272         -10,000
       Gapfiller
       Satellites
       (Space)
          Improving     ..............  ..............         -10,000
           funds
           management:
           Prior year
           carryover
    9 Global                    13,171          10,171          -3,000
       Positioning
       (Space)
          Maintain      ..............  ..............          -3,000
           program
           affordabili
           ty:
           Unjustified
           support
           services
           and launch
           and
           checkout
           growth
   11 Evolved                  768,586         568,586        -200,000
       Expendable
       Launch
       Capability
          Restoring     ..............  ..............        -200,000
           acquisition
           accountabil
           ity:
           Acquisition
           Strategy
   12 Evolved                  737,853         442,853        -295,000
       Expendable
       Launch Veh
       (Space)
          Restoring     ..............  ..............        -295,000
           acquisition
           accountabil
           ity:
           Acquisition
           Strategy
   13 SBIR (High)              362,504         342,504         -20,000
       Space
          Improving     ..............  ..............         -20,000
           funds
           management:
           Prior year
           carryover
------------------------------------------------------------------------

    Evolved Expendable Launch Vehicle.--The fiscal year 2017 
budget requests $1,506,439,000 for the Evolved Expendable 
Launch Vehicle [EELV] program: $737,853,000 for launch services 
and $768,586,000 for launch capability. In the Department of 
Defense Appropriations Act, 2016 (Public Law 114-113), Congress 
expressed concern with the Air Force's 2016 budget request that 
accelerated GPS III launches ahead of the plan laid out in the 
2015 budget request. Congress noted concerns that delays in the 
Operational Control Segment [OCX] ground system that is needed 
to launch, checkout, and ultimately integrate and operate the 
GPS III satellites with the legacy GPS architecture will not be 
ready for many years after the Air Force plans to launch 
several of the GPS III satellites. Furthermore, the Department 
of Defense has been unable to provide Congress with a 
validation of the requirements for accelerating GPS III 
launches ahead of the 2015 schedule as required in the 2016 
Act.
    Despite these concerns and additional delays in the OCX 
system, the 2017 budget request outlines a plan to launch six 
satellites before 2019, the earliest the Air Force expects to 
have a Contingency Operations [COps] solution that would enable 
operation of the GPS III satellites in the constellation. The 
Director, Operational Test and Evaluation [DOT&E;] noted in a 
January 2016 memorandum to the Secretary of Defense, however, 
that the proposed COps schedule is ``grossly optimistic and 
unrealistic.'' Additionally, the Air Force plans to launch 
another three GPS III satellites before the end of 2021. The 
Committee sees no justification for launching so many 
satellites without a system in place to operate them.
    The Committee, therefore, recommends a reduction of 
$295,000,000 in the EELV program for two GPS III launch 
services in 2017 which are ahead of need. In addition, the 
Committee recommends a reduction of $200,000,000 for EELV 
launch capability for those launches and two launches in 2016 
that will not be awarded due to congressional termination of 
one launch in the Department of Defense Appropriations Act, 
2016 (Public Law 114-113) and an Air Force movement of the 
other launch award to an earlier fiscal year. Finally, the 
Committee recommends a rescission of $157,000,000 for the 2016 
EELV launch service which the Air Force moved to an earlier 
award date, but for which funding remained in the fiscal year 
2016 budget.

                  Procurement of Ammunition, Air Force

Appropriations, 2016....................................  $1,744,993,000
Budget estimate, 2017...................................   1,677,719,000
Committee recommendation................................   1,665,219,000

    The Committee recommends an appropriation of 
$1,665,219,000. This is $12,500,000 below the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
            PROCUREMENT OF AMMUNITION, AIR FORCE
 
     PROCUREMENT OF AMMO, AIR FORCE
   1 ROCKETS                                            ..............          18,734  ..............          18,734  ..............  ..............
   2 CARTRIDGES                                         ..............         220,237  ..............         220,237  ..............  ..............
 
     BOMBS
   3 PRACTICE BOMBS                                     ..............          97,106  ..............          97,106  ..............  ..............
   4 GENERAL PURPOSE BOMBS                              ..............         581,561  ..............         581,561  ..............  ..............
   5 MASSIVE ORDNANCE PENETRATOR (MOP)                  ..............           3,600  ..............           3,600  ..............  ..............
   6 JOINT DIRECT ATTACK MUNITION                               12,133         303,988          12,133         291,488  ..............         -12,500
 
     FLARE, IR MJU-7B
   7 CAD/PAD                                            ..............          38,890  ..............          38,890  ..............  ..............
   8 EXPLOSIVE ORDNANCE DISPOSAL [EOD]                  ..............           5,714  ..............           5,714  ..............  ..............
   9 SPARES AND REPAIR PARTS                            ..............             740  ..............             740  ..............  ..............
  10 MODIFICATIONS                                      ..............             573  ..............             573  ..............  ..............
  11 ITEMS LESS THAN $5,000,000                         ..............           5,156  ..............           5,156  ..............  ..............
 
     FUZES
  12 FLARES                                             ..............         134,709  ..............         134,709  ..............  ..............
  13 FUZES                                              ..............         229,252  ..............         229,252  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT OF AMMO, AIR FORCE        ..............       1,640,260  ..............       1,627,760  ..............         -12,500
 
     WEAPONS
  14 SMALL ARMS                                         ..............          37,459  ..............          37,459  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT OF AMMUNITION, AIR FORCE  ..............       1,677,719  ..............       1,665,219  ..............         -12,500
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    6 Joint Direct             303,988         291,488         -12,500
       Attack Munition
          Restoring     ..............  ..............         -12,500
           acquisition
           accountabil
           ity: Unit
           cost
           pricing
           adjustment
------------------------------------------------------------------------

                      Other Procurement, Air Force

Appropriations, 2016.................................... $18,311,882,000
Budget estimate, 2017...................................  17,438,056,000
Committee recommendation................................  17,503,191,000

    The Committee recommends an appropriation of 
$17,503,191,000. This is $65,135,000 above the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
                OTHER PROCUREMENT, AIR FORCE
 
     VEHICULAR EQUIPMENT
 
     PASSENGER CARRYING VEHICLES
   1 PASSENGER CARRYING VEHICLE                         ..............          14,437  ..............          11,437  ..............          -3,000
 
     CARGO + UTILITY VEHICLES
   2 FAMILY MEDIUM TACTICAL VEHICLE                     ..............          24,812  ..............          16,812  ..............          -8,000
   3 CAP VEHICLES                                       ..............             984  ..............           1,700  ..............            +716
   4 ITEMS LESS THAN $5M (CARGO)                        ..............          11,191  ..............           7,191  ..............          -4,000
 
     SPECIAL PURPOSE VEHICLES
   5 SECURITY AND TACTICAL VEHICLES                     ..............           5,361  ..............           5,361  ..............  ..............
   6 ITEMS LESS THAN $5M (SPECIAl)                      ..............           4,623  ..............           4,623  ..............  ..............
 
     FIRE FIGHTING EQUIPMENT
   7 FIRE FIGHTING/CRASH RESCUE VEHICLES                ..............          12,451  ..............          12,451  ..............  ..............
 
     MATERIALS HANDLING EQUIPMENT
   8 ITEMS LESS THAT $5,000,000                         ..............          18,114  ..............          18,114  ..............  ..............
 
     BASE MAINTENANCE SUPPORT
   9 RUNWAY SNOW REMOVAL & CLEANING EQUIP               ..............           2,310  ..............           2,310  ..............  ..............
  10 ITEMS LESS THAN $5M                                ..............          46,868  ..............          46,868  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, VEHICULAR EQUIPMENT                   ..............         141,151  ..............         126,867  ..............         -14,284
 
     ELECTRONICS AND TELECOMMUNICATIONS EQUIP
 
     COMM SECURITY EQUIPMENT(COMSEC)
  12 COMSEC EQUIPMENT                                   ..............          72,359  ..............          84,359  ..............         +12,000
 
     INTELLIGENCE PROGRAMS
  14 INTELLIGENCE TRAINING EQUIPMENT                    ..............           6,982  ..............           6,982  ..............  ..............
  15 INTELLIGENCE COMM EQUIP                            ..............          30,504  ..............          30,504  ..............  ..............
 
     ELECTRONICS PROGRAMS
  16 TRAFFIC CONTROL/LANDING                            ..............          55,803  ..............          49,403  ..............          -6,400
  17 NATIONAL AIRSPACE SYSTEM                           ..............           2,673  ..............           2,673  ..............  ..............
  18 BATTLE CONTROL SYSTEM--FIXED                       ..............           5,677  ..............           5,677  ..............  ..............
  19 THEATER AIR CONTROL SYS IMPRO                      ..............           1,163  ..............           1,163  ..............  ..............
  20 WEATHER OBSERVATION FORECAST                       ..............          21,667  ..............          21,667  ..............  ..............
  21 STRATEGIC COMMAND AND CONTROL                      ..............          39,803  ..............          19,903  ..............         -19,900
  22 CHEYENNE MOUNTAIN COMPLEX                          ..............          24,618  ..............          24,618  ..............  ..............
  23 MISSION PLANNING SYSTEMS                           ..............          15,868  ..............          15,868  ..............  ..............
  25 INTEGRATED STRAT PLAN AND ANALY NETWORK (ISPAN)    ..............           9,331  ..............           9,331  ..............  ..............
 
     SPECIAL COMM-ELECTRONICS PROJECTS
  26 GENERAL INFORMATION TECHNOLOGY                     ..............          41,779  ..............          50,679  ..............          +8,900
  27 AF GLOBAL COMMAND & CONTROL SYSTEM                 ..............          15,729  ..............          15,729  ..............  ..............
  28 MOBILITY COMMAND AND CONTROL                       ..............           9,814  ..............           9,814  ..............  ..............
  29 AIR FORCE PHYSICAL SECURITY SYSTEM                 ..............          99,460  ..............          99,460  ..............  ..............
  30 COMBAT TRAINING RANGES                             ..............          34,850  ..............          34,850  ..............  ..............
  31 MINIMUM ESSENTIAL EMERGENCY COMM N                 ..............         198,925  ..............         198,925  ..............  ..............
  32 WIDE AREA SURVEILLANCE (WAS)                       ..............           6,943  ..............           6,943  ..............  ..............
  33 C3 COUNTERMEASURES                                 ..............          19,580  ..............          19,580  ..............  ..............
  34 GCSS-AF FOS                                        ..............           1,743  ..............           1,743  ..............  ..............
  36 THEATER BATTLE MGT C2 SYS                          ..............           9,659  ..............           9,659  ..............  ..............
  37 AIR AND SPACE OPERATIONS CTR-WPN SYSTEM            ..............          15,474  ..............          15,474  ..............  ..............
  38 AIR OPERATIONS CENTER [AOC]                        ..............          30,623  ..............          15,323  ..............         -15,300
 
     AIR FORCE COMMUNICATIONS
  39 INFORMATION TRANSPORT SYSTEMS                      ..............          40,043  ..............          40,043  ..............  ..............
  40 AFNET                                              ..............         146,897  ..............         131,897  ..............         -15,000
  41 JOINT COMMUNICATIONS SUPPORT ELEMENT (JCSE)        ..............           5,182  ..............           5,182  ..............  ..............
  42 USCENTCOM                                          ..............          13,418  ..............          13,418  ..............  ..............
 
     ORGANIZATION AND BASE
  52 TACTICAL C-E EQUIPMENT                             ..............         109,836  ..............         106,836  ..............          -3,000
  53 RADIO EQUIPMENT                                    ..............          16,266  ..............          16,266  ..............  ..............
  54 CCTV/AUDIOVISUAL EQUIPMENT                         ..............           7,449  ..............           7,449  ..............  ..............
  55 BASE COMM INFRASTRUCTURE                           ..............         109,215  ..............          88,215  ..............         -21,000
 
     MODIFICATIONS
  56 COMM ELECT MODS                                    ..............          65,700  ..............          65,700  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, ELECTRONICS AND TELECOMMUNICATIONS    ..............       1,285,033  ..............       1,225,333  ..............         -59,700
            EQUIP
 
     OTHER BASE MAINTENANCE AND SUPPORT EQUIP
 
     PERSONAL SAFETY AND RESCUE EQUIP
  58 ITEMS LESS THAN $5,000,000 (SAFETY)                ..............          54,416  ..............          46,416  ..............          -8,000
 
     DEPOT PLANT + MATERIALS HANDLING EQ
  59 MECHANIZED MATERIAL HANDLING                       ..............           7,344  ..............           7,344  ..............  ..............
 
     BASE SUPPORT EQUIPMENT
  61 BASE PROCURED EQUIPMENT                            ..............           6,852  ..............           6,852  ..............  ..............
  63 MOBILITY EQUIPMENT                                 ..............           8,146  ..............          13,146  ..............          +5,000
  64 ITEMS LESS THAN $5M (BASE SUPPORT)                 ..............          28,427  ..............          28,427  ..............  ..............
 
     SPECIAL SUPPORT PROJECTS
  66 DARP RC135                                         ..............          25,287  ..............          25,287  ..............  ..............
  67 DISTRIBUTED GROUND SYSTEMS                         ..............         169,201  ..............         169,201  ..............  ..............
  69 SPECIAL UPDATE PROGRAM                             ..............         576,710  ..............         576,710  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER BASE MAINTENANCE AND SUPPORT    ..............         876,383  ..............         873,383  ..............          -3,000
            EQUIP
 
     SPARE AND REPAIR PARTS
  72 SPARES AND REPAIR PARTS                            ..............          15,784  ..............          15,784  ..............  ..............
      CLASSIFIED PROGRAMS                               ..............      15,119,705  ..............      15,261,824  ..............        +142,119
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, OTHER PROCUREMENT, AIR FORCE          ..............      17,438,056  ..............      17,503,191  ..............         +65,135
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2017 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    1 Passenger                 14,437          11,437          -3,000
       Carrying
       Vehicles
          Improving     ..............  ..............          -3,000
           funds
           management:
           Unjustified
           growth
    2 Medium Tactical           24,812          16,812          -8,000
       Vehicle
          Improving     ..............  ..............          -8,000
           funds
           management:
           Unobligated
           balances
    3 Cap Vehicles                 984           1,700            +716
          Program       ..............  ..............            +716
           increase:
           Civil Air
           Patrol--veh
           icles
    4 Items Less Than           11,191           7,191          -4,000
       $5 Million
          Improving     ..............  ..............          -4,000
           funds
           management:
           Unjustified
           growth
   12 Comsec Equipment          72,359          84,359         +12,000
          Program       ..............  ..............         +12,000
           increase:
           Cybersecuri
           ty upgrades
   16 Air Traffic               55,803          49,403          -6,400
       Control &
       Landing Sys
          Restoring     ..............  ..............          -6,400
           acquisition
           accountabil
           ity:
           Schedule
           slips
           (RAPCON)
   21 Strategic                 39,803          19,903         -19,900
       Command And
       Control
          Improving     ..............  ..............         -19,900
           funds
           management:
           Unobligated
           balances
   26 General                   41,779          50,679          +8,900
       Information
       Technology
          Program       ..............  ..............          +8,900
           increase:
           Cybersecuri
           ty training
   38 Air Operations            30,623          15,323         -15,300
       Center [AOC]
       10.2
          Restoring     ..............  ..............         -15,300
           acquisition
           accountabil
           ity:
           Schedule
           slips
   40 AFNET                    146,897         131,897         -15,000
          Improving     ..............  ..............         -15,000
           funds
           management:
           Unobligated
           balances
   52 Tactical C-E             109,836         106,836          -3,000
       Equipment
          Maintain      ..............  ..............          -3,000
           program
           affordabili
           ty:
           Eliminate
           program
           growth
           (TACP-M MCS
           Non-
           Recurring)
   55 Base Comm                109,215          88,215         -21,000
       Infrastructure
          Improving     ..............  ..............         -21,000
           funds
           management:
           Unobligated
           balances
   58 Items Less Than           54,416          46,416          -8,000
       $5 Million
          Improving     ..............  ..............          -8,000
           funds
           management:
           Program
           delays
           (LSS)
   63 Mobility                   8,146          13,146          +5,000
       Equipment
          Other Base    ..............  ..............          +5,000
           Maintenance
           and Support
           Equipment
      Classified            15,119,705      15,261,824        +142,119
       Programs
          Classified    ..............  ..............        +142,119
           adjustment
------------------------------------------------------------------------

                       Procurement, Defense-Wide

Appropriations, 2016....................................  $5,245,443,000
Budget estimate, 2017...................................   4,524,918,000
Committee recommendation................................   4,921,274,000

    The Committee recommends an appropriation of 
$4,921,274,000. This is $396,356,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                 [Dollars in thousands]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2017 budget                      Committee   -------------------------------
Line                         Item                              Qty.          estimate          Qty.       recommendation                      Budget
                                                                                                                               Qty.          estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
                 PROCUREMENT, DEFENSE-WIDE
 
     MAJOR EQUIPMENT
 
     MAJOR EQUIPMENT, DCAA
   1 MAJOR EQUIPMENT ITEMS LESS THAN $5M                ..............           2,964  ..............           2,964  ..............  ..............
 
     MAJOR EQUIPMENT, DCMA
   2 MAJOR EQUIPMENT                                    ..............              92  ..............  ..............  ..............             -92
 
     MAJOR EQUIPMENT, DHRA
   3 PERSONNEL ADMINISTRATION                           ..............          14,232  ..............          14,232  ..............  ..............
 
     MAJOR EQUIPMENT, DISA
   6 INFORMATION SYSTEMS SECURITY                       ..............          21,347  ..............          21,347  ..............  ..............
   7 TELEPORT PROGRAM                                   ..............          50,597  ..............          50,597  ..............  ..............
   8 ITEMS LESS THAN $5M                                ..............          10,420  ..............          10,420  ..............  ..............
   9 NET CENTRIC ENTERPRISE SERVICES [NCES]             ..............           1,634  ..............           1,634  ..............  ..............
  10 DEFENSE INFORMATION SYSTEMS NETWORK                ..............          87,235  ..............          87,235  ..............  ..............
  11 CYBER SECURITY INITIATIVE                          ..............           4,528  ..............           4,528  ..............  ..............
  12 WHITE HOUSE COMMUNICATION AGENCY                   ..............          36,846  ..............          36,846  ..............  ..............
  13 SENIOR LEADERSHIP ENTERPRISE                       ..............         599,391  ..............         599,391  ..............  ..............
  15 JOINT REGIONAL SECURITY STACKS                     ..............         150,221  ..............         150,221  ..............  ..............
 
     MAJOR EQUIPMENT, DLA
  17 MAJOR EQUIPMENT                                    ..............           2,055  ..............           2,055  ..............  ..............
 
     MAJOR EQUIPMENT, DMACT
  18 A--WEAPON SYSTEM COST                                           4           8,060               4           8,060  ..............  ..............
 
     MAJOR EQUIPMENT, DODEA
  19 AUTOMATION/EDUCATIONAL SUPPORT & LOGISTICS         ..............             288  ..............             288  ..............  ..............
 
     MAJOR EQUIPMENT, DSS
  20 MAJOR EQUIPMENT                                    ..............           1,057  ..............           1,057  ..............  ..............
 
     MAJOR EQUIPMENT, DEFENSE THREAT REDUCTION AGENCY
  21 VEHICLES                                           ..............             200  ..............             200  ..............  ..............
  22 OTHER MAJOR EQUIPMENT                              ..............           6,437  ..............           6,437  ..............  ..............
 
     MAJOR EQUIPMENT, MDA
  23 THAAD SYSTEM                                                   24         369,608              24         419,608  ..............         +50,000
  24 AEGIS BMD                                                      35         463,801              35         513,801  ..............         +50,000
  25 BMDS AN/TPY-2 RADARS                               ..............           5,503  ..............           5,503  ..............  ..............
  26 ARROW WEAPON SYSTEM CO-PRODUCTION                  ..............  ..............  ..............         120,000  ..............        +120,000
  27 DAVID'S SLING WEAPON SYSTEM CO-PRODUCTION          ..............  ..............  ..............         150,000  ..............        +150,000
  28 AEGIS ASHORE PHASE III                             ..............          57,493  ..............          57,493  ..............  ..............
  29 IRON DOME SYSTEM CO-PRODUCTION                     ..............          42,000  ..............          62,000  ..............         +20,000
  30 AEGIS BMD HARDWARE AND SOFTWARE                    ..............          50,098  ..............          50,098  ..............  ..............
 
     REDESIGNED KILL VEHICLE-AP                         ..............  ..............  ..............          50,000  ..............         +50,000
 
     MAJOR EQUIPMENT, NSA
  36 INFORMATION SYSTEMS SECURITY PROGRAM [ISSP]        ..............           4,399  ..............           4,399  ..............  ..............
 
     MAJOR EQUIPMENT, OSD
  37 MAJOR EQUIPMENT, OSD                                           39          29,211              39          29,211  ..............  ..............
 
     MAJOR EQUIPMENT, TJS
  38 MAJOR EQUIPMENT, TJS                               ..............           7,988  ..............           7,988  ..............  ..............
 
     MAJOR EQUIPMENT, WHS
  40 MAJOR EQUIPMENT, WHS                               ..............          24,979  ..............          24,979  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, MAJOR EQUIPMENT                       ..............       2,052,684  ..............       2,492,592  ..............        +439,908
 
     SPECIAL OPERATIONS COMMAND
 
     AVIATION PROGRAMS
  42 SOF ROTARY WING UPGRADES AND SUSTAINMENT           ..............         150,396  ..............         150,396  ..............  ..............
  43 UNMANNED ISR                                       ..............          21,190  ..............          21,190  ..............  ..............
  45 NON-STANDARD AVIATION                              ..............           4,905  ..............           4,905  ..............  ..............
  46 SOF U-28                                           ..............           3,970  ..............           3,970  ..............  ..............
  47 MH-47 CHINOOK                                      ..............          25,022  ..............          25,022  ..............  ..............
  49 CV-22 SOF MODIFICATION                             ..............          19,008  ..............          19,008  ..............  ..............
  51 MQ-9 UNMANNED AERIAL VEHICLE                       ..............          10,598  ..............          10,598  ..............  ..............
  53 PRECISION STRIKE PACKAGE                           ..............         213,122  ..............         200,072  ..............         -13,050
  54 AC/MC-130J                                         ..............          73,548  ..............          76,598  ..............          +3,050
  55 C-130 MODIFICATIONS                                ..............          32,970  ..............          32,970  ..............  ..............
 
     SHIPBUILDING
  56 UNDERWATER SYSTEMS                                 ..............          37,098  ..............          37,098  ..............  ..............
 
     AMMUNITION PROGRAMS
  57 SOF ORDNANCE ITEMS UNDER $5,000,000                ..............         105,267  ..............         105,267  ..............  ..............
 
     OTHER PROCUREMENT PROGRAMS
  58 SOF INTELLIGENCE SYSTEMS                           ..............          79,963  ..............          79,963  ..............  ..............
  59 DCGS-SOF                                           ..............          13,432  ..............          13,432  ..............  ..............
  60 OTHER ITEMS UNDER $5,000,000                       ..............          66,436  ..............          66,436  ..............  ..............
  61 SOF COMBATANT CRAFT SYSTEMS                        ..............          55,820  ..............          55,820  ..............  ..............
  62 SPECIAL PROGRAMS                                   ..............         107,432  ..............         107,432  ..............  ..............
  63 TACTICAL VEHICLES                                  ..............          67,849  ..............          67,849  ..............  ..............
  64 WARRIOR SYSTEMS UNDER $5,000,000                   ..............         245,781  ..............         245,781  ..............  ..............
  65 COMBAT MISSION REQUIREMENTS                        ..............          19,566  ..............          19,566  ..............  ..............
  66 SOF GLOBAL VIDEO SURVEILLANCE ACTIVITIES           ..............           3,437  ..............           3,437  ..............  ..............
  67 SOF OPERATIONAL ENHANCEMENTS INTELLIGENCE          ..............          17,299  ..............          17,299  ..............  ..............
  69 SOF OPERATIONAL ENHANCEMENTS                       ..............         219,945  ..............         224,393  ..............          +4,448
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, SPECIAL OPERATIONS COMMAND            ..............       1,594,054  ..............       1,588,502  ..............          -5,552
 
     CHEMICAL/BIOLOGICAL DEFENSE
  70 CHEMICAL BIOLOGICAL SITUATIONAL AWARENESS          ..............         148,203  ..............         148,203  ..............  ..............
  71 CB PROTECTION AND HAZARD MITIGATION                ..............         161,113  ..............         161,113  ..............  ..............
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, CHEMICAL/BIOLOGICAL DEFENSE           ..............         309,316  ..............         309,316  ..............  ..............
 
      CLASSIFIED PROGRAMS                               ..............         568,864  ..............         530,864  ..............         -38,000
                                                       -------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT, DEFENSE-WIDE             ..............       4,524,918  ..............       4,921,274  ..............        +396,356
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 2017 budget       Committee       Change from
Line                            Item                               estimate      recommendation  budget estimate
----------------------------------------------------------------------------------------------------------------
   2 Major Equipment                                                      92  ...............              -92
         Budget documentation disparity: Ahead of need       ...............  ...............              -92
  23 THAAD                                                           369,608          419,608          +50,000
         Program increase: Obsolescence upgrades             ...............  ...............          +50,000
  24 Aegis BMD                                                       463,801          513,801          +50,000
         Program increase: Obsolescence upgrades             ...............  ...............          +50,000
  26 Arrow Upper Tier                                        ...............          120,000         +120,000
         Increase for Arrow 3 co-production upper tier       ...............  ...............         +120,000
          interceptor program
  27 David's Sling                                           ...............          150,000         +150,000
         Increase for David Sling's co-production program    ...............  ...............         +150,000
  29 Iron Dome                                                        42,000           62,000          +20,000
         Increase for Iron Dome co-production                ...............  ...............          +20,000
  XX Redesigned Kill Vehicle--AP                             ...............           50,000          +50,000
         RKV long lead materials only                        ...............  ...............          +50,000
     Classified Programs                                             568,864          530,864          -38,000
         Classified adjustment                               ...............  ...............          -38,000
  53 Precision Strike Package                                        213,122          200,072          -13,050
         Transfer Precision Strike Package: SOCOM requested  ...............  ...............          -13,050
          to PDW Line #54 AC/MC-130J
  54 AC/MC-130J                                                       73,548           76,598           +3,050
         Transfer Precision Strike Package: SOCOM requested  ...............  ...............          +13,050
          from PDW Line #53 Precision Strike Package
         Improving funds management: Program delays (MC-     ...............  ...............          -10,000
          130J)